Loading...
HomeMy WebLinkAbout8/29/13 plans2013 DOCUMENT 000492 ADDENDUM NO. 2 DATE:May 7, 2013 PROJECT NAME:SE Junior High Monson Gym Heating, Cooling, & Ventilation Upgrades Iowa City Community School District This Addendum forms a part of the bidding and contract documents. This Addendum supersedes and supplements all portions of the original bidding and contract documents dated April 17, 2013with which it conflicts. ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE BID FORM. FAILURE TO DO SO MAY SUBJECT THE BIDDER TO DISQUALIFICATION. A. BIDDING REQUIREMENTS 1.No Changes B. CONTRACT FORMS AND CONDITIONS OF THE CONTRACT 1.No Changes C. SPECIFICATIONS 1.No Changes D. DRAWINGS 1.Sheet M6.01-Mechanical Schedules and Details ADD a)the following noteto Detail 4: 1.Exterior Metal Panelsshall be as follows: a.Composition: Two sheets of aluminum sandwiching a core of composite formed ina continuous process without the use of glues or adhesives between dissimilar materials. Bond integrity testing to adhere to ASTM D1781-76. 1)Texture: Smooth 2)Finish: Manufacturer’s standard anodized finish b.Aluminum face sheets: thickness .032”. c.Panel thickness: .184”. d.Tolerances: 1)Thickness: 1/32 inch 2)Length and Width: +0, -1/8 inch SE Junior High Monson Gym Heating, Cooling, &Ventilation Upgrades 112224-0 Addendum No. 2 000492-1 DOCUMENT 000492 ADDENDUM NO. 2 3)Squareness: 1/64 inch per lineal foot e.Color: 1)Platinum (to match existing) f.Installation: 1)Install in accordance with manufacturer’s instructions . 2)Conform to panel manufacturer’s instructions for attachment systems. 3)Weather seal all joints as required using methods and materials as recommended by the panel manufacturer. Prepared By:Shive-Hattery, Inc. _______________________________________ Timothy R. Fehr, P.E. Iowa License No. 12877 My registration renewal date is December 31, 2013. END OF DOCUMENT 000492 SE Junior High Monson Gym Heating, Cooling, &Ventilation Upgrades 112224-0 Addendum No. 2 000492-2