Loading...
HomeMy WebLinkAbout1977-09-20 CorrespondenceData Sheet Senior Center Project Goal: To develop a community center for senior citizens and to coordinate programs, activities and services to meet their needs in one convenient, readily accessible location. Project Description: The City of Iowa City proposes to buy and remodel the vacant post office located at the corner of Washington and Linn Streets into a multipurpose senior center and to facilitate the development of an attached senior citizen housing structure to be constructed on the site immediately east of the old post office. The proposed housing will not be developed by the city and will be a high rise structure containing as many as 100 units. Area and Persons to be Served: The senior center will be a focal point for activities of and services for Iowa City senior citizens. The facility and services will be designed to provide accessibility to physically handicapped senior citizens. Programs and services will be available for persons of all income levels and educational and social back- grounds. According to a 1974 special census, Iowa City had a population of 47,744, of which 6.3% (or 3,008) were over 60 years of age. A large percentage of the senior citizens reside in older neighborhoods near the downtown area. The former post office structure is in an excellent location, both from the standpoint of direct access for the mobile elderly population and its proximity to central business services which abound in the area around the site. Relationship to Other City Activities: The City of Iowa City currently does not own or operate a facility solely for use by senior citizens. However, the Community Recreation Center does plan and supervise recreation and social activities for this special population group (i.e., a Golden Age Club, scheduled exercise programs, trips, and other parties and gatherings -- totaling four or more activities per week) and the Public Library does provide books, literature, films, and meeting rooms for all age groups including elderly and in addition special order large print materials are available and a mail service has been developed for shut-ins. The now proposed senior center would provide a wide range of social, recreational, and educational opportunities to senior citizens. Currently provided recreation and library services would be coordinated with other activities in one accessible location. Environmental Impact: The impact on the surrounding environment has been analyzed, and no significant negative effects have been noted. Areas investigated include topography and other natural features, water run-off., water pollution, air pollution, animal habitat, vegetation, traffic, energy requirements, relocation, support services and affect on historical or cultural assets. There will be some dust and noise during construction and an increase in parking demand. To minimize adverse impact, steps will be taken to assure adequate parking for users of the center and inhabitants of the apartment complex. Estimated Cost Summary: Real Property Acquisition $ 250,000 Rehabilitation Costs 1,047,000 Total $1,297,000 Operating Costs $ 110,000 per year -2 - Estimated Cost Breakdown: Rehabilitation Costs All interior remodeling and redecorating except elevator installation and heating - cooling equipment Elevator New roof, all new construction such as ramps, loading docks, exterior surface work, window repair, etc. Heating and cooling equipment (venting and pipes included in remodeling estimate) Extra cost of commercial kitchen Total Square foot cost for 27,800 square feet $ 780,000 130,000 70,000 52,000 15,000 $1,047,000 $ 37.66 The figure of $780,000 was reached by taking a $600,000 estimate made by a local contractor which was given in 1975 and increasing it by 30% for inflation which has occurred since then. A local architectural firm estimated that elevator installation costs would range from $110,000 to $150,000. City staff arbitrarily chose a figure of $130,000. City staff also estimated exterior work costs and the figure used for heating and cooling equipment using standard construction cost publications. The extra cost for the commercial kitchen was added to assure additional funds for increased kitchen space. Operating Expenses Staff Materials Utilities, maintenance and repair $ 72,000 20,000 18,000 Total $ 110,000 A portion of the operating costs will be offset by rents received from the apartment complex for use of the senior center facilities. Additional revenues may be received from rental of office space to various social service agencies. Other Comments: Although the project has a lot of community support, the City Council will be assuming the leadership role by acquiring the Post Office for use as a senior center. In this leadership role, citizens will probably expect the city to provide both the 1 to 14 million dollar physical structure, and also the management support necessary to make the center successful. In acquiring the Post Office structure the Council is establishing a new city policy in relationship to providing services for senior citizens. The Council should be advised that current zoning regulations for a CB district would allow a maximum of 42 units in the adjoining apartment complex. This density is possible only if one owner holds title to the entire post office lot. The Iowa City Council 410 E. Washington St. Iowa City, Iowa Deax People: Iov:a City, Iowa Sept. 12, 1977 So you :.ave oiled our section oz the bruvcl�co road: If you have never lived in a lust situation you will never know how;wondeful it is to again hang washed clothes on a line outside and to be able to open doors and windows to the fresh air. I and I think everyone within 300 feet of the t road would join me, in thanking You for this oiling. It is also nice to know that you are concerned about the problems of us ordinary citizens. Very sincerely, � aL pp SEP 131977 ABBIE STOLFUb CITY CLERK 3697 6 OCity of Iowa Cit* MEMORANDUM DATE, September 12, 1977 TO: Neal Berlin and City Council 1I``�'- FROM: Jim Brachtel, Traffic Enginee��-' REs Parking prohibition on north side of Brookland Park Drive As directed in Chapter 6.02.01 this memorandum is to advise you of the following action: ACTION On September 26, the Traffic Engineer as authorized under Chapter 6.16.01 intends to remove from the north side of Brookland Park Drive the existing no parking B a.m. to 6 p.m. signs and replace them with no parking anytime signs. COMMENT This action is being taken to help resolve a long standing special events night time parking problem which has occurred in this neighborhood. At the suggestion of one of the residents of the neighborhood, a postcard survey was conducted and 75% of the respondents were favorable to the proposed action. cc: Dick Plastino IT 0 L E D U SEP 121977 D ABBIE STOLFUS CITY CLERK • 9 ,5T, --v ,yam Lo APZJ U ��,�� la�•�- o sus w. --7o / �ti e vitt/ M`�aQUa� COI -172,V '0q4/J,u�U� /mac. Z 7c'wur�zle. ,-,t- a 3707 0 0 /.N.�1! L✓'�T' // 1 LC�YI� O- rQ �7f %L `-nq /Xi14 NO Y, --"L �"'f [�.,- Hyl- L�-a�ci %?Gw!` � -`C is�'� �.,�..n�t� U/ �9� ,C �✓/`.. ��;� nvrr�.:G•r-t/ �r �d-.rrrv�� Ci .� �?<�r� �t-2- ��fj /'-r�,.l.:•.��-�jv!r'�ti �yr/Lv�-%/J�_i- r/7�n.r..u,-ir•�to s-y2���;%, �h.,co d0�+-f���iT;-U �'�'-u�.c�,�C ,'!/t'-r^L, C1� � U'PiC�/N//` /�Fi/�L' f_ S `'�1��/ �d% f�/F%ti/,/�[Gr P�lt.�/�i%+.lLf �✓�' �Cr� 4.C. iii �Ypli �{Jca. .4e�ti s��r,�-l(Jf�-r C7•S-��- �a-�-� Cn.��.� % �• G� `- b?: n 0 C September 23, 1977 v IaAA crtr,IDYM• MAYOR MAIN REUHAUSER COURCILMEMSERS XHM UALMEH CAIIOLb FOSSE LP FOSTER DAVIDPERRET EMS EUEH ROOERTVEVERA Mr. Wayne J. Fiala 2324 Deborah Drive, S.W. Cedar Rapids, Iowa 52404 Dear Mr, Fiala: At its regular meeting of September 20, 1977, the City LOUuLII I -••- Clintonplaced on file urletter regarding the use of one of the modular units on linton Street a These modules have been in use for a far longer time than anticipated when they were constructed, and the Council has determined that they will be removed from Clinton Street as they are vacated. Your business would be most welcome in Iowa City and I hope that some other arrangement can be made. If you should have questions concerning this matter, please do not hesitate to.contact me. T Sij�erei'y yours, Neal G. Berlin City Manager cc: City Clerk 3707 Iowa clerks graduate Thirty-eight Iowa and Minnesota city clerks and fmauce officers have uaduated from a special naliling plogralil on municipal government operations co-sponsored by the Iowa Suite University (ISU) Extension Service and the lowa t\Iunicipal finance Officers Association. Participants completed a series of three annual week-long sessions to eam credit toward a "Certified Municipal Clerk" designation awarded by the International Institute ol'Munici- pal Clerks (IIRIC) and to upgrade professional skills. ISU offers the only Iowa municipal clerks' inslilule accredited by IIAIC and Iowa is one of only 17 stales with accredited clerks' training programs. The three-year training program includes wotkslmps in accounting, administration, affirmative action, annexation, auditing, budgeting, conlnuuli. c:nions, co nnumity power and social action, decision -slaking, government policy, group dynamics, labor negotiation. land use, management, parliamentary procedure, revenue sharing. personnel practices, taxes and zoning. League Executive Director Robert Ilarpsler led Illis year's workshop on general revenue sharing. ISU plea to npcal 1hL irainmg courses w mid -luny, 1978. �- V " Municipal Clarki In911o1a Grnduenng Claa of 1977. (Beginning with the bock row, lett m right): I,ux-GJew.KmurutHwtUh—t-' Uie:o-A-Bvnniwnll (Uane1-MNL_Colloon-Biee-IParrYl,—Bet tv-Lao-Work'1 Mnrangol,niehmd Lake 'I, Not ahownr stave Waller (sponcad. 370? Total State Grant Local Contribution Federal Grant Total cost of improvements $131,000 68,000 99,000 $298,000 1 - Project cost will be shared equally by City and State 2 State will fund the entire project 3 - State will fund one-half of the local share of a federal grant, or 10% of the total cost. 0 JL77 019E ABBIE S T OLFUS CITY CLERK 37// STATE TRANSIT ASSISTANCE GRANT A number of projects have been identified as possible candidates for funding under the State Transit Assistance Program. These projects, and the amounts for which they might be eligible, are as follows: 1. Evening Service, 6:30 - 10:00 P.M. $28,000 1 2. Additional peak -period service 24,000 1 3. SEATS Elderly and handicapped transit 28,000 2 4. SEATS after-hours taxi service 2,000 1 5, Transit marketing program 10,000 2 6. Transit garage site feasibility study 25,000 2 7. Two-way radios 3,000 3 8. "Kneeling" apparatus 3,000 1 9. Replacement bus 8,000 3 Total State Grant Local Contribution Federal Grant Total cost of improvements $131,000 68,000 99,000 $298,000 1 - Project cost will be shared equally by City and State 2 State will fund the entire project 3 - State will fund one-half of the local share of a federal grant, or 10% of the total cost. 0 JL77 019E ABBIE S T OLFUS CITY CLERK 37// NOTICE OF PUBLIC HEARING ON A PROPOSAL BY THE CITY OF IOWA CITY, IOWA TO APPLY FOR AN IOWA DEPARTMENT OF TRANSPORTATION OPER- ATING AND CAPITAL GRANT FOR THE CITY TRANSIT SYSTEM A public hearing will be held before the Council of the City of Iowa City, Iowa, on Tuesday, Sept. 20, 1977, at 7:30 P.M. in the Council Chambers, Civic Center, 410 E. Washington St., Iowa City, Johnson Co., Iowa, on the question of whether the City should apply for an Iowa Dept. of Transp. Operating and Capital Grant for the City transit system. Persons wishing to be heard on this question should ,appear at the Council meeting at the time speci- fied above. A copy of the proposed grant applica- tion is now on file at the office of the City Clerk, Civic Center, 410 E. Washington St., Iowa City, Johnson Co., Iowa. 8/22/77 /s/ ABBIE STOLFUS, CITYCLERK z 3 711- • • City of Iowa City MEMORANDUM DA11: September 16, 1977 TO: City Manager and City Council FROM: Hugh Mose, Transit Manager �,j77 RE: Expand Service Possibilities In its informal session of September 12, the City Council requested further information on various alternatives for improved transit service. The two main areas of consideration are evening service and additional rush hour service. EVENING SERVICE Evening service can be provided in an infinite number of variations. For the purpose of this discussion, the possibilities are limited to the following: a) all routes, 6:30-12:00, 1 hour headway b) all routes, 6:30-10:00, !1 hour headway c) selected routes, 6:30-12:00, 1 hour headway d) selected routes, 6:30-10:00, h hour headway e) all routes, 6:30-10:00, 1 hour headway Alternate A has the advantage of providing service until midnight, about the time that Cambus and Coralville Transit stop operating. The one-hour headways limit the attractiveness of this option, although all routes are covered. To provide this service will require six buses operating 5h hours per evening. At a cost of $13.00 per bus -hour, the service will cost $429.00 per evening, or $132,132 per year. Because Cambus already serves the Hawkeye area in the evening, service on that route will not be provided. The Iowa City Transit Development Program estimated that evening ridership would average 15% of the total daytime ridership. Excluding the Hawkeye Route, this means an average of 550± riders will be carried each evening. Cost per passenger will be 78¢, compared with 49¢ per passenger in our current daytime service. Alternate B provides service on all routes (except Hawkeye) from 6:30 p.m. until 10:00 p.m. Headways are h hour except on the Wardway-Goodwill route, which provides the same level of service as daytime operation. Eleven buses are required, each operating 3h hours per evening. At a rate of $13.00 per bus -hour, this service will cost $500.00 per evening, or $154,154 per year. Assuming that the additional riders attracted by the half-hour headways will offset the late evening riders not served, the expected ridership increase will be about 15%, or 550*- passengers per evening. Costs will be in the vicinity of 86¢ per passenger. Alternate C, providing service on selected routes at one-hour headways from 6:30 p.m. to 12:00 p.m., has the advantage of minimizing the cost per ride, but service is not.offered to all areas of the community. The cost of providing this type of service will depend of course on the number of routes operated. 71 • -2- Again excluding Hawkeye, the routes that appear to have the most potential are as follows: 1) Mall 2) Lakeside 3) West Benton 4) Towncrest 5) East College 6) North Dodge Estimating that service can be provided at $13.00 per bus -hour, the cost of service on the three route pairs comprising the six most likely routes can be calculated as follows: 4 buses x S'j hours x $13.00/bus-hour = $286.00 per day. Operating 308 days a year, the annual cost would be $88,088. Ridership is somewhat difficult to estimate. Using the 15% increase suggested by the Transit Development Program, and reviewing the past ridership trends for the various Iowa City route pairs, a rough estimate of the ridership potential is as follows: 1) Mall = 95 passengers 4) Towncrest = 95 passengers 2) Lakeside = 85 passengers 5) East College = 60 passengers 3) West.Benton = 80 passengers 6) North Dodge = 30 passengers Total ridership would be in the neighborhood of 445 passengers per evening, for a cost per passenger of 64¢. Alternate D, serving selected routes with buses every half-hour from 6:30 p.m. to 10:00 p.m., will also serve to minimize the cost per ride. The distinct disadvantage of this approach is that part of the community receives a high level of evening transit service while other areas receive none. Using the six routes identified in Alternate C, the cost would be $320.00 per day (7 buses x 31 hours x $13.00/bus- hour). Annual costs would be $98,560. Again, ridership is most difficult to estimate. If it can be assumed that the riders lost by not running from 10:00 until midnight will equal the additional riders attracted by half-hour service, then ridership should approach 15% of the daytime patronage on these routes. As shown above, ridership is expected to be about 450 passengers per evening, for a cost per rider of 71¢. Alternate E has the advantage of providing service on all routes during the early evening hours at the lowest possible cost. Six buses will be required, each operating 3! hours per evening. At a cost of $13.00 per bus -hour the service will cost $275.00 per evening, or $84,700 per year. If a ridership increase of 15% can be anticipated for 6:30 p.m. to midnight service, then at least 10% increase should be warranted for 6:30 p.m. to 10:00 p.m. service, This figures to be an average of 365 riders per evening, resulting in a cost of 75¢ per passenger. PEAK PERIOD SERVICE At the present time Iowa City Transit offers extra peak period service on only one route pair: Hawkeye-North Dubuque. During the winter, we anticipate oper- ating several other "trippers" to provide additional service along protions of the Lakeside, West Benton, East College and Towncrest routes. This additional service will require 15 buses on the street morning and evening; our total fleet numbers only 17, plus one vintage spare. The Iowa City Transit Development Program identified 20 -minute peak -hour service on all routes (15 minutes for Hawkeye) as the transit improvement of highest priority. However, this recommendation was accompanied by the recommendation that nine additional buses be purchased. To provide this level of service would require 21 buses to be on the street, meaning a minimum fleet of 24 or 25 buses would be needed. • -3- The 1977 Update to the Transit Development Program scaled down this recommendation to include 20 -minute headways on four routes only, plus the 15 -minute Hawkeye service. This service is on the same scale as the winter trippers currently planned, but the routes are changed somewhat. The nature of the improvement is that the trippers would run for nine months instead of just during cold weather. The only way to provide increased peak -hour service on all routes on short notice is to lease buses. Buses have been leased during the past several winters, but this cannot be regarded as a workable solution. The buses which have been obtained from Ottumwa are in very poor repair, and the transit mechanics are forced to neglect our own buses in order to keep the leased buses running. Furthermore, with our three new buses, additional vehicles will need to be stored outside or else in rented quarters. Neither option .is attractive. In addition, the cost of leasing these buses is very high -- buses of that age and condition could probably have been purchased for less money than Iowa City paid last year to lease them. As suggested in the 1977 TDP Update, the one option for improved peak -hour service that might be instituted with the vehicles we now have would be to extend the wintertime trippers to run throughout the school year. Extra service is not really needed during the summer months. The cost of this improvement, figured at $13.00 per bus hour, would be as follows: Per day = 2 buses x 6 hours x $13.00/bus-hour = $156 Per year = $156 x 22 days/month x 9 months = $30,880 Ridership would undoubtedly increase, perhaps by several hundred passengers per day. More importantly, the comfort and convenience provided to the passengers would improve substantially, and to some small degree traffic and parking problems downtown would be reduced. The question of priorities for improved transit service is an interesting subject. The Transit Advisory Committee of the .1CRPC identified increased rush-hour service to Ilawkeye as the highest priority improvement, followed by increased peak period service on four other routes. Evening service was ranked fifth, following improved elderly and handicapped transportation and transit promotion. Two different surveys of public opinion have determined that the transit improvement most favored by respondents is the extension of bus service to the evenings. In an attitudinal study of area residents conducted by the Institute of Urban and Regional Research, the highest priority item identified was the extension of service to evenings and Sundays. The Iowa City People's Cuide and Survey also inquired about bus usage, and found that 56.9% of the respondents indicated evening service would encourage their use of the bus. This was the only choice that elicited a positive response of greater than 40%. From an operational standpoint, several of the options for improved service are more attractive than others. Of the various possibilities for evening service, those which allow buses to return to the transit garage earliest are the most attractive for cleaning and servicing efficiency. Also, the concept of evening service to only 10:00 p.m. is most suited to driver scheduling, as two full-time shifts would cover this 16 hour operating day. The option of increased peak period service may cause difficulties in maintaining and repairing the buses, and being forced to use the old spare bus on a more or less regular basis will not be attractive to the drivers, mechanics, or passengers. It is my recommendation that increased peak -hour service be initiated to the extent possible with our existing buses at the first of November, and continue until Spring weather reduces ridership to the point that the service is no longer warranted or until the close of the school year. It is also my recommendation that evening service be instituted on n limited basis, with or without assistance from the State. As an "experimental" project, I would consider 6:30 p.m. to 10:00 p.m. service, at one-hour headways on all routes, to be the most attractive operationally and financially. I believe the level of service would be acceptable to the majority of potential riders. 1_ r:j