Loading...
HomeSearchMy WebLinkAbout2003 Addition2017 Addition and RenoMusic AdditionPast Property History02-21-03 BFP 2901 Melrose Ave08/07/02 2901 Melrose10/17/18 West High School Phase 2 - City Review - 2018-08-0210/20/15 plansrestrooms201510/27/10 firealarmplanscience201010/7/15 plansrestrooms201511/23/11 electricaltunnelplans201112/29/17 2901melrosetelecom12-18-02 BFP 2901 Melrose Ave2/2/18 2901melroseplanstelecom2.2.182/26/15 2013plansexterior2004BFPs2-5-2019 West High Window Replacement2901melrosemodular7.3.143/14/07 firealarmspecs2901melrose3/19/14 plansenveloperepairs20123/28/14 planslockerroom20123/3/06 planselectricaltempbldgs3/31/14 plans2010scienceroomremodel3/31/16 manuallockeroomwaterline20163/31/16 manualmainfloorestroom20163/31/16 plans2016restroommainfllor3/31/16 planslockerroomwaterline4/2/14 plans2007theaterremodel4/25/16 plansmodular20164/28/03 bp2901melrose4/28/03 co2901melrose4/28/03 energy2901melrose4/28/03 engine2901melrose4-12-2019 West HS Drawings Vol 24-12-2019 West HS Drawings Vol15/15/03 plansbaseballwesthigh5/4/18 West High Textile Reno Specifications 03-02-185/4/18 WHS-TextileArts-Quotes5/5/17 2017-02-20_IFB_Signed_DWGS5/5/17 specswesthigh5/5/17-West High Upper RR Remodel Drawings5-6-2003 bfp 2901 melrose6/11/07 firealarmplanmusicartsaddition6/11/07 sprinklerplansmuscisarts addition6/16/15 plans2015bathrooms6/3/05 moving2901melrose6-18-2003 bfp 2901 melrose7/23/10 alrmspecs2010remodel7/3/14 plans2014modular8/15/14 2014restroomprijectmanual8/15/14 plansrestrooms2014BFP 12-30-04BFP 2-2-05BFP 4-15-05 2901BFP 4-18-04 2901BFP 6-20-05BFP 6-20-05 2BFP 6-20-05 3BFP 6-7-04BFP 6-7-04 2901BFP 9-27-04