HomeMy WebLinkAbout2015-03-19 Info Packet-.�...._
�OmCITY COUNCIL INFORMATION PACKET
CITY OF IOWA CITY
March 19, 2015
www.icgov.org
IP1 Council Tentative Meeting Schedule
MARCH 23 WORK SESSION
IP2 Work Session Agenda
IP3 Memo from Economic Development Administrator and Coordinator: Selection of preferred
developer for Court / Linn site
IP4 Pending City Council Work Session Topics
MISCELLANEOUS
IPS Memo from City Manager: Economic Development Administrator resignation
IP6 Memo from Asst. City Manager: Coralville Arena Project Update
IP7 Memo from Development Services Coordinator: Unitarian Church property demolition
permit
IP8 Memo from Parks and Recreation Director: Administration of the Farmers Market
IP9 Email from Council Member Botchway: KXIC Schedule — `Your Town' participation
IP10 Email from Council Member Botchway: County anti -wage theft ordinance
IP11 Email from City Manager to Council Member Throgmorton: Comp Plan Amendments
Memorandum from City Manager to Director, Neighborhood and Development Services:
Rezoning request for the College St / Gilbert St property [Distributed as late handout on
3/20/15]
IP12 Email from City Manager: Op-ed on Solar
IP13 Memo from Neighborhood and Development Services Dir.: Housing and Urban
Development (HUD) and Department of Veterans Affairs Supportive Housing Assistance
(VASH) program
IP14 Copy of letter to Kennedy Parkway area households: Removal of Speed Humps on
Kennedy Parkway
IP15 Letter from Mediacom: WGN decision to move from superstation to a cable network
IP16 Copy of press release: Public input sought on Public Access Television (PATV)
CITY COUNCIL INFORMATION PACKET
CITY OF IOWA CITY
March 19, 2015
www.icgov.org
IPI Council Te tative Meeting Schedule
MARCH 23 WORK SESSION
IP2 Work Session Age a
IP3 Memo from Economic velopment Administrator and Coordin or: Selection of preferred
developer for Court / Li site
IP4 Pending City Council Work ession Topics
SCELLANEOUS
IP5 Memo from City Manager: Economic evelopment dministrator resignation
IP6 Memo from Asst. City Manager: Coralvil Arena roject Update
IP7 Memo from Development Services Coordin to . Unitarian Church property demolition
permit
IP8 Memo from Parks and Recreation Director: min tration of the Farmers Market
IP9 Email from Council Member Botchway: IC Schedu —'Your Town' participation
IP10 Email from Council Member Botchway: ounty anti -wag theft ordinance
IP11 Email from City Manager to Council ember Throgmorton: C mp Plan Amendments
IP12 Email from City Manager: Op-ed n Solar
IP13 Memo from Neighborhood nd Development Services Dir.: Housing and Urban
Development (HUD) and De rtment of Veterans Affairs Supporti Housing Assistance
(VASH) program
IP14 Copy of letter to Kenne Parkway area households: Removal of eed Humps on
Kennedy Parkway
IP15 Letter from Mediacom- WGN decision to move from superstation to a cablexn�twork
y
IP16 Copy of press rel se: Public input sought on Public Access Television (PATVj
03-19-15
IN
r
City Council Tentative Meeting Schedule
lI,-,•. *Ag
Subject to change
March 19, 2015
�
- %ANN.
CITY OF IOWA CITY
Date
Time
Meeting
Location
Monday, March 23, 2015
5:00 PM
Work Session Meeting
Emma J. Harvat Hall
7:00 PM
Formal Meeting
Tuesday, April 7, 2015
5:00 PM
Work Session Meeting
Emma J. Harvat Hall
7:00 PM
Formal Meeting
Wednesday, April 15, 2015
5:00 PM
Special Formal Mtg.-Executive Session
Emma J. Harvat Hall
(evaluations Manager, Attorney, Clerk)
Monday, April 20, 2015
4:00 PM
Reception prior to meeting
TBA (Coralville)
4:30 PM
Joint Meeting / Work Session
Tuesday, April 21, 2015
5:00 PM
Work Session Meeting
Emma J. Harvat Hall
7:00 PM
Formal Meeting
Tuesday, May 5, 2015
5:00 PM
Work Session Meeting
Emma J. Harvat Hall
7:00 PM
Formal Meeting
Tuesday, May 19, 2015
5:00 PM
Work Session Meeting
Emma J. Harvat Hall
7:00 PM
Formal Meeting
Tuesday, June 2, 2015
5:00 PM
Work Session Meeting
Emma J. Harvat Hall
7:00 PM
Formal Meeting
Tuesday, June 16, 2015
5:00 PM
Work Session Meeting
Emma J. Harvat Hall
7:00 PM
Formal Meeting
Monday, July 27, 2015
5:00 PM
Work Session Meeting
Emma J. Harvat Hall
7:00 PM
Special Formal Meeting
Tuesday, August 18, 2015
5:00 PM
Work Session Meeting
Emma J. Harvat Hall
7:00 PM
Formal Meeting
Tuesday, September 1, 2015
5:00 PM
Work Session Meeting
Emma J. Harvat Hall
7:00 PM
Formal Meeting
Tuesday, September 15, 2015
5:00 PM
Work Session Meeting
Emma J. Harvat Hall
7:00 PM
Formal Meeting
Tuesday, October 6, 2015
5:00 PM
Work Session Meeting
Emma J. Harvat Hall
7:00 PM
Formal Meeting
I t 1
qk
®,®
CITY OF IOWA CITY
4t0 East Washington Street
towa City. Iowa 52240-1826
(319) 356-5000
(319) 3S6-S009 FAX
www.tcgov.org
City Council Work Session Agenda
Monday, March 23, 2015
Emma J. Harvat Hall - City Hall
410 E. Washington Street
5:00 PM
■ Questions from Council re Agenda Items
■ Council Appointments [#14]
■ Gateway Project Update
• Determine preferred developer for Court / Linn property [IP #3 Info Packet of 3/19]
■ Information Packet Discussion [March 12, 19]
■ Council Time
■ Pending Work Session Topics [IP #4 Info Packet of 3/19]
■ Upcoming Community Events/Council Invitations
-19-15
=��,--'r..®4. CITY OF IOWA CITY IP3
IT
MEMORANDUM
To: Tom Markus, City Manager
From: Jeff Davidson, Economic Development Administrator
Wendy Ford, Economic Development Coordinator
Date: March 16, 2015
Re: Selection of preferred developer for Court/Linn site
The internal review committee for the Court/Linn site met on March 11 to review and discuss the
proposals from the two finalists. Both proposals were judged by the review committee to be
fully responsive to all of our imposed requirements. At the meeting it was unanimously agreed
to rank the proposals as follows:
➢ Preferred developer: CA Ventures
➢ First alternate preferred developer: Core Campus
The internal review committee included two members of the City Council, Kingsley Botchway
and Susan Mims. The next step is for the full City Council to determine if they concur with the
recommended preferred developer, and if so, direct staff to begin negotiations of a development
agreement. This does not require official action by the City Council; it may be done by
consensus at the March 23 City Council Work Session.
Attached is the review committee document which summarizes the two proposals and the two
final proposals. Staff will be prepared to answer any questions at the March 23 Work Session.
We wish to retain the first alternate preferred developer in case we are unable to come to
agreement with the preferred developer.
cc: Wendy Ford
xa_
- ��4 i MIT$ L
CITY OF IOWA CITY
UNESCO GTY OF UTMTM
CITY OF IOWA CITY
MEMORANDUM
Date: March 3, 2015
To: Court/Linn internal review committee
From: Jeff Davidson, Economic Development Administrator
Wendy Ford, Economic Development Coordinator
Re: Court -Linn Proposals, revised February 2015
The internal review committee met on February 10, 2015 to discuss the revised proposals from the two
finalists for the Court/Linn site. The committee offered each proposer the opportunity to respond to
concerns over adherence to the Riverfront Crossings Form Based code and to the City's desire to include
affordable housing in the project, as opposed to providing a fee in lieu of. Proposers were given until
February 24 to submit revised proposals.
Riverfront Crossings Form Based Code compliance
Prior to the meeting on February 10, Karen Howard, Development Services, reviewed each proposal for
its compatibility with the form -based code and provided a memo with points of concern. She outlined
deficiencies in each plan and shared those with the internal review committee and with the proposers.
Upon review of the final proposals submitted February 24, she notes, in general, that CA's RISE building
is completely redesigned and substantially improved and now appears to meet both the letter and the
intent of the form -based code with no discernible exceptions. Retail, office, and hotel uses are now
ideally located to create a visible and prominent urban frontage along Court Street. Parking is now
completely screened from view with garage access from the alley. Residential units front on Linn Street
with much improved, usable open space proposed on the site in the mid -block pedestrian plaza and
second floor outdoor patio and amenity space. The redesign has the added bonus of providing improved
light and views for the residential units and for the interior amenity space.
Core's Hub also has a change in their design. They extended the building closer to Court Street so there
is a direct connection between the second floor office space and the public sidewalk. Some minor
adjustments will still need to be granted to allow the corner courtyard and the recessed hotel forecourt
along Linn Street.
Affordable Housing provisions
Tracy Hightshoe, Neighborhood Services Coordinator, reviewed the proposals for the provision of
affordable housing. She noted that CA's RISE would provide 32 one -bedroom units at the Home Fair
Market Rate ($668) to households under 80% Median Income, compared to Core's Hub of 40 efficiency
units at the HOME Fair Market Rate ($558 — also noting a discrepancy between the HFMR of $558 and
the proposal's narrative at $588.)
She noted that one bedroom units would be preferable over efficiencies because they would invite a
greater diversity of households. She also noted a concern with providing affordable housing within
developments designed primarily for undergraduate students, citing significant style -of -life differences
that may exist between people who are young parent(s) with an infant or child, disabled, and/or
seniors. She said it might be good to consider a portion of the building that would be designated for
March l7,Z0lS
Page
either non -students orstudents who prefer a"ouket"lifestyle. Doing snwould achieve agoal uffor
,quiet" living for both students and non -students without segregating by income differences.
Each revised proposal is attached as is an updated Zoning Analysis for the Court / Linn finalists.
|nthe table below, we have added updated information provided by the proposers in red. Unchanged
HUB at Iowa City
The RISE at Riverfront Crossings
by CORE
by CA Ventures
loll
I 10i
Purchase Offer
$5 million
$6.5 million
(initial response: $4.5 million)
(initial response: $5 million)
Approximate
$95.5 million for 672,872 GSF
$102.5 million for 558,746 GSF
Project Cost
Project
15 story mixed use building with 405
15 story south residential tower and 14 story north
Description
residential units, 4,000 SF retail, 20,145 SF
hotel tower with 320 residential units, 6,325 SF
office. 153 room hotel.
retail, 25,518 SF office, 152 room hotel.
Residential
405 units; 798 beds; avg 766 SF per unit.
320 units; 557 beds; avg 760 SF per unit
components
(Drawings in proposal show unit mix on floor
plans with 357 units and 762 beds. Unit mix
from drawings1plans below)
Efficlencles
38(11%)
Affordable
Inclusion of 40 efficiency units at Home Fair
Inclusion of 10% (32) one bedroom affordable
Housing
Market Rent; currently $558/mo;
apartments for 80% or lower of Median Household
though Core stated $588 (typo?) in text..
Income.
Parking spaces
482
326
Col-ablOffice
$400,000 contribution towards CoLab facility
23,355 SF
Space
in form of 1 It year rent abatement (20,000
Iowa City would have first option to lease at
CoLab space
$4.15 million
Depending on level of build -out of 29,100 GSF:
for sale to
Option 1; Warm Dark Shell @ $80/SF = $2.328 M
Option 3; Vanilla Box plus $45/SF build -out
allowance for $4.656 M
Hotel
153 rooms
152 rooms. Last proposal 150.
March 17, 2015
Page 3
HUB at Iowa City
The RISE at Riverfront Crossings
by CORE
by CA Ventures
Management: First Hospitality Group
Relocated to Court Street frontage.
including these brands as possibilities: Hyatt
Management: First Hospitality, Bricton Group, or
Place, Fairfield Inn & Suites, Stanwood, Aloft,
Aimbridge Hospitality.
Courtyard by Marriott.
Brands: Canopy by Hilton, AC Hotels by Marriott or
Starwood Aloft
Retail
4,000 SF for Goodness — a fast casual
6,365 SF
restaurant
Riverfront
Building design modified to bring the Court
Active street frontage for each use in building.
Crossings
Street facade to 8' of the property line.
Screened parking.
Form Based
Codeissues
addressed?
Sustainable
Striving to achieve LEED silver certification;
Targeting LEED silver or higher.
Qualities
green roof.
Staff Estimated
annual
Property taxes,
year one
$1,881.230
$1,839,495
Staff Estimated
annual hotel
tax, year one
$196,021
$192,177
Owner
Core Campus, Chicago, IL, Tom Harrington.
CA Ventures (formerly known as Campus
Development Partner— DRW Holdings LLC
Ac uisitions , Chica o, IL
Contact
Tom Harrington
John Diedrich
Architect
Karen Herold — Studio K Design with Grant
Hartshorne Plunkard Architecture
Brandenburg —WareMalcomb.
Contractor
Evans S ileo Construction Manager
Regional GC
Zoning Analysis for Court/Linn Finalists
Analysis based on South Downtown Subdistrict Standards in the adopted Form -based Zoning
Code. The form -based code states that "the South Downtown Subdistrict is intended for high intensity
mixed-use development in buildings with active ground floor uses opening onto pedestrian -friendly
streetscapes. Buildings are designed with facades aligned along public sidewalks with parking and
service areas located behind buildings in rear lot and mid -block locations."
Basic form -based zoning standards for the South Downtown Subdistrict:
• Building Placement (primary street setbacks): 2' min.; 8' max. (Note that both Court and Linn
Streets are designated as primary streets).
• Building height: 2 stories min.; 8 stories max. Bonus height may be granted up to max. of 15 stories.
• Upper story stepback of 10' required above the 5th story. This stepback requirement can be met at a
lower level upon request.
• Frontage Requirement: A storefront frontage is required on at least a portion of the Court Street
frontage and either a storefront frontage or urban flex frontage is required for the remainder of the
ground level building fagades. The storefront frontage requires facades that are aligned close to the
streetside property line, with large transparent windows and multiple building entries at the grade of
the fronting sidewalk. The urban flex frontage is similar, requiring ground floor storefront conditions
with high proportions of transparency, but to a lesser degree than the Storefront Frontage.
• Facade Continuity: To define pedestrian friendly streetscapes and create a mostly continuous
frontage of buildings along primary streets, principal buildings must occupy a min. of 75% of the
primary street lot frontage.
Parkinq must be setback a min. of 30' from the front building fagade and located behind fully -
enclosed, occupied building space.
Parkinq required: No parking required for non-residential uses. Parking is required for the
residential units at the following ratios:
• 0.50 spaces per efficiency/1-bedroom apt;
• 1 space per 2 -bedroom apt; and
• 2 spaces per 3 -bedroom apt.
• Parking may be waived for affordable units
Other parking related provisions/issues to note:
• Site is located in the Downtown and Riverfront Crossings Parking District, which allows the
parking requirement to be reduced by up to 50%, provided a fee is paid in lieu.
• While parking is not required for the hotel, there will be a demand for it, so will be an issue the
chosen developer will have to address.
• Uses allowed: All proposed uses (hotel, office, retail, residential) are allowed. Residential density is
unlimited, but the number of 3 -bedroom apartments is capped at 30% of the total number of units
on the site.
Open Space Requirement for Projects with Residential Use: Usable open must be provided at a
ratio of 10 square feet per bedroom. To meet the standard, the space must be designed to be
accessible for all residents, designed to preserve privacy for individual dwelling units, improved to
support leisure activities and informal gathering, located in one or more clearly defined, compact
areas, with each area not less than 400 square feet and no dimension less than 20' and no slope
greater than 10%.
Zoning Analysis for "Hub on Campus"
Executive Summary: In large part, the proposed design satisfies the letter and the intent of the
Riverfront Crossings form -based zoning standards. The proposed building is designed with active
ground floor uses opening onto pedestrian -friendly streetscapes with facades aligned along public
sidewalks and parking and service areas located behind active building space. While some minor
changes to the building and site design will be necessary, these should not present a significant hurdle.
The code allows the staff form -based code committee limited administrative authority to allow minor
departures from certain code provisions to accommodate difficult or unique site conditions. Some
flexibility in application of the code provisions is warranted in this case due to the complexities
presented by the sloping building site. Minor adjustments could be granted administratively for the small
garden courtyard at the corner of Linn and Court and the modified forecourt proposed for the hotel
entrance/drop-off.
Building Placement: With some minor modifications to the building design to create more connection
between the building and the public sidewalk along Court Street, the building could be approved under
the current form -based code requirements with some administrative adjustments to accommodate the
complexities caused by the sloping building site. For more detailed analysis see below:
• Proposed building exceeds the maximum setback along Court Street. It is setback
approximately 20 feet along Court Street frontage with outdoor garden/courtyard at the corner
with dimensions of approximately 55' x 48'. Due to the sloping nature of the both the Court and
Linn Street frontages, the architect has chosen to place the above -grade building levels at a
lower elevation to correspond with the longer building frontage along Linn Street. This makes it
possible to create a more active building front along Linn Street, with no exposed parking
garage, but results in a small sunken plaza space along Court Street. The first two levels of
above -grade building space along Court Street are intended for the co -lab office space. If the
building is extended toward Court Street in compliance with the form -based code this will allow
the possibility for direct access from the public sidewalk to the second floor of the office space
as well as direct access from the Linn Street sidewalk to the first floor office space through the
at -grade corner garden courtyard. With this change, the building would comply with the building
placement standards along Court Street. (Revision made to extend the building toward Court
Street to comply with the maximum front setback).
• It appears that the building meets or could meet the setback requirements with some minor
changes along Linn Street for most of the frontage. Hotel drop off could be allowed within an
approved modified forecourt frontage. This is more easily accomplished along the lengthier Linn
Street frontage, without compromising the desired pedestrian -oriented character of the street.
Combined with the garden courtyard at the corner, this creates a significant corner presence for
the hotel. (A modification will still be needed to allow the corner greenspace and the hotel drop-
off within the forecourt frontage).
• The corner garden courtyard would have to be approved through the minor adjustment
provisions in the code. Using the space as an outdoor garden space at the corner to address
slope issues and to open up views of the hotel entrance may be acceptable reasons to adjust
the standards, provided that the space remain fairly small as shown on the plans, so there
remains visual and physical connection between the building and the public sidewalk. As noted
above, to meet the building placement standards on Court Street, the building will have to be
extended or shifted toward the street to connect more directly with the sidewalk, which would
eliminate the sunken portion of the courtyard that extends north along the Court Street frontage.
It should also be noted that the green space proposed at the corner is flat rather than sloping
making it a more accessible and usable outdoor amenity space for the development. (The
redesign extends the office space to front on Court Street and eliminates the sunken light court.
This creates a better interface with the public sidewalk for the second floor office space allowing
an entrance directly from the street, but since the lower level office space is set back from Linn
Street behind the corner greenspace light into the interior space will be from the east, but not
possible from the north).
Building Height — Maximum building height in the South Downtown Subdistrict is 8 stories by right.
Bonus height may be granted up to a maximum of 15 stories. The proposed 15 -story height could be
achieved through bonuses for class A office space, the hotel space, and for leadership in energy and
environmental design.
Upper floor stepback — The proposed building meets this requirement along both street frontages. An
outdoor terrace for the hotel lounge is proposed for the stepback area along Court Street. The stepback
area along Linn Street is shown as outdoor terrace space for the residential units.
Frontage Requirement: A retail storefront frontage is required along the Court Street frontage to ensure
a pedestrian -friendly streetscape and an active connection between the building uses and the public
sidewalk. To meet the storefront frontage requirement, the proposed building or a portion of the building
would need to be placed closer to the public sidewalk (they have revised to meet the standard), have a
greater amount of window coverage (Revised plans do not include a new elevation, so can't tell if
standard is met. However, with the building close to the street it will be easier to meet the storefront
frontage requirements and window coverage standard), and at least one building entrance on Court
Street. As noted above, adjustments could be made to the current design to achieve these goals while
making some accommodation for the sloping site. Along Linn Street a storefront frontage or flex
frontage would be required for the mixed -uses proposed along this frontage. It appears that the current
design can be designed to meet one or both of these allowed frontage types, since ground level
commercial space is aligned close to the street, with multiple street -level pedestrian entrances
proposed, and extensive window coverage.
Facade Continuity: The proposed building maintains a nearly continuous fagade along both frontages,
except some areas exceed the maximum setback, specifically the hotel drop-off and corner courtyard
garden. Continuity standard is approximately 20' short of meeting the standard on Linn Street and is
approximately 15' short of meeting the standard on Court Street. A minor adjustment may be warranted
as these features are used as a means of addressing the sloping site. Although staff notes that the new
CA Ventures design seems to be a better solution to address the slope and fully meet the continuity
standard and places the retail space at the corner to meet the retail frontage requirement in the code).
Parking Placement: The proposal meets the parking placement standards. Parking is provided in an
integrated parking structure that includes below -grade parking as well as above -grade structured
parking that is located behind fully -enclosed, occupied building space. In other words, there will be very
little evidence along the street that there is a large parking garage integrated into the building. A minor
adjustment can be granted to allow the garage entrance off Linn Street, which would be justified given
the configuration and topography of the site.
Open Space Requirement for Projects with Residential Use: The HUB is proposing 743 bedrooms, so a
minimum of 7430 square feet of open space is required. The HUB proposes 14,525 square feet of
outdoor open space. The outdoor amenitX space is located in two large rooftop patios (of approximately
7,000 square feet each) located on the 4` floor of the building. The two rooftop patios are connected by
4,000 square feet of shared indoor amenity space, including a fitness center, club room, and spa.
These spaces have open views to the west. While outdoor space is not required for the hotel, the
proposal includes a penthouse lounge, fitness center and spa with rooftop patio. The corner courtyard
garden would also count toward shared, usable open space.
Building Design Standards: It appears that the building as proposed can easily meet the building design
standards in the code, including fagade articulation, building entries, windows, building materials, etc.
(Note that the building has not been reviewed for these more detailed standards, but do not see any red
flags with the proposed design).
Uses: Proposed uses (hotel, office, retail, and residential) are all allowed. 366 apartments with 743
beds are proposed. Be advised that the unit mix illustrated on the floor plans does not match the
revised unit count and mix in the text of the revised proposal. We asked for clarification on this point
and the developer sent these revised numbers: 46 efficiency apts.; 47, 1 -bedroom apts.; 339, 2 -
bedroom apts.; 104, 3 -bedroom apts. This mix of residential units complies with the standard in the
code that limits the number of 3 -bedroom units to no more than 30% of the total.
Parking spaces required: 452 structured parking spaces are proposed. 424 parking spaces are required
for the residential units proposed, which leaves 28 parking spaces that can be used by the hotel or
other uses.
Zoning Analysis for "RISE at Riverfront Crossings"
Executive Summary: (Substantial revisions were made by the developer. These changes have
significantly improved compliance with the form -based zoning code. See below for details). Significant
changes to the buildings and site plan will be necessary for the proposal to meet the form -based zoning
standards for Riverfront Crossings. The project is designed as a pedestal building consisting of three
stories of structured parking with two separate towers on top of this parking "pedestal". The west tower
is 15 stories tall, which in addition to the 3 stories of parking, creates a building that exceeds the
maximum 15 stories allowed even if the maximum bonus height is granted through the form -based
code. The towers are elevated between 2 and 3 stories above Linn Street and approximately one story
above Court Street at its intersection with Linn. The only location where one of the towers is at the
same level as the public sidewalk is at the northwest corner of the site at Court Street. All the active
building uses open onto an interior elevated linear courtyard that is located on top of the parking
structure rather than facing and connecting with the public sidewalks as required by the form -based
code. These inconsistencies with the letter and the intent of the Riverfront Crossings code were noted
during the first review of the projects for the Linn/Court site. Finalists were advised to review the form -
based code requirements and consult with staff if necessary and adjust their proposals accordingly
before final submittal. Not much was changed from the original proposal to address the significant
departures from the zoning standards that apply to this site. Since significant modifications would be
necessary to comply with the zoning requirements, it is difficult to determine whether the numbers
presented in the proposal are an accurate reflection of the project that would result if it were modified to
comply with the zoning code.
Building Placement: Significant changes to the building and site plan would be necessary for the
proposal to meet the building placement standards in the code. The overall design of the site consists
of a pedestal building with two separate towers that face and open onto an interior private courtyard
rather than facing the public streets as required by the form -based code.(Tower footprints have
changes significantly. Hotel/office/retail is in a tower that is close to and fronts on Court Street and has
a retail storefront at the corner of Court and Linn.) For more detailed analysis see below:
• Proposed west tower is setback further than the maximum allowed setback along Court Street.
Measurements were not labeled in the proposal, however, the ground level floor of the west
tower appears to be setback between 25-40 feet from the sidewalk along Court Street. If
extended or shifted toward Court Street and the arcade frontage eliminated, it could be
designed to meet the standard. The east tower appears to be set back at least 1 00'from Court
Street and is elevated at least one story above Court Street at its intersection with Linn Street
through use of a sloping corner greenspace/automobile court. The architect has chosen to
place the active building floors at a level that matches the highest elevation of Court Street,
which provides very little active building space along either Court Street or Linn Street due to
the sloping nature of the site. This is most noticeable for the east tower where the active
building levels are elevated 2 to 3 stories above the level of the sidewalk along Linn Street, with
2 to 3 levels of the parking garage exposed along most of the Linn Street frontage.
East tower does not meet the setback requirements along Linn Street, because the lower levels
of the building are structured parking, which is required to be setback at least 30' from the
street -facing building fagade (see parking placement below). None of the primary building
entrances of either building face or provide a direct connection to either Court Street or Linn
Street. All primary pedestrian entrances appear to face the interior of the site at a level
significantly elevated above the public sidewalk.
The greenspace/auto court provided at the corner would not qualify as usable outdoor space
according to the code due to the slope and because residents/visitors would have to walk
across and along vehicular driveways to get to the main building entrances, which are located
on the non -street sides of the towers more than 100 feet from Court Street and not accessible
from the Linn Street sidewalk, which is located 2 to 3 stories below. (The corner greenspace has
been eliminated and the building now addresses the corner with a storefront frontage. A east -
west pedestrian plaza now separates the two towers, which makes for a more usable open
space without the encroachment of automobiles).
The designated retail space in the east tower is elevated and setback without any direct
connection to either street. The lack of visibility and direct pedestrian access to this space
makes it a questionable prospect for viable retail use. (Retail is now placed at the corner of Linn
and Court in compliance with the form -based code, a location more viable for retail or restaurant
space).
Building Height — Maximum building height in the South Downtown Subdistrict is 8 stories by right.
Bonus height may be granted up to a maximum of 15 stories. Building height is measured from average
grade, so depending on where the point of average grade is along Linn Street, the building is 17-18
stories tall, which would exceed the maximum height allowed even with bonus height granted for the
office, hotel, and for demonstrating leadership in energy and environmental design. (Towers have been
lowered in height and appear to comply with the form -based code if maximum height bonus to 15
stories is granted).
Upper floor stepback — The west tower meets the stepback requirement along its Court Street frontage.
The east tower does not comply with the upper floor stepback requirement along the Linn Street
frontage. (Re -designed towers now comply with the upper floor stepback requirement).
Frontage Requirement: A retail storefront frontage is required along the Court Street frontage to ensure
a pedestrian -friendly streetscape and an active connection between the building uses and the public
sidewalk. To meet the storefront frontage requirement, the ground level floors of the building would
need to be placed closer to the public sidewalk along Court Street with building entrances at grade and
opening toward the street. The west tower does not meet the storefront frontage or urban flex frontage
standards as it consists of exposed parking structure along the entirety of its frontage along Linn Street
and is set back more than 100 feet from Court Street and elevated approximately 1 story above
sidewalk level. (Elevations and perspective drawings do not show much of the Linn Street frontage.
However, floor plans show that residential units will front on Linn Street and act as a liner building that
hides the view of the parking structure located behind the units. There are a number of residential
frontage types that might be allowed along the Linn Street frontage, so it should not be an issue forthis
design to meet the code. Along Court Street, building appears to meet the storefront frontage
requirement with the building located close to the street with generous window coverage and entrances
that open directly to the public sidewalk.)
Facade Continuity: Measurements were not illustrated in the submittal, but it appears that the proposal
does not meet this standard along either street frontage. (Redesigned building appears to meet the
fagade continuity standard along both frontages. This is a significant improvement as the new design is
a better solution to address the slope while fully meeting the continuity standard and placing the retail
space at a visible corner location that meets the letter and intent of the retail frontage requirement in the
code. The pedestrian courtyard can be allowed as a midblock pedestrian passage that allows access
through the block. While there are stairs on the eastern end of this mid -block passage there are a
number of accessible routes to this plaza space from the west and the north in addition to elevator
access from the east).
Parking Placement: (Redesigned building now fully meets the parking placement standards with
parking located behind active uses with two access points from the alley as required by the code.) The
proposal does not meet the parking placement standards. Significant changes to the site and the
building would be necessary to meet the code standards. Parking is provided in a parking structure that
extends close to the front property line along Linn Street, which is not allowed in the Riverfront
Crossings code. Above -grade structured parking must be setback a minimum of 30' from the primary
street building facade and located behind active, enclosed building space. Due to this aspect of the
proposal, it would be nearly impossible for the project to meet a number of the form -based code
standards, which are predicated on active building uses aligned close to public sidewalks to create a
pedestrian -friendly urban streetscape. In addition, the form -based code would not allow vehicular
access to the towers through the proposed street -fronting circular driveway that extends from Court
Street up to the top of the pedestal. The need for such a driveway is caused by a design that sets the
primary building entrances and active building uses more than 100 feet from the primary street.
Open Space Requirement for Projects with Residential Use: (Redesigned site now contains more
usable open space both in the landscaped central courtyard and on the second floor outdoor amenity
deck. Both of these spaces seem more usable than previous sloping corner greenspace and narrow
linear courtyard). The development proposes 547 bedrooms, so a minimum of 5470 square feet of
open space is required. The proposal states that 18,250 square feet of open space is provided within
the setback area, corner public park, and private residential court. However, the corner greenspace
would not qualify to meet the usable open space requirement due to its slope and the fact that it is
separated from the buildings by driveways. The linear courtyard between the east and west towers
could be counted toward the standard, but it should be noted that with its location on top of the parking
structure and limited access to sunlight due to the narrow width of the space and the height of the
buildings, it may be difficult for landscaping or trees to survive. The indoor amenity space for the
residents is located in the west tower along this pedestrian corridor. There is also open space proposed
on the far south side of the east tower that would have more access to sunlight so might be better
suited to outdoor leisure activities or gathering space and would qualify to meet the standard in the
code. While outdoor space is not required for the hotel, the proposal includes penthouse indoor amenity
space and an outdoor patio with pool.
Building Design Standards: It is difficult to tell from the submittal whether the proposed building would
meet the fagade composition standards in the form -based code, although compliance would be difficult
as currently designed. There are several code provisions that the proposal definitely does not meet due
to the fact that the active building levels are elevated above both street frontages and there is several
hundred linear feet of exposed garage wall. The proposal would not meet requirements for street -facing
accessible entrances and limitations on blank, windowless facades. (Redesigned building is much
improved and while details have not been reviewed, there are no longer any red flags. Entrances are
now located along street frontages).
Uses: Proposed uses (hotel, office, retail, and residential) are all allowed. 293 apartments with 547
bedrooms are proposed. There is a mix of unit types proposed and the number of 3 -bedroom units is
55, which is well within the maximum allowed. (Number of apts is now 320. Number of 3 -bedroom units
has been decreased to 44. Bedroom count is now 557. Affordable housing units = 32).
Parking spaces required: 322 structured parking spaces are proposed. A minimum of 301 parking
spaces would be required for the residential uses proposed, which would leave the extra 21 spaces
available for other uses. It should be noted that to comply with the form -based code that prohibits
parking within 30 feet of Linn Street, the building will have to be significantly redesigned, so parking
numbers in the proposal are not reliable. (Redesigned project now has 326 parking spaces. 300 would
be required for the proposed residential, leaving 26 for other users).
a
n
1.0
;�J,U
n;
Dm
�mnmp=
DD m m
1 m m
+ D=—
C�
n O m
m
m (r) d
Ul
U O
EA EA A ff,
O Ln
Np m
Vv'
Ln K A —
O >
O
C
9
OZ
Dm
=O
m
4) ��
.
O
O a
m
Z zs
G7
D�
O
n
m
o' 0
Z
EA
D
D
3
m
m
N
can
Z
l0
tA
Ui
00
N N
A
O
O
W
W�
p
O O
N
V ••
N
O
M
.y
(-n
O
O
W
O
N
NN
Ut
N
0)
(DN
00
A
"f1
T
(n
TI
T
OM
v is IMM lbaft �
i� if• i�F .«aq iA irp i� yM . wa
i= i� a1BE ' � i'► ii":a ata i =� ws+
To: Mr. Jeff Davidson
Economic Development Administration
City of Iowa City, Iowa
410 E. Washington Street
Iowa City, IA 52240
RE: COURT LINN RFP RESPONSE
Dear Mr. Jeff Davidson:
OANIPUS
In addition to prior additions, modifications and clarifications Core Campus is pleased to offer the
following modifications to the Court -Linn RFP response:
The $1,000,000 affordable housing cash -in -lieu payment is eliminated. Core Campus will provide
affordable units within the development. The developer will agree to rent 40 efficiency apartment
units at rates equal to the Home Fair Market Rent for an efficiency unit. The current rate for these
units is $588 per month. The details of the program will be agreed upon with the city of Iowa City on
mutually agreeable terms.
Core Campus has modified the building design to bring the Court Street facade to 8' of the property
line.
Attached are revised plans and Project Metrics.
Please feel free to contact me with any further questions or concerns.
With Best Regards,
Tom Harrington, Jr.
Core Campus LLC
TomHOCoreCamp.us
Cell: 217-369-00381 Fax: 217-352-5513
WWW.CORECAMP.US 1 2234 W NORTH AVE CHICAGO, IL 60647 1 773.227.2850
wa
a�a
N
sw
wm
�D
bi L
4-L flm�
N
Ice
133HiS � "Td ,05 L
iHnoO
1SV3
bn
9b6
_
a
>�
o
a
.
V
ism—
_—
I
1332l1S NOISMdVH iSV3n
_
O
.z
J
J
w
Z
a
w
LL
a
cn
w
Z
Z
Zi
0-
•'-
�
M
7
U)
I
.......�. -
(n
U0
LL n
I
I
LLI
r
K
r
�FI
QII
I W
AS SLZL
r
-I r
Asool -.
of
z1
O
b
w w
UN
O e
p
pLL
F>
IW
Ice
133HiS � "Td ,05 L
iHnoO
1SV3
0
bn
_
a
>�
a
V
0
l3A3l
133N1S iwdnoo
a
01
.9c
G
3�tlgaa319Wa
4
e
. ...,.
m
TTflT
� � T
-
J
S
A311v Ol /
W
U
mLo
z
Q
'
z
o
� y
I
Nry
i;
Q
y
N
CD
co
n
M
sR
a
a
N530 I
W a
U
1HONi ___LLLLLILLL
�
8
LL
LL
0
(p]
00
M
as
p
01.
- OR AM1N3
O
3ovaa3iaooa
O
l3A3l
133N1S iwdnoo
a
19b 4
G
4
1
J
TTflT
J
n
A311v Ol /
W
U
mLo
z
o
I
Nry
i;
Q
y
CD
co
n
sR
a
a
W a
U
�
8
LL
LL
0
00
U
p
01.
- OR AM1N3
l3A3l
133N1S iwdnoo
a
M
` LL
T AM
O
M
b ,£6
I
m
_
m
m
m
h
p
1 m
m
i
a
�
K
M
` LL
T AM
O
M
b ,£6
I
_
h
p
K
M
` LL
T AM
O
M
b ,£6
Pill I
r
M I
c
Zr8- r � i LL
X6
Plill
I
1A =-
r
i
I
n
n
p
r
M I
c
Zr8- r � i LL
X6
Plill
I
1A =-
iM
0
LL
OE
w �n
I
i3
-,
FQ
I
m
_ - r
S
J-
= J
sa
rc rc
i=
00
s
B
LL
Q
M
s
r
n
.L8 I
E
cco
m
_ - r
rc rc
Cl)
00
LL
Q
M
T
CL
I
xti
E6
I
� m M
K---� 00
Ed,
M
Mill
,£b 1 £6 �l 'Ev
r
n
n
LR
u
M
r
1 M
M
�
M
1
co
l_
l
Y
I
,L8
_J
rt
I � I ��
I
00
a
I
� m M
K---� 00
Ed,
M
Mill
,£b 1 £6 �l 'Ev
r
n
n
LR
u
M
r
w:
0
M
co
I
LL
•a
I � I ��
w:
0
tt
m,
i
T
F
tt
K
p
f
1�6
I
❑yeI N�
W:0
VENTURES
" RISE at Riverfront Crossings
--'
Proposal for the
,I }
Court Street /Linn Street
r
Poll I
Redevelopment Site
N (�
MIXED-USE REDEVELOPMENT:
M,
HOTEL
APARTMENTS
OFFICE
1
TW. y
RETAIL
I,
JJ Smith, Chief Operating Officer
312 994 1882
jjsmith@ca-ventures.com
February 2015 1 ca-ventures.com
City of Iowa City, Iowa
410 East Washington Street
Iowa City, Iowa 52240
February 24, 2015
Mr. Jeff Davidson,
CA Ventures would like to thank Iowa City and the City Council for allowing us to continue presenting our vision for the
redevelopment of the Court & Linn property into RISE at Riverfront Crossings.
Following city discussions, review of comments, and rigorous implementation of the Riverfront Crossings Form -Based Zoning Code, CA
has reached a final proposal that is an evolution of the original design idea. The dual -building scheme and courtyard concepts have
been maintained in conjunction with newly added "L-shaped" forms that now result in a break of open space providing facade relief
to the neighboring context in the east/west direction. The 75% minimum street frontage is provided, allowing each component of the
mixed-use Residential, Hotel, Office, and Retail program to have direct interface with the public right-of-way. All originally proposed
unit, bed, parking, and square footage numbers for all uses have been maintained or slightly increased through the recent design
adjustments.
CA Ventures has taken the necessary steps to ensure RISE at Riverfront Crossings quickly can be successfully financed,
constructed and operated. CA Ventures has a refined list of hotel flags and has received updated letters of interest from the
following: Canopy by Hilton, AC Hotels by Marriott and Starwood Aloft. We have also narrowed our list of hotel operators to the
Bricton Group, First Hospitality Group and Aimbridge Hospitality and have current letters of interest from all groups.
This CA Ventures project is fully financed with three potential construction lenders vying to provide the construction loan, an
institutional equity partner, Harrison Street Real Estate Capital, providing 85% ($30.5million) of the equity needed to complete
the project, and CA Ventures investing the remaining 15% ($5.4 million) of the equity. We have done nearly 40 projects with
this same financial structure in the past 7 years. Finally, we have received updated construction cost estimates for our project
and feel extremely confident in our proposal from both a design and financial perspective.
Below you will find a recap of our proposal highlights:
- Maintained land purchase price of $6,500,000
- Inclusion of 10% affordable apartments that meet the goals of the Community Development and Affordable Housing
Departments
- East / West pedestrian corridor at south property line
- Hotel/Office/Retail focused at primary corner and Court Street Frontage
- Modified building setbacks and stepbacks have resulted in an architecturally -attractive design, with new open space
opportunities
While CA Ventures' primary focus has been in student housing, we do have extensive experience in all of the other proposed
uses and have raised over $550 million in debt and equity outside of the student housing asset class. With this experience, CA
Ventures is confident in being able to deliver a community that exceeds the expectations of the City and the community.
We look forward to advancing toward a development agreement phase where we can collaboratively tailor a project that meet not
only our needs but the objectives of the City, neighborhood, taxpayers and university. Together, we can create a catalyst for the
Riverfront Crossings District for decades to come.
Sincerely,
JJ Smith
Chief Operating Officer
jismith@ca-ventures.com
312 994 1882
R 15 EAL
�_ CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601 ,r+r_c
01
Executive Summary.........................................................................................4
02
Project Overview.............................................................................................
5
03
Project Data, Design Info & Plans....................................................................6
04
City's Economic Incentives.............................................................................
19
05
Potential Hotel Flags......................................................................................20
06
Potential Hotel Operators..............................................................................30
07
Financial Summary.........................................................................................
35
08
CA Ventures Overview...................................................................................37
R R E
fl}VF A �� F AA4T
Cl05SI X(S
CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
Page: 34.4
1
VENTURES
CA Ventures (CA) continues to propose a mixed-use development consisting of a limited service hotel, apartments, office
and retail. Known as RISE at Riverfront Crossings, the project consists of two buildings with substantial open area and green
space. The 14 -story north tower will feature the hotel, office space and retail components. The 15 -story south tower will
house the residences. This upscale design has extensive modern amenity spaces, high-end finishes, emphasis on energy
efficiency and four floors of underground parking connecting both buildings. CA's full-service on-site staff will manage the
apartments and we have received multiple letters of interest from major hotel franchises and operators, as indicated in this
proposal.
PROJECT
32
BENEFITS TO THE CITY: This project will have a significant benefit to Iowa City
SUMMARY
Office:
in the amount of revenue generated through property tax, lodging tax and land
Parking Spaces:
326
purchase price. CA estimates the project will generate $1.6 million in property tax
Land Purchase Price:
$6,500,000
and another $690,000 in lodging tax within the first year. Over the course of 15
Hotel Keys:
152
years, CA estimates a net tax exceeding $43 million of which $30 million would
15 Stories*
*above avg. grade plane
directly go to Iowa City and schools, respectively. Lastly, CA has not requested
Apartments:
320
any public financial assistance while offering the highest purchase price, which is
Beds:
557
maintained at $6.5 million.
Affordable Units:
32
Retail:
6,325 RSF
Office:
25,518 OSF
Parking Spaces:
326
Average SF
Per Unit:
760
North (Hotel) Tower:
14 Stories*
South (Resid.) Tower:
15 Stories*
*above avg. grade plane
CA has maintained an affordable housing component in the proposal. 10% of the
total units will be designated for households earning less the 80% of AMI and will
adhere to Iowa City's affordable housing regulations. In addition to the affordable
housing, RISE at Riverfront Crossings will feature a variety of sustainable features
and seek to be rated LEED Silver or higher.
CA has communicated with local consultants and city staff to ensure adherance to
the Riverfront Crossings Form -Based Zoning Code, and looks forward to continue
our collaboration on this development. CA will offer Iowa City the first opportunity
to lease the office space fronting Court St. at a rate of $20.00 per square foot.
Retail space now activates the primary property corner, boosting sales tax revenue
while serving the nearby community.
Based on CA's historic data, the City will immediately benefit from approximately
400 to 450 jobs needed for construction and an additional 70 jobs once the asset
is stabilized. In addition, CA will choose to use a regional general contractor for the
project.
DEVELOPER CAPABILITY: Since its inception in 2004, CA has developed or
acquired over 9.5 million square feet of real estate totaling $2.0 billion in
investment value with another $2.5 billion currently in the pipeline. As a result
of the company's success and growth, CA has fostered numerous financial
relationships and has raised over $700 million in debt and equity.
Since 2008, CA has developed 16,000 student beds and 256 hotel keys. CA
continually delivers projects on-time, on -budget and fully integrated with their
markets. This track record is a direct result of our insistence on creative design,
competitive construction costs and an experienced leasing team.
WW
O R S E CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601 i
Page:4 VENTURES Aba
RISE AT RIVERFRONT CROSSINGS
Land Size:
60,000 SF
Residential:
248,515 SF
Office:
25,518 OSF
Hotel:
81,373 SF
Retail:
6,325 RSF
Common:
63,155 SF
Parking:
133,860 SF
Total SF: 558,746 SF
Apartments:
Bedrooms:
Hotel Keys:
Affordable Apartments:
Parking Spaces:
320
557
152
32 (10% of total units)
326
Potential Hotel Flags:
Hilton Canopy I Curio Marriott AC Hotels
Starwood Aloft
Land Cost:
$6,500,000
Hard Cost:
$78,892,907
Potential Hotel Operators:
Soft Cost
$17,192,619
Bricton Group
Aimbridge Hospitality
First Hospitality Group
Total Cost:
$102,585,526
Partner Information:
Unit Mix:
Architect:
Hartshorne Plunkard Architecture
Bedroom:
127 apartments
Developer:
CA Ventures
2 -Bedroom:
149 apartments
General Contractor:
Regional GC
3 -Bedroom:
44 apartments
Property Manager:
CA Ventures
Equity Provider:
Harrison Street Real Estate Capital
Potential Lenders:
Fifth Third I Private Bank I RBS
Amenities:
Fitness Center
Rooftop Pool
Project Schedule:
Modern Cardio Equipment
Yoga
Entitlements Complete:
Q2 2015
Landscaped Courtyard
Sun Deck
Permits Complete:
Q3 2015
Club Room
Coffee Bar
Construction Starts:
Q3 2015
Private & Group Study Lounges
Wi-Fi
Construction Completion:
Q3 2017
S R i 5 E
CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601 _
Page: 5 VENTURES
CA has designed a project that will be sustainable and target a LEED Silver rating or higher. Below is list of sustainable
features that will be pursued at RISE at Riverfront Crossings:
• Site Planning for Maximum Energy Efficiency • Lowi Paints
• High Efficiency Mechanicals • Bicycle and Scooter Parking
• Low -E Glazing • Electric Car Charging Stations
• Recyclable Materials • Rainwater Harvesting for Landscape
• Energy Star Appliances • Sustainable Material Selections
• Low -Flow Fixtures • Reclaimed & Repurposed Finish Material
• Lot Coverage less than 50%
Based on the below scorecard, RISE at Riverfront Crossings currently anticipates LEED Silver rating with 54 points. RISE
at Riverfront Crossings has the potential to achieve a higher certification level if other criteria becomes available. A draft
LEED scorecard is shown below:
LEED v4 for BD+Q New construction and Major Renovation
Project Checklist
Y ! N
Fundamental command g tlVerification
R q ired
�b. n
lntegmXve P,aceee
1
14 i 1 1 Location and Transp4tte6on
16
go
n
LE ED Iu r Nelghtal atl Development L—t...
-
1
c u
6ensnlve Land PmlecFMn
I
2
n
Hip FioMY Site
2
9
Oe6I
5 MI H Rai antl Diverse Uses
5
5
Renewable Energy Production
Ac t Oalb Transit
5
1
1
Ra F Fo
1
1
fl n sired
Reduced Parking Footprint
1
1
r
Green VeM1ldes
1
71 1 2 still
SIEi— _
10
Y I
IimI llan Ae[vIb bn PoIIWPmmnfon
Required
1 Cards
Thentual Counfort
Sde A nt
1
2
0
SXe D anent Protect or Restore Habibt
2
I
_
SW
1
3
Accepts Performance
Z0
R -pausta, Management
3
2now,
Rest IsldReduction
2
1
Lent Pollution Reesman
1
3 B 0 Water Efgeimcy
Y las,
Ouldogr Water Use Reduction
Resulted
iyi I lai
I nGwr Water Use Reduction
Required
ter Metering
Indoorater
Requiretl
re
nuttlaa Water Use Reduction
2
Use Re
Indoor Water Use terEuse
6
21
V-'.
n
ewllnH Tozer Water Use
2
Water Metering
1
resort
Fundamental command g tlVerification
R q ired
Reryasteles
antl Land
Minimum Energy Performance
Requiretl
amp
Building Usual Snarl Metering
Rall
wrom
Fundamental Refrigerant Management
RequiaA
9"ItingP 1uR Dsessum and OptimizationEnvironmental Product
EnhanmCCammlewi nine
6
ca:r r
0pfimd. Energy Performance
is
r
AdnMed Eal Metering
1
Oe6I
Demantl Ra3PaNe
2
two
Renewable Energy Production
3
swid,
EaM1enced Refrigerant Management
1
o
Green Pwrcr and Date. Starts
2
O R I S E
or
'11, ...n a,
Ie0i S14f.S
Project Name: RISE at Rkwhwt coatings
Date: 1/162015
85011ilatiori and R•tggignign .
13
Y ria.ing
Reryasteles
antl Land
Regnir,t
Y
DeMol
Cunshutlion antl OemWlXon Waste Management Planning
constru
RequireE
somu
Building LXscycle lmryct Reduction
5
4
9"ItingP 1uR Dsessum and OptimizationEnvironmental Product
RH IP bSpecfc credit
2
D reti; ons
2
2
OI ti; 1uct Ds<Iosurtantl OPt mvM an Bouncing of flaw Materials
2
Z
Surfing Poorest Saclrsure and OPtmvton Mateial Ingredients
2
_
car,
construction and Dema11f1an Write Replanted
2
12 0 Initnar FJnllpin- QWro
16
T
M'murn tl A credit, Performance
R. Iretl
T
E-ommulawl Totatic, Eri control
fl n sired
$ r
b Stegies
Ems mosttl A' D It tra
2
lncm It g M t
3
1 ^
ComuctIn. Air 0Illy Management Plan
1
2'loas
Indoor Air Oalb Assessment
2
1 Cards
Thentual Counfort
1
2 oaaat
Interior C[ntin[
3 n
Daylight
I
_
Quality Wows
t cpm,
Accepts Performance
1
4 2
0 Inagivill
6
3:S�cadll
lmoul_5
1
LEED Accredited P hzzional
I
12 2
0 Rcffte1nl lart•riy _. .. _. __..
4
1
RH IP bSpecfc credit
I
1
R6 aIP rySpe YC Doing,1
1
Ra o ry Steel(i
1
_
Rwell Pri Boosted0i
24
g
k
CMXIe2 40 to 09 points, Silwc 50 [0 59 points, Gal 60 to 79 points. Platinum: 90 to 110
CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
Page: 6 VENTURES
mw, ee1104ICI IelJlexuunb' lite PlVPVa0l aJ JIlllvvn, vl Illdihlllg UCZ,H ll aujlAUllenlJ.
OR` eIs 5 E
CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
Page: 7
VA VENTURES
sane
South Downtown
Subdistrict
_
U.
Mixed -Use
Multifamily apartments, Affordable Housing,
Residents!
Student Apartments, Office, Hotel, Retail
ei4e area
60,000 Sf (1.38 ac)
—
PaMirry
resklermal
326 spaces proposed
Loading
0.5 spaces per 1 BR
All access from public alley side, dedicated access at
1.0 spaces per 2BR
south (lower) garage entry, privately screened from
2.0 spaces per 3BR
public parking within garage space.
301 total spares
Loading: Confirmed with Bob Miklo (Sr. Planner) that
raga
no residential loading rgml. exists. Location of
commercial loading is suitable for shared usage by
residential.
oi5n /hotel l stag
NIA In SO subdistrict
Not required, however excess parking provided for
hotel/office/retail use. Dedicated access at north (upper)
garage.
Loading: Per Bob Miklo, loading count per code is
intended for big -box retailers (or sim.). A reasonable
accommodation for the hotel/office/retail use is
preferred. Location as shown will include (2) 12x25
loading berths.
HC spaces
reakbrdal
8
8
coma encid
2
2
setbacks)
hoot
2' (min); 8' (max.)
8' Primary (Court St.)
stepbaclls
Primary & Secondary;
2' Secondary (Unn St.)
70' fagsde stepback
10' fa{.ade stepback
shove 5°' Door
Add'l elective stapback at upper floors as
primary facade
suggested by height bonus. 75% facade continuity
provided per code. Equal architectural quality
provided at both street frontages. Primary and
secondary fill bay dimensions are maintained
to create facade rhythm and define dedicated
entrylaccess points. Residential facades at Linn St.
grade level exceed minimum rqmts. for "Urban
Flex" frontage,
Open space at Linn qualities as "Forecourt" per RC
Form -Based code per location and site, max.
1.5x7.0 dimensional proportion. Optional
fence/gates illustrated on Civil clans. to be included
at discretion of city staff.
side
10,
10% Harrison St. pedestrian connector added ta
provide through -block access
5'(g alley
T provided
bulldog height
CA intends to pursue the max. 15
2stores (min.)
story height achievable via
bonuses in the South Downtown
6 stories (max.)
North building: 14 stories above Avg. Grade Plane.
Subdistrict. This will include, but
15 stories (max. ed
13 stories (736') above adjacent grade. Stapback at
not be limited to Level I a II
section 14 -2G -7G
36' above adjacent grade.
Design Review and will request
provisions)
all applicable bonuses within
section 1420.16, for:
South building: 75 stories above average grade
- cuts A Office span (+2)
See talc. to left;
plana. 16 stories above adjacent grade. Stapback at
-Public Art@Hotel court (+I)
CA would request
5 stories a bove adjacent y rade.
codification (+2)
(+7) of the potential
" udant Haualne(+3)
10+L add'I story
Volsilver
� (+1)
allowances to
' All height/stepback criteria verified w/ Karen
76Arrordabie Housing (+1)
achieve max. height
Howard,Zoning/Development Services
of 16 stories.
comma
10SF per bedroom
8,500 SF of COMMON open space at forecourt
open apace
for Mixed-use Resid.
10,000 SF of RESIDENTIAL open space at 2ne story,
Projects
private amenity deck.
557 beds X 10 SF =
6,760 SF of HOTEL open space at rooftop.
6,570 SF Req'd
1,760 SF of OFFICE open space at stepback.
OR` eIs 5 E
CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
Page: 7
VA VENTURES
L!
F.
RISE at Riverfront Crossings will be compliant with the following applicable building codes:
• 2009 International Building/ Residential Code, as amended
• 2009 International Mechanical Code
• 2009 Uniform Plumbing Code, as amended
• 2012 International Fire Code
• 2009 International Fuel Gas Code
• 2011 National Electrical Code, as amended
Furthermore, CA Ventures prides itself on compliance with accessibility and fair housing standards. The following guide-
lines will be followed for RISE at Riverfront Crossings:
• Iowa Code Rules 661-302.1 through 302.11 (103A, 104A)(based on ADAAG)
• Fair Housing Accessibility Guidelines (FHA/HUD)
• ANSI A117.1 2012
PROGRAM SUMMARY
PROGRAM SUMMARY IPARKING,.
ULATIONS
ICZO Sect. 14 -SA -4:
Lot Area = 60,000 SF (1.38 ac.)
558,746 Gross Sq. Ft.
Minimum Parking Requirements
RESIDENTIAL '
248,515 Net Sq. Ft.
` 127 IE R/16A Units
0.5 Spaces per 1BR Unit X 127 Units = 64 Spaces
N 149 2BR/28A Liniis
1.0 Spaces per 2 BR Unit x 149 Units = 149 Spaces
44 3BR/2BA Units
2.0 Spaces per 3BR Unit x 44 Units = 88 Spaces
320 Wait. -
301 Residential Parking Spaces Required
MJA(326
Spaces providedd)
HOTEL
HOTEL PARKING
81,373 Net Sq. Ft.
Not Req'd in RC District
19 Keys (Rooms) X S Flrs.
OFFICE PARKING
Not Req'd in RC District
RETAIL PARKING
Not Req'd in RC District
PARKING REQUIREMENTS
Level P-01
95 Spaces 37,325
Level P-02
95 Spaces 37,325
Level P-03
93 Spaces 37,325
Level 1
43 Spaces 21,885
T arkine Provided
301 Required Parking Spaces
(Compliant)
R I S E
R F.
CA Ventures ( 161 N Clark I Suite 4900 1 Chicago, IL 60601
Page: 8 VENTURES
RENDERING
GROUND LEVEL PERSPECTIVE
LOOKING SOUTHWEST
Following city discussions, review of comments, and rigorous implementation of the Riverfront Crossings Form -Based
Zoning Code, CA has reached a final proposal that is an evolution of the original design idea. The dual -building scheme and
courtyard concepts have been maintained in conjunction with newly added "L-shaped" forms that now result in a break of
open space providing facade relief to the neighboring context in the east/west direction. The 75% minimum street frontage
is provided, allowing each component of the mixed-use Residential, Hotel, Office, and Retail program to have direct
interface with the public right-of-way, while concealing all off-street parking and loading access at the public alley. All
originally proposed unit, bed, parking, and square footage numbers for all uses have been maintained or slightly increased
through the recent design adjustments.
O R I df S E CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
R ° °°' ° " °{ T
SSPage: 9 VENTURES
IAO Inf
RENDERING
AERIAL VIEW
LOOKING WEST
The site configuration makes for an efficient hierarchy and distribution of public/private program uses. To the north, the
smaller, shorter hotel/office/retail building places contiguous public program along 100% of the Court St. frontage. CA
has worked intensively with the design team to establish grading conditions which optimize the building appearance
and function along the right-of-way, eliminating the need for unsafe and unsightly recessed plaza spaces along the sl'
perimeter. The natural street grade declines from the NW corner along both primary streets to the SE corner, allowing
separate access points for the various site uses to establish their own entry locations and character.
ORIS E
CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
Page: 10
1
VENTURES
••
SITE PLAN PARKING LEVEL P-03
m w• w' ne en• E._ E.
w• w• w' nr
—? _ — _ _
_ wuurxr mwoxunr w„a r]n„r „nal Lnnr �ems _
W!L muw
1W.n'P.LV IFO6TeL •
�• Yk �.._..-..-.._..-..I
_ _ _ _ _ _ _ _ _ w
R)W NIIPY ,.-
ROOF TERRACE _ _ wKrarartn 1
< HOTEL11110
I .4
II I I "I�
2
PLAZA 03 GARAGE Ii w'
PU\COGRTYARO Ca[U%ee
1
xesmexnaL 1
b I OxLGF I
s 1
RESIDENTIAL
LEI_ --
ENTRY _ I I �♦1 s I
GARAGE
ENTRY
w
2- SE ACK I OO
! 10'3ETNACK , I
RE¢IOENTIA p
• AMENITY CE R 1
• 6 CK 1
E. IM
• � I,.E I _ _ _ _
• E' !I nWPuv
eGw rovn ei
GARAGE
• ENTflY
' i�4LlL-0 _ w' 1I
• R �� �•� 1H78'Pl 1978'TPA
F I _—
• _. F7
•
•
• O R I S E CA Ventures I 161 N Clark Suite 4900 1 Chicago, IL 60601
• Page: 1 1
VENTURES
eee
PARKING LEVEL P-02
so
PARKING LEVEL P-01
I eu• eeo• m _ E.
eeomo mr 6
uduevno : e'i = e[ale[nlm� -' RETAIL
F1 4 I N L�
1ZA 02 GARAGE III eer IMAZA 01 GARAGE _
- II C •'
SF `
ye 9f
A
IU
M
1
�
e
�
I
er•
—TnnRfl
-::q
E
mvve��
IDBS s!
I
erose vs
O R I S E CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601 0
x`
Page: 12 VENTURES
vvsae vaxr g
fP055I ML5
Z-1
FIRST FLOOR PLAN SECOND FLOOR PLAN
I I I
I I
xmEl Emnv mYR16x Exwr Rnnsxlnr urn Lrt9r =
XOI0. OIxPOf[ -
I6L5]'P.L. iNf ] IW.6)'RL
• • •� � - � f � REiYlnllO I I
tI HOTEL COMMOP RETAIL r ¶ OFFICE INCUBATOR
— ' LOBBY ENTRY
I
Of FIC d IuVI
- - LOBBY'-
- I
HOTEL - �_� h I µ• �'�-� �w'
BAR I REST.I, LANGscAPEG Ili E' mwriuuo I�I ;III
�CGGRTYARO A6
RES. I uI LED uuuw
'- LOBBY umrm 69Ev 9az5
PNPGFMPrt E IFPS N6 UNI01 05DSF 10906F IEDET I
ldRYf N 9,i C[ - - �- B 11w6 x50S,
L11AgNG I ELECT
ENTRY PARKING I'
GARAG�
C N6, _ len'
ENTRY —___--- Iwi� -- Nl C1
6
wlFl 61464w
E6
Illbwn 69
1 - wIDY ISfA 1
• SW I Pm 54644
RESIO.
__-E AMENITY
• LNrtw
RErS
^ IGENTIA uxll of
066 . A NITY GE IR B5w6
ruof
Ry IL
�Nllw uNI66
w9 —i
C1 I
IF w• I � asss eeA' � 1
• uxuw — — urvlR ;.
•_ 6w6 x646
-- — — —- _—I_ es6s1.
I ash IF yy
• '
ELECT
uurm
• ®e' m INTI II III IND IINIIOS NSEO
RYIPOYi01fNLR41 NP' R 106444
YF6M ]6E6 61ID. ICFO 3BE6
GARAGE loos ss vrss mss el6sv
• ENTRYEr
- -- _ -
11 •.JII�ut _ _ wr 111111111(6 IIIIIIIIIIII IRlllflll'll jI11TII�III <� n]'
• L -a.v—.
150.]B'Pl. 150)9 PL
• � I I _.- i � II Y II. Ili '
•
•
SR fJ E CA Ventures 161 N Clark Suite 4900 Chicago, IL 60601
Page: 13VENTURES
3RD -4TH FLOOR PLAN
_eeB_
TYPICAL HOTEURESIDENTIAL t
FLOOR PLAN `
I
-
P—
Bn'
_rR
r IR5)'P� L �_top
eep'
OFF
ROAI OI IRWIN MEN OfRNYdMOM RAmII LBRVY diRORld
moan. uxc mIG wrlG IFNI-- nxJ m wls
F
yl
y
iF RIOIIB m
I$ RLOI II IOJLN IryL
`
1/!
RfOM
mmd: XMG 4TG IR
NF OIIEFNi
'
ii ROIeIBI
ROIIE61
IIRIW IIi
I
IR 011fdi
RPN1101 ��
9G
_
I a001111 i \
eLp115 ���00.014N1i
MME
_ NNE]' JNid
U Ilf
ON 02 II IF }MO
m UMIJI 80 SF BSE Bf INOBf
HB 5J 3!
neIF
I II JMIP NFL''
MLN 11211 --
a BEO �I SIS S
FIT
506f UNN R2 li iii^Il_
2H EU UNIT05
_ B5E Bf � �i IBFO
i 5153[
UM100
Fm
R¢ ]azEl 51511
I,, IF
IDENiIA -- UNIT O)
AM NIM DE ( I.G
BELOW "IF IT BswF
m eF
UNIT
d
2 BIO
,me JNII IB 05015
¢BFO
_ 4y BSO Sf
l
UNi OB
Mi IA ]BFI
SIUOO BSO 3I
",I,3f
NNMI IS UMi18 N11 SIS IF
II _.
8]O SF ,I, F45FF NFC'
UNIT IO
IF, UNN II UMi.T I] UNIT IR UNIT II Id53f
3 NEN I BEN I IF, I BEO
1ON58f Ne 3F 5158F 1.3F
1
I �
IRA P L
RF S E CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
Page: 14
0i
len'
Oil
eN'
I
I �
i
•
VENTURESAft
`
00 AMENITY LEVEL FLOOR PLAN AMENITY EXAMPLES
ow
00
See eeB __ _ are nt• _ E. CC
00
00
ROOF TEflflPCEy
00
I.�
HOTEL
— AMMENITENIT
Y
00 j
I
POOLIIow
00
.
I
00 L
6- MIT 11 ^ UNIT
UNIi01 I B5A1&0
UNIT 01 2AE0 U6F IIII 8f
SBE` 0503[
I l UILT11 ELES!
1XU'N. STTI
1115 I .11 5154E
� 11 ems' UNIT 22 IND.
xSf 1 ] 4F0 UNIT BE
— .EBF1BEO
U. 11
00 IO°En oe
MIT xI l e5o
I BIT 155E
o B509f
A
Nm ENiofIa UI E.
PB
J EB
BELOW wf3V 95ov
00
xEEO
wEF
o2 B
"
UNIT 19 85015E
E
I BSBSf I
-- UNIT 00
um*lB Aeco I
J 311010 5051
UNIT 16 UNIT 11 515 SE
OR I
s 515'3[ 513.3..
TIT
X1111
'$ IL UI NEED
Me Y. 1N1 ' 1] ! x UXIN 1[965,
F1ET
SO1BF0 TBFB IPSO
IWS OE 5154' 5150E NEFF
.A j �T �..
150.]B'PL
04
J i 1
00
000J
O R I $ E CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
sr
P EEVOF E F P o E I Page: 15
AA�VENTURES
PROGRAMMATIC SECTION DIAGRAMS
RESIDENTIAL HOTEL/OFFICE
BUILDING BUILDING
153'-0 .136'0-
_____
19hFLR. ._ _ _ I`P— 1' HOTEL ROOFAMENITY 131h FUR_
Il P HOTEL BEYaw HOTEL
HOTEL
HOTEL
gawk HOTEL
RESIDENTIAL r NOLFL
REGIMENTAL � HOTEL
RESIDENTIALLB HOTEL
RESIDENTIAL HOTEL BEYOND XOTEI
flESIOENT14 OFC INCUBATOR BEYOND OFFICE INCUBATOR .3A' -0 -ABOVE AVE.
_
aruw
- _ _ _ OFC INCUBATOR BEYOND OFFICE INCUBATOR GRADE PUKE
RESIDENTIAL
RESIDENTIAL OFC INCUBATOfl BEYOND OFFICE INCUBATOR
N AVL ua� RESIDENTIAL RES LOBBY LANDSCAPED PLAZA RETAIL ne'AVA AxapF VFra+o
wNuxu a._ RESIDENTIAL I PARKING P 01 _
_WFUR RESIDENTIAL IPARKING P03 -
_ PESIOENfIALIPARKINGP.03 _ _ _ At ----------------
NORTH/SOUTH
------'NORTH/SOUTH SECTION LOOKING WEST
HOTEL Y REYONO
HOTEL MIA FLR.
HOTEL _
HOTEL
HOTEL
HOTEL
HOTEL
HOTEL
HOTEL
HOTEL `
.34'0- ABOVE AVE. OFFICE INCUBATOR
GRAOEPLANE OFFICEINCUBATOR
OFFICE IN CUBA TOR
RETAIL 4 WILL 'LOBBY HOTELLOBBY'
.1 4341 P�0I PARKING
P 02 PARKING
P-03 PARKING `
EAST/WEST SECTION LOOKING SOUTH
O RIS E CA Ventures 1 161 N Clark ( Suite 4900 Chicago, IL 60601
1A051I N1.
Page: 16 VENTURES
CIVIL SITE PLAN - ACCESSIBILITY, ZONING, & ACCESS LAYOUT
VICINITY MAP
CONCEPTUAL SITE PLAN
�ySCALE 1•.,D
NOT TO SCALE
SITE PLAN KEYNOTES
OIRGPINLY UNEeO
ACCESS .-INS
OHOTELeO
RALBMN CREEK
ONOTE, POOL
O A..E1AROACCEBa
OLANO%AFEOCWRTVARO
O REONNNOWALLANDRANP
ORESI13EH11AIEL.ISI.
O GARAOEPARKINO ACCE.S
ORENDENMLANENTE9OECK
O STRETICREENEENCES
lO AWBIOEAA1EIEE...NO
O LOAOMGARE[
SITE INFORMATION
81TEAOSflESlTM
SETEAC ES.
u LINNBTREET
EAI 3 FEET, IG FEETABOYE LEVEL!
EYNTiNGZONING: PUBLIC
'80010 10 FEEEi T. OFEETABOVE LEVEL!
LOTSE`E
NEST:I III
.'-.
EALLENEMB'. NONE
EABTMEeT.CITNN
FT
TOTALSUIIDINGVENICVURPA IING
LEGEND
N,DNDED-�
ExISTNGFEATURES
lroRM aENEn
eA.Rl..A
— — — — — — —
NAOR CONTOURS
"
MXJR.,AS
PROPTY LIKE
ICTRAFFIC
DIRECTION
ELECTRIC UTILITY
UNMRQROUNDNAGIIs ^
—. —y—
STE. NLe WETGGAL
,,.....� 1.38
LONCEPTUAL LAYOUT PIAN
hbk
SN6INSS I
NGINEEPINING.LLC
E.GIIIA 5 S
N aI .
P.—M1133LT81T
IAC 13391 SELE.,
$TVOFJ�T
3 uvv Si.,SYTISA0
OlICAS., IL.1
PHONE NO. (112) N44LB7A
MARNNOR�
ARCNRELTVRE
NORTH URPENTER ST.
CHICAGO, IL POFD]
P O.OM iE6<a9a
TC BL LETERIVINED
CONCEPTUAL
MILAN
. CA has coordinated with HBK Engineering's Iowa City office to assist with planning around specific site criteria. Given the severe
site topography, HBK has developed a grading and access strategy that provides universal access for those with accessible needs
both within the site and the surrounding public right-of-way. HBK has also consulted with city staff to verify zoning requirements
. pertaining to the location and quantities of off-street parking and loading requirements. The hotel/office component includes
. curbside dropoff at Court St., and dedicated parking/loading access via the public alley.
O R 15 E CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
Page: 17 VVENTURES
(YO[SINCa
CIVIL CONTEXT MAP - FLOOD PLAIN REVIEW
MAP SCALE V • 1000'
S00 0 1000 2000
F
DARK GRAY AREA
1 k ANNUAL CHANCE FLOOD
(100 -YR FLOOD EVENT)
100 -YR EL. NEAR BLDG = 654.00
LIGHT GRAY AREA
0.2% ANNUAL CHANCE FLOOD
(500 -YR FLOOD EVENT)
V n,5xel uuF
FIRM
FLOOD NSURANCE RATE YIAP
® JOHNSON COUNTY,
IOWA
ANUwCORP MDARF.fB
PANEL195OF450
tFEe w,v .eo, nw nw vua urwm
,mm uu mrt,w
®i
WNUhER
19MNA1w
FESMIARY 142101
FppY Gvgmq Mn�nFnmml Agmq
., hbk
ENGINEERING
HBK has also performed a Flood Plain analysis, and has identified that the SE corner of the site appears to encroach into the 500 -
yr flood event zone. A professional surveyor will need to confirm the extents of this zone, however the design team has planned the
finish floor elevations of the lowest level in accordance with the code guidelines below:
Residential Buildings:
All new or substantially improved residential structures must have the lowest floor of the original structure and any lateral addition elevated a minimum of one foot
(1') above the flood hazard elevation. Where existing topography, streetgrades, or other factors preclude elevating by fill, alternate methods of elevating, such as
piers, may be allowed, subject to approval by the building official. In such a case, a licensed professional shall certify that the methods used will be adequate to
support the structure as well as withstand the various forces and hazards associated with flooding.
Nonresidential Buildings:
All new or substantially improved nonresidential buildings must have the lowest floor of the original structure and any lateral addition elevated a minimum of one
foot (1) above the flood hazard elevation or, together with attendant utility and sanitary systems, be floodproofed to such a level. When floodproofing is utilized,
a professional engineer registered in the state shall certify that the floodproofing methods used are adequate to withstand the flood depths, pressures, velocities,
impact and uplift forces and other factors associated with the flood hazard, and that the structure below the flood hazard elevation is watertight with walls
substantially impermeable to the passage of water. Such certification must also indicate the specific elevation, in relation to national geodetic vertical datum, to
which any structures are floodproofed. A record of this certification will be retained in the office of the building official.
ORIr. ofS E CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601 A
1 ° F , s' F ',w 9 °<< x ' Page: 18 VENTURES
RISE at Riverfront Crossings will have a significant economic impact on Iowa City through the increased purchase price,
property tax, lodging tax and job creation. Below is a summary of the estimated taxes that RISE at Riverfront Crossings will
generate:
Tax Analysis
Portion to
City
to _
ls
Est. Residential Assessed Value
-
:..
Est. Residential Property Tax
$419,048
2 •..
Est. Commercial Assessed Value
-
•:
Est. Commercial Property Tax
$285,399
7
Total Est. Property Tax
$704,447
9 : r
Est. Lodging Tax
Est. Sales Tax (From Food & Beverage)
$403,894
j$2347
••
Total Est. Tax (Per Year)
$1,108,341
9Total
GAP/Assistance Requested
None
Total Est. Tax (15 Years)
$20,613,939
946Less:
GAP/Assistance
Net Tax Over 15 Years
$20,613,939
946
Net Tax Over 15 Years w/ Purchase Price:
$27,113,939
CA has maintained the land purchase price at $6.5 million. If selected, CA will put a $250,000 deposit down while nego-
tiating the fine points of the agreement. When combining this purchase price with the net tax over 15 years, Iowa City is
estimated to directly receive over $26 million.
This project's economic impact extends beyond revenue generation by also providing job creation and affordable housing
units. With an estimated construction cost of $78,892,907, RISE at Riverfront Crossings is expected to generate between
400 to 450 construction jobs over the course of 20 months. Upon completion, the project will create approximately 70
permanent jobs while accommodating 100 permanent jobs within the 25,000 square feet of office space. The design also
includes 32 rentable affordable apartments (10% of total units) that will be designated to households earning less than
80% of the area's median income. All 32 of the affordable apartments will be one bedroom units.
ORI S E
fl1YFA GY11Mi
IPII1 S1NF.i
CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
Page: 19
VENTURES
Since the first submittal, CA Ventures has been in constant contact with Hilton Worldwide, who has continually expressed
interest in the RISE at Riverfront Crossings project. While CA initially thought Hilton would choose the Garden Inn brand,
our due diligence has found a Garden Inn already in the pipeline for the Iowa City market. In response, Hilton has ex-
pressed interest in using either Canopy or Curio brands for this project.
Please see the below 101:
OR r . F . ONT E
R Rt VEi R
rap<<r.1,5
F7 HILTON
WORLDWIDE
January 13, 2015
John Diedrich
VP of Investments
CA Ventures
jdiedrich@ca-ventures.com
Re: Iowa City, IA
Dear John,
5uaan & ..
Hlkon Wor l M
Sr. Dkutm, D., kW n[
755 (lower lane
PPHP -, Ptft
Hanphk, Tl 30117 USA
((D, M 0, MO, MN, HE,
PH: 901-374-5950
ND, SD)
f%901-379-6300
.h rranphlft o.mm
VIA E-MAIL
It was good talking to you about your downtown Iowa City project, it sounds like a
great opportunity. As we discussed, the Canopy and Curio brands are both available
for that market and I think your location would be a good one for either brand.
I will try to get up to the area to look at the site as soon as possible; perhaps we can
meet at that time and discuss the project in further detail.
Please keep in mind, it is the policy and practice of the company to enter into license
agreements for specific locations only after formal application for the franchise has been
received, processed and duly considered by our Development Committee.
If you have not been to our website to review brand information please be sure to do
so. The address is: www.hiltonworldwide.com.
If you have any questions concerning any aspect of our franchising procedure, please feel
free to call me at 901-3745958. Again, thank you for your interest in Hilton Worldwide.
SinGcerelyy,,--
C�
Susan Bachman
Sr. Director - Development
Northwest Region
CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
Page: 20
VENTURES
CQ RE��
What we're all about 9Y ."'°.
Canopy by Hilton is the energizing, new hotel in the neighborhood offering simple,
guest -directed service, thoughtful local choices, and surprisingly comfortable spaces,
so guests simply feel better going forward. Each property is designed as a natural
extension of its neighborhood, with local design, food & drink, and culture.
OUR NEIGHBORHOODS
Canopy by Hilton will develop through new -build and conversion projects in key urban
neighborhoods and vibrant secondary markets around the globe with properties expected to
begin opening in 2015. Canopy by Hilton currently has 11 signed letters of intent to open in
the following neighborhoods:
• Canopy Portland I Pearl District
• Canopy London I Neighborhood to be announced
• Canopy Miami I Brickell
• Canopy Washington, D.C. I Bethesda North
• Canopy San Diego I Gaslamp Quarter
• Canopy Nashville I Downtown
• Canopy Savannah I Historic District
• Canopy Indianapolis I City Centre
• Canopy Charlotte I Uptown
• Canopy Oklahoma City I Bricktown
• Canopy Ithaca I The Commons
OUR CULTURE
Canopy by Hilton's culture is defined by who we are and how we interact with each other, our
guests, our partners, and our neighbors. Our culture, "Positively yours," is much more than a
slogan. Its our underlying attitude, the story of who we are and how we approach everything.
Why we are here:
So you simply feel better
going forward. New and
different. Ahead and
active. These "fresh -
forward" qualities
describe our commitment
to guests, partners,
neighbors, and
enthusiasts.
What we do:
Create a positive stay.
We focus on the simple
details that make a
different, always a step
beyond the expected.
Every detail hasjust the
right feeling: caring,
energizing, positive.
How we do it:
Simple. Personal. Positive.
Local. Keep things simple
and focused on the
personal. Look at every
situation from the bright
side. Take pride in our
neighborhood and gladly
share what it has to offer.
canopybyhilton.com i news.canopybyhilton.com
John Walls I Director, Brand PR i +1703 883 5232 1 john.walls@hilton.com
R I S E CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
`.'I .I I Page: 21
VENTURES
COROP",
What we're all about
CANOPY EXPERIENCE
Creating a "Positive Stay" is our Brand promise. To bring the promise of a positive stay to Life,
we focus on five essential aspects of the total guest experience:
• Energizing, comfortable experience.
Open, welcoming Lobby I Friendly,
facilitating staff providing guest -directed
service I Casual F&B with healthful
choices I "Positively Yours" service
culture.
• More included value. Rise & Dine
complimentary breakfast delivered to
room or to go 1 Included fresh, artisanal
breakfast in the cafe I Free basic W i-Fi.
• Suprising Extras. Welcome gift from the
neighborhood I Thoughtfully themed,
FOOD & BEVERAGE
• Canopy Breakfast. A signature
complimentary concept to start your
day. Every morning in the cafe, guests
will enjoy an artisanal breakfast featuring
fresh, local ingredients. For those on the
go, a Canopy Rise & Dine breakfast offers
Local tastes delivered to the guest rooms.
• Caff all day. A made-to-order and ready -
to -serve menu for both takeout and table
delivery and a bar providing refreshing
juices, wine, craft beers, and signature
cocktails.
reasonably priced foodie bags I Evening
tastings featuring Local offerings.
The just -right room. Great bed and ideal
sleep environment I Open shelves and
hangers provide uncloseted ease
Filtered Water.
Local know-how. Locally inspired design
Local art and music programs
Neighborhood fitness options, including
bikes and jogging routes I Guides to the
locate
Evening Fun. Each evening, the Lobby bar
will host a complimentary tasting of Local
craft beers, wines, or spirits. The caff bar
takes center stage for serving small bites
and enticing beverages. Guests canjoin
the hum or slip into a quiet corner to let
the night unfold.
Foodie Bags. Guests may also choose
one of several thoughtfully themed and
priced foodie bags for their in -room
minibar, each selected at check-in.
HILTON WORLDWIDE
Canopy by Hilton is the Lifestyle brand of Hilton Worldwide, a leading global hospitality
company. For 95 years, Hilton Worldwide has been dedicated to continuing its tradition of
providing exceptional guest experiences. The company's portfolio of 12 world -c Lass global
brands is comprised of more than 4,200 managed, franchised, owned and Leased hotels and
timeshare properties, with more than 690,000 rooms in 93 countries and territories.
HILTON HHONORS
At Canopy by Hilton, Loyalty is rewarded. As a member of Hilton HHonors, our award-winning
Loyalty program, guests can earn exclusive benefits and Points towards free nights, premium
merchandise, unforgettable experiences and more. HHonors Diamond and Gold members
also receive extra HHonors Bonus Points and space-avaiLable room upgrades on qualifying
stays.
canopybyhilton.com I news.canopybyhilton.com
John Walls I Director, Brand PR 1 +1703 883 5232 1 john.walls@hilton.com
R 1 5 E CA Ventures J 161 N Clark I Suite 4900 1 Chicago, IL 60601
lFll141Yf.5
Page: 22 VENTURES
00
00
00
00
00
00
00
00
00
00
go
4D
CURIO
A COLLECTION BY HILTON"
Take a journey of discovery
Individuality. It's what unifies the hotels in the Curio
Collection. These hotels exude authenticity. They capture
you. Each with a distinct character and personality that you
can't duplicate.
Curio is a collection of diverse properties that have been
hand-picked for their character and uniqueness. Created
for those who want to step out of the day-to-day and make
new discoveries, these hotels come with their own stories
and rewards for the curious.
This is Curio — A Collection by Hilton
From downtown landmarks to out-of-the-way local gems,
each Curio hotel is hand-picked for its distinctive charac-
ter. Each one part of the fabric of the city it calls home.
With Curio, you'll discover unique, independent hotels
while still enjoying the same benefits offered to all Hilton
guests — including access to Hilton HHonors, the world's
leading hotel loyalty program. So whether you're seeking
the excitement of the Las Vegas strip, or the beaches of
south Florida, Curio has a place to reward your curiosity.
0
R CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
"' ` ` Page: 23 VENTURES
As a result of the Hilton Garden Inn being unavailable, CA Ventures has been in recent contact with Marriott. This interna-
tional corporation has also expressed interest in the RISE at Riverfront Crossings project. Marriott has chosen to elect AC
Hotel as the available brand.
Please see the below LOI:
It ,�a1Tl0�j. Marriott InternatDevelopment
Inc. Bethesda,
da,MID d Road
■■ll ■■ll Lodging Development Bethesda, MD 20617
January 13, 2015
Mr. John Diedrich
CA Ventures
161 N Clark Street, Suite 4900
Chicago, IL 60601
Dear Mr. Diedrich:
Marriott International is pleased to advise you of its support of the project you're pursuing at the intersection of
Court and Linn in downtown Iowa City, IA. Having analyzed the location, market, and regional growth, we
believe this to be a great opportunity for an upscale Marriott brand and more specifically, support our AC Hotel
line for this project. As you are aware, the AC Hotel brand is our European brand that was conceived in Spain
with a distribution of over 80 hotels internationally and currently maintains a growing pipeline that covers most
major urban locations in the United States. I believe that the modern contemporary European style of this brand
will provide a great compliment to your overall project as well as the City and academic setting.
We are excited about this project and are happy to support you with design review and brand programming as
you refine the concept Please keep me posted on your progress and don't hesitate to call or e-mail with
questions as you work through the process.
Sincerely,
Lee Janezic
Director of Development
cc: Paula Mahrenholz
Tom Onken
O R ( 5 E CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
r,a
Page: 24 _' VENTURES
rnosstu
5. POTENTIAL HOTEL FLAGS
T _
AC HOTELS BY MARRIOTT"M
Founded in 1998 by Antonio Catalan, AC Hotels has
more than 75 properties located in Spain, Italy, France and
Portugal. AC Hotels and Marriott International formed
a joint venture in 201 1, leveraging the unique style and
design
of these upscale urban -inspired hotels with the
portfolio power and distribution of Marriott International.
AC Hotels by Marriott provides innovative spaces of
JL
freedom and comfort, with a style that defines the most
r
A *
contemporary hospitality — the unmistakable AC style. This
brand targets travelers searching for a design -led hotel
in a great location. Sleek, sophisticated European -inspired
aesthetics bring the culture of the location alive to support
our guests' experience.
With its global expansion, we now introduce AC Hotels
by Marriott to the United States in the top twenty travel
markets, expanding Marriott's reach to an under -served $2
at #
billion customer base.
f
0
6. POTENTIAL HOTEL FLAGS
AC HOTELS BY MARRIOTT - STANDARDS
EXTERIOR
Signature AC logo on top corner of the building • Signature channel lettering at main
entrance with location name _
PUBLIC SPACE/REGISTRATION Registration
European sensibility with linear clean aesthetic • Tone -on -tone color palette • Gallery
quality, modern art and artifacts • Flexible layout • Retail inspired lighting
RETAIL -
Sleek retail display adjacent to registration • Innovative shelvin i'„•-;;
j
Features speciality waters, sweet treats and delectable snac a- _ •: _ _— � '
AC LOUNGE
Contemporary European design infused with signature lounge seating and multimedia iiCioun
area • Known for its dynamic atmosphere • Selective mix of beverages and delectable
bar bites • The AC Lounge defines the local bar scene
lighting • Complimentary Wi-Fi • 47"Television • Two prototype options -
FITNESS
Complimentary state-of-the-art fitness facilities • Accessible seven days a week, 24 hour x
a day • Personal viewing screens (i.e., LCDTV) on all cardio equipment • 32" Flat -panel
LIBRARY
Collaboration area with low communal table • Reading area with carefully curated press,
magazines, city guides • Wireless printer and laptop or tablet for guest use • Adjacent to
-
the AC Lounge
Library -
BREAKFAST
Healthy crafted small -plate breakfast (paid offering) including a wide range of fresh
products and juices • Flexible space cross -utilized for meeting room and private events
MEETINGS
a
Required two AC Media Salons with integrated technology • One medium-sized room for
business or social events (optional) - Featuring Workspace on Demand by Marriott for
online meeting space bookings
Breakfast.,
GUEST ROOM
Simplistic design with consistent FF&E in all rooms • Signature closet featuring exposed
design • Showers as standard • Work desk and luggage bench • Thoughtful architectural
lighting • Complimentary Wi-Fi • 47"Television • Two prototype options -
FITNESS
Complimentary state-of-the-art fitness facilities • Accessible seven days a week, 24 hour x
a day • Personal viewing screens (i.e., LCDTV) on all cardio equipment • 32" Flat -panel
00
00
Since the first submittal, CA Ventures has been in constant contact with Starwood, who has continually expressed interest
in the RISE at Riverfront Crossings project. Starwood has chosen to elect Aloft as the available brand.
Please see the below 101:
starwood
Mate15 MN
R. mu
Jamey Cua
SENIOR DIRECTOR. DEVELOPMENT
Te14.06.3118 F614.695.1462
C 814,4095051
E Pa= WaioR_o]Eo,els'MM
5241 spE rmh coup
W.
1%ON 43162
Med .area
VIA EMAIL
December 31, 2014
John Diedrich
VP of Investments
CA Ventures
161 N Clark Street, Suite 4900
Chicago, IL 60601
Re: Aloft Hotel, Iowa City, IA
Dear John
Thank you for your interest regarding the Aloft brand in Iowa City, IA (the "Hotel', and your interest in the
possibility of having Starwood franchise the Hotel as an Aloft Hotel. Based on our understanding of the
market and your description of the Hotel project, we are pleased to express our interest in further evaluating
this opportunity.
Please now that this letter is only an expression of our interest to further evaluate this opportunity and does
not create any legally binding obligation on Starwood. You should not rely on this letter, or any further
discussions regarding this potential transaction as an agreement, ober or commitment by Starwood to enter
into any transaction with respect to the Hotel.
We look forward to continuing our discussions with you.
Sincerely,
Jamey Cua
Senior Director, Development
Starwood Hotels & Resorts Worldwide
cc: Allison Reid
W b[...
ORarS E CA Ventures 161 N Clark Suite 4900 1 Chicago, IL 60601
Pt v6 Rc vdv. Page: 27
uD v srar, r
VENTURES
6. POTENTIAL HOTEL FLAGS
an a- st
advantage
Aloft Hotels caters to the next generation of travelers
who crave jet -setting style and a vibrant social scene
ata competitive price.
Bold, sleek and unique, Aloft has completely redefined the select service category
by pairing a tech -savvy, design -oriented product with the power of Starwood Hotels
& Resorts' global sales and marketing platform, including the Starwood Preferred
Guest' loyalty program. Aloft is stealing market share, sending satisfaction scores
soaring and increasing third -party recognition—and all with an international appeal
that drives global growth.
In touch, in style and in demand, Aloft's portfolio is growing around the world.
The time to seize the Aloft advantage is now.
sryie
at a steal
❑ean, contemporarg architecture is adorned with
a stylishly striped pofte cochere that leads the wag
Active and inviting, our public spaces are always alive and abuzz with activity.
Our loft -like layout with knocked -down walls creates a modern space that's open
in design and open for adventure.
Our signature round front desk puts our talent in the hub of it all, allowing
them to easily survey the space and multitask, while conveying a feeling of
accessibility to guests.
With a bright and buzzing social scene, w xyz bar'" anchors the space with a
contemporary setting and flows into the inviting re:mW- lounge. Day -to -night
lighting, a pool table and board games encourage guests to come down from
their rooms and socialize.
Work or play, Aloft is designed to accommodate today's trends and the
lifestyle of tomorrow's traveler. Energy flows freely, personalities mingle and
opportunities abound.
SM
o�
A VISION OF W HOTEL S
The new way to stay and play
w xyz bar-- The fun flows freely with signature
cocktails, a full menu and live music. Live atAio(t
Hotels events make this hot spot the place to be,
generating revenue and attracting both guests and
locals alike.
re:mixaa lounge A playful place or quiet space,
re:mix lounge has everything right within reach, with
plenty of seating, fast + free WiFi and music to switch
up the vibe.
refuel by Aloft- Guests on the go energize 24/7
with grab'n go gourmet light meals, mix -and -match
snacks and regional treats from dim sum in China to
make -your -own cappuccinos in the U.S.
guestrooms Nine -foot -high ceilings, plush platform
beds, fast + free WiFi, 42" LCD TVs, custom amenities
by Bliss" Spa, rainfall showerheads, our signature
coffee and more. Guests' gadgets power up in our
plug 'n play docking station, which also links a
computer and tunes to the TV.
re:charge-- Sprint, stretch, lift and pump -day
or night. Plus stationary bikes, treadmills and
elliptical machines from Life Fitness -all the tools
for a fitness fix.
backyard Warm rays, fresh air and lounge tunes
keep the vibe going outside, with stylish seating,
mood lighting, and an indoor/outdoor fireplace.
splash Guests can take a dip or relax in style at our
pool, open morning to night.
tactic Great ideas are sparked in our sleek meeting
space, equipped with state-of-the-art A/V, plasma TV
and fast + free WiFi.
5. POTENTIAL HOTEL FLAGS
rast &
Flexible
Aloft offers friendly and flexible building options
designed to meet your location and market -
purpose build, adaptive re -use and conversion
The Aloft prototype is a highly effective build -in -a -box that opens quickly
while remaining cost efficient. Bright and bold conversions and purpose
builds feature an easy-to-use, fully sourced FF&E package.
Across all building variations, flexible food and beverage options are
available based on specific market needs, with requirements limited to
breakfast, a pantry and the w xyz bar,
aiwags
in step
AlofYs cutting-edge technology
and programming is designed for
the next generation of travelers.
From fiirsttouch to lasttaste, the
fresh and hip Aloft experience
resonates with guests.
EnErgp is
& alive
With an eclectic, carefree style and a buzzing
social scene, Aloft offers self -expressers a fresh,
fun adventure at a competitive rate. Our core
values—a sassy attitude, a savvy approach
and a hip, urban -inspired space—affect everything
We do, from our stylish design to ourtech-forward
programming, and ensure an effervescent,
energetic atmosphere.
r--
Aloft Tallahassee Downtown
Tallahassee, Florida, USA
MEN
Aloft Brussels Schuman
Brussels, Belgium
all
Air
e
Aloft Richmond West / *'
Glen Allen, Virginia, L*&, -
CA Ventures has contacted Bricton Group to potentially operate the hotel aspect of the RISE at Riverfront Crossings project.
CA and Bricton were project team members on a Hyatt Place in Normal, IL, and are excited about the potential to work
together again.
Please see the below 1-01:
r.
The Bricton Group
NO SP i TA L ITT RES OU RC E5
January 6, 2015
Mr. John Diedrich
Vice President – Investments
CA Ventures
161 North Clark Street, Suite 4900
Chicago, IL 60601
RE: Iowa City Hotel – approximate 144 units
Dear John,
Thank you for providing us the update on your progress with the above -referenced asset
in Iowa City. As we discussed, Bricton has a strong interest in operating the asset and
being part of the transaction.
Bricton is a Chicago -based hotel management company which currently oversees a
hospitality portfolio consisting of 23 hotels with a market value of approximately $450
million. Our 24+ years of experience allows us to bring a deep breadth of experience to
operating hospitality assets.
Bricton has a strong record of successfully operating big -box full-service hotels, select -
service hotels as well as resorts. For the Iowa City transaction, we currently operate in
two Big 10 cities and have previous experience in two others. Our 225 -room, full-service
Holiday Im located in Am Arbor is a top performer in the area We have operated there
for 21 years and have forged long-lasting bonds with the university, city and civic groups
as well as numerous high-tech and health companies (for profit) that are associated with
the University. We have replicated that performance in Lafayette with Purdue University.
We operate 3 select -service hotels in Lafayette and have developed strong relationships
with the same sectors as Am Arbor. Additionally, we interface with the hospitality
management school Bad employ interns, provide real life experience, eta. We would
envision a similar relationship developing in Iowa City.
Bricton currently operates the 7,000 -acre Eagle Ridge Resort and Spa on the Iowa/Illinois
border. The resort attracts a high number of visitors from the Iowa City area (recently
hosted wedding for daughter of Kirk Ferentz) and we would cross -market the Two assets.
This is a great opportunity for us and we look forward to working with you.
Very truly
yours,
'd ' T/.iLT—
Edward J. Doherty
President
I A71 E. BUSINESS CENTER DR., SUITE 900, MOUNT PROSPECT, ILLINOIS 60056 P:(Bdr) 6983800 WWW.BRICTON.COM
B pR I S E CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601VA
Y
Page: 30 VENTURES
lt oyr p 4PVrla Ynfr 5
CA Ventures has contacted Aimbridge Hospitality to potentially operate the hotel aspect of the RISE at Riverfront Crossings
project.
Please see the below 101:
Ambridge
January 15, 2015 Hospitality
Mr. John Diedrich
Vice President of lnvestments
CA Ventures
161 North Clark Sam
Suite 4900
Chicago, IL. 60601
Re: letter of Interest for Management of the Proposed Hotel at The Rise at Riverfront
Crossing, lows City, Iowa
Dear John:
We wish m confirm our interest in being the management company for your proposed
Hotel at The Rise at the Riverfront Crossing Mixed Use Development in Iowa City, Iowa.
Aimbridge Hospitality is uniquely qualified to manage this asset because of several key
factors, including:
• AWARD WINNING MANAGEMENT - Aimbridge Hospitality is the second
largest independent hotel management company operating over 250 hotels and
32,000 guestrooms nationwide. We have been awarded numerous awards for Guest
Satisfaction by Forbes, Hilton, Hyatt, Starwood, and TripAdvisor.
• EXPERIENCED MANAGEMENT TEAM - Each of our senior management team
has more than 30 years of hospitality experience in a vast array of markets and has
managed properties in site from 70 to 1,600 rooms for all the major brands.
• MAXIMIZING REVENUES AND PROFITABILITY - Contributing to ora ability
to drive revenues and profitability is am competitive advantage of having
centralized revenue management and am unique direct sales approach for each
hotel we manage. Our centralized infrastructure provides responsive and creative
solutions to the needs of ownership. Aimbridge has the infrastructure to provide
full-time support in sales & marketing, revenue management, moms, food &
beverage, accounting, and human resources.
• GUEST EXPERIENCE FOCUS - Aimbridge understands the need to provide
unique experiences to guests that are tailored to individual markets and travel
purposes. Our team's focus on service and operational experience will create a
positive, unique and memorable visits.
• TRUSTED STEWARDSHIP - Aimbridge Hospitality has eamed Preferred
Management Company stems with Hyatt, Hilton, Hyatt, Marriott, and Starwood
Hotels. We are the largest independent operator of Hyatt Place, Hyatt House, aloft
by Starwood, and one of the largest operators of Hilton branded hotels. Our senior
leadership came from running a brand and are well versed in all the major hotel
franchise systems and programs.
We look forward to being part ofthis exciting project. Please feel free to reach out to me if
1 can be army assistance ofyou have any questions.
Sincerely,
Richard T. Sprecher CHA
Vice President of Business Development
O I rI F „E CA Ventures 161 N Clark Suite 4900 Chicago, IL 60601
11 7
Page: 31 VENTURES
CA Ventures has contacted First Hospitality Group to potentially operate the hotel aspect of the RISE at Riverfront Cross-
ings project. CA and First Hospitality Group have been project team members on a Hyatt Place in Champaign, IL, and are
excited about the potential to work together again.
Please see the below L01:
NFF
woa.nt. x.eM,ou
January 5, 2015
Mr. John Diedrich
Vice President of Investments
CA Ventures
161 N. Clark Street
Suite49O0
Chicago, It 60601
Dear John:
Thank you for the opportunity regarding the management of your property located in Downtown Iowa
City, Iowa. On behalfof the entire professional team at First Hospitality Group, Inc. (FHG), I am pleased
to make the following proposal for management services.
First Hospitality Group, Inc. (FHG) is a professional hospitality management and development company
that provides a broad base of supervisory and consulting services to institutional and individual clients
throughout the Midwest. First Hospitality has successfully grown the company to over 60 hotels in 10
states, consisting of over 8,500 rooms. Since its incorporation in 1984, First Hospitality Group has been a
leader in hotel management, acquisition and development services with a proven track record In a
variety of markets and economies, including experience with 16 major hotel brands.
First Hospitality Group, Inc. is committed to producing the maximum profit consistent with the prudent
operation of your hotel asset. We have earned the distinction of leading each of our hotels to a
significant increase in total revenue and gross operating profit through an energetic hands on
management approach. Each ofour properties has been recognized as a leader in market share and
quality within its competitive set and brand system. Our hotels have won more than 30 hospitality
industry awards for outstanding guest service and value.
As part of our services, FHG will provide the following:
Marketing Wan
We will develop a comprehensive marketing plan designed to maximize the hotel's revenue potential
consistent to your overall development plans of this distinctive location within Iowa City
Invi
We will prepare for your review an annual Operating Plan (budget) detailing the anticipated
performance of the hotel for the coming year, including operations, capital expenditures, and cash Flow.
First Hospitality tinder, 10275 West Higgins goad, Suite 300, 8osemi IL 00 18 86F299-9040 P 849-299-9045 www.Otginc.com
O Rf,;S E CA Ventures 1 161 N Clark Suite 4900 1 Chicago, IL 60601
Page: 32 VENTURES
(Pni Si Hni
•
•
•
,OFHG
• Management
• We will hire, train, and supervise the gaff. Our primary focus is on maintaining a high level of guest
satisfaction, along with delivering the budgeted performance. We emphasize the top line (Revenues)
and then manage to the bottom line.
Aaountine Services
Within 15 days after the last day of each calendar month, a detailed Operating (Financial) Statement will
beprepared. Any unusual variance to budget will be explained.Also, monthly and annual narratives will
be provided explaining our current performance, an overview of market conditions, and anticipated
• future performance. As part of our services, we will prepare a full detailed general ledger, manage
receivables, pay all invoices (cash permitting), and prepare a full monthly statement. The full scope of
our services reduces the staffing requirements for a professional "accounting department" at the unit
• level, saving in excess of $75,000 per year. Our staff Includes several Certified Public Accountants along
with providing you access via the Internet to your financial Information on a timely basis.
Our full fee schedule and term will be presented to you at a later data however will Include a Base
• Management Fee of the greatest of 3.0% of Gross Revenue or $4,000 per month.
We will provide to you and this project a high level of expertise in all phases of operations from design
feedback, to franchise relations, training, purchasing, human resources administration, and bottom line
performance. Our success is grounded in our values focused on People, Product, Performance and
• Principles.
Thank you in advance for your consideration of First Hospitality Group. We look forward to working with
you now and intro the future.
•
•
Sincerely,
• c�Jk et
Robert J. Habeeb
• President & COO
•
•
First Hospitality Gmup,10275 West Higgins Road, Suite 300, Rosemont, IL 60018 947-299-9040 F 847-2994045 www,R,ginc.com
•
•
O RI 01 J E CA Ventures 1 161 N Clark Suite 4900 1 Chicago, IL 60601
�
P rra Fa II f S 1 xage: 33
f. P
VENTURES
CA Ventures has recently contacted Harrison Street Real Estate Capital (HSRE) regarding the RISE at Riverfront Crossings
project. HSRE has expressed interest in providing 85% of the equity required for the development, thus CA would provide
the remaining 15%. To date, CA and HSRE have partnered on 13 different projects totaling to 6,000 beds. This successful
relationship has led to HSRE being CA's leading equity provider in contributing more than $90.7 million to CA projects.
Please see the below LCI:
January 13, 2015
W. Jeff Davidson
City of Iowa, Iowa
410 East Washington Street
lows City, IA
HARRISON STREET I Real F_state Capital
STRICTLY CONFIDENTIAL
RE: Campus Acquisitions Development
Dear Jeff:
I write to confirm our interest In providing 85% of the equity required to develop a mixed use project
featuring 547 student rousing beds, a 150 room hotel and 504 parking spaces in Iowa City, W We are
working intently with the CA Ventures team to prepare for our intemal investment committee.
Since our founding In 2005, Harrison Street Real Estate Capital has invested over $600,000,000 in the
Student Housing sector encompassing over 50,000 beds at 70 different Universities. Today, we remain
the largest privately -held owner of on and offeampus student housing beds in the United States.
Since 2006, we have been the exclusive equity provider to CA Ventures and together with the projects
currently under development, will have completed thirteen (13) development projects totaling over
6,000 beds at thirteen (13) Universities. We strongly endorse the CA Ventures Team and have enjoyed
great success with them both as development partners as well as asset operators.
Please do not hesitate to contact me should you have any further questions about our fion or our Joint
Venture with CA Ventluas,
Very Truly Yours,
Gror ie
Vice President
+1 (312) 3760146
Cc: John Diedrich —CA Ventures
JJ Smith — CA Ventures
Tan Scoff — CA Ventures
Ok i s t CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
Fr'p°pr �sr I°w'r",T Page: 34 VENTURES
AD
00
The below exhibit presents a preliminary project building cost, preliminary pro forma and sources and uses of funds. CA
can provide additional items upon request.
Summary of Net Operating Income
RISE at Riverfront Crossings
Sources & Uses
Year 1
2017-18
Year 2
2018-19
Year 3
2019-20
Year 4
2020.21
Year 5
2021-22
Operating Revenue
Common Equity
35.0%
35,905,526
Residential Rental Revenue
7,191,380
7,407,122
7,629,335
7,858,216
8,093,962
Hotel Revenue
6,058,872
6,423,500
6,898,727
7,105,689
7,318,860
Retail & Office Revenue
214,900
221,347
227,987
234,827
241,872
Office Revenue
510,360
525,671
541,441
557,684
574,415
Total Operating Revenue
13,975,512
14,577,640
15,297,491
15,756,415
16,229,108
Total Departmental Expenses
1,375,904
1,427,920
1,481,926
1,537,999
1,596,218
Operating Expenses
Total Uses
100.0%
102,585,526
67,641,530
28,131,522
Management Fee (4.0%)
559,020
583,106
611,900
630,257
649,164
G&A / Payroll
1,152,825
1,189,238
1,227,741
1,264,573
1,302,510
Marketing
290,520
299,236
308,213
317,459
326,983
Insurance
116,686
120,187
123,792
127,506
131,331
Property Taxes
1,624,680
1,673,421
1,723,623
1,775,332
1,828,592
Utilities
592,320
610,090
628,392
647,244
666,661
Maintenance
278,500
286,855
295,461
304,324
313,454
Franchise Fee
380,760
367,553
461,452
543,195
559,491
Turnover
50,130
51,634
53,183
54,778
56,422
Capital Reserve
234,554
234,554
234,554
234,554
234,554
Total Operating Expenses
5,279,996
5,415,872
5,668,311
5,899,223
6,069,163
Op Expense as % of Total Revenue
47.63%
46.95%
46.74%
47.20%
47.23%
Net Operating Income
7,319,612
7,733,848
8,147,254
8,319,194
8,563,727
Sources & Uses
%
Total
Apartment
Hotel
Office
Retail
Common Equity
35.0%
35,905,526
Senior Debt
65.0%
66,680,000
Total Sources
100.0%
102,585,526
Land Costs
6.3%
6,500,000
1,000,000
2,500,000
2,000,000
1,000,000
Hard Costs
76.9%
78,892,907
55,874,528
19,670,664
2,328,000
1,019,715
Soft Costs
16.8%
17,192,619
10,767,002
5,960,858
323,194
141,566
Total Uses
100.0%
102,585,526
67,641,530
28,131,522
4,651,194
2,161,281
CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
Page: 35
AA�VENTURES
The below exhibit presents a preliminary project building cost, preliminary pro forma and sources and uses of funds. CA
can provide additional items upon request.
Unit Mix Summary
Type
Qty.
Market Rate
Afford. Rate
1 Bed
127
$1,600
$668
2 Bed
149
$2,200
n/a
3 Bed
44
$2,700
n/a
320
$2,031
$668
Hotel Rate Assumptions: -
Stabilized Occ: 70.00%
Initial Daily Rate $160.00
Retail & Office Rate Assumptions:
Retail NNN Rent ($/SF) $25.00
Office NNN Rent($/SF) $20.00
Residential SF
Common SF
Hotel SF
Parking SF
Retail SF
Office SF
Total SF
247,780
63,850
81,373
133,860
6,365
O R I S E CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
"` a "�ns "'
nssPage: 36 VENTURES
rGt
a
N
HERE
University of Illinois
143
526
West Quad
University of Illinois
136
472
The Flats I, II & I II
Illinois State University
152
446
Evolve
Southern Illinois University
109
365
Landmark
University of Michiean
173
606
Chauncey Square Purdue University 158 386
Fuse Purdue University 229 489
The Vue Arizona State University 132 468
Rise
Texas A&M University
173
471
The Castilian
University of Texas
371
742
Texas West Campus
University of Texas
62
190
Vintage West Campus
University of Texas
62
121
Union
Baylor University
54
120
Bishop's Square
Texas State University
134
315
Evolve
University of Tennessee
59
228
Garnet River Walk
University of South Carolina
170
472
River Mill
University of Georgia
243
461
Landmark
University of Maryland
273
827
Icon Plaza
University of Southern California
56
256
UCSB I & II
University of California - Santa Barbara
51
205
Mountain Lofts
Brigham Young University
161
1,072
Uncommon
University of Oregon
120
380
LIV
University of Washington
56
199
Identity
University of Washington
198
206
Arc at Old Colony
South Loop Universities
108
488
Infinite
South Loop Universities
124
481
Social 28
University of Florida
169
592
Onyx
Florida State University
219
583
Latitude
University of Nebraska
198
569
OneEleven
University of Ottawa
222
427
TOTAL
5.799
16.784
ORI 5 E
RI
RI VF RF R011'
rR�Rs,.n�
CA VENTURES PORTFOLIO
19%
41/ 6%
Based on # of Properties
39%
e Student Housing
■ Multi -family
■ Office
■ Retail & Hospitality
®Senior Housing
CA Ventures l 161 N Clark I Suite 4900 Chicago, IL 60601
Page: 37
*-&Wk VENTURES
VENTURES
RISE at Riverfront Crossings
Proposal for the
Court Street / Linn Street
Redevelopment Site
MIXED-USE REDEVELOPMENT:
HOTEL
APARTMENTS
OFFICE
RETAIL
JJ Smith, Chief Development Officer
312 994 1882
jjsmith@ca-ventures.com
CA Ventures 1 161 N Clark I Suite 4900 1 Chicago, IL 60601
Ott
CITY OF IOWA CITY
UNESCO CITY OF LITERATURE
PENDING CITY COUNCIL WORK SESSION TOPICS
March 18, 2015
April 7th
1. Discuss Charter Review Commission recommendations
Pending Topics to be Scheduled
1. Discuss city related marijuana policies and potential legislative advocacy positions
2. Review of the Sensitive Areas ordinance
3. Discuss formation of staff /citizen climate adaptation advisory group (spring 2015)
4. Discuss transit route planning framework
5. Review University of Iowa enrollment and housing projections
6. Discuss nuisance and property management standards in neighborhoods
7. Review sale of alcohol to minors regulations
r03-19-15
�•-�..--,.Ar CITY OF IOWA CITY IP5
�ch
MEMORANDUM
Date: March 17, 2015
To: City Council
From: Tom Markus, City Manager
Re: Davidson resignation
After thirty-four years of service, Jeff Davidson has informed me of his intention to resign the
position of Economic Development Administrator to accept a position with the Keep Iowa
Beautiful organization. His resignation will be effective April 8, 2015. We are grateful for Jeff's
service and many accomplishments over the years and wish him the very best in his new
endeavor.
03-19-15
3� ! - � CITY OF IOWA CITY iPs
I SISM
C%.Q�W= ftimeRaluk
MEMORANDUM
Date: March 13, 2015
To: Tom Markus, City Manager
From: Geoff Fruin, Assistance City Manager
Re: Coralville Arena Project Update
The Iowa City / Coralville Area Convention and Visitor's Bureau (CVB) contacted the City last
week regarding the City of Coralville's intent to apply for State of Iowa Reinvestment District
program funding for a sports performance center and 7,000 seat multi-purpose arena. The
arena has been part of Coralville's plan for their Iowa River Landing district since the early
2000s. The State of Iowa Reinvestment District program allows for a city to capture newly
generated state sales and hotel motel taxes to support eligible economic development projects
within a designated district.
In previous years, the arena discussion included scenarios that involved the University of Iowa
Athletic Department utilizing the facility for various sports and/or office needs. Because the
project did not materialized there was never in-depth discussion on what the University would
do with existing facilities located in Iowa City if operations moved to Coralville. When we learned
of the project's re-emergence last week, we contacted University of Iowa leadership to
determine what involvement, if any, they are planning with the current proposal. The University
communicated that there are no plans or intentions to own the facility or move any athletic
operations to the new arena. If the facility is constructed, the University indicated it would
contemplate lease of the facility on a case-by-case basis for special events, sports camps or
other such needs. Therefore, it is our understanding that the arena project has no bearing on
the athletic campus in Iowa City.
During those same discussions, it was conveyed that the sports performance center may have a
connection with the University of Iowa Hospitals and Clinics operations that will eventually
relocate to that district. It is our understanding that this project is not in their capital plan,
however conversations on collaboration are currently taking place between the hospital and
Coralville.
The University and CVB have both pledged to keep the City appraised of plans involving this
project and any related impacts to facilities and operations on the main athletic and hospital
campus in Iowa City.
CITY OF IOWA CITY
U NESCOj���CITY O FLIT��ERATU RE
Xa����a
Date: March 17, 2015
CITY OF IOWA CITYip�
MEMORANDUM
To: Tom Markus, City Manager
From: John Yapp. Development Services Coordinator
Re: Unitarian Church property demolition permit
Introduction
On March 16, a representative of the Unitarian Church submitted an application for a demolition
permit for the Church property.
Background
The City requires a seven business day `posting' of a notice of demolition on the property before
demolition may commence. The posting was confirmed this morning (March 17); the notice
period will expire on March 26.
Per the Iowa Department of Natural Resources, the property owner is also required to hire an
asbestos abatement contractor to conduct an evaluation of the property — if asbestos is present
on the property, it must be abated before demolition commences.
Demolition permits are valid for 180 days, but may be renewed. After the seven-day posting
period and after any asbestos is abated, demolition may commence at the property owner's
discretion.
Discussion
The original Unitarian Church structure would likely qualify to be a historic landmark. To date,
however, we have not received a landmark application. The historic landmark designation
functions as an overlay zone, and as such requires a rezoning process with recommendations
from the Historic Preservation Commission and Planning and Zoning Commission and
ultimately would be considered by the City Council. If / when the City Council sets a public
hearing on the historic landmark rezoning, the City would put a hold on the demolition permit
until the City Council votes on the landmark rezoning request.
If the landmark designation is approved by the City Council, any demolition or changes to the
exterior of the structures on the property would need to be approved by the Historic
Preservation Commission. If the landmark designation is denied, the property owner may
proceed with changes to the property, including demolition, at their discretion.
Conclusion
Staff will proceed with normal procedures related to the demolition permit application.
r
Oh®fir CITY OF IOWA CITY IP8
,�,,�_ MEMORANDUM
Date: March 19, 2015
To: Tom Markus, City Manager
From: Michael Moran, Director of Parks and Recreation
Re: Administration of the Farmers Market
Introduction: Changes to the management and marketing of the Iowa City Farmers Market
History/Background: After careful consideration, the Parks and Recreation Department has
determined that the management and marketing of the Farmers Market will be outsourced to a
private firm for the 2015 season. Two factors determined this; 1) Department Budget
constraints and 2) after some position consolidations and added assignments to staff, it will
make it more difficult to administer this program in house. We are confident that outsourcing
the management and marketing of the market is the most efficient option at this time. The
Department will retain stewardship and oversight of the market by providing leadership in
setting policies and regulations over market functions and services including selecting vendors,
determining the location of the markets and setting the times the market is open.
Discussion of Solution: The Department has selected Avacentre, a full service event
management company located in Cedar Rapids, to fulfill this contract. This is the same company
that currently administers the event management services at the Terry Trueblood Recreation
Area Park Lodge and Ashton House. We have developed a positive relationship with their staff
over the past two years. The only change for the vendors will be the contact person for
scheduling stall spaces which will now be the Avacentre staff instead of our department. We
anticipate that they will be hiring our existing staff for a smoother transition during market
events and activities.
Financial Impact: The results of this arrangement would amount to a small cost savings of
approximately $8,000 in the first year with some additional cost savings in years to come if we
are to continue on with this arrangement.
I would be happy to answer any additional questions that you may have.
03-19-
L
Marian Karr IP9
From:
Kingsley Botchway
Sent:
Monday, March 16, 2015 9:52 AM
To:
Marian Karr
Subject:
Re: KXIC schedule
Hello Marian,
Will we talk about this at our next council meeting?
Kingsley Botchway II
Iowa City Council Member
Sent from my iPad
On Mar 11, 2015, at 12:36 PM, "Marian Karr" <Marian-Karr@iowa-cit�org> wrote:
FYI
From: Capron, Jay [mailto:JayCapron iheartmedia.com]
Sent: Wednesday, March 11, 2015 12:33 PM
To: Marian Karr; Matt Hayek; Kingsley Botchway; Rick Dobyns; Jim Throgmorton; Susan Mims; Terry
Dickens; Michelle Payne
Subject: KXIC schedule
Dear Marian and Councilors,
I am pleased to tell you that I have made some adjustments to our schedule and I was able to free
up some live interview slots for the morning show in addition to our weekly recorded slots.
Both Susan and Rick expressed interest in coming to the studio for live interviews to keep our
morning listeners in the loop with Iowa City news and information.
(In addition to our weekly pre-recorded interviews on Wednesday morning at Sam) I propose
that an Iowa City councilor join me for'Your Town' on the 1st and 3rd Friday of the month from
7:15am - 7:45am.
I understand if this time slot will not work for all of you however my hope is that we could pre-
record something on Thursday to air during the morning show on Friday if you can't make it to
the studio for a live interview.
I am very happy that we can continue to feature Iowa City council members during our morning
show.
Please let me know if this plan works for you.
Thank you,
.lay Capron
Morning Host/Program Director I AM -800 KXIC
iHeartMedia
o 319.354.9500 Ex. 104 1 m 319.330.0800
1 Stephen Atkins Dr., Iowa City, IA 52240
www.kxic.com
I have created a schedule that can be filled out with a rotation that works for you.
Wednesday Interviews 8am
3/11 - Mims
3/18
3/25
4/1
4/8
4/15
4/22
4/29
5/6
5/13
5/20
5/27
6/3
6/10
6/17
6/24
7/1
7/8
7/15
7/22
7/29
8/5
8/12
8/19
8/26
9/2
9/9
9/16
9/23
9/30
10/7
10/14
10/21
10/28
11/4
11/11
11/18
11/25
12/2
12/9
12/16
12/23
12/30
1st and 3rd Fridays
4/3
4/17 - N/A (booked)
5/1
5/15
6/5
6/19
7/3
7/17
8/7
8/21
9/4
9/18
10/2
10/16
11/6
11/20
12/4
12/18
From: Marian Karr [Marian-Karr@iowa-city.org]
Sent: Tuesday, March 10, 2015 11:48 AM
To: Capron, Jay
Subject: KXIC schedule
Susan Mims will be on the show tomorrow. I will send you a new schedule shortly.
Marian K. Karr, MMC
City Clerk I City of Iowa City
P. 319-356-5041
F. 319-356-5497
Population 67,862
Proud Home of the Iowa Hawkeyes!
LMarian Karr IP10
From: Kingsley Botchway
Sent: Tuesday, March 17, 2015 8:59 AM
To: Marian Karr
Subject: Fwd: We passed a county anti -wage theft ordinance!
Attachments: image001.png
Hello Marian,
Can you add this to the upcoming council packet?
Kingsley Botchway II
Iowa City Council Member
Sent from my iPad
Begin forwarded message:
From: Misty Rebik <misty@cw'io1 wa.org>
Date: March 4, 2015 at 10:29:39 AM CST
To: Kingsley Botchway <Kingsley-Botchwayna,iowa-cit�org>
Subject: FW: We passed a county anti -wage theft ordinance!
Hi Kingsley,
I hope you are doing well. I just wanted to forward the following email to you regarding another
progressive, meaningful ordinance that was passed to help combat wage theft.
I know this was at the county level, but it might serve as inspiration for something our council
could consider at some point down the road.
Best regards,
Misty R.
Misty Rebik
Executive Director
Center for Worker Justice
(319) 594-7593
misiy@cwjiowa.org
Follow us on Facebook:
www.facebook.com/centerforworkeriusticeofeasterniowa
From: Adam Kader [mailto:adamparisechicago ori]
Sent: Tuesday, February 10, 2015 8:19 PM
To: Adam Kader
Subject: We passed a county anti -wage theft ordinance!
Fellow Worker Centers,
Just wanted to share our latest in the anti -wage theft fight!
**For Immediate Release
February 10, 2015
CONTACT
Adam Kader, Worker Center Director, Arise Chicago
773-937-1826 1 adamgarisechicago.org
Arise Chicago Announces Unanimous Passage of Groundbreaking Cook County Anti -
Wage Theft Ordinance
* Photos and video available upon request
Chicago — Today, the Cook County Board of Commissioners voted unanimously in favor of the
Cook County Anti -Wage Theft Ordinance. President Toni Preckwinckle and Commissioner
Tobolski led the bold initiative to curb the widespread practice of employers not paying their
workers, a problem estimated to exceed $7.3 million weekly county -wide.
The Ordinance prohibits businesses that engage in wage theft from obtaining county contracts,
business licenses and property tax incentives for a period of five years. Businesses seeking these
services and benefits from the County will need to certify compliance with wage and hour laws
and maintain compliance for continued eligibility. Cook County becomes the largest county in
the United States with such provisions.
The Ordinance was inspired by advocacy by workers' rights organization, Arise Chicago,
surrounding the recent closing of Source Interlink in McCook, IL. Angelina Landaverde, Arise
Chicago member and a leader of the Source Interlink workplace campaign that inspired the
Ordinance states, "When our employer closed our plant without providing us any notice and
without paying us severance, it was a terrible thing. But I'm glad that something good could
come out of it, and I'm proud to support this bill."
"Unscrupulous business owners have exploited low-wage workers by refusing to pay overtime,
classifying legal employees as independent contractors, paying less than minimum wage, and, in
some instances, even refusing to pay wages outright," Preckwinkle says. "This is unfair to hard-
working employees and their families and it's unfair to competing businesses which are
operating within the confines of the law."
"Millions of dollars in wages are stolen from workers by their own employers every year.
Businesses who take advantage of Cook County workers should not benefit from Cook County
contracts, licenses and property tax incentives," said Tobolski.
"For businesses and working people to thrive in Cook County, we need to be morally grounded
in our business ethics. We applaud Commissioner Tobolski and President Preckwinkle for their
leadership on this ordinance, which is a building block in making Cook County the most ethical
place in the country to do business!" says Arise Chicago Executive Director, Rev. C. J. Hawking.
A broad coalition of community organizations representing low-wage workers and their allies,
including the Raise the Floor alliance of area worker centers and the Jewish Council on Urban
Affairs, supported the Ordinance.
Adam Kader
Worker Center Director
ARISE CHICAGO
773-937-1826
adam(2arisechicago.org
1436 W. Randolph St., Suite 202 1 Chicago, IL 60607
03-19-15
IN1
=J
Marian Karr
From: Tom Markus
Sent: Monday, March 16, 2015 9:46 AM
To: 'Jim Throgmorton'
Cc: Marian Karr; Doug Boothroy; John Yapp; Jeff Davidson; Eleanor M. Dilkes; Sue Dulek; Sara
Greenwood Hektoen; Geoff Fruin; Simon Andrew
Subject: RE: Comp Plan amendments
Jim: In response to your email of March 13, 2015 1 offer the following. Because the comprehensive plan amendment
failed, the status quo remains. That means that these three blocks are solely governed by the principals set forth in the
IC2030 Comprehensive Plan, and not by any particular sub district plan. The IC2030 Plan shows these three blocks as
appropriate for public or semi-public uses, except for the Chauncey site, which is shown as appropriate for commercial
development. Other than the MidAm substation and the Unitarian Universalist properties, which are currently zoned
CB -5, these three blocks are zoned Public.
Any rezoning application must be consistent with the comprehensive plan. You are correct that nothing that happened
on Monday inhibits the City's ability to apply to rezone the Chauncey site. With the exception of the Chauncey project,
however, if a property owner or developer desires to use any of these three blocks for a use that is not considered a
public use or semi-public use, a comprehensive plan amendment would be required before Council could approve the
rezoning application. With regard to the Unitarian -Universalist site, you are correct that they could redevelop their site
in accordance with the CB -5 designation. But should they desire a rezoning to any other commercial designation or
desire to incorporate any portion of the City -owned property into redevelopment of their office addition in order to
preserve the sanctuary and redevelopment of the office addition, the City -owned property would need a rezoning,
which, again, is not supported by the current IC2030 plan.
The proposed language in the resolution denied on Monday would have allowed for these rezoning applications without
the need to amend the comprehensive plan on an ad hoc basis, would have incorporated these areas into the goals and
objectives of the downtown comprehensive plan, and would have established a framework for building heights on these
three blocks. While we do not believe any projects are truly "dead", the comprehensive plan will need to be amended in
order to move forward with any redevelopment of City -owned property other than the Chauncey site. As this
information is likely something the balance of council may also have questions on I am asking Marian to place in the info
packet at the end of this week so the council and public is aware of this information.
From: Jim Throgmorton [mailto:jthrogmo@yahoo.com]
Sent: Friday, March 13, 2015 5:18 PM
To: Tom Markus
Subject: Re: Comp Plan amendments
Sure, Tom.
Just so you know, I will be out of town from the 14th through the 20th.
Jim
Sent from my Wad
On Mar 13, 2015, at 3:35 PM, Tom Markus <Tom-Markuskiowa-cit� wrote:
Jim: I would like a little time to contemplate my answer to your questions. Is responding next
week ok?
From: James Throgmorton [mailtwithrogmokyahoo.com]
Sent: Friday, March 13, 2015 12:31 PM
To: Tom Markus
Subject: Comp Plan amendments
Tom,
Monday night was a difficult evening for everyone concerned.
Subsequent to the vote, several people (both pro and con) have asked me, "Does this mean The
Chauncey is dead?" I have told them, no, it's not dead. The City could file for rezoning to CB -10
any time in the near future, and the rezoning process would unfold.
If this is not correct, please let me know.
Also, Mitch Schmidt's March 12 Gazette article basically states that three development projects
in the 3 -block area have been delayed because of the Council's vote. Andy Davis' article in
today's Press -Citizen says pretty much the same thing. He writes that Monday night's vote "has
all but halted progress" on The Chauncey and the U -U site.
This honestly puzzles me.
As I understand it, nothing about the vote on Monday night inhibits the City's ability to apply for
a rezoning of The Chauncey site to CB -10. The rezoning process would unfold, people would
express their views, the process would be contentious, votes would be taken, and the issue would
be resolved.
If that is not correct, please let me know.
I am perhaps even more puzzled by the discussion of "the New Pi building" in Mitch Schmidt's
article. I am, of course, very much aware that such a building has been discussed, and I certainly
remember the conversation you and I had with Martha Norbeck, which set that project in
motion. As best I can recall, however, this possible building was never explicitly discussed in
any of the staff reports, public hearings ,and emails concerning the proposed amendment. And
(again, to the best of my knowledge and recollection) we council members have never received
any staff memos or reports about it. So, I was very surprised to see it mentioned in the article.
Moreover, it's not clear to me whether the proposed building would be located where you,
Martha, and I discussed, or whether it would be in some other unidentified location.
As for the third site, it is my understanding that U -U or any subsequent owner would be able to
redevelop that site in accord with existing CB -5 zoning. It is also my understanding that they
would have to apply for a rezoning if they wanted to redevelop it at a higher density, even if we
had adopted the Comp Plan amendment.
If this is not correct, please let me know.
And I am puzzled by something Jeff Davidson is quoted as saying about The Chauncey and New
Pi sites in Schmidt's article. According to Schmidt, Jeff said, "The significant thing is, as it
stands right now, neither one of those projects could proceed because they don't have the zoning,
We've got to go back to square one now." As I have already indicated, it is my understanding
that the property owners would have to apply for a rezoning regardless of whether we had passed
the Comp Plan amendments or not.
If this is not correct, please let me know.
If the staff understood that a vote against the proposed amendments meant that any one (or all
three) of those projects would truly be killed, the staff should have said so very clearly in
writing and in its oral presentation.
Jim
LATE HANDOUTS
� r
rirng®4
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa S2240-1826
(319) 356-5000
(319) 356-5009 FAX
www.icgov.org
Information submitted between distribution of packet on Thursday and close of business
on Friday.
Regular Agenda:
ITEM 10 HOTEL DEVELOPMENT — See additional correspondence
Info Packet of 3/19: �—
Memo from City Manager: Rezoning request for the College St./Gilbert St. property
� r
110 MT
CITY OF IOWA CITY
UNESCO CITY OF LITERATURE
CITY OF IOWA CITY
MEMORANDUM
Date: March 20, 2015
To: Doug Boothroy, Director, Neighborhood and Development Services
From: Tom Markus, City Maer
Re: Rezoning request for the St /Gilbert St property
Introduction
The City has identified the northeast corner of College Street and Gilbert Street as a prime
location for in -fill development. The City owns a majority of the property. MidAmerican Energy
owns an electrical substation property adjacent to the Swan Parking Ramp, which is currently
zoned CB -5. The property was formerly the location of a Greyhound Bus Station, and Wilson's
Sporting Goods. It is currently used for surface parking and storage. The NE corner of College
St / Gilbert St is identified as 'general commercial' on the IC2030 Comprehensive Plan Future
Land Use Map. While the City -owned property is currently zoned Public ('P'), there are no
municipal functions identified for the property. The next step to allow development of this
property is to initiate a rezoning.
Background
The NE corner of College St / Gilbert St was identified as a redevelopment parcel in 2012 as the
City was conducting a Facilities Study, and determined the property was not needed for
municipal functions. The property has characteristics that would support development of
downtown density (CB -10), including:
• Adjacency to a 450 -space parking structure (Swan Parking Ramp)
• Access from a 4 -lane arterial street (Gilbert St)
• Public transit service
• The property is already in the Downtown and Riverfront Crossings Parking District
• Adjacency to Chauncey Swan Park, making the property more attractive for residential
living
• One block (or less) from City Hall, the Recreation Center, the Public Library, and the
pedestrian mall; within easy walking distance of downtown and the University of Iowa
Campus
• The City has general goals, as stated in the IC2030 Comprehensive Plan, to identify
properties for infill development, and to encourage projects that can attract residents to
Downtown
• The property does not contain historic landmark properties, is across Gilbert St from CB -
10 Zoning, and is surrounded by public property and facilities.
March 19, 2015
Page 2
It was with these characteristics in mind that the City identified this property as 'general
commercial' in the IC2030 Comprehensive Plan, which was approved in 2013.
Recent Comprehensive Plan Activity
This property is governed by the goals and objectives of the IC2030 Plan, but not by any sub-
area plan. The IC2030 Plan identifies the area 'east of Gilbert St and north of Burlington St' as
an area needing further study, and recommends that a process be initiated to address how this
area redevelops over time. Since last fall, staff has been conducting this process, and
recommended that the three blocks east of Gilbert St, north of Burlington St and south of Iowa
Ave be added to the Downtown District of the Downtown and Riverfront Crossings Master Plan.
The three blocks are already a part of the Downtown and Riverfront Crossings Parking District.
While a majority of the City Council (on a 5-2 vote) supported this Comprehensive Plan
amendment at the Council's March 9, 2015 meeting, the amendment failed due to the super -
majority vote requirement triggered by the Planning and Zoning Commission not recommending
approval. Staff and the Planning and Zoning Commission are continuing work on
Comprehensive Plan guidance for properties east of Van Buren St which are zoned CB -2 and
CB -5.
While adding these three blocks to the Riverfront Crossings and Downtown Master Plan would
have meant that the goals and objectives for that area applied to these properties, thereby
providing a larger framework for future development, the NE corner of College St / Gilbert St is
already identified for commercial land use. The current IC2030 Comprehensive Plan and
Future Land Use map still applies to this property.
Discussion of Solutions
The next significant step in the process of bringing development to the NE corner of College St /
Gilbert St is rezoning of the property. It is appropriate for the City to initiate a rezoning
application for CB -10 zoning due to the City owning the property, and due to the other factors as
outlined in this memo.
Direction
Please proceed with a rezoning application for CB -10 zoning for the NE corner of College St /
Gilbert St. CB -10 is consistent with the Comprehensive Plan and would allow the City to
proceed with development of this corner.
IP12
Marian Karr
From: Tom Markus
Sent: Tuesday, March 10, 2015 9:18 AM
To: *City Council & All Dept Heads
Subject: FW: My op-ed on solar
fyi
From: Tom Markus
Sent: Tuesday, March 10, 2015 9:17 AM
To: Brenda Nations
Cc: 'Rochekat@gmail.com'; Geoff Fruin; Simon Andrew; Doug Boothroy
Subject: FW: My op-ed on solar
Brenda: Please let me know your thoughts on Katie's op-ed piece. Please compare against our plans and initiatives in
terms of what has been done and what we have as goals. Tom
From: Katie Roche [mailto:rochekat@gmail.com]
Sent: Tuesday, March 10, 2015 8:46 AM
To: Tom Markus
Subject: My op-ed on solar
Dear Tom,
I value your opinion on the future of Iowa City and wanted to let you know that I'm planning to submit an op-ed
calling for real commitment to solar power. I've sent it to an array of people (JC Supervisors, the school board
and Superintendent Murley) seeking feedback. Those that responded were in favor of the ideas expressed here.
My final step, before submitting it to the Press -Citizen, is to ask you and the City Council to look at it and give
you an opportunity to have your opinion included in the piece.
Thank you for taking the time to look at this.
The piece:
Time for Solar Schools and City Buildings
Thanks to a breakthrough Iowa Supreme Court decision last summer, which upheld the City of Dubuque's right
to install solar panels on municipal buildings, third party power purchase agreements for rooftop solar are
spreading across Iowa.
Iowa City is already on the move. Johnson County Supervisors anticipate a long-term savings of $285,000 on a
new pilot agreement for solar panels on the Secondary Roads Facility. The University of Iowa issued a request
for proposals for solar power purchase agreements on campus. The City of Iowa City just announced1p ans to
purchase four solar -powered trash compactors. At an Ecopolis Forum at the public library last month, developer
Kevin Hanick spoke about his Riverfront Crossings District apartment complex, which will include 700 rooftop
solar panels.
But with tax credits set to expire in 2016, the clock is ticking for Iowa City and the Iowa City Community
School District to take advantage of third party power purchase agreements or pursue other solar power
arrangements and ramp up our community's commitment to clean energy, climate action, and long-term
savings. Because the savings that come from third party power purchase agreements are generated primarily by
federal and state tax credits, the savings is initially really just a transfer of funds paid by the taxpayer (eg. you
and I) on a broader scale to a more finite project — the school building. But, with ownership of the solar panels
reverting back to property owners (the school district) after only 10 years the long term savings are excellent,
because the school will already be producing and consuming their own electricity with their now fully owned
panels, which still have 15 years left under what is usually a 25 -year warranty.
When I walk my child to Longfellow Elementary School every morning, I am reminded of the students at the
Wayland, Iowa school, who will switch on their lights generated from solar panels, and save the small Waco
School District an estimated $100,000 annually. In Austin, Minnesota, students not only power their computers
and part of their electricity needs from solar panels, but are using them as learning tools in their science and
computer classes.
According to a recent assessment by a local solar company, over 20 ICCSD buildings retrofitted with solar
panels could generate electricity at market rates through third party power purchase agreements. Other options
for long-term solar financing exist for the rest of the school locations.
How do we move forward on solar in a timely manner?
We need benchmarks: The City of Iowa City and ICCSD should adopt a requirement for 25% of the projected
district and municipal energy use be provided by on-site renewable energy (solar, geothermal or wind) by
2016. This should be required for all new construction and major renovations of city buildings and projects
seeking city TIF funding that have a construction budget of greater than $500,000 and city support greater than
$75,000. At a recent forum on solar, hundreds of people signed petitions in support of such benchmarks.
At the same time, both the City and ICCSD should adopt a 2030 Challenge requirement for all new buildings
and existing innovation projects to be designed and built to meet energy efficiency standards of 70% below the
regional average EUI for that building type.
I've reached out to some elected officials in our community to see what they think of this idea and all that
responded were encouraging of embracing a more regenerative future. County Supervisor Rod Sullivan thought
that setting a goal of 25% at each location would be a tall order, but thought that reaching that goal as an
average by requiring some onsite solar, geothermal or wind at each location would be possible. In an email to
me, Sullivan pointed out that "realistically, you could put hundreds of solar panels at Alexander. You just can't
do that at Mann or Lincoln. But if Alexander averaged 70%, Mann 2%, and Lincoln 2%, you are there."
It's Sullivan's kind of reasoning, combined with backing of our city and school leadership that could make a
plan like this possible. But, if we don't make renewable energy a priority for our community it will continue not
to be part of planning for the future.
I look forward to the day when the Longfellow Elementary School mission "to create a safe environment where
all students are challenged to become independent life-long learners and leaders in society" is powered by solar
energy.
Thank you Tom,
Katie
Katie Roche
Development Director at The Englert Theatre
Member of Association of Fundraising Professionals
Boa!�d aic,uncr. AFP Eastern Iowa
M"Isicion �%: 'h Awful Purdies, The Dandelion Stompers
katieia)englert.org - 319.688.2653 x107
Follow the Englert
Facebook rlt Twitter /// Instagram
)'lease onsidvr a ikir r a tax deductible donation to "I lie Englert "I heatre .aia%
I -
t ����=CITY OF IOWA CITY �p13
Ott
ME
M
Date: March 12, 2015
To: Tom Markus, City Manager
From: Douglas Boothroy, Director, Neighborhood and Development Services
Re: Housing and Urban Development (HUD) and Department of Veterans Affairs
Supportive Housing Assistance (VASH) program.
Steven J. Rackis, Housing Administrator, in a memorandum to you and dated March 12, 2015,
stated that HUD contacted the Housing Authority on March 6, 2015, to determine whether or not
the Housing Authority would be interested in administering an additional 10 vouchers.
As mentioned in Steve's memorandum, these additional vouchers will raise the total number of
Veterans served through the HUD-VASH program from 57 to 67 with the Housing Authority
administering the housing assistance portion. The HUD-VASH program has had a positive
impact serving Veterans residing in the Iowa City/Cedar Rapids Corridor by providing services
to Veterans experiencing chronic homelessness, severe mental illness, and other significant
barriers. The Housing Authority has the capacity to administer the additional vouchers.
Recommendation:
Therefore, as you have directed, staff will apply for the additional 10 HUD-VASH vouchers. If
the funding is approved by HUD, then the City Council will need to consider whether or not to
accept the HUD-VASH vouchers.
I r 1
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(319) 356-5000
(319) 356-5009 FAX
www.lcgov.org
March 11'h, 2015
Kennedy Parkway area households
Re: Removal of Speed Humps on Kennedy Parkway
Dear Kennedy Parkway area households,
You recently received a survey asking your opinion on the removal of speed humps on Kennedy Parkway
following a petition received from a group of neighborhood residents. Each household was given an
opportunity to vote for or against the proposal. Out of the ninety-four surveys sent, sixty-one households
responded (65% response rate). Twenty-three households (38%) wish to remove the speed humps and
thirty-eight households (62%) prefer the speed humps remain. At least 60% of responding households
must prefer the removal of speed humps for the measure to move forward, therefore the speed humps
will remain.
If you have any questions please feel free to contact me at darian-nagle-gamm@iowa-city.org or 356-
5254.
Since ,
DIan Na -G m
Tra ngineering Planner
cc: Tom Markus; City Manager
Geoff Fruin; Assistant City Manager
Ron Knoche; Public Works Director
Jason Havel; City Engineer
Jon Resler; Streets Superintendent
Doug Boothroy; Neighborhood & Development Services Director
Kent Ralston; Transportation Planner
Marcia Bollinger; Neighborhood Services
Sam Hargadine; Police Chief
Jim Steffen; Police Captain
S.tJf 0G\ FRANSt`lrat fic Stuoies' i raffic C aln7,ng%enneciy Park -way . letter doox
Mediacom V %!
March 10, 2015
Ms. Marian Karr
City of Iowa City
410 E. Washington St.
Iowa City, Iowa 52240-1826
Dear Ms. Karr
17-
2015 MAR, 16 Fill 1;: 39
WGN America has made the decision to move from a superstation to a cable network.
Therefore, on or about April 15, 2015, Mediacom will be moving WGN America from
Local Plus TV to Digital Family TV. WGN America will only be available in a digital format
using a digital -ready TV or a Mediacom digital converter or adapter. WGN America HD
will require a HD converter or adapter.
Customers will be notified of these changes via bill message.
To see the changes WGN America is making to better serve the interests of its national
audience, please visit WGNAmerica.com.
At the same time Mediacom will also be launching the Madison Square Garden channel
(MSG) on channel 182 in the Sports & information package.
These changes will not result in any price changes for our subscribers.
If you have any questions please call me at 319-395-9699 ext. 3461 or e-mail
Igrassley mediacomcc.com .
Sincerely,
e4 OJT
Lee Grassley
Senior Manager, Government Relations
Mediacom Communications Corporation
6300 Council St. NE • Cedar Rapids, IA 52402
319-395-7801 Fax 319-393-7017
New Digital
Current Local
New Digital Family
Ready TV
New Service
Plus Channel
Channel
Channel
Level
78
53
54-25
Digital Family TV
At the same time Mediacom will also be launching the Madison Square Garden channel
(MSG) on channel 182 in the Sports & information package.
These changes will not result in any price changes for our subscribers.
If you have any questions please call me at 319-395-9699 ext. 3461 or e-mail
Igrassley mediacomcc.com .
Sincerely,
e4 OJT
Lee Grassley
Senior Manager, Government Relations
Mediacom Communications Corporation
6300 Council St. NE • Cedar Rapids, IA 52402
319-395-7801 Fax 319-393-7017
03-19-15
Marian
From:
City of Iowa City <webmaster@iowa-city.org>
Sent:
Wednesday, March 18, 2015 10:06 AM
To:
Marian Karr
Subject:
Public input sought on Public Access Television (PAN)
Contact: Tv Coleman
Contact Phone: 319-356-5454
Public input sought on Public Access Television (PATV)
Issued by: Communications Office
Mailing List(s): Classes, Programs S Events
- General City News
Originally Posted 3/18/2015 10:06:11 AM
The Iowa City Telecommunications Commission will receive public comments on the performance of Public Access
Television (PAN) on Monday, March 23, 2015 at 5:30 p.m. in Meeting Room A of the Iowa City Public Library, 123 S.
Linn Street.
Written comments may be sent to:
Iowa City Telecommunications Commission
c/o Ty Coleman
410 E. Washington
Iowa City, IA 52240
Email comments may be sent to tv-coleman(aa)iowa-citv.org.
PAN operates public access channel 18 on the Mediacom cable TV system as a contractor for the City of Iowa City.
PATV provides equipment and training to the public to produce programs for live cablecast and/or replay on channel 18
from its facility at 226 Lafayette Street. More information about PATV is available at www.patv.ty.
PAN is one of six Iowa City channels that feature original, locally produced programming. Other channels include: City
Channel 4, InfoVision Channel 5, University of Iowa Television (UITV) Channel 17, The Library Channel (channel 20), and
the Iowa City Community School District Channel 21. Program schedules for some of Iowa City's cable access channels
may be found at http://www.citychannel4.com/access.
For more information, contact Ty Coleman with the City's Cable Office at 319-356-5454.
View this article on the ICGov Web Site: http'//www.icqov.org/apps/news/?newslD=10359
This media release was sent to: marian-karr(o)iowa-city.org
Do not reply directly to this a -mail) It is produced from an automated system, and is not monitored for replies. If you have a question or comment
about this information, please contact the individual(s) listed in the release.
• Unsubscribe or edit your subscription details.
• Visit our lobs page for employment opportunities.
• View more news from the City of Iowa City.