Loading...
HomeMy WebLinkAbout2019-11-04 Public hearing0110 NOTICE OF PUBLIC HEARING NOTICE OF PUBLIC HEARING ON PROJECT MANUAL AND ESTIMATED COST FOR THE BURLINGTON AND MADISON INTERSECTION IMPROVEMENTS PROJECT (NHSX-001-5(120)--3H-52) PROJECT IN THE CITY OF IOWA CITY, IOWA TO ALL TAXPAYERS OF THE CITY OF IOWA CITY IOWA, AND TO OTHER INTERESTED PERSONS: Public notice is hereby given that the City Council of the City of Iowa City, Iowa, will conduct a public hearing on the Project Manual, including the plans, specifications, contract, and estimated cost for the construction of the Burlington And Madison Intersection Improvements Project (NHSX-001- 5(120)--3H-52) in said city at 7:00 p.m. on the 4th day of November, 2019, said meeting to be held in the Emma J. Harvat Hall in the City Hall, 410 East Washington Street in said city, or if said meeting is cancelled, at the next meeting of the City Council thereafter as posted by the City Clerk. This project includes the widening of Burlington Street from Madison Street to Front Street to include continuous buffered bike lanes from Madison Street to Riverside Drive. The project also includes an asphalt overlay from Capitol Street to Front Street, and traffic signal and pedestrian signal improvements, ADA sidewalk improvements, and public utility improvements at the Burlington Street and Madison Street intersection and is located in the City of Iowa City from Capitol Street to Riverside Drive. Said Project Manual and estimated cost are now on file in the office of the City Clerk in the City Hall in Iowa City, Iowa, and may be inspected by any interested persons. Any interested persons may appear at said meeting of the City Council for the purpose of making objections to and comments concerning said Project Manual or the cost of making said improvement. This notice is given by order of the City Council of the City of Iowa City, Iowa and as provided by law. Kellie K. Fruehling, City Clerk OCT 16 2019 City Clerk Iowa City, Iowa Burlington And Madison Intersection Improvements Project (NHSX-001-5(120)--3H-52) Project 0110— Page 1 of 1 STAFF PRESENTATION TO FOLLOW: 1 r I C04;qui h CITY OF lOVVA CITY 410 East Washington Street Iowa City, Iowa S2240-1826 (319) 356-5000 (3I9) 356-5009 FAX www.icgov.org Burlington and Madison Intersection Improvements Project Background • Anderson -Bogert designed the Burlington Street Median Project in 2010 • Featured landscaped medians to discourage mid -block pedestrian crossings Burlington Street Median Project wdaboa Map Index FOR REVIEW ONLY ACCENT PLANTINGS, TYP MEDIAN TREE, TYP. Ik^0 I 6J :11117.1 y 93IJ!V14"1 NO PRIMARY GATEWAY ELEMENT GREENSPACE -RLLOCATLD SIDEWALK AND PLDESTRIAN FENCE LANDSCAPED MEDIAN PRDPOSED UNIVERSITY OF IOWA REC CENTER Current Project • Original design evaluated and redesigned by Anderson -Bogert to meet current standards • Includes pavement widening from Madison Street to Front Street • Continuous buffered bike lanes from Madison Street to Riverside Drive • Signalization and ADA sidewalk improvements at Burlington/Madison Intersection Current Project BURLINGTON ST 7 1r guRliNGTON Si s Ob .A 1 IN Project Coordination Madison Street 4 -lane to 3 -lane Conversion University of Iowa Project • Stanley Art Museum —Present to Spring 2021 • Old Capitol Steam Tunnel Project — Spring 2020 to Fall 2021 • Communications Center Demolition —Winter 2019 • Power Plant Turbine General Construction — Spring 2020 .,A=UK . sIN-.-E j� ' .xoaUIN. Main s.AN—INEA \ -- I S -LFGEND 2019 [ONSTHuuloN ® n2o coH6lm VIUN ® N2z coN51161 ,A. Questions? STAFF PRESENTATION CONCLUDED � r rrM as � h CITY OF IOWA CITY 410 East Washington Strect Iowa City, Iowa 52240-1826 (3 19) 356-5000 (3 19) 356-5009 FAX www. icgov. o rg