DOCUMENT 000492
ADDENDUM NO. 2
DATE:May 7, 2013
PROJECT NAME:SE Junior High Monson Gym Heating, Cooling, & Ventilation Upgrades
Iowa City Community School District
This Addendum forms a part of the bidding and contract documents. This Addendum supersedes and supplements all
portions of the original bidding and contract documents dated April 17, 2013with which it conflicts.
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE BID FORM.
FAILURE TO DO SO MAY SUBJECT THE BIDDER TO DISQUALIFICATION.
A. BIDDING REQUIREMENTS
1.No Changes
B. CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
1.No Changes
C. SPECIFICATIONS
1.No Changes
D. DRAWINGS
1.Sheet M6.01-Mechanical Schedules and Details
ADD
a)the following noteto Detail 4:
1.Exterior Metal Panelsshall be as follows:
a.Composition: Two sheets of aluminum sandwiching a core of composite
formed ina continuous process without the use of glues or adhesives
between dissimilar materials. Bond integrity testing to adhere to ASTM
D1781-76.
1)Texture: Smooth
2)Finish: Manufacturer’s standard anodized finish
b.Aluminum face sheets: thickness .032”.
c.Panel thickness: .184”.
d.Tolerances:
1)Thickness: 1/32 inch
2)Length and Width: +0, -1/8 inch
SE Junior High Monson Gym Heating, Cooling, &Ventilation Upgrades 112224-0
Addendum No. 2 000492-1
DOCUMENT 000492
ADDENDUM NO. 2
3)Squareness: 1/64 inch per lineal foot
e.Color:
1)Platinum (to match existing)
f.Installation:
1)Install in accordance with manufacturer’s instructions
.
2)Conform to panel manufacturer’s instructions for attachment
systems.
3)Weather seal all joints as required using methods and materials as
recommended by the panel manufacturer.
Prepared By:Shive-Hattery, Inc.
_______________________________________
Timothy R. Fehr, P.E.
Iowa License No. 12877
My registration renewal date is December 31, 2013.
END OF DOCUMENT 000492
SE Junior High Monson Gym Heating, Cooling, &Ventilation Upgrades 112224-0
Addendum No. 2 000492-2