Case Details

BLD19-00622
F
2500 HEINZ RD
THIS PROPOSED PROJECT CONSISTS OF INTERIOR TENANT IMPROVEMENTS OF AN EXISTING SHELL BUILDING ASSOCIATED WITH A NEW DELIVERY CENTER TENANT. NO NEW AREA IS BEING ADDED. THE PROJECT PROVIDES SPACE FOR A PACKAGE DELIVERY SERVICE.

Case Actions

Date Description Status Notes
3/19/2020 PROJECT COMPLETED DONE
3/19/2020 (F) Issue FINAL C.O. DONE
3/19/2020 Insp - Building FINAL PASS
3/17/2020 Insp - Building FINAL FAIL 1. Outlet at column L6 not showing power. 2. Top outlet at column K5, G5 not showing power. 3. Gfci outlet at column F5, F8 not resetting. 4. Outlet cover missing in restrooms on east side of building. 5. Can not run far northwest overhead door off extension cord. 6. Foam on exterior walls need thermal barrier. (verifiy with IBC 2603.4) OK BASED ON ICC ESR-1375 7. Electrical wires exposed on column between column A10 and A9. 8. Open box at column I7. 9. Outlet in break area by east water dispenser shows no power. 10. Outlets on west side of main Corridor have no power, open box on west wall of main corridor. 11. Outlets in pick-up area showing no power. 12. Need stairs on exterior exit west side of pick-up area. 13. Finish gaurd/hand rails on exterior.
3/13/2020 Insp - plumbing rough-in PART Plumbing rough-in Passed for foot cleaning area.
3/10/2020 Insp - Above Ceiling Elect PART South side 1. no wires can be on grid 2. remove unused mc cable 3. Blank off junction box
3/4/2020 Insp - Above Ceiling Elect PART Above ceiling in main corridor, office areas, and common/break area ok.
2/28/2020 Insp - gas meter release PASS
2/28/2020 Insp - Gas Pressure Test PASS
2/24/2020 Insp - electric svc released PASS
2/14/2020 Insp - electrical rough-in PART South interior walls ok
1/24/2020 Insp - plumbing rough-in PASS EAST SIDE SMALL BATHROOM GROUP PASSED PLUMBING ROUGH-IN
1/24/2020 Insp - building framing PART WEST END BATHROOM GROUP CEILING PASSED
1/24/2020 Insp - Above Ceiling Elect PART Ok 4 Restrooms in middle
1/21/2020 Insp - plumbing rough-in PART Break Room and Main Bathroom Group Passed Plumbing Rough-In
1/21/2020 Insp - building framing PART core area- ok
1/17/2020 Insp - plumbing rough-in FAIL A double combination wye cannot be used as a vent connection fitting from a horizontal trap arm.
1/14/2020 Insp - electrical rough-in PART Center office Ok secure raceways at boxes
1/6/2020 Insp - plumbing groundwork PASS Relocation of bathroom group and wash bay Passed
1/2/2020 Insp - Mechanical Rough-In PART Above ceiling; ductwork for RTU1-4 and exhaust ductwork OK
12/23/2019 Insp - building framing PART Partial inspection of 1 hour fire barrier
12/18/2019 Insp - electrical rough-in PASS South hallway walls ok
12/13/2019 Insp - plumbing groundwork PASS
12/3/2019 (F) Issue permit DONE
12/3/2019 Review - PLAN CHECK DONE
12/3/2019 (F) Plan Check Sign-Off Sheet DONE
11/20/2019 Email Notice of Payment Due DONE
11/11/2019 PDox - Under Review DONE
11/11/2019 PDox - Applicnt Uploaded Plans DONE
11/5/2019 PDox - Create New Project DONE
11/5/2019 Review - PLAN CHECK DONE This is an interior alteration for a package delivery service. Mixed use building consisting of S-1/B/A-3(breakroom) 1. Licensed subcontractors required to apply for and obtain their own spcialty permits. 2. Sprinkler protection needs to be maintained as per NFPA 13 Standard. Any system modifications will need approval of the Fire Marshal. Approved audible and visual alarm notification devices to alert building occupants of sprinkler water flow are needed in locations as determined by the Fire Marshal. 3. Alterations required to meet the 2010 Department of Justice Guidelines for Accessibility. This is to include and not be limited to lever door handles, thresholds an clear floor spaces. 4. Exterior exit doors required to be provided with exterior lighting on emergency back up power. 5. Fire extingushers shall be install per Section 906 of the 2018 International Fire Code as amended. 6. Smoke and heat venting not required when building is equiped with early suppression fast response(ESFR) sprinklers. 7. All exterior signage required to obtain their own permits
11/5/2019 Application received
11/5/2019 HOLD - site plan review DONE Note: site plan review not required for interior improvements without a change in use or expansion. jjt

Files

File Name Description Upload Date
2500 HEINZ RD-LIGHTING COMPLIANCE.PDF lighting 12/2/2019 10:39:09 AM
2500 HEINZ RD-MECHANICAL COMCHECK COMPLIANCE-REPORT.PDF mechanical compliance report 12/2/2019 10:39:25 AM
PLANS 1.PDF plans 12/2/2019 10:40:01 AM
2500 HEINZ RD-DIA4-PERMIT SET_ARCH AN.00-A1.10-191107.PDF plans set 12/2/2019 10:41:16 AM
HEINZ ROAD REVISED SITE FOR UTILITIES.PDF changes due to conflicts with utilities 1.31.20 1/31/2020 2:41:13 PM
2500 HEINZ RD REVISED PLAN.PDF Revised building plans 2/26/2020 2:29:06 PM
2500 HEINZ RD- AMAZON HUB.MSG fire dept 3/12/2020 8:39:39 AM
CO AMAZON.PDF CO 3/19/2020 11:24:45 AM

Fees

Fee Id Fee Code Description Amount Charged Amount Paid
201911200851506450 PLNO PLAN CHECK - OTH * $12,326.34 $12,326.34
201911200851536890 PRM4 PERMIT FEE - OTH * $18,963.60 $18,963.60
201911200852058810 ESUB Electronic Doc & Plan Fee BLD $28.00 $28.00