Loading...
HomeMy WebLinkAbout1980-12-16 Info PacketE _11 .. Johnson Cnty Council of Governr.­-its 410EVATlirigionSl bAoCity Wo52210 rr i0 W Dae ff It December 1, 1980 Dear Council Member: As you know, the meeting with our local legislators, originally scheduled for November 22nd, has now been re -scheduled for 10:00 a.m. Saturday, December 13, 1980. .; The JCCOG is sponsoring this first meeting. Invitations are being sent to all area legislators and we hope to have many attend. In order to make this meeting meaningful, I urge you to come and to meet the new and re-elected legislators. I feel that it is important for community leaders to establish contact with their legislators; this meeting will be one opportunity to show the legislators that we, indeed, wish to help them make decisions. In case you have specific items to discuss, kindly call Karin Franklin, 354-1800, ext. 312, by December 8, 1980. Best reg ds] P1. Kat hee Temporary Chairman (Mayor of Coralville) tpl/2 Invitations to: Mayors in Johnson County Johnson County Supervisors Members of JCCOG i Superintendents in Johnson County 1 e, 1 a it . MICROFILMED BY JORM MICR+LA9 a " i CEDAR RAPIDS • DES MOINES 1. W Dae ff It ' y � RECOMMENDATION DESIGN REVIEW COMMITTEE DECEMBER 4, 1980 RECREATION CENTER, ROOM A MEMBERS PRESENT: Wockenfuss, Lilly, Lafore, Summerwill, Alexander. MEMBERS ABSENT: Seiberling, Haupert, Sinek, Wegman. STAFF PRESENT: Hauer, Chiat, Tyler. GUESTS PRESENT: Don Scatena and Jack Klaus, Old Capitol Center Partners; Curt Seifert, Press -Citizen; Lyle Muller, Daily Iowan. RECOMMENDATION TO THE CITY'COUNCIL: Representatives from Old Capitol Center Partners presented preliminary design plans for the Old Capitol Center logo. After discussion, the Design Review Committee made the following recommendation to the City Council: That the Design Review Committee sets out the following reservations concerning the Old Capitol Center logo: 1. That a deeper shade of blue in the arch would be more satisfactory, and 2. That the letter style, to an extent, lacks sufficient legibility; nevertheless, the Committee recommends the approval of the concept of the logo design. SUMMARY OF DISCUSSION Don Scatena, representing Old Capitol Center Partners, stated that he had met with the designers for Old Capitol Center and relayed the Committee's concerns to them. The main areas discussed were the complete redesign of the logo, color variations, and changing letter styles. He reported that the designer took, the position that the logo as originally designed was preferable to the Committee's suggestions. He pointed out that under the concept of the logo that the curved arch reappeared throughout the entire design of the shopping center. To illustrate his point, he presented two des.ign sketches of the center's interior. In the area of color variation, he pointed out that blue tile will be used as feature strips in the center's interior. He also stated that the designer had been opposed to changing the letter style to Helvetica because of the serif features of the logo design. aa69 I. MICROFILMED BY JO RM MIC R+LAE3 ^ 4 ij CEDAR RAPIDS DES MOINES S D Design Review Committee December 4, 1980 Page 2 Members of the Committee responded that they had no objections to the design itself and that they would not request a developer to redesign a logo at such an advanced stage. In fact, they felt the design was attractive. Their objections were with the color. Specifically, they objected to the shade of blue. Members ascertained that other shades of blue are available. Scatena rejoined that this particular shade was felt to be the most complimentary. Members further ascertained that a different shade of blue will be used in the tile which will form the feature strip in the interior. They pointed out that the sign could be made the same darker color which would be more attractive and more consistent with the shopping center itself. Scatena stated that he had to respect the designer's opinion on color. He stated that HSA of Chicago had designed Younker's and the interior of the shopping center as well as the exterior signage and they were concerned with keeping the design consistent. Scatena pointed out that the blue in the logo would be the only color in the building's signage during the day. Members stated frankly that they felt the blue color was tacky and plastic looking and undercut the general good design of the structure itself. Wockenfuss stated that a gold arch or a painted blue arch, with back lighting which matched the interior tile, would be much richer looking. Wockenfuss added that the Committee had recommended a different letter style because they felt it was more readable, however, it was the builder's choice if they desired a less legible sign. He stated that the Committee also had recommended a different color to avoid the garish look of the bright blue. He opined that it was a mistake to use the process blue which would cheapen the look of the building. Other members stated that they feared people would tire of the color. Alexander moved that the Committee express their thanks for Old Capitol Center Partners' efforts to reach a compromise with the designer and for their presentations to the Committee, and the Committee recommends to Council the acceptance of the proposed Old Capitol Center logo. The motion died for lack of a second. Members stated that they did not feel they could recommend the logo without qualification. They did not want to put their stamp of approval on a sign to which they had objections. Wockenfuss added that he felt the designer should have actually made a design based on the Committee's recommendations in order to allow the developer to objectively choose between the two designs. Scatena rejoined that he felt the designer had given an honest reaction to the Committee's suggestions. Members were somewhat divided on the issue of lettering. Alexander felt rather strongly that Lubalin should not be used, whereas Summerwill stated that she had no real objections; although the Helvetica was more readable. MICROFILMED BY JORM MIC R+L -B CEDAR RAPIDS • DES MOINES aa� 9 i i I i 11�) Design Review Committee December 4, 1980 Page 3 Alexander moved that the Committee express their thanks to Old Capitol Center Partners for their efforts to reach a compromise with the designer and for their presentations to the Committee and that the Committee sets out the following reservations concerning the Old Capitol Center logo: 1. That a deeper shade of blue in the arch would be more satisfactory, and 2. That the letter style, to an extent, lacks sufficient legibility; nevertheless, the Committee recommends the approval of the concept of the logo design. Wockenfuss seconded. The motion carried unanimously. scatena and Klaus thanked the Committee for their time and stated that they felt they had been fairly and professionally treated throughout the entire process. .._, as 6 9 , MICROFILMED BY JORM MICR+LA6 CEDAR RAPIDS • DES MOINES _ rF � I r� 1 I I " 1. I i y F a a 11�) Design Review Committee December 4, 1980 Page 3 Alexander moved that the Committee express their thanks to Old Capitol Center Partners for their efforts to reach a compromise with the designer and for their presentations to the Committee and that the Committee sets out the following reservations concerning the Old Capitol Center logo: 1. That a deeper shade of blue in the arch would be more satisfactory, and 2. That the letter style, to an extent, lacks sufficient legibility; nevertheless, the Committee recommends the approval of the concept of the logo design. Wockenfuss seconded. The motion carried unanimously. scatena and Klaus thanked the Committee for their time and stated that they felt they had been fairly and professionally treated throughout the entire process. .._, as 6 9 , MICROFILMED BY JORM MICR+LA6 CEDAR RAPIDS • DES MOINES _ I i I I " 1. ,0` ■ i City of Iowa Ci:, MEMORANDUM Date: November 20, 1980 To: City Manager and City Council From: Jim Hencin, CDBG Program Coordinator Bette Meisel, Senior Center Coordinator $ Re: Office Space for City Employees in Senior Center In May of this year you accepted bids for remodeling the Senior Center. You also agreed to accept the alternate for completion of the third floor at a cost of $27,000. The reasoning was that since the bids came in lower than expected, and since there were funds available to cover the additional work, it would be cost effective to spend the money now. It has been established that only one room on the third floor would be needed at this time for the Senior Center Program. However, our projection was that in three to five years the program will develop to the point that the remaining rooms would be needed for classroom and office space. Rather than leave almost an entire floor vacant for this period, we conceived the idea of using the vacant office space to house all City employees now located at the Davis Building. However, since the major portion of the funding for the remodeling of the Senior Center is being paid for with CDBG money, the City cannot use this space for non -Senior Center programs and personnel without cost. There are two possible solutions to this problem: a. Additional CDBG money could be allocated to pay for carpeting, blinds and electrical outlets. The Senior Center would then rent the space to the City. The rent money would then go back into the CDBG fund to be used for other projects. b. The City could pay for the remodeling of the second floor ($27,000 plus carpeting, blinds, partitions and electrical outlets) out of local funds and pay no rent for the use of this space. To evaluate the suggested solutions, you need to take the following facts into account: 1. The average annual cost per square foot of the Davis Building is $5.28 or $24,096.60 per year. This price includes heat and hot and cold water. It does not include electricity or janitorial services. 2. The Davis Building is neither energy effective nor handicapped accessible. 3. The contract for the Davis Building is renegotiable each year. Thus, we can expect to pay an increase in rent each year. 4. Using the new federal post office as comparable quality space as will be available in the Senior Center, we find that the cost is $7.50 per square foot per year. This cost includes all utilities and janitorial services. Furthermore, it is handicapped accessible. MICROFILMED DY JORM MIC R;LAB CEDAR RAPIDS • DES MOINES M i PA 5. Using the $7.50 per square foot per year figure as the fair market price for rental of the Senior Center space (approximately 3,094 sq. ft.), the cost to the City per year would be $23,205. This includes all utilities and janitorial service. 6. If the City were to pay the entire cost of remodeling the third floor of the Senior Center (approximately $52,887.16), it would amortize its investment in two years and then enjoy one to three years of rent free usage. (See attached memo). Sq. Ft. Amount of Building Cost Space Utilities Janitor Accessibility Davis Hotel $5.281 4,380 sq. ft.2 .97 .56 No Senior Center 5.87 3,094 1.00 .63 Yes 1. 3,580 sq. ft. on first and second floors at $5.64. 800 sq. ft. on third floor at $4.92. 2. This includes hallway and restrooms. Davis Building The figure for electricity is an estimate as only 1978 figures are available. The figure for janitorial services is figured at $5.50 per hour, seven hours per week. Senior Center The figure for utilities is based on estimates obtained last year from Iowa -Illinois, etc. The figure for janitorial helpis based on a Maintenance Worker II at $6.28 per hour and a temporary employee at $3.50 per hour pro rated for the amount of space on the third floor. bdw/sp MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES i i d. a 0 City of Iowa C1. MEMORANDUM Date: November 20, 1980 To: City Manager and City Council From: Bette Meisel, Senior Center Coordiantor y Re: Cost of Remodeling Third Floor Senior Center .In order to efficiently utilize the third floor of the Senior Center for Offices for City employees, four additional expenses have to be considered: floor treatment, window treatment, partitions and electrical work. Windows - New windows are being installed as part of the original bid. However, all 47 windows will need to be covered for light and energy control. To be consistent with the rest of the building louvre blinds would be installed. The following price is an estimate and includes installation. 47 windows - $4,526.84 Carpet na - The existing floors are covered with tile. Because the ceilings are high and all surfaces presently have no sound absorbing qualities, carpeting is necessary to make this a quiet work environment. The carpeting used would have to have the same fire resistant qualities as that used on the other floors. The following price includes installation, but does not reflect inflation. 344 square yards at $12.90/yard - $4,437.60 Partitions - the offices on this floor provide spaces for 2-7 persons per area. For a productive work environment spaces need to be compartmentalized. 69 panels and fittings - $7,847.80 Elec_ trical - The present offices have 1 electrical outlet per office whether there is space for one employee or 7 employees within that space. They also have only one overhead lighting fixture. We requested a price for 1 additional double convenience electrical outlet per employee. We will thus have the capability of handling desk lamps and calculators. 31 duplex electrical outlets - $4,267 Cost of remodeling Senior Center third floor: Basic work - $27,000:00 Windows - 4,526.84 Carpet - 4,437:60 Partitions - 7,847.80 Electrical - 4 267.00 48,079 4 807.92 10% Contingency 52,88 . tp/sp MICROFILMED BY JORM MICR+LAS CEDAR RAPIDS • DES MOINES i City of Iowa CL r---- MEMORANDUM Date: November 20, 1980 To: City Manager and City Council From: Rosemary Vitosh, Director of Finance R� Re: Funding for Remodeling of Third Floor, Senior Center In view of the potential savings in rent in future years as a result of moving City staff from the Davis Building to the third floor of the Senior Center, I recommend that the City pay for the remodeling costs for the third floor. Unappropriated funds are available in the fund balance of the General Fund. The City Council has discussed retaining these unappropriated funds for the funding of are not paid by F theCity, it ill thenY82 budget expenditures. �erremodeling necessary to pay renttoosts the Senior Center in FY82. The FY82 Budget will then have to include approximately $24,000 in rental costs. However, if the City pays the remodeling costs, nothing would budgeted in FY82 for rental costs and this would reduce the FY82 Budget and likewise the FY82 funding needs by $24,000. The total that City staff willnbeYapproximately offices58l onthe afor a ssumethird floor e earandhat of the third floor,pthisdmeanstthatttheCCitypwill savehover as for te m$75,000 in rental costs over that five year period. Because we expect limited revenues in the future, it would be financially prudent for the City to pay for the remodeling in this fiscal year (FY81) in order to save future rental costs. bc4/1 MICROFILMED BY JORM MIC R;LAB CEDAR RAPIDS • DES MOINES r i j' 1 i City of Iowa CL r---- MEMORANDUM Date: November 20, 1980 To: City Manager and City Council From: Rosemary Vitosh, Director of Finance R� Re: Funding for Remodeling of Third Floor, Senior Center In view of the potential savings in rent in future years as a result of moving City staff from the Davis Building to the third floor of the Senior Center, I recommend that the City pay for the remodeling costs for the third floor. Unappropriated funds are available in the fund balance of the General Fund. The City Council has discussed retaining these unappropriated funds for the funding of are not paid by F theCity, it ill thenY82 budget expenditures. �erremodeling necessary to pay renttoosts the Senior Center in FY82. The FY82 Budget will then have to include approximately $24,000 in rental costs. However, if the City pays the remodeling costs, nothing would budgeted in FY82 for rental costs and this would reduce the FY82 Budget and likewise the FY82 funding needs by $24,000. The total that City staff willnbeYapproximately offices58l onthe afor a ssumethird floor e earandhat of the third floor,pthisdmeanstthatttheCCitypwill savehover as for te m$75,000 in rental costs over that five year period. Because we expect limited revenues in the future, it would be financially prudent for the City to pay for the remodeling in this fiscal year (FY81) in order to save future rental costs. bc4/1 MICROFILMED BY JORM MIC R;LAB CEDAR RAPIDS • DES MOINES r i j' i -1 1.04 i I t d Tom. City of Iowa MEMORANDUM Date: December 3, 1980 To: City Manager and City Council From: 4 Jim Hencin, CDBG Program Coordinator Re: Status of Spouse of Abuse Shelter In December 1979, the City Council approved an agreement that permitted Aid and Alternatives for Victims of Spouse Abuse (AAVSA) to purchase and rehabilitate a house for use as an emergency shelter for victims of spouse abuse. Under the agreement, the City provided $80,000 from the CDBG program for this project. I am pto rort that the leted the September p30, 1980 d adline specifiedrinetthe amendedmct was agreement The Department of Housing and Inspection Services inspected the shelter and has certified that it meets Code requirements. Susan Dickinson, Director of the Spouse Abuse Shelter, reported in October that six adults with a total of seven children had been provided emergency shelter and services during the first 10 days of operation, Please, let me know if there are any questions concerning this project. tp2/8 MICROFILMED RY JORM MICR;LAO 1 'i CEDAR RAPIDS • DES MOINES B1 1 I City of Iowa C: "y MEMORANDUM Date: December 5, 1980 To: City Manager and City Council From: Rosemary Vitosh, Director of Finance Re: Purchase of Outstanding Water Revenue Bonds I have authorized the purchase of $17,000 of Water Revenue Bonds which are being offered for sale by the bond holder. When the Water Revenue Bond and Interest Reserve Funds has an excess balance, the bond resolution states that the excess maybe used to call (purchase) any outstanding bonds. $12,000 of the bonds are being purchased at a price of 92 and accrued interest and $5,000 of the bonds are being purchased at a price of 87 and accrued interest. Total cost of this purchase equals $15,390 plus the accrued interest. By calling these bonds before their maturity date, the City will save $1,610 in principle payments and $1,473 in interest payments (the bonds maturity dates were December 1, 1982 and December 1, 1983). Total savings to the City is $3,083. If the City did not purchase the outstanding bonds with the excess fund balance, a bondholder would have the right to come in and force the City to purchase outstanding bonds at par plus accrued interest. It is to the City's advantage to purchase outstanding bonds when they are offered for sale by a bondholder as this enables the City to purchase at a price less than par value. tp5/2 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES Is I. i 'i t i i t l [p Y I City of Iowa C: "y MEMORANDUM Date: December 5, 1980 To: City Manager and City Council From: Rosemary Vitosh, Director of Finance Re: Purchase of Outstanding Water Revenue Bonds I have authorized the purchase of $17,000 of Water Revenue Bonds which are being offered for sale by the bond holder. When the Water Revenue Bond and Interest Reserve Funds has an excess balance, the bond resolution states that the excess maybe used to call (purchase) any outstanding bonds. $12,000 of the bonds are being purchased at a price of 92 and accrued interest and $5,000 of the bonds are being purchased at a price of 87 and accrued interest. Total cost of this purchase equals $15,390 plus the accrued interest. By calling these bonds before their maturity date, the City will save $1,610 in principle payments and $1,473 in interest payments (the bonds maturity dates were December 1, 1982 and December 1, 1983). Total savings to the City is $3,083. If the City did not purchase the outstanding bonds with the excess fund balance, a bondholder would have the right to come in and force the City to purchase outstanding bonds at par plus accrued interest. It is to the City's advantage to purchase outstanding bonds when they are offered for sale by a bondholder as this enables the City to purchase at a price less than par value. tp5/2 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES Is I. b 'i t ■ The Unlveraity of Iowa Iowa City•lowa 52212 Gerard P. Woeg Computing Center Lindquist Center for Measurement (310) 353.3170 I RECENED is -'i 2 J '680 November 18, 1980 Mr. Neal Berlin City of Iowa City 410 East Washington Iowa City, IA 52240 Dear Mr. Berlin: As the installation date far the city computing system approches and the involvement of the Weeg Computing Center draws to a close, '1' want to say how pleasant and enlightening it was to work with Rosemary' Vitosh, Cathy Eisenhofer, and Monica Uthe during the specification and acquisition phases of the computer project. These days many people complain about inefficiencies in government administration at all levels. I think these complaints arise, in large part, from people who have little or no appreciation for what it takes to make it all work! My association with the city these past months has made me aware of some of the many problems and challenges you face. I am pleased, as a taxpayer, that the city has such capable and dedicated employees as Rosemary, Cathy, and Monica. I am sure with their support and your leadership the new computer system will meet your expectations. Sincerely, )w"Zh 97v—tk Mike Noth Assistant Director Weeg Computing Center MN/ma CC:Jim Johnson, Director MICROFILMED BY DORM MICR+LA13 CEDAR RAPIDS • DES MOINES 1041 1 VEENSTRA & KIMM, INC. I NGINI 11), I'1 P1NN1:11S +; :vl '.I 1..❑r 1'•Rll uii. �i '.'.I. ',I RIII December 1, 1980 Neal G. Berlin City Manager City of Iowa City Civic Center 410 East Washington Street Iowa City, Iowa 52240 RIVER CORRIDOR SEWERS PROJECT WEEKLY PROGRESS REPORT NO. 20 This is to report progress on the River Corridor Sewers project for the week ending November 29, 1980, and to provide information regarding the contractor's plans for the weeks ahead. This was a short week due to the Thanksgiving holiday. Work was terminated Wednesday noon. i Crew No. 1 completed the installation of 36 -inch pipe in Dubuque Street from Park Road to Taft Speedway. The upstream manhole was constructed at Taft Speedway. Four -lane traffic was restored on Dubuque Street. This crew will now move back to the municipal water plant. Crew No. 2 spent the week backfilling curbs in the new pavement on Madison Street from Iowa to Bloomington. Crew No. 2 will return to Riverside. Drive this week. Metro paved the Iowa Avenue intersection. This completes Metro's major paving operation until next spring. However, the inlet builder will remain on the job until ail inlets are built on Madison Street. U6I continued working on driveways and sidewalks along Madison Street. The driveways and sidewalks to the University parking ramp were poured. The ramp should be opened early this week. ENI & KIM�21NC. ( 'J. W. Kimco < <L JWK: jk 11648 cc: Charles J. Schmadeke W. L. Levay I MICROFILMED BY JORM MICR+LA6 w CEDAR RAPIDS • DES MOINES I i r i i i i .I f t n MANAGEMENT BY OBJECTIVES DEPARTMENT: CITY MANAGER DECISION UNIT: ENERGY CONSERVATION PROGRAM QUARTER: FIRST Fiscal Year Objectives: I. Update building inventory and analyze the energy consumption of buildings, July -September. 2• Conduct walk-through energy audits, September -April. 3. Arrange for Technical Audits of buildings, timetable undetermined. 4• Update division vehicle assignment and establish fuel use data base, July -September. 5• Identify vehicle assignment and operating changes, October -December. 6. Explore alternative fuel and smaller vehicle purchase, August - December. 7• Monitor solar collector performance, ongoing for entire year. 8. Disseminate energy conservation information to City employees, as needed. Work Completed: The compilation of the building energy use data was completed and the computer analysis will be completed during October. A cost estimate was obtained, from Sta-Fed, on a new motor vehicle printout showing fuel use by fuel type for each division. They quoted $1,050 for the programming alone and this will wait until the City's in-house computer is available. The conversion Of 18 vehicles to compressed natural gas was reviewed: 21 month payback and net yearly benefit of $35,000. - Federal funding sources for the compressed natural gas were investigated; none available. conversion The generation of methane at the new pollution control plant, for use in the natural gas vehicles, was investigated; too expensive; pelletizing the sludge and burning it in a solid waste incineration plant looks more feasible. The question of whether the City could switch motor fuel suppliers, because of price differences, without jeopardizing the base period allocation crucial for shortage situations was investigated. The City can switch suppliers or purchase "surplu FY82 was reviewed. s" fuel from other suppliers without jeopardizing its base period allocation. The Equipment Superintendent's equipment replacement proposal rot, Bids were taken and contracts awarded for the two solar grant homes. Construction is nearly completed on the greenhouse and construction Will begin on the liquid collector an October 20. Construction was monitored and photographs taken. Energy conservation information has been distributed to City employees monthly. These newsletters have been prepared by interns. An intern conducted a carpool survey Of City employees and helped form carpools for those interested. Plans and specifications of new Civic Center HVAC system were reviewed and commented on. MMi aa7s MICROFILMED BY JORM MICR#LA9 CEDAR RAPIDS • DES MOINES I n The Energy Program Coordinator participated in the CIP review process and attended a Conference of Local Energy Officials. Staffing was provided for the Resources Conservation Commission. Analysis: the building energy audits are behind schedule, due to a variety of reasons: primarily, the delay in the solar grant project, the special questions raised concerning the motor vehicle fuel, and the problems with the State's energy audit grant program. The energy audits are expected to begin in November. Because of the problems with the State's energy audit grant program (they lost the City's information), technical audits of the buildings are in doubt. There may be another grant cycle this fiscal year (Spring, 1981) and, if so, application will be made for the State funds. With completion in the second quarter, much less time will be spent on the solar project. 1251.0: Expenditures Budget This Quarter % 6000 17,586.00• 3,824.25 21.746 7000 600.00 82.81 13.802 8000 12,100.00 1,346.58 11.129 9000 5,450.00 0.00 0.000 Total i I i I I 5,253.64 I i i 8153.0: Expenditures i This Quarter % n The Energy Program Coordinator participated in the CIP review process and attended a Conference of Local Energy Officials. Staffing was provided for the Resources Conservation Commission. Analysis: the building energy audits are behind schedule, due to a variety of reasons: primarily, the delay in the solar grant project, the special questions raised concerning the motor vehicle fuel, and the problems with the State's energy audit grant program. The energy audits are expected to begin in November. Because of the problems with the State's energy audit grant program (they lost the City's information), technical audits of the buildings are in doubt. There may be another grant cycle this fiscal year (Spring, 1981) and, if so, application will be made for the State funds. With completion in the second quarter, much less time will be spent on the solar project. 1251.0: Expenditures Budget This Quarter % 6000 17,586.00• 3,824.25 21.746 7000 600.00 82.81 13.802 8000 12,100.00 1,346.58 11.129 9000 5,450.00 0.00 0.000 Total 35,736.00 5,253.64 14.701 8153.0: Expenditures Budget This Quarter % 6000 2,000.00 658.04 32.902 7000 400.00 377.00 94.25 8000 0.00 196.72 - 9000 7,000.00 7.000.00 100.00 Total 9.400.00 8.231.76 87.572 MICROFILMED BY JORM MIC R+LA13 CEDAR RAPIDS • DES MOINES 4 I r r _\ MANAGEMENT BY OBJECTIVES DEPARTMENT: POLICE QUARTER: FIRST FY81 DECISION UNIT: ADMINISTRATION Fiscal Year Objectives: 1. Develop within budgetary limitations a downtown enforcement program. 2. Institute a priority system to respond to requests for service. 3. Establish a block -watch and other anti -vandalism programs. 4. Explore the possibilities of a crime prevention program. Work Completed: 1. Partial program developed -- specifically for high usage hours and occasions. 2. In progress and partially completed. 3-4. Partially completed. One officer trained in "crime -stopper" techniques. Literature being obtained on crime prevention programs from several sources. Analysis: Partial completion of FY81 objectives during the first quarter. It is extremely difficult to generate any enthusiasm for crime prevention among affected groups with the exception of the Northside Lighting group. Expenditures Budget This Quarter % 6000 j $18,219.00 22.37 I 3,164.00 561.30 17.74 8000 17,692.00 1,123.00 6.35 9000 0 700.40 0 Total $102,303.00 $20,604 20.14 r r _\ MANAGEMENT BY OBJECTIVES DEPARTMENT: POLICE QUARTER: FIRST FY81 DECISION UNIT: ADMINISTRATION Fiscal Year Objectives: 1. Develop within budgetary limitations a downtown enforcement program. 2. Institute a priority system to respond to requests for service. 3. Establish a block -watch and other anti -vandalism programs. 4. Explore the possibilities of a crime prevention program. Work Completed: 1. Partial program developed -- specifically for high usage hours and occasions. 2. In progress and partially completed. 3-4. Partially completed. One officer trained in "crime -stopper" techniques. Literature being obtained on crime prevention programs from several sources. Analysis: Partial completion of FY81 objectives during the first quarter. It is extremely difficult to generate any enthusiasm for crime prevention among affected groups with the exception of the Northside Lighting group. Expenditures Budget This Quarter % 6000 $81,447.00 $18,219.00 22.37 7000 3,164.00 561.30 17.74 8000 17,692.00 1,123.00 6.35 9000 0 700.40 0 Total $102,303.00 $20,604 20.14 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOVIES , i i L ' i r MANAGEMENT BY OBJECTIVES DEPARTMENT: POLICE QUARTER: FIRST FY81 DECISION UNIT: ANIMAL CONTROL Fiscal Year Objectives: 1. To prepare and implement a comprehensive animal control licensing program following passage of the revised animal control ordinance. 2. Graduation of officers from Animal Control Academy (April 1981). Work Completed: 1. Revised Animal Control ordinance adopted by City Council, October, 1980. Planning for licensing program underway. Analysis: Reduced staffing levels have greatly limited time and personal resources that can be allocated to the preparation and implementation of the licensing program. Expenditures Budget This Quarter % 6000 $65,670.00 $15,818.00 24.08 7000 • 5,350.00 1,299.00 24.28 8000 12,723.00 2,616.40 20.56 9000 1,200.00 2,736.00 227.95* Total $84,943.00 $22,469.00 26_45 *Includes prior year encumbrances. u MICROFILMED BY JORM MIC R¢LA0 CEDAR RAPIDS • DES MOINES i aa755" M A i I' i i i i MANAGEMENT BY OBJECTIVES ! DEPARTMENT: POLICE DECISION UNIT: CRIMINAL INVESTIGATION QUARTER: FIRST FY81 Fiscal Year Objectives: 1. To provide investigative and referral services not below those i provided in fiscal 1980. 2. To provide thorough and rapid investigative follow-up on all cases. 3. To improve investigative support, including crime prevention measures to the Patrol unit, to the extent allowed by resources. Work Completed: All objectives are continuous and are constantly modified to meet changing conditions and situations. Work is partially completed on all objectives. Analysis: I 1 Obvious alteration of individual circumstances, resource availability and service demands underscore the difficulty of a rapid achievement of the stated objectives. Expenditures Budget This Quarter 6000 $125,842.00 $29,221 23.22 ✓ '`+ 7000 13,865.00 786 5.67 i 8000 11,925.00 894 7.50 i 9000 0 568 0 Total $151,632.00 $31,470.00 20.75 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES as 75 MANAGEMENT BY OBJECTIVES DEPARTMENT: POLICE DECISION UNIT: PATROL QUARTER: FIRST FY81 Fiscal Year Objectives: 1. Respond to emergency and serious calls as rapidly as personnel and equipment allow. 2. Increase the effectiveness of Patrol in the follow-up of criminal investigations. Work Completed: 1. No significant reduction of response time has been noted. 2. Patrol is following-up on significantly more investigations in cooperation with the Detective Division with success. Analysis: The above stated objectives- can never be fully completed but should be regarded as a portion of the on-going development of the patrol unit's capabilities. Expenditures Budget This Quarter % 6000 $802,476.00 $182,402.37 22.73 7000 86,451.00 11,147.93 12.90 8000 47,870.00 8,661.35 18.10 9000 66,500.00 5,089.84 7.65 Total $1,003,297.00 $207,301.49 20.66 MICROFILMED BY JORM MICR¢LAB CEDAR RAPIDS • DES MOINES 1 I MANAGEMENT BY OBJECTIVES DEPARTMENT: POLICE DECISION UNIT: PATROL QUARTER: FIRST FY81 Fiscal Year Objectives: 1. Respond to emergency and serious calls as rapidly as personnel and equipment allow. 2. Increase the effectiveness of Patrol in the follow-up of criminal investigations. Work Completed: 1. No significant reduction of response time has been noted. 2. Patrol is following-up on significantly more investigations in cooperation with the Detective Division with success. Analysis: The above stated objectives- can never be fully completed but should be regarded as a portion of the on-going development of the patrol unit's capabilities. Expenditures Budget This Quarter % 6000 $802,476.00 $182,402.37 22.73 7000 86,451.00 11,147.93 12.90 8000 47,870.00 8,661.35 18.10 9000 66,500.00 5,089.84 7.65 Total $1,003,297.00 $207,301.49 20.66 MICROFILMED BY JORM MICR¢LAB CEDAR RAPIDS • DES MOINES 1 n MANAGEMENT BY OBJECTIVES DEPARTMENT: POLICE DECISION UNIT: CROSSING GUARDS/OTHER QUARTER: FIRST FY81 Fiscal Year Objectives: I. To reduce operating costs through an analysis of school crossing needs. 2. To assure the safe passage of children at guarded crossings. Work Completed: I. Operating costs reduced by Council/School Board actions. 2. Successful, so far. Analysis: Program costs remained an issue of political concern in the FY81 budget thus obviating national program analysis by the Administration. Expenditures Budget This Quarter 6000 $23,938 $2,426.60 10.14 7000 0 62.44 0.00 8000 0 368.37* 0.00 9000 0 0 0.00 Total $23,938 $2.857.41 _ 11.94 *Includes charges for electricity and maintenance of warning sirens. Iowa City has not been bomb activated. ed by enemy planes since the sirens were MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES a� 7$ i i i t. i I i I _ i 1 1 MANAGEMENT BY OBJECTIVES DEPARTMENT: POLICE I DECISION UNIT: RECORD & IDENTIFICATION QUARTER: FIRST FY81 Fiscal Year Objectives: 1. To provide for greater use of polygraphic, photographic and identifi- cation services. 2• To provide for timely and accurate production of reports and statistics. 3• To install and operate a computer-based records system if L.E.A.A. funds become available. Work Completed: I. Identification services usage increased by 10%. 2• Completed and undergoing continuous review. 3• Not applicable. L. E.A.A. is defunct for all intents and purposes. City owned computer is being examined as a possible alternative. Analysis: Substantial personnel reductions in the number of available clerk/typists coupled with some assignment of duties among remaining personnel make the successful completion of the above stated objectives difficult if not impossible, Expenditures Budget This Quarter _ 6000 $130,485 $29,585 22.67 7000 2,775 431 15.52 8000 18,081 1,387 7.67 9000 270 752 278.64 Total $151,611 $32.155 21_21 i I MICROFILMED 9Y JORM MICF1;LAB CEDAR RAPIDS DES MOINES K S'. MANAGEMENT BY OBJECTIVES DEPARTMENT: FIRE DECISION UNIT: ADMINISTRATION QUARTER: FIRST Fiscal Year Objectives: I. To implement preparation of a comprehensive training manual. 2. To develop a program for human relations training in the Fire Department. 3, To develop a long-range planning program as to the needs of the community and assignment of personnel. Work Completed: 1• Some preliminary work has been done identifying reference material. 2• Work on a human relations program will now get underway with the newly appointed DirectorThe deartment . 3 in Putt ng together a long gerange ec community needs manual. material which will of assistance Analysis: Work on FY81 objectives in proceeding satisfactorily although most areas are still very much in the preliminary preparation stage. Expenditures Bud et —L % This Quarter i _ 6000 32,146.00 10,921.94 33.976 7000 1,986.00 620.52 31.245 8000 8,414.00 I 1,334.23 15.857 9000 0 0 0 Total 42,546.00 122876.69 30.265 i c aa75" MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS •DES MOINES v P . r i t i i I i MANAGEMENT BY OBJECTIVES DEPARTMENT: FIRE DECISION UNIT: SUPPRESSION QUARTER: FIRST Fiscal Year Objectives: 1. To continue preventive maintenance and readiness program for all pumper and ladder trucks. 2. Improve lines of communication within the department. 3. Continue technical training of personnel so masks, nozzles and gauges can be maintained and repaired in-house. 4. Continue to provide emergency medical assistance. Work Completed: 1. Recording of all daily and periodic checks on all pieces of equipment. 2. Monthly meetings for each shift have been scheduled for the middle of each month. 3. Three officers from different shifts attended weekend conference held at the Fire Extension Service building in Ames, Iowa. 4. Thedepartment has responded to a total of 66 medical assistance calls during the first quarter. Analysis: Work towards FY81 objectives has already paid off in large dividends in the form of sizeable savings in maintaining masks, nozzles and gauges. Expenditures Bud This Quarter % 6000 892,917 201,264.96 22_ 54 7000 45,052 6,160.00 13.67 8000 29,175 4,362.96 14.95 9000 8.350 5.320.10 63.71 Total 975,494 217,108.43 22.25 MICROFILMED BY JORM MICR+LAO CEDAR RAPIDS • DES MOINES a a7,51 M i i i 1 1 i MANAGEMENT BY OBJECTIVES DEPARTMENT: FIRE DECISION UNIT: SUPPRESSION QUARTER: FIRST Fiscal Year Objectives: 1. To continue preventive maintenance and readiness program for all pumper and ladder trucks. 2. Improve lines of communication within the department. 3. Continue technical training of personnel so masks, nozzles and gauges can be maintained and repaired in-house. 4. Continue to provide emergency medical assistance. Work Completed: 1. Recording of all daily and periodic checks on all pieces of equipment. 2. Monthly meetings for each shift have been scheduled for the middle of each month. 3. Three officers from different shifts attended weekend conference held at the Fire Extension Service building in Ames, Iowa. 4. Thedepartment has responded to a total of 66 medical assistance calls during the first quarter. Analysis: Work towards FY81 objectives has already paid off in large dividends in the form of sizeable savings in maintaining masks, nozzles and gauges. Expenditures Bud This Quarter % 6000 892,917 201,264.96 22_ 54 7000 45,052 6,160.00 13.67 8000 29,175 4,362.96 14.95 9000 8.350 5.320.10 63.71 Total 975,494 217,108.43 22.25 MICROFILMED BY JORM MICR+LAO CEDAR RAPIDS • DES MOINES a a7,51 M i 1 ■ n s t MANAGEMENT BY OBJECTIVES DEPARTMENT: FIRE DECISION UNIT: PREVENTION & TRAINING QUARTER: FIRST Fiscal Year Objectives: 1. To continue fire investigation with more intensity towards the arson related incidents. 2. To inspect and require all drinking establishments to the new Provision of the Iowa Administrative Code. 3. To provide a more intensive fire prevention program for the dormitories (December 81). 4. To maintain and provide the public with fire prevention material. Work Completed: 1. During the first quarter 48 fire situations were investigated and all fire causes were determined. With help from our State Fire Marshal's office a State Arson program is now in progress. 2. Thirty-three drinking establishments have been inspected, and to date only minor violations have been found. 3. Three fire prevention programs have been given to dormitory personnel. Programs have been well received by the University personnel. 4. Several boxes of materials have been received from the N.F.P.A. (National Fire Protection Association). Approximately 1500 fire pamphlets have been given out to the general public. Analysis: The fire prevention/training program has been effective and is moving along smoothly. We feel our dormitories personnel are much more fire safety oriented. The fire prevention/training programs will continue to improve with the help of our Fire Department officers. Expenditures Budget This Quarter X 6000 24,356 5,751.48 23_ 6 7000 2,045 486.50 23.7 8000 2,290 66.44 .3 9000 -- _ Total 28.691 6,304.42 22.0 NICRO"I'MED DY JORM MICR;LAO CEDAR RAPIDS • DES MOINES I I n s t MANAGEMENT BY OBJECTIVES DEPARTMENT: FIRE DECISION UNIT: PREVENTION & TRAINING QUARTER: FIRST Fiscal Year Objectives: 1. To continue fire investigation with more intensity towards the arson related incidents. 2. To inspect and require all drinking establishments to the new Provision of the Iowa Administrative Code. 3. To provide a more intensive fire prevention program for the dormitories (December 81). 4. To maintain and provide the public with fire prevention material. Work Completed: 1. During the first quarter 48 fire situations were investigated and all fire causes were determined. With help from our State Fire Marshal's office a State Arson program is now in progress. 2. Thirty-three drinking establishments have been inspected, and to date only minor violations have been found. 3. Three fire prevention programs have been given to dormitory personnel. Programs have been well received by the University personnel. 4. Several boxes of materials have been received from the N.F.P.A. (National Fire Protection Association). Approximately 1500 fire pamphlets have been given out to the general public. Analysis: The fire prevention/training program has been effective and is moving along smoothly. We feel our dormitories personnel are much more fire safety oriented. The fire prevention/training programs will continue to improve with the help of our Fire Department officers. Expenditures Budget This Quarter X 6000 24,356 5,751.48 23_ 6 7000 2,045 486.50 23.7 8000 2,290 66.44 .3 9000 -- _ Total 28.691 6,304.42 22.0 NICRO"I'MED DY JORM MICR;LAO CEDAR RAPIDS • DES MOINES MANAGEMENT BY OBJECTIVES Department Parks and Recreation Decision Unit _Administration Quarter _ First. F21 Fiscal Year Objectives: I. Prompt dissemination of information from the Council, City Manager, Parks and Recreation Commission, and other departments and divisions to appropriate division heads and divisions. Ongoing. 2. Systematic monitoring of divisions to ensure that each is functioning at capacity for the complete budget year. Ongoing. 3. Avoid duplication of services within city government, and attempt to avoid duplication of parks and recreation services that are offered by other governmental units or private enterprise. Ongoing. Work completed: 1. In progress. 2. Public comments and surveys indicate that each division is performing well. 3. In progress. Analysis: Expenditures l r. _This Quarter % 6000 49,776 MANAGEMENT BY OBJECTIVES Department Parks and Recreation Decision Unit _Administration Quarter _ First. F21 Fiscal Year Objectives: I. Prompt dissemination of information from the Council, City Manager, Parks and Recreation Commission, and other departments and divisions to appropriate division heads and divisions. Ongoing. 2. Systematic monitoring of divisions to ensure that each is functioning at capacity for the complete budget year. Ongoing. 3. Avoid duplication of services within city government, and attempt to avoid duplication of parks and recreation services that are offered by other governmental units or private enterprise. Ongoing. Work completed: 1. In progress. 2. Public comments and surveys indicate that each division is performing well. 3. In progress. Analysis: Expenditures r. _This Quarter % 6000 49,776 11,825 23.76 7000 915 MANAGEMENT BY OBJECTIVES Department Parks and Recreation Decision Unit _Administration Quarter _ First. F21 Fiscal Year Objectives: I. Prompt dissemination of information from the Council, City Manager, Parks and Recreation Commission, and other departments and divisions to appropriate division heads and divisions. Ongoing. 2. Systematic monitoring of divisions to ensure that each is functioning at capacity for the complete budget year. Ongoing. 3. Avoid duplication of services within city government, and attempt to avoid duplication of parks and recreation services that are offered by other governmental units or private enterprise. Ongoing. Work completed: 1. In progress. 2. Public comments and surveys indicate that each division is performing well. 3. In progress. Analysis: Expenditures Budget _This Quarter % 6000 49,776 11,825 23.76 7000 915 111 12.13 8000 2,325 859 36.94 9000 O 0 0 Total 53.016 .x,.296 24,Ig MICROrILMED BY JORM MICR+LAeI CEDAR RAPIDS • DES MOINES f F 8 fpgA F t7 � p L 1 -i. MANAGEMENT BY OBJECTIVES Department Parks and R -lion Decision Unit _gecreation Quarter First, FY81 Fiscal Year Objectives:. I. Continue with existing successful programs as outlined in activity description. 2. Add four new one -day trips for special populations and senior citizens made possible by donation of van from Pilot Club by June 1981. 3. Provide one more overnight trip for general public by June 1981. Work completed: I. Division programs continuing on schedule. 2. 75% completed with one trip for senior citizens and two trips for handicapped; another trip planned but smaller vehicle used instead. 3. Trip to Kansas City cancelled due to lack of registration. 0 Analysis: New staff has met the challenge and maintained service quality and quantity. Swim pool and flood lights on ball fields have been expensive with rising repair and utility costs. Trend continues in public demand for more opportunities for team and individual sports services. Expenditures 6000 7000 8000 9000 Total Budget 370,059 36,800 93,138 700 500,697 This Quarter 114,676 18,002 43,827 0 176,505 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES 30.989 48.918 47.056 0 35.252 I i is i i i i MANAGEMENT BY OBJECTIVES Department Parks and Recreation Decision Unit Parks Quarter -FY81. First ua ter Fiscal Year Objectives: 1. Construct a four diamond softball complex for girls at Napoleon Park - April, 1981. 2. Upgrade and make uniform all signs in City Park - September, 1980. 3. Continue with program of cultural practices to improve turf on all heavy use park areas - ongoing. 4. Establish ground cover on steep banks at College Green Park - May, 1981. 5. Create new informal (low maintenance) beauty spots at Pheasant Hill and Wetherby Parks with spring flowering bulbs - November, 1980. 6. Continue development of Hickory Hill arboretum with completion of phases I, II, and III - November, 1980. i Work completed: 1. Sites have been selected - project will be delayed for approximately two years due to new sewer construction scheduled for 1982. 2. 90% complete. 3. Several areas were filled, graded, and seeded this fall. 4: No progress to date. 5. Completed - October, 1980. 6. 85% complete. Analysis: I. Objective will not be completed in FY81. 2. Improved appearance and better regulation of traffic. 3. Noticeable results will be slow. Various factors will determine success or failure. 4. Results will be slow. 5. Will provide added beauty to park areas that do not have any floral display. 6. Arboretum is progressing satisfactorily - will require time to show results. Expenditures Budget This Quarter % 6000 238,871 55,282 23.143 7000 28,079 5,817 20.718 8000 99,092 26,907 27.153 9000 4,200 2,039 48.548 Total 370,242 91,274 24.653 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES ■ I MANAGEMENT BY OBJECTIVES Department Parks and Recreation Decision Unit Parks Quarter -FY81. First ua ter Fiscal Year Objectives: 1. Construct a four diamond softball complex for girls at Napoleon Park - April, 1981. 2. Upgrade and make uniform all signs in City Park - September, 1980. 3. Continue with program of cultural practices to improve turf on all heavy use park areas - ongoing. 4. Establish ground cover on steep banks at College Green Park - May, 1981. 5. Create new informal (low maintenance) beauty spots at Pheasant Hill and Wetherby Parks with spring flowering bulbs - November, 1980. 6. Continue development of Hickory Hill arboretum with completion of phases I, II, and III - November, 1980. i Work completed: 1. Sites have been selected - project will be delayed for approximately two years due to new sewer construction scheduled for 1982. 2. 90% complete. 3. Several areas were filled, graded, and seeded this fall. 4: No progress to date. 5. Completed - October, 1980. 6. 85% complete. Analysis: I. Objective will not be completed in FY81. 2. Improved appearance and better regulation of traffic. 3. Noticeable results will be slow. Various factors will determine success or failure. 4. Results will be slow. 5. Will provide added beauty to park areas that do not have any floral display. 6. Arboretum is progressing satisfactorily - will require time to show results. Expenditures Budget This Quarter % 6000 238,871 55,282 23.143 7000 28,079 5,817 20.718 8000 99,092 26,907 27.153 9000 4,200 2,039 48.548 Total 370,242 91,274 24.653 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES ■ I MANAGEMENT BY OBJECTIVES Department oir P and Recreation ` Decision Unit C B D Main enance — I Quarter First FY81 Fiscal Year Objectives: 1. Provide year-round interest and color in some horticulture display areas by using spring flowering bulbs, summer annuals, fall mums and Christmas trees. 2. Reduce mortality rate and increase health, vigor and growth rate of trees and shrubs by implementing a general horticultural care system consisting of proper watering and fertilization, diagnosis and treatment of diseases and pests, proper pruning. high quality maintenance and cleanliness 3. Establish procedures to ensure of areas. Work completed: 1. Work mostly completed. 2. In progress - successful. 3. Manual written - maintenance good. � I ! I Analysis: j Expenditures Budget This Quarter % 6000 24,853 8,446 33.98 1,063 23.63 7000 4,500 8000 4,215 863 20.47 9000 250 455 182.00 Total 33,818 10,828 32.01 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES m r MANAGEMENT BY OBJECTIVES Department Parks and Recreation Decision Unit Government Buildings Quarter First, FY81 Fiscal Year Objectives: 1. Coordinate and consolidate maintenance services in all downtown government buildings, including Civic Center, Recreation Center, Senior Center and Library. 2. Reduce expenditures to heating and air conditioning businesses for service and repairs through better preventative maintenance and better employee training. Work completed: 1. Deleted from budget. 2. Some progress - new units being installed in Civic Center. Analysis: Expenditures Budget This Quarter % 6000 34,502 5,837 16.92 7000 6,600 929 14.08 8000 67,382 22,139 32.85 9000 91,000 379 .417 Total 199484 29.286 lg,E MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES g M M i MANAGEMENT BY OBJECTIVES Department Parks and Recreation Decision Unit ceme ry/For stry/dursery Quarter First. FY81 Fiscal Year Objectives: I. To continue the successful public relations program for all units. 2. Prevent deterioration of present physical properties of the cemetery by annual improvements. 3. Continue the record keeping systems for all units. 4. Review current ordinance violation processing procedures for possible improvement. Work completed: I. Ongoing. Successful: 2. Good progress on road work. 3. Records up-to-date. 4. Will work on this winter. Analysis: Expenditures Budget ThisQuarter % 6000 88,988 20,032 22.51 7000 10,533 1,006 9.54 8000 45,368 47,615 104.95 9000 10,400 2,450 23.55 Total 155,309 71,104 45.78 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES T s i I. i s D 1") MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS DECISION UNIT: ADMINISTRATION QUARTER: FIRST FY81 Fiscal Year Objectives: I. To complete construction of the Ralston Creek north branch detention structure by June, 1981.' 2. To provide direction to the City Council in adopting a transportation plan for the Iowa City area by June, 1981. Work Completed: 1. Work assignment transferred to City Engineer for execution. 2. Transit division under the day-to-day supervision of the City Manager. 3. Department services maintained at high productivity including special work assignments such as CDBG sidewalk project substantially completed. Several homes in Small Cities Area demolished by City crews at a savings to the taxpayers. 4. City Plaza Phase IIB street improvement, substantially completed; Ramp B substantially completed; landscaping for City Plaza IIC, HVAC for Civic Center and Ramp "A" corridor projects all out for bids; undergrounding of utilities in CBD Phase I in final design stages. Analysis: All work completed and Department functioning at optimum service level with the Acting Director since June 4, 1980. Expenditures Budget This Quarter % 6000 48,135 5,537.56 11_ 5 7000 650 5.96 .91 8000 5,255 1,722.10 32.77 9000* -0- 387.80 -0- Total 541040 7,653.42 14.16 *Prior year encumbrance MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES f i I i J 1") MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS DECISION UNIT: ADMINISTRATION QUARTER: FIRST FY81 Fiscal Year Objectives: I. To complete construction of the Ralston Creek north branch detention structure by June, 1981.' 2. To provide direction to the City Council in adopting a transportation plan for the Iowa City area by June, 1981. Work Completed: 1. Work assignment transferred to City Engineer for execution. 2. Transit division under the day-to-day supervision of the City Manager. 3. Department services maintained at high productivity including special work assignments such as CDBG sidewalk project substantially completed. Several homes in Small Cities Area demolished by City crews at a savings to the taxpayers. 4. City Plaza Phase IIB street improvement, substantially completed; Ramp B substantially completed; landscaping for City Plaza IIC, HVAC for Civic Center and Ramp "A" corridor projects all out for bids; undergrounding of utilities in CBD Phase I in final design stages. Analysis: All work completed and Department functioning at optimum service level with the Acting Director since June 4, 1980. Expenditures Budget This Quarter % 6000 48,135 5,537.56 11_ 5 7000 650 5.96 .91 8000 5,255 1,722.10 32.77 9000* -0- 387.80 -0- Total 541040 7,653.42 14.16 *Prior year encumbrance MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES f i J I B MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: FIRST DECISION UNIT: ENGINEERING UNIT OBJECTIVES: I. Coordinate the design process of the new Waste Water Treatment plant enabling an application for a construction grant gy June, 1981. 2. Completion of the South Gilbert Street Improvement project by October, 1980. 3. Completion of the Corridor Sewer Project by April, 1981. 4. Completion of Phase II of right-of-way improvements for Urban Renewal by October, 1980. (Washington, Capitol, Clinton - pavement amenities). 5. Completion of Phase I of Scott Boulevard by September, 1980. WORK COMPLETED: 1. 'Continuing design work. 2. South Gilbert Street project is 98% complete. 3. Corridor sewer project is progressing on schedule. 4. Phase II is moving toward completion. 5. Scott Boulevard Phase I has been extended to 4th Quarter of fiscal year. EXPENDITURES BUDGET YEAR-TO-DATE _% 6000 $265,533 $ 32,896.36 12.384% 7000 6,975 1,636.59 23.464% 8000 24,483 6,090.66 24.877% 9000 2,000 137.10 6.855% Total 298,991 40,760.71 13.633 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES i —I � 1 i MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: FIRST DECISION UNIT: ENGINEERING UNIT OBJECTIVES: I. Coordinate the design process of the new Waste Water Treatment plant enabling an application for a construction grant gy June, 1981. 2. Completion of the South Gilbert Street Improvement project by October, 1980. 3. Completion of the Corridor Sewer Project by April, 1981. 4. Completion of Phase II of right-of-way improvements for Urban Renewal by October, 1980. (Washington, Capitol, Clinton - pavement amenities). 5. Completion of Phase I of Scott Boulevard by September, 1980. WORK COMPLETED: 1. 'Continuing design work. 2. South Gilbert Street project is 98% complete. 3. Corridor sewer project is progressing on schedule. 4. Phase II is moving toward completion. 5. Scott Boulevard Phase I has been extended to 4th Quarter of fiscal year. EXPENDITURES BUDGET YEAR-TO-DATE _% 6000 $265,533 $ 32,896.36 12.384% 7000 6,975 1,636.59 23.464% 8000 24,483 6,090.66 24.877% 9000 2,000 137.10 6.855% Total 298,991 40,760.71 13.633 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES 0 MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: FIRST FY81 DECISION UNIT: POLLUTION CONTROL Fiscal Year Objectives: 1. Provide input in the planning and design of the new treatment plant. 2. Clean 15 miles of sanitary sewers with reoccurring problems by June 30, 1981. 3. Continue televising program to include new subdivisions and problem areas. Work Completed: 1. We have taken several equipment inspection trips with V & K personnel and met with them several times to discuss equipment. We have made decisions on types of major equipment to be incorporated in design. 2. We have cleaned 26,530 feet of sewer (21%), this quarter. 3. No subdivisions were accepted this quarter. Analysis: We believe we are making satisfactory progress towards objectives. We are pacing expenditures to stay within our budget. Expenditures Budget This Quarter % 6000 334,371 74,050 22 7000 42,000 11,840 28 8000 279,562 43,287 15 9000 360,961 76.065 21 Total 1,016,894 205.242 20 MICROFILMED BY JORM MIC R�LA13 CEDAR RAPIDS DES MOINES On I 'I I I I MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: FIRST FY81 DECISION UNIT: POLLUTION CONTROL Fiscal Year Objectives: 1. Provide input in the planning and design of the new treatment plant. 2. Clean 15 miles of sanitary sewers with reoccurring problems by June 30, 1981. 3. Continue televising program to include new subdivisions and problem areas. Work Completed: 1. We have taken several equipment inspection trips with V & K personnel and met with them several times to discuss equipment. We have made decisions on types of major equipment to be incorporated in design. 2. We have cleaned 26,530 feet of sewer (21%), this quarter. 3. No subdivisions were accepted this quarter. Analysis: We believe we are making satisfactory progress towards objectives. We are pacing expenditures to stay within our budget. Expenditures Budget This Quarter % 6000 334,371 74,050 22 7000 42,000 11,840 28 8000 279,562 43,287 15 9000 360,961 76.065 21 Total 1,016,894 205.242 20 MICROFILMED BY JORM MIC R�LA13 CEDAR RAPIDS DES MOINES On I 'I MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: FIRST FY81 DECISION UNIT: LANDFILL Fiscal Year Objectives: 1. To ensure revenues equal expenses. 2. To operate landfill in compliance with DEQ. 3. To maintain higher standards for the portions of the landfill that are completed. Work Completed: 1. The landfill is meeting this goal. 2. City is meeting DEQ regulations. 3. Work is started on final faces of portions of landfill that have been filled with refuse. Expenditures Budget Year -to -Date % 6000 $118,171 r 18 7000 12,960 3,371 26 8000 143,128 45,263 31.6 9000 160,000 �r 45 I $434,259 $142,769 32.8 MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: FIRST FY81 DECISION UNIT: LANDFILL Fiscal Year Objectives: 1. To ensure revenues equal expenses. 2. To operate landfill in compliance with DEQ. 3. To maintain higher standards for the portions of the landfill that are completed. Work Completed: 1. The landfill is meeting this goal. 2. City is meeting DEQ regulations. 3. Work is started on final faces of portions of landfill that have been filled with refuse. Expenditures Budget Year -to -Date % 6000 $118,171 $ 21,370 18 7000 12,960 3,371 26 8000 143,128 45,263 31.6 9000 160,000 72,763 45 Total $434,259 $142,769 32.8 MICROFILMED BY JORM MICR+LA13 CEDAR RAPIDS • DES MOINES ,f i. 1 ,f i. i , i f a� 7� a D. 75' MICROFILMED BY JORM MICR+LA9 CEDAR RAPIDS • DES MOINES 1 I MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS DECISION UNIT: REFUSE QUARTER: FIRST FY81 Fiscal Year Objectives: I. To maintain prompt and high quality service. 2. To maintain low cost refuse service. 3. To continue upgrading handicap service. 4. Increase productivity with present work force. Work Completed: 1. Fewer complaints being filed. 2. No price increase in refuse pickup. 3. Continuous program. 4. No increase in work force in Fiscal Year 1181". Expenditures 8udnet Year -to -Date % 6000 $168,791 $45,623 27 7000 1,300 1,349 103 8000 230,731 54,734 23 9000 -0- -0- -0- Total $400,822 $103,571 25 a D. 75' MICROFILMED BY JORM MICR+LA9 CEDAR RAPIDS • DES MOINES 1 I n MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS DECISION UNIT: STREET QUARTER: FIRST FY81 Fiscal Year Objectives: 1. A continual work program set up in priority system. 2. A continuing surveillance of new streets to be added to street maintenance program. 3. To continue concentrating on the higher priority trafficways and bus routes. If time and funding allows then go to residential streets. Work Completed: 1. Keep high priority complaints to a minimum. 2. New streets are being added to city map for Street Department functions, 3. 20-25% of work has been completed on high priority streets. Also some work has been done to residential streets. Expenditures Budget Year -to -Date % 6000 $ 365,205 $ 70,696 19 7000 157,800 75,674 47 8000 442,350 110,806 25 9000 255,000 184,251 72 Total $3,030,144 $886,700 29 k I a I i . It I n MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS DECISION UNIT: STREET QUARTER: FIRST FY81 Fiscal Year Objectives: 1. A continual work program set up in priority system. 2. A continuing surveillance of new streets to be added to street maintenance program. 3. To continue concentrating on the higher priority trafficways and bus routes. If time and funding allows then go to residential streets. Work Completed: 1. Keep high priority complaints to a minimum. 2. New streets are being added to city map for Street Department functions, 3. 20-25% of work has been completed on high priority streets. Also some work has been done to residential streets. Expenditures Budget Year -to -Date % 6000 $ 365,205 $ 70,696 19 7000 157,800 75,674 47 8000 442,350 110,806 25 9000 255,000 184,251 72 Total $3,030,144 $886,700 29 aa�5 MICROFILMED BY JORM MICR+LAS y. CEDAR RAPIDS • DES MOINES ;d A k I a I i . aa�5 MICROFILMED BY JORM MICR+LAS y. CEDAR RAPIDS • DES MOINES ;d A MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS DECISION UNIT: TRAFFIC ENGINEERING QUARTER: FIRST FY81 Fiscal Year Objectives: I. Continued reduction of signal and street light corrective maintenance call outs. 2• Continued aggressive signal controller preventative maintenance. 3. Continued traffic and accident location analysis to determine trends and problems and propose corrective action. 4. Convert street lighting at U.S. Highway 6, 218 and Iowa N1 intersec- tion from high voltage mercury vapor to high pressure sodium vapor by June 1981. 5. Signalize Church Street/Dubuque Street by June 1981. Work Completed: I. Corrective maintenance down 18% from previous quarter, UP 26% over first quarter FY80. 2• No preventative maintenance was performed on signal controllers. 3. One hundred and two Senior Engineering Technician hours were spent on this effort in the first quarter. 4. No work completed. 5. Design under way, no materials ordered. Expenditures Budaet This Quarter _ 6000 167,554 36,677 21.9 7000 72,525 9,090 12.5 8000 214,066 45,331 21.2 9000 3,750 24,936 664.9 Total 457,895 116,034 25.3 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES aa75 / I i i I i E MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS DECISION UNIT: TRAFFIC ENGINEERING QUARTER: FIRST FY81 Fiscal Year Objectives: I. Continued reduction of signal and street light corrective maintenance call outs. 2• Continued aggressive signal controller preventative maintenance. 3. Continued traffic and accident location analysis to determine trends and problems and propose corrective action. 4. Convert street lighting at U.S. Highway 6, 218 and Iowa N1 intersec- tion from high voltage mercury vapor to high pressure sodium vapor by June 1981. 5. Signalize Church Street/Dubuque Street by June 1981. Work Completed: I. Corrective maintenance down 18% from previous quarter, UP 26% over first quarter FY80. 2• No preventative maintenance was performed on signal controllers. 3. One hundred and two Senior Engineering Technician hours were spent on this effort in the first quarter. 4. No work completed. 5. Design under way, no materials ordered. Expenditures Budaet This Quarter _ 6000 167,554 36,677 21.9 7000 72,525 9,090 12.5 8000 214,066 45,331 21.2 9000 3,750 24,936 664.9 Total 457,895 116,034 25.3 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES aa75 r a MANAGEMENT BY OBJECTIVES DEPARTMENT: MASS TRANSIT DECISION UNIT: MASS TRANSIT QUARTER: FIRST Fiscal Year Objectives: I. Strengthen the organizational structure by the addition of an Assistant Transit Manager. 2. To pursue Federal and State Grants for operating assistance and various capital items. 3. To divert peak -hour riders to off-peak service and to attract new evening and mid-day passengers. Work Completed: I. An Assistant Transit Manager was hired at the end of FY80. The summer has been spent in training the new person, and by the end of the quarter he was handling•most of the day-to-day operations. This has allowed the Transit Manager to concentrate his energies in other administrative matters. 2. Grant applications were completed for FY81 prior to the beginning of the fiscal year. However, during the first quarter specifications for new transit buses, two-way radios, and bus shelters were largely completed. 3. During the summer months our marketing program concentranted on building ridership evenings, Saturdays and during •other off-peak times. During the first quarter evening ridership was up 18.9 percent over the previous year, and Saturday ridership was up 1.4 percent. No statistics are available for mid-day ridership. Expenditures Budget This Quarter Year -to -Date % 6000 $815,881 $167,986 $167,986 20_ 6 7000 8,400 1,592 1,592 16.9 8000 502,613 154,181 154,181 30.7 9000 25,000 5,479 5,479 21.9 Total $1.351.894 $329.238 $329.238 24.4 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES j i i r a MANAGEMENT BY OBJECTIVES DEPARTMENT: MASS TRANSIT DECISION UNIT: MASS TRANSIT QUARTER: FIRST Fiscal Year Objectives: I. Strengthen the organizational structure by the addition of an Assistant Transit Manager. 2. To pursue Federal and State Grants for operating assistance and various capital items. 3. To divert peak -hour riders to off-peak service and to attract new evening and mid-day passengers. Work Completed: I. An Assistant Transit Manager was hired at the end of FY80. The summer has been spent in training the new person, and by the end of the quarter he was handling•most of the day-to-day operations. This has allowed the Transit Manager to concentrate his energies in other administrative matters. 2. Grant applications were completed for FY81 prior to the beginning of the fiscal year. However, during the first quarter specifications for new transit buses, two-way radios, and bus shelters were largely completed. 3. During the summer months our marketing program concentranted on building ridership evenings, Saturdays and during •other off-peak times. During the first quarter evening ridership was up 18.9 percent over the previous year, and Saturday ridership was up 1.4 percent. No statistics are available for mid-day ridership. Expenditures Budget This Quarter Year -to -Date % 6000 $815,881 $167,986 $167,986 20_ 6 7000 8,400 1,592 1,592 16.9 8000 502,613 154,181 154,181 30.7 9000 25,000 5,479 5,479 21.9 Total $1.351.894 $329.238 $329.238 24.4 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES j ■ n MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS DECISION UNIT: WATER QUARTER: FIRST FY81 Fiscal Year Objectives: 1. To flush and record all city owned hydrants by June 1981, to remove sedimentation from the system. 2. To install 1,000 Outside Remote Readers by June 1981. 3. To keep meter reading on a preset schedule. ' 4. To ensure random water samples meet the requirements of the Iowa Department of Environmental Quality. Work Completed: 1. No hydrant flushing has been done this quarter. 2. Have installed 440 outside readers since the start of FY81. 3. Meter reading is on schedule. 4. We are meeting all requirements of the Department of Environmental Quality. Analysis: 1. July of 1980 was the largest pumpage month of 211,297,000 gallons; also peak day pumpage was established at 7,975,000 gallons on July 14, 1980. First quarter of FY81 pumpage ran 6% over FY80 first quarter. 2. Replaced 7 leaky valves in the water system, and 7 old hydrants which did not operate properly with new ones, had 13 water main breaks the first quarter of FY81. ExpendituresBu_ deet This Quarter % 6000 422,676 86,498.88 20.465 7000 176,555 95,581.70 54.138 8000 503,743 54,669.51 19.355 9000 659.748 207.102.47 31.391 Total 1.762.717 486.679.88 27.610 MICROFILMED BY JORM MICR�LAB CEDAR RAPIDS •DES MOINES a a 75 i 'I I n MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS DECISION UNIT: WATER QUARTER: FIRST FY81 Fiscal Year Objectives: 1. To flush and record all city owned hydrants by June 1981, to remove sedimentation from the system. 2. To install 1,000 Outside Remote Readers by June 1981. 3. To keep meter reading on a preset schedule. ' 4. To ensure random water samples meet the requirements of the Iowa Department of Environmental Quality. Work Completed: 1. No hydrant flushing has been done this quarter. 2. Have installed 440 outside readers since the start of FY81. 3. Meter reading is on schedule. 4. We are meeting all requirements of the Department of Environmental Quality. Analysis: 1. July of 1980 was the largest pumpage month of 211,297,000 gallons; also peak day pumpage was established at 7,975,000 gallons on July 14, 1980. First quarter of FY81 pumpage ran 6% over FY80 first quarter. 2. Replaced 7 leaky valves in the water system, and 7 old hydrants which did not operate properly with new ones, had 13 water main breaks the first quarter of FY81. ExpendituresBu_ deet This Quarter % 6000 422,676 86,498.88 20.465 7000 176,555 95,581.70 54.138 8000 503,743 54,669.51 19.355 9000 659.748 207.102.47 31.391 Total 1.762.717 486.679.88 27.610 MICROFILMED BY JORM MICR�LAB CEDAR RAPIDS •DES MOINES a a 75 i MANAGEMENT BY OBJECTIVES DEPARTMENT: HOUSING & INSPECTION SERVICES QUARTER: FIRST FY81 DECISION UNIT: ADMINISTRATION Fiscal Year Objectives: 1. To improve the permit issuance procedures especially plan checking to assure accurate full review of all proposed construction projects. 2. To continue program evaluation and modification to maintain housing inspection services at high levels. 3. To continue to encourage boards and commissions to explore new methods of construction and allow same through code modifications where necessary. 4. To encourage variety of housing alternatives both public and private for owners and renters. 5. To solicit other governmental monies to accomplish housing goals. Work Completed: 1. All permits reviewed internally using departmental staff. 2. Housing inspection production has suffered due to a shortage of trained inspectors (budget cuts), a delay in shifting duties to fire fighters caused by the development of a new Housing Code and a significant increase in the number of complaint request inspections from previous reporting periods. 3. A substantial rewrite of the Housing Code has been undertaken by the Housing Code Task Force of the Housing Commission and nears completion. 4. Public housing application continues to move slowly ahead. S. Several new Section 312 Federal Rehabilitation loans have been processed this quarter. 6. Time spent as Acting Director of Public Works has prevented a more aggressive housing alternatives program. Expenditures Budget This Quarter % 6000 43,723 7,420.31 16.97 7000 460 33.39 7.25 8000 8,824 878.31 9.95 9000 292 34.45 11_79 Total 53,299 8,366.46 15.69 MICROFILNED BY JORM MIC R;LAB CEDAR RAPIDS • DES MOINES aa7.5 i i i MANAGEMENT BY OBJECTIVES DEPARTMENT: HOUSING & INSPECTION SERVICES QUARTER: FIRST FY81 DECISION UNIT: ADMINISTRATION Fiscal Year Objectives: 1. To improve the permit issuance procedures especially plan checking to assure accurate full review of all proposed construction projects. 2. To continue program evaluation and modification to maintain housing inspection services at high levels. 3. To continue to encourage boards and commissions to explore new methods of construction and allow same through code modifications where necessary. 4. To encourage variety of housing alternatives both public and private for owners and renters. 5. To solicit other governmental monies to accomplish housing goals. Work Completed: 1. All permits reviewed internally using departmental staff. 2. Housing inspection production has suffered due to a shortage of trained inspectors (budget cuts), a delay in shifting duties to fire fighters caused by the development of a new Housing Code and a significant increase in the number of complaint request inspections from previous reporting periods. 3. A substantial rewrite of the Housing Code has been undertaken by the Housing Code Task Force of the Housing Commission and nears completion. 4. Public housing application continues to move slowly ahead. S. Several new Section 312 Federal Rehabilitation loans have been processed this quarter. 6. Time spent as Acting Director of Public Works has prevented a more aggressive housing alternatives program. Expenditures Budget This Quarter % 6000 43,723 7,420.31 16.97 7000 460 33.39 7.25 8000 8,824 878.31 9.95 9000 292 34.45 11_79 Total 53,299 8,366.46 15.69 MICROFILNED BY JORM MIC R;LAB CEDAR RAPIDS • DES MOINES aa7.5 MANAGEMENT BY OBJECTIVES DEPARTMENT: HOUSING & INSPECTION SERVICES DECISION UNIT: BUILDING INSPECTION QUARTER: FIRST Fiscal Year Objectives: 1, To provide the least complex and quickest Interpretation and respond to citizen inquiry, Code 2• To develop procedures fora more complete plan review with'alquicker turnaround time. 3. To acquire documentation on illegal uses or conversions in new Zoning Ordinance, conjunction with training sessions to provide enforcement with the Work Completed: I. The CDBG sidewalk re tion is 5% com 2• reduced Have reassigned job duties to adjustlacement andpto thelhigh work load withea new 3• Systematic ainspections have been reduced in order to maintain and respond to citizen complaints. 4. Have been able to 'maintain one week turnaround time on all checks. 5. Have issued a permit to Ecumenical Housing, Plan Analysis: Number of building permits: 139 Dollar amount: $6,633,478 Number of field inspections: 957 Expenditures Bud et —�— This Quarter 6000 $108,840.00 27,727.69 7000 2,050.00 1,741,57 8000 19,420,00 9,563.26 9000 • UO = Total $130,310.00 $3985 MICROFILMED BY JORM MICR+LA6 CEDAR RAPIDS • DES MOINES 25.476 84.955 49.244 .000 29.964 77 i i I MANAGEMENT BY OBJECTIVES DEPARTMENT: HOUSING & INSPECTION SERVICES DECISION UNIT: BUILDING INSPECTION QUARTER: FIRST Fiscal Year Objectives: 1, To provide the least complex and quickest Interpretation and respond to citizen inquiry, Code 2• To develop procedures fora more complete plan review with'alquicker turnaround time. 3. To acquire documentation on illegal uses or conversions in new Zoning Ordinance, conjunction with training sessions to provide enforcement with the Work Completed: I. The CDBG sidewalk re tion is 5% com 2• reduced Have reassigned job duties to adjustlacement andpto thelhigh work load withea new 3• Systematic ainspections have been reduced in order to maintain and respond to citizen complaints. 4. Have been able to 'maintain one week turnaround time on all checks. 5. Have issued a permit to Ecumenical Housing, Plan Analysis: Number of building permits: 139 Dollar amount: $6,633,478 Number of field inspections: 957 Expenditures Bud et —�— This Quarter 6000 $108,840.00 27,727.69 7000 2,050.00 1,741,57 8000 19,420,00 9,563.26 9000 • UO = Total $130,310.00 $3985 MICROFILMED BY JORM MICR+LA6 CEDAR RAPIDS • DES MOINES 25.476 84.955 49.244 .000 29.964 MANAGEMENT BY OBJECTIVES DEPARTMENT: HOUSING & INSPECTION SERVICES QUARTER: FIRST DECISION UNIT: HOUSING INSPECTION Fiscal Year Objectives: I. Provide licensing and inspection services for as many multiple dwellings and rooming houses as possible. 2. Respond to citizen complaints within a reasonable period of time. 3. Provide housing code information to the public. 4. Provide enforcement of the Municipal Housing Code, State Fire Code, and the Municipal Snow Ordinance. Work Completed: 1. Conducted most of the annual inspections of multiple dwellings and rooming houses which were due first quarter. Experienced a marked decrease in the total number of inspections. 2. All citizen complaints responded to within a 48 hour period and a special meeting of the Housing Appeals Board was held in response to a special housing problem. 3. Held numerous meetings of the Housing Code Task Force in order to submit a housing code recommendation to the Housing Commission. Analysis: Units inspected first quarter - 972 Units reinspected first quarter - 351 Orders issued - 202 Units in compliance - 1591 Court cases - 5 Placards - 1 EXPENDITURES BUDGET YEAR-TO-DATE _% 6000 $57,666 $17,642.88 30.595* 7000 2,076 322.93 15.555 8000 12,685 2,188.14 17.250 9000 515 31.90 - TOTAL 76,145 2 ,185.8 *Budget Amendment Forthcoming. MICROFILMED BY i JORM MICR+LAB CEDAR RAPIDS • DES MOINES I � i i i i MANAGEMENT BY OBJECTIVES DEPARTMENT: HOUSING & INSPECTION SERVICES QUARTER: FIRST DECISION UNIT: HOUSING INSPECTION Fiscal Year Objectives: I. Provide licensing and inspection services for as many multiple dwellings and rooming houses as possible. 2. Respond to citizen complaints within a reasonable period of time. 3. Provide housing code information to the public. 4. Provide enforcement of the Municipal Housing Code, State Fire Code, and the Municipal Snow Ordinance. Work Completed: 1. Conducted most of the annual inspections of multiple dwellings and rooming houses which were due first quarter. Experienced a marked decrease in the total number of inspections. 2. All citizen complaints responded to within a 48 hour period and a special meeting of the Housing Appeals Board was held in response to a special housing problem. 3. Held numerous meetings of the Housing Code Task Force in order to submit a housing code recommendation to the Housing Commission. Analysis: Units inspected first quarter - 972 Units reinspected first quarter - 351 Orders issued - 202 Units in compliance - 1591 Court cases - 5 Placards - 1 EXPENDITURES BUDGET YEAR-TO-DATE _% 6000 $57,666 $17,642.88 30.595* 7000 2,076 322.93 15.555 8000 12,685 2,188.14 17.250 9000 515 31.90 - TOTAL 76,145 2 ,185.8 *Budget Amendment Forthcoming. MICROFILMED BY i JORM MICR+LAB CEDAR RAPIDS • DES MOINES I � I i (over) MICROFILMED BY JORM MIC R+LA 13 CEDAR RAPIDS • DES MOINES a _ 1 ' IOWA CI'T'Y 1'11111.10 LIBRARY j FIRST QUARTER RI:I10R'I' OF i GOALS AND 013.11:CI'IVI;S AND STATISTICAL SUMMARY ` I (over) MICROFILMED BY JORM MIC R+LA 13 CEDAR RAPIDS • DES MOINES a � 1 i IOWA CI'T'Y 1'11111.10 LIBRARY j FIRST QUARTER RI:I10R'I' OF i GOALS AND 013.11:CI'IVI;S AND STATISTICAL SUMMARY ` pY1981 i I I Fiscal Ycar Objectives IA. Monitor construction, furnishing and equipping of new building' (March, 1981). i 18. plan and complete move to new building (May 1981) and dispose of surplus equipment/furnishings in old building (,July 1981). 2. Close down card catalog and bring second component of automated System - on-line public catalog - into operation (,January 1981). 3. Keep rate of purchase of new items at at least 65% of state and national library standards and bring size of total collection to 65% of standards. (June 1981) 4. Develop plan for PY1982 services analysis based on 1980 census, community surveys, and impact of automation and new building (June 1981). Work Completed IA. i General construction'completion date moved to February 1, 1981. Carpet, general equipment and furniture bids and specifications prepared with bid openings scheduled for October. Shelving and millwork contracts awarded. Signage and AV equipment plans and specifications in preparation. 18. Move consultant considered and rejected. Offers from organizations to provide volunteers under review. Basic research on methods completed. Development of strategies and identification of necessary equipment and supplies in progress. 2. First two terminals for on-line public catalog launched 9-25-80. Card production, corrections and withdrawing from card catalog stopped 9-30-80. Only catalog cards received with pre-processed materials being filed. Two more terminals for public use ordered for 11-1-80 installation. Public reaction so far has been over- whelmingly positive. !, 3. Library's collection reached approximately 131,000 items by .June 30, 1980, but rate of acquisition not enough to maintain size and condition of collection at current rate of circulation (one new item added for each fifty circulated). 'rhe 1,960 items added during; the first quarter are 22% of the total planned additions for fiscal year. 21% were gifts, 4. j Planning process postponed until FY1982. preparation for new building, work on automation, a sharp jump in use of services, and loss of four F.T.r. staff leaves no staff support for this project. (over) MICROFILMED BY JORM MIC R+LA 13 CEDAR RAPIDS • DES MOINES a ■ n ICPL FY81 1st Quarter G F, 0, Stat report Page 2 11 Analysis Item 4. tells the story. following cutbacks in services and staff for FY1981, the unexpected loss of (York/Study staff and a sudden increase in demand for all services has left the library staff uneasy about their ability to stretch resources to move and initiate services in the new building. Without the staff time reassigned due to automating basic opera- tions, the library would now be in critical condition. EXPENDITURES BUDGET 1st Quarter % 6000 $ 493,209 $ 105,857 21.5 7000 12,065 2,196 18.2 8000 80,745 18,871 23.6 9000 73,800 15,412 20.9 TO'1'AI, $ 659,108 $ 142,236 21.6 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES A 1 i l d { i IOWA CITY PUBLIC L1BRP- STATISTICS SUMMARY FOR First 3rter FY1981 ;ELF -SERVICE Entered building F"rs open, t. .rage # per hour Current Year % Period Ago Change' 75,060 60 72,527 Average # per hour 785 732 �--3�.55 V� Z 95.6 99.7 3.5 LENDING SERVICES Paid 13-359 GROWTH Total items loaned 117,963 103,726 13.7 Average # per hour 150.3 141.7 6.1 % Children's material 36.4% 38.1% Net growth % Non -print 11.6% 10.4% quarter NA, 10.8 % Iowa City 85.5% 88.2% % Fee cards 018% 1.2% % Contract 11..2% 8.6% % Reciprocal' 2.5% 2.0% Reserves placed 808 1,208 (33.1) Interlibrary loans 342 263 30.0 Loans to Jail 194 86 125.5 Loans to Homebound 78 92 (15.2) ris to Institutional 2,111 NA Cardholders INFORMATION SERVICE Questions handled 7,428 6,894 7 Z� % by telephone i 49.5% 48.5% Children's programs 71 100 Attendance 4,556 5,319 Tours 4 1 Publications (titles/N) 17/13.44 1/1000 Displays 3 4 Radio/TV appearances 3 18 Nfwspeper items_ 23 L le casting (hours) N.A.- 0 CONTROL SERVICE Current Year % Patrons.Period Ago Change regisered 2,070 NA _ Cumulative total 21,812 -- _ % Children 14.0% NA _ Fee cards sold 6 10 _ N Fines 2,373 1,328 44.0 collected _ Overdue notices 3,465 2,613 32.6 COLLECTION Paid 13-359 GROWTH Volunteers 623 1.201 (48.1) Items added 1,960 1,087 _ % Gifts 21.1% 10.8%* _ % AV 8.0% 16.7% _ Net growth 1,609 291 *1st quarter NA, 10.8 is annual rat HOURS WORKED Paid 13-359 14.379 ( 7.1 Volunteers 623 1.201 (48.1) Paid by outside 1.819 2,683 source Hours paid per hour open 17.0 19.6 G13.3 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES a a 7,5 I MANAGEMENT BY OBJECTIVES DEPARTMENT: PLANNING & PROGRAM DEVELOPMENT DECISION UNIT: ADMINISTRATION QUARTER: FIRST Fiscal Year Objectives: 1. To enable all decision units within the department to meet their objectives as enumerated in their decision packages and to promote a higher level of supervisory and administrative performance by all division heads (throughout the year). 2. To ensure that all federal program requirements are met in a timely manner. 3. To provide for the effective implementation of the Comprehensive Plan by fostering the adoption of a new set of subdivision regulations (October 1980). 4. To efficiently prepare, research and background reports and analyses for various ad hoc projects as assigned by the City Manager or as requested by boards, commissions, or the City Council (within prescribed time frames). Work Completed and Analysis: Since the beginning of this fiscal year and the resignation of the department director, departmental actions and policies have instituted with a high degree of success. been Emphasis has been placed on both formal and informal communications, a high degree of accessibility to managerial staff, utilizing expertise within the department to the utmost, and meeting deadlines prescribed for long and short-range projects and activities. The resultant effect is a higher level of supervisory and administrative performance within the department in meeting objectives within a timely manner. A draft set of subdivision regulations for effective implementation of the Comprehensive Plan have been prepared by the Plan Administration Division. Review and ultimate adoption of the regulations has been preempted due to the unexpected delay in the Planning and Zoning Commission's review of the new proposed Zoning Ordinance. It is anticipated that the Commission will undertake the review of the subdivision regulations in the fourth quarter of this fiscal year. Expenditures Budget This Quarter % 6000 52,264.00 9,847.33 18.8 7000 1,715.00 369.58 21.6 8000 8,070.00 194.31 9.8 9000 0.00 0.00 Total 62,049.00 11,011.22 17,1 MICRO rILMED RY JORM MICR;LAB CEDAR RAPIDS • DES MOINES i I j I I � i I MANAGEMENT BY OBJECTIVES DEPARTMENT: PLANNING & PROGRAM DEVELOPMENT DECISION UNIT: ADMINISTRATION QUARTER: FIRST Fiscal Year Objectives: 1. To enable all decision units within the department to meet their objectives as enumerated in their decision packages and to promote a higher level of supervisory and administrative performance by all division heads (throughout the year). 2. To ensure that all federal program requirements are met in a timely manner. 3. To provide for the effective implementation of the Comprehensive Plan by fostering the adoption of a new set of subdivision regulations (October 1980). 4. To efficiently prepare, research and background reports and analyses for various ad hoc projects as assigned by the City Manager or as requested by boards, commissions, or the City Council (within prescribed time frames). Work Completed and Analysis: Since the beginning of this fiscal year and the resignation of the department director, departmental actions and policies have instituted with a high degree of success. been Emphasis has been placed on both formal and informal communications, a high degree of accessibility to managerial staff, utilizing expertise within the department to the utmost, and meeting deadlines prescribed for long and short-range projects and activities. The resultant effect is a higher level of supervisory and administrative performance within the department in meeting objectives within a timely manner. A draft set of subdivision regulations for effective implementation of the Comprehensive Plan have been prepared by the Plan Administration Division. Review and ultimate adoption of the regulations has been preempted due to the unexpected delay in the Planning and Zoning Commission's review of the new proposed Zoning Ordinance. It is anticipated that the Commission will undertake the review of the subdivision regulations in the fourth quarter of this fiscal year. Expenditures Budget This Quarter % 6000 52,264.00 9,847.33 18.8 7000 1,715.00 369.58 21.6 8000 8,070.00 194.31 9.8 9000 0.00 0.00 Total 62,049.00 11,011.22 17,1 MICRO rILMED RY JORM MICR;LAB CEDAR RAPIDS • DES MOINES i MANAGEMENT BY OBJECTIVES DEPARTMENT: PLANNING & PROGRAM DEVELOPMENT DECISION UNIT: PLAN ADMINISTRATION QUARTER: FIRST Fiscal Year Objectives: 1. To review, analyze and prepare recommendations on all applications submitted for rezoning, subdivision, site plan and variance approval making a determination whether development proposals complement or conflict with the Comprehensive Plan. 2. To monitor development activities including: (1) advising developers of the impact of development may have upon the Comprehensive Plan; and (b) maintaining a current data base with which to amend the Comprehensive Plan to reflect a change in trends and conditions. 3. To prepare appropriate amendments to the Comprehensive Plan and implementation of ordinances to reflect any changes in the City Council's development policies with respect to new developments or a misunderstanding of the implications of the Plan upon adoption. 4. To develop plans and policies at a micro -level. Work Completed: All applications submitted have been reviewed on a timely basis as submitted. This activity is an ongoing function of this decision unit. Review of the new zoning ordinance is nearly completed by the Planning and Zoning Commission and public hearings will be held in the second quarter of FY81. Detail plans regarding traffic improvement alternatives in the Melrose Avenue area have been forwarded to the Melrose Corridor Committee for their consideration and recommendations. An update of the Comprehensive Plan addressing the area in southwest Iowa City surrounding the Freeway 518/Highway 1 interchange is being revised to reflect the City Council's decision to extend sanitary sewer to the County Home. This decision has resulted in a complete revision of the aforementioned report. The annexation study is nearing completion and is expected to be forwarded to the Planning & Zoning Commission for their review upon completion of their work on the new zoning ordinance. Analysis: Subdivision plat submissions, rezoning applications, Large Scale Residential and Non -Residential Development plans have been reviewed to determine whether proposed developments are consistent with the Comprehensive Plan and ordinance requirements. This review and processing has been done in a timely manner. The Planner Program Analyst II of this decision unit was appointed as the Acting Senior Planner and results in less staff support to this division's activities. A reduced work program maybe required as an alternative to filling the vacant position. Future work activities will. involve the development of new subdivision regulations and the micro -analysis of problem areas and developing areas of the community. MICROFILMED BY JORM MICR+LA11 CEDAR RAPIDS • DES MOINES aa-75� F i I I � I i 1 MICROFILMED BY JORM MICR+LA[! CEDAR RAPIDS • DES MOINES ■ MANAGEMENT BY OBJECTIVES DEPARTMENT: PLANNING & PROGRAM DEVELOPMENT QUARTER: FIRST (FY81) DECISION UNIT: DEVELOPMENT PROGRAMS Fiscal Year Objectives: 1. a. Insure full compliance with all redevelopment contracts. b. Coordinate downtown redevelopment activities. C. Facilitate completion of CBD Streetscape Improvement Project. d. Facilitate completion of Ramp B. 2. Carry out the Economic Development Program as directed by the City Council. 3. Carry out all land acquisition/disposition activity in accordance with the schedule established for each project. Work Completed and Analysis: A. Downtown Redevelopment: I. Private construction activity in the downtown has continued at a rapid rate. The following is a review of the status of private redevelopment projects: a. Under Contract: All parcels except Parcels 64-1 and 82-1b are under contract. b. Design Review: All private sector design reviews have been completed except for revisions as necessary and for Parcels 64-1, 82-1b and 93-3. C. Conveyances: All urban renewal property has been conveyed except Parcels 64-1 and 82-1b. d. Changes: Parcels 65-2 and 65-4 have been removed as disposition parcels by action of the City Council. Parcel 65-2 is the Blackhawk Mini -Park and Parcel 65-4 is the new Iowa City Library site. e. Construction Start: Construction has begun on nine parcels. Construction on the two remaining parcels is expected as follows: 64-1 Expected Spring, 1981 82-1b Expected in Spring, 1981 f. Construction Completion: The following construction has been completed: 81-1 Hawkeye Barber Stylist 82-1b College Block Building 93-1/101-2 Pentacrest Garden Apartments 101-1 Perpetual Savings & Loan 102-1 Mod -Pod MICROFILMED DY JORM MICR;LAB CEDAR RAPIDS • DES MOINES a. 7 r 1 LI 103-3 Capitol House Apartments The other five parcels are expected to be completed as follows: i 1 LI a. City Plaza: City Plaza is substantially complete. Supplementary items will be completed by Spring, 1981. b. Ramp A: Final completion in Summer, 1980. C. Ramp B: Final completion is expected in November, 1980. d. Streetscape Phase II -A: Construction was completed in Fall, 1979. e. Streetscape Phase II -8: This project began in Spring, 1980, and will be completed in Fall, 1980. f. Streetscape Phase I C: Contract to be awarded in Fall, 1980. Final completion is expected in Spring, 1981. g. Public Library: Final completion is expected in Spring; 1981. B. Real Property Acquisition/Disposition: I. South Gilbert Street Project: , Acquisition by sales contract and/or condemnation was completed by Spring, 1980. Review of City files by IDOT will occur in FY81. II. South Branch Ralston Creek Stormwater Detention Project: Acquisition by sales contract of the two fee parcels was completed by Spring, 1980. Construction will be completed in FY81. III. New Pollution Control Plant Site: Appraisals and review appraisals have been received. Land acquisition negotiations are underway. Relocation of mobile home tenants is underway. MICROFILMED BY JORM MICR+LA6 CEDAR RAPIDS • DES MOINES a�-7S 1 103-3 Capitol House Apartments The other five parcels are expected to be completed as follows: 64-1 1982-1983 (Hotel/Retail) 82-1b 1981-1982 (Office/Commercial) 83-84 Fall, 1980 (Old Capitol Center) 93-3 Spring, 1981 (Breese) 102-3,4 Fall, 1980 (First Federal) g. Block 64 Hotel/Retail: Parcel 64-1 has been rebid, with Plaza Towers Associates designated as the developer on July 15, 1980. h. Parcel 82-1b: 'Company -was The contract with North Bay Construction mutually rescinded in June, 1980. This parcel will be rebid in FY81, with proposals due in November, 1980. II. The following is a review of the status of public projects in the CBD: a. City Plaza: City Plaza is substantially complete. Supplementary items will be completed by Spring, 1981. b. Ramp A: Final completion in Summer, 1980. C. Ramp B: Final completion is expected in November, 1980. d. Streetscape Phase II -A: Construction was completed in Fall, 1979. e. Streetscape Phase II -8: This project began in Spring, 1980, and will be completed in Fall, 1980. f. Streetscape Phase I C: Contract to be awarded in Fall, 1980. Final completion is expected in Spring, 1981. g. Public Library: Final completion is expected in Spring; 1981. B. Real Property Acquisition/Disposition: I. South Gilbert Street Project: , Acquisition by sales contract and/or condemnation was completed by Spring, 1980. Review of City files by IDOT will occur in FY81. II. South Branch Ralston Creek Stormwater Detention Project: Acquisition by sales contract of the two fee parcels was completed by Spring, 1980. Construction will be completed in FY81. III. New Pollution Control Plant Site: Appraisals and review appraisals have been received. Land acquisition negotiations are underway. Relocation of mobile home tenants is underway. MICROFILMED BY JORM MICR+LA6 CEDAR RAPIDS • DES MOINES a�-7S 1 1 i i , IV. North Branch Ralston Creek Stormwater Detention Project: Appraisals have been received. Review appraisals will be received in Fall, 1980. Just compensation will be established and negotiations commenced in Fall, 1980. V. Old Public Library: With the assistance of a consultant, the City will develop a strategy for marketing this parcel for private redevelopment. The parcel will be offered for sale in Spring, 1981. V1. Elm Grove Park: This parcel will be offered for sale for private redevelopment in late 1980 or early 1981. C. Economic Development: The first draft of an industrial site survey has been completed. Further work on this project and on the economic development program in general will proceed pursuant to the direction of the City Manager and City Council. Preparation of an Industrial Revenue Bond Policy will occur in Fall, 1980. D. General Comments: None. Expenditures Budget This Quarter % 6000 $33,489.00 $6,670.79 19.9 7000 1,700.00 119.26 7.0 8000 6,150.00 2,405.16 39.1 9000 0.00 3.75 -- Total $41,339.00 $9,198.96 22.3 MICROFILMED BY JORM MICR+LAS CEDAR RAPIDS • DES MOINES i i MICROFILMED BY JORM MICR+LAS CEDAR RAPIDS • DES MOINES D n MANAGEMENT BY OBJECTIVES DEPARTMENT: LEGAL DECISION UNIT: LEGAL QUARTER: FIRST Fiscal Year Objectives: I. Continue the preventative law program (ongoing). 2. Attend meetings of the City Boards and Commissions in order to improve procedures and aid members to understand the legal context in which the Board or Commission functions (ongoing). 3. Gain further expertise in property acquisition and certain areas of litigation, particuarly personal injury and land use; gain greater familiarity with federal statutes and regulations pertaining to federally funded city programs. 4. Improve administrative procedures to include regular meetings with certain departments. Work Completed: 1. Litigation: Stevens vs. City - application for further view accepted by Supreme Court, settlement reached; Young vs. City - tentative rezoning settlement reached; Commission of Labor vs. City - two OSHA violations settled; Craig vs. City - disciplinary action upheld by Civil Service Commission, appeal filed; Gate City Steel vs. City - interpleader filed; Property dispositions to Ecumenical Housing Corporation; continued property acquisition on Small Cities, Ralston Creek detention structure and Scott Boulevard; Block 64 disposition; review of City's Affirmative Action Plan and the Housing Code; drafting of Animal Control Ordinance and Sewer Use Ordinance.' Unit Goal: To provide the City Council and City departments with legal advice to enable them to comply with Federal, State and local laws and to represent the City effectively in litigation, administrative hearings and other matters. Expenditures Budget This Quarter % 6000 87,392 16,957.07 19.403 7000 3,363 1,100.32 33.242 8000 46,337 7,280.83 15.713 9000 0 0 0 Total 137,092 25,495.55 18.597 MICROFILMED OY JORM MICR;LA6 CEDAR RAPIDS • DES MOINES c 2 75' D i MANAGEMENT BY OBJECTIVES DEPARTMENT: CITY CLERK Fiscal Year Objectives: QUARTER: FIRST FY81 1. To improve productivity. 2• To improve response time for retrieval requests. 3. To continue emphasis on responsible record -k Work Completed: eeping. 1. To absorb duties of eliminated part-time employee, 8 hours of additional duties were added to Marian's workload, 8 hours to Ramona's to Abbie's. Processing of State Tax Refunds was turned over and to Finance. Marian attended the first of 3 weeks of Clerk's training at Ames. 4 hours 2• We do not have a back-7og of retrieval requests. Information requested by auditors required many hours for retrieval. One retrieval of 1958 employment records resulted in a previous employee's IPERSPayment increase from $141 to $257 a month, and a check for back a amount of $1,620. isin 3. Indexing is not always current. On-going work on vault files. Le in requirements met for publications, notices, record-keeping. Legal records provided for lawsuits. Legal records. Code supplement N5 received and distributedone d microfilming g 9 1980 Analysis: Although the same number of Council items are Other week Council meetings will cut the number of minutes to be and number of agendas to be eventually, the every hed finalization of ives Bi each item from oapmeetingnbefdre anotore eradequate time tos be readied. However, additional monitoring and notification of beeis r /liquor taxicabelicenses andone. We ve hada considerable amount Of Problems be /liquor ermits revisions y the ordinance with Legal enddd lPolice departments. have discussed staff, many times onl have discussed illness, vacations y two persons are covering our offices because of cover bid openings and kother,metc., and we both had to close the Office to time; We've not gotten any complaints from the Publice scheduled at the same Expenditures Bud et --S_ Thisuarter % 6000 55,580 12,626 22 72 7000 1,6$0 168 10.00 8000 21,045 3,827 18.18 9000 I I Total 78,305 16.641 21.25 MICROFILMED BY -)ORM MICR+LA9 CEDAR RAPIDS • DES MOINES m NEWSLETTER For Lower Ralston Creek Neighborhood FALL 1980 Update on Activities in the Lower Ralston Creek Neighborhood Acquisition Acquisition of property in the area is proceeding on schedule. To date we have acquired or completed negotiations on all but one of the Phase I properties, and all but two of the Phase II properties. The first appraisals of Phase III properties are complete, and review appraisals will probably occur during the second week of December, with purchase offers being made about the middle of January, 1981. At that time we will also contact all Phase III residents and businesses to give them all possible help in relocating. 2. Relocation To date six home owners have relocated to new homes in the Iowa City area, and all of them seem pleased with their new property. In addition, two tenant families have made use of the downpayment provisions of the relocation benefits, and have bought their first homes. Five other tenants and their families have moved to new houses or apartments. Of the seven businesses relocated to date, three have received moving expenses and four have received payments "in lieu of" moving expenses. These payments which range from the minimum of $2,500 to a maximum of $10,000, depending on the net average annual income of the business, are made if the business is not part of a commercial enterprise having another establishment in the area, and if the business can show substantial loss of patronage through the relocation. 3. Engineering Design for Ralston Creek Improvements Contracts have been signed with two engineering firms to do all the necessary investigations, designs and specifications for the proposed Ralston Creek improvements. Shoemaker & Haaland, Professional Engineers, Inc., will be in charge of the base mapping of the area and channel design. This firm will also draw up plans and specifications for the Benton Street culvert, Benton Street pavement, improvements to the Prentiss Street bridge, lift stations at Benton Street and sheetpiling at the National Copy Center. Shive Hattery & Associates will be carrying out the hydrological (water flow) analysis and analyzing the soils. This firm will also be responsible for the design, plans and specifications for rebuilding the Lafayette Street railroad trestle. These two firms have begun work, and will have designs and specifications ready so that construction can begin in the spring of 1981. Questions? If you have any questions about the project in general or how you will be affected in particular, please do not hesitate to write or call Marianne Milkman, Department of Planning and Program Development, 410 E. Washington Street, Iowa City, Iowa 52240, 354-1800, Extension 312. Act Ionl You will have noticed that a number of houses in the area have already been demolished and the land cleared and filled. This process will continue this winter and spring. The huge trenches you may have seen near the Benton Street bridge recently, were made by the Iowa/Illinois Gas & Electric Company. This company has now completed the moving and reburying of a large gas line in the area. It was necessary to move this line in order to have room for the proposed additional culvert under the Benton Street bridge, and for channel widening. Grant Application In October, 1980, we submitted a grant application to the Department of Housing and Urban Development (HUD) for funding of the third year of the Lower Ralston Creek Neighborhood Revitalization Project. We requested $770,000 to be spent almost entirely on design and construction of the Ralston Creek improvements. We expect to hear whether HUD has approved this grant sometime in December. At this time we do not anticipate any problems with funding. City of Iowa City Dept. of Planning & Program Development Civic Center Iowa City, Iowa 52240 JORM MICROLA6 rhblu 4d'°III; A, '401N[f HUIJC RATE U, 3. POSTAGE PAID IOWA CITY, IOWA' Permit No. 155 City of Iowa CI.j MEMORANDUM Date: December 12, 1980 To: City C''ounff it From: Ciger Re: Stop ll ••Sign - Washington/Madison Streets At a recent Council meeting several bus drivers inquired concerning the necessity for having a stop sign at this location. Enclosed is a j detailed memorandum from the Traffic Engineering explaining the justification for the sign at that location. Also enclosed are the comments of the Transit Manager. The City Manager agrees that the stop sign should stay at the intersection. Pedestrian safety alone represents sufficient reason to retain the sign. If the Washington Street hill is considered to be unsafe during certain inclement weather, the question of a stop sign at that intersection is irrelevant. Buses should not be sliding down the hill - with or without the sign. During initial training transit drivers are issued instructions to use Capitol Street as -an alternate route when they believe Washington may be unsafe. They likewise have received instructions for certain other streets in the City where there are acceptable alternatives. The transit manager will again notify all transit drivers of this policy in writing. The actions stated in the memorandum of the transit manager are acceptable. tp/sp cc: Hugh Mose Transit Drivers MICROFILMED BY JORM MICR+LAEI CEDAR RAPIDS • DES MOINES i i City of Iowa CI.j MEMORANDUM Date: December 12, 1980 To: City C''ounff it From: Ciger Re: Stop ll ••Sign - Washington/Madison Streets At a recent Council meeting several bus drivers inquired concerning the necessity for having a stop sign at this location. Enclosed is a j detailed memorandum from the Traffic Engineering explaining the justification for the sign at that location. Also enclosed are the comments of the Transit Manager. The City Manager agrees that the stop sign should stay at the intersection. Pedestrian safety alone represents sufficient reason to retain the sign. If the Washington Street hill is considered to be unsafe during certain inclement weather, the question of a stop sign at that intersection is irrelevant. Buses should not be sliding down the hill - with or without the sign. During initial training transit drivers are issued instructions to use Capitol Street as -an alternate route when they believe Washington may be unsafe. They likewise have received instructions for certain other streets in the City where there are acceptable alternatives. The transit manager will again notify all transit drivers of this policy in writing. The actions stated in the memorandum of the transit manager are acceptable. tp/sp cc: Hugh Mose Transit Drivers MICROFILMED BY JORM MICR+LAEI CEDAR RAPIDS • DES MOINES i City of Iowa CL MEMORANDUM Date: December 4, 1980 To: City Manager and City Council From: Hugh Mose, Transit Manager Re: Washington Street Stop Sign Ever since Madison Street reopened I have been working with Jim Brachtel, Traffic Engineer, trying to pursuade him to remove the stop sign at the foot of the Washington Street hill. Just when we finally seemed on the verge of agreement, several drivers appeared at a City Council meeting to demand the stop sign be immediately removed. This action has caused the Traffic Engineer to take a hard line, and to insist that the stop sign stay posted. Although I understand the Traffic Engineer's reasoning, I remain unconvinced. Because the buses must slow to 5-10 mph to round the corner, the stop sign does not seem to represent any great increase in pedestrian safety. Furthermore, a simple "vehicles approaching from the right (left) do not stop" sign beneath the stop signs on Madison street should alleviate the drivers' expectation problem. to The Transit position is that year -around the stop sign is detrimental Coralville Transitsmooth andon of Cambus)tonnsit buses the Washingtonwa CitStre ty Hill. OTransitn those infrequent occasions when the hill is so icy a bus descending cannot stop, the stop sign could lead to a disaster. Therefore we would like it removed. However, if the stop sign is retained, the Transit Division will take the following action: 1. As soon as construction is complete on the new shopping mall, we will move Street and other by ravoid Hthe eWashingtonrStreetuhill. Markt arktIV and Manville Heights will be the only Iowa City Transit routes still encountering the stop sign. 2. Bus drivers will be reinstructed to avoid the Washington Street hill whenever the street is slippery by detouring via Capitol, Burlington, and Madison Streets. This detour is already one of the alternative routes given to drivers during their initial training, and this detour has routinely been used under adverse conditions in the past. These two actions should alleviate our most pressing concerns. tp4/7 j MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES ■ 3 Should you have any further questions or comments regarding this matter, please don't hesitate to contact me. bdw4/6-8 B MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS - DES MOINES �;La77 g i ■ __ _ _. __ : _. . 2 2. The geometric changes which have taken place at the intersection of Washington Street/Madison Street would indicate through the using driver that Madison Street is the principal street. In fact, Washington Street will appear to be a minor feeder street onto the Madison Street facility. The average driver would be surprised if he is required to yield the right-of-way to vehicles entering the intersection from the east leg. Therefore, it was felt that a four- way stop installation would more properly meet driver expectation at this intersection. BUS DRIVERS REQUEST The bus drivers have indicated that they would desire to have the stop sign on the east leg of this intersection removed. They claim that during the winter months when snow and ice is present that they are unable to stop a bus when it is moving down Washington Street. I would suggest that it is highly improper to create a less than desirable situation simply for the few snow days during the year when the Washington Street hill may be slippery. It should be noted that the Streets Division is keenly aware of the difficulties of these hills in the event of an ice or snow condition. The Washington Street hill, along with other hills, has been put on a priority rating and will receive first -call attention for either sanding, salting or plowing in the event of inclement weather. It is my opinion that it is extremely inappropriate to create a less than optimum intersectional control situation for a small number of inclement weather days during the year. The bus drivers have also indicated that they feel a second reason for this request is that previously the east leg of this intersection was uncontrolled. They reason then that it should revert to that condition. As noted above, geometric conditions at this intersection have changed since last year and these changes would suggest that the installation of the stop signs on the eastern leg is appropriate. RECOMMENDATIONS 1. . The stop sign be left in place on the east leg of the intersection of Washington Street/Madison Street. 2. If the bus drivers have difficulty stopping the buses on snow and ice days then provisions be made to alter the route and deter around the Washington Street hill using Capitol Street to Burlington Street, and then either the Burlington Street river crossing or north on Madison Street to the Iowa Street river crossing. 3. If it is the opinion of the bus drivers that stopping on the Washington Street hill is in deed difficult at all times, then I would suggest that the routes be permanently removed from the Washington Street hill and the routes rerouted to avoid the Washington Street hill. MICROFILMED BY DORM MICR+LA9 CEDAR RAPIDS • DES MOINES a2a7 7 ^' City of Iowa Ci. ,/ MEMORANDUM Date: To: From: Re: November 20, 1980 Neal Berlin, City Manager James Brachtel, Traffic Engineer Stop Sign Installation - East Leg of Washington Street/Madison Street At the regular meeting of the City Council on Tuesday, 18 November 1980, bus drivers appeared before the Council objecting to the establishment of a stop sign on the east leg of the intersection of Washington Street/ Madison Street. The bus drivers requested that this stop sign be removed for two primary reasons. This memo is to respond to that request from the bus drivers. BACKGROUND Some three or four years ago University of Iowa President Willard Boyd approached the City Council and requested that stop signs be installed at Jefferson and Madison and at Washington and Madison so as to provide college -aged students and staff a margin of safety in crossing at these two intersections. The City Council concurred in President Boyd's assessment of the situation and directed that a four-way stop be installed at Jefferson Street/Madison Street and improved conditions be implemented at Washington Street/Madison Street. The intent of the City Council and President Boyd was to protect the large number of pedestrians crossing at these two intersections. It should be noted that the number of pedestrians using these two intersections has not decreased in the intervening years. Ih the summer of 1980 in conjunction with the sewer corridor project, Madison Street and Washington Street were repaved due to new dimensions and new alignments. While Madison Street has retained its four -lane characteristic at both the Jefferson Street/Madison Street intersection and the Washington Street/Madison Street intersection, the width of Washington Street has been changed. Specifically, Washington Street has been narrowed from a facility which permitted parking on both sides with two extremely wide driving lanes to a paving width of 31 feet. NEW SIGN PLACEMENT Upon the completion of the paving effort and opening to vehicular traffic, it was determined that Washington Street/Madison Street would be made a four-way stop. This decision was based upon two principal factors. 1. The number of pedestrians using this intersection has not decreased since Council determined that pedestrian crossing should be protected at this location. MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES 51Q77 City of Iowa City MEMORANDUM DATE: December 10, 1980 TO: City Council FROM: C1 Wager RE: Spouse Abuse Shelter At the informal Council session of December 8, a question was raised concerning any agreement which the City may have with the Spouse Abuse Shelter for operating funds. Enclosed is the resolution and the contract between,the City and the Spouse Abuse Shelter. You will note that Page 3, Paragraph 4, Item B of the Agreement provides: "The City will assume no responsibility or liability for the operation, program funding, or debts of the property." I MICROFILMED BY JORM MICR+LA9 CEDAR RAPIDS • DES MOINES i' r i1 M I...,�_w,.w,+..amra+w.,w..r.,o:�rswllVl"'P-^-•:C7Y'S'.�.; ..� RESOLUTION NO. 79-557 RESOLUTION AUTHORIZING THE MAYOR TO SIGN AND THE CITY CLERK TO ATTEST AN AGREEMENT WITH OUT OF DANGER, INC., dba AID AND ALTERNATIVES FOR VICTIMS OF SPOUSE ABASH (AAVSA), FOR THE USE: OF COMMUNITY DEVELOPMENT BLOCK GRANT FUNDS TO ACQUIRE, REHABILITATE AND UTILIZE A SHELTER FOR VICTIMS OF SPOUSE ABUSE. i WHEREAS, the City of Iowa City is the recipient of funds granted by the U.S. Uopartment of (lousing and Urban Development (IIUD) under Title I of the (lousing and Community Development Act of 1974, as amended (Public Law 93-383); and, W111:11iAS, the City of Iowa City wishes to utilize such funds to provide a shelter for victims of spouse abuse and to engage Out of hanger, Inc., dba Aid and Alternatives for Victims of Spouse Abuse, to acquire, rehabilitate, and utilize :In emergency spouse nbuse shelter in the City of Iowa City. NOW, TIIIiREFORE, BE IT RESOLVED BY TllF CI'T'Y COUNCIL OF IOWA CI'T'Y, IOWA: 1. That the Mayor be authorized to sign and the City Clerk to attest an agreement with Out of Danger, Inc., dba Aid and Alternatives for Victims of Spouse Abuse, (AAVSA), to acquire, rehabilitate and utilize an emergency spouse abuse shelter. 2. That the approval of said agreement shall be contingent upon AAVSA demonstrating X to the City Council firm financial commitments for the program operation of the spouse abuse shelter. It was moved by del'ronae and seconded by P. rdahl that the resolution as read be adopted, and upon roll call there were: AYES: NAYS: ABSENT: - a Balmer x deProsso -x Erdahl — Neuhnuser x % Perrct x Roberts x Vevera Passed and approved this 11th day of December , 1979' / ! Al"('EST: City C erk 4. Mayor MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES ,,a:aived L Approved By the Legal ep &mnt I M CONTRACT BETWEEN THE CITY OF IOWA CITY AND OUT OF AID AND ALTERNATIVES AFOR RA VICTIMS OF SPOUSE ABUSE FOR THE USE OF COMMUNITY DEVELOPMENT BLOCK GRANT FUNDS TO ACQUIRE, REHABILITATE, AND UTILIZE A SHELTER FOR VICTIMS OF SPOUSE ABUSE THIS AGREEMENT, entered into this I I ticlay of Derombcr by and *between the City of Iowa City, a municipal corpo— rei on 1979 eiiI referred to as .the "City") and Out of Danger, Inc., dba Aid rand Alternatives for Victims of Spouse Abuse, a private non-profit entity (herein referred to as "AAVSA"); WHEREAS, the City is the recipient of funds granted by the U. S. Department of Housing and Urban Development (HUD) under Title I of the Housing and Community Development Act of 1974, as amended (Public Law 93- 383); and WHEREAS, the City wishes to utilize such funds to provide a shelter for victims of spouse abuse and to engage AAVSA to acquire, rehabilitate, and utilize an emergency spouse abuse shelter in the City of Iowa City; NOW, .THEREFORE, the parties hereto agree to the following in performance of this contract: PART I 1, PURPOSE AND SCOPE OF SERVICES: A. AAVSA will acquire and rehabilitate a residential structure (property) in the City of Iowa City which will then be utilized as an emergency shelter for victims of spouse abuse. B. The property to be acquired shall meet the following criteria: 1. Its location shall be limited to the designated Iowa City community development block grant neighborhood improvement project area. 2. Upon completion of rehabilitation it shall, at a minimum, meet HUD Section 0 Existing Housing Quality Standards. 3, In all other respects, it shall conform to applicable laws, codes, and ordinances of the the State of Iowa. City of Iowa City and C. Selection of the property to be acquired shall be made by AAVSA, with written concurrence of the City. MICROFILMED BY r. JO RM MIC R¢LA9 CEDAR RAPIDS • DES MOINES A D. Technical assistance in the rehabilitation of the structure shall be provided by the City. E. Following the completion of rehabilitation, the structure shall be occupied and utilized by AAVSA solely as an emergency shelter for adults alone and with children who are seeking refuge from domestic violence, i.e., victims of spouse abuse. II. TIME OF PERFORMANCE: AAVSA will perform according to the following schedule; subject to change upon mutual agreement of both parties, in writing: Program Element Deadline 1. Demonstration of Financial Viability December 31, 1979 2. Acquire property January 31, 1980 3. Contract for rehabilitation February 29, 1980 4. Complete rehabilitation May 31, 1980 5. Occupy structure/begin shelter June 30, 1980 operations 6. Continue shelter operations July 1, 1980 through June 30, 1985 III. COMPENSATION AND METHOD OF PAYMENT: AAVSA agrees that demonstration to the City Council of financial viability, in the form of firm monetary commitments toward the shelter's first year operating budget, shall be a condition precedent. to the receipt of and/or acceptance of any compensation under this agreement. The City will pay and AAVSA agrees to accept in full the sum of eighty thousand dollars (580,000) for performance under this agreement, as follows: 1. Partial payment will be made upon presentation of a properly executed 'real estate sales agreement for purchase of the property. Payment will be contingent, however, upon. procurement of insurance as required under Section IV -C of this agreement. 2. Balance of compensation due will he paid upon presentation of a properly executed contract for the rehabilitation of the structure. The City will determine whether proposed and actual rehabilitation work meets the required minimum standards. MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES x I 3 ^ 3. The total of the above payments will not exceed $80,000. IV. TERMS AND CONDITIONS OF OWNERSHIP: A. Title to the property will be vested in the name of Out of Danger, Inc. B. The City will assume no responsibility or liability for the operation, program funding, or debts of the property. C. AAVSA will, at its own expense, procure and maintain during the period of this agreement, all-risk property damage and liability insurance to be effective as of the date of possession of the property. Property damage coverage shall not be less than $80,000, and liability coverage shall not be less than $100,000 bodily injury per person or $300,000 bodily injury per occurrence. Proof of insurance shall be shown to the City by furnishing a copy of a duly authorized and executed policy issued by an insurance company licensed to do business in the State of Iowa. D. AAVSA will not sell, assign, or transfer any legal or equitable interest in the property at any time prior to June 30, 1985 without the written concurrence of the City. E. In the event that the AAVSA elects to sell or otherwise transfer legal or equitable interest in the property prior to June 30, 1985, AAVSA will pay to the City the full amount of $80,000. F. This agreement is subject to and incorporates all other terms and conditions set forth in Part II hereof. MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES 4 PARI II 1. PERFORMANCE AND REPORTING: A. AAVSA will maintain on ongoing program of services for victims of spouse abuse at the property to be acquired under this agreement until June 30, 1985, in a manner satisfactory to the City. B. AAVSA will direct all correspondence concerning this agreement to the office of the Iowa City Community Development Block Grant Program Coordinator. C. AAVSA will submit quarterly reports to the Program Coordinator's office by the tenth day of January, April, July, and October of each contract year. In addition, an annual report will be submitted by January 15 of each contract year. No repurting requirements shall extend beyond June 30, 1985. Such reports will include, at a minimum, statistics pertaining to the numbers and places of residence of persons housed in or utilizing the services of the shelter. D. Not later than July 15, 1980, AAVSA will provide the City with a certified statement of the expenditure of funds disbursed under this agreement. II. OTHER REPORTS, AUDITS, AND INSPECTIONS: A. AAVSA will furnish the City or HUD with such statements, records, data, and information as the City or HUD may request pertaining to this agreement within the time requested. i B. At any time during normal business hours, there shall be made available to the City, HUD, and/or the Comptroller General of the United States, or their duly authorized reprsentatives, all of AAVSA's records with respect to this contract in order to permit examination of any audits, invoices, materials, payrolls, personnel records, conditions of employment, and other data relating to all matters covered by this contract. C. AAVSA will retain financial records, supporting documents, statistical records, and all other records pertaining to expenditures under this agreement for a period of three (3) years from the close of this contract, D. AAVSA shall take reasonable precautions to protect the privacy interests of persons seeking and/or receiving assistance at the spouse abuse shelter. AAVSA also agrees to ,abide by all applicable State and federal laws pertaining to domestic and/or child abuse information, if and when such laws would apply. I I a X7? MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS - DES MOINES III. PROCUREMENT STANDARDS: The requirements of Attachment 0 (Procurement Standards) of OMB Circular A-102 shall apply to the use of funds disbursed under this contract. IV. NON-DISCRIMINATION: No person shall be excluded from or denied the benefits of the Emergency Spouse Abuse Shelter on the basis of race, color, national origin, or sex. Reasonable fees may be charged for the use of the shelter, but charges which will have the effect of precluding low and moderate income persons from using the shelter shall not be permitted. V. EQUAL EMPLOYMENT OPPORTUNITY: AAVSA certifies that it is an Equal Opportunity Employer and that it will comply with Chapter 18 (Human Rights) of the Iowa City Code, Chapter 601A (State Civil Rights) of the Iowa Code, and all applicable regulations of the U.S. Department of Housing and Urban Development pertaining to equal opportunity and affirmative action in tracts for work munderent. Further, this agreement AcontaAVSA inlanill eapp opriatensure that aequalll nemployment opportunity statement. V1. HISTORIC PRESERVATION: AAVSA will assist the City to comply with all historic preservation requirements of HUD and the State Historic Preservation Officer of Iowa. I VII. LEAD-BASED PAINT POISONING PREVENTION: AAVSA will comply with the requirements of the Lead-based Paint Poisoning Prevention Act (42 U.S.C. 4831 et seq.) and HUD regulations thereunder (24 CFR Part 35), insofar as they apply to the performance of this contract. VIII.TERMINATION OF CONTRACT FOR CAUSE: If AAVSA shall fail to fulfill its obligations under this contract in a timely and proper manner, or if AAVSA violates any of the terms, agreements, or stipulations of this contract, the City shall thereupon have the right to terminate this contract by giving written notice to AAVSA of such termination, specifying the reason(s) for termination and the effective date thereof, at least 30 days before the effective date of such termination. In that event, AAVSA will re -pay to the City the full amount of 580,000, or alternatively, shall convey legal title of the property to the City of Iowa City. i i MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS - DES MOINES g Further, either party may terminate this contract by giving written notice to the other party which shall set forth the reason(s) for termination and the effective date thereof, at least 30 days before the effective date of such termination. Upon such termination, AAVSA will repay to the City the full amount of $80,000, or alternatively, shall convey legal title of the property to the City of Iowa City. IX. INTEREST OF CERTAIN FEDERAL AND OTHER OFFICIALS: A. No member or delegate to the Congress of the United States, and no Resident Commissioner, shall be admitted to any share or part of this contract, or to any benefit to arise herefrom. B. No member of the governing body of the City, no officer, employee, official, or agent of the City, or other local public official who exercises any functions or responsibilities in connection with the review, approval, or carrying out of the project to which this contract pertains, shall have any private interest, direct or indirect, in this contract. X. INTEREST OF AAVSA: AAVSA covenants that it presently has no •interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of services to be performed under this contract. AAVSA further covenants that in the performance of this contract no person having such an interest shall be employed by AAVSA. XI. ASSIGNABILITY: AAVSA shall not assign or transfer any interest in this contract, whether by assignment or novation, without the prior written approval of the City. XII. HOLD HARMLESS PROVISION: AAVSA shall indemnify and hold harmless the City, its officers, employees, and agents from all liability, loss, cost, damage, and expense (including reasonable attorney's fees and court costs) resulting from or incurred by reason of any actions based upon the performance of this agreement. MICROFILMED BY JORM MICR+LAB '�' CEDAR RAPIDS • DES MOINES I ,1 g Further, either party may terminate this contract by giving written notice to the other party which shall set forth the reason(s) for termination and the effective date thereof, at least 30 days before the effective date of such termination. Upon such termination, AAVSA will repay to the City the full amount of $80,000, or alternatively, shall convey legal title of the property to the City of Iowa City. IX. INTEREST OF CERTAIN FEDERAL AND OTHER OFFICIALS: A. No member or delegate to the Congress of the United States, and no Resident Commissioner, shall be admitted to any share or part of this contract, or to any benefit to arise herefrom. B. No member of the governing body of the City, no officer, employee, official, or agent of the City, or other local public official who exercises any functions or responsibilities in connection with the review, approval, or carrying out of the project to which this contract pertains, shall have any private interest, direct or indirect, in this contract. X. INTEREST OF AAVSA: AAVSA covenants that it presently has no •interest and shall not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of services to be performed under this contract. AAVSA further covenants that in the performance of this contract no person having such an interest shall be employed by AAVSA. XI. ASSIGNABILITY: AAVSA shall not assign or transfer any interest in this contract, whether by assignment or novation, without the prior written approval of the City. XII. HOLD HARMLESS PROVISION: AAVSA shall indemnify and hold harmless the City, its officers, employees, and agents from all liability, loss, cost, damage, and expense (including reasonable attorney's fees and court costs) resulting from or incurred by reason of any actions based upon the performance of this agreement. MICROFILMED BY JORM MICR+LAB '�' CEDAR RAPIDS • DES MOINES 4 7 I IN WITNESS WHEREOF, the parties hereto have executed this contract on this iltidayof ncccmber 1979. I CITY OF IOWA CITY ' I BY: ( rr �11 6= MAYO' ATTEST: fi CITY CLERK, OUT OF DANGER, INC., DBA AID AND ALTERNATIVES FOR VICTIMS OF SPOUSE ABUSE 77 ;i Rah e/Dd 8 q pprovW Y Lepel DeparnrwM . t I ' MICROFILMED BY JORM MICR+LAB • CEDAR RAPIDS • DES MOINES aa -7001 2 City of Iowa CI MEMORANDUM Date: December 10, 1980 To: City Council From: Assistant City Manager Re: League of Iowa Municipalities Legislative Policy As a result of your discussion at the December 8, 1980, informal meeting, I am sending the attached two documents for your information. The "STATEMENT OF CONCERN" contains a list of those issues which we sent to the League last summer in response to their request for concerns to be incorporated into their 1980-1981 legislative policy. The second document is a reprint from the October, 1980, issue of IOWA MUNICIPALITIES which enumerates the 11 point policy adopted by the League for the coming legislative session. bj3/3 MICROFILMED BY JORM MICR+LA9 CEDAR RAPIDS • DES MOINES d City of Iowa CI MEMORANDUM Date: December 10, 1980 To: City Council From: Assistant City Manager Re: League of Iowa Municipalities Legislative Policy As a result of your discussion at the December 8, 1980, informal meeting, I am sending the attached two documents for your information. The "STATEMENT OF CONCERN" contains a list of those issues which we sent to the League last summer in response to their request for concerns to be incorporated into their 1980-1981 legislative policy. The second document is a reprint from the October, 1980, issue of IOWA MUNICIPALITIES which enumerates the 11 point policy adopted by the League for the coming legislative session. bj3/3 MICROFILMED BY JORM MICR+LA9 CEDAR RAPIDS • DES MOINES STATDIENT OF CONCERN (Attach additional shoats if necessary) TO: League Resolutions Committee FROM: Name o City SUBJECT: The following Statement(s) of Concern is (are) submitted for consideration by the League Resolutions Committee: (Type or print -- leave space between individual statements) The City of Iowa City (believes, supports, opposes...) " SUPPORTS 1. Additional local option taxing authority as an alternativb to +limitations on property taxing. 2. Continued and increased funding assistance for local mass transit systems, 3, Modification of the Iowa Open Meetings Law to eliminate certain procedural constraints which impede even normal public discussions of pressing issues and/or require excessive and costly recording and documentation procedures. 4. Continue funding of the Municipal Assistance program as a revenue sharing vehicle between the State and municipal governmental subdivisions. 5. Mandatory multi-year (2) public sector contracts for collective bargaining ' agreements, 6. Continued legislative efforts to improve and enhance interstate and intra- state rail passenger and freight service. 7. State legislation to control and regulate the movement of hazardous materials and the disposal of hazardous wastes. OPPOSES It Further reduction Or limitation Of property taxing authority, 2. Imposition of any constitutional spending limits on municipalities. 3. Any legislation which would reduce below 10% the amount of retainage fees which may be withheld on public construction and improvement contracts or which would diminish public authority to control and disburse those funds. 4. Further reduction,in funding from the road use tax which will result if current taxing formulas and exemptions are retained, 0 i MICROFILMED BY JORM MICR+LAE CEDAR RAPIDS • DES MOINES a;. 7 9 a Z,4 - League '80-'81 legislative policies 77ie League of Iowa Alunicipallties presents this statement of policy as. an expression of the needs of the more than two million Iowans living in municipalities. 7711s statement of legislative policy represents the philosophy of efflcient and cost-effective local government In which citizens and public officials share the concern of providing necessary public services at a reasonable cost. I. FAIR PLAY. The legislature should enact legislation requiring stale reimbursement f6r costs of implementing state mandates imposed on cities by slate statutes or administrative rules. 2. IIOME RULE. The legislature must resist Infringing upon the right of self-determination granted to residents of Iowa cities by the constitution and home rule law. 3. TAXATION. The legislature should promote strong local government with sound taxation policies that allow cities to determine the most efficient means of providing the services demanded by the public by: a. insuring that city programs and services receive an equitable proportion of the state revenues generated from cities. b. enabling cities to utilize local option taxes. c, examining the propriety of all present property tax exemptions. It. developing a uniform property tax assessment system that Is easily understood and administered. Such a system should make assessments equitable within and and punitive damages that the state enjoys, the same immunity on inspections that Insurance companies enjoy, and revising a municipality's duties to defend and indemnify its officers and employees. 6. LAW ENFORCEMENT. The legislature should promote effective local law enforcement by: a. funding the local cost of training Iowa law enforce- ment officers. b, evaluating the local cost/benefit relationship of utDiz- Ing the unified law enforcement act. c, enacting more stringent moped licensing provisions. 7. ROAD USE TAX. The legislature should make certain the road use tax fund Is funded In a manner that will maintain our road system through the imposition of an ad volarem tax on all fuels, elimination of the gasohol exemption, creation of new revenue sources, transfer of funds from the state's. general fund, or any other appropriate means. 8. BETTER GOVERNMENT. The legislature should create and adequately fund an Iowa Advisory Commission on Intergovernmental Relations. Such a commission would encourage more efficient government end more equitable taxation through legislative and administrative recommen- dations based on analysis of specific problems In the complex interrelationships among governmental units. 9. EQUAL RIGHTS. The legislature should guarantee equal rights under the law to all Iowa citizens. among property classes as well asjurisdlctions. 10. COLLECTIVE BARGAINING. While the Public Employ- ment Relations Act has proved effective in resolving 4. LAND USE. The legislature should recognize the public collective bargaining disputes, elements of the law specifi- need for meaningful land use policies by making certain tally mandating final binding arbitration must be viewed as that present and future state laws encourage wise land use an erosion of local fiscal and administrative responsibility. decisions and provide cities and counties with the neces- Alternatives to this method of dispute settlement should sary authority to implement efficient land use controls. be Investigated and, if appropriate, adopted into law. i. LIABILITY. The legislature should protect taxpayers' 11, TRANSIT ASSISTANCE. The legislature should encour- inveslmenl in governmental facilities and personnel by age transit programs by funding state transit assistance In a correcting municipal liability laws. Such corrections could manner that allows for inflation and system growth while rake the form of either limiting the amount of awards or providing a dependable allocation formula that allows local extending the same exemptions on discretionary functions budget decisions to be made In an Informed manner. °°f 0�, R. E. HAYS AND ASSOCIATES CODIFIERS FOR THE LEAGUE OF IOWA MUNICIPALITIES M&N 1C%f l' Suits 102 Wait Torlara Bldg. -1200 05th Svut—Wart Oq Moinos, Iowa 50755 R. E. Mayr, Prnid.nt Td.phons 516/726.6525 MICROFILMED BY JORM MICR+LAE3 CEDAR RAPIDS • DES MOINES IOWA MUNICIPALITIES, October, 1980 a D-7? i City of Iowa City MEMORANDUM DATE: December 4, 1980 TO: City Council FROM: Planning &.Zoning Commissi RE: Use of a Lift Station for lFuure Developments in the Oakes Drive Area Dean Oakes has submitted an application to the City to develop 33 single family lots located off Oakes Drive extended. Because this development is located in the Rapid Creek Watershed, it necessarily requires provision of sewer service via the use of a lift station. At one time, as proposed by the 1963 Sanitary Sewer Report submitted by Veenstra & Kimm, this area was to be sewered by lift station and use the Northeast Trunk Sewer. Subsequently, it has been City Council policy that the City will neither allow nor accept any new lift stations. This policy appears to be under consideration in regards to the proposed Highlander lift station. The Engineering Division has addressed the question of sewer capacity and lift station use for the subject area and recommend against allow- ing the developer to use capacity allocated to a different watershed now being served by Northeast Trunk Sewer (see attached memorandum). They recommend sewer service be provided to this area in conformance with the 1979 Sanitary Sewage System Facility Plan prepared by Veenstra & Kimn and adopted by the City Council. According to this plan, in lieu of using the Northeast Trunk Sewer, Mr. Oakes should seek sewer service from a different sanitary sewer system - the River Corridor System. Therefore, development would not occur with City sewer service in the immediate future and the preliminary plat of Oakes Third Addition would need to be substantially revised to re- flect either a septic system density or denied by this body because of the lack of sewer service. The Commission is interested as to whether or not the Council's policy has changed regarding use of lift stations and particularly in reference to the development of this area of the City. We re- spectfully await your reply on this matter before further consid- eration of the preliminary plat of Oakes Third Addition. MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES City of Iowa C; 1 MEMORANDUM Date: November 18, 1980 To: Doug 800throy From: Denny Gannon D& Re: Dean Oakes Third Addition In 1963, a Sanitary Sewer System Report was submitted by Veenstra & Kimm to the City of Iowa City. In that report, it was stated that an area of 135 acres located just south of Interstate 80 (which includes Dean Oakes Third Addition) drains to the north and a pumping station would be required at the time of development in order to provide sewer service. The station would discharge to the Northeast Trunk Sewer. This trunk sewer would also serve an additional 1,300 acres of gravity flow besides the aforementioned 135 acres of pumped flow. Since this 1963 study, businesses located outside the Northeast Trunk Sewer drainage area, as defined in the 1963 report, are now sewered by the Northeast Trunk Sewer. The businesses include ACT, Howard Johnson's, Sinclair gas station, and possibly in the future, the Highlander Inn. Therefore, with this extra flow, the Northeast Trunk Sewer will not be able to sewer the entire drainage area as defined in the 1963 report. In 1979, another study was submitted by Veenstra & Kimm to the City of Iowa City, entitled the Sanitary Sewerage System Facility Plan; it has been adopted by the City Council. In this report, the 135 acre area (which includes Dean Oakes Third Addition), which the 1963 study analyzed to be pumped into the Northeast Trunk Sewer, now is to be sewered by gravity by an entirely different sanitary sewer system - the River Corridor System. The owner of Dean Oakes Third Addition has requested to sewer this sub- division and future development to the north by a lift station, which would pump to the Northeast Trunk Sewer. Engineering is hereby recommending against the proposed lift station for the following reasons: 1. The 1963 study included a lift station in this area to be pumped into the Northeast Trunk Sewer; however, since this report has been submitted, previously mentioned businesses, located outside the 1963 drainage area are now sewered by the Northeast Trunk Sewer, which therefore limits capacity. The remaining capacity should be provided for areas which can be sewered by gravity. 2. The 1979 study shows the area to be pumped, as defined in the 1963 study, to be sewered by gravity by the River Corridor System. 3. The City's policy of late has been to avoid lift stations due to the extensive maintenance problems involved with them. bcl/8 MICROFILMED BY DORM MICR+LAB CEDAR RAPIDS • DES MOINES i INri RSrATG eD &To^" WMTat _ lloft. A S.�wa �LPo SED OA¢ES 'V ADOITiOeJ S " ��•FUTUR• JI\f 11 to.D oA1cEti 1�` OAKES Wo ADDITIOLI i 44 1.00ATio W�__ I ' SGAL' 1"� i.VO• AVVvp MICROFILMED BY t JORM MICR+LAB CEDAR RAPIDS • DES MOINES 1. r 1 I 1 I i ii I 1 �i `1 l 1 i INri RSrATG eD &To^" WMTat _ lloft. A S.�wa �LPo SED OA¢ES 'V ADOITiOeJ S " ��•FUTUR• JI\f 11 to.D oA1cEti 1�` OAKES Wo ADDITIOLI i 44 1.00ATio W�__ I ' SGAL' 1"� i.VO• AVVvp MICROFILMED BY t JORM MICR+LAB CEDAR RAPIDS • DES MOINES 1. r 1 I 1 I i ii I 1. �i `1 I 1 i INri RSrATG eD &To^" WMTat _ lloft. A S.�wa �LPo SED OA¢ES 'V ADOITiOeJ S " ��•FUTUR• JI\f 11 to.D oA1cEti 1�` OAKES Wo ADDITIOLI i 44 1.00ATio W�__ I ' SGAL' 1"� i.VO• AVVvp MICROFILMED BY t JORM MICR+LAB CEDAR RAPIDS • DES MOINES 1. r 1 City of Iowa C1. MEMORANDUM Date: December 12, 1980 To: City Council From: Dale Hel ling, Assistant City Manager Re:Sanitary Sewerage System Facility Plan This Friday's information packet includes a memorandum from the Planning and Zoning Commission requesting Council input regarding policy on the present and future use of lift stations. Council has previously addressed this issue both as it relates to specific requests for the approval of the lift stations as well as in general terms as an overall policy matter. You are being asked to respond to a question from the Planning and Zoning Commission which we do not feel you should consider without having a more comprehensive view of the entire 1979 Facility Plan and how it relates to short-term and long-term development on the north side. Please note that a time has been scheduled at your December 15, 1980, informal session for discussion of this plan. Staff members from the Plan Administration Division and the Engineering Division will review the current plan with you. I am sure that you will find this information extremely helpful as a basis for future decisions regarding both residential and non-residential development and related sewerage questions. bj5/1 � 1 1 aa8a MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES M r � 1 1 aa8a MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES M - I i i i d City of Iowa Ci!1 MEMORANDUM Date: December 3, 1980 To: City Manager and City Council From: Hugh Mose, Transit Manager 9114 Re: Transit Fact Sheet Attached please find a copy of the UMTA Region VII Transit Fact Sheet. We have added the statistics for Iowa City Transit at the bottom for comparison. You will note that although Iowa City is smaller than any of the communities listed, our transit operation is comparable to most of the Urbanized Areas. Even though we have fewer buses than all but one of the cities listed, our ridership is greater than that of many cities twice our size, and our "Riders Per Revenue Vehicle Mile" is higher than almost all of the other systems. Furthermore, our "Ratio of Revenue/Operating Costs" is the highest on the page. Our conclusion is that in spite of our small size, Iowa City Transit compares most favorably with the other larger cities in our UMTA region. Not only do we carry more passengers, but we do it very efficiently. It is also interesting to note that if Coralville Transit and Cambus were included, the statistics for the Iowa City/Coralville Urbanized Area would be even more impressive. Although we would have fewer buses than Cedar Rapids, our ridership would approach 5,000,000 and our "Riders Per Revenue Vehicle Mile" would probably be the highest on the page. bil/3 MICROFILMED BY JORM MIC R+L A13 CEDAR RAPIDS - DES MOINES I ■ i i `i ■ 0 x o a w rai ~ x H 0 N T1 W - v rai ¢ m 1 z d W d u a H S b b -H s 0 X w a 8 U , b N t .0 U y Itl 0 y P i„•,� a U w C OW i H u O U) i� 8' x o” :t/ H U to ZK V to j JORM MICR+LAB j CEDAR RAPIDS •DES MOINES ro N +1 U ro 0 r� 1 j '. j i 1 1 3 I 0 x o a w rai ~ x H 0 N T1 W - v rai ¢ m 1 z d W d u a H S b b -H s 0 X w a 8 U , b N t .0 U y Itl 0 y P i„•,� a U w C OW i H u O U) i� 8' x o” :t/ H U to ZK V to j JORM MICR+LAB j CEDAR RAPIDS •DES MOINES ro N +1 U ro 0 r� 1 j '. j 3 0 v •a al 7 u a1 N m 0 O ID 1D N H 0 O O m "'I M In D1 N ul a' w 10 UJ V> V . i M M M P M M M .-1 N 0 Kq a) a a! of N H u O u O u u O u u u u u U N Q O Q N O u1 O O O N O O O O N In W u) Q V M ul Q v N N N H 0 a v v 0 H d•.UI M %D �: m r•1 �; O m J .D ID n `0 T M N N .•/ N N N ri H (7i N n 'O • w0�1 Z •-1 .-1 N ayx> a1 a1 O r O w O r m 1D M m V N N N O ro C U min P in " 0 O P .-1 O N M O T O in u 1, 7 W •u .-I .-1 m N O m r m D\ m (71 p £ m p0 Q CK > co m r O N m w N M m P M r H m w Q n P T � (71 N ••I ..1 (71 N m N T � H of 'D .0.0 IU O O O in OI C, C C '� X O m m N mO N O V. 1D ID m M v Q O O m M M Ip (71 m ul 11 ,..1 ,� iin n N N >ina 3 m a N P n P r i o r z ro aH N -o . a m0-1 m 91 HN N O b h r b M N H a b9 0 r D1 O N m N M O 0 in N C C y N m 0 M r n u1 0 D- .O M .-1 ' a 14 N N in N N N Cj H M to ch M ri r-1 in .O.1 0 rl �D 0�1 14 n al ID ul M Y1 cn r•/ N r`I .i N "� e-1 0 N F to W a in V H •q 0 m M N m Q M H MN ' N N m N lin N M w N 1D In o m a r ch m In Q o ul P ma H M N Q N N Q N N Q M M N M N U M (M W H L K a, a 10 N M t0 m In u) 0r :111 N M r (P1+1 H $4 > O aJ 0 H (71 r D in to r r ID r .1 vl r Q O\ r' m a u ~If a H m 1 W -x'11 d m M u1 Q O M m u1 M 0 O r m 1D N Q v N ry N N .r -1N Z K 1'01 (7011 (7i a1 W 11 Ql N in M OD m V CO O 7 V m r In In O r -1M .•1 M 0 Q ' o P M Q Q N W m m Q CD m P O 0 O .i n 0: E l0 r-1 ID N m M N H N r -I N rl r-1 .-1 11 Q r� 41 ID 1�0 W a) N (71 D1 O r-1 r M V M O V M OI r•I r1 J 0 M M N N N 14 .i .••1 H .1 H H 11 Z 1 C Q r ID Q P M m m O .-1 r M O V 0 R] O Q m r M N Q O 0 P m M N 0 o p 'I r r M m P (71 O M m 01 u1 0 N Ort N m Ia N r•1 N i 4 'i N m M N N (71 N In r In m r I C 1 m O 01 O 1n N M M N (71 m N ID N p O IC m .-1 V M N ri .i .-I .-1 ..1 ul R.N 0 x o a w rai ~ x H 0 N T1 W - v rai ¢ m 1 z d W d u a H S b b -H s 0 X w a 8 U , b N t .0 U y Itl 0 y P i„•,� a U w C OW i H u O U) i� 8' x o” :t/ H U to ZK V to j JORM MICR+LAB j CEDAR RAPIDS •DES MOINES ro N +1 U ro 0 r� 1 j '. j City of Iowa C7 f t -'a Date: December 9, 1980 To: City Manager & City Council From: Hugh Mose, Transit Manager Re: Council Referral/Small Buses Several weeks ago a Councilperson inquired about the viability of using small buses to supplement our existing fleet. I do not believe that the acquisition of small buses is a realistic answer to our present problems, for the following reasons: 1. Although the initial cost of a small bus is low, small buses are generally not designed for heavy duty transit use, and consequently they do not age well. ,The life expectancy of a small bus is generally only five years, as opposed to a standard transit coach which should last 12 to '15 years. Also, as the vehicle deteriorates, the cost of maintenance skyrockets. 2. The cost of the driver's time accounts for more than half of our operating expenses. In this respect the operation of a small coach is just as expensive as a larger vehicle. 3. On a per mile basis, the maintenance of a small bus is likely to be more costly than the maintenance of a larger vehicle, particularly if the small bus is gasoline powered. Also, the acquisition of a new parts inventory and new mechanics' skills will certainly drive up our maintenance expenses. 4. A small bus is not cheap; the "Bionic" bus last year purchased by the University cost in excess of $26,000. A similar bus purchased today would probably cost about $30,000. When one considers that this purchase will need to be repeated again in five years, the life -cycle cost difference between a large bus and a small bus decreases dramatically. 5. There is currently available a new breed of small bus designed specifically for transit use. These 30 -passenger, diesel -powered vehicles cost in excess of $100,000. At this price there seems to be no real advantage over a $140,000 full-size coach. Although the small bus looks attractive initially, when one considers its total operation there is really no great cost advantage. Although the small bus may look more efficient, have a shorter delivery time, and be more manueverable on narrow streets, its use to supplement our regular line haul buses cannot•be recommended at this time. tpl/l .... ._-... ,.._. _..,. i MICROFILMED BY JORM MICR+LAB i CEDAR RAPIDS - DES MOINES I REC­ ,J, hr iu r�rrilUNITED STATES 'rr NIICLEAH HEGULATORY COMMISSION WASIIIN(11(IN• D. f.. 1 The Honorable John R. Balmer Mayor of Iowa City Iowa City, Iowa 52240 Dear Mayor Balmer: an regardingnthreponse toestransportationlofter of radioactivebwaste materialsCovernAhearne, U.S Highway 218. Iregard to your specific concerns, US Highway 218 (between Iowa City and in Nt. Pleasant) was approved for spent fuel shipments by 7 Requ-NRCirements staff s October, 1979 under the original version of 10 CFR 73.37, Requirements for Physical Protection of Irradiated Reactor Fuel in Transit. The regulatiohere ns at that time required licensees to plan spent fuel shipmentsto avoobligated practicable, heavily populated areas. Accordingly, licensees to by-pass Des Moines. The US -218 to US -34 by-pass, as proposed by a licensee, was Iowas sStat pecial were nowhich statenorulocal after restrictionsdiscussions with which precluded spent fuel shipments on this route. There has been only one shipment of spent fuel to date on this section of US -218. Five more shipments have been approved but most probably will never be made. (These five were to go to a ofcilitnucloarnmaterialdi WWashington, which has since stopped receiving this typ In regard to future shipments in general, the Department of Transportation has tentatively established hforlthertransportation ofhighwas dradioactiveferre materials highways" as appropriate and has published a proathlslin rproposas to re posed rule that would requi over such routes (45 FR 7140). The NRC Staff supports general and is considering the merits of adopting the requirements of this rule, specifically for spent fuel shipments. sincerely, William'J. Ducks Executive Director for Operations cc: Senator Jepsen Senator Culver Representntive I.each Representntive Grassley Representative Tauke MICROFILMED BY JORM MICR+LAB l CEDAR RAPIDS • DES MOINES I r`CE.".. J DLI- 3 1980 YolmrP, * DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT WASHINGTON, D.C. 20410 DEC t 1980 OFFICE OF THE ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT IN REPLY REFER TO, Mr. Neal G. Berlin City Manager Civic Center 410 T{ast Washington Street Iowa City, Iowa 52240 Dear Mr. Berlin: Assistant Secretary Robert C. Rmbry, Jr., has asked me to acknowledge and thank you for your letter of November 4 concerning industrial revenue bonds. Although this form of local financing to enhance private investment has its detractors, this Department has In fact, HUD was successful in expanding the latitude supported the mechanism. accorded to IRB issues used in conjunction with the Urban Development Action Grant program. We are particularly impressed by your articulate statement of policy far issuance to IRBs, and the strategic relationship to downtown revitalization implicit in that policy. We. believe your approach to written policies in this phrticular area is unique; an with kc 1 your permission, would give. this statement broad distribution to other citirs as guirlance and tohnical assistance. I look forward to your early approval. Sincerely, •I on 1 G.r- Dirertor ()ffirc of Policy Planning; aa8� i MICROFILMED BY d JORM MICR+LAB Z CEDAR RAPIDS • DES MOINES I- I �j j 1.1 .. 1:c LWV of Johnson County Iowa Clt•;, Iowa Ilecombor 11F8 1980 Mayor John Balmer Iowa City Civic Center 410 E. WKshington Street Iowa City, Iowa Dear Mayor Bnlmer: We would like to call your attention and the attention of the Iowa City City Council to the December 16th luncheon meeting of the League of Women Voters of Johnson County. Dr. Thomas Pogue of the University of Iowa's economicaPpopartmont will speak briefly on local option taxes and then answer.questions raisod by those at the lunch- eon. The luncheon will be at 12 noon at Maxwollls, 121 E. College Stroot, and will cost about $3.00 or lees. The program will begin at about 12:30 p.m., and those who wish may attend just the program. 411 aril welcome. Thone who plan to attend are asked to call Kathleen Henderson, 338-11.41.7, or Naomi Novick, 337-46499 by December 13. Sincoroly yours, Kathleen Henderson MICROFILMED BY JORM MICFV+LAB CEDAR RAPIDS - DES MOINES rrHawkq,-,y(1e CableVisio November 18, 1980 Braodbcrnd TvIecummunIeatton Cc) non lslilon City of Iowa City Iowa City, Lowa 52240 Dear Commissioners: Once again, I am happy to report that construction and completion of the remainder of Iowa City proper is muvLnl; steadily forward. Recently, we accepted Phase 211 representing another 25 miles of plant and 2,517 additional passings. With this recent addition we now stand at 10,275 total passings or nearly 65% of total estimated passings. Phase 3 and 4 will be ready soon, possibly yet this month. The 5th and final phase should he completed yet this year leaving only a small amount. of underground to carry -aver Into 1981. Presently, we arc feverlshl.y attempting Lo conlp Lota .1:. much underground as possible; however, the exLcnL of compluLion of this portion of our project depends heavily on weather conditions. Even at worst case, we can expect only a 4-5 mile carryover into the 1981. spring construction season. This represents only 257 of the total. underground mileage and less than 107 of total underground passings. Sincerely yours, William L. Blough General Manager WLB/.Ie 546 SoulhOatc Avotojo Iowa City, Iowa .`,2'/.40 315.351.3984 A subsidiary of Amoriran'I" levision 0 Colnlmniicalinns, Inc, MICROFILMED BY DORM MICR+LAB CEDAR RAPIDS • DES MOINES I MANAGFMFNT BY OBJl.CllVFS DEPARTMENT: CITY MANAGER QUARTER: FIRST DECISION UNIT: BROADBAND TELECOMMUNICATIONS SPECIALIST FISCAL YEAR OBJECTIVES: 1. Oversee and monitor Hawkeye Cable Company progress and implementation of cable system. 2. Keep City and City Council updated on status of cable TV. 3. Serve as Broadband Telecommunications Commission (BTC) staff and advisor. 4. Act as information resource for community on cable and access TV. 5. Advise, assist, promote funding, operation and usage of access channels. 6. Identify, contact, train access channel users; produce, supervise and/or assist in the production of access programming. 7. Start administering National Telecommunications Information Adminstration (NTIA) grant. WORK COMPLETED: I. Contacted Hawkeye Cablevision on bi-weekly basis. 2. Reported to City weekly. 3. Advised, assisted and updated BTC as necessary. 4. Continued to respond to citizens problems dealing with cable TV. 5. Production workshops continued for City staff, library staff and public. Spoke at four conferences and one dozen community groups; consulted and advised almost 30 cities, towns, access centers and colleges. 6. City government access channel and public library access channel upgraded. Character generator information implemented and visual programming planned. Four City video programs in production stages. Access center system operating from public library and Hawkeye. 7. Started testing potential video and micro -computer equipment purchases from NTIA grant. ANALYSIS: Monitored cable TV construction; dealt with cable company, BTC, City and citizens on resulting problems and concerns; started administering grants for access center equipment; upgraded City and library journals and initiated City programming; continued production workshops for City, library and public. MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES I I EXPENDITURES BUDGET YEAR-TO-DATE % 6000 $21,633 $ 4,421.29 20.438 7000 1,520 329.43 21.673 8000 2,866 683.26 3.840 9000 --- TOTAL $26,019 $ 5,433.98 20.885 I } ,t � I i e i 1 I n {Y MICROFILMED BY JORM MICR+LA9 CEDAR RAPIDS • DES MOINES m C fin.. I_ I MICROFILMED BY JORM MICR+LA9 CEDAR RAPIDS • DES MOINES m I_ I I I } I I I � I i e n {Y Si RECD!'::::: VEENSTRA & KIMM, INC. December 8, 1980 Meal G. Berlin City Manager City of Iowa city CIVIC Center 410 East Washington Street Iowa CitY, Iowa 52240 RIVER CORRIDOR SEWERS PROJECT WEEKLY PROGRESS REPORT NO. 21 This Is to report progress on e the River corridor Sewers project for the week ending December 6, 1980. Crew No. I moved to Manholeat the mupal water plant. The crew Installed 150 feet of 42 -inch Pipe. A conflict with a 10 -inch Univ main was discovered. ersity voter Crew No. 2 laid 48 feet of 27 -inch pipe In Riverside Drive and connected I to the tunnel at the railroad crossing. The crew then moved to the siphon inlet structure to lAY Pipe back to Riverside Drive. Iowa Avenue and Madison Street were opened to 'traffic. E 2C Kimm JWK:jk 11648 cc: Charles J. Schmadeke W. L. Levay ,1 i MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS - DES MOINES I \ ` MINUTES ! ! MELROSE CORRIDOR COMMITTEE / NOVEMBER lZ/ I980 ! CITY MANAGER'S CONFERENCE ROOM � MEMBERS PRESENT: Wnlraich/ Roberts, Perret, Kammermeyer, Bezanson, Mart` Turner MEMBERS ABSENT: None ' ' STAFF PRESENT: Brachtel/ Schmadoko/ Farmer, 800thrny/ Tyler SUMMARY Chairperson KammermeyerCalled the meeting to order. The minutes ofJuly 24, 1980 were amended as follows: Page 2 //Present University plans anticipate relocation of the playing field at such time as future extension of the / nspitl occurs." Insert after n, i Page 3 Paragraph 3^ Delete statement of Universitypositi0n and insert oand resery �� had b ` » a 0ns a been expressed. . Page 5 Add 0 to $22,000 so the figure reads $220,000, Minutes stand approved as amended. . ENGINEERING � Kammermeyer explained that in the intervening months since the last Committee meeting, Engineering had formulated a number of proposals and cost estimates for /the Melrose Corridor. Discussions s�Uss uns ar� currently taking place between the City and the University and the University is reviewing three proposals at the City's request. BezanSnn stated that formerly the University was not in a t o consider the Melrose Diagonal. Particularly, the University was concerned about the existing neighbor which would be impacted by the construction of the Diagonal. However, since the City had requested theUn1versi�y �o review the proposals, the Campus Planner and architect for the new Law Building have begun the review process. He cautioned that a | ` definite conclusion may not be forthcoming. � , Schmadeke explained that Melrose Avenue has an existing 66 foot right of ' | ` way. Virtually, any improvement on the street will cause some ' | MICROFILMED BY CEDAR RAPIDS - DES MOINES I � � u MINUTES MELROSE CORRIDOR COMMITTEE NOVEMBER 12, 1980 PAGE 2 encroachment on University property and possibly on private property. As the southern curb of the existing street is at or near the right of way line, most of the encroachment would be to the north of the existing street. Schmadeke presented a series of maps and slides showing various proposals for road construction in the Melrose Corridor area. The first option presented was the Melrose Diagonal with a 15 foot wide median strip. The pavement would be widened beginning at Wolf Avenue. beiwould the location require south nfor t2 foot riht of he p oposed southycu bhandithensouthernusidewalk would Thisalignment wouldgencroach naso ebike pr vateup operty,aaelane wold be va anton thelotrand one home. The northern edge of the right of way would be located 50 feet from Slater Hall. The S-shaped curve would have a 350 foot radius with two lanes 25 feet wide. Total cost estimate is $706,000. Members raised several questions. In response to a query about the need lanesfor 12h foot nmstreets Schmadeke explainedthatthewidth was determined a ned on thercrite ianeof beyond comfort. fenceBezanson ofasked thehow p playing field. ofwaywould extend stated approximately 32 feet. Bezanson also raised the question of pedestrian crossing and asked if a pedestrian overpass had been considered. Schmadeke responded that the City had not really considered building an 1 Schmadeke explained that questioned t order to allow ahe need fprotected turning movement 1 and facilitate snow removal, at least 15 feet was required. The second tion ly ' and widenedopavementsextendingleasthOfsame Wolfatothe thefirst with Rock IslandhRaillroad bridge. A major advantage to many would be that the Wolf Avenue intersection would be completed and allow better traffic movement. The additional cost would be $5,000. This option would require modification of the tennis courts. The third option presented was the Melrose Diagonal without a median. This would require a 78 foot right of way and thus necessitate acquiring an additional 18 feet. The bike lane would remain. Pavement would consist of four 11 foot wide lanes. Total cost estimate is $674,000. Members questioned the need to remain 50 feet from Slater Hall arguing that the 50 feet might impact more critically on private homes than on Slater. Roberts stated that the Committee should remember that the homes will eventually be removed but that Slater Hall will remain for many, many years. The impact on the playing field was discussed. Kammermeyer pointed out that the University was concerned with maintaining the integrity of the field. Bezanson asked how far the right of way would infringe onto the I MICROrILMED BY JORM MICR+LAB CEDAR RAPIDS - DES MOINES MINUTES MELROSE CORRIDOR COMMITTEE NOVEMBER 12, 1980 PAGE 3 field. Schmadeke responded that with the eight foot bikeway and the steep slope, perhaps 30 feet, the possibility of placing a retaining wall at the south end of the playing field was raised. In response to a question, asking for the dimensions of the playing field, Bezanson stated that the field was intensively used and layed out and that little extra space existed. Bezanson asked about entrances and exits from the parking lot located on South Grand. Farmer responded that the estimate included eliminating the eastern parking lot. Kammermeyer pointed out that the Committee had discussed the undesirability of the parkinglot directly across from Melrose Court. exit being located Members questioned whether a traffic light had been anticipated. Schmadeke responded that a light had not been considered . Kammermeyer stated that the Committee had discussed the possible need for signalization at South Grand. This could aid pedestrian crossing on Melrose Avenue. Members asked whether the Byington extension north of Grand, Grand Avenue and South Grand would remain open if the Diagonal was built. Schmadeke responded that this would be dependent on the University's needs. He stated that the City has no need to keep this street open. Bezanson stated that unless Grand were kept open, the Cambus route from the hospital to the dorms to the east side would be affected and that might cause an increase in undesirable pedestrian crossings. The fourth option proposes a four -lane street with the proposed south curb matching the alignment of the present paving. Byington Avenue will be expanded to 45 feet wide paving by constructing a "S" curve with a 125 foot minimum radii. This alignment would encroach onto private property at Melrose Avenue and Byington and two University -owned houses would have to be removed. If all four lanes were in use, a maximum speed of ten mph would have to be observed. Total cost would be approximately $642,000. Engineering is not in favor of this option as it does not provide a smooth transition between Melrose Avenue and Grand Avenue and might not successfully relieve pressure on Melrose Court. The fifth option was the improved "traffic circle" concept with the addition of a widened pavement on Melrose Avenue from two lanes to three lanes from South Grad avenue to Byington. In addition, an improved intersection at Byington and Melrose Avenue would accommodate future extension of Byington south. Under this plan, Byington would remain one- way for northbound traffic. The intersections of Byington and Melrose Avenue and Grand Avenue would be enlarged to a 125 foot minimum to improve trafficement allowing southboundnd Avenue lbusetrafficwonlfor westbound traffic would be a one-way for southbound traffic with a bus lane South r nortAvenue hbound bus traffic only. Grand Avenue would need to be widened to accommodate three lanes. Total cost estimate, would be $682,000. i MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES , MINUTES MELROSE CORRIDOR COMMITTEE NOVEMBER 12, 1980 PAGE 4 Members questioned the need for such a large turning radius and the need for traffic to travel at 25 mph instead of 10 or 15. Perret pointed out that at the corner of Riverside Drive and Iowa Avenue, the turning radius is 75 feet and traffic still moves through that intersection. He suggested that having a smaller turning radius would save property and money. Roberts responded that millions of dollars were being put into the downtown in order to build up the retail section but at present there was no direct way to get to the downtown. He stated that the Melrose Diagonal looks to the future, especially in light of the construction of 518, allowing direct access to the downtown. Members questioned how much more traffic could actually get through the intersection with these improvements. Berlin stated that the goal of the improvements was to provide convenient, safe travel and keep traffic off Melrose Court. Perret responded that it was also important to preserve neighborhoods. Boothroy pointed out that providing an arterial street would consolidate traffic, taking it off local streets. Perret pointed out that in order to build the diagonal, at least five residences would have to be removed. He stated that they were attempting to preserve part of a neighborhood by partially decimating another neighborhood. Kammermeyer stated that especially considering icy streets, the Committee should consider the safety aspect. He stated that the diagonal was safer. Turner stated that Byington was much worse now than it would be after improvements proposed with the "traffic circle" concept and that even so, it was not particularly hazardous. She agreed that safety had to be a concern but that the Committee would not be correcting a situation which had become unsafe. Other members pointed out that the traffic circle would increase the number of lanes and would create some two-lane traffic which is presently one -lane which could increase the hazard. Brachtel stated that there might be an increase in random accident occurrence and that with the two-lane "S" more sideswiping might occur. He added that a straighter alignment would be preferrable from a safety point of view but that the increase in traffic accidents would not be statistically meaningful. Kammermeyer asked if the estimate on the traffic circle was perhaps low since a lot of earth moving would be required. Schmadeke stated that most of the widening would be on the east side of Byington and approximately 20 feet would have to be taken off the hill. Bezanson asked what impact this would have on the new Law Building. Schmadeke said that the house on the corner of Grand and Byington would have to go as well as a privately owned piece of property in the right of way. He added that the property owner was upset with this alignment and preferred the diagonal. The sixth proposal was the traffic circle with the Byington extension. The total cost would be $946,000. Members pointed out that this was more than the Diagonal. MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES m MINUTES MELROSE CORRIDOR COMMITTEE NOVEMBER 12, 1980 PAGE 5 The seventh option was the traffic circle without the improved intersection for the Byington extension. The improvements on Melrose Avenue from the bridge to South Grand would remain the same as in the other traffic circle proposals. Total cost would be $675,000. Perret questioned if reconstruction on South Grand was necessary. Farmer rejoined that the curbs were virtually gone because the street had been overlayed so many times and that if street improvements were being made it made good sense to improve south Grand at the same time. Hart asked what the grade on the diagonal would be. Hart ascertained that the grade on the diagonal would be about one-half the present grade on Grand Avenue. Farmer stated that the grade would change very little if Byington was reconstructed into a four -lane. Brachtel explained that with the diagonal, the intersection at Grand and Riverside Drive would operate much more efficiently, perhaps a 75% increase. Whereas, with the "S" alignment, the improvement would be 35%- 45%. He felt the diagonal would reduce perceived driver delay considerably. With the "S" alignment there would be some perceived driver delay improvement but not as much. He explained that the intersection should be seen as having eight phases with each turning time included. The time allotted to each phase of the cycle is based on demand. A cycle might be skipped if there is no demand. Brachtel stated that there was no way to adjust the timing to favor traffic from the Melrose Corridor without penalizing the other legs. However, the sensing devices could be tightened which might give the Melrose traffic an advantage. To function most efficiently, cars must be going at speed. The diagonal allows faster, smoother movements therefore allowing drivers to get through the intersection more efficiently. Perret stated that one problem now with the Melrose Corridor is the short stacking lane for a left-hand turn at Riverside Drive onto Grand Avenue. He stated that drivers viewed this intersection as a reason to take Myrtle and Melrose Court. He asked Engineering to consider re -design of the intersection. Brachtel responded that re -design of the intersection would be extremely difficult because of the physical constraints of the bluffs on one side and the hydraulics plant on the other. Brachtel added that every city has a 100% intersection, which is in constant use and this is Iowa City's 100% intersection. This means some congestion will probably always be present. Turner responded that she was concerned about straining an already congested intersection with further improvements which would increase traffic. Brachtel stated that the intersection would not necessarily be more congested if it were more efficient. He added that the queue length would be improved with two lanes. Wolraich questioned how much improvement was needed to make maximum use of the light before the intersection was overloaded. Brachtel answered that Irm MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES I MINUTES MELROSE CORRIDOR COMMITTEE NOVEMBER 12, 1980 PAGE 6 with the "S" alignment, the queue length would still be relatively short with traffic moving at 10 mph. With the diagonal and its straighter alignment, the queue length would be significantly longer. He explained that the timer allows seven seconds for cars to start through the intersection. The detector then allows a passage time of four seconds and assumes a gap between cars of less than four seconds. If the gap is longer, the detector interprets that as no demand. The shorter the gap between cars, the more efficient the movement through the intersection. If the curves are sharp, such as on the "S", the movement will not be as smooth. Turner asked the engineer about the advisability of the traffic circle concept. She also asked if it could be implemented without widening Melrose Avenue to three lanes from south Grand to Byington. Farmer stated that eventually the area would need more improvement. He also said that the pavement and curbs were badly deteriorated. Schmadeke agreed that it would be a short-term solution. Hart asked what the findings had been from the pedestrian crossing count. Brachtel reported that the count had been taken in October on a Tuesday and a Wednesday. Tuesday Clear weather 1200 crossings 6:00 a.m.-10:00 p.m. Wednesday Inclement 1000 crossings 6:00 a.m.-10:00 p.m. He also reported that automobile traffic appeared to be about 30% of the volume before closing Melrose Court. Counts were done over a three week period and there did not appear to be week -to -week increases. Members of the public were invited to give their opinions. One member asked the Committee to concentrate on rush-hour problems. Another strongly urged the inclusion of a median strip so that Melrose Avenue would not turn into a highway. She pointed out the advantages to the hospital and the City to creating a boulevard as opposed to a highway. Perret pointed out that a median might help turning traffic. Farmer cautioned that 15 feet was not really enough to protect a turning car. Meeting adjourned. Prepared by: Andrea Tyler, Minute aker Approved by: �" 0 Isabel Turner, Secretary ""J`� MICROFILMED BY JORM MICR+LA6 CEDAR RAPIDS • DES MOINES aa�9 MINUTES AFFIRMATIVE ACTION TASK FORCE NOVEMBER 25, 1980 COUNCIL CHAMBERS MEMBERS PRESENT: Eggers, Keating, Kucharzak, Marcus, McCartt, Meisel, Miller, Yates MEMBERS ABSENT: Orelup STAFF PRESENT: Carroll, Helling, Morris, Williams, Woito GUESTS: Public hearing for all interested parties. RECOMMENDATIONS TO CITY COUNCIL: None. RECOMMENDATIONS TO CITY MANAGER: None. SUMMARY OF RELEVANT DISCUSSION: 1. The meeting was called to order at 7:35 p.m. by Chairperson Bette Meisel. 2. Open to public discussion; Anne Shire, representing the League of Women Voters, had the following comments: The statement, "This POl2icy will be im lemented -by P an Affirmative Action Program, www h will encom ass the following areas; under the section �P°t�_icy atement and ro�ra_m Gu de nes'ris uunclear of what t�program�s. u93 gest ion: "This Po cy wi be implemented by an Affirmative Action Program, which will be developed within the following guidelines; and having the program spelled out." Responsibility of Human Relations Director, N4: "This seems Impossible to implement and who woul be responsible in determining bona -fide occupational qualifications necessary for job performance?" City-wide Grievance Committee: "Others not employed by the City show d e nclude on t e Zomiffttee." Clara Oleson had the following comments: "The task force seems to be working under certain assumptions." "The City's commitment to non-discrimination is not evenly spread throughout the City, nor the knowledge of how to implement non-discrimination principles. "Working basically with a seX -segregated work force. " The perceptual model you have set up depends heavily on economical factors where the knowledge base is limited." "Rosemary Vito:' should prepare a cost -analysis and cost out the plan. There is r indication of what the document will cost." Contract CCompliia_n Policy: "No indication who will do this. Is a new task forc o 9 I � MICROFILMED BY JORM MICR+LA6 CEDAR RAPIDS • DES MOINES MINUTES AFFIRMATIVE ACTION TASK FORCE NOVEMBER 25, 1980 PAGE 2 to be appointed?" Page 2, N9; Performance Monitoring of Affirmative Action Pro ram: "Unclear: What do you mean?" Responsibi- -' y of City Mona er: "No accountability of the Affirmative Action Program. Suggestion: "Insert as N4 under City Council -- To ensure that the City Manager, Boards and Commissions of the City understand that continue evaluation of performance will include emphasis on their affirmative actions and results." "This ensures that Affirmative Action Accountability will not stop at department head level." Human Relations Director's Power: "How will you secure this position? I suggest as a final recommendation that this position is ensured compensation and annual staff support." Dissemination: "Can see as an area you can get bogged down in." Establishment of Goals and Timetables: "A(1) is not telling you very much, again because of a sex -segregated work force." "A(2) What do you mean?" Two assumptions are that pay grade is valid and job qualifications for jobs are valid." "This may not be true." "You should add the review of job qualifications for validation of non-discriminatory factors as well as employee evaluations." "A(3) What is the relevant comparable labor market for Iowa City?" "How are you going to identify it?" "You ma need to go national." "I suggest to add to NA(3) and page 6, N3; ma where appropriated national labor market It :Who wins if department heads can't meet the Human Relations Director's goals and timetables?" Suggestion: to add "In case of a conflict in said goals and timetables, the Human Relations Director's recommendation for goals and timetables shall be implemented, except where department headsjA&Cij in writing setting out alternative goals and timetables and his/her rationale within 30 days to the City Manager." "The City Manager makes the final decision." Each Annual Report will also contain the following assessments::In-add rate of selection and add N3 to s_ay`-a_n_nu_7Ti report of rate acceptance for evaluation of each department head's performance." Grievance Procedure: "I am unclear of the philosophy of setting up a separate nternal grievance procedure." Just modify the current grievance procedure." "It is politically dumb to confine the City-wide Grievance Committee to just City employees."' "Parties should have the option to choose a non -City representative." "If this procedure is non-binding, it is fruitless to put in caps (There will be no retaliation for filing a grievance)." "How are you going to enforce the procedure?" "Why should it be attached to this i document?" "You did not address the relationship between the Legal Department and the Human Relations Director." "Ir, case of a conflict who wins?" You did not address sexual orientation in this policy." Recruitment Funds: "Doesn't fit into this policy." There is no re er— ego money elsewhere in the document." "Why draw attention to just recruitment' funds?" Pat Dowd, representing the Women's Resource and Action Center had the following comments: Grievance Committee: "All members should not be employees." Res onsib�t on�der how indeed the City Council would overy ew t e City Manager's overview of the policy." Minority Repreesse_ntation: "Extend to national labor market." Grievance Procedure: "Consider if there is retaliation to filing, what wil be done?"—Clara Oleson aa9d MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES MINUTES AFFIRMATIVE ACTION TASK FORCE NOVEMBER 25, 1980 PAGE 3 suggested that due to the lack of public attendance thatthe task force should.hold another public hearing. It was decided by the task force to sent out copies of the Affirmative Action Policy draft to all organizations who received the press release for them to respond by phone or in writing. All public comments and suggestions will be reviewed and discussed at the next scheduled meeting. 3. The meeting was adjourned at 9:00 p.m. by Chairperson Bette Meisel. The next scheduled meeting is December 9, 1980, City Manager's Conference Room, 10:00 a.m. 0 MICROFILMED BY JORM MICR+LAB v CEDAR RAPIDS • DES MOINES -i k i I i i i k CITY OF IOWA CITY CITIZEN INPUT SURVEY QUESTIONNAIRE DATA MONTH OF August 1980 NUMBER OF QUESTIONNAIRES MAILE 300 NUMBER OF RESPONSES RECEIVED 41 13.7 % NUMBER OF REQUESTS MADE WITHIN THE PAST YEAR FROM THE FOLLOWING DEPARTMENTS: Animal Control 7 City Manager —3— Code Enforcement T Finance T Fire —3— Housing Inspection —� Human Rights Library —� Parking 3 Parks —T— Personnel Police �"— Pollution Control Recreation —3 Refuse Streets �— Transit —� Water — WERE CITY EMPLOYEES COURTEOUS? Yes 20 95.2 % No • .l. 4.8 % WAS YOUR REQUEST HANDLED Immediately 16 la % Within one week_ 2 ILD —% Within one month _]_ 5.0 % Longer _L —LQ —% WAS THE RESULT SATISFACTORY? Yes_ 18 No _]_ 5.3 % WHAT IS YOUR GENERAL REACTION TO CITY SERVICES? Acceptable —'3— T.'g—% Poor % MICROFILMED BY -- JORM MICR+LAB CEDAR RAPIDS • DES MOINES i 6 CITY OF IOWA CITY CITIZEN INPUT SURVEY QUESTIONNAIRE DATA MONTH OF August 1980 NUMBER OF QUESTIONNAIRES MAILE 300 NUMBER OF RESPONSES RECEIVED 41 13.7 % NUMBER OF REQUESTS MADE WITHIN THE PAST YEAR FROM THE FOLLOWING DEPARTMENTS: Animal Control 7 City Manager —3— Code Enforcement T Finance T Fire —3— Housing Inspection —� Human Rights Library —� Parking 3 Parks —T— Personnel Police �"— Pollution Control Recreation —3 Refuse Streets �— Transit —� Water — WERE CITY EMPLOYEES COURTEOUS? Yes 20 95.2 % No • .l. 4.8 % WAS YOUR REQUEST HANDLED Immediately 16 la % Within one week_ 2 ILD —% Within one month _]_ 5.0 % Longer _L —LQ —% WAS THE RESULT SATISFACTORY? Yes_ 18 No _]_ 5.3 % WHAT IS YOUR GENERAL REACTION TO CITY SERVICES? Acceptable —'3— T.'g—% Poor % MICROFILMED BY -- JORM MICR+LAB CEDAR RAPIDS • DES MOINES aa9/ i 6 'i i I aa9/ i a WHAT ONE THING WOULD YOU CWANGE ABOUT THE IOWA CITY GOVERNIA"'T OR SERVICES IF YOU COULD AND WHY? r _ IANA„&4z 44a'��-f� M/I MJ n< tH LJr-P.V� A nCI� (j.yl. Gdl -4ta/I A.cPNn.+.I). r4nn..w rt.Q CC.J�e� (.+a rYl'L6JLL O•CM<r�.J-a I.G.Pu.W.Mq_vLw�a.Ciena.. mnDy. tuG f i d,x G Y ✓> rnJa4J, aQaJn�r c+� a4 d F<yQ trL �wLo(. dw as Ata. %//lo-,a.¢rl arsiuJ.c v.....Qo<n.Q ..a..,..,r+t..X • � � �...u.. �.�,t.,. L1eo «9�ry4q 0� . E O./a,AJn.'.P.Lu•• ,/in< M. NL�L rJtLf r.� �d-�. L/at�( CGr+w.� . L.Gpn `� 35 �+. �•- LG.a.4..i� �a'i5 ltdl.rJ,.t . WHAT SERVICES SHOULD BE REDU�C�EjD��� OR ELIMINATED AND WHY? QL,.aCIV{UtA4.LL .�d-u.a-a<n4.� 4hW�6:dD(m dA .c([[_ AY 40¢J✓ { PP...4...T alJUJ.i.c. <. CXAL 4;,. � an. d a r(/ ¢...4p, . ' (J �O....0.-.+•� IM/J�I.e�.f+n , :(Iy4(.N � /\/ (.4cL-11A'11Y� , J(L4yL„L4• /it Q/ N �G C.GC:I/.PK> WHAT NEW SERVICES WOULD�J YOU LIKE OR WHICH EXIS�ItjG SERVICES WOULD YO INPROV OR EXPA14D_7 y(µJ•aryrl.rna.i�tq9 ,QL44J.a tn+- [d.L( as.d-,w•.u.tt n.� Cit+/ �T''M�^�.`&. M-uJal Lia %<, a(in Jd Q Gtr/.w ,ea.R�,.L,;.tA.., ��/t,•a.t✓GLL9 j,P pq 'rb', ' J ,Ld.4.,d 1t�L4',41i, C>{G„ Q Zee, . .Ul.(.�- ro.Jr.B.'�,•a gq/.�. dewL..r-Lv/ L,...P,,:p�L rl 3 �e...� rm <-u. u,,..,� a c �.... ElLp,h.[, .Il1 Io, . aLA.LLLCG. .ta 4A 46a.t.. Cr�i ,cee.M.(,6a.ccT.Q..CJ.ia.,al'.`^a;F.%J. � fU Laf/t1 ..Oa Q<.�Jµ4y�L,, jajt �OL11�4��4�¢ I QfG/5�1 / `'� SAY `FUKKKR'TH=U ICH ! O O"tA VA A" 1:f' a IWALNM�w/'"f�a.LLd'Lu. IOYLv✓LWA6C,sa.�-I. O�nMa�'✓QJ f/H/j.lM1CJ.IiMy nLU..t,N411•LL(..:/j •L(NIhU<IA, p, 11 W�j-G frff.¢�4�,). A % O `ZAA. Cr L'ltl rJ� LIALiQ I jla. A, WHAT DO YOU LIKE BEST ABOUT THE IOWI� CITY..G9VERNMENT? 6J 4.1a.iNlf. G,ra .(d•r6A�uGi .Uaos�-¢I-Pi*` -. �,,.vLG PD G tiff. Ona d ht(Jj,a41 .QL•Wa rG . / � � tAun,•a� a.'a<y(.AJN+ C.oxcN.W .0 JCtdrt4'YHu< /fJ:i .�A(nG4.. Rr. ��.Ler �,. G:��Aa,.ya' alA.c..��a•u:,,r, 7 WHAT DO YOU LIKE LEAST ABOUT THE IOOVIA CITY GOVERNMENT? g.b {LG.IFd e . OCLJ�dl., ))))f4y.6t� l ,f1K[J. .1,4. , ,?n -e A.rjLA :r� tolgtt,. 'u C$pi eA {yy,Ja I A — 2lanz a s ,Q o ldnl_ aun L O, A, (0.. aA U w �^ a A GQ ), ' c' A L' aC,A<. 6r, QJ4�/wnnGA G.A �JNadWM, �hu. ry�ud tlAw} at4c. dtAll.Z a, 1.3. •f,� i�4N4..i. e. QA d 4e C AQO. a �.s`e iL a,,,.J.J./l a..1aa,.ataMt,b ♦ J /� wy �4u:ab a b6/J m4,la An �4.t ,-�i�, .jM/W // .a1// -t 4,/ aM d OTHER COMMENTS: jjU ' H A .AJ-( 00• deet d +7�NANM G.Iit t. 1},/La,,.Q • �al. 4.1.14,./, , Ki ILI A.!9�4,.A/"c..dJ:, i/tHrt4J2A,ae(1:.J<.L„a (a•.alraal c .L!1O4lN 41i7G�coA�ur17 4on�i4ifru,lrA,L4a0,, !A�,L7a .a}�i,rLl�o,�,en4.• �J1(d�f�•»�ei,,�' MICROFILMED BY t JORM MICR+LAB CEDAR RAPIDS • DES MOINES I' i a WHAT ONE THING WOULD YOU CWANGE ABOUT THE IOWA CITY GOVERNIA"'T OR SERVICES IF YOU COULD AND WHY? r _ IANA„&4z 44a'��-f� M/I MJ n< tH LJr-P.V� A nCI� (j.yl. Gdl -4ta/I A.cPNn.+.I). r4nn..w rt.Q CC.J�e� (.+a rYl'L6JLL O•CM<r�.J-a I.G.Pu.W.Mq_vLw�a.Ciena.. mnDy. tuG f i d,x G Y ✓> rnJa4J, aQaJn�r c+� a4 d F<yQ trL �wLo(. dw as Ata. %//lo-,a.¢rl arsiuJ.c v.....Qo<n.Q ..a..,..,r+t..X • � � �...u.. �.�,t.,. L1eo «9�ry4q 0� . E O./a,AJn.'.P.Lu•• ,/in< M. NL�L rJtLf r.� �d-�. L/at�( CGr+w.� . L.Gpn `� 35 �+. �•- LG.a.4..i� �a'i5 ltdl.rJ,.t . WHAT SERVICES SHOULD BE REDU�C�EjD��� OR ELIMINATED AND WHY? QL,.aCIV{UtA4.LL .�d-u.a-a<n4.� 4hW�6:dD(m dA .c([[_ AY 40¢J✓ { PP...4...T alJUJ.i.c. <. CXAL 4;,. � an. d a r(/ ¢...4p, . ' (J �O....0.-.+•� IM/J�I.e�.f+n , :(Iy4(.N � /\/ (.4cL-11A'11Y� , J(L4yL„L4• /it Q/ N �G C.GC:I/.PK> WHAT NEW SERVICES WOULD�J YOU LIKE OR WHICH EXIS�ItjG SERVICES WOULD YO INPROV OR EXPA14D_7 y(µJ•aryrl.rna.i�tq9 ,QL44J.a tn+- [d.L( as.d-,w•.u.tt n.� Cit+/ �T''M�^�.`&. M-uJal Lia %<, a(in Jd Q Gtr/.w ,ea.R�,.L,;.tA.., ��/t,•a.t✓GLL9 j,P pq 'rb', ' J ,Ld.4.,d 1t�L4',41i, C>{G„ Q Zee, . .Ul.(.�- ro.Jr.B.'�,•a gq/.�. dewL..r-Lv/ L,...P,,:p�L rl 3 �e...� rm <-u. u,,..,� a c �.... ElLp,h.[, .Il1 Io, . aLA.LLLCG. .ta 4A 46a.t.. Cr�i ,cee.M.(,6a.ccT.Q..CJ.ia.,al'.`^a;F.%J. � fU Laf/t1 ..Oa Q<.�Jµ4y�L,, jajt �OL11�4��4�¢ I QfG/5�1 / `'� SAY `FUKKKR'TH=U ICH ! O O"tA VA A" 1:f' a IWALNM�w/'"f�a.LLd'Lu. IOYLv✓LWA6C,sa.�-I. O�nMa�'✓QJ f/H/j.lM1CJ.IiMy nLU..t,N411•LL(..:/j •L(NIhU<IA, p, 11 W�j-G frff.¢�4�,). A % O `ZAA. Cr L'ltl rJ� LIALiQ I jla. A, WHAT DO YOU LIKE BEST ABOUT THE IOWI� CITY..G9VERNMENT? 6J 4.1a.iNlf. G,ra .(d•r6A�uGi .Uaos�-¢I-Pi*` -. �,,.vLG PD G tiff. Ona d ht(Jj,a41 .QL•Wa rG . / � � tAun,•a� a.'a<y(.AJN+ C.oxcN.W .0 JCtdrt4'YHu< /fJ:i .�A(nG4.. Rr. ��.Ler �,. G:��Aa,.ya' alA.c..��a•u:,,r, 7 WHAT DO YOU LIKE LEAST ABOUT THE IOOVIA CITY GOVERNMENT? g.b {LG.IFd e . OCLJ�dl., ))))f4y.6t� l ,f1K[J. .1,4. , ,?n -e A.rjLA :r� tolgtt,. 'u C$pi eA {yy,Ja I A — 2lanz a s ,Q o ldnl_ aun L O, A, (0.. aA U w �^ a A GQ ), ' c' A L' aC,A<. 6r, QJ4�/wnnGA G.A �JNadWM, �hu. ry�ud tlAw} at4c. dtAll.Z a, 1.3. •f,� i�4N4..i. e. QA d 4e C AQO. a �.s`e iL a,,,.J.J./l a..1aa,.ataMt,b ♦ J /� wy �4u:ab a b6/J m4,la An �4.t ,-�i�, .jM/W // .a1// -t 4,/ aM d OTHER COMMENTS: jjU ' H A .AJ-( 00• deet d +7�NANM G.Iit t. 1},/La,,.Q • �al. 4.1.14,./, , Ki ILI A.!9�4,.A/"c..dJ:, i/tHrt4J2A,ae(1:.J<.L„a (a•.alraal c .L!1O4lN 41i7G�coA�ur17 4on�i4ifru,lrA,L4a0,, !A�,L7a .a}�i,rLl�o,�,en4.• �J1(d�f�•»�ei,,�' MICROFILMED BY t JORM MICR+LAB CEDAR RAPIDS • DES MOINES I' WHAT ONE THING WOULD YOU CHANGE ABOUT THE IOWA CITY GOVERNMF"' OR SERVICES IF YOU COULD AND WHY? ,�^� } 117.1AQhJ '"'Addef �aBL, 7AAAANM� LwnG PL�L�etdan�n'+iiAo�iQ�� aG�• �i�LL�G WHAT aSERVICES SHOULD BE REDUCED./OR ELIMINATED AND WHY? IC NALtiA U.U�.N aV O�Yl dt 0 / � (WX/1'1'�U< GpMILCLa 'j -1. "G; - WHAT NEW SERVICES WOULD YOU L/IKE OR WHICH EXISTING SERVICES WOULD YOU.IMPROVE OR EXPAND? le9'Lelue+n 4..a ipf �KI.LI. GIAY.N^4A,.. h......,.lR.a, 1 1,4,u A.<1,. dd.�..M'Ga �,/a.�o -Gu nt.- .nLl.l.l,r•..0 d� raw. cQ1a� n+. �p,oaa.Q-�A� kc G�.emL�D.n-avl�v. .4LGn uLato ,L. �i. �D'a.u' HOW WOULD YOU PAY FOR THESE CHANGES? �!y�..Cl4-W"1 .� Z�L�iCL;, /1 /,YIPVLI•�-L•• WHAT DO YOU LIKE BEST ABOUT THE IOWA CITY GOVERNMENT? �1�4 n.sLaAA 43w,ud-Iwa,�axAc ,�•G.�a,,�-j�U, e-2. a,lh. a(/�GtA< a.LI LQ �n.•.i4<a . WHAT DO YOU LIKE LEAST ABOUT THE IOWA CITY GOVERNMENT? . Ol6M �,C-�i, n .(�.r�ll•.i.L � �7 �[� f10Yu—ILNCCCLfLLu: �.uv�l•A'Lt� 1� AIAGI.Ia�^��u.. �A,Ly4�vL�(LO'l•� 6. �. e<�� QdnT.a, a...d�A .N.wAG.Qi.a Ju al cuoJ- "lia GO .f/, .�u e. •4,a do iLwwry Lieo irvuLc Q.- �/xAa�I-Tax p.l-/✓-.at .%e JCG't a.v dehw•G/.�. �� U O . .Qr Cana yA�<.�i q,lPia(4J A VIJGJIA/(J. C���I /Y)Lu•((✓//1.f1./. 1/pry[/] « aAA-v0y- 9P��CAQMv .��ih llll 1i/f_ "4&A PAiCu.A 44.."/ OTTHERCOWNTS:S „L"II1 H(� Qn1. GW C'd LlAa nL 44•QOLM1 o�(� Ld en.(-^ol.i, 0.l/0(J,'//, �a�z�%a• koo Jl-U•4.1.1iiA.IwlPp.LMi`-c= .7t ZhtC6WAd �( .[A.<e d/ .':-1 J. awl ii.l::l.N.a� Oj C.d'vl•I�::U ✓V".c� aa9i II MICROFILMED BY JORM MICR+LAO f CEDAR RAPIDS • DES MOINES 1 WHAT ONE THING WOULD YOU CHANGE ABOUT THE IOWA CITY GOVERNMF"' OR SERVICES IF YOU COULD AND WHY? ,�^� } 117.1AQhJ '"'Addef �aBL, 7AAAANM� LwnG PL�L�etdan�n'+iiAo�iQ�� aG�• �i�LL�G WHAT aSERVICES SHOULD BE REDUCED./OR ELIMINATED AND WHY? IC NALtiA U.U�.N aV O�Yl dt 0 / � (WX/1'1'�U< GpMILCLa 'j -1. "G; - WHAT NEW SERVICES WOULD YOU L/IKE OR WHICH EXISTING SERVICES WOULD YOU.IMPROVE OR EXPAND? le9'Lelue+n 4..a ipf �KI.LI. GIAY.N^4A,.. h......,.lR.a, 1 1,4,u A.<1,. dd.�..M'Ga �,/a.�o -Gu nt.- .nLl.l.l,r•..0 d� raw. cQ1a� n+. �p,oaa.Q-�A� kc G�.emL�D.n-avl�v. .4LGn uLato ,L. �i. �D'a.u' HOW WOULD YOU PAY FOR THESE CHANGES? �!y�..Cl4-W"1 .� Z�L�iCL;, /1 /,YIPVLI•�-L•• WHAT DO YOU LIKE BEST ABOUT THE IOWA CITY GOVERNMENT? �1�4 n.sLaAA 43w,ud-Iwa,�axAc ,�•G.�a,,�-j�U, e-2. a,lh. a(/�GtA< a.LI LQ �n.•.i4<a . WHAT DO YOU LIKE LEAST ABOUT THE IOWA CITY GOVERNMENT? . Ol6M �,C-�i, n .(�.r�ll•.i.L � �7 �[� f10Yu—ILNCCCLfLLu: �.uv�l•A'Lt� 1� AIAGI.Ia�^��u.. �A,Ly4�vL�(LO'l•� 6. �. e<�� QdnT.a, a...d�A .N.wAG.Qi.a Ju al cuoJ- "lia GO .f/, .�u e. •4,a do iLwwry Lieo irvuLc Q.- �/xAa�I-Tax p.l-/✓-.at .%e JCG't a.v dehw•G/.�. �� U O . .Qr Cana yA�<.�i q,lPia(4J A VIJGJIA/(J. C���I /Y)Lu•((✓//1.f1./. 1/pry[/] « aAA-v0y- 9P��CAQMv .��ih llll 1i/f_ "4&A PAiCu.A 44.."/ OTTHERCOWNTS:S „L"II1 H(� Qn1. GW C'd LlAa nL 44•QOLM1 o�(� Ld en.(-^ol.i, 0.l/0(J,'//, �a�z�%a• koo Jl-U•4.1.1iiA.IwlPp.LMi`-c= .7t ZhtC6WAd �( .[A.<e d/ .':-1 J. awl ii.l::l.N.a� Oj C.d'vl•I�::U ✓V".c� aa9i II MICROFILMED BY JORM MICR+LAO f CEDAR RAPIDS • DES MOINES WHAT `�ONE TeHINFG WOULD YOU CHS E ABOUT THE IOWA /TC,IITY G�OVERNMFJ"T OR SERVICES IF YOU COULD AND ,qIHY? .CO a -f �y.OYWI�!L /Y1'1 a.GUL�64 .YAILM. /1 /YLO^^^-'6wG{ �lll�Yo� �%"�� / / �•L )M. /f aA It —TI Y U.e-L0� cwa� CONO<R.uG Na.w..,-L�,f�-�p�',• Fes` 8�.�' �d �<.���.4'�.,,,. , ! a.v<dr..B'Lcu.�la..�.—+�-o.Ta-�!^''}a'm.'+rLaf(p��/,.�➢.,, •�[°- .l� �-{AMf (-0-fA1'Ll .�^'� `"--- �••4 1 ��' � 0 M1.4//Mwd)G�V�''f0.��^l�j'�'q•tQ-CY. .Q/� C¢a � ar.•.}-( C✓,t-U/woK.C�'c�.Ci. m • a • 0 , dau.c-� na M.a°�'u"`" f �'/-�M'LaJiNA➢MaUt.L �d 6 4 II ea WHAT SERVICES SHOULD BE REDUCED OR ELIMII/rNATED AND WHY? WHAT NEW SERVICES WOULDYOULIKE OR WHICH EXISTING SERVICES WOULD YOU IMPROVE OR EXPAND? ,o"d ,r�-rti f�er�•-Q [�l/L��t,/J1LCti. nt�^"/ �� 1 n 3a,G.(LY. AM•sul- �/ "AA, oHOW WOULD YOU PAY FOR THESE CHANGES? �➢ &-p pa -,, Zea-(��, .d d i tt owner WHAT DO YOU LIKE BEST ABOUT THE IOWA CITY GOVERNMENT? Q.✓ww� 0 p Jj✓.a,-�.flt➢CA. o n,L.w•xaQ�cuf,�i.�iL.`�°" WHAT DO YOU LIKE LEAST ABOUT THE IOWA CITJ(}GNhENT OVER?? c�asrp•�n'vt20�M/ '.. .r�.lLrri'a, i"untr0[>Mi¢ o0v1'L°. OL q/Lxt M/ �/ 4&a.t�.L.L OTHER COMMENTS � ,G,➢.w,Tj yyvW(fM,a.d.L•^• ruftfj - I fl-QQ �ff.,.a A,t ana Un�ht UCtif �➢i LLy.tn��. /YN A.�.! JJ.aJ . �//µ.aAa.•i (L d!//YI 0./,Qnn�. ryyu.v+/ET➢(� .4� eA /] 0.XQ .�lA�J14l.A➢QL�m'ali/'AJ.6 f.ALQ gq.rf 0..Q.¢ MA dC�4JO �AA �D Lf/ll• 1 I I MICROFILMED BY JORM MICR+LAB t CEDAR RAPIDS • DES MOINES m , OEYELOPMENTJfo CHO/CESron rev S_ s i1 11/26/80 GROWTH AND CHANGE IN THE 1808: An Action Program For Housing Affordability and Efficient Communities Thirty-seven state and local elected officials and leaders of the development industry -- homebuilders, consulting architects, lenders and land developers -- have announced their tentative recommendations to improve development and redevelopment in the decade ahead in the light of changing economic, resource and demographic changes. The following summarizes their findings: 1. lower service coats -- the Council advises state and local governments and the development industry to plan together to permit and create compact projects and more contiguous development. 2. In place of with vast tracts of the Council urges infill incentives to make such land available for new activities in the cities and counties with services and facilities already in place. 3. In place of single use projects, zones and whole towns -- the Council urges government to enable developers to produce centers where residential, shopping, recreation and employment can be sited together, encouraging pedestrian movement and short trips between activities. 4. In place of forcing families to bear the expense of mult the Council urges that governments encourage and permit transit -serving densities and facilitate ride -sharing in more compact, mixed use communities. 5. In place of nonessential costly regulatory procedures that inflate housing costs -- the Council urges governments to slash processing timet drop "gold plated" property, rehabilitation, building and development standards and provide an adequate supply of land for development. 6. the Wq the Council urges governments to encourage improved maintenance, expanded rehabilitation, modernization and expansion of existing housing and other buildings. saga. MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES -z- 7. In place of residential areas without activity centers; of s job centers accessible only at the cost of billions of miles and barrels of imported oil consumed; and of neighborhoods w Local, State and Federal governments should adopt the "Urban village" concept to guide future growth and conserve land. Action Program 1. County and municipal governments should: (a) Revise regulations to achieve compact developments allow increased densities; reduce lot and yard size requirements, setbacks, and street widths; encourage development on non -conforming lots; and establish minimum density requirements where needed. (b) Remove constraints on housing types, lot sizes, and densities; allow market forces to control within service limits and performance standards. (c) Change land use regulations to encourage mixed-use development; permit more uses within present zoning districts. (d) Permit conversion of single-family homes to multiple unit structures to offset local housing affordability crises. (e) Assess vacant land at current market values or at highest and best use permitted under zoning. (f) Use public acquisition, including use of eminent domain, where necessary, to meet essential housing and community development objectives under broader testa of public necessity. Permit delegation of eminent domain to developers under suitable safeguards to achieve publicly -approved plans. (g) Establish local and cooperative regional inclusionary housing policies, making a perccentage of units in larger projects available at moderate prices and a percentage available to low-income groups through subsidies. To assure profitability, include incentives -- e.g. density boneses, fast-track permitting, tax abatements, tax-exempt financing. (h) Replace outrYght restrictions on factory built mobile homes with performance standards applicable to all housing. (i) Remove rent controls with provisions to protect elderly and low income households. Allow condominium conversions and establish equity -sharing programs to enable lower-income renters to purchase units. aa9a� MICROFILMED BY q JORM MICR+LAB I CEDAR RAPIDS • DES MOINES -3- 2. States should: (a) Adopt, in cooperation with local governmetns, regional development and housing goals and planning guidelines for local housing availability and affordability implementation programs, including the need for diverse and affordable housing for current and future residents, and provide support to enable localities to meet those objectives. (b) Discourage local "population caps", large -lot zoning, "gold-plated" subdivision standards, or unjustifiable development fees when used for exclusionary purposes. (c) Adopt uniform, statewide performance-based building codes. (d) Authorize self -taxing improvement districts for mixed-use development; liberalize property tax laws to allow localities to encourage infill and home improvements. 3. The Federal Government should: (a) Test the effectiveness of substantial incentive reductions in tax rates and regulatory requirements ("incentive zones") in areas with high unemployment in cooperation with state and local governments. (b) Focus future transportation improvements on maintenance and enhancement of the existing systems and transit improvements. In fast growing areas, transit should be considered as top priority. (c) Allow non -homeowners to establish tax-exempt savings accounts (similar to IRA accounts) for the purpose of buying a house. (d) Expand Federal mortgage guarantees to cover mixed use project. (e) Eliminate differences in federal tax treatment of allowances for accelerated depreciation between new and existing buildings. 4. State and Federal agencies should: (a) Initiate an immediate review of, existing land and housing impacting regulations to eliminate those that are unnecessarily costly compared with the benefits derived. This is particularly needed in environmental policies. In weighing proposed new regulatory and investment proposals affecting development, take into account the cost effects on housing production and conservation. (b) National and state energy policies fail to include the energy conserving benefits of compact and mixed use development, redevelopment and infill. Federal state and local governmetns should adopt and apply these principles in their planning and investment decisions as essential, long range contributions to the reduction of energy consumption. MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES aa9ar A i ,1 -3- 2. States should: (a) Adopt, in cooperation with local governmetns, regional development and housing goals and planning guidelines for local housing availability and affordability implementation programs, including the need for diverse and affordable housing for current and future residents, and provide support to enable localities to meet those objectives. (b) Discourage local "population caps", large -lot zoning, "gold-plated" subdivision standards, or unjustifiable development fees when used for exclusionary purposes. (c) Adopt uniform, statewide performance-based building codes. (d) Authorize self -taxing improvement districts for mixed-use development; liberalize property tax laws to allow localities to encourage infill and home improvements. 3. The Federal Government should: (a) Test the effectiveness of substantial incentive reductions in tax rates and regulatory requirements ("incentive zones") in areas with high unemployment in cooperation with state and local governments. (b) Focus future transportation improvements on maintenance and enhancement of the existing systems and transit improvements. In fast growing areas, transit should be considered as top priority. (c) Allow non -homeowners to establish tax-exempt savings accounts (similar to IRA accounts) for the purpose of buying a house. (d) Expand Federal mortgage guarantees to cover mixed use project. (e) Eliminate differences in federal tax treatment of allowances for accelerated depreciation between new and existing buildings. 4. State and Federal agencies should: (a) Initiate an immediate review of, existing land and housing impacting regulations to eliminate those that are unnecessarily costly compared with the benefits derived. This is particularly needed in environmental policies. In weighing proposed new regulatory and investment proposals affecting development, take into account the cost effects on housing production and conservation. (b) National and state energy policies fail to include the energy conserving benefits of compact and mixed use development, redevelopment and infill. Federal state and local governmetns should adopt and apply these principles in their planning and investment decisions as essential, long range contributions to the reduction of energy consumption. MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES aa9ar A MINUTES OF STAFF MEETING December 3, 1980 Referrals from the informal and formal Council meetings of December 1 and 2 were distributed to the staff for review and discussion (copy attached). Items for the agenda of December 16 include: Public hearings for five industrial revenue bond issues Third reading of the Housing Code Resolution for inspection fees Appointments to the Senior Center Commission, Parks and Recreation Commission, Human Rights Commission, Board of Adjustment, Board of Examiners of Plumbers, and Board of Appeals The Assistant City Manager reminded the staff of program division statements. A memo will be sent to the division heads soon. The Assistant City Manager advised the staff of a walk. -through energy audit of City buildings which will be conducted soon. There will be suggestions on energy saving measures. A management training film was shown to the staff by the Human Relations Director. Prepared by: ep Lorraine Saeger i I. i I i I I i i MINUTES OF STAFF MEETING December 3, 1980 Referrals from the informal and formal Council meetings of December 1 and 2 were distributed to the staff for review and discussion (copy attached). Items for the agenda of December 16 include: Public hearings for five industrial revenue bond issues Third reading of the Housing Code Resolution for inspection fees Appointments to the Senior Center Commission, Parks and Recreation Commission, Human Rights Commission, Board of Adjustment, Board of Examiners of Plumbers, and Board of Appeals The Assistant City Manager reminded the staff of program division statements. A memo will be sent to the division heads soon. The Assistant City Manager advised the staff of a walk. -through energy audit of City buildings which will be conducted soon. There will be suggestions on energy saving measures. A management training film was shown to the staff by the Human Relations Director. Prepared by: ep Lorraine Saeger i I. i I I I i i MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES __Informal -December Council Meeting DEPARTMENT REFERRALS W 1, 1980 W I 1 MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES W SUBJECT c o REFERRED DATE ~ COMMENTS/STATUS TO Parking Ramp B 12-1 Public Wks 4lalkerWhen rs engineere vie to ? iWhave tewillsour r� action be as it relates to opening rampr J i Inspection fee schedule resolution Housing Code/Inspection Fees 12-1 H&IS must be on 12-16 agenda for third consideration of the Code. Discuss with City Manager re. Banner poles - City Plaza 12-1 JP'bPD what is to be done. Informal Council Meetings 12-1 Info Will begin later on Mondays when agenda is brief. ! H&IS/P&PD Task force from Housing Commissjnn Mortgage financing for residential 12-1 I and CCN should address this is..'. property. Street Snow Removal 12-1 Public Wks What is minimum snowfall before strei plowing is done? Explain why sand/ salt is applied after only 1/4 inch snowfall. In ormat on to Louncll re. cost of salt use - historical cost figures; effectiveness of lower salt sand ratio. Trash in Ramp A 12-1 Parking I Great deal of trash at noon on Mondaj MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES Regular Council Meeting December 2, 1980 DEPARTMENT REFERRALS d MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES REc o REFERRED DUEDATS W ~ � 1 OATS/STATUS, SUBJECT Parking in front of Jefferson Building 12-2 Public Wks/ Lorraine Item approving no -parking signs ' deferred 2 weeks, Resources Conservation Commission 12-2 Lorraine Thomas Gartland appointed. Animal and Fowl Ordinance 12-2 Lorraine/ Police i Waived 2 readings, passed and adopt c i I d MICROFILMED BY JORM MICR+LAB CEDAR RAPIDS • DES MOINES i i i I Regular Council Meeting j Rpcember 2, 1980 DEPARTMENT REFERRALS MICROFILMED BY JORM MICR+LAO CEDAR RAPIDS - DES MOINES DATE REC'D REFERRED TO DATE DUE tu I COMMENTS/STATUS SUBJECT SME Parking in front of Jefferson Building Parkingin front of e 12-2 Public Wks/ Lorraine Item approving no -parking signs deferred 2 weeks. Resources Conservation Commission Resources Conservation 12-2 i Lorraine Thomas Gartland appointed. Or Animal Ordinance Animal and Fowl Ordinance Fowl 12-2 Lorraine/ IPolice Waived 2 readings, passed and adopts MICROFILMED BY JORM MICR+LAO CEDAR RAPIDS - DES MOINES