Loading...
HomeMy WebLinkAbout4/4/14 energyreview Generated by RES check-Web Software Compliance Certificate 2009 IECC Energy Code: Iowa City, Iowa Location: Single Family Construction Type: Bldg. faces 0 deg. from North Building Orientation: 3282 ft2 Conditioned Floor Area: 14% Glazing Area Percentage: 6227 Heating Degree Days: 5 Climate Zone: Construction Site:Owner/Agent:Designer/Contractor: Two-StorySouthgate HomesJim Walker Iowa City, IowaIowa City, IowaSoutgate Homes Passes using performance alternative Compliance: 5.3% Better Than Code Compliance: GrossCavityCont.GlazingUA AssemblyArea orR-ValueR-Valueor Door PerimeterU-Factor Ceiling: Raised or Energy Truss127649.03.024 Front- Main and Upper Wall: Wood Frame, 16in. o.c.108019.02.051 Orientation: Front Door: Solid500.27014 Orientation: Front Window: Vinyl Frame, 2 Pane w/ Low-E730.29021 SHGC: 0.22 Orientation: Front Left - Main and Upper Wall: Wood Frame, 16in. o.c.40119.02.017 Orientation: Left Side Window: Vinyl Frame, 2 Pane w/ Low-E770.29022 SHGC: 0.22 Orientation: Left Side Right - Main and Upper Wall: Wood Frame, 16in. o.c.40019.02.021 Orientation: Right Side Window: Vinyl Frame, 2 Pane w/ Low-E70.2902 SHGC: 0.22 Orientation: Right Side Rear - Main, Upper and Lower Wall: Wood Frame, 16in. o.c.123519.02.051 Orientation: Back Door: Glass840.29024 SHGC: 0.23 Orientation: Back Window: Vinyl Frame, 2 Pane w/ Low-E1800.29052 SHGC: 0.22 Orientation: Back Floor abv Garage: All-Wood Joist/Truss Over Uncond. Space14430.02.04 Front -Basement: Solid Concrete or Masonry74113.02.036 Orientation: Front Wall height: 9.0' Depth below grade: 8.5' Insulation depth: 9.0' Left - Basement: Solid Concrete or Masonry21313.02.011 Orientation: Left Side Wall height: 9.0' Depth below grade: 8.0' Insulation depth: 9.0' Right - Basement: Solid Concrete or Masonry18013.02.09 Project Title: Report date: 09/22/11 Data filename: Page 1 of 6 Orientation: Right Side Wall height: 9.0' Depth below grade: 8.5' Insulation depth: 9.0' Furnace: Forced Hot Air 92 AFUE Air Conditioner: Electric Central Air 14.5 SEER Compliance Statement: The proposed building design described here is consistent with calculations submitted with the permit application. The proposed RES check-Web and to comply with the mandatory requirements listed in the RES check Inspection Checklist. Name - TitleSignatureDate Project Title: Report date: 09/22/11 Data filename: Page 2 of 6 Generated by RES check-Web Software Inspection Checklist Ceilings: q Ceiling: Raised or Energy Truss, R-49.0 cavity + R-3.0 continuou Comments: Insulation must achieve full height over the plate lines of exte Above-Grade Walls: q Front- Main and Upper Wall: Wood Frame, 16in. o.c., R-19.0 cavit Continuous insulation specified for this above-grade wall has co Comments: q Left - Main and Upper Wall: Wood Frame, 16in. o.c., R-19.0 cavit Continuous insulation specified for this above-grade wall has co Comments: q Right - Main and Upper Wall: Wood Frame, 16in. o.c., R-19.0 cavi Continuous insulation specified for this above-grade wall has co Comments: q Rear - Main, Upper and Lower Wall: Wood Frame, 16in. o.c., R-19. Continuous insulation specified for this above-grade wall has co Comments: Basement Walls: q Front -Basement: Solid Concrete or Masonry, 9.0' ht / 8.5' bg / Comments: q Left - Basement: Solid Concrete or Masonry, 9.0' ht / 8.0' bg / Comments: q Right - Basement: Solid Concrete or Masonry, 9.0' ht / 8.5' bg / Comments: Windows: q Window: Vinyl Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window: Vinyl Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window: Vinyl Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: q Window: Vinyl Frame, 2 Pane w/ Low-E, U-factor: 0.290 For windows without labeled U-factors, describe features: #Panes Frame Type Thermal Break? Yes No Comments: Doors: Project Title: Report date: 09/22/11 Data filename: Page 3 of 6 q Door: Solid, U-factor: 0.270 Comments: q Door: Glass, U-factor: 0.290 Comments: Floors: q Floor abv Garage: All-Wood Joist/Truss Over Uncond. Space, R-30. Comments: Floor insulation is installed in permanent contact with the unde Heating and Cooling Equipment: q Furnace: Forced Hot Air: 92 AFUE or higher Make and Model Number: q Air Conditioner: Electric Central Air: 14.5 SEER or higher Make and Model Number: Air Leakage: Joints (including rim joist junctions), attic access openings, p q sources of air leakage are sealed with caulk, gasketed, weathers solid material. Air barrier and sealing exists on common walls between dwelling q window/door jambs and framing. Recessed lights in the building thermal envelope are 1) type IC q between the housing and the interior wall or ceiling covering. Wood-burning fireplaces have gasketed doors and outdoor combusti q Air Sealing and Insulation: Building envelope air tightness and insulation installation comp q ACH at 33.5 psf OR 2) the following items have been satisfied: (a) Air barriers and thermal barrier: Installed on outside of air-pe repaired. (b) Ceiling/attic: Air barrier in any dropped ceiling/soffit is subs (c) Above-grade walls: Insulation is installed in substantial contac (d) Floors: Air barrier is installed at any exposed edge of insulati (e) Plumbing and wiring: Insulation is placed between outside and pi sprayed/blown insulation extends behind piping and wiring. (f) Corners, headers, narrow framing cavities, and rim joists are in (g) Shower/tub on exterior wall: Insulation exists between showers/t Materials Identification and Installation: Materials and equipment are installed in accordance with the man q Insulation is installed in substantial contact with the surface q Materials and equipment are identified so that compliance can be q Manufacturer manuals for all installed heating and cooling equip q Insulation R-values, glazing U-factors, and heating and cooling q specifications. Duct Insulation: All ducts not completely inside the building envelope are insula q Duct Construction and Testing: Building framing cavities are not used as supply ducts. q All joints and seams of air ducts, air handlers, filter boxes, a q of tapes, mastics, liquid sealants, gasketing or other approved UL 181B and are labeled according to the duct construction. Meta fastened. Crimp joints for round metal ducts have a contact lap equally spaced sheet-metal screws. Exceptions: Joint and seams covered with spray polyurethane foam. Project Title: Report date: 09/22/11 Data filename: Page 4 of 6 Where a partially inaccessible duct connection exists, mechanica joint so as to prevent a hinge effect. Continuously welded and locking-type longitudinal joints and sea Duct tightness test has been performed and meets one of the foll q (1) Postconstruction leakage to outdoors test: Less than or equal to (2) Postconstruction total leakage test (including air handler enclo conditioned floor area) pressure differential of 0.1 inches w.g. (3) Rough-in total leakage test with air handler installed: Less tha when tested at a pressure differential of 0.1 inches w.g. (4) Rough-in total leakage test without air handler installed: Less Temperature Controls: At least one programmable thermostat is installed to control the q the heating cycle and 78 degree F for the cooling cycle. Heating and Cooling Equipment Sizing: Additional requirements for equipment sizing are included by an q For systems serving multiple dwelling units documentation has be q Building Mechanical and/or Service Water Heating (Sections 503 a Circulating Service Hot Water Systems: Circulating service hot water pipes are insulated to R-2. q Circulating service hot water systems include an automatic or ac q system is not in use. Heating and Cooling Piping Insulation: HVAC piping conveying fluids above 105 degrees F or chilled flui q Swimming Pools: Heated swimming pools have an on/off heater switch. q Pool heaters operating on natural gas or LPG have an electronic q Timer switches on pool heaters and pumps are present. q Exceptions: Where public health standards require continuous pump operation. Where pumps operate within solar- and/or waste-heat-recovery sys Heated swimming pools have a cover on or at the water surface. F q minimum insulation value of R-12. Exceptions: Covers are not required when 60% of the heating energy is from s Other Requirements: Snow- and ice-melting systems with energy supplied from the serv q off the system when a) the pavement temperature is above 50 degr above 40 degrees F (a manual shutoff control is also permitted t Certificate: A permanent certificate is provided on or in the electrical dist q U-factors; type and efficiency of space-conditioning and water h of the circuit directory label, service disconnect label or othe NOTES TO FIELD: (Building Department Use Only) Project Title: Report date: 09/22/11 Data filename: Page 5 of 6 Project Title: Report date: 09/22/11 Data filename: Page 6 of 6 2009 IECC Energy Efficiency Certificate Insulation RatingR-Value Ceiling / Roof52.00 Wall21.00 Floor / Foundation15.00 Ductwork (unconditioned spaces):_____ Glass & Door RatingU-FactorSHGC Window0.290.22 Door0.290.23 Heating & Cooling EquipmentEfficiency Forced Hot Air Furnace92 AFUE Electric Central Air Conditioner14.5 SEER Water Heater:___________________________ Name:Date: Comments: