NOTICE OF PUBLIC HEARING
NOTICE OF PUBLIC HEARING ON PROJECT MANUAL
AND ESTIMATED COST FOR THE BURLINGTON AND
MADISON INTERSECTION IMPROVEMENTS PROJECT
(NHSX-001-5(120)--3H-52) PROJECT IN THE CITY OF
IOWA CITY, IOWA
TO ALL TAXPAYERS OF THE CITY OF IOWA CITY
IOWA, AND TO OTHER INTERESTED PERSONS:
Public notice is hereby given that the City Council of the
City of Iowa City, Iowa, will conduct a public hearing on the
Project Manual, including the plans, specifications, contract,
and estimated cost for the construction of the Burlington And
Madison Intersection Improvements Project (NHSX-001-
5(120)--3H-52) in said city at 7:00 p.m. on the 4th day of
November, 2019, said meeting to be held in the Emma J.
Harvat Hall in the City Hall, 410 East Washington Street in
said city, or if said meeting is cancelled, at the next meeting
of the City Council thereafter as posted by the City Clerk.
This project includes the widening of Burlington Street
from Madison Street to Front Street to include continuous
buffered bike lanes from Madison Street to Riverside Drive.
The project also includes an asphalt overlay from Capitol
Street to Front Street, and traffic signal and pedestrian
signal improvements, ADA sidewalk improvements, and
public utility improvements at the Burlington Street and
Madison Street intersection and is located in the City of Iowa
City from Capitol Street to Riverside Drive.
Said Project Manual and estimated cost are now on file
in the office of the City Clerk in the City Hall in Iowa City,
Iowa, and may be inspected by any interested persons.
Any interested persons may appear at said meeting of
the City Council for the purpose of making objections to and
comments concerning said Project Manual or the cost of
making said improvement.
This notice is given by order of the City Council of
the City of Iowa City, Iowa and as provided by law.
Kellie K. Fruehling, City Clerk
OCT 16 2019
City Clerk
Iowa City, Iowa
Burlington And Madison Intersection Improvements Project (NHSX-001-5(120)--3H-52) Project 0110—
Page 1 of 1
STAFF PRESENTATION TO FOLLOW:
1 r I
C04;qui h
CITY OF lOVVA CITY
410 East Washington Street
Iowa City, Iowa S2240-1826
(319) 356-5000
(3I9) 356-5009 FAX
www.icgov.org
Burlington and Madison
Intersection Improvements
Project
Background
• Anderson -Bogert designed the Burlington Street Median Project in 2010
• Featured landscaped medians to discourage mid -block pedestrian crossings
Burlington Street Median Project
wdaboa Map Index
FOR REVIEW
ONLY
ACCENT
PLANTINGS, TYP
MEDIAN
TREE, TYP.
Ik^0 I 6J :11117.1 y 93IJ!V14"1 NO
PRIMARY GATEWAY
ELEMENT
GREENSPACE
-RLLOCATLD SIDEWALK
AND PLDESTRIAN FENCE
LANDSCAPED
MEDIAN
PRDPOSED
UNIVERSITY OF IOWA
REC CENTER
Current Project
• Original design evaluated and redesigned by Anderson -Bogert to meet current standards
• Includes pavement widening from Madison Street to Front Street
• Continuous buffered bike lanes from Madison Street to Riverside Drive
• Signalization and ADA sidewalk improvements at Burlington/Madison Intersection
Current Project
BURLINGTON ST
7
1r
guRliNGTON Si
s Ob
.A 1
IN
Project Coordination
Madison Street 4 -lane to 3 -lane Conversion
University of Iowa Project
• Stanley Art Museum —Present to Spring 2021
• Old Capitol Steam Tunnel Project — Spring 2020 to Fall 2021
• Communications Center Demolition —Winter 2019
• Power Plant Turbine General Construction — Spring 2020
.,A=UK
. sIN-.-E j�
'
.xoaUIN. Main s.AN—INEA \ --
I S
-LFGEND
2019 [ONSTHuuloN
® n2o coH6lm VIUN
® N2z coN51161 ,A.
Questions?
STAFF PRESENTATION CONCLUDED
� r
rrM as � h
CITY OF IOWA CITY
410 East Washington Strect
Iowa City, Iowa 52240-1826
(3 19) 356-5000
(3 19) 356-5009 FAX
www. icgov. o rg