HomeMy WebLinkAbout1983-05-16 Info Packet...ti
City of Iowa Cit -1
MEMORANDUM
DATE: May 13, 1983
TO: City Council
FROM: City Manager
RE: Informal Agendas and Meeting Schedule
May 16, 1983 Monday
'6:15 P.M. - Lower City Park, Northwest Side - Dedication of "Bobby
Oldis Memorial Building"
7:30 - 9:30 P.M. Conference Room
7:30 P.M. - Special Council Meeting - Separate agenda posted
7:35 P.M. Discuss 70 -acre annexation on southwest side
7:50 P.M. - Discuss Central Junior High
8:15 P.M. - Discuss FY 84 Capital Projects schedule
8:30 P.M. - Discuss Burlington Street Bridge Project alternatives
8:40 P.M. - Discuss vehicle uses of transit interchange area
9:00 P.M. - Council time, Council committee reports
May 17, 1983 Tuesday
INFORMAL MEETING CANCELED
PENDING LIST
Priority A: Iowa -Illinois Utilities Franchise
Priority B: Discuss City Council Majority Voting Requirements
Discuss Affirmative Action Task Force Report
City Council Salaries
Housing Inspection Funding Policy
Housing Market Analysis Recommendations
MECCA Funding Request
Transit Fare Subsidy Program
Community Energy Study Proposal
Shamrock/Arbor Drive Drainage Area
Lower Ralston Creek Parcels - Use and Configuration
North Dubuque Street Improvements
Meet with Broadband Telecommunications Commission
i
Priority C: Meet with Design Review Committee regarding recommendations
Traffic Signals - Flashing Mode
Mandatory Parkland Dedication (Fall 1983)
Appointments to Resources Conservation Commission and
Housing Commission - May 24, 1983
Appointments to Board of Library Trustees and United Action
for Youth Board - June 21, 1983
. a
ya �
l
141CROFILMED BY
J O 67M MIC REEL A13 +
CEDAR RAPIDS • DES 1401NES
I �
AGENDA
SPECIAL COUNCIL MEETING
MAY 16, 1983 7:30 P.M.
-COUNCIL CHAMBERS
Item No. 1 - MEETING TO ORDER.
ROLL CALL.
Item No. 2 - CONSIDER RESOLUTION SETTING PUBLIC HEARING ON MAY 24, 1983,
ON AMENDING THE FY 83 OPERATING BUDGET.
Comment: State legislation mandates that municipalities amend their
annual budget by May 31. This resolution sets the public
hearing for amendments on May 24, 1983. Detailed information
on amendments will be available for public inspection on
May 16, 1983.
Action: -
Item No. 3 - CONSIDER RESOLUTION SETTING PUBLIC HEARING ON MAY 24, 1983, ON
APPROVING THE FY 83 CAPITAL PROJECTS BUDGET.
Comment: This resolution sets the public hearing for approving the
Capital Projects budget on May 24, 1963. Detailed information
on the budget will be available for public inspection on
May 16, 1983.
Action:
i
Item No. 4 - ADJOURN TO INFORMAL SESSION.
M&
r�
I MICROFILMED BY
JORM.--MIC RISCA EL_ _�
CEDAR RAPIDS • DES MOIIJES I i�
r -
RESOLUTION NO.
RESOLUTION SETTING PUBLIC HEARING ON AMENDING THE FY83
OPERATING BUDGET
BE IT RESOLVED BY THE CITY COUNCIL OF IOWA CITY, IOWA, that a Public
Hearing be held in the Civic Center at 7:30 p. m., May 24, 1983, to permit
any taxpayer to be heard for or against the proposed amendment to the FY83
Operating Budget.
The City Clerk is hereby directed to give notice of public hearing and
time and place thereof by publication in the Iowa jity Press -Citizen, a
newspaper of general circulation in Iowa City,not less than four 4) days
and not more than twenty (20) days before the time set for such hearing.
It was moved by and seconded by _ the
Resolution be adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
Balmer
Dickson
Erdahl
Lynch
McDonald
Neuhauser
Perret
Passed and approved this day of 1983.
MAYOR
ATTEST:
CLERK
141CRor1LMED BY
lI l 1 - -JOR M" -MIC RbLA B'"
CEDAR RAPIDS DES MOINES i
Roeelved A R.rn;w;;1
By ThB legal Gape:tnirnt
9-z9
9
JI
l
RESOLUTION NO.
a
I RESOLUTION SETTING PUBLIC HEARING ON APPROVING THE FY83 CAPITAL
PROJECTS BUDGET
BE IT RESOLVED BY THE CITY COUNCIL OF IOWA CITY, IOWA, that a Public
Hearing be held in the Civic Center at 7:30 p.m., May 24, 1983, to permit
any taxpayer to be heard for or against the proposed FY83 Capital Projects
Budget.
The City Clerk is hereby directed to give notice of public hearing and
time and place thereof by publication in the Iowa City Press -Citizen, a
newspaper of general circulation in Iowa City, not less than four 4) days
and not more than twenty (20) days before the time set for such hearing.
It was moved by and seconded by
the - ..... _
Resolution be adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
Balmer
Dickson
_
Erdahl
Lynch i
McDonald
Neuhauser
Perret
Passed and approved this day of 1983.
r
MAYOR
i
ATTEST:
CITY CLERK
i
II9CNtVr,d rl, t^�^.�•r�.yr..l
8Y1 �n Lce51 Depc t-K'n1
l0 1 " /3 �S
7Q?
I : IAICROFILMED BY
- .RbB
..._� _
JORM....MICLA- 1
CEDAR RAPIDS DES MOINES I
City of Iowa Cif
MEMORANDUM
Date: May 10, 1983
To: City Council
From: City Manage rZ-r—��
Re: City's Health Insurance Program
Attached is a memorandum from the Director of Finance concerning the
City's health insurance program. The memorandum indicates that in the 17
months since the City has had a self-funded type plan there have been
savings of approximately $61,000. At this time we are projecting a 6%
increase in the chargeback rate. The memorandum also indicates that this
summer Anne Carroll and the Finance Department will begin working with
AFSCME to explore other incentives which will help contain future health
insurance costs. It appears that the decision to change the method of
funding the City's health insurance program was the correct decision. If
you have any questions, please contact me.
tp/sp
i
r
MICROFILMED BY -�
11_ "'J0RM-"MICR6L:A13_'
CEDAR RAPIDS DES MOIRES
FAM
J I
I�
City of Iowa Cit.
MEMORANDUM
Date: May 5, 1983
To: Neal Berlin, City Manager �}/1
From: Rosemary Vitosh, Director of Finance `
Re: Proposed Increase in Health Insurance Chargeback Rate
The City's health insurance was converted to a Self -Funded Plan on
December 1, 1981. This change affected only the method of payment for
insurance costs; it in no way affected coverage levels for the employees.
For the basic coverage, instead of monthly premiums, the City reimburses
BC/BS for the actual claims paid in the prior month plus an administrative
fee which is a set percentage of the claims amount. Major medical
coverage is not being self-funded and therefore is community rated and is
paid for based upon a monthly premium amount.
As you recall Anne Carroll, you and I investigated the alternative funding
method when we were notified in October, 1981, that the City's health
insurance premiums were to increase by 20% on December 1, 1981. A study
of the self -funding method showed that if the City's claims remained at
their normal low level., this method had the potential for cost savings.
The attached financial analysis shows that the City has saved
approximately $61,000 in insurance costs in the past 17 months by
converting its health insurance to the self-funded plan. A detailed
explanation of this savings follows. The key to self -funding is to set up
a reserve account and to establish a monthly chargeback rate for
departments similar to a monthly premium. The monthly chargebacks are
deposited into the reserve account and claims payment plus the major
medical premium is paid monthly from that reserve account. The balance of
the reserve is kept invested and all interest earned is deposited into the
reserve.
The fund balance in the reserve should be sufficient at all times to cover
a minimum of 2h months worth of claims as that is the approximate lag time
in the payment of claims. Therefore when projecting costs for the next
year's coverage, the monthly chargebacks plus the reserve balance must be
sufficient to provide coverage for the next twelve months plus the 2h
months of claims lag. Should the plan be terminated, the City would be
responsible for paying all claims filed during the coverage period and
must have the funds available to pay for the lag in claims (the estimated
2h months worth of claims).
Annually BC/BS estimates total claims costs for the group based upon the
group's past actual claims cost and projected inflationary increases in
medical costs. This total estimated cost is then used to provide a
monthly chargeback rate for the City's use.
The administrative fee paid BC/BS includes the cost of an aggregate annual
stop -loss insurance that caps the City's liability at 120% of the annual
estimated claims cost. This stop -loss provides a safeguard should the
1
i MICROERMED BY
EORMDCROLA B
fIDES
_
MOINES
r
9.3 a
V1
I F
1
City, in any one year, experience a large number of claims or large dollar
claims. Once claims reach the 120% stop -loss figure, the City would
continue to pay the administrative fee but would not be liable for claims
cost.
The original chargeback rate, which was based upon BC/BS's claims projec-
tions when the City converted to the self-funded plan (12-1-81), has been
used since that time. Or, for a period of 17 months the City has not found
it necessary to increase its health insurance chargeback rates because the
fund balance in the reserve and the revenue from that chargeback rate were
sufficient to pay claims cost, to cover a 12-1-82 increase in the Major
Medical monthly premium, and to provide for a sufficient fund balance in
the reserve.
BC/BS recommended a 10A increase in the chargeback rate as of December 1,
1982. As stated above, the balance in the reserve was sufficient enough
to delay such an increase in the chargeback for several months. After
evaluating claims costs and the current size of the reserve balance, I now
recommend that the chargeback rate be increased by 6% effective May 1,
1983.
This increase should be sufficient to fund claims cost through the end of
calendar year 1983, as long as those claims cost do not show an unusually
large increase. More specifically, the 6% increase in addition to the
available reserve balance should be sufficient to cover a 13% increase in
claims cost in the next twelve months or a 21 percent increase in the next
six months. Claims costs are monitored monthly and the chargeback rate
can be increased whenever necessary should those claims increase faster
than anticipated.
As long as we tie the rate increase to our actual cost, I feel there is no
need to increase the rate prematurely or at a faster rate than is needed;
to do so would only increase the reserve balance unnecessarily. It should
be noted that this philosophy does not build up a large reserve balance to
provide for a sudden dramatic increase in claims cost. However, past
actual costs do not show such fluctuations in costs for our group and as
such there is nothing to indicate that we should be overly cautious in
working to increase that reserve balance. In addition, staff will be
working with the AFSCME Union this summer on identifying incentives which
would help to contain future health insurance costs.
The attached exhibits provide more detail on monthly claims cost, the
status of the reserve fund, the cost savings to date, and
premium/chargeback rates. Exhibit I shows the monthly cost since conver-
sion to the self-funded plan on 12-1-81. The claims cost is based upon
the actual claims paid by BC/BS in the prior month. This chart
illustrates very clearly the lag in claims payments. In fact, we were
five months into the plan before the claims processing started to catch up
as shown by the large April, 1982, amount. It also shows the possible
fluctuation in claims paid from month to month.
1
I4ICROFILMED By ;
"JORM MICROLAB-
CEDAR RAPIDS • DES MOINES i
` i
I�
3
The average monthly cost for the first twelve months, through November,
1982, was $36,960 as compared to an average monthly cost of $34,919 for
the entire 17 -month period. This shows a decrease in the average monthly
cost in spite of the substantial increase effective 12-1-82 in the major
medical premium rate. Although we do not have enough historical data to
identify trends in claims costs during the year, it is apparent that we
are not currently seeing any significant increase in those monthly costs.
Exhibit II provides the financial status of the Health Insurance Reserve
as of 4-30-83. It shows that we have earned $8,500 on the investment of
the reserve balance. In other words, we have benefitted from being able
to hold onto our funds and keep them invested until needed for actual
claims cost as opposed to the insurance company being able to.
I
The 4-30-83 balance is a "projected" since our April 30 financial reports
are not yet finalized. The balance needed to cover the claims lag is
$77,500 which results in an excess balance of $28,142 at this time.
Exhibit III illustrates the elements of the cost savings to -date from
converting to a self-funded plan. First, approximately $22,300 was saved
because the monthly chargebacks under the self-funded plan were lower than
the monthly premium cost would have been under the old plan. The excess
reserve balance as of 4-30-83 amounts to $28,142 which can also be
considered a cost savings.
Normally we experience an increase in our insurance rates on each December
1, but because the chargeback rate generated more than what was needed to
cover actual monthly insurance costs as of December 1, 1982, the balance
available in the reserve at that time was sufficient to delay the rate
increase until the following May 1. This delay in the increase of the
rate has saved the City approximately $10,300.
The above three elements account for the total cost savings to date of
close to $61,000.
Exhibit IV provides the monthly premium/chargeback rates for both Single
and Family Coverages for the past six years. It shows that the City
experienced a large rate increase in rates in 1979 and again in 1981.
Other years were comparably much smaller and probably below average in
comparison with other groups.
The note with the double asterisks at the bottom of the page shows what
the 12-1-81 premium rate would have been under the old plan; that was
approximately 5% higher than the chargeback rate we actually used under
the new self-funded plan.
I request your approval of the 6% rate increase effective May 1, 1983.
Since we have not yet done the May chargebacks, there is still time to
make the rate change in May. Please contact me should you have any
questions or need any additional information.
cc: Anne Carroll
93 a
MICROFILMED BY
" CORM "MIC R#CA 6
CEDAR RAPIDS •DES 11018E5
I
J
MONTHLY HEALTH INSURANCE COSTS
DECEMBER, 1981 TO APRIL 1983
MAJOR CLAIMS COST
MEDICAL & ADMINIS-
December 1981
3,385
January 1982
3,385
February 1982
3,550
March 1982
3,597
April 1982
3,602
May 1982
3,611
June 1982
3,612
July 1982
3,602
August 1982
3,574
September 1982
3,613
October 1982
3,616
November 1982
3,635
SUBTOTAL FIRST 12 MOS. 42,782
December 1982 4,898
January 1983 4,600
February 1983 4,591
March 1983 4,591
April 1983 4,628
TOTAL FIRST 17 MOS. 66,090
10,833
16,739
50,292
25,219
43,988
35,353
24,885
15,727
26,372
67,474
316,882
23,891
25,416
21,920
30,243
30,426
448,778
EXHIBIT I
3,385
3,385
14,383
20,336
53,894
28,830
47,600
38,955
28,459
19,340
29,988
71,109
359,664
28,789
30,016
26,511
34,834
35,054
514,868
14ICROFIL14ED BY !I
I1 -DORM--MICR6UAE3*-
CEDAR RAPIDS DES MOINES
AVERAGE
MONTHLY
36,960
34,919
JI
-" EXHIBIT II
HEALTH INSURANCE RESERVE
FOR THE SEVENTEEN MONTHS ENDING 04-30-83
7x10112&I
Monthly Chargebacks $ 611,992
Interest Income 81518
DISBURSEMENTS:
Major Medical Premiums $ 66,090
Claims Costs & Administrative Fees 448,778
PROJECTED 04-30-83 BALANCE
$ 620,510
514,868
¢ 105,642
IdICROF1U1E0 BY
"-
JORM -MICR6LAB-'
CEDAR RAPIDS • DES MDINES
$ 620,510
514,868
¢ 105,642
SELF-FUNDED HEALTH INSURANCE PLAN
COST SAVINGS TO -DATE
01-01-81 THROUGH 04-30-83
MONTHLY CAHRGEBACKS (11 MONTHS ENDING 04-30-83):
Actual Chargebacks $ 514,868
Estimated Premium Cost Under Old Plan 537,254
EXCESS RESERVE BALANCE:
Estimated 04-30-83 $ 105,642
Required Balance for Claims Lag 77,500
SAVINGS FROM DELAYING CHARGEBACK RATE INCREASE:
Actual Chargebacks (12/82 - 04/83) $ 155,204
Estimated Chargeback with Increase 165,551
TOTAL SAVINGS
j
141CROFILI•IED BY -`
�.
-DORM -MIC ROCA9
CEDAR RAPIDS •DES 140 LIES
�.. . J
EXHIBIT III
AMOUNT
OF SAVINGS
$ 22,386
28,142
10,347
$ 60,875
93 �
EFFECTIVE DATE
OLD PLAN:
12-01-77
12-01-78
12-01-79
12-01-80
07-01-81*
SELF -FUNDING PLAN:
12-01-81**
12-01-82
05-01-82
MONTHLY PREMIUM/CHARGEBACK COSTS
HEALTH INSURANCE
--------SINGLE---------
% INCREASE OVER
$ PRIOR YEAR
23.40
24.17 3.3
28.45 17.7
28.53 0.3
29.30
EXHIBIT IV
--------FAMILY---------
% INCREASE OVER
$ PRIOR YEAR
66.10
67.95 2.8
83.60 23.0
84.52 0.1
86.20
33.66 14.9 99.52 15.4
33.66 99.52
35.70 6.0 105.50 6.0
*Coverage was increased as negotiated with the Unions.
**Rates under the old plan would have been:
% Increase Over
$ Prior Year
Single 35.08 19.7
Family 104.02 20.7
vii1 C. �WW-- -%1
MEMORANDUM
Date: May 13, 1983
To: City Council .�
From: Assistant City Manager
Re: Vehicle Policy in the Transit Interchange Area
Attached are various documents which you should find helpful in reviewing
the status of the policy on vehicles in the downtown transit interchange
area. This item has been scheduled for discussion at your May 16th
informal meeting.
bdw5/4
Attachments
i
t
i 141 CAOFILI4ED BY
1" 1-JORM-MICR46B
C4"
CEDAR RAPIDS • DES ROISES
93 /
JI
' I
i
i
i
i
' I
City of Iowa Cit
MEMORANDUM
Date: May 13, 1983
To: Charles Schmadeke, Director of Public Works
From: James Brachtel, Traffic Engineer
Re: Accident Experience in the DTI
I
Attached to this memorandum please find the collision diagram for the DTI
and the two intersections which bound the DTI. The accident diagram
illustrates those accidents reported to the City from April 1, 1982, to
March 31, 1983. Below is a brief description of each accident.
i
CAPITOL STREET/WASHINGTON STREET
i
I
Accident of May 18, 1982: This incident involved two vehicles both
right turning from Washington Street south onto Capitol Street. Lead
vehicle stopped and put his vehicle in the reverse and backed into
jthe following vehicle.
Accident of September 16, 1982: This accident involved a CAMBUS
making a right-hand turn from Capitol Street eastbound onto
Washinstanding in the traveled pathet. Two onWashington one pushing
They noticedbicycle,
wthe
bus making a right-hand turn and proceeded to walk south to the south
curb line. The bicyclist allowed the back end of his bike to remain
in the path of the bus and the bus rear duals were driven over the
rear tire of the bicycle.
ACCIDENT DTI
I
C Accident of May 4, 1982: This accident involved two City buses which
were staged in the OTI. The trailing bus attempted to leave the curb
before the lead bus. In pulling out from behind and maneuvering
around the lead bus, the trailing bus struck the rear of the lead bus
on the right-hand side of the trailing bus.
I
INTERSECTION OF WASHINGTON STREET/CLINTON STREET
Accident of May 30, 1982: This involved two vehicles, one eastbound
on Washington Street and one southbound on Clinton Street. The
eastbound driver claimed to have a green light and that the vehicle
southbound on Clinton Street ran the red light and the two
automobiles came together in the middle of the intersection.
Accident of July 17, 1982: This involved two vehicles on Clinton
Street, one moving northbound and one moving southbound. The
southbound vehicle attempted to complete a left-hand turn in front of
the northbound vehicle. The two vehicles collided in the
intersection.
I
I
931
1�-
i 141CROFILI•lLD BY
l
-"JORMMICR�LAB'-
1+ CEDAR RAPIDS • DES'MOINES i
—T - T'1
E
Accident of February 16, 1983: This involved two vehicles, one
eastbound on Washington Street and one southbound on Clinton Street.
The eastbound driver on Clinton Street did not see the signals at the
intersection of Clinton and Washington and did not see the southbound
vehicle on Clinton Street. The two vehicles collided in the
intersection.
I
The above brief descriptions of the accidents diagramed on the attachment
are drawn from the reports prepared by participants in the six incidences
noted. Should you require additional information, please don't hesitate
to contact me.
bdw5/5-6
1 � !
141CROFILMED BY j
1. JORM-MIC RTLA B-
CEDAR RANDS DES MOINES
i
—T - T'1
E
Accident of February 16, 1983: This involved two vehicles, one
eastbound on Washington Street and one southbound on Clinton Street.
The eastbound driver on Clinton Street did not see the signals at the
intersection of Clinton and Washington and did not see the southbound
vehicle on Clinton Street. The two vehicles collided in the
intersection.
I
The above brief descriptions of the accidents diagramed on the attachment
are drawn from the reports prepared by participants in the six incidences
noted. Should you require additional information, please don't hesitate
to contact me.
bdw5/5-6
1 � !
141CROFILMED BY j
1. JORM-MIC RTLA B-
CEDAR RANDS DES MOINES
COLLISION DIAGRAM
INDICATE NCRTH
BY .ARROW
WASHINGTON ST
SYMBOLS
MOVING
VEHICLE
w' BACKING
VEHICLE
NON-INVOLVED
VEHICLE
--- PEDESTRIAN
VEHICDLE
❑ FIXED OBJECT
0 FATALITY
O INJURY
—J
'1
.o °
«'NOTE: REAR WHEEL OF BIKE STRUCK BY
TURNING BUS. BIKE OWNER HOLDING
BIKE AT CURBLINE.
TYPES
OF COLLISIONS
PAVEMENT
REAR END
D: DRY 1: ICY
W -WET
-�+-
HEAD ON
.r--
SIDE SWIPE
WEATHER
gyp-
OUT OF CONTROL
C: CLEAR F: FOG
S: SLEET R : RAIN
-..�-
LEFT TURN
CL: CLOUDY
RIGHT ANGLE I
S: SNOW
DATE:
APRIL 1, 1982 TO
MARCH 31. 1983
INTERSECTION WASHINGTON ST 10 BLOCK EAST
i MICROFILMED BY
-JORM "MIC R6LAB-- .1
CEDAR RAPIDS • DES t4018ES
93/
J
City of -Iowa Cit,
MEMORANDUM
Date: April 25, 1983
To: Dale Helling, Assistant City Manager
From: James Brachtel, Traffic Engineer Z
Re: Traffic Volumes in the 10 Block of East Washington Street
The City Council has requested that traffic counts be conducted in the 10
block of East Washington Street to determine the usage of and mix of
traffic through the Downtown Transit Interchange. On Thursday, 21 April
1983, the Traffic Engineer counted traffic from 7:00 a.m. until 7:00 p.m.
As can be seen bicycles, buses and other vehicles were counted as they
moved along Washington Street. Additionally, pedestrians using the mid -
block crosswalk were also counted. Attached to this memorandum is a 12
hour composite total sheet and an hourly total sheet. Hopefully, these
attachments will provide the City Council with the traffic volume
information which they desire.
Should you have additional questions or comments, please don't hesitate to
contact me.
bdw1/4
Attachments
i
H
—rY OF IOWA CITY, IOWA
DEPARTMENT OF PUBLIC WORKS
TRAFFIC ENGINEERING DIVISION
VEHICLE PEDESTRIAN BICYCLE
VOLUME MOVEMENT
THUR
DATE APR 21. 1983 LOCATION 'WASHINGTON ST 10 BLOCK EAST MID BLOCK )
TIME 7:00am to 7:00pm WEATHER CLEAR 600 RECORDER LD/61/KK
I
i 141CROFIL14ED BY -�
-DORM"-MICRdLA6` l
CEDAR RAPIDS • DES MOINES
1?3/
JI
W A o
=
�-
W o
r r
n
m m
y
m
r
y
y
PEDS
PED
—Ll
143
3035
PEDS
PEDS
115
218
v
�n
v
c7i
m
N
V
�
W
W
nn
N
N
W
F
co
N
2
n
_
Ln
f7
n
m
N
N
m
y
y
r
z
z
0
I
i 141CROFIL14ED BY -�
-DORM"-MICRdLA6` l
CEDAR RAPIDS • DES MOINES
1?3/
JI
City of Iowa City
MEMORANDUM
Date: October 20, 1981
To: Chamber of Commerce
Downtown Association
Old Capitol Center Merchants
From: Neal G. Berlin, City Manager
Re: Central Business District Issues
2
will be provided if necessary. If you are aware of problems,
give me a call.
7. What are the alternatives for reconstructing the sidewalk on
the north side of 01d Capitol Center?
Any changes in the sidewalk will be expensive and based on our
observations, there are other City projects which deserve
funding before this change. Also we do not believe that the
problem is severe enough to justify the expense of
reconstruction. The alternatives are:
a) Remove eastbound private auto traffic from the area. This
should allow the sidewalk to be widened an additional five
feet without disturbing bus operations.
b) Quit using island for bus boarding; move eastbound traffic
over against island and widen sidewalk as necessary.
Abandoning the island will be a "moral" defeat for the
transit interchange, and will eliminate two westbound bus
bays. This could be accommodated at the present time but
would really limit future expansion potential.
c) Remove the island and reconstruct it five feet north of its
present, location. Widen sidewalk five feet. This will be
very expensive, but will cause the least disruption to
present transit and traffic operations.
d) Remove island altogether; widen sidewalk about 25 feet;
place shelters, benches, trees, etc. in plaza area created
by the extremely wide sidewalk. This will be the most
—� expensive alternative, and will cause future problems if
expansion is desired. However, the shelters on the island
could be salvaged, and the waiting area for transit
patrons in front of "Gifted" could be maximized.
8. The drain holes in the bike rack area do not work.
The removal of a couple of bricks and the construction of 'a
small concrete channel to the curb will correct the problem.
Thocn rhannpB will be made.
i�
i 141CROFILMED OY
L 'DORM MCR;
4ES 1
% CEDAR RAPIDS DCS F101,
93/
r
City of Iowa CI'
MEMORANDUM
Date: January 29, 1981
To: City Council
From: City\u4er
Re: Washington Street Transit Interchange
Approximately a year and one-half ago, when plans for the Washington
Street Transit Interchange were being finalized, the City Council decided
that traffic should be permitted in the eastbound direction, at least on a
trial basis. Although the original concept called for the area to be used
exclusively by buses, in the interest of providing better auto access
through the downtown area, general traffic was permitted.
Now that the Downtown Transit Interchange has opened, the transit system
is experiencing some serious problems in its operation. Virtually all of
these difficulties stem from the basic incompatibility of auto traffic in
an area that was designed for transit vehicles and pedestrians. Some of
the problems that have been encountered already include:
1. Pedestrian Safety. Passengers boarding and alighting from buses
cross the street at several mid -block locations in accordance with
the planned use. Bus riders, seeing seven or more buses on both
sides and in the center of the street, appear to forget that they are
crossing the street against through traffic. Drivers have already
reported more than one "close call" which resulted from a passenger
getting off the bus and immediately crossing the street, right into
the path of an oncoming automobile.
2. Deliveries Bein Made in the Bus Area. When commercial or other
Fr vehicles use the curb lang at the entrance to the Mall for
deliveries or other short-term parking, buses have no choice but to
"double-park" in the traveled lane. When this happens either west-
bound traffic is blocked completely or the buses are forced to
maneuver in very close quarters. The conflict between buses and
delivery vehicles has caused considerable hostility between delivery
persons, bus operators, and inconvenienced drivers, and we have
already experienced two minor collisions as buses jockeyed around
illegally parked vehicles. While this problem will decrease as the
mall stores are completed, it will remain somewhat of a problem as
long as Washington Street is open to general traffic.
3. Conflict with Eastbound Traffic Alona the Bus Stop Island. Each
day the transit staff has put out traffic control cones to keep east-
bound vehicles from occupying the lane immediately south of the bus
stop island. The cones are a makeshift solution, but without them we
have found that eastbound traffic wishing to turn left onto Clinton
Street will occupy the lane next to the island and keep our west-
bound buses from reaching their proper bus stops. This occurs
despite the double yellow line marking. A more permanent type of
barrier might resolve the problem with left -turning vehicles, but
any barrier will seriously impede the maneuverability of the buses as
they enter and leave their designated spots.
9.a/
f
7
MICROFILMED BY
"JOR M _MIC R6LA9 1
CEDAR RAPIDS DCS MOINES �
Buses Merging with Eastbound Traffic. When a queue of vehicles has
developed east -bound at the Clinton Street traffic signal, it is very
difficult for buses to re-enter the traffic flow. Because the center
lane west of Clinton Street aligns with the right-hand lane east of
the intersection, buses in the curb lane by the Old Capitol Center
have nowhere to go once they cross the intersection. Although no
sideswipe collisions have yet been reported, a dangerous situation
nonetheless exists.
5. Difficulty of Approaching the Island Bus Stop. The presence of
vehicles waiting for the traffic signal precludes buses south -bound
on Clinton Street from turning into the island stop, as the buses
cannot swing wide enough to make the turn. This means only buses
entering downtown from the south can use the island bus stop and its
shelters, which reduces their effectiveness.
6. Ina de uate Sidewalk b Old Ca itol Center. The sidewalk along the 1
north side of the Mall south side of Washington Street) is much too
narrow. The construction area was constricted by the fact that the
north curbline could not be moved. Several years ago the Pentacrest,
to the curbline, was designated a historic site. The sidewalk along
the Mall is only eight feet wide, and this space is further
constricted by benches, trees and trash cans. The elimination of
auto traffic would increase the availability of the sidewalk for bus
patrons as autos would not be loading and unloading passengers.
In addition to the foregoing, the opening of Washington Street to east-
bound traffic has in effect created an unplanned east -bound arterial. The
traffic plan for downtown Iowa City did not envision this as through
traffic east and west was to use the Jefferson -Market couplet or
Burlington Street. The removal of auto traffic from the Transit
Interchange will not only bring downtown traffic patterns into closer
conformance with the original plan, but by doing so may well reduce some
of the congestion problems that have persisted east of Clinton Street.
The decision that traffic be allowed east -bound on Washington Street was
made in the interest of improving traffic circulation at a time when
Clinton Street was constricted by construction and the remaining
modulars. Now that Clinton Street has been completely rebuilt four lanes
wide, it would seem somewhat less essential that Washington Street be open
to east -bound auto traffic. Furthermore, the Transit Interchange concept
developedwas
Althoughphysically the traffic may b
fit, functionally t does
Therefore, it is recommended that the City Council rescind its earlier
decision to permit traffic east -bound through the Transit Interchange.
The City Manager, the Transit Manager, the Traffic Engineer and the
Transportation Planner concur in this recommendation. The American
Federation of State, County and Municipal Employees (AFSCME), which
represents the bus drivers, also supports this position, as per the
attached letter.
bj3/7-9
1r'
nlCRorILMED BY
1. JORM-MICRbLA9 1
CEDAR RAPIDS • DES 11014ES
93/
Suite C.
"-= Des Moines. lova 50317
Public Employees Council 61 515266.2622
American Federation of State, County and Municipal Employees, AFL-CIO
January 16, 1981
i
I Mr. John A. Lundell
Transportation Planner
I Johnson County Council of Governments
410 E. Washington Street
I Iowa City, Iowa 52240
Dear Mr. Lundell:
Regarding your January 12 letter to Mr. Wayne Johnson inviting a
j representative of the Transit Drivers' Union to participate in the
dedication ceremony of Iowa City's new transit interchange, we have
decided not to send a representative on January 20. We are boycotting
this ceremony to protest what we believe to be a major design flaw in
the interchange. The design flaw we would like to call your attention
to is the movement of vehicular traffic eastbound in a one lane, one
block area bordered by Capital and Clinton Streets.
iWe feel this is an unsafe and unworkable situation for several reasons.
First and foremost is the potential danger pedestrians face in crossing
the street in the one block area. This includes bus riders transferring
I to other busses, as well as shoppers, students, and other persons in the
area. With busses sitting stationary in their downtown stops, pedestrians
seem to get a false sense that there is no other traffic movement in the
area. And cars coming through on the one lane are blind to pedestrians
stepping out from between the busses. Several close calls have been observed.
Another potential accident situation are busses merging left from their
downtown stops on the south side of the street into the moving lane of
traffic. As of this date at least one such accident has occured.
Futhermore, leaving the one eastbound lane open to all traffic creates
much congestion and confusion in the interchange area that impedes
schedule performance.
, \•tc\c (n the pwblksctvfce
93/
1'
111CROFILMED BY
---JORM---MIC ROIL AB- ..
CEDAR RAPIDS • DES ?101RES I l
l I
s
,'1'•;- • [{////'{'�'� vHF/V Y- Y 2000 Walker Street
r ARX10
6 f r Suite ••C••
;i Des Moores. Iowa 50377
Public Employees Council 61 575/266-2622
I American Federation of State, County and Municipal Employees, AFL-CIO
in the first weeK since It has been open, it has taKen the better part
of the Transit Manager's and his assistant's time to keep things in order.
And it has not been without problems.
In closing, we would like to add that the drivers are very supportive of the
transit interchange idea. We will do our utmost to make it function, but
it will only do so properly and safely, when all traffic except busses are
banned from the area.
We wish you good weather for the 20th.
Sincerely,
�
Bill Peterson
AFSCME Local 183
Transit Steward
Inshe bikseru4v
111 i
j 14ICRorIU4ED BY-
�- JORM-MICR6L:AB' 1
ICEDAR RAPIDS • DES MO MES
I
i
1
i
City of Iowa Cit,
MEMORANDUM
Date: May 13, 1983
i
To: Neal Berlin, City Manager
From: Andrea Hauer, Development Coordinator
I
Re: HUD Meeting -- UDAG
On Wednesday, May 11, '1983, Tom Flynn (ZHA), Vernon Beck and Gene Prietzel,
representing the developer, and I met in Omaha with UDAG officials for the
preliminary review of the City's UDAG application.
I
I It appears there are three areas of major concern:
I
(1) The total cost of the hotel is too high;
1 (2) The ratio of UDAG money being requested to the developer's equity is not
particularly acceptable; and
j (3) Financing is not in place.
In addition, there were approximately another ten problematical areas which are
for the most part related to the above -listed issues.
After this meeting, the attached list was drawn up delegating responsibilities
( for the responses to the major and minor concerns.
After some discussion, it was agreed that the "solution" to the major concerns
will occur by:
(1) Decreasing the actual costs and better justification of the costs of the
hotel;
I (2) Amending the UDAG amount to a lesser amount (about 15% of the total cost )
and increasing developer equity to $2.5-$3 million (approximately 20-25%
oTtotal costs); and
(3) Obtaining financial letters of commitment with each and all of the lenders'
requirements satisfied.
The developer has been informed the design has to be finalized within the next
week so final costs can be determined. He is also aware that a meeting of the
Hotel Steering Committee should be held in the very near.future for discussion
of the design changes and of exterior materials and their costs.
Task Assignment from UDAG Meeting
A. Developer
1. Narrative regarding CIOCO's experience, principal(s), and the
management agreement for the hotel. (CIDCO will be the management
organization for the hotel.)
1
7
141 CROS ILME D BY
1
-JORMMIC RCA B�
CEDAR RAPIDS • DES MOINES
I
93z
U1
2
2. FFE component breakdown.
3. Satisfaction of the contingencies contained in the banking letters of
commitment (this means that all contingencies listed in all letters of
commitment should be fulfilled or else the City's UDAG application
will be moved to the next quarter).
4. Detailed construction cost breakdown.
5. Letters of financial commitment.
6. Letter from Holiday Inn indicating they hold the franchise for the
area and statement as to when the market study will be done.
7. Research to backup actual costs of financial fees and their bases.
8. Documentation from A&P (the construction company) regarding the
subsurface conditions and what costs it adds to the hotel project.
B. ZHA
1. Documentation for room costs.
2. Rewrite of repayment terms (expansion).
3. Evaluate arbitrage for financing.
4. Explanation/rationale for reason for high development costs.
5. In conjunction with City, answer additional market study questions.
C. city
1. Send copy of May 24th IRB resolution.
2. Contact bond counsel re TEFRA (tax legislation) for 25% recreation
requirement for IRB.
3. Document City's IRB fee.
4. Investigate mortgaging the land purchase price - reiterate in written
form the reasons cited as meeting as to why this is not possible.
5. Amend site map.
6. Begin work on parking agreement.
This material is due within the next three weeks.
bj4/2-3
ff �
i MICROFILMED BY j
-JORM-MICROLAB-
CEDAR RAPIDS DES MOVIES
f3.z-
r
J
City of Iowa Cit
MEMORANDUM
Date: May 12, 1983
To: Neal Berlin, City Manager
From: Karin Franklin, Planner
Re: Elm Grove Park Disposition
The deadline for bids on Elm Grove Park was 2:00 p.m. May 11, 1983. No
bids were received.
cc: Don Schmeiser
Doug Boothroy
Andrea Hauer
bj4/9
t
i MICROFICI11D BY
1 JORM "MICR6L-XS'- , - 1!
CEDAR RAPIDS DES MOINES I
993
City of Iowa City
MEMORANDUM
DATE: May 13, 1983
TO: City Council
FROM: Karin Franklin, Planner
I
RE: best Side Co. --rezoning of 70 acres
The enclosed area study is excerpted from the adopted 1983
Comprehensive Plan Land Use Update. Please refer to page
SW -2 section 2b. for a discussion of development near the
Freeway 218/Highway 1 interchange. The requested rezoning
submitted by West Side Co. and before you for consideration
is entirely consistent with the adopted plan.
i 141CROFILIIED BY
( 1' -DORM MIc RLAO-_ -
t+ CEDAR RAPIDS DES MOMES
I �
JI
SOUTHWEST AREA STUDY
STUDY AREA
The intent of this area study is to view both the long-range and short-range
development patterns for the Southwest Area of Iowa City. This area includes
the land located south of Melrose Avenue and generally west of Sunset Street to
the north and the municipal airport to the south. The long-range plan reflects
an ultimate land use pattern which, at this time, seems best able to serve the
future needs of a growing Iowa City.
For over ten years, extensive residential development has been occurring on the
west side. While much of this development has been spurred by the expansion
of employment at University Hospitals, area growth is made possible by available
sewer service capacity. Plans for the construction of Freeway 218 along the
Iowa Department of Transportation a!ignment with interchanges at Melrose
Avenue and Highway 1, the subsequent reconstruction of Highway 1 West as a
four -lane limited access facility, the realignment of Mormon Trek Boulevard, and
the Willow Creek sewer extension to the Johnson County Home are creating both
residential and commercial development pressures in the study area.
Due to the imminent impacts of these developments, a reassessment of land uses
in the arisen and tsuggest hwest rboth long- and short-range lend usesea is needd. This sudy wiaddres the issues which have
plans for the area.
COMPREHENSIVE PLAN
The 1978 Comprehensive Plan has envisioned development in the Southwest Area
as primarily in tow- to medium -density residential use, with a large portion of
land in the far west outside the Limits of Urban Development line and in
agricultural use. In anticipation of the Freeway 218/Highway 1 interchange,
large areas have been designated as Highway and Land Consumptive
Commercial. The Development Sequence of the 1978 Plan indicates Phase I, II,
and III development for only part of the Southwest Area. This study will
consider the continued ateness of
proposals for the Southwest rlthese
Areaas part of theiv
Comprehense PI n update ment
ISSUES
Sewer Availability
The Willow Creek trunk sewer extension to the Johnson County Home has
increased development opportunities in the study area. An 18" sewer line
has been extended; however, this potential capacity is limited by a 10"
trunk line at the point of hook-up creating a bottleneck situation which
effectively limits the sewerage capacity at the present time. Although the
sewerage from approximately 438 acres of undeveloped land could naturally
drain to the 10" trunk line, this line has the ability to accommodate
development at only two people per acre for this entire area due to current
constraints.
Two policies which determine the development sequence for any area of the
City are: 1) maintaining compact and contiguous growth and 2) maximizing
efficiency in the provision of municipal services. If these considerations
}
I
MICROFIL14ED BY I
l I
LAB
JORM MICRO
CEDAR RAPIDS • DES
I.1019C5
93t�
J
SW -2
are taken into account, the development of the remaining capacity in the
10" line is most desirable in the area east of Freeway 218. Approximately
95 developable acres of land lie east of the Freeway 218 right-of-way and
within the 10" trunk sewer service area. Taking the balance of the
capacity of the 10" line into consideration, these 95 acres can develop at 11
people per acre. Development can occur at only two people per acre if
land both east and west of Freeway 218 is developed. Consequently,
development could be reasonably limited to the area east of the Freeway 218
right-of-way. Unfortunately, the Hunter's Run Subdivision, located to the
west of Freeway 218, has already received preliminary approval. Any
future requests for subdivision approval west of 218 should be carefully
evaluated in terms of the limited capacity available. This should not,
however, negate the original goals of compact and contiguous growth.
Freeway 218 Interchanges
The location of proposed Freeway 218.stirred controversy for nearly two
decades prior to the April 1980 agreement between the City of Iowa City
and the Iowa Department of Transportation ([DOT). Freeway 218 will now
be built on the alignment originally designated by IDOT. At one time,
Iowa City's preferred alignment for Freeway 218 was approximately one mile
southwest of IDOT's alignment. In the Trafficways Report prepared in
April 1977, as part of the Iowa City Comprehensive Plan, several negative
"urban development" implications which could be expected from the IDOT
alignment for Freeway 218 were enumerated.
One of those implications identified commercial development pressure due to
the Freeway's interchange with Highway 1 as a potential problem. With
revised plans including a second interchange at Melrose Avenue, attention
must be given to both interchanges.
Melrose Avenue Interchange
Residential development continues to be encouraged in the area
surrounding the Melrose interchange in accord with the
Comprehensive Plan's recommendation. While access to the freeway
makes commercial development attractive, both commercial and
industrial uses have been discouraged in order to direct this
development to the Highway 1 interchange. The City may not be able
to support full development of commercial and industrial land uses at
both interchanges. And since ample, sewerable land is available at
the Highway 1 interchange for these more intensive land uses, it is
the recommended location for commercial and industrial growth.
Implementation of this land use recommendation may be difficult,
however, since portions of the land surrounding the interchange are
owned by Johnson County as part of the County Home. A joint
agreement has been proposed to restrict the sale and re -use of that
land for uses other than the current County uses or low-density rural
residential.
b. Highway 1 Interchange
Residential development is discouraged in this general area due to its
:. location near the airport and its proximity to two main traffic
I
a
14ICROFIL14ED 6Y
I. "JORM MICROLA j
CEDAR RAPIDS • DES MOINES
912 5�1
f�
J
SW -3
facilities. Commercial and industrial uses are better suited to this
location. Presently, several commercial establishments are located in
the NE quadrant of the Freeway 218/Highway 1 interchange and the
realignment of Mormon Trek Boulevard provides access to this area
from the north while providing a frontage road for the freeway. With
the availability of sewer service, the NE quadrant is a logical choice
for controlled commercial development.
The NW and SW quadrants are located within the County's jurisdiction
and are not considered appropriate for annexation because of the cost
prohibitive nature of extending sewer service to the area. It is
recommended that a joint City -County agreement be negotiated in
order to control land use in these quadrants of the interchange.
The short-range plan suggests the SE quadrant be zoned agricultural
to reflect its present use and the fact that the area is not presently
sewered. The long-range plan for this area indicates an industrial
classification that could be developed as sewer service is extended or
the demand for industrial uses is felt.
It is, therefore, the recommendation of this report that commercial and
industrial development be encouraged at the Highway 1 interchange leaving
the land surrounding the Melrose Avenue interchange in residential use.
iThis recommendation is generally consistent with the Comprehensive Plan
and reflects the impact Freeway 218 will have on the .study area.
3. Annexation
i
In order to control development, especially to the east of Freeway 218,
annexation of a rather large tract of land is recommended. This will enable
zoning of the Highway 1 interchange for commercial and industrial use,
thereby limiting residential use in the airport's flight path.
A key purpose of annexation is to promote orderly urban growth. Interde-
pendence between a developing community and its undeveloped fringe areas
is obvious. Although boundary lines are no guarantee against substandard
development, the extension of these boundaries through annexation brings
the fringe areas within the City and widens the application of coordinated
development practices.
The area proposed for annexation meets the general criteria for annexation
stated in the 1978 Comprehensive Plan:
1) the area is contiguous to the present city limits;
2) the area has a natural "unity" with the City because of the
existing extension of major streets to and through the area and
the availability of sewer service presently or in the future with
minimal capital improvement costs;
3) numerous municipal services will be readily available to the area
without substantial capital outlay for the provision of these
services.
141CROFILIIED B'.
1.
J__JORMM1cR6L_Ak]EJ8CEDAR RADIOSDES MOV ! �
C
i
r
SW -4
By annexing this crucial area on the Southwest side, the City has the
ability to direct and stage orderly and compatible growth patterns more
successfully and with greater certainty.
4. De -annexation
I i
A city should annex only that area of land which can be provided municipal
services (e.g., city water and sewer) within a reasonable time. With the
recommendation to annex a large portion of potentially developable land,
the City should assess whether there are tracts of land in the study area
which are not developable in the foreseeable future and should possibly be
de -annexed.
One area has been identified where .the provision of utilities is unlikely.
The area of land bordered on the north by Rohret Road and the south by
the city boundary line is located in a watershed which drains to an area
outside of the present city limits. To extend utility service to this area
would not only be expensive, but would also open up development of a
large area outside of the city limits.
I
j De -annexation of all but a 300 foot wide strip fronting Rohret Road should
be considered. This proposed de -annexation would have the desired effect
of directing frontage development along Rohret Road while limiting a cost
prohibitive municipal service commitment to that area.
5. Schools {
The analysis carried out for this study indicates both higher potential total
population and elementary school population in the Southwest Area than
were predicted by the Comprehensive Plan. A number of factors could
influence these calculations, including the rate of residential growth,
family size, housing type, and the effect of growth in unincorporated J
areas.
The Comprehensive Plan's recommendation of two elementary school sites is
not consistent with School Board plans. Because elementary school enroll-
ment in the district as a whole is seen as declining, no new construction is
anticipated. As the need for additional elementary school facilities in the
Southwest Area develops, students would be assigned to alternate
elementary schools to maintain the viability of existing facilities and to
Increase overall operational efficiency within the Iowa City school system.
While such a scheme conforms with planned efficiency, it would depart from
the Comprehensive Plan's concept of the neighborhood school.
No elementary school site will be designated for the Southwest Area in
recognition of the School Board's policy. By not committing the City to a
school site, residential patterns will not be encouraged based on a future
unknown service.
6. Green Space
Open green space should continue to be encouraged along Willow Creek and
its tributaries. This recommendation both encourages green space and
)ernes toJimitdeyelopment in the flood plain.
lax
i 141CROFILMED By
-" JORM 'MICROLA B- -
CEDAR RAPIDS • DES 14019ES
f
J
` I
! l
SW -5
In the area proposed for annexation east of 218 and northwest of Highway
1, an open space buffer along natural features is suggested to separate
residential and Highway Commercial uses.
7. Proposed Land Use
Two maps have been prepared which identify both the long-range and
short-range land use patterns for the Southwest Area. The long-range
plan reflects the ultimate desired land use pattern for the area. The long-
range view will help guide development, allowing bath public and private
interests to anticipate the likely growth patterns.
The land use pattern recommended in the short-range plan identifies the
development anticipated in the next 15 years. All of the area shown for
residential and commercial development in the short-range may develop
during Phase 1 (1983-88). The density of residential use proposed reflects
i a predominance of single-family residential use with the possibility of some
duplex development; development between the West High property and
i Mormon Trek Boulevard is seen as developing at a higher density with
townhouses, condominiums, and low-density multi -family housing. Areas
j designated agricultural reflect the current use pattern and should be
designated for more intensive use in the long range as growth pressures
develop and/or municipal services can be efficiently provided.
i
RECOMMENDATIONS
I. With the exception of the already platted Hunter's Run Subdivision,
residential development should be confined to areas east of Freeway 218 to
promote efficient, compact and contiguous growth.
2. An area of land generally east of the Freeway 218 and Highway I
interchange and extending north to the city boundary line should be
annexed in order to focus commercial and industrial development at this
interchange.
3. Commercial development pressure should be resisted at the Melrose Avenue
interchange with Freeway 218, and an agreement should be reached with
the County to restrict sale of their land at that interchange for uses other
than residential.
I
4. Deannexation of land which will require future commitments of cost
prohibitive municipal services should be considered.
5. No school sites should be designated in the study area. The School Board
anticipates no construction and assumes busing is a realistic and economic
necessity.
6. Open green space should be promoted where possible.
f.�
i
r MICR01ILMED BY
i 7
"JORMMICRILAB-1
CEDAR RAPIDS r DES N40IRES i
1 ! 1
x'-�'_---__-
CITY
OF
1n/A
CIVIC CENTER I
41 O E. WASHINGTON ST O " '� C 1 T Y
IOWA CITY, IOWA 52240 (319) 356-5CM
May 9, 1983
I
Paul C. Bogs
730 S. Lucas Street
I
Iowa City, Iowa 52240
Dear Mr. Bogs: _
i
I am writing this letter to inform you that the Iowa City City
I Council is currently considering a request to vacate the Lucas Street
right-of-way located north of Page Street, south of the Chicago, Rock
Island and Pacific Railroad right-of-way and immediately east of
Your property and to dispose of it to the property owners to the west
(who requested the vacation). Second consideration of the ordinance
to vacate this right-of-way (three considerations are required) will
be given at the Council meeting scheduled May
public hearing on the proposed disposition of this propert Also, a
I property owners to the west will be held at that time, 1983. y t° the
the public hearing will be on a proposal to transfer owropertpBoflthe
property in exchange for the relocation of an existing
line located on the property west of the right-of-way, storm sewer
which is
currently not covered by an easement.
You are invited to attend this meeting and submit comments on both
the proposed vacation and
described above. If Proposal to dispose of this property as
i either in writing or you may contacannot t me and t 356-524meeti
8. y If may
beof
any further assistance to you on this matter, please feel free to
call.
Si erely,
A
uce A. K/°l/fight
Planner
tp3/3
MICROFILMED BY
"-JORM MICR6LAE3 I
CEDAR RAPIDS • DES MOINES
I !
19
j
i
i
J
City of Iowa Cil
MEMORANDUM
Date: May 20, 1983
To: City Council and Neal Berlin
From: Dan Holderness, Civil Enginee�`v
Re: St. Ann's Drive and Ventura/Tanglewood Paving Assessment
Programs Information - One-third/two-thirds Cost Sharing
Attached are two memos comparing one-quarter/three-fourths and one-
third/two-thirds cost sharing alternatives for the above-mentioned
projects. The costs are for the 1984 construction season and are based on
assessing property owners with frontage only.
Enc.
bj4/15
�f
141CROFILMED BY -
I 1"- 'JORM---MICR6LAB.-
CEDAR RAPIDS • DES 1401YE5
I
9�d
JI
1. Pat Grantham
2. Gary Grantham
3. Carroll Whetstone
4. Glasgow (7 properties)
5. Yeggy (3 properties)
i
j 6. Bross (2 properties)
7. Valanis
TOTAL TO BE ASSESSED
TOTAL TO BE PAID BY CITY
TOTAL ESTIMATED PROJECT COST
Il yµ
ST. ANNE'S DRIVE PAVING
ASSESSMENT 33-
1 � �
}
MICROFILMED BY
CEDAR RAPIDS • DES MOINES
J .
6,644.69
2,214.90
1,661.17:
5,400.46
1,800.15
1,350.12
7,602.12
2,534.04
1,900.53
r
44,772.23
14,924.08
11,193.1,E
18,363.34
6,121.11
4,590.84
i.
8,581.62
2,860.54
2,145.41 j
9,000.77
3,000.26
2,250.19
$ 100,365.24
$ 33,455.08
$ 25,092.31
3,437.50
70,347.66
78,711.43
$103,802.74
i.
1 � �
}
MICROFILMED BY
CEDAR RAPIDS • DES MOINES
J .
8. Pitzen
j 5.
Berg (3 properties)
23,701.17
7,900.39
5,925.29--'
j.
6.
Pieper (3 properties)
31,633.80
TANGLEWOOD VENTURA PAVING
7,908.45
TOTAL TO BE ASSESSED
! ',
Casey
10,641.34
3,547.11
2,660.34
93,321.33
104,986.49
I
TOTAL ESTIMATED PROJECT COST
139,982.00
NAME
OF PROPERTY OWNER
100% ASSESSMENT
33-1/3% ASSESSMENT
25% ASSESSMENT
d
1.
Jensen
14,510.92
4,836.97
3,627.73
2.
Carlson
14,510.92
4,836.97
3,627.73
a
3.
McCoy
6,191.32
2,063.78
1,547.83
4.
Church
7,255.46
2,418.49
1,813.87 I
I_
8. Pitzen
j 5.
Berg (3 properties)
23,701.17
7,900.39
5,925.29--'
4,965.96
6.
Pieper (3 properties)
31,633.80
10,544.60
7,908.45
TOTAL TO BE ASSESSED
7.
Casey
10,641.34
3,547.11
2,660.34
8. Pitzen
11,318.52
3,772.84
2,829.63
9. Shepherd
14,897.88
4,965.96
3,724.47
10. Kleinhesselink
5,320.67
1,773.56
1,330.17
TOTAL TO BE ASSESSED
$ 139,982.00
$ 46,660.67
$ 34,995.51
TOTAL TO BE PAID BY CITY
---
93,321.33
104,986.49
I
TOTAL ESTIMATED PROJECT COST
139,982.00
MICROFILMED BY
(�— JORM-"MIC IF'6 ,40" -
CEDAR RAPIDS • DES MOINES
1
City of Iowa Cit_
MEMORANDUM
Date: May 4, 1983
To: Neal Berlin, City Manager
�1
From: Frank Farmer, City Engineer
Re: Railroad Crossings on South Gilbert (Crandic Line) and
Greenwood Drive (Iowa Railroad Company)
Engineering contacted both the Crandic and the Iowa Railroad Company with
regard to the crossing signals at the above-mentioned crossings. Both
companies are aware of the problems and send their repairmen to the site
as soon as possible when trouble is reported.
Crandic believes some of the problems with the South Gilbert Street
E
signals are due to switching in the area. The signals are supposed to
shut off after 20 minutes, even with a train sitting near the crossings.
This system was malfunctioning but they feel they have now corrected the
c
problem.
The Iowa Railroad Company is having trouble with the system, since they
have not received any plans regarding the signal system from the Rock
Island who owns the line. The Iowa Railroad Company is in the process of
having a signal repairman brought in to evaluate the system and make the
I
necessary changes or repairs as soon as possible.
F
l
i
�I
t
i
i
I
bj3/6
1 MICROFILMED BY
1.
I-JORM -MICR6LAG' 1
CEDAR RAPIDS DES M01,1ES
I �
P7
�l
City of Iowa Clt,,
MEMORANDUM
Date: April 29, 1983
To: Neal Berlin and City Council
From: Charles Schmadeke 611.
Re: Burlington Street Bridge (serving eastbound traffic)
Shive-Hattery and Associates has completed the preliminary design study
of the Burlington Street bridge over the Iowa River serving eastbound
traffic. A copy of their report is attached. Two options are presented
in the report:
1. a new structure using only the existing foundations. Total cost -
$1,154,000; and
2. rehabilitating the existing structure. Total cost - $1,021,000.
Shive-Hattery and Associates recommends rehabilitating the existing
structure and the Public Works Department supports this recommendation.
Public Works recommends proceeding with the design of the reconstruction
of the Burlington Street bridge but delaying construction until federal
monies are available. It is estimated that federal money will be
available within one or two years. The maximum federal share for this
bridge is presently $500,000.
bdw4/14
I
i MICROFILMED BY
1.
-DB i
ORM -'MIC ROCA
CEDAR RAPIDS DES MOVES
I
T%
JI
BURLINGTON STREET BRIDGE
OVER THE IOWA RIVER
IOWA CITY, IOWA
Original Construction
The original three span reinforced arch bridge was constructed in 1915.
The design plans were prepared by B.J. Lambert. Copies of these original
plans have been utilized in the preparation of this report. Additional
information regarding the construction and controlling specifications has
not been located.
The field survey has determined that the structure as built is 4 feet
narrower than shown on the design plans. (One foot in each of two sidewalks
and two feet in the roadway.) The original roadway width was 30 feet clear
between curbs.
The as -built structure consists of three clear arch spans of 104 feet
(measured at the springing) founded on two 10 -foot wide piers and mass con -
crate abutment skewbacks, all bearing on rock. The three centered arches
-- yield a 15 -foot rise from springing line to crown. The 44 -foot wide arch
barrel varies in thickness from 2 feet -0 inches at the crown to about 5 feet -
0 inches at the springing. Arch reinforcing consists of 1 -1/8 -inch square
bars at 12 inch centers longitudinally top and bottom with 5/8 -inch square
bars at 36 inch centers transversely.
The exterior fascia walls are 14 -inch reinforced concrete, paralleling
the edge of the arch barrel and rise from the extrados of the arch to the
bottom of the sidewalk. Two inch recesses provide visual treatment on the
exterior face. The height of these walls vary from 1 foot -2 inches to 9 feet-
_- 8 inches. Eight -inch concrete spandrel closure walls parallel the exterior
fascia walls (4 feet -4 inches clear between) and rise with the inside face
to provide the curb and sidewalk support. These interior walls retained
_ the spandrel fill. Typically, the walls are reinforced with 4 -inch square
bars at 24 inch centers vertically each face and 9 inch center horizontally.
Longitudinal relief in these walls is provided with expansion Joints at the
face of the abutment, each side of the pier, and third span points between.
These longitudinal walls are transversely stabilized with 12 -inch con-
crete cross walls.(diaphragms) that dowel to these walls and to the arch.
_. These walls typically stop about 19 inches below the sidewalk to provide a
clear longitudinal space for utilities. Fascia walls at the piers and abut-
ments were 2 feet -2 inches thick to provide pilaster treatment and extended
without break at the sidewalk to form heavy handrail posts. Panel recesses
—" and reinforcing is similar to the above description.
-1-
SHIVE•HATTERY h ASSOCIATES
141CROFILMED BY
I -JORM -MIC ROL:AB
CEDAR RAPIDS • DES MOINES
I
MIA
1
The arch spandrel is sand filled between the interior longitudinal span-
drel walls and serves as a base for the roadway pavement. As built, this
roadway was a 5 -inch nonreinforced concrete slab with a brick wearing surface
bedded in a sand cushion. One -inch asphaltic expansion joint separation was
provided between the edge of the slab and the spandrel walls to insure
_ freedom of movement and to provide thermal relief. Surface drainage was
provided with 4 -inch x 17 -inch cast iron refuse chutes recessed into the
inside spandrel wall and projected through the arch at the centerline of span.
— The 5 -inch sidewalk spanned transversely over the spandrel walls and
provided a 5 foot -5 inch clear walk to heavy concrete balustered handrails.
Manholes in the sidwalk at the'arch crowns, piers, and abutments provided
access to the aforementioned conduit spaces.
— There is no record of the design live load criteria. References suggest
i— that the design live load may have exceeded the present day 1-115.
I Subsequent Reconstruction
In the early 1960's the deck surface was modified to the present geometry.
I ! Major items included in this contract work were detailed in the specifications,
as follows:
1. Remove existing roadway surfacing to the original 5 -inch paving slab.
Remove the sidewalks to the inside face of the outer spandrel walls.
~ Remove existing concrete handrail. Remove north inside spandrel wall to
the top of the existing pavement.
2. Furnish and place 6 -inch P.C. concrete pavement as the roadway surface.
3. Furnish and place sand fill sufficient to bring the pavement base
— to grade. This included the 4 foot -4 inch clear space between the
parallel spandrel walls on each side of the structure.
4. Furnish and install new aluminum handrail. This rail was aluminum
tube top rail, channel intermediate rails, and aluminum tube vertical
spindles with cast aluminum posts.
5. Furnish and place new concrete downstream sidewalk (5 inch minimum
thickness) reinforced with 6 X 6 #10 welded wire fabric. This
resulted in a 4 -inch cap over the existing concrete at the spandrel
— walls.
6. Furnish and place a reinforced concrete safety curb over the north
_ outside fascia wall.
By reference this work was to be executed in accordance with the Iowa
State Highway Commission Standard Specifications, Series of 1960.
The special provisions of the contract document addressed surface drainage
and required shaping of the surface to accommodate the existing drain chutes
at the south curb line and the placing of new grates in the surface over the
existing refuse chutes at the original north curb line.
-2-
SHIVE•HATTERY& ASSOCIATES
L 141CROFIL1.4ED BY
"-JOR&A MICR6LA13 i
CEDAR RAPIDS D[5 I401NES ji
i f 1
i
i
This work eliminated the north upstream walk, provided a 6 foot -3 inch +
south sidewalk, and a roadway width of 34 feet -9 inches' clear between curbs.
Thus, adequacy for three traffic lanes was enhanced.
Usage Modifications
In 1967, the Iowa State Highway Commission proposed to construct a four -lane
westbound bridge parallel to and upstream from the 1915 reinforced concrete
arch bridge. Subsequently, on June 20, 1967, the City entered into agreement
with the state in this regard. In this agreement, the City accepted responsi-
bility for "maintenance and repairs of the eastbound present bridge".
The westbound bridge was constructed as a four -lane facility -with bids
received on January 9, 1968. Contract cost was about $343,000.
Subsequent to the completion of this structure, the existing one way
traffic flow was established. This newer westbound facility has a 52 feet -
0 inches roadway, 8 feet -3 inches clear upstream walk, and a safety curb
downstream.
The existing downstream bridge carries three lanes of eastbound traffic
on State Highway 1. This structure is heavily traveled with the 1980 ADT
shown as 22,200, 2! percent trucks. The downstream'sidewalk serves the ped
estH an traffic on Burlington Street South.
Present Condition
The Iowa Department of Transporation conducted an intensive inspection
on August 7, 1980. Applicable comments from the report of that inspection
are, as follows:
_ Condition Summary on date inspected 7-3-80 i
Waterway - Satisfactory.
I I
Substructure - The groundline is above the springline at both abutments. j
The piers have deep scaling with exposed reinforcing and map cracks. I
Structure - The bottom of the arch has large spalled areas with exp^sed
reinforcing. There is stalactites in all spans. The fascias have large
scaled areas and heavily map cracked.
Recommendation
4 This report has been reviewed by Bridge Design. The bridge has been found
I to be adequate for two lane legal loads. The ratings are:
Operating Rating 75% yield) Legal
Inventory Rating 55% yield) - Legal
0
SHIVE•HATTERY& ASSOCIATES 9 4�
I�
MICROFILMED BY
_JORM MICR/6LA13
CEDAR RAPIDS - DES MOINCS
This concrete arch structure is severely deteriorated. The deterioration
includes severe deep scaling on the piers at the waterline and map cracking,
spalling, and leaching on the bottoms of the arch rings and on the arch fascias.
This deterioration has progresses significantly since 1976.
The roadway slab across the arch bridge is quite.badl•y broken up. This
appears to result in drainage through the cracks onto the arcn causing deter-
ioration of the arch rings. The roadway surface should be given an asphalt
overlay and surface seal to keep out moisture.
If this bridge must remain in service indefinitely, it also appears that
the arch itself should be repaired. This would be an extensive undertaking.
A comparison with the Condition Summary in the cited 1976 report reflects
some condition deterioration with nominally different verbage. Applicable
comments of the 1976 ,recommendations are:
The picture and sketches in the report indicate the need for repair of
the spalled areas on the bottoms of the arch rings and on both piers close
to the waterline. The map cracking and leaching on the fascias and spandrel
— walls is also a cause for concern but little can be done within the scope
of normal maintenance operations.
I Periodically, during the past several years and recently in the execution
of this study, Shive-Hattery and Associates have made visual evaluation of
this structure. A summary of these observations are as follows:
1. Extreme deterioration and spalling of the concrete near the arch
springing line of the piers and abutments. This primarily caused
by the freeze -thaw cycle at the low water line. Experience has
demonstrated that this extends about 6 inches below low water line.
However, the present low water line is controlled by the flash
— boards on the dam. Prior to installation of these flash boards,
the low water line would have been about 10 inches lower. Thus,
we may conclude that the deterioration may extend to about 18 inches
— below the present low water line.
2. Numerous spall areas with exposed reinforcing on the arch intrados.
Exposed reinforcing shows some corrosion.
3. Narrow cracks on the arch intrados surface that reflect the rein-
forcing steel pattern. Typically, these do not evident significant
- staining that would indicate corrosive expansion of the underlying
reinforcing.
4. Stalactite formations on the arch extrados near the outside edges
indicating some moisture penetration through the arch in this area.
5. Significant staining of the intrados at the arch longitudinal con-
struction joints (extending out about 6 feet to 8 feet from the
springing line).
-4-
SHIVE•HATTERYGASSOCIATES
93�
I '
141CROFILMED BY
"JORM MICR46LA13
CEDAR RAPIDS • DES M01NES
.1
f�
6. Approximately 20 to 25 wood blocks, per span, exposed in the center
section of the arch intrados. Nominally these are 4 inches X 4 inches
in two longitudinal rows and probably were rebar supports at initial
construction. After almost 75 years, these blocks do not reflect
excessive deterioration and the concrete adjacent to them typically
does not show distress or deterioration. Therefore, their presence
is aesthetically displeasing but not otherwise of significant concern.
7. The arch fascias show considerable "map cracking", efflorescense,
spalling, and surface deterioration.
8. Thelexposed faces of the exterior spandrel walls shown significant
surface deterioration. Our experience would suggest that consider-
able deterioration would exist at the interface of the bottom of -
- this wall and the arch with considerable corrosion of the reinforcing
steel.
i
_ 9. Similarly, we would expect the interior spandrel walls and the con-
necting crosswall diaphragms to show the same problems but magnified.
This is probably additionally compounded by the added sand fill in
these originally open areas.
10. Abutment wing walls where exposed appear structurally sound and
stable. However, they show significant surface deterioration.
I 11. The roadway surface is badly cracked and obviously permits consider-
able water penetration into the supporting base material.
12. The existing aluminum handrail appears to be sound in normal condition
with limited areas of traffic abuse and collision damage.
Therefore, we may initially conclude that many of the observed deter-
iorations may originate in the surface water that penetrates the deck surface.
In addition to the open cracks in the deck surface, our experience with similar
structures suggests that the designed "expansion joint" between the edge of
the deck and the interior spandrel wall is an open joint that "funnels" the
runoff into the spandrel fill. This joint is at the gutter line without ade-
quate seal. With the relatively flat longitudinal grade, the migration of
runoff to the drains at 114 foot centers is poor at the best. Thus, surface
runoff provides a considerable source of water during precipitation periods
to enter the arch spandrel fill. This sand fill provides an excellent
— reservoir to store this moisture until it migrates to the drains at the
arch springing, through the spandrel walls, or arch construction joints.
Quite obviously this penetrating moisture transports contaminatinq de-
icing agents in the winter months. 'After many years of this.action, a large
quantity of these waterborne contaminants have entered this "reservoir"
area and now provides a continuing supply of contamination to the exposed
materials. Experience clearly demonstrates the rapid and accelerating deter-
lorating effects of saline solutions on concrete and reinforcing steel.
-5-
SHIVE•HATTERY & ASSOCIATES
1'
i I41CROFIL14ED By
JORM-MICR06LAS
CEDAR RAPIDS DES MOVIES
I �
M
Although the arch extrados is not available for visual evaluation,
we may assume that this surface is vulnerable to deterioration in this con-
taminated environment.
In summary, we might conclude that much of the deterioration in evidence
is.progressing and probably at an accelerating rate. This conclusion requires
that we recommend the pursuit of a program of rehabilitation or replacement
of this structure in the immediate future.
Major Rehabilitation of Existing Structure
This proposed reconstruction incorporates the philosophies and construction
techniques used on similar structures in Cedar Rapids, lowa,:in the early 1960's.
The author had significant responsible involvement in this previous work as
design engineer and field resident during the reconstruction. Functional
details developed in those projects are incorporated into this proposal with
modifications to utilize recently developed construction materials and methods.
This was reflected in the design intent of the recently completed recon-
struction plans for the Iowa Avenue Bridge, three blocks upstream.
The reconstruction proposal intends the removal of all existing con-
struction down to the arch, nominal reinforcement of the arch, and construction
of new transverse support beams and column walls from the arch to a multiple
longifudinai span deck. •Thus, the main superstructure element, the reinforced
concrete arch, is salvaged for continued use.
A visual examination of the arch intrados suggests that deterioration
of this structural element has not progressed to a nonsalvageable condition.
In normal arch behavior the arch is continuously subjected to thrust creating
low level compressive stresses. Excepting as unbalanced live loads or thermal.
loads shift, the pressure line of the thrust and gravity loads outside the
arch sectional kern, the entire arch cross section remains in compression.
This minimizes the development of transverse surficial cracks and greatly
retards the permeation of moisture into the arch in areas of uninterrupted
continuity. Typically, the arch extrados is treated with a cement rich
topping and/or asphaltic membrane treatment to dampproof this area of vul-
nerability. This probably explains the maximum deterioration evidenced at
the edges and the longitudinal construction joints (both being lines of
discontinuity).
The transverse cracks noted in the intrados at the outside segments of
the arch probably reflect the aforementioned expansion joints in the spandrel
walls. These spandrel wails doweled to the arch create nominal deviation
_. from the true arch theory. These wall elements make the arch much stiffer
and force the normal arch flexibility to concentrate at the joints in the
spandrel wall.
The design plans show the arch concrete to be proportional at 1:2:4.
This projects to an Pc = 4000 psi at 28 day's. This mix is indicated to
extend into the pier and abutment skewbacks to about 1 foot below springing
line elevations.
-6-
SHIVE•HATTERY 3 ASSOCIATES QAv
I
I•IICAOF1 MED BY i
-.�•,_ I. _-JORM MICR;LAB-
L CEDAR RAPIDS • DES , 01
,JE5
To assist in the evalution of the concrete in the arch barrel, five
cores were taken (one in each span, crown and one at the east abutment
springing and one at the west pier springing). Obviously, five cores
are not a statistically representative sampling, but they were taken in
locations without bias. The cores were all tested in compression to
_. failure and averaged to 5163 psi. The three "crown" cores averaged 5487 psi
and the two "springing" cores averaged 4553 psi. Low test was 4012 and high
test 6482 psi. This minimum sampling, if representative, suggests very sound
and structurally adequate concrete within this arch barrel. The average den-
sity of the total core volume taken was 149 pounds per cubic foot. (This is
high but the concrete was placed before the advent of air entrainment.) Visual
evaluation of the cores showed a good dispersal of the aggregate throughout
the cores (total core lengths were about 15 inches at the crown and about 42
inches at the springing). Coarse aggregate was a hard gray limestone, pro-
bably 11 inch maximum size. The top of the arch reflected extra working
and densification as characterized by the lack of coarse aggregate in the
top } inch. The absence of a separate topping could not be confirmed or denied
This evaluation may confirm our conjecture that the arch barrel retains
an adequate structural adequacy for continued functional use. In order to .
establish additional confirmation, an arch analysis to establish the operating
stress level is necessary.
The computer analysis of the arch barrel for the gravity loads under
existing conditions and the proposed reconstruction are graphically depicted
on pages 9 through 11. A comparative evaluation of the plotted pressure lines
reveals the expected effects of the reduced dead load. The elimination of
about one-third of the dead load (970 tons per span) shows a significant
reduction in the axial thrust carried in the arch. This thrust reduction
creates more flexibility in the arch with increased bending moments.
The preliminary analysis of the stress distribution in the arch sections
at the crown and springing are compared, as follows:
i
- 7-
SHIVE•HATTERY & ASSOCIATES
938
I4ICAOEILIdED BY I
` 1 —DORM --"MIC R6LA 13
CEDAR RAPIDS • DES MOVES I I
r I
I
r.,
Dead Loads at Croom:
P/A
fb
Extrados
=Intrados
Dead Loads at Springing:
P/A
fb
(Extrados
lEIntrados
Dead Load + Live Load at Crown:
P/A
fb
Extrados
7,Intrados
Dead Load + Live Load at Springing:
P/A
fb
Extrados
,ZIntrados
Dead Load + Live Load at 4 Span:
P/A
fb
oExtrados
-wIntrados
Existing Proposed
-300
!
J
+ 99
+178
"1
j-
i,
psi
j
i
—
i
I
I
—
—
r.,
Dead Loads at Croom:
P/A
fb
Extrados
=Intrados
Dead Loads at Springing:
P/A
fb
(Extrados
lEIntrados
Dead Load + Live Load at Crown:
P/A
fb
Extrados
7,Intrados
Dead Load + Live Load at Springing:
P/A
fb
Extrados
,ZIntrados
Dead Load + Live Load at 4 Span:
P/A
fb
oExtrados
-wIntrados
Existing Proposed
-300
-235
+ 99
+178
-399
psi
-413
Psi
-201
psi
- 57
psi
-155
-116
+151
± 33
- 4
psi
- 83
Psi
-306
psi
-149
psi
-359
-294
+286
+365
-645
psi
-659
psi
- 73
psi
+ 71
Psi
-173 -128
+253 +155
+ 80 psi + 27 psi
-426 psi -383 psi
-259 -213
+300 +328
+ 41 psi +115 Psi
-559 psi -541 psi
r
-B-
SHIVE•HATTERY & ASSOCIATES
1
I
r MICROFIL14CO BY
-DORM -MIC R#C'A E?I'- --�
CEDAR RAPIDS DES MOIYES
934
Zoo: i T'
U)
77.3k
S.D" -8.7"
2. 1 " 3.9 "• G. (o " 5.8" : -9.8' -2.5"
/--EXI5TING u
s
PROPOSED s
D PRESSURE LINE DIAGRAM
IT WIDTH)
r
PRECEDING
DOCUMENT
MICROlniarD e,
i JORM MICROLAB
CEDAR RAI1IDS • AS 'dOPV.,
1
�I
I •
-9-
141CROFILMED BY
-JORM"-MICR6L:AB 1
CEDAR RAPIDS DES MOINES
r
JI
v Y Y
y
Z
0
uj
Y
(n
d'
a°fpm
c0
0
00
I�
�MMQ
• jV
a .
0
W
. J
OWC ,
U
WG
W i
Ix
o�
Q =
O F . F
Z • Q
W 2w.3
o
� z
J 'n
V �
N z
J x
d Q
� v
O
J
a
W
0,
i
The above comparison shows that the proposed reconstruction will yield
a nominal stress level increase at the crown section, same reduction at the
springing, and an increase at the quarter span point. As may be expected,
the maximum calculated working stress levels in the arch from gravity loads
are well below the normal design stresses.
The above stress summaries do not include allowances for longitudinal
loads do to thermal effects and/or rib -shortening from initial shrinkage
and subsequent creep. A preliminary analysis shows a horizontal thrust of
- 23.5 kips/foot for a 40 temperature variation. This axial thrust with
resulting moments may produce stress variations of ±371 to +535 psi at the
crown and +395 to +469 psi at the springing. References recommend rib -
shortening allowances to be 38 percent of the 400 thermal change.
The above detailed loads in combination will produce binding stresses
above the modulous of rupture and "cracked" section considerations are
necessary. An analysis of this maximum combination reveals maximum stresses
at an acceptable level. Ultimate strength analysis and review are beyond
the cope of this preliminary investigation.
An evaluation of the preliminary.design permits us to conclude that
^ the arch barrel retains structural adequacy for the proposed reconstruction.
The visual evaluation dictates that certain areas and details require sur-
face restoration and/or sealant.
Elements of the proposed rehabilitation are shown on Appendix Sheet 1.
This proposal shows a 38 foot roadway for three traffic lanes between con -
Crete barrier rails, a 7 feet -0 inches clear sidewalk downstream with aluminum
handrails. The drawing shows a new three line outside handrail, however, the
accompanying cost estimate separately addresses the salvage, reconditioning,
and reuse of the existing rail. Appendix Sheet 3 shows the plan geometry
and the lateral constraints at the east end of the existing structure that
establishes the maximum out -to -out of the reconstruction.
The superstructure is shoo-in paneled in nine 12 feet -6 inch panels per
span. The reinforced concrete deck pours directly on the arch and doweled
to the arch to provide additional arch section for subsequently imposed
j thrust. The balance of the longitudinal deck spans between transverse
floor beams as the arch drops away from the roadway surface. These floor -
beams are expected to be 15 inches wide by 2 fee N 6 inches deep. Column walls
12 inches wide continue from the floorbeam to the arch extrados. These
walls are poposed to "hinge" at the arch surface to minimize undesirable
"fixed end" moments in local areas of the arch barrel.
The sidewalk and safety curb are proposed with longitudinal fascia
beams with an arch soffet to carry the character of the arch barrel into
the smaller deck spans between floor beams.
The proposal includes high strength post tensioning rods at each panel
point (3 above and 2 below). These serve to "tie" the arch barrel together
and induces a minimal transverse compression in the arch that enhances the
longitudinal compressive adequacies. The eccentricity of the post tensioning
-12-
SHIVE•HATTERY& ASSOCIATES
i MICROFILMED BY
1 -' CDORMI'OM ,CROLAB 1
DES MOVIES
r
i
` J
934F
I�
load to the extrados permits transferral of some of the normal arch loads
to the new arch edge.
The proposal includes a 2 -foot wide arch addition upstream and a 2 -foot
wide arch reconstruction downstream. This permits restoration of the deter-
iorated fascia of existing arch, conceals the post tensioning end detail,
and provides the opportunity to develop a heavily reinforced new "edge beam"
on the arch barrel.
Reconstruction of the existing structure will require areas of removal
of deteriorated concrete and subsequent restoration to smooth lines. These
areas are known to include segments at the arch springing and identifiable
areas of the arch intrados. Other areas may be identified in the field during
the construction period. It is anticipated that removal would be to sawcut
edges in sound concrete to depths as necessary (about 3 inches). "Patch"
areas would be reinforced with welded wire fabric anchored in place. The
restorative concrete would include an epoxy bonding agent and may be placed
by hand or pneumatically and finally finished as necessary.
This proposal also anticipates a sealant as necessary in exposed areas
of the arch extrados to prevent moisture penetration into the arch barrel.
This is expected to require a special joint preparation and treatment at the
existing longitudinal joints in the arch. If deemed necessary during con-
struction, the total exposed extrados may be coated with an epoxy penetrating
sealant.
The proposal project includes approach paving work for a total project
length of about 410 feet plus revision to the existing median on east approach
as necessary.
Appendix Al details the estimated project cost for the proposed
rehab-ilitation of the existing Burlington Street Bridge, as above defined.
-- Proposed New Structure
I
— The proposed new structure is projected to utilize structural steel
girders similar to those on the newer parallel bridge structure. The pro-
jected spans exceed the span limitations of precast, prestressed concrete
girders presently used in Iowa. Changes in existing span geometry are not
a justifiable alternate consideration.
The proposed new structure is expected to have a deck cross section
similar to that defined in the reconstruction proposal. Similarly, the
plan geometry and project length would be as afore described.
- The superstructure is anticipated to have a 9 -inch transverse deck over
six continuous composite welded steel girders. Diaphragms, bearings, and
details to be in accordance with present [DOT standards.
-13-
SIiIVE•HATTERY & ASSOCIATES
I
i MICROFILMED BY
I' -JORM -M IC R6LAB- 1
CEDAR RAPIDS • DES MO NES 1
I
931e
Since the proposed new structure must have span arrangements to match
the existing north bridge (for hydraulic considerations) the substructure
units must be in their present location. Therefore, we would propose that
the existing footing elements which bear on rock be salvaged .and reused for
the new construction. Removal of these existing elements would be expensive
and not justifiable.
The proposed new piers would have a multiple column shaft with a rectan-
gular cap beam on the existing pier footings. These existing massive concrete
footings are 14 feet x 60 feet in plan and are founded on rock. The tops of
these footings are shown at elevation 43.0. The concrete in these footings
was of a 1:2}:5 mix (estimated f'c = 3,000 psi) and is not reinforced.
There is no visible signs of any structural problem with these footings and
our experience suggests that this concrete in a continuously submerged environ-
ment, would be adequate for the proposed reuse. These footings contain about
400 cubic yards of concrete each and removal and replacement is totally unjusti-
fied. This proposal anticipates drilling and grouting reinforcing dowels for
the new pier shaft.
Similarly, the existing abutment skewbacks would be retained for the
foundation of the new abutments. Arch barrel removal would terminate at
about 3 feet above springing line elevation. The resulting removal would
be extended as necessary to sound concrete and capped to provide a base
for the new abutment backwall. The bearing seat "beam" would cantilever
j outside the existing abutment wings to accomodate the wider proposed structure.
i
- Appendix Sheet 2 shows typical elements of the proposed new structure.
Appendix B-2 details the estimated project cost for the alternate proposed
new structure.
Utilities
We have been in communication with Northwestern Bell Telephone Company
and the University of Iowa relative to their facilities on the existing
Burlington Street Bridge.
Northwestern Bell presently has 15 cables in fiber ducts under the south
sidewalk. These cables carry in excess of 30,000 circuits. In 1981, two
— 2-4 inch diameter conduits were bdded to brackets on the south fascia. Their
projections indicate additional crossing needs in this area by 1985• In anti-
cipation of replacement or reconstruction of the Burlington Street Bridge in
— the near future, they have commenced planning and design for a major duct
bank crossing on the steel girder bridge. This alternate crossing will permit:
1. Permanent detour route for the existing affected crossing.
2. Required expansion of the crossing for projected needs.
The University of lona presently has two 5 -inch diameter conduits carrying
high voltage electrical and one 2 -inch diameter conduit carrying telemetry.
— These facilities are presently cantilevered off the south fascia of the existing
-14-
SHIVE•HATTERY 6 ASSOCIATES
MICROt ILMED BY
I I .-JORM MICROLAB- 1
CEDAR RAPIDS • DES MOVIES
i
i
.l
bridge. They have indicated a desire for continuation of the
Present with a considerable expansion. In order to minimize interference with the
proposed project, these utilities may also be relocated on the existing nor -
The
therly bridge.
The University of Iowa also has an insulated 12 -inch water main can-
tilevered off the north bridge fascia. This may be replaced with a 20 inch
submerged crossing at another location.
Presently there is no indication of intent to carry any new utilities
on the proposed project. There is space under the south sidewalk available
for utilities if the utilities choose to use this space for their future needs
We will remain in communication regarding these utilities until their pro-
jected needs are satisfied.
The included cost estimates for the proposal studies do not include any
allowances for utilities. If utility involvement in the project becomes
necessary (other than street lighting), the costs incurred for this work will
be reimbursable to the City by the involved utility.
Restoration of the street lighting is included in the estimates.
Conclusion
This report addresses two viable alternatives for replacement or recon-
struction of the existing reinforced concrete arch bridge on Burlington
Street over the Iowa River. Either alternate should provide a facility to
satisfy present loading requirements with a projected life of about 40 years
with normal maintenance.
Our recommendations are addressed in the letter transmitting this
document.
1 hereby declare that this report was prepared by me or under my direct
supervision and that I am a duly Registered Engineer under the laws of the
State of Iowa.
Iowa Reg. No. 3883
-15-
SHIVE•HATTERY & ASSOCIATES
I
r 141CROFILMED BY
I. "'DORM-MICR(SLAB - 1
CEDAR RAPIDS DES MOVIES
I '
I
?.W
J
SHIVE•HATTERY & ASSOCIATES
1
RICROEILMED BY !
1
I -JORM "MICR ,AL,4B
CEDAR RAPIDS DES MOINES
i 1
J
Appendix A-1
COST ESTIMATE
PROPOSED RECONSTRUCTION
OF THE
_
EXISTING BURLINGTON STREET BRIDGE
OVER THE
IOWA RIVER
IOWA CITY, IOWA
Open spandrel construction with reinforced
concrete
deck on new
transverse
^' cross walls
over the existing
arch barrel with 38 -root roadway,
7 -foot side-
walk with
barrier curbs, and aluminum handrails and
with approach paving and
sidewalks.
I
Description
Quantity
Unit Price
Total
I-- I. Removal
I.
A.
Pavement E Sidewalks 610
s.y.
$ 10.00
$ 6,100
I B.
R.C. Bridge Walks
100
C.Y.
40.Oo
4,000
_
j C.
R.C. Concrete Walls
280
c.y.
70.00
19,600
_. D.
R.C. Arches
100
C.Y.
150.00
15,000
E.
Piers s Abutments
40
c.y.
150.00,
6,000
I J
Subtotal
$50,700
II. Substructure
A.
Class 21 Excavation
280
c.y.
$ 50.00
$14,000
y B.
Class 20 Excavation
1800
C.Y.
10.00
18,000
C.
Reinforced Concrete
Pier Nose
& Abutment Skewback
110
C.Y.
300.00
33,000
D.
Springing Line Restoration Boo
C.Y.
10.00
8,000
E.
Reinforcing Steel
25,000
lbs.
.50
12,500
F.
Coffer Dams
2
each
10,000.00
20,000
Subtotal
$105,500
III. Superstructure
A.
Structural Concrete
900
C.Y.
$300.00
$270,000
B.
Arch Concrete
175
c.y.
400.00
70,000
C.
Reinforcing Steel
130,000
lbs.
.50
65,000
D.
Epoxy Coated Reinforced
Steel
80,000
lbs.
.60
48,000
SHIVE•HATTERY & ASSOCIATES
1
RICROEILMED BY !
1
I -JORM "MICR ,AL,4B
CEDAR RAPIDS DES MOINES
i 1
J
0
SHIVE•HATTERY 6 ASSOCIATES pt
MICROFILMED BY
11"-.JORM-"MICFt6LAI3'
CEDAR RAPIDS DES MOIRES C
! I
�l
Appendix A-1
Cost Estimate
Burlington
Street Bridge
Page Two
Description
Quantity
Unit Price Total
E. Structural Steel
50,000
lbs.
$ 1.50
$ 75,000
F. High Strength Post Tension
Rods
42,O00.lbs.
.75
31,500
G. Arch Intrados Restoration
2,000
s.f.
10.00
20,000
H. Arch Extrados Sealant
8,000
s.f.
1.50
12,000
I. Aluminum Barrier Curb Rail
350
l.f.
15.00
5,250
*J', Aluminum Handrail
380
l.f.
40.00
15,200
K. Lighting
Lump Sum
-
12,000
Subtotal
$623,950
IV. Approaches
A. Structural Concrete
30
C.Y.
$260.00
$ 7,800
B. Reinforcing Steel
24,000
lbs.
.45
10,800
C. Reinforced Approach Pavement 280
s.y.
50.00
14,000
D. 8" P.C. Pavement
120
s.y.
40.00
4,800
E. 4" P.C. Sidewalk
500
s.f.
3.00
1,500
Subtotal
$ 38,900
Total Estimated Construction Cost
i
'$819,050
10% Contingency Allowances
81,950 ;
Final Design
55,000
Construction Observation E Contract
Administration
65,000
i
TOTAL ESTIMATED PROJECT COST
$1,021,000
t. Credit for salvage reconditioning
and re -erection
of existing handrail
(380 linear feet) $9,000.
0
SHIVE•HATTERY 6 ASSOCIATES pt
MICROFILMED BY
11"-.JORM-"MICFt6LAI3'
CEDAR RAPIDS DES MOIRES C
! I
�l
Appendix B-2
COST ESTIMATE
PROPOSED NEW STEEL PLATE GIRDER
BURLINGTON STREET
OVER THE
IOWA RIVER
IOWA CITY, IOWA
Three 114 -foot span welded steel
girder bridge with
38 -foot roadway, 7 -foot
clear sidewalk, with concrete barrier curbs
and aluminum
handrails
and with
approach
paving and sidewalks.
Description
Quantity
Unit Price
Total
I. Removal
A.
Pavement & Sidewalk
610
s.y.
$10.00
$ 6,100
B.
R.C. Bridge Walks
100
c.y.
40.00
4,000
C.
R.C. Walks
280
c.y.
60.00
116,800
D.
R.C. Arches
1400
c.y.
50.00
70,000
E.
Piers E Abut Skewbacks
700
c.y.
50.00
35,000
Subtotal
$131,900
II. Substructure
A.
Cofferdams
2
ea.
$25,000.00
$ 50,000
B.
Class 20 Excavation
1800
C.Y.
10.00
18,000
C.
Class 21 Excavation
650
c.y.
20.00
13,000
D.
Reinforced Concrete
300
c.y.
200.00
60,000
E.
Reinforcing Steel
•40,000
lbs.
.45
18,000
F.
Structural Steel
1,000
lbs.
2.00
2,000
Subtotal
$161,000
111. Superstructure
A.
Structural Concrete
600
c.y.
$220.00
$132,000
B.
Reinforcing Steel
55,000
lbs.
.45
24,750
C.
Epoxy Coated Re. Steel
90,000
ibs.
.60
54,000
D.
Structural Steel
610,000
lbs.
.65
396,500
SHIVE•HATTERY & ASSOCIATES %9
r�
f 1
i IIICROFIL14ED BY
1. `JORM -MICR#LAB-
CEDAR RAPIDS • DES M014ES
.. 1
JI
Appendix B-2
Cost Estimate
Burlington Street Bridge
Page Two
Description Quantity Unit Price Total
E. Aluminum Barrier Curb Rail 350 l.f. $ 15.00 $ 5,250
F. :Aluminum Handrail 380 l.f. 40.00 15,200
G. Lighting Lump Sum - 12,000
IV. Approaches
A.
Structural Concrete
30
c.y.
B.
Reinforcing Steel
24,000
lbs.
C.
Reinforced Approach
Pavement 280
s.y.
D.
8" P.C. Pavement
110
S.Y.
E.
4" P.C. Sidewalk
480
s.f.
Subtotal $639,700
$260.00
$ 7,800
.45
10,800
50.00
14,000
40.00
4,400
3.00
1', 44o
Subtotal
$ 38,440
Total Estimated Construction Cost $ 971,040
8% Contingency Allowance 77,960
Final Design 50,000
Construction Observation and Contract Administration 55,000
TOTAL ESTIMATED PROJECT COST $1,154,000
* Credit for salvage reconditioning and re -erection of existing handrail
(380 linear feet) $9,000.
j
SHIVE•HATTERYG ASSOCIATES 93 f
i
i 141CROFILI4ED BY
I_ -JOF'M -MICR6L-AI3- -�
CEDAR RAPIDS DES MOVIES I
JI
Im-
2'-
7'/z'- TO 13'- 9
EDGE OF EXISTING
WEST BOUND BRIDGE
1/z
i MICROFILMED BY
"JORIVI-MICROL7f B
CEDAR RAPIDS DES MOINES
T
1
Project No.
183108
MJ
J
m
�N
.,
.,
o
•O
m m
2
. "
N 4)
t
N 4)�Q
0
Q'rn;•
��t
W W
e
QI
C
« 9
�
w,
W •�
yr 7
�
3 ti
n
rt+ N
l6 0
p
U
or
_
•.
Q a
d
G
'
o:
t
Z
�
W
(7
O iu
>
m It
U,
F-
m
U- OC,.
Z W
U O
2W
O
O o
-
�.
m
U
r
Cr
I— W
Q
o
m
U N
W Z
CC
O
O 1—
LIJ (D
Z
O J
0. a
O
M 0°
1
Project No.
183108
MJ
J
t
48-9 OUT TO OUT
ROADWAY
[70WN STREAM
43 8+ EXISTING, ARCH.
AT CROWN
fOPOSED CROSS SECTION
LE; ° :1/6 = I:o,
t
MICROFILMED BY
DORM""-MlCR#t.:AB-
CEDAR RAPIDS DES MOIYES i
.-7i
JI
E'm
g3'_g'4 EXIS'�
NEAR SPRINGING
i 111CROf ILMED BY
I" " JORM---MICR6LAE3
CEDAR RAPIDS • DES MOINES
PROPOSED CROSS
SCALE
JI
9=2'�
7-O
.EAR SIDEWALK
141CROFILMED BY
I 'JORM-MIC R4ICA B-'
CEDAR RAPIDS DES M0114ES
I
JI
F -*-
A(qA wo,eve
SPRINCI
51.5 (T'ff
,34Z'—PAGE TO FAGS BACKWALLS
109- o"
9 SPACES 12L 4�'
L_
SPAN
n
STREAM BED
ELEV, 41.4
-------- 44'. 1
jr- EI 572 6Oc,5ti,i3t? h(�gh
ELEV. CREST OF DAM 49,3
ELEVATION VIEW
(WEST ABUTMENT and FIRST PIER)
SCALE:
I
i MICROFILMED BY
I --JORMMICROLAB- �
CEDAR RAPIDS DES MOINES
�l
� I
I
TO F,
9 SPACES
LABUTMENT
PRINWNG ELE`/• 50.5
-YRABUTMENTS)
S POST TENSIONING RODS (TYP.)
MICROFILMED BY
'JORM--MICR46LAB 1 -�
CEDAR RAPIDS DES MOVIES
MICROFILMED BY —
--�
JORNI"—MICRI�JLA9�—
CEDAR RAPIDS • DES MOIRES
I
'SPRINGING ELEV. 50.5
(TYP, ABUTMENTS)
-J
l
? 5
v
I
MICROFILMED BY —
--�
JORNI"—MICRI�JLA9�—
CEDAR RAPIDS • DES MOIRES
I
'SPRINGING ELEV. 50.5
(TYP, ABUTMENTS)
-J
II
MICROFILMED
BY
-,-JORM --&AJCR16LA13--
CS MOINES
CEDAR RAPIDS • DES'MOINES
-Gr- ALE.
48'-q" OUT TO OUT
35'-0"
70AD `/VA'f
DOWN STRGAM
ROADWAY
I
.------4@ q'_3 37=0„
ROPOSED CROSS SECTION
TYR. INTERIOR DIAPHRAGM
INTERIOR SECTION
i MICROFILMED BY
-.JORM- -MICR6LA13 --
CEDAR RAPIDS DES MOINES
71/-
,
L
w 24 END DIAPHRAGM
(TYP.)
�--GOMPOSIT WELDED
PLATE GIRDERS
((oO'.± DEEP)
I
I41CROPILMED BY
I l" -"DORM- MICRdCAB-_. - -�
CEDAR RAPIDS • DES MOIRES I
SG PLE' —'
48'-91
DOWN STRI
_® {II
4@J
PROPOSED CROSS
SCALE:
I
/ 1
% / 1
/ I
1
------------ ------_____ 114-0"
I;
I II
I
I 09'- O"
LEV. GREST OF DAM 48,3
L�-
ELEVATION 'VIEW _
MICROFILMED By
"-DORM"MICROCAB
CEDAR RAPIDS •DES MOINES
I
i-ELEV, 57,7
EDGE SECTION
�l
c)" FACE TO FACE OF AEUTMENTS
pr ABUTMEN-r
LSPRINGING ELEV. 50.5
I CTYP. ABUTMENTS)
INTERIOR SECTION
14ICROEIU4ED BY
I _
1--JORM --MlCR#lLAB" '
CEDAR RAPIDS DES I40NE5 i
I '
J
------------------------
/ 20"d1 STEEL PIPE W
V1 LLS
PLAN VIEW
I"= 10 0
� I
MICROFILMED BY
I -JORM-MIC R�fLlC O"-
CEDAR RAPIDS DES MOVIES
I
END 111 PROJ GT
EXCEPT MEOI N
JI
0
a
J
SyyY
3
JI
Y
�I ra
-
�'-I-- - - -- _ ¢
f I Q
W
t°
I �
'ISTING I Nl a
RBS
11
I
I
co
n
342=30 PROPOSED FADE TO FADE E3ACKWALLS
1
i MICROFILI4ED DY
I JORM "MICRbL"AB 1
CEDAR RAPIDS •DES M019ES I
0 STEEL PIF
PROPOSED PLAN VIEW I
SCALE; I"= 10 1!
JI
-------------
342=30 PROPOSED FADE TO FADE E3ACKWALLS
1
i MICROFILI4ED DY
I JORM "MICRbL"AB 1
CEDAR RAPIDS •DES M019ES I
0 STEEL PIF
PROPOSED PLAN VIEW I
SCALE; I"= 10 1!
JI
� �' �
� � J
�.
��
i
� � �
,% \,�-
_z,: `,
>�
,:,,:
''i%�-: s
��.<r
_.,,7.
'.i.
i,
'.fhQKi
_ .y;��
���.
Vi
!i`.
-'�:
;4 _`a�
MICROFILMED BY
--JORM -MICR46LAB--
CEDAR RAPIDS - DES MOINES
�l
354'-G'
2° 15' SKEW
I
w
w s
L -
_ _ 4 W
-j 5
J p
7
N
N W cL
J K
354'- G
E
MICROFILMED BY
-JORM -MICR46L6B--
CEDAR RAPIDS DES'MGiWES
JI
i
i
POLICE DEPARTMENT MONTHLY REPORT
April, 1983
t -
Citizen generated requests for various police services (complaints)
increased by 17% in April, 1983 as compared to March, 1983,and
were 21% higher than the same month in 1982. April, 1983 com-
plaintstotaled 3,100; March, 1983 totaled 2,647. Complaints for
April, 1982 numbered 2,668. Increases in reported offenses
were noted in the following categories:
OFFENSE March, 1983 April, 1983 April, 1982
:
Assault 16 25 18
Arson 1 5 -
1
Forgery $ Counterfieting 4 8 1
Vandalism 138 146 107
O.W.I. 46 54 32
Intoxication 36 47 40
Disorderly Conduct 298 407 251
I All Other Violations 22 53 53
Suspicion 65 79 62
r Juvenile 29 64 34
4 Motor Vehicle Accidents 164 184 192
Assist and Service 484 567 519
Alarms 110 143 108
Parking 201 247 186
I
I
i Arrests, tickets and citations also increased in April as
compared to March, 3101/2871, Criminal arrests totaled one
hundred ninety-three, Seven hundred twenty-one motorist were
Ecited for various violations; one hundred eighty-one vehicles
were towed and 2,001 andhappy;unhappy; (check one)
j motorists received policeissued parking tickets,
4
f A total of two hundred thirty-nine noise complaints was
received by the Department.
1
141CROFILMED BY
I 1. -JORM--MICR46LAB
CEDAR RAPIDS DES MDI YCS I
I
%U 9
J
i
i I
t Sergeant Bill Cook used his home computer (we don't have this
kind of equipment in the Police Department) to program and
analyze some basic statistics gathered during the month, The
results of the O.W.I. (operating while intoxicated) program is
attached. Note that of the total number of people charged with
O.W.I. during April the average age of arrestees was twenty-
four years; twelve percent of the arrestees were under the legal
I drinking age; and, thirty-one percent of all O.W.I. arrestees
were female. Interestingly, every few O.W.I. charges were as a
result of motor vehicle accidents, thus indicating that officers
are searching for O.W.I.Is rather than waiting for the sound of
breaking glass and the clash of metal to bring the offense to
their attention.
Finally, the frequency distribution indicates that the best
probability to avoid the drunken driver in Iowa City is on
` Monday night. Other nights. and O.W.I. is an evening and ;
I{j very early morning phenomena. . . look out!!
The Animal Control staff is somewhat short-handed because of
injuries. Consequently, that division's monthly report is
I conspicuously absent this month. However, next month a full
Animal Control report will be offered that will titillate the
passions of all Iowa City.
Watch for it on your local newstand.
Statistical reports are appended. I+
i
f
t
t
i
i
i
I
939
rte'
IdICROFILMED BY
'1.
— --!
DORM -'MIC RGILAB"
CEDAR RAPIDS DES IdOIAES
' I
IOWA CITY COMMUNITY
SCHOOL DISTRICT
David L. Cronin
Superintendent
If EECI':tiirJ
11 May 1983
509 S. Dubuque Street
Iowa City, Iowa 52240
(3191338.3685
Mary Neuhauser, Mayor
City of Iowa City
Civic Center
Iowa City, Iowa
Dear Mary:
At our meeting last evening, the Board of Directors directed me to com-
municate to you the Board's willingness to pay the City of Iowa City the
sum of $50,000 as a cash settlement for a clear title to the Central Junior
High School property. Also, we request that the City Council discuss this
proposal and respond to us by May 25.
If the City's response is favorable, which I hope it will be, we will
proceed to have the appropriate legal documents prepared.
Please contact me if you have any questions.
Sincerely yours,
Lynne Cannon, President
Board of Directors
Iowa City Community School District
cc: Members, Board of Directors
Neal Berlin, City Manager
John Cruise, Attorney
1
141CROFILMED BY
1--JOR M --MIC ROLAEI'"
CEDAR RAPIDS DES t4gI3ES
t I
I
940
JI
Lj
I
APPRAISAL REPORT
CENTRAL JUNIOR HIGH SCI
JEFFERSON & JAN BUREN Sl
IOWA CITY, IOWA
PREPARED FOR
MR. BRUCE A. KNIGHT
PLANNER
CITY OF IOWA CITY
410 E. WASHINGTON STREE
I014A CITY, IOWA 5224(
PREPARED BY
ARTHUR J. FRAHM & ASSOCIATE!
REAL ESTATE APPRAISER!
502 INSURANCE EXCHANGE BUIL
DES MOINES, IOWA 50305
RICROFILIIED BY
JOFi M""'Ml CDR 'A B'"
CEDAR RAPIDS DES MOINES
i
f{
k
Lj
I
APPRAISAL REPORT
CENTRAL JUNIOR HIGH SCI
JEFFERSON & JAN BUREN Sl
IOWA CITY, IOWA
PREPARED FOR
MR. BRUCE A. KNIGHT
PLANNER
CITY OF IOWA CITY
410 E. WASHINGTON STREE
I014A CITY, IOWA 5224(
PREPARED BY
ARTHUR J. FRAHM & ASSOCIATE!
REAL ESTATE APPRAISER!
502 INSURANCE EXCHANGE BUIL
DES MOINES, IOWA 50305
RICROFILIIED BY
JOFi M""'Ml CDR 'A B'"
CEDAR RAPIDS DES MOINES
i
ARTHI, J. FRAHM & ASSOCIATES
REAL ESTATE COUNSELORS
502 Insurance Eschango Building Des Moines, Iowa 50309
515-283.1531
May 6, 1983
Mr. Bruce A. Knight
Planner
City of Iowa City
410 E. Washington Street
Iowa City, Iowa 52240
Dear Mr. Knight:
•
As you requested, I have completed an appraisal of Central Junior High School
located at Jefferson and Van Buren Streets, Iowa City, Iowa.
The purpose of this appraisal is to estimate the market value. The value estimate
applies as of May 2,. 1983.. The property rights appraised are fee simple title owner- I'
ship,, assuming no•indebtedness against the property..
The property consists of a three level, masonry, old junior high school building
with an attached, enclosed walkway and annex building housing a gymnasium. The build-
ings contain a gross floor. area of 40,308 square feet and were originally constructed
in 1903 with.various stages of subsequent remodeline and are now ronni.dered to be in
t below average condition.'
The improvements are situated on a site having dimensions of 320 feet by 320 feet,
for an area of 102,400 square feet, or 2.35 acres, more or less. The site is zoned R-3
and the present use is conforming.- However, the resulting value estimate considers the
site to be vacant of the existing improvements and ready for redevelopment.
As a result of my investigation and analysis, as summarized in this report, I
estimate the market value of this property to be:
FIVE HUNDRED SIXTY FIVE THOUSAND DOLLARS
$ 565,000.00
I wish to thank you for the opportunity to serve you in this matter, and I will
be available to discuss any questions at your convenience.
Arthur J. Frahm M.A.I.
Reviewing Appraiser
Respectfully 'submitt
._De'nis K. Kesterson l
1
I MICROFILMED BY
-JORM"-MICR46LAB" � 1
L / +
CEDAR RAPIDS •DES NDIYES i /
PREFACE
Title Page.
Letter of Transmittal.
Photographs.
TABLE OF CONTENTS
Salient Facts and Conclusions.
1.
Date and Purpose of the Appraisal.
2.
The Appraisal Process.
3.
};
City and Area Data.
q,
Map Excerpt Showing Location of Iowa City, Iowa.
5, j
Location Map.
6.
Neighborhood Description.
7,
S
Zoning Nap Excerpt.
8. I .._..... .. _
Site Description.
y,
`y
Narrative Description of the Improvements.
10.
Highest and Best Use.
13.
ESTIMATE OF MARKET VALUE.,
Land Value Estimate.
17. I
Land Sales.
18. j
Land Sale Comparison Table.
Y0,
Correlation of Land Sale Data.
21,
Contingencies and Limiting Conditions.
23,
6 {
Certification.
24.
Qualifications of Appraisers.
25, I
I
is
i
1
I
�
i
I
Y
l
1
I MICROFILMED BY
-JORM"-MICR46LAB" � 1
L / +
CEDAR RAPIDS •DES NDIYES i /
r"•r
1
SALIENT FACTS AND CONCLUSIONS
i141CROFILMED BY -�
-JORM-MICR6L-A13
CEDAR RANDS DES MOINES i
9W/
J
PROPERTY IDENTIFICATION:
Jefferson S Van Buren Street, Iowa City, Iowa.
LEGAL DESCRIPTION:
Center Market Original Town of Iowa City
FEE OWNER:
Iowa City School District.
PURPOSE OF THE APPRAISAL:
To estimate the market value.
DATE OF THE APPRAISAL:
As of May 2, 1983.
TYPE OF PROPERTY:
An older, 3 level, brick masonry and stone school
building, an enclosed walkway and a brick masonry
annex building.
r
AGE OF IMPROVEMENTS:
Built in 1903.
4
UTILITIES:
All available.
i.
Y
ASSESSED VALUE:
NOT ASSESSED. PRESENTLY TAX EXEMPT
TAX RATE:
32.29
GROSS TAXES:
None
LOCATION OF THE SITE:
Intersection of Jefferson 6 Van Buren Streets,
Iowa City, Iowa.
LOT SIZE:
320' X 320' = 102,400 S.F. OR 2.35 Acres, more or
less.
ZONING:
R-31 Multiple Residential District.
HIGHEST AND BEST USE:
As a vacant site, for redevelopment within the
R-3 zoning classification.
LAND VALUE ESTIMATE:
$565,000.00 ( AS VACANT )
C
MARKET VALUE ESTIMATE:
$565,000.00
i141CROFILMED BY -�
-JORM-MICR6L-A13
CEDAR RANDS DES MOINES i
9W/
J
r.
/ f
2 I
DATE AND PURPOSE OF THE APPRAISAL
The term " Market Value " is synonymous with the definition in the 1975 edition
of Real Estate Appraisal Terminology published jointly by the American Institute of
Real Estate Appraisers and the Society of Real Estate Appraisers. The definition for
I
this appraisal is similar, and set out as follows:
The highest price estimated in terms of money which a property will likely bring
in a competitive and open market under all conditions requisite to a fair sale, the
buyer and seller each acting prudently, knowledgeably and assuming the price is not
affected by undue stimulus.
Implicit in this definition•is.the consummation of a sale as.of a specified date
i
and the passing of title from seller to buyer under conditions whereby:
i
1, buyer and seller are typically motivated. {
r 2, both parties are well informed or well advised, and each acting in what
i
he considers his own best interest.
3. a reasonable time is allowed for exposure in the open market.
4. payment is made in cash or its equivalent.
5. financing, if any, is on terms generally available in the community at the i
specified date and typical for the property type in its locale.
6. the price represents a normal consideration for the property sold unaffected by
special financing amounts and/or terms, services, fees, costs, or credits
incurred in the transaction.
The value estimate applies as of May 2, 1983.
The purpose of this appraisal is to ,estimate the market value of this property, in
fee simple•
IdICROPILRED BY
l'--� ---JORM�-MIC R�CAB
% CEDAR RAPIDS DES MOVES i
THE APPRAISAL PROCESS 3.
It is generally recommended by the American Institute of Real Estate Appraisers
of the National Association of Real Estate Boards, that the market value of a parcel
of real property be estimated by the use of three approaches to value. These are the
Cost Approach, the Income Approach, and the Market Data -Approach. The value indicated
by each approach will be carefully reviewed and that approach, which in the judgement
of the appraiser, most adequately and accurately reflects all the circumstances in
connection with the part`_cular property under appraisement, and the purpose for which
the appraisal is being made, will be selected as the best indication of market value.
The Cost Approach is the value of the land to which is added the depreciated cost
new of any improvements. In this appraisal, however, since we are considering only the
value of the land, this approach will be considered synonymous with the Market Data
Approach.
The Income Approach is the capitalization of net income at a proper rate. Income
is derived, if possible, from the comparison of the subject property with similar prop-
erties in the area that are leased. The capitalization rate is derived, if possible,
from recent sales of leased property in the area. The appraisal of land does not, as
a rule, lend itself to the techniques of the income approach. In some areas, where
there is an active market for leased land, significant data could be readily accumula-
ted and justified. In this case, however, accurate data is difficult to obtain be
of the lack of recent sales of leased land and the resulting difficulty in obtaining
a proper rate. This approach will not be used in this appraisal.
The Market Data Approach is the comparison of recent sales of comparable properties
as a guide to market value. If sales of property having the same features as the subject
property are not available, sales of properties having some or part of the same features
will be considered, and adjustments will be made to indicate the market value of the
subject property from these transactions.
I i
r MICROFILMED BY
JORM-MICR6LA9" �
CEDAR RAPIDS DES MOINES j
9W
Jl
i
4.
CITY AND AREA DATA
The City of Iowa City is located in the east -central area of the State of Iowa
approximately 120 miles east of the City of Des Moiens, the Capital of the State of
Iowa.
I
Iowa City is the County Seat of Johnson County.
The 1980 Census of Johnson County was 81,717 and 50,508 for Iowa City.
Iowa City is served with several major highways including I-80, which is gen-
` .... _ _ _ ..
erally the northern boundary. Other highways included are O1, # 6 and 0 218.
i
The major industry in Iowa City is the University of Iowa, which is the largest
university in the State. Also of major importance is the University Hospital
' , a i
t national leader in several medical specialties. Another area of strong economic
ti
S importance is agri-business, which generally influences Johnson County.
Iowa City offers a great and varied selection of retail goods, and professional
services. However, if a larger selection of retail goods and professional services !
is required, residents can travel to Cedar Rapids, Iowa, approximately 30 miles north
of Iowa City.
The economy of Iowa City appears stable and there is nothing that would indicate
a change in the future.
The City is served with all public utilities and Police and Fire protection are
provided by the City of Iowa City.
911/
1 -
L j 141CROFILI-ED BY
-1'••... I' DORM.... MICR6LAB._
I CEDAR RAPIDS DES MOIYES
r
0
.-,
LOCATION IMP
CENTRAL JUNIOR HIGH
SCHOOL
i MICROFILMED BY
f JORM--MIC R6LAB-
CEDAR RAPIDS • DES MOINES
f
9f/
6
4
L-
7.
NEIGHBORHOOD DESCRIPTION
The subject neighborhood is located in the central area of the City of Iowa
City. For the purpose of this appraisal the neighborhood boundaries are described
as Bloomington Street on the north, the Iowa River on the west, Burlington Street
on the south and Governor Street on the east.
Within the neighborhood boundaries are the Central Business District District
i
and the University of Iowa classrooms.
Neighborhood uses include, as stated, the University of Iowa classrooms, the i
i
Central Business District, offering many retail stores, restaurants, banking, theaters,
i
professional services, City Government buidlings, and single and multi -family housing. I
New construction has been limited and any recent construction has been due to
ii
enlarging or remodeling existing properties. The neighborhood is considered to be f
100% developed and new construction is generally a result of purchasing an existing
I
building for the land.
Streets in the neighborhood are typically asphaltic and have curbs and gutters.
There are public sidewalks. The subject neighborhood has good access to I-80, approx-
i
imately 4 miles north .
The topography of the neighborhood is generally level with natural drainage to
the south and west.
The neighborhood has all available public utilities.
Police and Fire protection are provided by the City of Iowa City.
f�
141CROFILMED B
DORM --MICROL-AB J
1 1 CEDAR RAPIDS • DE OL" AB
I M018ES
� I
4
J
I
9.
SITE DESCRIPTION
The subject site covers an entire city block, having Jefferson Street on the
south, Van Buren Street on the west, Market Street on the north, and Johnson Street
on the east.
The site is square in shape and has dimensions of 320' X 320', for an area of
102,400 square feet or 2.35 Acres, more or less. The subject site is zoned R-3 and
the present use is conforming.
The topography of the site is level with natural drainage to the south. The
soil apparently affords good support for foundations in the area as only normal settle-
ment in the subject foundation was observed.
The site.is graded and crowned at the building location, providing drainage of
surface water away from the improvements.
I
The site, at curb line, is approximately 1 foot above grade.
Neighborhood uses include a hospital, single and multi -family housing, and
commercial facilities.
The site is served with all available public utilities.
Police and Fire protection are provided by the City of Iowa City.
I
i
ED BV
D
RL_ A6`
DES MOINES
10
NARRATIVE DESCRIPTION OF THE IMPROVEMENTS
The subject property is improved with a masonry, brick and stone faced, 3 level,
building that was constructed in 1903 and presently is used as a Junior High School
and a 3 level masonry, brick faced, annex building housing classrooms and a gym. The
two buildings are connected by an enclosed walkway.
MAIN BUILDING•
PARTIAL BASEMENT:
This area contains the mechanical room and has a concrete floor and stone and
brick masonry foundation. Some areas of the ceiling are covered with unfinished dry-
wall. There is a gas-fired, Pacific boiler, having 16 horsepower. An inspection certifi-
cate is current. Theme is a sump pumpin a pit and a BOCK gas-fired water heater, having
a capacity of 100 gallons. There is a utility sink.
i;
IST LEVEL LUNCH ROOM
�i
t
The floor is painted concrete and the ceiling and walls are plaster. There is a
stainless steel serving line, a HOBART dishwasher and an In-sink-erator disposal.
Lighting is from overhead fluorescent fixtures.
}; STORAGE ROOM
The ceiling and walls are plaster, and the floor is painted concrete. There is
an A.O. Smith 89 gallon gas-fired water heater and a walk-in ATLAND freezer.
DINING AREA
The ceiling is 12" x 12" tile and the floor is vinyl tile. The walls are painted
plaster and brick.
MUSIC ROOM (2)
The floors are either vinyl or carpeted and the ceilings and walls are 1' x l'
tile and plaster.
BOY'S RESTROOM
The ceiling and walls are plaster and the floor is ceramic tile. There are seven
enclosed stalls, 6 urinals and 5 sinks.
r'-
It
MICROFILMED BY
- -:AO RM --'M IC ROCA9- '-
CEDAR RAPIDS • DES MOINES I
JI
r -r
lj"�,
11
2ND 6 3RD FLOOR LEVELS CLASSROOMS ( 22 )
The classrooms have tile or plaster ceilings and either vinyl tile or hardwood
floors. Lighting is from overhead fluorescent fixtures.
NURSE'S OFFICE
This room was locked and a physical inspection was not made. However, it is assumed
that the finish is typical and consistent with the rest of the building.
CONFERENCE ROOMS (2)
The finish in these rooms is typical with the rest of the building.
STUDY HALL
The ceiling is plaster and the walls have paneling and plaster. The floor is carpet -
ed.
Y LIBRARY
' The ceiling and walls are plaster and the floor is carpeted.
i•
GENERAL OFFICE
The ceiling and walls are plaster and the floor is carpeted.
PRIVATE OFFICES ( 2 )
7'
These rooms have plaster ceilings and walls. The floor is carpeted.
GIRL'S RESTROOM
The ceiling and walls are plaster and the floor is ceramic tile. A complete
inspection was not possible because of constant use, however, it is considered to be
typical in comparison to size to the boy's restroom.
HALLWAYS
The floors are generally hardwood and in poor condition. The ceiling and walls
are plaster and there are student lockers located against the walls.
The entire building has a pressure water sprinkler system. However, the condition
of the system is not known.
ATTIC
There is a partial attic that has a floor and is served with'electricity. There is
no finish.
{1 i
i MICROFILMED BY !
�- JORM--MICR6LAB'
CEDAR RAPIDS DES MOINES
�l
12
ENCLOSED WALKWAY
The floor is concrete and the walls are painted concrete block. The south wall
has glass panes with wire mesh. There are 2 Reznor ceiling hung, gas-fired, forced
air furnaces.
ANNEX
BASEMENT
This level contains a locker room, an industrial arts classroom, and two storage
,. rooms. The floors are exposed concrete and the ceilings and walls are plaster. The
classroom has one ceiling hung, gas-fired, forced air furnace.
BOY'S ROOM
I
This room has one water closet. The ceiling is 12" x 12" the and the walls are
i; plaster.
j
CLASSROOMS (5)
" These rooms have plastered ceilings and walls and the floors are exposed hardwood. i
Lighting is from exposed fluorescent fixtures.
GIRL'S ROOM'
This room has the same finish as the boy's room. However, an inspection was not
made because of.constant use.
GYM
This area is typical of a gym, having a basketball arrangement. There is a running
track around the upper level of the gym.
c. I
CONDITION
The overall condition of the main building and annex is considered to be fair
to poor.
SITE IMPROVEMENTS
There is an asphaltic surfaced parking lot on the south side of the main building,
`I having an estimated capacity of 20 automobiles or light trucks.
I
97/
I ,
r_
I i MICROFILIIED BY _
,
�•,-.,' t - "JORM- 'MICR�LAB`
1f CEDAR RAPIDS DES'MOVIES i
13
HIGHEST AND BEST USE
The highest and best use is defined as the most prcfitable likely use to which
1
a property may legally be put.
The opinion of such use may be based on the highest and most profitable contin-
uous -use to which a property is adapted and needed, or likely to be in demand in the
near future. That use of land which may reasonably be expected to produce the greatest
net return to the land over a given period of time, or that legal use which will yield
to the land the highest present value, are other ways of defining the highest and best
use. In other words, the optimum use.
To determine the highest and best use, as defined, the use of surrounding prop-
erties, the zoning, and physical characteristics of the subject property must be analyzed
to select the use or uses that are most likely to occur. These must then be evaluated
is
to determine the most profitable use. i
The highest and best use of a site, if vacant and available for use, may be diff-
erent from the highest and best use of the improved p property. This will be found when �
an improvement exists that is producing a net return over and above the requirement
by the land, but is not an appropriate use nor is it producing the highest return.
I
The subject property is improved with a three story, masonry, old school house
building containing 30,404.0 square feet plus an attached gymnasium building containing
9,904.0 square feet, for a gross floor area of the complex at 40,308.0 square feet.
The facility was originally built in 1903 and has been subsequently remodeled at various
times to bring the building up to acceptable standards for day to day use as a Junior
High School. It is however,
presently in such poor condition that closing the school is
being considered and redevelopment of the site is anticipated.
The site consists of a square city block measuring 320.0 feet by 320.0 feet, for
a total site area of 102,400.0 square feet, or 2.35 acres.
cl.
re!
Zoning of the site is R-3, Multiple Family Residential District
This zoning
r
I F
14
lower.density residential use and public uses such as parks, libraries and schools.
Industrial and high density commercial uses are precluded under this zoning, nor would
they be an acceptable use due to the surrounding neighborhood which is predominantly
residential in character.
.A single family use of the site would not produce the greatest continuing net
return to the land in view of the optimum development permitted, such as multiple resid-
ential as of which there is an apparent demand for in the area. Therefore, a multiple
family residential use within the R-3 zoning classification appears to represent the
highest and best use.
The question then arises as to whether the value of the property lies in the
existing improvements or within the land alone, as vacant, ready for complete redevelop
i
ment.
i
As the improvements p presently exist, the Cost Approach to Value would be of little
benefit. The buildings are in poor condition for the current school use and for all
practical purposes, are almost fully chpreciateduut physically and certainly economic-
ally. This approach would also not be consistent with the highest. and best use.
A search of the market has not revealed any transactions of property similar in
nature to the subject property. Therefore, the Market Data Approach to Value is also
• I
mgretably not utilized in this case. However, this approach too, would fail to meet
the criteria under the highest and best use as it presently exists:
The existing use as an educational facility does not provide a net income sufficient
to support even the land value estimate alone, so even though the current use may be a
proper use for the socio-economic requirements of the community it fails to support
the underlying value of the overall property. (Given the fact that the school use is not
absolutely essential to the subject's particular location and in view of the overall
condition of the property.) Therefore, an alternative use of the existing facility
within the R-3 zoning must be analyzed. This will then confirm whether there is any value
attributable to the improvements over and above the land value estimate alone.
In considering an alternative use, a multiple residential use is most probable
i MICROFILMED BY i
�. 'DORM MICRbLAB -
CEDAR RAPIDS • DES MOVIES /
i
i
15
both legally and financially in regard to the optimum return.
To our knowledge, there have not been any plans for this type of conversion.
Therefore, the following proposal is purely speculative in nature and is used only for
illustrative purposes in support of our final value estimate.
We estimate that within the main classroom building a total of 30-800 square foot
residential units could be realized after calculating and deducting the requirements for
hallways, mechanical and other common areas. The annex -gymnasium building could be
updated and remodeled to be utilized as a recreational building within the complex.
Total conversion costs are estimated at $50.00er square foot of
p q gross floor area, or
I
about $2,000,000.00. This conversion cost considers complete interior demolition and
the cost to remodel into the 30 units and common areas. 'Included -in this cost estimate
f
`s is floor repair and covering, interior partitions and doors, ceiling, electrical, heat- JJj
ing and cooling, plumbing, appliances, exterior renovation and paved parking requirements. j
These costs are taken from the Marshall Valuation Service, a nationally recognized cost
I
service and verified by local contractors.
j
If the conversion is feasible, the resulting market value of the project, as
t
completed, should absorb the conversion cost and the expected return should justify
the net income and consequently the gross potential income of the project, or the
required rent for the proposed units. 'In addition, the anticipated market value of
the project, as completed, would also include the underlying land value, which has not
been considered up to now.
I
The land value has been estimated on the following pages at $590,000.00. Therefore,
the total "value" at this point would be about $2,590,000.00.
In deriving the required return on the total cost or " value" thus far, typical
first mortgage financing for the real estate investment and the proper equity dividend
or cash -on -cash return must be analyzed.
Discussions with several lenders indicates that the best mortgage terms available
for this type of property would be for a term of 30 years, at a 13k2 interest rate and
a 752 loan to value ratio, with probably a 5 or 10 year call. The annual constant,
MICROFILMED 6Y
III"' --JORM--MICR46L-AB_ �..�
'l CEDAR RAPIDS • DES MOINES
i I
i
% I
i
16
based on monthly payments is .135093.
The current attitudes of investors, in multiple family residential property, is
the willingness to take a relatively low annual cash dividend on the cash investment
(equity dividend ). This has been demonstrated in the market, where we find equity div-
idend rates ranging from a negative low to a high of about 10%. The new income tax laws,
with the faster depreciation allowed, has created a better tax situation than before.
In addition, lower equity dividend rates are common because the investors are betting
on continuing inflation and an increase in their equity positions over the term of
ownership, resulting in a higher yield, particularly after income taxes. However, the
additional risk in the subject would tend to raise this rate.
As a result, I estimate an equity dividend rate of about 8.0% to be sufficient
to attract investment capital.
f' Therefore, the overall rate of return, based on a band of investment technique,
i
r using the above terms, is calculated at 12.1320%.
The total required return, or net income, is then calculated at $314,218.80
($2,590,000.00 X .121320). This net income must now be converted into a gross income
estimate. Based on net income ratios of other similar projects ( similar in economic
structure ) the proper net income ratio is estimated at 547. Therefore, the effective
gross income is calculated at $581,886.67 and after considering a 3% vacancy rate, the
gross potential income of the project is estimated at $599,883.16.
Therefore, on a per month basis, the typical unit would have to rent for about
$1,666.34, or 2.08.per square foot. This rental rate is far in excess of what the
current rental market is presently demonstrating, and thus, concluding that a possible
conversion to the proposed residential use is not justified. Any lower density conver-
sion or alternative use would be under -utilizing the building and site area.
Therefore, the highest and best use of the property is considered to be for
redevelopment of the entire site with demolition of the existing improvements. The land
1
value estimate must now be adjusted for the cost of demolition.
f4w.
14ICROFIL ED BY
I ' `JORM - MIC RGtiL Atj'
CEDAR RAPIDS DES 1401NE5
i MICROFILMED BY
l
D
ORM"'-MICRbLA13
CEDAR RAPIDS DES MOINES 1
fill
y r
d
1 17.
LAND VALUE EST I -M •
The estimation of land value considers the site to be vacant and subject to
improvement. The value estimate is based on sales of similar vacant land in the area.
This is a comparison process utilizing the principle of substitution. This principle,
simply stated, affirms that the maximum value of a property tends to be set by the
cost of acquisition of any equally desirable and valuable substitute property, assum-
ing no costly delay is encountered in making the substitution. This method entails
a search of the market for sales of comparable properties and the comparison with
the subject site for an indication of value.
In addition, the final step will be to deduct the estimated cost of demoltion from
the land value to arrive at actual land value as vacant and ready for redevelopment.
i MICRDF IEMED DY
—JORM_._MI C R4ICA B-'
} CEDAR RAPIDS •DES MOlAES
j }
a
f W .
r�
J
LAND SALE NO. 1
ADDRESS:
LEGAL DESCRIPTION:
SOLD:
FILED:
GRANTOR:
GRANTEE:
SALE PRICE:
LOT SIZE:
SOLD AT:
ZONING:
UTILITIES:
LAND SALE NO. 2
ADDRESS:
LEGAL DESCRIPTION:.
SOLD:
FILED:
GRANTOR:
GRANTEE:
SALE PRICE:
LOT SIZE:
SOLD AT:
ZONING:
UTILITIES:
LAND SALE NO. 3
ADDRESS:
LEGAL DESCRIPTION:
SOLD:
FILED:
GRANTOR:
GRANTEE:
SALE PRICE:
LOT SIZE:
SOLD AT:
ZONING:
UTILITIES:
18'
LAND SALES
505 E. Burlington, Iowa City,Iowa
W 170' of 0. L. 26 O.T. Lying N of R.R.
1-12-83 BOOK: 628 PAGE: 49-50
1-13-83
Ronald Shank
Iowa -Illinois Manor
$375,000.00
170' X 362' = 61,540 S.F.
$6.09 per S.F.
CB
All available.
625 S. Clinton, Iowa City, Iowa
S 40' of Lots 3-4 Blk. CSA
9-30-82 BOOK : 626 PAGE: 103-04
10-4-82
Stephen F. Bright
Larry Svoboda
$97,000
120' X.150' = 18,000 S.F.
$5.39 per S.F.
R- 3
All available
620-32 S. Dodge, Iowa City, Iowa.
Not available.
8-20-82
8-23-82 BOOK: 642 PAGE: 224-26
642 82
Nick Lutgen
Roger Vincent
$170,000.00
148' x 150' = 22,200 S.F.
$7.73 per S.F.
R-3
All available.
I MICROFILMED BY i
—DORM�-'MIC RI�LA9 -
... .._111..-�
I CEDAR RAPIDS DES M01NES /
i .
LAND SALE NO. 4
ADDRESS:
LEGAL DESCRIPTION:
SOLD:
FILED:
GRANTOR:
GRANTEE:
SALE PRICE:
LOT SIZE:
SOLD AT:
ZONING:
UTILITIES:
LAND SALE NO. 5
ADDRESS:
LEGAL DESCRIPTION:
SOLD:
{ FILED:
GRANTOR:
GRANTEE:
SALE PRICE:
LOT SIZE:
SOLD AT:
�
ZONING:
UTILITIES:
3
r ,
SW Corner of Burlington & Clinton, Iowa City, Iowa.
Lot 1 and N 40' Lot 2 Block 101 and N 120' of alley
adjoining the west.
4-11-78
4-11-78 BOOK: 512 PAGE: 158
City of Iowa City
Perpetual Savings
$161,720.00
120 x 170 = 20,400
$7.93 per S.F.
CBS
All available.
Burlington & Dubuque S1
Lot 1 and N 29' of Lot
Lot 1
6-2-80
6-2-80 BOOK:
Drive Inn Realty
Albert & Wilfred Biepm
$130,000.00
Irregular - 14,315 S.F
$9.08 per S.F.
CBS
All available.
y MICROf iLMEO BY
1_ JORM--MICROCd:B*-
CEDAR RAPIDS DES MOINES I
19
1 1-12-83
2 9-30-82
3 8-20-82
4 4-11-78
5 6-20-80
SUBJECT
320 X 320 102,400 R-3
(2.35 A+)
MICROFILMED BY _f
. _.._�
I - JORM--MIC R#[. -A15' -
CEDAR RAPIDS • DES MOME5 I
ADJUSTED
PRICE
-10% $5.48 g
-5% $5.12
-20% $6.18
-25% $5.95
-40% $5.45
SALE
SALE PRICE
SIZE
S.F. SIZE
ZON
PRICE
PER SF. DATE
LOC
TOPO SIZE
SHAPE
ZON
$375,000
170 X
362
61,540
CB
$6.09 -
-5%
- -5%
+5%
-5%
$ 97,000
120 X
150
18,000
R-3
$5.39 -
-
- -10%
+5%
-
$170,000
148 X
150
22,200
R-3
$7.73 -
-15%
- -10%
+5%
-
$161,700
120 X
170
20,400
CBS
$7.93 +10%
-20%
- -10%
-
-5%
$130,000
Irregular
14,315
DBS
$9.08 -
-20%
-
-15%
-
-5%
320 X 320 102,400 R-3
(2.35 A+)
MICROFILMED BY _f
. _.._�
I - JORM--MIC R#[. -A15' -
CEDAR RAPIDS • DES MOME5 I
ADJUSTED
PRICE
-10% $5.48 g
-5% $5.12
-20% $6.18
-25% $5.95
-40% $5.45
21.
CORRELATION OF LAND SALE DATA
On the preceding page I have listed 5 comparable land sales ranging in size from
14,315 to 61,540 square feet. According to information obtained from the city of Iowa
City Assessor's Office, the comparable properties have zoning classifications as CB, CBS
and R-3. The subject is zoned R-3.
Sale dates for the comparables ranged from 4-11-78 to 1-12-83.
Adjustments to the sales have been considered which attempt to quantify the diff-
erences between each sale property and the subject. These adjustments are based on a
combination of market trends and the appraiser's judgement. We have followed the market
i
for years', and.through our observations of -market activity, have learned to recognize
factors which explain the differences in the sale prices of real property. Occasionally,
the sale information included in a report can be used to demonstrate the proper magni-
tude of a particular adjustment. However, most often observation of sales of other
properties over an extended period of time have to be relied upon in adjusting for 1
differences between properties.
i
The comparables were adjusted to the subject with regard to the date of sale,
location, topography, size, shape and zoning.
Generally, adjustments for date reflects the increases in property values over
f
time, location adjustments reflect the relative desirability of different locations,
size adjustments are based on the observation that smaller parcels generally sell for
- i
more per square foot, adjustments for shape and topography account for physical char-
acteristics which effect the sale price, and zoning adjustments compensate for diff-
erences in permitted uses.
As adjusted, the comparables showed a range from $5.12 to $6.18 per square foot.
By eliminating the low, Comparable 4 2, the range is then from $5.48 to $6.18 per
square foot.
Considering the comparables as adjusted to the subject, I estimate the market
value to be about $5.75 per s !are -•.foot+ slightly more than the average of all the
comparables and slightly less than comparibles 11 1, 0 3, # 4 and 1 5.
141CROFILMED BY
1. JORM MICR4CA9' 1
CEDAR RAPIDS • DES MOINES i /�
22
300.00
)00.00
)00.00
)00.00
141111111IM11 11
-JORM -MlCR6L-AG'-
CEDAR RAPIDS DES MOINES
I
23
CONTINGENCIES AND L'DIITING CONDITIONS
No responsibility is assumed for legal matters. No report on title is rendered.
The legal description and ownership information have been furnished by reliable sources,
but no responsibility is assumed for correctness. The property is assumed to be free
and clear of all indebtedness, liens, encumberences, and special assessments, although
some type of capital structure may be used in the appraisal process.
No survey has been made, unless furnished by other sources. The size of the site
is taken from records believed to be reliable. Usual methods of measuring were employ-
ed and are believed to be correct, but not guaranteed. Plats and sketches are included
only for illustrative purposes. Unless otherwise noted, no expert opinion is reported
on soil conditions. Unless otherwise noted, any improvements are assumed to be within
r .
lot lines. No responsibility is assumed for conformity to zoning ordinances or building
codes. No representations are made concerning the condition of mechanical equipment
or the existence of past damage or infestation.
This appraisal is to be used in whole, and not in part or in conjunction with any
other appraisal. The separate valuations of land and improvements apply only under
i
the highest and best use premise of land utilization and must not be used in reference
to any other appraisal or in any other manner.
The appraiser shall not be required to give testimony or appear in court by reason
of this appraisal, unless prior arrangements have been made.
Neither all nor any part of the contents of this report shall be conveyed to the
public through advertising, public relations, news, sales or other media, without the
written consent and approval of the appraiser, particularly as to value conclusions,
the identity of the appraiser or firm with which he is connnected, or any professional
appraisal organizations or designations.
a _ _
r
i I4ICROE ILIdED BY
�—JORM -MIC RI�jLAB
i I CEDAR RAPIDS DLS Id01AE5 I
I
i
941/.
J
I
24
CERTIFICATION
I certify that I have no interest, present or contemplated, in the property
appraised. I have no personal interest or bias with respect to the subject matter
or the parties involved. This appraisal has been made in accordance with the Federal
I
Fair Mousing Law ( Title VIII of the Civil Rights Act of 1968 ). Neither the employ-
ment nor the compensation is contingent upon reporting a predetermined value or the
value estimate.
To the best of my belief and knowledge, the statements of fact and information
contained in this report, upon which the analysis and conclusions are based, are true
and correct: i
No pertinent information has knowingly been withheld. The report sets
S
forth all of the assumptions and limiting conditions affecting the analyses, opinions, I
and conclusions contained in this report.
This report has been made in conformity with and is subject to the requirements I
of the Code Of Ethics and the Standards of Professional Conduct and Practice of the
I
American•Institute of Real Estate Appraisers of the National Association of Realtors.
I accept the responsibility for the entire contents of this report, which direct-
lY involves the exercise of judgement in arriving at analysis and conclusions con-
.
cerning real estate. I acknowledge the assistance by others under my supervision
In the preparation of phases of the appraisal process.
I certify that I have personally inspected the property unless otherwise stated
below the undersigned signature.
c
Arthur J. Frahm M.A.I.
Reviewing Appraiser Denis K. Kesterson
i misorILMED BY
'JORM M.0 R/�JCA B`
(\ r
- - -1
LCEDAR RAPIDS DES MOINES I
25
QUALIFICATIONS OF THE APPRAISER
DENIS K. KESTERSON: Born in Des Moines, Iowa
ELEMENTARY EDUCATION: Des Moines Public Schools, Des Moines, Iowa
HIGH SCHOOL: Roosevelt High School, Des Moines, Iowa
COLLEGE EDUCATION: Centerville Junior College, Centerville, Iowa
1962-63
Drake University, Des Moines, Iowa
1961-62 and 1963-65
REAL ESTATE EDUCATION: Real Estate Courses in accounting, marketing and law.
Past instructor of real estate - Des Moines Area
Community College.
MEMBERSHIPS: Iowa Real Estate License
National Association of Realtors
Iowa Real,Estate Association
Greater Des Moines Board of Realtors
Public Relations Committee Member
EXPERIENCE: 1965 to 1.967 - Developing residential lots and construction
of single family and multi -family residences.
,
1967-1976 - Real Estate Marketing
1976 - Present, Real estate appraising and consulting
( single family, commercial, multi -family; industrial, office,
rural, T.V. Transmitters, subdivisions, resorts, condomin-
iums, warehouses, urban renewal projects, manufacturing
plants, automobile dealerships, restaurants and motels.)
Clients have consisted of 'the Federal Government, State of
Iowa, City of Des Moines, City of Sioux City, City of Urban-
dale, City of Polk City, Bank of Dallas, Bank of Oklahoma,
Bank of Bellevue, Nebraska, 1st Bank of Bartlesville, Bank
of St. Louis,,lst National Bank of Sioux Falls, Glennview
State Bank, 1st National Bank of Maryland, United Central
Bank, Valley National Bank, Iowa -Des Moines National Bank,
Northwest Brenton Bank, Bankers Trust, Plaza State Bank,
National Bank of Des Moines, Banco, Scandia Savings & Loan,
Central Federal Savings Association, American Federal Savings
& Loan, State Federal Savings and Loan, Midland Financial
Savings & Loan, Agri -Industries, A.M.F., Eli Lilly Co., Ford
Motor Company, Motorola Corp., Westinghouse, Massey Ferguson,
American Telephone and Telegraph, Alcoa Aluminum Company,
B.F. Goodrich, Firestone Tire and Rubber Company, Hallmark
Cards, Brock Hotels, Inc., Cargill Feeds, McDonald's Corp.,
Northwestern Bell, 3-M Corporation, The Upjohn Company, Iowa
Power and Light Company, Iowa Educational Broadcajtigg- Co
W.H.O. Broadcasting Company, Chevron Chemical Company,-'AIJL .4
Insurance Co., Farland Insurance, Royal Insurance Economy_ r
Fire Insurance Company, Des Moines Water Works, The Des Moines
Register and Tribune Company, Major Oil Companies, Homequity,
i 14100ilu4ED D1'
--J017M-MICR6LA13'" 1
CEDAR RAPIDS • DES MOINES I �
� I
PUBLICATIONS:
GEOGRAPHIC AREA:
26
Trarsliarica, Investor's Relocation Service, Byron Peed Co.,
Employee Transfer Corporation, Better Homes E Gardens Real
Estate Service, Ticor ,Greacer Des.Moines Board .of Realtors,
District Court of Polk County, Numerous law firms, CPA firms
and individuals.
}
Approved Federal National Mortgage Association Appraiser.
Qualified in Polk County, Warren County .and Dallas County
District Courts, Condeanation courts and by the Polk County
Board of Review, as an expert witness.
Business and Industry Magazine, February, 1983 RELOCATED
Iowa and surrounding states.
Designated as a Senior Real EstateAnalyst, Society of Real
Estate Appraisers ( S.R.E.A. )
IIICROFIL14ED BY
--JORM IMIC RfSCA6- 1 ,�
I CEDAR RAPIDS • DES MOTIFS
I
27
1
Q. 'IFICATIONS OF THE APPRAISER
ARTHUR J. FRMI:
Born October 13, 1924.
ELEMENTARY EDUCATION:
Davenport Public Schools, Davenport, Iowa
HIGH SCHOOL:
Davenport High School, Davenport, Iowa
COLLEGE EDUCATION:
Iowa State College - Sept. 142 to Feb. '43.
Iowa State College - Jan. '46 to June '48.
APPRAISAL EDUCATION:
Appraisal Courses I, II, IV and VI, Sponsored by the American
Institute of Real Estate Appraisers. Educare, jointly sponsored
by the American Institute of Real Estate Appraisers and the
Society of Real Estate Appraisers, and many seminars throughout
the country.
TEACHING EXPERIENCE:
Beginning in 1975 have taught Capitalization Theory and Tech-
niques, an intense course, now with three, 1 week modules, for
the American Institute of Real Estate Appraisers at various
Universities in the United States. Currently teaching Case
Studies in Real Estate Valuation and Valuation Analysis and
Report Writing, an intense 2 week course, also for A.I.R.E.A.
Have taught a number of seminars on appraisal topics locally
and otherwise.
EXPERIENCE:
Dec. 149 to April '52 employed by the Federal Housing Adminis-
tration as construction examiner, work consisting of estimat-
ing construction costs of all types of residential construct-
ion, compliance inspections and supervision of single family
units and apartment rental projects.
April '52 to present, self-employed, immediately after leaving
FAA, work consisted of buying and selling unimproved and
improved properties, designing and building homes, as well as
designing and estimating for others. Along with this work,
limited appraisals for others were being made. Assigned to
the Veteran's Administration Fee Appraisers Panel Jan. 1, 1955.
Also assigned as an FHA Fee Appraiser. Work since January 1,
1955 has been limited to appraising of real estate and consult-
ation. Properties appraised consist of all types of real est-
ate, including residential ( single family through large, high-
rise apartment buildings ), commercial, office; industrial,
institutional, rural properties, and subdivision lands in
suburban and urban areas. Qualified in several District Courts,
in the State of Iowa, and the United States District Court, as
an expert 'witness in cases involving eminent domain. Clients
have consisted of the U.S. District Attorney, Southern District
of Iowa, Iowa Department of Transportation, numerous Lawyers,
Individuals, Corporations such as I.B.M., General ifills,
Western Electric and Etc., Ford Motor Company, many banks,
a number of savings and loan associations, insurance companies,
and many others.
Designated as a Senior Real EstateAnalyst, Society of Real
Estate Appraisers ( S.R.E.A. )
IIICROFIL14ED BY
--JORM IMIC RfSCA6- 1 ,�
I CEDAR RAPIDS • DES MOTIFS
I
CERTIFICATION
r,
I
28
A member of the Appraisal Institute ( M.A.I. ), 1964
Past president, Iowa Chapter f 34, American Institute of Real
Estate Appraisers, and Des Eoines Chapter #47, S.R.E.A.,
Vice President, North Central Region, American Institute of
Real Estate Appraisers,1973 and 1974. Chairman, National
Finance Committee, Member of the Executive Committee, 1976 and
1977, American Institute of Real Estate Appraisers.
The American Institute of Peal Estate Appraisers conducts a
voluntary program of continuing education for its designated
.members. MAI's and MM's, who meet the minimum standards of this
program are awarded periodic educational certification.
I am certified under this program through December 31, 1983.
I
On February 14, 1983, Robert W. Jansen, City Attorney of Iowa City, Iowa,
filed an administrative hearing complaint with this department on behalf of
the City of Iowa City, Iowa. In his administrative hearing complaint, Mr.
Jansen charged that these violations occurred in the establishment known as
Wilke's, at 122 Wright Street, Iowa City, Iowa: on November 6, 1982, licensee,
or his employees, possessed unlawful gambling devices, and unlawful gambling
was conducted by licensee, or his employees, contra to sections 123.49(2)(a),
123.49(2)(j), 998.15, 725.9(4), Iowa Code, and administrative rules 150-4.7(1),
and 150-4.9.
An administrative hearing was held concerning Mr. Jansen's administrative
hearing complaint in front of William Armstrong, the director's designated
hearing officer, in the department's central office in Ankeny, Iowa, on Friday,
March 18, 1983. David E. Brown, Assistant City Attorney of Iowa City, towa,was
present on behalf of the city of Iowa City, Iowa, and presented the case against
the licensee. Licensee Christopher S. Wilke and his attorney, Larry L. Fugate,
Iowa Ctty, Iowa, were present. Mr. Brown called Iowa City, Iowa Police Officers
James Linn and Paul Sueppel as witnesses. Licensee Christopher Wilke did not
testify, and Mr. Fugate did not call anyone as a witness for licensee.
STATEMENT OF FACTS
At 11:15 a.m. on Saturday, November 6, 1982, Iowa City, Iowa Police Officers
James Linn and Paul Sueppel, and James Whalen, Special Agent for the Federal
Bureau of Investigation, entered Wilke's with a Federal search warrant to
search the person of Rudolph Scheler, licensee's manager, for unlawful gambling
paraphernalia. Mr. Scheler was sitting at the bar when the three police officers
entered. The police officers found these items directly in front of Mr. Scheler
on the bar: a notebook containing information Mr. Scheler used for gambling
purposes, and a piece of paper bearing the words "Plaza Hotel Casino". The
police officers found these items on Mr. Scheler's person: $1,068 in cash,
two notebooks containing information Mr. Scheler used for gambling purposes,
1r
141CROFIL14ED BY -�
1 - JORM -MICROLAB 1
CEDAR RAPIDS • DES MDINES
I i
?4$kz
9
1
I
I
I
I
I
o0vc+c0uu0l Oou"uwlusul
IL 1�
HON. TERRY E SRANSTAO.GOVERNOR II
• AIY .0 Y> IOWA
�I► �.
BEER & LIQUOR CONTROL OEPARTM WW 1VY1
V,IC ip,
:1••1 ,•l Cl •K.SfN
.. c-' n
1111 S.E. HULSIZER AVE MAY
I`le.x
'" '
1
ANKENY. IOWA 50021
515-944-61131)DIVISION
ucENSINGmV1MARIAN K. KARR
(3)
Christopher S. Wilke
DOCKET NO. 83-L-000CLERK
d/b/a Wilke's
,
122 Wright Street
Iowa city, Iowa 52244
0 R 0 E R
Liquor License LC -13010
On February 14, 1983, Robert W. Jansen, City Attorney of Iowa City, Iowa,
filed an administrative hearing complaint with this department on behalf of
the City of Iowa City, Iowa. In his administrative hearing complaint, Mr.
Jansen charged that these violations occurred in the establishment known as
Wilke's, at 122 Wright Street, Iowa City, Iowa: on November 6, 1982, licensee,
or his employees, possessed unlawful gambling devices, and unlawful gambling
was conducted by licensee, or his employees, contra to sections 123.49(2)(a),
123.49(2)(j), 998.15, 725.9(4), Iowa Code, and administrative rules 150-4.7(1),
and 150-4.9.
An administrative hearing was held concerning Mr. Jansen's administrative
hearing complaint in front of William Armstrong, the director's designated
hearing officer, in the department's central office in Ankeny, Iowa, on Friday,
March 18, 1983. David E. Brown, Assistant City Attorney of Iowa City, towa,was
present on behalf of the city of Iowa City, Iowa, and presented the case against
the licensee. Licensee Christopher S. Wilke and his attorney, Larry L. Fugate,
Iowa Ctty, Iowa, were present. Mr. Brown called Iowa City, Iowa Police Officers
James Linn and Paul Sueppel as witnesses. Licensee Christopher Wilke did not
testify, and Mr. Fugate did not call anyone as a witness for licensee.
STATEMENT OF FACTS
At 11:15 a.m. on Saturday, November 6, 1982, Iowa City, Iowa Police Officers
James Linn and Paul Sueppel, and James Whalen, Special Agent for the Federal
Bureau of Investigation, entered Wilke's with a Federal search warrant to
search the person of Rudolph Scheler, licensee's manager, for unlawful gambling
paraphernalia. Mr. Scheler was sitting at the bar when the three police officers
entered. The police officers found these items directly in front of Mr. Scheler
on the bar: a notebook containing information Mr. Scheler used for gambling
purposes, and a piece of paper bearing the words "Plaza Hotel Casino". The
police officers found these items on Mr. Scheler's person: $1,068 in cash,
two notebooks containing information Mr. Scheler used for gambling purposes,
1r
141CROFIL14ED BY -�
1 - JORM -MICROLAB 1
CEDAR RAPIDS • DES MDINES
I i
?4$kz
9
1
I
I
I
I
I
-2-
four football line sheets which were filled in, five sheets of paper which con-
tained names of universities, numbers and dollar amounts, and two filled-in
copies of the line sheet of sports activities which were found under the tele-
phone behind the bar.
Officer Linn, while checking the area behind the bar, observed a patron
come behind the bar and take papers from under the telephone behind the bar in
an attempt to hide the papers from the police officers. Officer Linn secured
the papers from the patron. The papers were seventeen copies of a line sheet
which had on it these athletic events: five NBA professional basketball games
played November 4, 1982; five NHL professional hockey games played November 4,
1982; seven NBA professional basketball games played November 5, 1982; two NHL
professional hockey games played November 5, 1982; eight NBA professional bas-
ketball games played November 6, 1982; eight NHL professional hockey games
played November 6, 1982; four NBA professional basketball games played November
7, 1982; six NHL professional hockey games played November 7, 1982; thirty-six
college football games played on November 6, 1982; thirteen NFL professional
football games played on October 24, 1982; and one NFL professional football
game played October 25, 1982.
Around 11:20 a.m., Officer Seuppel and Agent Whalen went to the hallway in
the rear of the establishment with Mr. Scheler. Officer Linn stayed to the bar
area next to the phone. Eight'calls were made to this phone 1n the hour period
beginning at 11:20 a.m. and ending at 12:20 p.m., and Officer Linn answered all
eight calls. Seven people made these eight calls; one person called twice. All
seven people asked for "Rudy", Mr. Scheler's nickname, and Officer Linn told the
seven callers that Rudy was not available and that he (Officer Linn) was taking
the action. Two of the seven callers did not place bets. Five callers made bets
on sports events by placing six calls (one person called twice and placed bets
both calls). These eight calls were made: first call, caller placed sixteen bets;
second call, caller placed four bets; third call, caller placed one bet; fourth
call, caller did not place a bet; fifth call, caller (same person who made the
first call) made twelve more bets; sixth call, caller made one bet; seventh call,
caller did not place a bet; and eighth call, the caller placed one bet. Thus, 1n
the hour which Officer Linn answered the phone, five people placed thirty-five bets
by placing six calls. Most of the bets taken by Office Linn over the phone during
this hour were given to Officer Linn in jargon which is under Iod W IsonE who
I`Jp MIIAY 131983
MARIAN K. KARR
CITY CLERK (3)
)
1
141CROFILMED BY
J - JORM'-MICRdLAB
i
CEDAR RAPIDS DES Id01YE5 I i
' I!
19442.
fr,
3
make and accept bets: some of the callers placed 25d bets which meant that they
were really making $25.00 bets, and some $20.00 bets were made which were really
$200.00 bets.
CONCLUSIONS OF LAW
Licensee, by and through the actions of his manager, Mr. Scheler, violated
on November 6, 1982, sections 123.49(2)(a), 123.49(2)(j), 99B.15, 725.9(4), Iowa
Code, and administrative rules 150-4.7(1) and 150-4.9 by conducting the gambling
activities and by possessing the gambling devices.
Section 123.30, Iowa Code, which authorizes warrantless searches of li-
censed establishments, gave OfficarLinn the authority to obtain the evidence `
he received by taking the eight phone calls which were intended for Mr. Scheler.
The evidence Office Linn obtained by taking the telephone calls was not secured
by an illegal search and seizure, and this evidence is admissible.
In his closing argument at the administrativelearing on March 18, 1983, Mr.
Brown recommended to this hearing officer, on behalf of the city of Cora City,
Iowa, that this liquor license should be revoked. This department agrees with i
the city of Iowa City, Iowa that a revocation is warranted in this case. This
liquor license expired at midnight on April 9, 1983; licensee did not file a
i
a renewal liquor license application; no new liquor license or beer permit has
been issued for this premise since April 9, 1983; thus, there has not been a i
liquor license or beer permit at this premise since April 9, 1983. The effective
I
date of the revocation is being backdated to April 30, 1983.
Under the authority of section 123.39, subsection 2, Iowa Code, this de-
partment Is hereby revoking liquor license LC -13010 effective April 10,1983,
because licensee Christopher Wilke, by and through an employee or agent, con-
ducted unlawful gambling activities and possessed unlawful gambling devices on
November 6, 1982. Pursuant to section 123.40, Iowa Code, licensee Christopher
Wilke cannot hold a liquor license or beer permit in Iowa until April 10, 1985,
i
and a liquor license or beer permit cannot be issued to anyone until April 10,
1984, for the premise at 122 Wright Street, Iowa City, Iowa, which was covered by
Mr. Wilke's liquor license (LC -13010)
Mr. Wilke may appeal this order by sending William Armstrong in this depart-
ment a Notice of Appeal, which Mr. Armstrong receives on or before June 15, 1983,
1n which Mr. Wilke appeals this case under the authority of section 123,32, sub-
section 4, Iowa Code, to the department's hearing board establ hed On sictiq
123.15, Iowa Code. MAY 1 31983
MARIAN K. KARR
CITY CLERK (3)
97�
i MICROFILMED BY +
)--""JORM-MICR(SLAB_-
CEDAR RAPIDS DES MOINES
f
.A_
If Mr. Armstrong receives a Notice of Appeal from Mr. Wilke on or before June 15,
1983, the hearing board will hear this case in Ankeny, Iowa, and will render a
decision.
Dated this 12th day of May, 1983, in Ankeny, Iowa.
IOWA BEER b LIQUOR CONTROL DEPARTMENT.
BY
o lana A. mll&ner. Director
BY Wi am nnstrong, Hear nng" f ce
Copies to: Larry Fugate
Attorney at Law
Iowa City, Iowa
Dave Brown
Attorney at Law
Iowa City, Iowa
Robert Jansen, City Attorney
Iowa City, Iowa
Abbie Stolfus, City Clerk
Iowa City, Iowa
Sue Riebl, KKIC Radio Station
Iowa City, Iowa
Don Milson, NMT Radio Station
Cedar Rapids, Iowa
r'—
I
j I41CROFILMED BY
i' JORM "MICR;L-A 13".
CEDAR RAAIDS DES MOIYES
( 0 1 1 M
MAY 131983
MARIAN K. KARR
CIN CLERK (3)