Loading...
HomeMy WebLinkAbout12/1/14 plansasbuiltcivil2014 Illinois Firm Number: 184-000214 Illinois Firm Number: 184-000214 06/17/2013 CONSTRUCTION PROJECT STRUCTURAL AND MEP/FP ENGINEER BALFOUR BEATTY CAMPUS SOLUTIONS 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 101 Hawkeye Court, Iowa City, IA 52246 SHUTTLEWORTH AND INGERSOLL, P.L.C. PROJECT DIRECTORY BALFOUR BEATTY CAMPUS SOLUTIONS 2834 Northgate Drive | Iowa City, Iowa 52245 KJWW ENGINEERING CONSULTANTS PROJECT LANDSCAPE ARCHITECT 115 3RD STREET SE, SUITE 500 Project Issue Date : REDEVELOPMENT SOLOMON CORDWELL BUENZ HAWKEYE COURT PROJECT CIVIL ENGINEER 625 N. MICHIGAN AVENUE 1123350 CEDAR RAPIDS, IA 524012834 NORTHGATE DRIVE2834 NORTHGATE DRIVE PHONE: (319) 365-9461PHONE: (312) 274-0058PHONE: (515) 334-9906PHONE: (319) 354-3040PHONE: (319) 354-3040 DES MOINES, IA 50322SHIVE-HATTERY, INC.SHIVE-HATTERY, INC. PROJECT ARCHITECT WILLIAM P. PROWELL PROJECT ATTORNEY IOWA CITY, IA 52245IOWA CITY, IA 52245 Iowa | Illinois | Missouri CHICAGO, IL 60611 PROJECT OWNER Issued For : 2882 106TH ST. PROJECT NO: PHASE I CLIENT NO: 9.0 ACRES 7.5 ACRES 9.3 ACRES 7.2 ACRES 14 SPACES 444 SPACES432 SPACES446 SPACES222 SPACES224 SPACES RM-20 PROJECT SITE DATA PROPOSED CONDITIONS IMPERVIOUS AREA EXISTING CONDITIONS IMPERVIOUS AREA PROPOSED CONDITIONS PERVIOUS AREA TOTAL VEHICULAR PARKING PROVIDED EXISTING CONDITIONS PERVIOUS AREA VEHICULAR PARKING REQUIRED STORMWATER POLLUTION PREVENTION PLAN - PRE/DURING CONSTRUCTION - NORTHWEST STORMWATER POLLUTION PREVENTION PLAN - PRE/DURING CONSTRUCTION - SOUTHWEST STORMWATER POLLUTION PREVENTION PLAN - PRE/DURING CONSTRUCTION - NORTHEAST BICYCLE PARKING REQUIRED BICYCLE PARKING PROVIDED STORMWATER POLLUTION PREVENTION PLAN - PRE/DURING CONSTRUCTION - SOUTHEAST CURRENT PROPERTY ZONING PHASE 1 - SITE AREA HANDICAP PARKING STORMWATER POLLUTION PREVENTION PLAN - POST CONSTRUCTION - NORTHWEST STORMWATER POLLUTION PREVENTION PLAN - POST CONSTRUCTION - SOUTHWEST STORMWATER POLLUTION PREVENTION PLAN - POST CONSTRUCTION - NORTHEAST STORMWATER POLLUTION PREVENTION PLAN - POST CONSTRUCTION - SOUTHEAST REGULAR PARKING STORMWATER POLLUTION PREVENTION NOTES AND DETAILS SITE DIMENSIONAL AND PAVING PLAN - NORTHWEST SITE DIMENSIONAL AND PAVING PLAN - SOUTHWEST SITE DIMENSIONAL AND PAVING PLAN - NORTHEASTELECTRICAL SITE NOTES, SCHEDULES AND DETAILS SITE DIMENSIONAL AND PAVING PLAN - SOUTHEAST CITY OF IOWA CITY WATER MAIN SPECIFICATIONS PROPOSED CONDITIONS AND INDEX OF SHEETS DETAILED GRADING BETWEEN "A" BUILDINGS TRAFFIC CIRCULATION AND PARKING PLAN ELECTRICAL SITE SYMBOLS AND DETAILS GENERAL NOTES AND SPECIFICATIONS SITE DEMOLITION PLAN - NORTHWEST SITE DEMOLITION PLAN - SOUTHWEST SITE LANDSCAPE PLAN - NORTHWEST SITE LANDSCAPE PLAN - SOUTHWEST SITE DEMOLITION PLAN - NORTHEAST SITE DEMOLITION PLAN - SOUTHEAST SITE LANDSCAPE PLAN - NORTHEAST SITE LANDSCAPE PLAN - SOUTHEAST PROFILE - NORTH SANITARY SEWER PROFILE - SOUTH SANITARY SEWER SITE GRADING PLAN - NORTHWEST SITE GRADING PLAN - SOUTHWEST SITE GRADING PLAN - NORTHEAST SITE GRADING PLAN - SOUTHEAST SITE UTILITY PLAN - NORTHWEST OVERALL SITE DEMOLITION PLANSITE UTILITY PLAN - SOUTHWEST OVERALL SITE LANDSCAPE PLAN SITE UTILITY PLAN - NORTHEAST SITE UTILITY PLAN - SOUTHEAST OVERALL EXISTING CONDITIONS 6/19/13 Date PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL: CONSTRUCTION DETAILSCONSTRUCTION DETAILSCONSTRUCTION DETAILS SITE ELECTRICAL PLAN SHEET INDEX LANDSCAPE DETAILSLANDSCAPE DETAILSLANDSCAPE DETAILS HAWKEYE COURT REDEVELOPMENT COVER SHEET Printed or typed name AL BOHLING L0.1-L2.2 Signature CE1.01CE1.02CE1.03 G0.00G0.10G0.11G0.20G0.30G0.40 C1.00C1.10C1.20C1.30C1.40C2.10C2.20C2.30C2.40C3.10C3.20C3.30C3.40C3.50C3.60C4.10C4.20C4.30C4.40C4.50C5.10C5.20C5.30C5.40C5.50C5.60C5.70C5.80C5.90C6.10C6.20C6.30 L0.1L1.1L1.2L1.3L1.4L2.0L2.1L2.2 6/30/13 License Expires: SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL 6/19/13 Date PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL: 2014 THE LAWS OF THE STATE OF IOWA. My License Renewal Date is: DECEMBER 31, JAKE HENKLE 12668 Printed or typed name:CE1.01-CE1.03 License Number: Signature: UNDER CITY OF IOWA CITY, IOWA SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER G0.00-C6.30 I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL 6/19/13 Date PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL: SITE OSVALDO PASTRANA 2014 THE LAWS OF THE STATE OF IOWA. My License Renewal Date is: DECEMBER 31, PROJECT AREA Vicinity Map 19316 Aerial Map Printed or typed name: License Number: Signature: PHASE I UNDER Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 AND SPECIFICATIONS CONSTRUCTION REDEVELOPMENT HAWKEYE COURT GENERAL NOTES 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN G0.10 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 5 5 44 3 3 2 2 1 1 A CB ED Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CITY OF IOWA CITY CONSTRUCTION REDEVELOPMENT HAWKEYE COURT SPECIFICATIONS 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 WATER MAIN Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN G0.11 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 5 5 44 3 3 2 2 1 1 A CB ED Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com EXISTING CONDITIONS 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN G0.20 OVERALL PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 5 5 44 3 3 2 2 1 1 A CB ED Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com PROPOSED CONDITIONS AND INDEX OF SHEETS 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN G0.30 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 5 5 44 3 3 2 2 1 1 A CB ED Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com TRAFFIC CIRCULATION 2834 Northgate Drive | Iowa City, Iowa 52245 AND PARKING PLAN CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN G0.40 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 14 SPACES 444 SPACES432 SPACES446 SPACES222 SPACES224 SPACES SITE PARKING DATA TOTAL VEHICULAR PARKING PROVIDED VEHICULAR PARKING REQUIRED 6 BICYCLE PARKING REQUIRED BICYCLE PARKING PROVIDED 6 HANDICAP PARKING REGULAR PARKING 5 5 44 3 3 2 2 227,133 SF397,360 SF 94,247 SF RM-20 13.1%31.6%55.3% PROJECT SITE DATA TOTAL IMPERVIOUS AREA MINUS BLDGS. TOTAL PERVIOUS (LANDSCAPE) AREA TOTAL BUILDING FOOTPRINT AREA PERCENT OF TOTAL SITE AREAPERCENT OF TOTAL SITE AREAPERCENT OF TOTAL SITE AREA CURRENT PROPERTY ZONING PHASE 1 - TOTAL SITE AREA 1 1 A CB ED Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com SITE DEMOLITION PLAN 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C1.00 OVERALL PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 5 5 44 3 3 2 2 ALL TREES NOT DESIGNATED TO BE REMOVED SHALL BE ABANDONMENT OF GAS, ELECTRICAL, AND TELEPHONEALL EXISTING UNDERGROUND PIPES WITHIN 10' OF THENOT RETAINED BY THE OWNER SHALL BE DISPOSED OF COMPANY. THE CONTRACTOR SHALL BE RESPONSIBLE REMOVED. UTILITY PIPING AND STRUCTURES OUTSIDEOFF-SITE BY THE CONTRACTOR IN ACCORDANCE WITH PROTECTED FROM DAMAGE USING TREE PROTECTION ALL DEMOLITION ITEMS SHOWN TO BE REMOVED AND TRANSFORMERS SHALL BE REMOVED BY THE UTILITY ALL UTILITIES TO BE ABANDONED IN PLACE SHALL BE ALL BUILDINGS, PAVEMENTS, & UTILITIES WITHIN THEFOR THE FULL DEPTH REMOVAL OF ANY CONCRETE ALL GAS METERS, ELECTRIC METERS, AND ELECTRIC DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL NO DEMOLITION SHALL BE DONE UNTIL ALL UTILITY SERVICE TO BE COMPLETED BY UTILITY COMPANY. PROJECT LIMITS TO BE REMOVED UNLESS NOTED CONTRACTOR SHALL COORDINATE REMOVAL OR ALL DISCONNECTIONS OF GAS AND ELECTRICAL FENCE PLACED AT THE DRIP LINE OF THE TREE. OF THE 10' LIMIT CAN BE ABANDONED IN PLACE. CONTRACTOR SHALL PROTECT ALL UTILITIES TO PROPOSED BUILDING FOUNDATIONS SHALL BE ALL APPLICABLE STATE AND LOCAL LAWS AND SITE DEMOLITION NOTES SERVICES HAVE BEEN DISCONNECTED. NOT DISTURB CAMPUS BUS SERVICE. CAPPED AND PRESSURE GROUTED. LINES WITH UTILITY COMPANY. 1 1 FOUNDATIONS OR PADS. REGULATIONS. OTHERWISE. REMAIN. 10.11. 2.3.4.5.6.7.8.9. 1. A CB ED Illinois Firm Number: 184-000214 SITE DEMOLITION PLAN - 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 SOUTHWEST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C1.10 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE S S A R G MATCH LINE (SEE SHEET C1.40) MATCH LINE (SEE SHEET C1.20) 6 6 5 5 OFF-SITE BY ALL EXISTING UNDERGROUND PIPES WITHIN 10' OF THE PROPOSED BUILDING FOUNDATIONS SHALL BE REMOVED. UTILITY CONTRACTOR SHALL COORDINATE REMOVAL OR ABANDONMENT OF GAS, ELECTRICAL, AND TELEPHONE LINES WITH ALL DEMOLITION ITEMS SHOWN TO BE REMOVED AND NOT RETAINED BY THE OWNER SHALL BE DISPOSED OF THE CONTRACTOR IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL LAWS AND REGULATIONS. ALL UTILITIES TO BE ABANDONED IN PLACE SHALL BE CAPPED AND PRESSURE GROUTED. PIPING AND STRUCTURES OUTSIDE OF THE 10' LIMIT CAN BE ABANDONED IN PLACE. 44 CONTRACTOR SHALL PROTECT ALL UTILITIES TO REMAIN. BALFOUR CONSTRUCTION AND THE UTILITY COMPANY. MATCH LINE (SEE SHEET C1.20) SITE DEMOLITION NOTES 10.11. 8.9. 7. 3 3 ALL GAS METERS, ELECTRIC METERS, AND ELECTRIC TRANSFORMERS SHALL BE REMOVED BY THE UTILITY COMPANY. THE ALL DISCONNECTIONS OF GAS AND ELECTRICAL SERVICE TO BE COMPLETED BY UTILITY COMPANY AND COORDINATED BY ALL TREES NOT DESIGNATED TO BE REMOVED SHALL BE PROTECTED FROM DAMAGE USING TREE PROTECTION FENCE ALL BUILDINGS, PAVEMENTS, & UTILITIES WITHIN THE PROJECT LIMITS TO BE REMOVED UNLESS NOTED OTHERWISE. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FULL DEPTH REMOVAL OF ANY CONCRETE FOUNDATIONS OR PADS. DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL NOT DISTURB CAMPUS BUS SERVICE.NO DEMOLITION SHALL BE DONE UNTIL ALL UTILITY SERVICES HAVE BEEN DISCONNECTED. 2 2 PLACED AT THE DRIP LINE OF THE TREE. CONTRACTOR. 2.3.4.5.6. 1. 1 1 A CB ED Illinois Firm Number: 184-000214 SITE DEMOLITION PLAN - 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 NORTHWEST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C1.20 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE MATCH LINE (SEE SHEET C1.30) MATCH LINE (SEE SHEET C1.10) 6 6 5 5 44 MATCH LINE (SEE SHEET C1.10) 3 3 2 2 ALL TREES NOT DESIGNATED TO BE REMOVED SHALL BE ABANDONMENT OF GAS, ELECTRICAL, AND TELEPHONEALL EXISTING UNDERGROUND PIPES WITHIN 10' OF THENOT RETAINED BY THE OWNER SHALL BE DISPOSED OF SERVICE TO BE COMPLETED BY UTILITY COMPANY AND COMPANY. THE CONTRACTOR SHALL BE RESPONSIBLE REMOVED. UTILITY PIPING AND STRUCTURES OUTSIDEOFF-SITE BY THE CONTRACTOR IN ACCORDANCE WITH PROTECTED FROM DAMAGE USING TREE PROTECTION ALL DEMOLITION ITEMS SHOWN TO BE REMOVED AND TRANSFORMERS SHALL BE REMOVED BY THE UTILITY ALL UTILITIES TO BE ABANDONED IN PLACE SHALL BE ALL BUILDINGS, PAVEMENTS, & UTILITIES WITHIN THEFOR THE FULL DEPTH REMOVAL OF ANY CONCRETE ALL GAS METERS, ELECTRIC METERS, AND ELECTRIC DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL NO DEMOLITION SHALL BE DONE UNTIL ALL UTILITY PROJECT LIMITS TO BE REMOVED UNLESS NOTED CONTRACTOR SHALL COORDINATE REMOVAL OR ALL DISCONNECTIONS OF GAS AND ELECTRICAL FENCE PLACED AT THE DRIP LINE OF THE TREE. OF THE 10' LIMIT CAN BE ABANDONED IN PLACE. CONTRACTOR SHALL PROTECT ALL UTILITIES TO PROPOSED BUILDING FOUNDATIONS SHALL BE ALL APPLICABLE STATE AND LOCAL LAWS AND SITE DEMOLITION NOTES SERVICES HAVE BEEN DISCONNECTED. NOT DISTURB CAMPUS BUS SERVICE. CAPPED AND PRESSURE GROUTED. COORDINATED BY CONTRACTOR. LINES WITH UTILITY COMPANY. 1 1 FOUNDATIONS OR PADS. REGULATIONS. OTHERWISE. REMAIN. 10.11. 2.3.4.5.6.7.8.9. 1. A CB ED Illinois Firm Number: 184-000214 SITE DEMOLITION PLAN - 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 NORTHEAST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C1.30 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 5 5 MATCH LINE (SEE SHEET C1.40) 44 OFF-SITE BY ALL EXISTING UNDERGROUND PIPES WITHIN 10' OF THE PROPOSED BUILDING FOUNDATIONS SHALL BE REMOVED. UTILITY CONTRACTOR SHALL COORDINATE REMOVAL OR ABANDONMENT OF GAS, ELECTRICAL, AND TELEPHONE LINES WITH 3 3 ALL DEMOLITION ITEMS SHOWN TO BE REMOVED AND NOT RETAINED BY THE OWNER SHALL BE DISPOSED OF THE CONTRACTOR IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL LAWS AND REGULATIONS. ALL UTILITIES TO BE ABANDONED IN PLACE SHALL BE CAPPED AND PRESSURE GROUTED. MATCH LINE (SEE SHEET C1.40) PIPING AND STRUCTURES OUTSIDE OF THE 10' LIMIT CAN BE ABANDONED IN PLACE. CONTRACTOR SHALL PROTECT ALL UTILITIES TO REMAIN. BALFOUR CONSTRUCTION AND THE UTILITY COMPANY. 2 2 SITE DEMOLITION NOTES 10.11. 7.8.9. ALL GAS METERS, ELECTRIC METERS, AND ELECTRIC TRANSFORMERS SHALL BE REMOVED BY THE UTILITY COMPANY. THE ALL DISCONNECTIONS OF GAS AND ELECTRICAL SERVICE TO BE COMPLETED BY UTILITY COMPANY AND COORDINATED BY ALL TREES NOT DESIGNATED TO BE REMOVED SHALL BE PROTECTED FROM DAMAGE USING TREE PROTECTION FENCE ALL BUILDINGS, PAVEMENTS, & UTILITIES WITHIN THE PROJECT LIMITS TO BE REMOVED UNLESS NOTED OTHERWISE. CONTRACTOR SHALL BE RESPONSIBLE FOR THE FULL DEPTH REMOVAL OF ANY CONCRETE FOUNDATIONS OR PADS. DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL NOT DISTURB CAMPUS BUS SERVICE.NO DEMOLITION SHALL BE DONE UNTIL ALL UTILITY SERVICES HAVE BEEN DISCONNECTED. 1 1 PLACED AT THE DRIP LINE OF THE TREE. CONTRACTOR. MATCH LINE (SEE SHEET C1.20) 4. 1.2.3.5.6. A CB ED Illinois Firm Number: 184-000214 SITE DEMOLITION PLAN - 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 SOUTHEAST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C1.40 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE ALL TREES NOT DESIGNATED TO BE REMOVED SHALL BE ABANDONMENT OF GAS, ELECTRICAL, AND TELEPHONEALL EXISTING UNDERGROUND PIPES WITHIN 10' OF THENOT RETAINED BY THE OWNER SHALL BE DISPOSED OF SERVICE TO BE COMPLETED BY UTILITY COMPANY AND COMPANY. THE CONTRACTOR SHALL BE RESPONSIBLE REMOVED. UTILITY PIPING AND STRUCTURES OUTSIDEOFF-SITE BY THE CONTRACTOR IN ACCORDANCE WITH PROTECTED FROM DAMAGE USING TREE PROTECTION TRANSFORMERS SHALL BE REMOVED BY THE UTILITYALL DEMOLITION ITEMS SHOWN TO BE REMOVED AND ALL UTILITIES TO BE ABANDONED IN PLACE SHALL BE ALL BUILDINGS, PAVEMENTS, & UTILITIES WITHIN THEFOR THE FULL DEPTH REMOVAL OF ANY CONCRETE ALL GAS METERS, ELECTRIC METERS, AND ELECTRIC DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL NO DEMOLITION SHALL BE DONE UNTIL ALL UTILITY PROJECT LIMITS TO BE REMOVED UNLESS NOTED CONTRACTOR SHALL COORDINATE REMOVAL OR ALL DISCONNECTIONS OF GAS AND ELECTRICAL FENCE PLACED AT THE DRIP LINE OF THE TREE. OF THE 10' LIMIT CAN BE ABANDONED IN PLACE. CONTRACTOR SHALL PROTECT ALL UTILITIES TO PROPOSED BUILDING FOUNDATIONS SHALL BE ALL APPLICABLE STATE AND LOCAL LAWS AND SITE DEMOLITION NOTES SERVICES HAVE BEEN DISCONNECTED. NOT DISTURB CAMPUS BUS SERVICE. CAPPED AND PRESSURE GROUTED. COORDINATED BY CONTRACTOR. LINES WITH UTILITY COMPANY. 6 6 FOUNDATIONS OR PADS. REGULATIONS. OTHERWISE. REMAIN. MATCH LINE (SEE SHEET C1.30) 10.11. 2.3.4.5.6.7.8.9. 1. 5 5 44 3 3 MATCH LINE (SEE SHEET C1.30) 2 2 1 1 MATCH LINE (SEE SHEET C1.10) A CB ED Illinois Firm Number: 184-000214 PAVING PLAN - SOUTHWEST 319.354.3040 | fax: 319.354.6921 | shive-hattery.com SITE DIMENSIONAL AND 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C2.10 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE CONCRETE PAVEMENT AT TRASH ENCLOSURE AND HEAVY DUTY WALK MATCH LINE (SEE SHEET C2.40) 6 6 5" P.C. CONCRETE PAVEMENT7" P.C. CONCRETE PAVEMENT P.C. CONCRETE WALK 4" AGGREGATE BASE 6" AGGREGATE BASE PAVING LEGEND 5 5 1.5" BITUMINOUS SURFACE COURSE 2.5" BITUMINOUS BINDER COURSE 10" TYPE B GRANULAR SUBBASE WITH PCC CURB AND GUTTER OPTION 2: 8" P.C. CONCRETE PAVEMENT6" P.C. CONCRETE PAVEMENT STANDARD DUTY PAVEMENT HEAVY DUTY PAVEMENT 6" GRANULAR SUBBASE6" GRANULAR SUBBASE OPTION 1: 44 MATCH LINE (SEE SHEET C2.20) PAVEMENT MARKING AND SIGN LEGEND PROVIDE HANDICAP RAMP WITH ADA DETECTABLE HANDICAP SYMBOL PER LATEST ADA STANDARDS 4" SOLID YELLOW AT 24" C-C AT 45 DEGREES R7-8 HANDICAP PARKING SIGN (12"X18") WARNING STRIP (TYP SEE DETAILS). 4" SOLID YELLOW STRIPE (TYP) 3 3 12345 CONCRETE PAVEMENT SECTION IS CHOSEN, ANDALL DIMENSIONS AND CURB RADII ARE TO FACE ALL SITE SIGNAGE SHALL BE IN CONFORMANCE ALL RADII ARE 3.0' UNLESS OTHERWISE NOTED. WITH M.U.T.C.D. STANDARDS, LATEST EDITION. CURB SHALL BE 5" INTEGRAL BARRIER CURB IF TYPE B-6.12 CURB AND GUTTER IF ASPHALT OF CURB UNLESS OTHERWISE NOTED. TO THE ASSOCIATED DRIVE AISLE. PAVEMENT SECTION IS CHOSEN. NOTES: 2 2 2.4. 3.5. 1. 1 1 A CB ED Iowa | Illinois | Missouri 9 6 . 6 0 '. 1 ' ' ' S 0 E . 0 T '. 6 B 8 0A . C 1 K 0 3 ' ' 5 9 . . 1 1 1 3 ' 0 . 6 2 . F ' . 7 . '6 S 0 . . ' 6 1 0 2 . G 1 2 = '7 B 0= ' . 7 0 9 . 9 G 9 T A T 9 N , A 1 S 11 I 9 6 . E 2 S 0'. 0 7 C E' . D S 2 A CE 1 T 3 P8 A . L 0B 6 ' . 0 SA I P ' = 6 C S 4 K 1 U 6 3 21 R 6 . 0 = ' B 1 O F 1 8 . 0 ' D F O 2 0 E . 5 L ' S F ' 6 O . 0 0 ' . D 4 ' P. 2 0 ' N. 1 7 F 6 . O . 1 8 U 1 R S ' . O 7 P . 1 ' 9 R R G '8 1 . 3 0 A .4 G 5 2 2 1 G 6 N , I ' 5 0 R ' 0 0 .. . D 5 1 4 ' 2 3 1 L 0 . I = 7 6 1 1 U6 = ' R = ' 0 B . 0 . 9 O F 0 T 9 D F A = O ' 0 S E . L E 9 2 9 . 8 C 'S T F A A P O S S 1 8 D . E0 6 ' . 3 0 P ' C 1 N A P O S U R 0 1 O 2 6 . 0 P ' 1 8 R . 0 ' ' K G 6 4 . C 0 . ' ' 5A 0 7 B . T 6 2 E S ' ' 5 ' . 5 ' . 0 2 . 56 '1 . 6 1R 4 60' . . 0 ' R0 5 . 7 0 5 1 ) ' 0 ' 3 .N 1 . 2 09 ' 1 .A '' 66 K L 0 77 .. 99 2 C 1P 55L 33 L O G L A ' N B 0I .W D 6L R ' 0G ' AA . 0 0 N T R .2 I 8N G N 1I E E A 1 6M ' 1E T . 8 0 ' G . S E 9( E R S R ' 0 . 8 R ' '0 '.0 2 0 . 0 . 2 6 2 R ' 0 . 0 2 ' 0 . 8 9 1 E L B A T C E T E P DI E R P T A I I T N D R HA S E G AT I D L 'W S G R S EA 8 B . N E A D I G A P 3E I D B NT 1IN V OD I I C RP T OW N V AE S O " R R O T T 4 PW A RE 2 S P DW R ' 0 . R ' 5 0 . 3 5 3 .. TT CC EE YY EE KK WW AA HH '4 . 70 1 ' 0 . 2 Illinois Firm Number: 184-000214 PAVING PLAN - NORTHWEST 319.354.3040 | fax: 319.354.6921 | shive-hattery.com SITE DIMENSIONAL AND 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C2.20 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE CONCRETE PAVEMENT AT TRASH ENCLOSURE AND HEAVY DUTY WALK MATCH LINE (SEE SHEET C2.30) CONCRETE PAVEMENT AT TRASH ENCLOSURE 6 6 5" P.C. CONCRETE PAVEMENT7" P.C. CONCRETE PAVEMENT P.C. CONCRETE WALK 4" AGGREGATE BASE 6" AGGREGATE BASE PAVING LEGEND 5 5 1.5" BITUMINOUS SURFACE COURSE 2.5" BITUMINOUS BINDER COURSE 10" TYPE B GRANULAR SUBBASE WITH PCC CURB AND GUTTER OPTION 2: 8" P.C. CONCRETE PAVEMENT6" P.C. CONCRETE PAVEMENT STANDARD DUTY PAVEMENT HEAVY DUTY PAVEMENT 6" GRANULAR SUBBASE6" GRANULAR SUBBASE OPTION 1: 44 MATCH LINE (SEE SHEET C2.10) PAVEMENT MARKING AND SIGN LEGEND PROVIDE HANDICAP RAMP WITH ADA DETECTABLE HANDICAP SYMBOL PER LATEST ADA STANDARDS 4" SOLID YELLOW AT 24" C-C AT 45 DEGREES R7-8 HANDICAP PARKING SIGN (12"X18") WARNING STRIP (TYP SEE DETAILS). 4" SOLID YELLOW STRIPE (TYP) 3 3 12345 2 2 CONCRETE PAVEMENT SECTION IS CHOSEN, ANDALL DIMENSIONS AND CURB RADII ARE TO FACE ALL SITE SIGNAGE SHALL BE IN CONFORMANCE ALL RADII ARE 3.0' UNLESS OTHERWISE NOTED. WITH M.U.T.C.D. STANDARDS, LATEST EDITION. CURB SHALL BE 5" INTEGRAL BARRIER CURB IF TYPE B-6.12 CURB AND GUTTER IF ASPHALT OF CURB UNLESS OTHERWISE NOTED. TO THE ASSOCIATED DRIVE AISLE. PAVEMENT SECTION IS CHOSEN. 1 1 NOTES: 2.3.4.5. 1. A CB ED Illinois Firm Number: 184-000214 PAVING PLAN - NORTHEAST 319.354.3040 | fax: 319.354.6921 | shive-hattery.com SITE DIMENSIONAL AND 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C2.30 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE CONCRETE PAVEMENT AT TRASH ENCLOSURE 6 6 5" P.C. CONCRETE PAVEMENT7" P.C. CONCRETE PAVEMENT P.C. CONCRETE WALK 4" AGGREGATE BASE 6" AGGREGATE BASE PAVING LEGEND 5 5 1.5" BITUMINOUS SURFACE COURSE 2.5" BITUMINOUS BINDER COURSE 10" TYPE B GRANULAR SUBBASE WITH PCC CURB AND GUTTER OPTION 2: 8" P.C. CONCRETE PAVEMENT6" P.C. CONCRETE PAVEMENT STANDARD DUTY PAVEMENT HEAVY DUTY PAVEMENT 6" GRANULAR SUBBASE6" GRANULAR SUBBASE OPTION 1: 44 MATCH LINE (SEE SHEET C2.40) PAVEMENT MARKING AND SIGN LEGEND PROVIDE HANDICAP RAMP WITH ADA DETECTABLE HANDICAP SYMBOL PER LATEST ADA STANDARDS 4" SOLID YELLOW AT 24" C-C AT 45 DEGREES R7-8 HANDICAP PARKING SIGN (12"X18") WARNING STRIP (TYP SEE DETAILS). 4" SOLID YELLOW STRIPE (TYP) 3 3 12345 2 2 CONCRETE PAVEMENT SECTION IS CHOSEN, ANDALL DIMENSIONS AND CURB RADII ARE TO FACE ALL SITE SIGNAGE SHALL BE IN CONFORMANCE ALL RADII ARE 3.0' UNLESS OTHERWISE NOTED. WITH M.U.T.C.D. STANDARDS, LATEST EDITION. CURB SHALL BE 5" INTEGRAL BARRIER CURB IF TYPE B-6.12 CURB AND GUTTER IF ASPHALT OF CURB UNLESS OTHERWISE NOTED. TO THE ASSOCIATED DRIVE AISLE. PAVEMENT SECTION IS CHOSEN. 1 1 NOTES: MATCH LINE (SEE SHEET C2.20)2.3.4.5. 1. A CB ED Illinois Firm Number: 184-000214 PAVING PLAN - SOUTHEAST 319.354.3040 | fax: 319.354.6921 | shive-hattery.com SITE DIMENSIONAL AND 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C2.40 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE CONCRETE PAVEMENT SECTION IS CHOSEN, ANDALL DIMENSIONS AND CURB RADII ARE TO FACE ALL SITE SIGNAGE SHALL BE IN CONFORMANCE ALL RADII ARE 3.0' UNLESS OTHERWISE NOTED. WITH M.U.T.C.D. STANDARDS, LATEST EDITION. PAVEMENT MARKING AND SIGN LEGEND CURB SHALL BE 6" INTEGRAL BARRIER CURB IF TYPE B-6.12 CURB AND GUTTER IF ASPHALT PROVIDE HANDICAP RAMP WITH ADA DETECTABLE HANDICAP SYMBOL PER LATEST ADA STANDARDS OF CURB UNLESS OTHERWISE NOTED. 4" SOLID YELLOW AT 24" C-C AT 45 DEGREES TO THE ASSOCIATED DRIVE AISLE. PAVEMENT SECTION IS CHOSEN. R7-8 HANDICAP PARKING SIGN (12"X18") WARNING STRIP (TYP SEE DETAILS). CONCRETE PAVEMENT AT TRASH ENCLOSURE 4" SOLID YELLOW STRIPE (TYP) 6 6 5" P.C. CONCRETE PAVEMENT7" P.C. CONCRETE PAVEMENT NOTES: P.C. CONCRETE WALK 4" AGGREGATE BASE 6" AGGREGATE BASE 2.3.4.5. 1. 12345 PAVING LEGEND 5 5 1.5" BITUMINOUS SURFACE COURSE 2.5" BITUMINOUS BINDER COURSE 10" TYPE B GRANULAR SUBBASE WITH PCC CURB AND GUTTER OPTION 2: 8" P.C. CONCRETE PAVEMENT6" P.C. CONCRETE PAVEMENT STANDARD DUTY PAVEMENT HEAVY DUTY PAVEMENT 6" GRANULAR SUBBASE6" GRANULAR SUBBASE OPTION 1: 44 MATCH LINE (SEE SHEET C2.30) 3 3 2 2 1 1 MATCH LINE (SEE SHEET C2.10) A CB ED Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 SITE UTILITY PLAN - CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 SOUTHWEST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C3.10 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE MATCH LINE (SEE SHEET C3.40) 4" WM OVER 8" SAN 12" ST OVER 8" SAN 8" SAN T/P = 652.678" SAN T/P = 652.02 4" WM B/P = 654.17 15" ST OVER 4" WM15" ST B/P = 655.894" WM T/P = 654.3915" ST OVER 8" WM15" ST B/P = 655.708" WM T/P = 654.2012" ST B/P = 655.9415" ST OVER 8" WM15" ST B/P = 655.368" WM T/P = 653.86 6 6 UTILITY CROSSINGS 10 6789 4" WM OVER 8" SAN 8" WM OVER 8" SAN8" WM OVER 6" SAN 15" ST OVER 8" SAN 8" SAN T/P = 654.238" SAN T/P = 653.556" SAN T/P = 652.346" SAN T/P = 652.45 4" WM B/P = 655.28 8" WM B/P = 655.058" WM B/P = 655.25 15" ST OVER 8" WM15" ST B/P = 656.498" WM T/P = 654.9515" ST B/P = 655.94 12345 EXISTING MATERIALS AND BRING IN NEW MATERIALS OR CONDITION EXISTING SOILS (WHERE NATIVE SOILS ARE ALLOWED) IS INCIDENTAL TO THE PROJECT. COMPACTION REQUIREMENTS. THE COST TO HAUL OUT UTILITIES AND OTHER SITE FEATURES SCHEDULED FOR DEMOLITION ARE NOT SHOWN ON THE SITE UTILITY PLANS. REFER TO THE SITE DEMOLITION PLANS DEWATERING IS INCIDENTAL TO THE PROJECT. THE USE OF DEWATERING EQUIPMENT WILL BE DONE AT THE CONTRACTOR'S OPTION. CONTRACTOR SHALL EXISTING ABANDONED UTILITIES SHALL BE CUT AND REMOVED AS REQUIRED TO INSTALL PROPOSED UTILITIES. CUT UTILITIES SHALL BE CAPPED AND 5 5 ALL CONDUITS AND PIPING PENETRATING ANY BUILDING WALLS SHOULD HAVE LINKSEALS AND A BENTONITE CLAY BACKFILL. THE CONTRACTOR IS REQUIRED TO BACKFILL THE TRENCH WITH SPECIFIED MATERIALS AND MEET ALL PIPES MUST BE TEMPORARILY CAPPED OVERNIGHT WITH WATER TIGHT FITTINGS. MATCH LINE (SEE SHEET C3.20) 44 ALL PROPOSED WATER MAIN SHALL HAVE A MINIMUM COVER OF 5'-6" COORDINATE ALL UTILITY OUTAGES WITH COMPANY OF UTILITY. RE-FILLED WITH FLOWABLE FILL AS NECESSARY. CONSULT SOIL INVESTIGATION REPORTS. SHEETS C1.00-C1.40. UTILITY CONSTRUCTION NOTES 3 3 10.11.12. 5.6.7.8.9. CONTRACTOR SHALL VERIFY WITH EACH UTILITY'S OPERATING AUTHORITY THAT LOCATES HAVE BEEN PERFORMED. IOWA ONE CALL SYSTEM: 1-800-292-8989. UTILITY IS DISCOVERED THAT WAS NOT SHOWN ON THE DRAWINGS OR A SUBSTANTIAL DEVIATION IN LOCATION OR ELEVATION OF A KNOWN UTILITY EXISTS, LOCATIONS ARE FIELD VERIFIED BASED ON OBSERVABLE SURFACE FEATURES SUCH AS MANHOLES, VALVE BOXES, EVIDENCE OF TRENCHES, ETC. OR FIELD CONTRACTOR HAS A CONTRACTUAL OBLIGATION TO COMPLY WITH ALL APPLICABLE LAWS AND OR REGULATIONS INCLUDING THOSE OF OSHA. AT NO TIME EXPLORE AND VERIFY THE LOCATION AND ELEVATION OF ALL UTILITIES AT LEAST 100 FEET IN ADVANCE OF THE EXCAVATION WORK. IN THE EVENT THAT A LOCATION, SIZE AND DEPTH OF BURIED UTILITIES ARE ILLUSTRATED BASED ON AVAILABLE RECORDS FROM THE UTILITY OPERATING AUTHORITY. RECORD ELEVATIONS FOR UTILITIES AT EACH CHANGE IN IT IS THE ESSENCE OF THIS CONTRACT TO PROTECT ALL EXISTING UTILITIES NOT DESIGNATED TO BE REMOVED. THE CONTRACTOR SHALL WORK TO MARKING BY THE OPERATING AUTHORITY WHEREVER POSSIBLE. EXCAVATIONS HAVE NOT BEEN MADE TO VERIFY LOCATIONS OR DEPTH OF BURIED WILL EITHER THE OWNER OR THE ENGINEER TAKE RESPONSIBILITY FOR EITHER THE MEANS OF THE WORK OR THE SAFETY OF THE CONTRACTOR'S IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT EACH UTILITY'S OPERATING AUTHORITY AND SCHEDULE JOINT MEET LOCATES. THE CONTRACTOR'S EMPLOYEES ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. THE UTILITIES. EXACT LOCATION AND ELEVATION OF ALL UTILITIES MUST BE DETERMINED BY THE CONTRACTOR. THE CONTRACTOR IS REQUIRED TO KEEP ACCURATE CONSTRUCTION RECORD DOCUMENTS INCLUDING THE CONTRACTOR SHALL REPORT IT TO THE OWNER'S REPRESENTATIVE AS SOON AS DISCOVERED. 2 2 THE MEANS OF THE WORK AND THE SAFETY OF THE 1 1 PROFILE OR ALIGNMENT. EMPLOYEES. 4. 2.3. 1. A CB ED Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 SITE UTILITY PLAN - CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 NORTHWEST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C3.20 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 4" WM OVER 8" SAN4" WM OVER 8" SAN MATCH LINE (SEE SHEET C3.30) 8" SAN T/P = 655.168" SAN T/P = 655.22 4" WM B/P = 656.384" WM B/P = 656.38 21" ST OVER 4" WM21" ST B/P = 652.684" WM T/P = 651.18 15" ST OVER 6" WM15" ST B/P = 656.256" WM T/P = 654.75 UTILITY CROSSINGS 16171819 6 6 4" WM OVER 8" SAN 8" SAN T/P = 654.30 4" WM B/P = 656.2921" ST OVER 8" WM21" ST B/P = 652.8821" ST OVER 4" WM21" ST B/P = 652.70 18" ST OVER 8" WM18" ST B/P = 655.148" WM T/P = 653.648" WM T/P = 651.384" WM T/P = 651.20 11131415 5 5 MATCH LINE (SEE SHEET C3.10) 44 3 3 2 2 OBSERVABLE SURFACE FEATURES SUCH AS MANHOLES, VERIFY THE LOCATION AND ELEVATION OF ALL UTILITIESREPORT IT TO THE OWNER'S REPRESENTATIVE AS SOON CONTRACTOR'S OPTION. CONTRACTOR SHALL CONSULT RESPONSIBILITY FOR EITHER THE MEANS OF THE WORKEXISTING UTILITIES NOT DESIGNATED TO BE REMOVED.EXISTING MATERIALS AND BRING IN NEW MATERIALS ORALL CONDUITS AND PIPING PENETRATING ANY BUILDINGPLANS. REFER TO THE SITE DEMOLITION PLANS SHEETSDEWATERING IS INCIDENTAL TO THE PROJECT. THE USE ALL PIPES MUST BE TEMPORARILY CAPPED OVERNIGHT VALVE BOXES, EVIDENCE OF TRENCHES, ETC. OR FIELDCOMPACTION REQUIREMENTS. THE COST TO HAUL OUTCOORDINATE ALL UTILITY OUTAGES WITH COMPANY OF REGULATIONS INCLUDING THOSE OF OSHA. AT NO TIMEOF A KNOWN UTILITY EXISTS, THE CONTRACTOR SHALLUTILITIES AND OTHER SITE FEATURES SCHEDULED FOR CONDITION EXISTING SOILS (WHERE NATIVE SOILS ARE CONTACT EACH UTILITY'S OPERATING AUTHORITY AND OR THE SAFETY OF THE CONTRACTOR'S EMPLOYEES. AUTHORITY THAT LOCATES HAVE BEEN PERFORMED. LOCATION, SIZE AND DEPTH OF BURIED UTILITIES ARE CONTRACTOR HAS A CONTRACTUAL OBLIGATION TO MARKING BY THE OPERATING AUTHORITY WHEREVERVERIFY LOCATIONS OR DEPTH OF BURIED UTILITIES. SUBSTANTIAL DEVIATION IN LOCATION OR ELEVATION THE MEANS OF THE WORK AND THE SAFETY OF THE AT LEAST 100 FEET IN ADVANCE OF THE EXCAVATIONTHE CONTRACTOR IS REQUIRED TO KEEP ACCURATEWALLS SHOULD HAVE LINKSEALS AND A BENTONITE POSSIBLE. EXCAVATIONS HAVE NOT BEEN MADE TO WORK. IN THE EVENT THAT A UTILITY IS DISCOVEREDOF DEWATERING EQUIPMENT WILL BE DONE AT THE IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TOSCHEDULE JOINT MEET LOCATES. THE CONTRACTORALL PROPOSED WATER MAIN SHALL HAVE A MINIMUM EXACT LOCATION AND ELEVATION OF ALL UTILITIES DEMOLITION ARE NOT SHOWN ON THE SITE UTILITY ILLUSTRATED BASED ON AVAILABLE RECORDS FROM THE CONTRACTOR SHALL WORK TO EXPLORE AND EXISTING ABANDONED UTILITIES SHALL BE CUT AND WILL EITHER THE OWNER OR THE ENGINEER TAKE CONSTRUCTION RECORD DOCUMENTS INCLUDING THE CONTRACTOR IS REQUIRED TO BACKFILL THE IOWA ONE CALL SYSTEM: 1-800-292-8989. IT IS THE THAT WAS NOT SHOWN ON THE DRAWINGS OR A REMOVED AS REQUIRED TO INSTALL PROPOSED UTILITY CONSTRUCTION NOTES ELEVATIONS FOR UTILITIES AT EACH CHANGE IN TRENCH WITH SPECIFIED MATERIALS AND MEET UTILITIES. CUT UTILITIES SHALL BE CAPPED AND SHALL VERIFY WITH EACH UTILITY'S OPERATING RE-FILLED WITH FLOWABLE FILL AS NECESSARY. ESSENCE OF THIS CONTRACT TO PROTECT ALL THE UTILITY OPERATING AUTHORITY. RECORD CONTRACTOR'S EMPLOYEES ARE SOLELY THE COMPLY WITH ALL APPLICABLE LAWS AND OR MUST BE DETERMINED BY THE CONTRACTOR. RESPONSIBILITY OF THE CONTRACTOR. THE ALLOWED) IS INCIDENTAL TO THE PROJECT. LOCATIONS ARE FIELD VERIFIED BASED ON SOIL INVESTIGATION REPORTS. WITH WATER TIGHT FITTINGS. 1 1 PROFILE OR ALIGNMENT. AS DISCOVERED. CLAY BACKFILL. COVER OF 5'-6". C1.00-C1.40. UTILITY. 10.11.12. 2.3.4.5.6.7.8.9. 1. A CB ED Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 SITE UTILITY PLAN - CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 NORTHEAST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C3.30 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 UTILITY CROSSINGS 21" ST OVER 8" WM21" ST B/P = 653.33 8" WM T/P = 651.83 19 COMPACTION REQUIREMENTS. THE COST TO HAUL OUT UTILITIES AND OTHER SITE FEATURES SCHEDULED FOR DEMOLITION ARE NOT SHOWN ON THE SITE UTILITY PLANS. REFER TO THE SITE DEMOLITION PLANS DEWATERING IS INCIDENTAL TO THE PROJECT. THE USE OF DEWATERING EQUIPMENT WILL BE DONE AT THE CONTRACTOR'S OPTION. CONTRACTOR SHALL EXISTING MATERIALS AND BRING IN NEW MATERIALS OR CONDITION EXISTING SOILS (WHERE NATIVE SOILS ARE ALLOWED) IS INCIDENTAL TO THE PROJECT. EXISTING ABANDONED UTILITIES SHALL BE CUT AND REMOVED AS REQUIRED TO INSTALL PROPOSED UTILITIES. CUT UTILITIES SHALL BE CAPPED AND 5 5 ALL CONDUITS AND PIPING PENETRATING ANY BUILDING WALLS SHOULD HAVE LINKSEALS AND A BENTONITE CLAY BACKFILL. THE CONTRACTOR IS REQUIRED TO BACKFILL THE TRENCH WITH SPECIFIED MATERIALS AND MEET ALL PIPES MUST BE TEMPORARILY CAPPED OVERNIGHT WITH WATER TIGHT FITTINGS. MATCH LINE (SEE SHEET C3.40) 44 ALL PROPOSED WATER MAIN SHALL HAVE A MINIMUM COVER OF 5'-6" COORDINATE ALL UTILITY OUTAGES WITH COMPANY OF UTILITY. RE-FILLED WITH FLOWABLE FILL AS NECESSARY. CONSULT SOIL INVESTIGATION REPORTS. SHEETS C1.00-C1.40. UTILITY CONSTRUCTION NOTES 3 3 10.11.12. 5.6.7.8.9. CONTRACTOR SHALL VERIFY WITH EACH UTILITY'S OPERATING AUTHORITY THAT LOCATES HAVE BEEN PERFORMED. IOWA ONE CALL SYSTEM: 1-800-292-8989. UTILITY IS DISCOVERED THAT WAS NOT SHOWN ON THE DRAWINGS OR A SUBSTANTIAL DEVIATION IN LOCATION OR ELEVATION OF A KNOWN UTILITY EXISTS, LOCATIONS ARE FIELD VERIFIED BASED ON OBSERVABLE SURFACE FEATURES SUCH AS MANHOLES, VALVE BOXES, EVIDENCE OF TRENCHES, ETC. OR FIELD CONTRACTOR HAS A CONTRACTUAL OBLIGATION TO COMPLY WITH ALL APPLICABLE LAWS AND OR REGULATIONS INCLUDING THOSE OF OSHA. AT NO TIME EXPLORE AND VERIFY THE LOCATION AND ELEVATION OF ALL UTILITIES AT LEAST 100 FEET IN ADVANCE OF THE EXCAVATION WORK. IN THE EVENT THAT A LOCATION, SIZE AND DEPTH OF BURIED UTILITIES ARE ILLUSTRATED BASED ON AVAILABLE RECORDS FROM THE UTILITY OPERATING AUTHORITY. RECORD ELEVATIONS FOR UTILITIES AT EACH CHANGE IN IT IS THE ESSENCE OF THIS CONTRACT TO PROTECT ALL EXISTING UTILITIES NOT DESIGNATED TO BE REMOVED. THE CONTRACTOR SHALL WORK TO MARKING BY THE OPERATING AUTHORITY WHEREVER POSSIBLE. EXCAVATIONS HAVE NOT BEEN MADE TO VERIFY LOCATIONS OR DEPTH OF BURIED WILL EITHER THE OWNER OR THE ENGINEER TAKE RESPONSIBILITY FOR EITHER THE MEANS OF THE WORK OR THE SAFETY OF THE CONTRACTOR'S IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT EACH UTILITY'S OPERATING AUTHORITY AND SCHEDULE JOINT MEET LOCATES. THE CONTRACTOR'S EMPLOYEES ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. THE UTILITIES. EXACT LOCATION AND ELEVATION OF ALL UTILITIES MUST BE DETERMINED BY THE CONTRACTOR. THE CONTRACTOR IS REQUIRED TO KEEP ACCURATE CONSTRUCTION RECORD DOCUMENTS INCLUDING THE CONTRACTOR SHALL REPORT IT TO THE OWNER'S REPRESENTATIVE AS SOON AS DISCOVERED. 2 2 THE MEANS OF THE WORK AND THE SAFETY OF THE 1 1 PROFILE OR ALIGNMENT. EMPLOYEES. 4. 2.3. 1. MATCH LINE (SEE SHEET C3.20) A CB ED Illinois Firm Number: 184-000214 NORTH SANITARY SEWER 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY PROFILE - KEY PLAN C3.50 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 5 5 44 3 3 2 2 1 1 A CB ED Illinois Firm Number: 184-000214 SOUTH SANITARY SEWER 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY PROFILE - KEY PLAN C3.60 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 5 5 44 3 3 2 2 1 1 A CB ED Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com SITE GRADING PLAN - 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 SOUTHWEST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C4.10 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE MATCH LINE (SEE SHEET C4.40) 6 6 5 5 MATCH LINE (SEE SHEET C4.20) 44 3 3 2 2 ALL CURB ELEVATIONS ARE FOR BACK OF CURB UNLESS FULFILLMENT OF THE GRADING REQUIREMENTS WILL BE PROTECT ALL TREES NOT SHOWN AS REMOVED DURING PLANS UNLESS INSTALLED WITHIN A PAVED SURFACE. CONTRACTOR SHALL LEAVE THE SITE ROUGH-GRADEDALL RIM ELEVATIONS WITHIN PAVED SURFACES SHALL MAINTAINS POSITIVE SITE DRAINAGE AT ALL TIMES. AT MATCH THE FINISHED ELEVATIONS INDICATED ON THE FREE-DRAINING AND WITHOUT LOW AREAS OR RUTS. ADJUST ALL VALVES, HYDRANTS, CASTINGS, ETC TO WITHIN THE DRIPLINE OF TREES SHOWN TO REMAIN.ALL EXCESS SOIL FROM GRADING AND EXCAVATION CONTOURS SHOWN ARE TO FINISHED GRADE TO BE SEE LANDSCAPE PLANS FOR MORE INFORMATION ON ESTABLISHPROVIDE 2.00% MAX (1.00% MIN) CROSS SLOPE AND ADJUST ALL VALVES, HYDRANTS AND CASTINGS TO SIDEWALKS. ALWAYS MAINTAIN POSITIVE DRAINAGE WORK SHALL BE DISPOSED OF OFF=SITE AT A SITE ALL ELEVATIONS SHOWN DEPICT FINISHED GRADE UNLESS OTHERWISE NOTED. SUBTRACT TOPSOIL 5.00% MAX LONGITUDINAL SLOPE ON ALL ON-SITE GRADING ACTIVITIES. NO GRADING SHALL OCCUR LEFT ON THE SITE BY THE CONTRACTOR AT THE GRADING SHALL BE DONE IN A MANNER WHICH (EXCEPT WHERE INDICATED OTHERWISE), BUT THE COMPLETION OF THIS CONTRACT, THE BE ADJUSTED TO MATCH FINISHED PAVING. SITE GRADING NOTES THICKNESS OR PAVEMENT SECTION TO COMPLETION OF THIS CONTRACT. SECURED BY THE CONTRACTOR. AT THE OWNERS DISCRETION. 1 1 SUBGRADE ELEVATIONS. OTHERWISE SPECIFIED. AWAY FROM BUILDING. SITE LANDSCAPING. FINISHED GRADE. 10. 2.3.4.5.6.7.8.9. 1. A CB ED Iowa | Illinois | Missouri E S I R " C 5 T . 6 0 2 .D G 1 U A C G U T 6 0 6 6 06 72 0 6.E .9 C 20 . 06 2 W 6 G 6 11 6.6. 66 2 60 6 6 2 W8. T 6 5R 66 W 6. 3 0. W 0 W 0 6 6 2T 1 . 5 0 0 W 1 G6 " . 6 66 66 2 3 .5.0. 0 6 0 0 1 W W 0 1 1 6 6 5 6 2 6 9. 5. 6 6G 6 1 9. 6 0 W 2 6 P 6 U6 1 . C8 6 G0 TW 0 0 0 0 . 0 .1 6 6 1 12 6 0. 66 606 W 2 .. 65 0 G 1 C T 6 0 9 . 1 6 P 6 G 0 6 0 4 . 5 W . 1 2 6 6 6 6 0 UG 0 . C G 0 2 G T W 5 0 6 C 0 6 .. T 1 P 0 0 0 6 6 1 5 06 2 . 0 .1 . 13 16 .6 6. 6 1 6 61 1 U 6 .66 C 6 G 6 6 T W 0 F 0 5 . 0 1 5 . 6 . U6 0 C G .T 1 0 0 9 .W 4 2. 0 S 6 1 6 U 6 6 6 6 0 .6 C G 6 U5 T . 1 C 0 G 1 0 G T9 6 . 4 0 . B 6 00 7 1 . 2 6 7 . 6 0 6 1 6 6 9 6 G 6 6 9 G N , 0 I 2 0 . 0 .2 D 2 G6 3 6 L 0 P I 5 = 6. 0 2 2 . U 6 6 0 6 R 6 = 6 B G G O F 0 0 5 . D W 7 F . O 2 U 0 1 6 C E 3 6G 6 L. U T 6 G 2 C0 G S 0 6 F 7 T 0 . 2 6 0 .3 1 0 . 4 G 2 O. 6 9 1 U . 6 16 0 D 6 C 1 6 G 6 5 6 P. T 6. 6 0 62 N 0 7 F 6 . 2 O .. 6 1 U 2 6 6 R 6 S 6 . O P 1 6 6 2 RG . 3 0 G W A 0 G W U 2 5 C . 0 G U 1 T 2 G 3 C U . 0 G 6 0CT 2 5 G 6 6 . 0 5 T6 N , . 0 17 0 6 I 1. 1 02 .6 4 8 . 91 6.5 %9 0 6 2 . 16 6 . D 6 1 6 6 1 6 6 6 3 L 6 6 I 6 = 2 6 . 3 0 W U6 R = B W O F P 0 0 D F 5 U 0 .O . C 1 G 1 E T 6 L 6 0 6 W 60 G 9 S . 4 F 5 . 0 0 0 1 3 6 . . O 6 6 2 1 6 D 6 6 P 6 6 G N 0 6 6 O 2 5 . 5 . 0 U U G 2 C R G 6 T W O 6 0 0 P 3 0 . 8 .0 1 R . 1 G6 6 26 2 6 6 6. 2 66 0 0 2 6 G . 5G 6 5 0 . G U 2 UC 6 G C T 6 6 G 6 0 2 T . 5 0 8 00 W G. 03 1 . .0 6 0 .1 16 9 16 . 66 66 6 1 6 6 1 6 .6 5 0 U W6 C T G W 0 0 2 2 0 . . 6 66 6 16 1 1 .0 . 5 . 09 6 06 W 1 6 G 6 6 U16 6 . 4 0 6 T C U C ' 6 6 6 7 T 0G . . 5 9 6 0 65 6 0 G 653 5 . 9U1 . 0 0 69 4 G0 6 .. 1 UT . C 4 01 1 T 6C 6 6 6 1 . 46 6 0 W 6 6 0 6 . 1 5 0 9 6 . G 66 U 0U0 6 . G6 6 C0 U0 G . T 1 6 C T0U C 6 T U 0 0C CU . 8C T G 00 6 4 T GG 6 T .G U19 .5 .5 3 0 0 0 0 0 T030 8 C6 . .2 7 7 62 . . 6 . 1. 0 6 6 6 2 1 0 2 62 6 . 0 56 6 6 666 6 G 6 U06 6 6 .6 5 5 T C U C UG 08.0 66 T G W U W C CT 00 3.1660 TG0 0 0 5 5 .6 . 00. . 4 3 163 3 . . 6 6 U6 6 09G 6 U 6 G 03. 066 6 06 UG 06.9 65565 C. U 3 TC 66 C6 T 08. 066 0 6 CT 010T .066G . 4 6 6 0 0 0 5 . . 3 2 6 6 6 6 G 00 .6 56 W W 0 0 4 5 . . 9 9 6 6 6 6 U U C C T G T G 0 0 0 0 6 1 5 0 . .. . 9 9 99 6 6 6 6 6 6 6 6 .. TT CC EE YY EE KK WW AA HH . XE T EE M . X E T E E M . T C E Y E K W A H Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com SITE GRADING PLAN - 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 NORTHWEST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C4.20 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE MATCH LINE (SEE SHEET C4.30) 6 6 5 5 MATCH LINE (SEE SHEET C4.10) 44 3 3 2 2 ALL CURB ELEVATIONS ARE FOR BACK OF CURB UNLESS FULFILLMENT OF THE GRADING REQUIREMENTS WILL BE PROTECT ALL TREES NOT SHOWN AS REMOVED DURING PLANS UNLESS INSTALLED WITHIN A PAVED SURFACE. CONTRACTOR SHALL LEAVE THE SITE ROUGH-GRADEDALL RIM ELEVATIONS WITHIN PAVED SURFACES SHALL MAINTAINS POSITIVE SITE DRAINAGE AT ALL TIMES. AT MATCH THE FINISHED ELEVATIONS INDICATED ON THE FREE-DRAINING AND WITHOUT LOW AREAS OR RUTS. ADJUST ALL VALVES, HYDRANTS, CASTINGS, ETC TO ALL EXCESS SOIL FROM GRADING AND EXCAVATION WITHIN THE DRIPLINE OF TREES SHOWN TO REMAIN. CONTOURS SHOWN ARE TO FINISHED GRADE TO BE SEE LANDSCAPE PLANS FOR MORE INFORMATION ON PROVIDE 2.00% MAX (1.00% MIN) CROSS SLOPE AND ESTABLISHADJUST ALL VALVES, HYDRANTS AND CASTINGS TO SIDEWALKS. ALWAYS MAINTAIN POSITIVE DRAINAGE WORK SHALL BE DISPOSED OF OFF=SITE AT A SITE ALL ELEVATIONS SHOWN DEPICT FINISHED GRADE UNLESS OTHERWISE NOTED. SUBTRACT TOPSOIL 5.00% MAX LONGITUDINAL SLOPE ON ALL ON-SITE GRADING ACTIVITIES. NO GRADING SHALL OCCUR LEFT ON THE SITE BY THE CONTRACTOR AT THE GRADING SHALL BE DONE IN A MANNER WHICH (EXCEPT WHERE INDICATED OTHERWISE), BUT THE COMPLETION OF THIS CONTRACT, THE BE ADJUSTED TO MATCH FINISHED PAVING. SITE GRADING NOTES THICKNESS OR PAVEMENT SECTION TO COMPLETION OF THIS CONTRACT. SECURED BY THE CONTRACTOR. AT THE OWNERS DISCRETION. 1 1 SUBGRADE ELEVATIONS. OTHERWISE SPECIFIED. AWAY FROM BUILDING. SITE LANDSCAPING. FINISHED GRADE. 10. 2.4.6. 1.3.5.7.8.9. A CB ED Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com SITE GRADING PLAN - 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 NORTHEAST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C4.30 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE ALL CURB ELEVATIONS ARE FOR BACK OF CURB UNLESS FULFILLMENT OF THE GRADING REQUIREMENTS WILL BE PROTECT ALL TREES NOT SHOWN AS REMOVED DURING PLANS UNLESS INSTALLED WITHIN A PAVED SURFACE. CONTRACTOR SHALL LEAVE THE SITE ROUGH-GRADEDALL RIM ELEVATIONS WITHIN PAVED SURFACES SHALL MAINTAINS POSITIVE SITE DRAINAGE AT ALL TIMES. AT MATCH THE FINISHED ELEVATIONS INDICATED ON THE FREE-DRAINING AND WITHOUT LOW AREAS OR RUTS. ADJUST ALL VALVES, HYDRANTS, CASTINGS, ETC TO WITHIN THE DRIPLINE OF TREES SHOWN TO REMAIN.ALL EXCESS SOIL FROM GRADING AND EXCAVATION CONTOURS SHOWN ARE TO FINISHED GRADE TO BE SEE LANDSCAPE PLANS FOR MORE INFORMATION ON ESTABLISHPROVIDE 2.00% MAX (1.00% MIN) CROSS SLOPE AND ADJUST ALL VALVES, HYDRANTS AND CASTINGS TO SIDEWALKS. ALWAYS MAINTAIN POSITIVE DRAINAGE WORK SHALL BE DISPOSED OF OFF=SITE AT A SITE ALL ELEVATIONS SHOWN DEPICT FINISHED GRADE UNLESS OTHERWISE NOTED. SUBTRACT TOPSOIL 5.00% MAX LONGITUDINAL SLOPE ON ALL ON-SITE GRADING ACTIVITIES. NO GRADING SHALL OCCUR LEFT ON THE SITE BY THE CONTRACTOR AT THE GRADING SHALL BE DONE IN A MANNER WHICH (EXCEPT WHERE INDICATED OTHERWISE), BUT THE COMPLETION OF THIS CONTRACT, THE BE ADJUSTED TO MATCH FINISHED PAVING. SITE GRADING NOTES THICKNESS OR PAVEMENT SECTION TO COMPLETION OF THIS CONTRACT. SECURED BY THE CONTRACTOR. AT THE OWNERS DISCRETION. 6 6 SUBGRADE ELEVATIONS. OTHERWISE SPECIFIED. AWAY FROM BUILDING. SITE LANDSCAPING. FINISHED GRADE. 10. 2.3.4.5.6.7.8.9. 1. 5 5 44 MATCH LINE (SEE SHEET C4.40) 3 3 2 2 1 1 MATCH LINE (SEE SHEET C4.20) A CB ED Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com SITE GRADING PLAN - 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 SOUTHEAST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C4.40 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE ALL CURB ELEVATIONS ARE FOR BACK OF CURB UNLESS FULFILLMENT OF THE GRADING REQUIREMENTS WILL BE PROTECT ALL TREES NOT SHOWN AS REMOVED DURING PLANS UNLESS INSTALLED WITHIN A PAVED SURFACE. CONTRACTOR SHALL LEAVE THE SITE ROUGH-GRADEDALL RIM ELEVATIONS WITHIN PAVED SURFACES SHALL MAINTAINS POSITIVE SITE DRAINAGE AT ALL TIMES. AT MATCH THE FINISHED ELEVATIONS INDICATED ON THE FREE-DRAINING AND WITHOUT LOW AREAS OR RUTS. ADJUST ALL VALVES, HYDRANTS, CASTINGS, ETC TO WITHIN THE DRIPLINE OF TREES SHOWN TO REMAIN.ALL EXCESS SOIL FROM GRADING AND EXCAVATION CONTOURS SHOWN ARE TO FINISHED GRADE TO BE SEE LANDSCAPE PLANS FOR MORE INFORMATION ON ESTABLISHPROVIDE 2.00% MAX (1.00% MIN) CROSS SLOPE AND ADJUST ALL VALVES, HYDRANTS AND CASTINGS TO SIDEWALKS. ALWAYS MAINTAIN POSITIVE DRAINAGE WORK SHALL BE DISPOSED OF OFF=SITE AT A SITE ALL ELEVATIONS SHOWN DEPICT FINISHED GRADE UNLESS OTHERWISE NOTED. SUBTRACT TOPSOIL 5.00% MAX LONGITUDINAL SLOPE ON ALL ON-SITE GRADING ACTIVITIES. NO GRADING SHALL OCCUR LEFT ON THE SITE BY THE CONTRACTOR AT THE GRADING SHALL BE DONE IN A MANNER WHICH (EXCEPT WHERE INDICATED OTHERWISE), BUT THE COMPLETION OF THIS CONTRACT, THE BE ADJUSTED TO MATCH FINISHED PAVING. SITE GRADING NOTES THICKNESS OR PAVEMENT SECTION TO COMPLETION OF THIS CONTRACT. SECURED BY THE CONTRACTOR. AT THE OWNERS DISCRETION. 6 6 SUBGRADE ELEVATIONS. OTHERWISE SPECIFIED. AWAY FROM BUILDING. SITE LANDSCAPING. FINISHED GRADE. 10. 2.3.4.5.6.7.8.9. 1. 5 5 MATCH LINE (SEE SHEET C4.30) 44 3 3 2 2 1 1 MATCH LINE (SEE SHEET C4.10) A CB ED Illinois Firm Number: 184-000214 319.354.3040 | fax: 319.354.6921 | shive-hattery.com BETWEEN "A" BUILDINGS 2834 Northgate Drive | Iowa City, Iowa 52245 DETAILED GRADING CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C4.50 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 5 5 44 3 3 2 2 1 1 A CB ED Illinois Firm Number: 184-000214 DURING CONSTRUCTION - STORMWATER POLLUTION PREVENTION PLAN - PRE/ 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 SOUTHWEST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C5.10 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE MATCH LINE (SEE SHEET C5.40) DIRECTION OF DRAINAGE TUBE OR SILT FENCE 12" COMPOST FILTER EXISTING GRADE 6 6 DISTURBED AREA PROJECT SITE 5 5 EXISTING STORM SEWER AND INTAKE, TYP 44 MATCH LINE (SEE SHEET C5.20) 3 3 2 2 PROVIDE 12" COMPOST FILTER TUBE DISTURBED AREA. SEE DETAILS 1 OR SILT FENCE ALONG EDGE OF 1 1 AND 2 SHEET C5.90, TYP. EXISTING CONTOUR, TYP EXISTING STORM CULVERT, TYP A CB ED Illinois Firm Number: 184-000214 DURING CONSTRUCTION - STORMWATER POLLUTION PREVENTION PLAN - PRE/ 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 NORTHWEST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C5.20 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE MATCH LINE (SEE SHEET C5.30) DIRECTION OF DRAINAGE COMPOST FILTER TUBES TUBE OR SILT FENCE 12" COMPOST FILTER EXISTING GRADE (2) 18" STACKED 6 6 DISTURBED AREA CONSTRUCTION PROJECT SITE STABILIZED ENTRANCE 5 5 STABILIZED CONSTRUCTION PROVIDE 25'X50' MINIMUMENTRANCE. IF REMOVED, MODIFIED OR REPAIRED, REQUIRED TO PREVENT TRACKING OFF-SITE. IF DRESS WITH STONE AS SEE DETAIL 3/C5.90. 44 MATCH LINE (SEE SHEET C5.10) 3 3 COMPOST FILTER TUBE OR SILT FENCE AS REQUIRED FROM LEAVING THE SITE TO PREVENT SEDIMENT EXISTING STORM PIPE. AND ENTERING THE PROTECT WITH 12" WATERWAY. REGULAR CLEANUP OF DIRT AND DEBRIS ALL METHODS NECESSARY TO PREVENT IS REQUIRED. CONTRACTOR SHALL USE CONTRACTOR SHALL ANTICIPATE THE USE OF DUST CONTROL MEASURES. PROVIDE 12" COMPOST FILTER TUBE TRACKING ONTO HAWKEYE COURT. DISTURBED AREA. SEE DETAILS 1 OR SILT FENCE ALONG EDGE OF EXISTING STORM CULVERT, TYP COMPOST FILTER TUBES. COMPOST FILTER TUBES. SEE DETAIL 2/C5.90, TYP. PROVIDE (2) 18" STACKED SEE DETAIL 2/C5.90, TYP. PROVIDE (2) 18" STACKEDAND 2 SHEET C5.90, TYP. EXISTING CONTOUR, TYP EXISTING STORMWATER DISCHARGE POINT, TYP 2 2 1 1 A CB ED Illinois Firm Number: 184-000214 DURING CONSTRUCTION - STORMWATER POLLUTION PREVENTION PLAN - PRE/ 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 NORTHEAST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C5.30 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE AND INTAKE, TYP EXISTING STORM SEWER 6 6 DIRECTION OF DRAINAGE TUBE OR SILT FENCE 12" COMPOST FILTER EXISTING GRADE 5 5 FILTER TUBE AROUND WRAP 12" COMPOST EXISTING INTAKE DISTURBED AREA PROJECT SITE PROVIDE 12" COMPOST FILTER TUBE DISTURBED AREA. SEE DETAILS 1 OR SILT FENCE ALONG EDGE OF AND 2 SHEET C5.90, TYP. EXISTING CONTOUR, TYP 44 MATCH LINE (SEE SHEET C5.40) SAWCUT SLURRY AND DUST MUST BE CONTAINED ACTIVITIES ARE REQUIRED TO BE PROTECTED. AND DISPOSED OF OFF-SITE. A TEMPORARY 8" SAWCUTTING ACTIVITIES IS PROHIBITED FROMSTORM INTAKES LOCATED NEAR SAWCUTTING ENTERING THE STORM SEWER SYSTEM. ALL COMPOST FILTER TUBE MAY BE REQUIRED. NOTE: CONCRETE SLURRY AND DUST FROM 3 3 2 2 1 1 MATCH LINE (SEE SHEET C5.20) A CB ED Illinois Firm Number: 184-000214 DURING CONSTRUCTION - STORMWATER POLLUTION PREVENTION PLAN - PRE/ 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 SOUTHEAST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C5.40 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE DIRECTION OF DRAINAGE TUBE OR SILT FENCE 12" COMPOST FILTER EXISTING GRADE 6 6 SAWCUT SLURRY AND DUST MUST BE CONTAINED ACTIVITIES ARE REQUIRED TO BE PROTECTED. AND DISPOSED OF OFF-SITE. A TEMPORARY 8" SAWCUTTING ACTIVITIES IS PROHIBITED FROMSTORM INTAKES LOCATED NEAR SAWCUTTING ENTERING THE STORM SEWER SYSTEM. ALL COMPOST FILTER TUBE MAY BE REQUIRED. NOTE: CONCRETE SLURRY AND DUST FROM PROVIDE 12" COMPOST FILTER TUBE DISTURBED AREA DISTURBED AREA. SEE DETAILS 1 PROJECT SITE OR SILT FENCE ALONG EDGE OF AND 2 SHEET C5.90, TYP. EXISTING CONTOUR, TYP EXISTING STORM SEWER 5 5 AND INTAKE, TYP 44 MATCH LINE (SEE SHEET C5.30) 3 3 2 2 1 1 MATCH LINE (SEE SHEET C5.10) A CB ED Illinois Firm Number: 184-000214 STORMWATER POLLUTION 319.354.3040 | fax: 319.354.6921 | shive-hattery.com POST CONSTRUCTION - 2834 Northgate Drive | Iowa City, Iowa 52245 PREVENTION PLAN - CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 SOUTHWEST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C5.50 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE MATCH LINE (SEE SHEET C5.80) DIRECTION OF DRAINAGE BAG WITH CURB FILTER PROPOSED PAVEMENT 6 6 BAG OR FILTER SACK INTAKE PROTECTIONINTAKE PROTECTION PROPOSED GRADE TUBE OR SILT FENCE 12" COMPOST FILTER EROSION CONTROL DISTURBED AREA PROJECT SITE 5 5 BLANKET SEWER ANDINTAKE, TYP EXISTING STORM PROPOSEDSTORM SEWERAND INTAKE, TYPBAG OR FILTER SACK. THISCONTROL TO REMAIN UNTIL THE PROVIDE INTAKE PROTECTIONSITE HAS BEEN STABILIZED ANDAPPROVED BY THE OWNER'SREPRESENTATIVE, TYP 44 MATCH LINE (SEE SHEET C5.60) GRASSED AREAS GREATER THAN 10% SLOPE. INSTALL EROSION CONTROL BLANKET IN ALL IMMEDIATELY AFTER COMPLETION OF FINAL INSTALL NORTH AMERICAN GREEN DOUBLE SC150BN, OR APPROVED EQUAL. EROSION NET EROSION CONTROL BLANKET, MODEL CONTROL BLANKET TO BE INSTALLED GRADING AND HYDROSEEDING, TYP 3 3 QUALITY UNIT, TYP STORMWATER PROPOSED CONTROL TO REMAIN UNTIL BAG WITH CURB FILTER. THISTHE SITE HAS BEENBY THE OWNER'S PROVIDE INTAKE PROTECTIONSTABILIZED AND APPROVEDREPRESENTATIVE, TYP PROVIDE 12" COMPOST FILTER APPROVED BY THE OWNER'S HILLSIDE. THIS CONTROL TO TUBE OR SILT FENCE ALONGREMAIN UNTIL THE SITE HAS PROPOSED BUILDING, TYP REPRESENTATIVE, TYP. BEEN STABILIZED AND PROPOSED RETAINING WALL, TYP SAWCUT SLURRY AND DUST MUST BE CONTAINED ACTIVITIES ARE REQUIRED TO BE PROTECTED. AND DISPOSED OF OFF-SITE. A TEMPORARY 8" SAWCUTTING ACTIVITIES IS PROHIBITED FROMSTORM INTAKES LOCATED NEAR SAWCUTTING ENTERING THE STORM SEWER SYSTEM. ALL COMPOST FILTER TUBE MAY BE REQUIRED. NOTE: CONCRETE SLURRY AND DUST FROM 2 2 1 1 DISCHARGE POINTDISCHARGE POINT PROPOSED PAVEMENT, TYP PROPOSED STORMWATEREXISTING STORMWATER PROPOSED CONTOUR, TYP EXISTING CONTOUR, TYP CULVERT, TYP PROPOSED STORM CULVERT, TYP EXISTING STORM A CB ED Illinois Firm Number: 184-000214 STORMWATER POLLUTION 319.354.3040 | fax: 319.354.6921 | shive-hattery.com POST CONSTRUCTION - 2834 Northgate Drive | Iowa City, Iowa 52245 PREVENTION PLAN - CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 NORTHWEST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C5.60 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE DIRECTION OF DRAINAGE MATCH LINE (SEE SHEET C5.70) PROPOSED PAVEMENT BAG OR FILTER SACK TUBE OR SILT FENCE 12" COMPOST FILTERINTAKE PROTECTION PROPOSED GRADE 6 6 BAG WITH CURB FILTER INTAKE PROTECTION EROSION CONTROL DISTURBED AREA PROJECT SITE BLANKET 5 5 SAWCUT SLURRY AND DUST MUST BE CONTAINED ACTIVITIES ARE REQUIRED TO BE PROTECTED. AND DISPOSED OF OFF-SITE. A TEMPORARY 8" SAWCUTTING ACTIVITIES IS PROHIBITED FROMSTORM INTAKES LOCATED NEAR SAWCUTTING ENTERING THE STORM SEWER SYSTEM. ALL COMPOST FILTER TUBE MAY BE REQUIRED. NOTE: CONCRETE SLURRY AND DUST FROM MATCH LINE (SEE SHEET C5.50) 44 3 3 CULVERT, TYP EXISTING STORM SEWER ANDMANHOLE, TYP PROPOSED STORM OWNER'S REPRESENTATIVE. DISCHARGE POINT, TYPREPRESENTATIVEDISCHARGE POINT EXISTING STACKEDREMAIN UNTIL THE SITE HASBEEN STABILIZED ANDAPPROVED BY THE OWNER'SPROPOSED STORMWATER EXISTING STORMWATERCOMPOST FILTER TUBES TOPROPOSEDQUALITY UNIT, TYP REMAIN UNTIL THE SITE HAS BEENSTABILIZED AND APPROVED BY THE STORMWATERPROVIDE INTAKE PROTECTION BAG WITH CURB FILTER. THIS CONTROL TO BAG OR FILTER SACK. THISCONTROL TO REMAIN UNTIL THE PROVIDE INTAKE PROTECTIONSITE HAS BEEN STABILIZED ANDAPPROVED BY THE OWNER'SREPRESENTATIVE, TYP 2 2 FENCE ALONG EDGE OF DISTURBED 12" COMPOST FILTER TUBE OR SILT AREA TO REMAIN UNTIL THE SITE APPROVED BY THE OWNER'S PROPOSED PAVEMENT, TYP HAS BEEN STABILIZED AND PROPOSED BUILDING, TYP EXISTING CONTOUR, TYP REPRESENTATIVE, TYP. GRADING AND HYDROSEEDING, TYP.REPRESENTATIVE, TYP. GRASSED AREAS GREATER THAN 10% SLOPE. INSTALL EROSION CONTROL BLANKET IN ALLIMMEDIATELY AFTER COMPLETION OF FINAL PROPOSED CONTOUR, TYPNET EROSION CONTROL BLANKET, MODELREMAIN UNTIL THE SITE HAS BEEN INSTALL NORTH AMERICAN GREEN DOUBLESC150BN, OR APPROVED EQUAL. EROSIONCONTROL BLANKET TO BE INSTALLEDPROVIDE 12" COMPOST FILTER TUBE OR SILTSTABILIZED AND APPROVED BY THE OWNER'S FENCE ALONG HILLSIDE. THIS CONTROL TO CULVERT, TYP DISCHARGE POINTPROPOSED STORM PROPOSED STORMWATER REPRESENTATIVE REMAIN UNTIL THE SITE HASBEEN STABILIZED AND EXISTING STACKEDAPPROVED BY THE OWNER'S COMPOST FILTER TUBES TO 1 1 A CB ED Illinois Firm Number: 184-000214 STORMWATER POLLUTION 319.354.3040 | fax: 319.354.6921 | shive-hattery.com POST CONSTRUCTION - 2834 Northgate Drive | Iowa City, Iowa 52245 PREVENTION PLAN - CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 NORTHEAST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C5.70 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 SEWER ANDINTAKE, TYP EXISTING STORM DIRECTION OF DRAINAGE BAG WITH CURB FILTER TUBE OR SILT FENCEBAG OR FILTER SACK 12" COMPOST FILTER INTAKE PROTECTIONINTAKE PROTECTION PROPOSED GRADE SITE HAS BEEN STABILIZED AND APPROVED BY THE OWNER'S TUBE TO REMAIN UNTIL THE EXISTING COMPOST FILTER 5 5 REPRESENTATIVE, TYP PROPOSED PAVEMENT EROSION CONTROL DISTURBED AREA PROJECT SITE BLANKET FENCE ALONG EDGE OF DISTURBED 12" COMPOST FILTER TUBE OR SILT AREA TO REMAIN UNTIL THE SITE APPROVED BY THE OWNER'S HAS BEEN STABILIZED AND REPRESENTATIVE, TYP. 44 MATCH LINE (SEE SHEET C5.80) SAWCUT SLURRY AND DUST MUST BE CONTAINED ACTIVITIES ARE REQUIRED TO BE PROTECTED. AND DISPOSED OF OFF-SITE. A TEMPORARY 8" SAWCUTTING ACTIVITIES IS PROHIBITED FROMSTORM INTAKES LOCATED NEAR SAWCUTTING GRASSED AREAS GREATER THAN 10% SLOPE. INSTALL EROSION CONTROL BLANKET IN ALL ENTERING THE STORM SEWER SYSTEM. ALL COMPOST FILTER TUBE MAY BE REQUIRED. IMMEDIATELY AFTER COMPLETION OF FINAL NOTE: CONCRETE SLURRY AND DUST FROM INSTALL NORTH AMERICAN GREEN DOUBLE NET EROSION CONTROL BLANKET, MODELSC150BN, OR APPROVED EQUAL. EROSION CONTROL BLANKET TO BE INSTALLEDGRADING AND HYDROSEEDING, TYP. 3 3 AND INTAKE, TYP STORM SEWER PROPOSED 2 2 PROPOSED PAVEMENT, TYPFILTER. THIS CONTROL TO REMAIN UNTIL THE PROVIDE INTAKE PROTECTION BAG WITH CURBTHE OWNER'S REPRESENTATIVE, TYP SITE HAS BEEN STABILIZED AND APPROVED BY PROPOSED CONTOUR, TYP EXISTING CONTOUR, TYP PROVIDE INTAKE PROTECTIONBAG OR FILTER SACK. THISCONTROL TO REMAIN UNTIL THEAPPROVED BY THE OWNER'SREPRESENTATIVE, TYP SITE HAS BEEN STABILIZED AND 1 1 MATCH LINE (SEE SHEET C5.60) A CB ED Illinois Firm Number: 184-000214 STORMWATER POLLUTION 319.354.3040 | fax: 319.354.6921 | shive-hattery.com POST CONSTRUCTION - 2834 Northgate Drive | Iowa City, Iowa 52245 PREVENTION PLAN - CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 SOUTHEAST Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C5.80 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 DIRECTION OF DRAINAGE PROPOSED PAVEMENT TUBE OR SILT FENCEBAG OR FILTER SACK 12" COMPOST FILTER INTAKE PROTECTION PROPOSED GRADE SAWCUT SLURRY AND DUST MUST BE CONTAINED ACTIVITIES ARE REQUIRED TO BE PROTECTED. AND DISPOSED OF OFF-SITE. A TEMPORARY 8" SAWCUTTING ACTIVITIES IS PROHIBITED FROMSTORM INTAKES LOCATED NEAR SAWCUTTING ENTERING THE STORM SEWER SYSTEM. ALL COMPOST FILTER TUBE MAY BE REQUIRED. NOTE: CONCRETE SLURRY AND DUST FROM FENCE ALONG EDGE OF DISTURBED 12" COMPOST FILTER TUBE OR SILT AREA TO REMAIN UNTIL THE SITE APPROVED BY THE OWNER'S HAS BEEN STABILIZED AND REPRESENTATIVE, TYP. BAG WITH CURB FILTER 5 5 INTAKE PROTECTION EROSION CONTROL DISTURBED AREA PROJECT SITE BLANKET INTAKE, TYP SEWER AND EXISTING STORM MATCH LINE (SEE SHEET C5.70) 44 GRASSED AREAS GREATER THAN 10% SLOPE. INSTALL EROSION CONTROL BLANKET IN ALL IMMEDIATELY AFTER COMPLETION OF FINAL INSTALL NORTH AMERICAN GREEN DOUBLE SC150BN, OR APPROVED EQUAL. EROSION NET EROSION CONTROL BLANKET, MODEL CONTROL BLANKET TO BE INSTALLED GRADING AND HYDROSEEDING, TYP. CONTROL TO REMAIN UNTIL THE SITE HAS BEEN STABILIZED AND PROVIDE INTAKE PROTECTION APPROVED BY THE OWNER'S BAG OR FILTER SACK. THIS REPRESENTATIVE, TYP CONTROL TO REMAIN UNTIL THE SITE HAS BEEN STABILIZED AND PROVIDE INTAKE PROTECTION BAG WITH CURB FILTER. THIS APPROVED BY THE OWNER'S 3 3 REPRESENTATIVE. PROPOSED CONTOUR, TYP EXISTING CONTOUR, TYP PROPOSEDPAVEMENT, TYP 2 2 PROPOSEDAND INTAKE, TYP STORM SEWER PROPOSED BUILDING, TYP 1 1 MATCH LINE (SEE SHEET C5.50) A CB ED Illinois Firm Number: 184-000214 STORMWATER POLLUTION 319.354.3040 | fax: 319.354.6921 | shive-hattery.com PREVENTION NOTES 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 AND DETAILS Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C5.90 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE BEWHERE WATER IS PUMPED FROM EXCAVATIONS ON SITE, PROVISIONS SHALL BE MADE TO REMOVE SEDIMENT FROM THE WATER BEFORE OF THE SITE REGARDLESS OF THE TIME PERIOD BEFORE THEY WILL BE DISTURBED AGAIN. IN THE EVENT THAT CONSTRUCTION ACTIVITYLOCATED NEAR THE CONSTRUCTION TRAILER OR FUELING AREA. THE SPILL KIT SHALL CONTAIN, BUT NOT BE LIMITED TO THE FOLLOWING EXCEPT AS PRECLUDED BY SNOW COVER, THE CONTRACTOR IS REQUIRED TO USE STABILIZATION CONTROLS ON ALL DISTURBED AREASMUCH AS POSSIBLE TOWARDS VEGETATED AREAS AND AWAY FROM DRAINAGE WAYS. REFER TO THE IDNR NPDES GENERAL PERMIT NO. INTAKEBASINS, OR DRAINAGE WAYS. SPILLED MATERIALS WILL BE CLEANED AND, IF NECESSARY, SOIL REMEDIATION PRACTICES WILL BE USED. IT IS RELEASED INTO THE STORM SEWER SYSTEM. METHODS INCLUDE: DEWATERING BAGS, ADDING FLOCCULANTS TO SILTY WATER ANDLUBRICANTS, CURING COMPOUNDS, FERTILIZERS, GREASE AND CLEANING SOLVENTS. THE CONTRACTOR STAGING AREA FOR PORTABLE IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTROL EROSION/SEDIMENTATION ON THE SITE AT ALL TIMES. THE CONTROL MEASURES CONTRACTOR TO LOCATE/RELOCATE SILT FENCING/COMPOST FILTER TUBES AS NECESSARY THROUGHOUT THE PROJECT TO CONTROLRESTROOM FACILITIES, TEMPORARY FUEL TANKS, WASTE CONTAINERS AND OTHER HAZARDOUS CHEMICALS MUST BE PROTECTED BY A ALL EXISTING STORM INTAKES WITHIN THE PROJECT AREA MUST BE PROTECTED THROUGHOUT THE DURATION OF THE PROJECT. AREA 6 ITEMS: A GARBAGE CAN, GLOVES, SAFETY GOGGLES, BROOM AND DUST PAN AND KITTY LITTER. THE SPILL KIT SHALL BE RESTOCKED AS DUST CONTROL: THE CONTRACTOR SHALL IMPLEMENT DUST CONTROL MEASURES WHERE DUST IS GENERATED. FREQUENT WATERINGON-SITE. AT A MINIMUM, THE CONTRACTOR IS REQUIRED TO PROVIDE SILT FENCE/COMPOST FILTER TUBES AROUND STOCKPILED SOILS 6 IN THE EVENT THAT SOILS LEAVE THE SITE, CLEANUP OF ALL SURROUNDING ROADS, DRIVES AND PARKING LOTS SHALL BE PERFORMED . ALL NEW INTAKES MUST BE PROTECTED UPON INSTALLATION. THESE PROTECTION MEASURES TAKEN TO PREVENT SPILLS. ANY SPILLED MATERIAL WILL IMMEDIATELY BE DIRECTED AWAY FROM STORMWATER INTAKES, DETENTIONON-SITE AND UNABLE TO USE THE WASHOUT AREA, THE CONTRACTOR SHALL DIG A PIT FOR WASTE MATERIAL. CONTRACTOR TO HAULSEQUENCE OF MAJOR ACTIVITIES: INCORPORATE ALL TEMPORARY STABILIZING AND PERMANENT EROSION/SEDIMENTATION CONTROL MUSTREMOVE ALL TEMPORARY EROSION/SEDIMENTATION CONTROLS, NOT CALLED OUT TO REMAIN, AFTER SITE HAS BEEN STABILIZED AND EROSION/SEDIMENTATION CONTROL MEASURES ARE REQUIRED REGARDLESS OF THE TIME OF YEAR. THIS PLAN AND ITS ASSOCIATEDWHICH INCLUDE WATER FLUSHED FROM WATER LINES, PAVEMENT WASHING (WHERE NO SPILLS OR LEAKS HAVE OCCURRED, UNLESS CONTRACTOR TO USE EXTREME CAUTION WHILE INSTALLING SILT FENCE OR OTHER EROSION/SEDIMENTATION CONTROL DEVICES TO PLACING A FILTER FABRIC BARRIER AROUND THE PUMP INLET. THE COMBINATION OF THESE METHODS HELPS TO REMOVE SEDIMENTWHERE WATER IS RELEASED FROM A DEWATERING SYSTEM, PRECAUTIONS SHALL BE TAKEN TO ENSURE THAT EROSION GULLIES DOSANITARY WASTE DISPOSAL: ALL LOCATIONS OF PORTABLE RESTROOM FACILITIES MUST BE IDENTIFIED ON THE PLAN (RELOCATE AS MAINTAIN SILT FENCING AT ALL TIMES IN AN UPRIGHT POSITION. CLEAN SILT FROM FENCING/COMPOST FILTER TUBES ON A REGULARREQUIRED TO INSTALL A 12" COMPOST FILTER TUBE AROUND THE FACILITY TO MINIMIZE THE RADIUS OF THE AFFECTED ZONE IN THECONCRETE, PAINT AND GROUT WASHOUT AREA: PROTECT WITH (2) 18" STACKED COMPOST FILTER TUBES. IF A PUMP TRUCK IS USED PREVENTION PLAN, NPDES GENERAL PERMIT NO.2 SUBMITTAL REQUIREMENTS AND EROSION/SEDIMENTATION CONTROL TECHNICALNOT FORM. ONE METHOD IS TO PIPE THE WATER DIRECTLY INTO A STORM SEWER STRUCTURE. WATER MUST BE FREE OF SEDIMENT STOCKPILED MATERIALS: CONTRACTOR TO IDENTIFY ALL LOCATIONS OF STOCKPILED MATERIALS ON THE STORMWATER POLLUTION POLLUTION AND SPILL PREVENTION PLANNING: POTENTIALLY HAZARDOUS MATERIALS ON THE CONSTRUCTION SITE INCLUDE FUEL, EVENT OF A SPILL. WASTES SHALL BE COLLECTED AND DISPOSED OF IN COMPLETE COMPLIANCE WITH LOCAL, STATE AND FEDERALTHE SPILLED MATERIAL HAS BEEN CLEANED UP), VEHICLE WASHING, AND GROUNDWATER (DEWATERING), SHOULD BE DIRECTED ASPREVENTION PLAN. CONTRACTOR SHALL PROVIDE ALL EROSION/SEDIMENTATION CONTROLS AS REQUIRED TO CONTAIN MATERIALS ON A DAILY BASIS AT A MINIMUM AND UPON REQUEST BY OWNER'S REPRESENTATIVE AT NO ADDITIONAL COST. PAVEMENT IS TO BE 12" COMPOST FILTER TUBE AT ALL TIMES (RELOCATE AS REQUIRED FOR CONSTRUCTION). ALL REASONABLE PRECAUTIONS WILL BEOF THE SITE, SPRINKLING/IRRIGATION, VEGETATIVE COVER, MULCH, WINDBREAKS, TILLAGE, STONE AND SPRAY-ON CHEMICAL SOIL IDENTIFICATION OF ALLOWABLE NON-STORMWATER DISCHARGES: DURING CONSTRUCTION THE NON-STORMWATER DISCHARGES, INTAKES SHALL BE PROTECTED BY A 12" COMPOST FILTER TUBE MAY BE SUBSTITUTED FOR SILT FENCE WHEN SLOPE OF GRADE IS LESS THAN 10%. COMPOST FILTER BEFORE STOCKPILE IS RE-SPREAD. CONTRACTOR IS ALSO REQUIRED TO COVER ALL STOCKPILED SOILS IF RAIN IS FORECASTED. REQUIRED FOR CONSTRUCTION). IN THE EVENT THAT PORTABLE RESTROOM FACILITIES ARE USED ON-SITE, THE CONTRACTOR ISCONTRACTOR AND IDENTIFIED ON THE PLAN (RELOCATE AS REQUIRED FOR CONSTRUCTION). THE CONTRACTOR IS REQUIRED TO WITHIN A DISTURBED AREA WILL NOT OCCUR FOR A PERIOD OF 21 OR MORE CALENDAR DAYS, THE CONTRACTOR SHALL INSTALLSPILL KIT: THE LOCATION OF THE SPILL KIT MUST BE IDENTIFIED ON THE PLAN. THE SPILL KIT SHALL BE A SEALED STORAGE SHED BE CLEANED OUT WHEN THEY ARE 50% FULL. COMPOST FILTER TUBES TREATMENTS (PALLIATIVES) ARE POSSIBLE DUST CONTROL MEASURES. IF THE DUST CONTROL IS NOT ACCEPTABLE IT SHALL BE SUPPLIES ARE USED. THE CONTRACTOR SHALL INSTALL A SIGN THAT DESIGNATES THE SPILL KIT. RELOCATE AS REQUIRED FOR IDENTIFIED ON THE PLAN ARE A MINIMUM. THE CONTRACTOR SHALL PROVIDE ADDITIONAL EROSION/SEDIMENTATION CONTROL FOR STORMWATER POLLUTION STABILIZATION MEASURES NO LATER THAN THE 14TH DAY AFTER CONSTRUCTION ACTIVITY CEASED IN THAT AREA. REFER TO FROM THE WATER. THE MOST COMMON METHOD INCLUDES PLACING CHITOSAN GEOTEXTILE TREATMENT BAGS WITHIN THE OFF ALL WASTE MATERIAL. ALL LOCATIONS OF CONCRETE, PAINT AND GROUT WASHOUT AREAS MUST BE PROVIDED BY THE DEWATERING BAG AND INSTALLING AN ADDITIONAL INTAKE PROTECTION BAG AT THE NEAREST DOWNSTREAM INTAKE. ARE TO REMAIN IN PLACE UNTIL THE SITE HAS BEEN STABILIZED AND APPROVED BY THE OWNER'S REPRESENTATIVE. SCRAPED OF DEBRIS AND MUD AND BROOMED CLEAN. MUD TRACKS ARE TO BE REMOVED AS THEY ARE CREATED. 00 FOR REQUIRED STABILIZATION CONTROLS NOT SHOWN ON THIS PLAN. REGULATIONS. PORTABLE RESTROOM FACILITIES MUST NOT BE LOCATED NEAR DRAINAGE WAYS. GRATED CURB REQUIREMENTS FOR THE PERMIT MUST BE IMPLEMENTED DURING WINTER MONTHS AS WELL. 01 57 23, 01 57 23.10, 01 57 23.20, 01 57 23.30 AND 31 25 00 INTAKES SHALL BE PROTECTED BY INTAKE PROTECTION BAGS/FILTER SACKS. A RECORD OF SPILLS WILL BE MAINTAINED BY THE PRIME CONTRACTOR. 5 5 CHANGED AS DIRECTED BY THE OWNER'S REPRESENTATIVE. MEASURES AS NECESSARY TO FULFILL THIS REQUIREMENT. INSTALL A SIGN THAT DESIGNATES THE WASHOUT AREA. MUST 2 FOR ALLOWABLE NON-STORMWATER DISCHARGES. PRIOR TO DISCHARGING INTO THE STORM SEWER. BASIS AS PER THE SPECIFICATIONS. SILT FENCES FEATURES AT THE EARLIEST TIME PRACTICABLE. APPROVED BY THE OWNER'S REPRESENTATIVE. CLEANED OUT WHEN THEY ARE 33% FULL. NOT DAMAGE UNDERGROUND UTILITIES. PROTECTION BAG WITH CURB FILTERS REFER TO SPECIFICATION SECTIONS TUBES MUST BE STAKED IN PLACE. SPECIFICATION SECTION 31 25 EROSION/SEDIMENTATION. SPECIFICATIONS. CONSTRUCTION. 20.21. 10.11.12.13.14.15.16.17.18.19. 2.4. 3.5.6.7.8.9. 1. 44 IMPLEMENTED ON A PER PHASE BASIS TO ALLOW FOR CONTROL DEVICES IDENTIFIED ON THE PLAN WILL BE UPON COMPLETION OF EACH PHASE AND APPROVAL THE UNIVERSITY OF IOWA IS THE APPLICANT FOR CONTRACTOR AND ALL SUB-CONTRACTORS ARE BY THE OWNER'S REPRESENTATIVE, EROSION/ REQUIRED TO SIGN ON AS THE CO-APPLICANT. MAXIMUM PEDESTRIAN ACCESS AND EASE OF SEVERAL PHASES. EROSION/SEDIMENTATION POST-DEVELOPMENT COEFFICIENT = 0.48 THIS PROJECT WILL BE CONSTRUCTED OVER SEDIMENTATION CONTROL DEVICES MAY BE THE NPDES GENERAL PERMIT NO. 2 AND THE PRE-DEVELOPMENT COEFFICIENT = 0.43 ALL RECORDS SHALL BE SUBMITTED TO THE CLOSEST SURFACE WATER ACCEPTING CONTRACT FULFILLMENT REQUIREMENTS. OWNER'S REPRESENTATIVE AS THEY ARE WITH A MECHANICAL OR PNEUMATIC TAMPER. FOR MACHINE INSTALLATION, POSTS SHALL BETOTAL DISTURBED AREA = 17.42 AC EMBEDDED 28" BELOW THE TRENCH BOTTOM. FOR TRENCH INSTALLATION, POSTS SHALL BE PRODUCED. SEE SPECIFICATIONS FOR DRIVING OVER EACH SIDE OF SILT FENCE 2-4 TOTAL PROJECT AREA = 19.03 AC ALL COMPACTION SHALL BE ACCOMPLISHED COMPACTION SHALL BE ACCOMPLISHED BY SITE DISCHARGE = IOWA RIVER EMBEDDED 28" BELOW GROUND LINE. ALL TIMES WITH DEVICE EXERTING 60PSI OR STAKED IN PLACE COMPOST FILTER(STAKE EVERY 8' TUBE TO BE FOR ADDED STABILITY) SITE INFORMATION:REMOVED/RELOCATED. SECURE TOP OF ENGINEERING FOLDED ACROSS BOTTOM OF ENGINEERING FABRIC SHALL HAVE A MINIMUM 36" WIDTH. ENGINEERING FABRIC TO BE 3 3 CONSTRUCTION. AREA TO BEPROTECTED FABRIC TO STEEL POST. GENERAL NOTES:GREATER. TRENCH. 2. 1. TOP VIEW W O L F F O N O I FORESLOPE T GROUND LINE C ENGINEERING FABRIC TO E DISTURBED AREA R I D BOTTOM OF TRENCH 12" MIN DEPTH BY 4" BE FOLDED ACROSS TYPICAL SECTION SILT FENCE MIN WIDTH TRENCH PLACE COMPOST PERPENDICULAR FILTER TUBE TO SLOPE INSTALL GEOTEXTILE 3" MACADAM STONE POST WIRE 10' MIN FILTER FABRICBELOW STONE FRONT VIEW 2 2 NATIVE SOIL COMPOST MATERIAL TO 6" MIN BETWEEN THE TUBE PLACE ADDITIONAL AND THE GROUND FABRIC FILL THE SEAM CORDGROUND LINE 5'-0" MIN FENCE POST "T" STEEL EMBED 12" 19" TWIST CORD AND PLACE AROUND DETAILS OF SILT FENCE POST, SECURE WITH WIRE. CORD POST WIRE SIDE VIEW 8' SPACING MAXTRENCH BOTTOM POST TOP VIEW 31"MIN NOTE: COMPOST ENGINEERING FILTER STAKE TUBE 1 1 GROUND FABRIC LINE A CB ED Illinois Firm Number: 184-000214 CONSTRUCTION DETAILS 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C6.10 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 5 5 44 3 3 AA 2 2 1 1 AA A CB ED Illinois Firm Number: 184-000214 CONSTRUCTION DETAILS 319.354.3040 | fax: 319.354.6921 | shive-hattery.com 2834 Northgate Drive | Iowa City, Iowa 52245 CONSTRUCTION REDEVELOPMENT HAWKEYE COURT 06/17/2013 101 HAWKEYE COURT 1123350 CAMPUS SOLUTIONS IOWA CITY, IA 52246 Iowa | Illinois | Missouri BALFOUR BEATTY KEY PLAN C6.20 PHASE I PROJECT NO.: ISSUED FORFIELD BOOK APPROVED DRAWN DATE 6 6 5 5 44 3 3 2 2 1 1 A CB ED Iowa | Illinois | Missouri #3#3#3#5 #3