Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1976-02-03 Correspondence
To the Honorable Mayod I'embera of the City, • Councif Iowa City Iowa: Inasmuch as your honorable Body has been asked to contribute money toward the Congregate Meal project of Johnson County, I am inclosing, for 1 your information, -a Zeroz copy of the legal opinion of the Johnson County Attorney regarding congregate meal eligibility, which document was filed on January 16 with the Board of Supervisors, which body had requested the opinion. You will note from this opinion that the federal statute under3,ting the congregate meal program `(Older ,American Act) requires that in order-to be eligible, ,an individual must be both aged 60 or over, and meet one or more of four, specified conditions; and that operating the program on an-open-or blanket' eligibility is in violation of the federal statute which established the program and the regulations which have implemented it. You will also note,from the following newspaper clippings, that the operated in Iowa City and Lone Tree on an congregate meal project is being open or blanket eligibility' policy. The following appeared in the August.2jn 1975 issue of the Iowa City Press -Citizen. I' -about meats for .e)de To the Editor although a rescrvallon inuma sl be de one -" I wouldl'iketocorreetonesmalldetatl in : day in advattcc by catling 738 9291 In Iowa , Della A. Grizel's letterwhich appeared In :.City or 629-1952 hr -Lone Trcc r :i_t 1 the-Press•Cilizen"Ang•'26. Congregate.. NaucyA.Johasua ; Meds are available in Iowa City and Lurie .576 South .Gilbert StrccC- Tree for, all. Individuals age 60 and over _ LJllur's vole ,1'he writer Is cmigrcgatc Tlaroore noolherquollficationsto benle,t , meals Salle- lsor for Juhason CountyI (See copy of the Grizel reply on Pago 2.) le�AjOr C t iMi , _ - �ru cotreg ftc, allible for . 1 "penortsj es�~il� ion' dCtd"ice avall�il�,ft�:In — This type of item has been appearing - once each week in the Press -Citizen. Interstate Also once a week in the Inters) jmtxired°°� P1�ceeuta tM Shopper: 8eptors C d�! + ' F G1i6�et;,3tt'f�f�'n::s y eMondiY zGloria eDef�Lutiteraa arch -- In order to comply with^ederal law (Older American-Act), shouldn't the above item read - "Congregate Meals are available for eligible persons 60 years of age or older"? 1530 Sheridan Avenin. JAi12 3 1916 ABBI S-1 O1 CITY CLERI: 5' >� f. - Page 2 This letter was mitted for publication to t editor of the tires - Citizen. It was not Olished. It is bein„'sent toWu.for Yourinformation because it states the situation, as it exists. (Auyust,1975) To the' Editor: This_letter is in reply to the Aug. 29 Letter to the Editor aigned.by Nancy A. Johnson, supervisor of congregate meals for Johnson County. Readers will recall that in my Aug. 26 letter -to the Editor I listed some of the many things the Government is already doing to help -the elderly, and included this statement: "Congregate meals are available in Iowa,,City- and `1; Tree for all individuals ,age 60 oroverone who meet -certain specifications.' In her letter ifs. Johnson disputed that'statement, saying that -the - congregate meals are available in Iowa- City and Lone Tree to all; persons age 60 and over; that there are no other qualifications to be met except to make reservations a day in advance. I take Me. Johnson's statement to be a special invitation to all 4.,258 Of us Iowa Citians who are age -60 -and over, to come to -dinner -on six days of each week.' The 2,750.persons age, 60 and over who live in Johnson ,County outside of Iowa City, they apparently are invited too. Available for the 7,008 persons, age 60 and over, to whom the invitation is extended, are about 35 meals now being served twice arweek and -about :70 mea being served four times a week, in Iowa City, and about 35 meals being servei in; Lone Tree three times a week. These meals are'said-to:be avail= r able to those persons, age 60 and over, who make resedations first. `Before been to_get low, it is said that some days as many as`lle or no meals sere served in Iowa City. uy statement regarding qualifications was based on the provisions of P4111 Lax 92, Title VII, Nutrition Program for the Elderly, which provides fo_ __ establishment of a federal nutrition project which is'set,up to zera minimum of one hot meal per day on at least five days a week in a' = GO—L=itY setting for individuals aged 60 or over who meet :the specifications set _07th in ClausEsl, 2, 3 or 4 of Section701(a)and their spouses, who are;_:ereafter referred to as eligible individuals. Listedalso;as "eligible” are Persons of the "minorities" and members, of limited English speaking groups who are age 60 or over. (See Public Law 92, Title VII, a copy of which is on file in the Government Docu=ents section of the University of Iowa Library.' ?rom the provisions inPublicLaw 92, Title VII, as to will is eligible for the federal nutrition project meals (congregate meals) it is ver apparent' he it'wae not the intention -to Congress to make tax -subsidized meals available to all persons in the United 'St- and for the rest of their live n. Without some` iieiinite regg ulations, a project such as the federal nutrition project'coula get- dompletel' put of hand and balloon beyond all control. And it `would be so costlgthat it could go a lone; ways toward dianipting the entire federal tax str+.leture. _- I would like to make it very clear, and to emphasize it, that I at not critical of any of those who are now partaking of the congregate:meals in ' Iowa City :or Lone Tree. After all, everyone in Johnson County, age 60and over, -has been invited. But there is something verb, ver y,wrong::ahen thousands of senior citizens -- the rich, the_,i,00r,_'and the :in-between; the physically. able, those of limited mobility, and the disabled — all are invited to cone to dinner six daya a,week when -apparently no care than, two -and -a -half meals are available on any serving day for every ;100 John- son County residents who are age 60 and over. (signed) Della Grizel, 1530 Sheridan Avenue: a = • --• TEL. 337-9638 P.O. BOX 2:50 Of -FICC OFTHC- AREA CODE 319 -23 SOUTH CL1NrON JOHNSON COUNTY ATTORNEY DJ::A CITY, IOSJA 572.10 -- ` --'- -'- : Jack W. Dooley County Attorney i+ J. Patrick White --- - - First Assistant - -:- CIVIL -JUVENILE DIVISION. CRltf.iNAL DIVISION. .. S January 16, 1976 J. Patrick While ..seven K. Fliszz,.dt - - Paola Desii ' Thomis T. S:.cvres - _.. - Daniel L. Bray Board of Superisots Count House Annex JAP12 31M' - -. iO1.'a City, TO;, -1a 52240 Re: Congregate meals eligibility ABBIE .� 1 O - CI'll' CI_'" Mr.. Chairmanand Alembers_of: the Board: You have requested our opinion in regard to eligibility reeuircments for the Congregate Mcals Program for the Elderly. opinionrequest to us followed your receipt of a letter Ms. Della A. Gri.zel questioning wltct-lier any qualifications __ted for individuals to be served meals. Sub -Chapter VII of _Title 42 of the U.S. Code is the s�a_atory basis for the Congregate Mcals Program -for the Elderly a--inisterect here in Johnson. County and elsewhere. In,inacting t -s lata, Congress found that there was a -need "to assist in the nutritionaland social needs of millions of.persons aged 60 or olds -r-." 42 USC 304S(a). This statute further orovides that ,Many elderly persons do not eat adequately.because (1) they cannot afford to do so; (Z) they lack the skills to select and ,prepare nourishing and taelh balanced meals; (3) they have Jimited mobility which may impair their capacity to shoji -and cook for them= selves; and (4) they 'have feelings of 'rejection and loneliness which obliterate the -incentive'necessary - - to prepare and cat a'_mcal-alone." it shouldhe noted here that the foregoing statutory language - is Identical to the language quoted by is. Gr zel in -her letter although her citation referred to the public lata form instead of the now codified form. -A subsequent section of this same statute, Section 3045c(a)(2) provides ,that funds under this program arc to be disbursed.to recipients of arants or contracts whoagree "to 'provide such nutrition project for'i.ndivi.duals aged 60 -or over who:meet the Board of Supervisors January .16, 1976 Page 2 Specifications set forth in clauses `(l (7Z, (3 or 4 of section 3U,15(a) of this ti.t'1c and their spouses (referred to herein as "eligible indivi.duals");".(Eiuphasis added.) This constitutes a clear statutory incorporation 'oE the.. four specifications for purposes of, eligibility, to participate in the nutrition-progrnm,for tile elderly under the Older ---Americans Act such as operates here in .Johnson County. That the federal statute underlying the Congregate Meals Progyam thus rc(Juires that an eligible individual must both be aged 60 or over and 'meet one or more of the above stated specifications, or be the spouse of such an individual is supported by examining the legislativehistory of the bill. T.-.-- House Report submitted on the b.il.l-states: /_1%he bill provides for participation in nutrition -'projects of .individuals who arc aged 60 or over and .' who meetoneor .more of a -number -of:: conditions �lescii�ed in the statement b.L' )urpose of —the::bill. Unc—car Lhe bi..1.1;-'spouses of such Individuals -are also eligible for participation i.n the nutrition project. The Committee wishes' to make clear that such ,spouses eligibility is not conditioned on age or'upon':meeting' the condi-tions set forth i.n the statement of purpose and findings. (Emphasis -added.) 19.72US Code -" CongressionalandAdministrative News 2036, 2093. Federal regulations, as :in many instances, are issued for purposes of implementing the statute described abovo. A` review of those regulations discloses that they incorporate precisely the; same language as was in the'statute in defining eligible individuals and clearly require meeting one of: the; four specifications in addition to being aged GO or over. See 45 C.F.R. 909.3(x). It is, in vi.civ-of all of the above, our opinion that " admini-stration of the congregate meals program in Johnson County, to whatever extent .it is or has been operated on an open door`- or blanket eligibility policy is in violationof federal statute which ustabLi.shed the program +`and -the regulations which have implemented it. We do recognize that the four specifications are very broad in nature and extremely difficult to measure or judge. That is particularly true of -tile fourth specification which refers to feelings of rejection and loneliness. Even so; a Board of Supercr.i_sors January 1.6,.1976. Page 3 and as broad ag Clic specifications arc stated,`+ authority for adopting a. policy which assumes tac find no indivi.dual ugcd 60 or over meets otic of ``tspecifications., It is our opinion ththe Lour hat at some procedure is required which reviewevery, single ands determines el.iglbil:i.ty pursuant to tile four specifications. It should be added that, i.n our opinion, the piroccdures adopted Lor this Clete.InI'm i.nation heed not be'complex or administratively burdensome. In .fact, the statute,. its legislative_history and the implementing regulations make it cicar,rcpeatedly• hat .it Live the intention .on of Consist program to avoid significant'adminiatra- dmi costs and, consistent' with that approach, a._complex administrative procedure for ident.i-Eying Cli.gible persons'should be avoided. 11hi.l.e it is certainly not our place"tpersonrminc hotf'to administer this necessary procedure, l relatively simple `orm could be utilized whereon an individual`des-ring:ao "tilize -the congregate meals program could simply state their e, their age, and check one or more of the Lour statutory ciEications -indicating that they apply to themselves as-one king to Participate i.n the program. ;_Ln view of the. broad cification categories, -i.t -would be our view that an `individual's �aratton that they are within one-of the categories would s__:ice. want to clarify one 'other point of discussion that ,was Whether=3 sad in requesting the opinion. IL is the participants' uecision as to Whether she or he is aUlc to pay 'for a'meal. sch individual must determine her/his otn ability to contribirte to:card the cost of a meal, Schedules oE,su ac opted but-these-schedules cannot be used agesLmeafees can tbe . determine eligibility. See 45-_ CFtt 909.44(b) and (c) Respectfully submitted this 16th. day of January, .1976.: Sincere ac P. , ooley -Joh+eon County Attorney .J. Patrick White , First Assistant County Attorney JIM: JPW/clb f ryr January 23, 1970., City Council JAN2 71976 City of Iowa City Civic Center _ ABBIE S O' --FLS Iowa City, Iowa 52240 C jY CLERK Dear Councilpersons: I would like to bring the matter of sidewalk cleanliness to your attention. Because I reside on the east side - of town, I often walk tothedowntown area via College street. For the past -several months, the decency of this walk has been Interrunted abruptly by the presence of vomit along the block of College street between Dubuque and Clinton. There are two local taverns:, on that block and the regurgitation (which seems to be present almost daily) Is inevitably on the pavement in front of those two establishments. Aside from this problem being a very` obvious eyesore in the downtown area, itisprobably not the most hygenic of things to be left'; lying around. I feel it would be to the benefit of all Iowa Citians if the council would take some sort of action to get rid of this mess. May I suggest that one way to resolve this problem would be to require the management of these taverns to hose down, or clean the pavement In front of their establishments at closing time, orearlythe following morning. An expedient resolution to this problem would be appreciated, I am sure,by-all persons using -that block of College street. GV Sincerely DebraCagan -1030 E. Court Since July of 1979 a group of people known: as the Sign Review Committee have been meeting twice a month to study, discuss, -;and -review the present sign ordinance. The goal of the committee is to examine in detail the operation of the current sign ordinance;_ since it has been in effect for some two years, and to arrive at a set of recommendations.for desirable amendments for consideration by the City, Council. The committee has been composed of representatives 'from local businesses the Chamber of Commerce, the local legal profession, sign erecting -com- panies, the Iowa City staff, the local -architectural '(profession, '`"the University -of Iowa, and from the Iowa City City Council. Since January 1, 1976, the City Council has been without representation on this committee. It is the consensus of the committeethat.it,is vitally_important toi_have a member of the present City Council to. participate in and monitor the deliberations of the 'committee. It is urgently requested that a member of the present City Council be appointed as soon as possible to serve on the Sign Review Committee. The committee meets regularly on the second and fourth Thursdays of each month for one hour starting at 8:30 a.m. in the City, Manager's Conference Room at the Civic Center. Sincerely yours, Q Robert A. Edberg Zoning Inspector Committee Secretary RE/jp DISBURSEMENTS FOR APPROVAL December 16-30, 1975 . GENERAL FUND Linds'Art Supplies - 'Office Supplies 5.32 Cabelibraries Art 15.00 University of Iowa - Work Study 337.39 ,Northwestern Bell Telephone Phone Chargee 187.50 The Old House Journal Books 2.50 Organizer'sBook' Center - Books"` 14.05 Regent Book Co. -Books 26.47 Stadia Sports: Publishing, Inc. Books 1.80 State Historical Dept. _ Serials 6.00 University of Iowa _ Books 39.95 - - --Christian Literature Crusade Books-; - - 2.33, " North Iowa Library Extension Books 2,600.64' Hertzberg -New Method, Inc. --Books`' 14.33 - Institute of International' Education Books- 2.00 Iowa Academy of Science, Inc._. Serials 8.00 Iowa .State University Press - - -". Books.-. _ -5.77 The Musical` Heritage' Society Records- 67.45 National Directory Service, Inc. Books 22.64 National Record Plan Records 94.88 The Frame House Art 256.40 Quad City Times Serials 36.40 Doubleday 6'Co. "'Books " "6.88 - Ebsco Subscription Services Serials 7.03 Epstein's Bookstore` Books 5.30 Follett' Library Book Co. Books 443.19 American Life Found. 6 Study ' Books 15.00 Bacon Pamphlet Service, Inc. Books- 60.80 Baker 6 Taylor Co. - Books 107.60 Baker 6 Taylor Co. Books 82.31 C. W. Associates _ Books 16:35_ Collector's Books Books 4.95 - Commerce_ Clearing House, Inc. Books 26.02 Congressional Quarterly, Inc. Books 30.47 Council Bluffs Public Library Books -5.50 Council on.Intern'l:.Education Exchange- - Books- - 3.50 J. P. Gasway Co. Printing Supplies 53.60 Gaylord office Supplies 47.27'` Hach Brothers Co., Inca Sanitation Supplies 44.39 Osco Drug Photo Supplies 9.52 Shank Office Supply Inca Office Supplies 9.36 The American Co. - Miscellaneous 4.98 Chenoweth -Kern Elevator Service Building Maintenance_ 30.00 D b J Industrial Laundry Laundry .15.20 Iowa 'City -Typewriter Co. Equipment Maintenance-'- 38.50 Iowa -Illinois Gas 8 Electric Electrical Charges 561.99 Academic Press " Books 24.00 Friends of ISBN _ ..Serials 10.00 Bureau of Labor >=Judgments .132.00 U. S. Post Office, Postage 990.00 DISBURSEMENTS LIST Page 2 GENERAL FUND (cont.) Iowa-Illinois Gas 6 Electric Miscellaneous 276.50 66.15 Boston Mutual Life .Insurance Life Insurance Surfacing Materials 35.00 _; _ Johnson County Ready Mix Building Repair 119.40 Larew Co. < - Hawkeye Medical Supply, Inc. Safety Supplies 35.92 61.90 Patrick Harney Clothing Purchase 45.40 Halogen Supply Co., Inc. als- Data.. Processing Services DatRepaiProcessing 6;147.50 Elbert -6 Associates Cedar Rapids Asphalt 6 Paving Surfacing Materials 172.75 417.70 Equipment Materials Ken's Iowa City Press -Citizen Publication23.50 638.73 Lawyer's Cooperative Publish. outside Printing 3.00 International Assoc. Offic. Human Rights Book ;, 16.00 Iowa Road Builders Co. Surface Materials 600.00 = U. S. Conference of .Mayors. Membership 80.45 Henry Louis Inc. Photo Supplies 467.99 Reproductions Office Supplies 54.83 .Rapids Kustom Signals, Inc. Vehicle Repair 144.95 'Vehicle KennedAuto Market y Repair 62.98 ' Stephen Morris Travel, Expense 40.009,00 Internt'l City Management Assoc. Training 19.00, Pamela Maher Medical Reimbursement Jean Spector Mileage 880.00 U. S. Post office Postage officeSupplies , 58.20 Oak Industries Inc. en's Food Allowance Firemen's .400.00 - ,- Kenneth-Irving _ ' Firemen's Food Allowance -400.00 Parrott Robert L. P_: Firemen's Food Allowance 466.00 Arthur C. Kloosarro - Engineering Service Iowa City Laboratory„ Inc. nsultant Services , 3,258.05 - - Callahan 6 Co. Callaghang Equip- ment Repair 4.00- Hawkeye'Awning Co. Iowa City Sporting Goods, Inc. - - Recreational Supplies 770.80` 60.00 Sladek &Lynch Refund Title_Information 8.00 Maryland Dept. of Transportation Equipment Maintenance 1-8.07- The National Cash Register Co. Building Maintenance 249.07 22 R. M. Boggs Co., Inc. Medical Services 18.75 Mercy Hospital - Safety Equipment 15.00. Vernon; Fisher Meals 42.00 Candy Morgan 25.00 Client Security Trust Fund Insurance 50.00 Doug Shalla Refund Pitney Bowes off134.50 160.81 Dan R. Feeler Equipment Maintenance 18.00- Nat'l. Council of Juvenile Ct. Judges Subscription 2 335.29 Linder Tire Service Equipment Repair 1,214.90 Office Equipment IBM Midland' Laboratories, Inc. Sanitation Supplies - - 64.3.0 131.36 Mary C. Nauhauser Travel Expense Medical Associates Medical'272.00 DISBURSEMENTS LIST Page 3 GENERAL FUND (cont.) office Equipment 7.39 834.05 Quill'Corp. Clothing Purchase 236.25 Kiecks Virgil Michel AnimalSupplies Surface Material 382.40 Bituminous Materials Co., Inc. Vehicle Storage 156.00 Paul's Towing Service $�8 908.67 DEBT SERVICE 10,000.00 " Paine, Webber, Jackson & Curtis Bonds 255.00 - First National Bank Coupons - on Bonds. 3,000.00 Iowa State Bank 6 Trust $13,255.00 CAPITAL PROJECTS Iowa City Press -Citizen Publication 25.27 $25.27 ENTERPRISE Iowa Book & Supply Co. Office Supplies Materials 9.404 . 24 9.24. Equipment 50.010 Kens Water Pollution Control Fed. Membership John Staley Refund7.16, Refund 5:14 Charles Seemuth - Refund 3.82 4.12: Cecil Shellady Refund 3.69 Nancy Ringstrom Refund 8.14 John Junker Refund 60.00 John Oaks Hawkeye Awning Co. Purchases `.for Resale Rental 15.00 Culligan Water Conditioning Equipment Equipment Repair 30.81 Linder Tire Service Equipment Maintenance 25.80 125.78 IBM Equipment Materials 26.,59 Autocon City of Coralville Water Service 2,505.42 Highlander Inn Refund Equipment Maintenance 134.21 W. G. Jacques Co Equipment Maintenance 96.98 4.26 Control Sales Refund 3.16 M.'P.'Hedges Refund 397.46 Larry Houser Hach Chemical Co. Treatment Chemicals $3,526.14 TRUST_ & AGENCY 4.97 Wallace Homestead Book Co. - Books 526.93 Coordinated Library Info. Program Book Bas g $531.90 DISBURSEMENTS LIST- - 3 Page 4 INTRAGOVERMMENTAL SERVICE ' Hawkeye State Bank Transfer 22,259.25 ..' Larew Co:'` Building Repair 234.72 Precision Bearing Supplies 8.27. Ken's Equipment Materials 63.98 Iowa City Press Citizen Publication ' 15.84 David -Byrd Travel Expense 25.00:: MECCA Refund., 60.00 Xerox Corp. Equipment Rental 1,811.00 Linder Tire Service Equipment. Materials 39.50 Quill Corp'. Office Supplies 236.05 Safety Test & Equipment Co., Inc. Vehicle Materials 68.43 $24,822.04 SPECIAL ASSESSMENTS Iowa City Press -Citizen _ Publication 56.76 $56.76 LEASED HOUSING Lyle Seydel Travel Expense 22.64 - Margaret Parrish Repairs 24.32 _;_Carol,Kofron Refund 0.00 50.00- Marcy Marcy Roberts Refund 50.00 Stephen-Slezak Refund 17.96 Diane Knight Refund 25.68 _ .City of Iowa City - - - - Water & Sewer; Service- -' 6.98 Gilpin Paint & Glass Materials 14.04 $211.62 , URBAN RENEWAL Verl Greenland Refund 32.55' Welton Becket & Assoc. Consultant, Services 16.82 -.Shive-Hattery & Assoc. - Services - '2,244.45 -. _ Rebel Motel Refund 20.25 $2;314.07 HOUSING & COMMUNITY DEVELOPMENT City of Iowa City Improvements Reimbursement 70;749.69 $70,749.69 ' GRAND TOTAL $144,401.16 The preceding disbursements allocated by fund in the total amount of $144,401.16 represent an accurate accounting of obligations of the City of Iowa City. -Patrick .i. Strabala Director Department of: Finance ,- -`City of Iowa Cil 1� �`�- -.. - - HAYEK, HAYEK & HAYEK - wILLJ.HAYEK - `-ATTORNEYS AT LAW- - --- AREA CODE.319 JOHN W. HAYEK : _ 110 EAST WASHINGTON STREET - `337-9606 C. PETER HAYEK - - IOWA CITY. IOWA 52240 January 27, 1976 JAil2 i ib The Honorable Mayor and City Council of Iowa City Civic Center CiTY CL SRX I_ Iowa City, Iowa 52240 Re: Municipal Regulation of Economic Activity Mayor and Council Members: Last fall the City Council requested that the Legal Department study the possibilities of City legislation in the area of anti-trust law and economic regulation. The question had arisen in connection with dis- cussion of landlord -tenant problems in Iowa City and the, general rental housing situation. , I have asked Angela Ryan to make a preliminary study of the possibilities of anti-trust and economic conduct legislationforIowa City.'' Attached you will _find a preliminary report from Ms. Ryan on this subject. Ms. Ryan's conclusion, :in- which ,I concur, is that at least on a preliminary basis the City of Iowa City. would have authority to`enact ordinances and regulations. prohibiting certain types Ofeconomic conduct' which would be detrimental to the health, safety and welfare of the citizens of ,our community. We find nothing in federal or state statutes which would rule out such legislation. Before we move forward into a more detailed study of this subject we would like to discuss the matter with you. "I believe that several strong arguments can be made for legislation in this area. Certainly .economic conduct can have an important effect on the welfare of the community. Citizens, -especially low_ income citizens, are. directly affected by charges which they must pay for housing, .food, and other basic goods and services. Conduct which serves to improperly reduce or eliminate competition in the provision, of these commodities and ser- vices can be very detrimental to the welfare of such citizens. Further, all citizens are consumers of goods and services provided in the community and are adversely affected by conduct which unduly restricts competition or otherwise interferes with. the working of the free-market. Indeed it can be argued that local citizens are more directly affected by local conduct which is anti-competitive or monopolistic than they are by The Honorable Mayor and City Council of Iowa City - 2 - January 27,. 1976 such conduct on the national or international scale. The City of Iowa City already has laws which touch either directly or indirectly upon economic activity in the community. Our zoning ordinances, building and housing codes are examples. Arguably the City of Iowa City has just as legitimate an interest, for example, in seeing to it that landlords do not enter into agreements to _fix rents as we do in seeing to it that landlords do not provide substandard housing. However, there are several difficult issues which should be considered before proceeding with legislation in this area. 'First of all, as Ms. Ryan indicates in her study, legislation of this sort is extremely rare and I am sure that Iowa City would be one of. the first' communities in the United States to adopt such legislation if it were adopted here. One of the reasons that such legislation is very unusual is that the regulation of; economic conduct is a very difficult and time consuming enterprise. For Iowa City to become involved in such regulation on any significant scale it would be necessary for the City to employ persons with the necessary background in economics, accounting, and related skills to perform market studies and the like on the scale necessary to prosecute anti-trust actions. -Parenthetically I would indicate, however, that it might be possible to adopt an ordinance and rely upon private individuals and citizens groups to prosecute actions under the ordinance and thereby enforce it. These are examples only of some of the considerations to which -I am sure you will want to address yourselves in considering the wisdom of proceeding further in this area. I would suggest that this matter be discussed at an informal meeting of the City Council and that the Council give direction to the Legal Department and let us know whether -you wish us to do further studies in this -area and whether you want us to draft a possible ordinance for your consideration. Respectfully submitted, JolW. I-Iayek JWH:vb: l Enclosure DATE: January 23, 1976 TO: John .Hayek, City Attorney FROM: _Angela Ryan, Law Clerk - L' r RE: Feasibility of a Municipal Anti-trust Ordinance { _.. -.. FU is UTY c- t _< Anti-trust, laws have been enacted on the Federal, State and municipal levels. Most anti-trust cases are prosecuted on.the Federal level. For jurisdiction under the Sherman Act the 'illegal ,activity must either;. operate on or within the flow `ofinterstate commerce or affect interstate commerce. The Clayton Act adopted in 1914 supplemented the Sherman Act outlawing specific practices such as exclusive dealing arrangements, tyingarrangements and requirements contracts. The Robinson-Patman Act of 1936 was _ f enacted in response to the growth of chain stores and its applica gj ..tion depends upon requisite involvement in interstate commerce. Except as limited by the commerce clause of the Federal Consti- tution aState legislature may legislate with_respect.to all: trusts and conspiracies in restraint of trade. Therefore, an illegal activity could be a violation of both Federal and .State law. In matters -rela- ting to interstate transactions, a state may; pass regulations.-to prohibit restraints of trade even if the Federal Government has no law whatever with respect to similar matters involving 'interstate `trans- actions. While "trade and _commerce" under the.Sherman-Act have been broadly construed, the scope of-state anti-trust laws is-unually more narrow. Some state codes cover only commodities, articles of:manu- facture and.products of the soil; others are limited to articles of -- - common-use.For-example, the Court. in Nasman v. Bankof New York, 49 N.Y.F.2d 181:(1944), held that bidding on real estate'did :not fall. `within the state anti-trust law .which _related to necessities in the form. of vendible tangibles. The court stated that sale and purchase of realty is not a necessity of life. In State of Arkansas v. Frank, 169 S.W. 333 (1914), price fixing the cost of laundering was_held to - - be outside the scope of the State anti-trust law. The scope of Iowa Code 553.1, Pools and Trusts, is "any article, commodity or merchandise to be manufactured,- mined,: produced or sold in this state...." The Court in Rohlf.v. Kasemeir, 140 Towa`182 (1908) held that "merchandise" refers' primarily to those things that merchants sell and that -the word "commodity" qualified by the words:.:._ "manufactured, mined, produced or sold" did not include labor,,,skilled --or-unskilled,-though the word "commodity" primarily means a conveni- ence,'profit.or advantage and in reference to commerce comprehends everything movable that is, bought or sold - except animals. The issue in Rohlf v.-Kasemeir was whether physicians could agree upon a fee schedule for professional services. The Court held 'that ,commodity" does not include personal services. Rental of realproperty would :not seem to come within the subject matter of section 553. -- Municipal Ordinances. - -- The only municipal anti-trust ordinances I have found -are quite old - to restrain and punish forestalling and regrating.- Forestalling is the act ofbuying or contracting .for any merchandise or provision on its way to the market with the intention of selling it again at a higher price; or dissuading persons from bringing their goods or provi- sions there; or, persuading` them to enhance the price when there. Regrating is the offense of, buying ata fair or market any provisions, corn or other dead victual with the intention of selling the same again _ in the same fair or market thereof at a higher price. Forsyth Mfg. Co .v. Castlen, 37:S.E.:485 (1900). These ordinances we_r_e held -valid -.under authority granted to municipalities -to g provide for or ulate ma11 rkets. ,. York v. Hatterer, 48 P.Super.,216 (1911). An important point is that there was an expressed delegation by'the State Legislature to the municipalities to regulate-andcontrol their markets. Real Property I found very little referencetothe use of anit-trust in relation to real property. There have been a few cases involving.real estate:. brokers, closing costs and title opinions. In a 1951 Law Review article Professor Marcus argued that the sale and rental of real property is --an item of trade or commerce and a necessity of life and therefore subject matter for anti-trust suits both under state and federal', law. Federal suits would be limited to Washington, D.C. and cities alongstate borders when real estate advertisements were, listed inneighboringstates.--His focus was on the use of anti-trust in the area of racial.'discrimination. He felt that citizens' organizationsformedto keep communities white and restrictive .covenants showed a concert ofiaction -orargreement_-to restrict the rental or sale of houses. -Since segregation causes a deviation from free competition it is an anti-trust violation. Marcus, Civil Rightsandthe Anti-trust Laws, 18 U.Chi.L.R.171,(1951). He cited no cases and, upon shepardizingthe article, `Ifound -no- subsequent' . -_-- -'--articles or cases, on -point. Home Rule Whether Iowa City can enact an anti-trust ordinance requires the consideration_ ofthe power of cities under home rule.- Clearly there is no express delegation as with the power to regulate markets :but neither " does there appear to be state preemption. Rental of real property 'does not fit within the definition of merchandise or commodities of section 553, Pools and Trusts. State preemption is found when: the state expresses an intent to occupy- the area, where its scheme regulation is so perva- sive that it is a reasonable inference -that -there is no room for the - municipality to supplement, where state interest is -so'dominant that:it would be assumed to preclude enforcement in the same area or'where there is a danger of conflict of administration. City of Des Moines v. Reiter, 251 Iowa 1206, 102 N.W.2d 363`(1960); Town of Randolph v. Gee, .199 Iowa 201 N.w.`567 (1925). „_ r Chapter 364 recognizes that the state and city will oftenlegislate i. in the same area. For"example,-364.2(3): "An exercise of a`city power is not inconsistent with astate law; unless it is irreconcilable with ' the state law. 364.3(3) - A city may not set standards and_require-" mentswhich are lower or lessstringentthan-those-imposed by state law, - but may set standards and requirements which arehigher or more stringent .' than those imposed by state law, unless a state law provides otherwise."'. Therefore, the factthatthe state has enacted some legislation in an area is not enough to concludethatthere is state preemption'. Under Article III, section 40, the limitations upon a municipality are -the following: 1. The home rule power cannot be inconsistent with the laws of the General Assembly; 2.. It must be exercised only with regard to local affairs and governments; _3. It does not include the power to levy taxes. "I With regard to the second point, there are noprecise-testsas to what is alocal concern.- The courts consider whether state-wide uniformity is desirable; whether municipal legislation would significantly affect persons living outside the city; whether intergovernmental'cooperation is required to protect those living. outside. the city;: and historical, _. areas of responsibility..:Rental ofreal property would seem .`_to be; a" matter of local concern although some courts have held it to, be a_matter -_.- of_state-wide. concern in rent control :cases:be.cause `it affected adjacent municipalities. Chapter 364.1 places another limitation on cities. "This grant of home rule powers does not include the power to enact private or civil law governing civilrelationships, except as incident to an- exercise of anindependent.-city power." -Under the police power ._a municipality _ indirectly interferes with the private landlord/tenant relationship in the enactment of housing codes, zoning regulations and slum clearance and redevelopment. In states where municipalrent control ordinances have been held invalid the courts held that it was a'direct_rather than indirect -regulation .of.. the landlord/tenant relationship. An anti-trust ordinance may: be distinguished from rent control in.that it;does-.not i regulate the landlord/tenant relationship but rather the landlord/landlord relationship where no civil relationship exists. - - Anti-trust Violations Anotherconsiderationis,the type of conduct which violates anti- trust laws. The fact that all landlords charge the same rent for a similar unit is not enough to be considered price fixing. -Identical prices are a neutral fact in the absence of evidence which_would_.lead es would have been.different-if-truly independent one to expect that pric decisions had been made. Identical, prices may be consistent with indepen dent competitive decisions. It becomes suspicious if prices remain existence of an agreement. It is necessary to show that decisions were interdependent, that - - - they were consistentwith the,.- individualself-interest of _those con-"-: cerned only if they all decided the, same way. There must be some agreement, some minimal meeting of the minds or acquiescence. Merely taking into accountthe-probable reactionofcompetitors in, setting prices without more in the way of agreement is not unlawful price fixing. Since there are no modern municipal anti-trust ordinances, the area is open and unclear. Under Home Rule, it appears possible that a PENDING LITIGATION PAGE 4 SATE CASE CAPTION W z ►_ m W Z o "" o w COMMENTS/STATUS ' CoAND o o a Q mow cr ;- ;: u z SUBJECT U Korshoj Const. Co: v. City 7/17/7, U.S. Dist. J. W. Ii. Plastino - • (digester suit) Ct. Penny Bryn v. City' 7/22/7 Dist. t. Ct. T. K. Plastino (damages case) Rock Island R- R- v. City 10/10/ Dist. B. B : Kraft (quiet title-S. Market Square) 74 Ct.. Trial set for May 10, 1976 Amerex v. City 10/15/ Dist. 74 Ct. J. W, Ii. Kraft (damages suit) - i Short v.' City ' : 11/12 U. S- 74 Dist. J. W. 1-1. j. Kraft damages suit) Ct. Adverse District Court Baker v: City 2/7/75 Dist. T.K. Pugh decision appealed to Iowa (Denver boot case) Ct. Supreme Court. 3/14/7, Dist. ` Lynch v: -City Ct. J. W. H. Epstein (civil service case) Stevens v. City 5/9/75 Dist. Ct. T. K. Plastino (access nage suit) Moore c. Epstein / 18/ 95 Dist. Ct. J. W. Ii. Epstein (damages case, Police) I�, I �J 1 li a [,`AYF: January .i0, 3.976 > a TO: City Council N dl mcm: CLt) ,lail i„ l' L1:rierta1 in Fr ida)'S Packet a� a Draft of: I:cnt IC:Ltllllo]d ing Ordinances (TIMI C.OL. c.11 m^mbMl s O 1. •1) 4 D;cmo-randum from City Planagcr to City Council rcgardi:nG visit—[rom Conglcssl!tin � riaz��insl.�•. G�j � 7 _ p ' 4:cmv oruhnp'c n from SuL:intcncic.nt of. Ccmctcly-FO1-JSLI to Ci.t)',hcuLagcr rLa ng i � 5ttc17. •SPM Fic�rJl>_-:✓IicC.1,�+y 7`tr�-. 3 '7� 1 i : Joseph's .Come g 3 3 }{ Monthly report of DMpurtment of Conmmtnity Devclopmenc for DMccmbcr, ]975.c �4 letter,from IFJD to Director of Community Devclopmcllt concerning fo].lox-up on C Jmulary 20, 1976, meeting bcL%ie City staff. murbcrs and IND. e Letter from Johnson County Regional Planning ConmiLss:ion to City Dlana,0017 to Transportation Committees. regarding Iona City appointer,--nt t a 'Letter to Mayor \cnhauscr from City of \cL:' Orleans i'cgndi-ng PTO cla!ilat.i.on of a Food Day. 7 ko? t Calendar for month of Februm 1976. A' Calcnclar shoL� ng schMdliicrl r:^ct.i.ngs of Commiltcc on Co-i'muni.ty Needs' (;ICDA) i 5 for month of Fcbroai 1916. L , ��,' f 6• s raga. t [i Pending 1egisl Ltion. 'r llousiug Autli,j it:y of city or Toxa City Financial Report, Junc 20, ].975. ��7— 1; I I a. s j t 1 a p 1 - �,.zm»v... ƒ\� - ƒ)rg _�_..«a«2±4:6%; w© DA\d>s ; i °30,\97/ \< ? . ro GR Council «» m z � }\ /} City,, y� , ?\. � «,\ s \� m /\mss Gj G» \� . . \ §\ \d §: .\ ■g d� � \� ». �� . :. .. /\� � « 2:� �\ . a /y\� \»\ U DEPARTMENT OF COMMUNITY DEVELOPMENT 76 GOALS DECEMBER, 1975 ACTIVITY REPORT GOALS: - I. - COMPREHENSIVE PLAN - to initiate work activity in four main " areas of the comprehensive plan. IL . IMPLEMENTATION OF FIRST-YEAR HCDA PROJECTS - to acquire and remodel a; building foruse as a Workshop Center, toacquire land for neighborhood parks and to make capital improvements to various neighborhood parks, to make a study of architectural barriers to handicapped access in public places, and to establish a rehabilitation program through a system of loans and `grants to low and moderate income persons. IIL CLOSEOUT OF URBAN RENEWAL ACTIVITIES - to initiate the.process which will result in the closeout of Iowa Project R-14 during .. - _. March,1976. - :. IV. ONE HUNDRED FORTY-NINE UNITS SECTION -8 EXISTING HOUSING - to convert 49 of the Section 23 housing units to Section 8 Existing Housing and to obtain approval of 100 additional.units. _ V. SIXTY-FOUR UNITS OF NEW CONSTRUCTION -. to nsaist In the provision ofadditionalhousing for low and moderate Incomeelderlyand handicapped persons. VI. PROJECT IA 22-2 - to obtain HUD approval for the construction of 62; units of new housing for the elderly. VII. HOUSING ASSISTANCE PLAN.- to provide support, for second year.HCDA application funds. VIII. MONITORING OF CURRENT PLANNING'.AND SIGN ENFORCEMENT ACTIVITIES to Provide -support to the Planning and. Zoning: Commission in " areas of review, analysis and.recommendation for zoning amend- ments, rezoning requests, and subdivision plat reviews; and , to-enforce:andinterpret the sign ordinance including.issuance " - of permits and inspections. - -- ' DECEMBER ACTIVITY: I. Comprehensive plan work activities initiated in December included base mapping, a land use report, a population report and a report on the environment. Department of Community Development December Monthly Report Page 2 DECEMBER ACTIVITY (continued): II. An engineering study on the Skills Unlimited Workshop ( Building) was initiated and will be completed in`IMe Too JaI: Cost .estimates -on capital improvements for neighborhood parks were obtained. The first draft of a study on architectural barriers was initiated, and a tentative designation of neighborhoods ` the rehabilitation program, was alsfor o made.- III. Four of the five houses which were new foundations. The thirdap-sold were moved and placed on _ praisal_on the College Block Building was received and sent to HUD (along with `two other_. appraisals) for establishment of a fair market v Seventh Addendum to _talue of that structure. The he Old Capitol -Associates Contract was pre- pared and approved by the City Councll. -- IV. -A letter from HUD was received,approving the application for _ 100 units of existing housing and converting 49 of the Section -_ 23 units to Section 8. The'AnnuaY Contributions.Contract was received and will be submitted to the City Council in January initial request for f for approval. The administrative plan, project budget and unds have been, prepared. V• The Mid States' proposal was tentattve.lyaelected by HUD as the developer of 64 units, of new -construction to be located at the northwest corner of Willow Street and American Legion Road., It Is anticipated that 90 days will be required to clear this project' at both local and HUD levels: VI- HUD indicated that the changes made by Old Capitol Associates in the 62 -unit elderly housing project located_in B1ock,103 of_ the R-14 urban renewal -area were not acceptable in Block 1 ause questioned legal impact on the bidding procedure. HUD granted a 30 -day period for the solution to this problem. . It was also indicated that if a solution was not provided, the 62 -unit all0 indicatedation would _be withdrawn. VII: No measurable progress this month; p Housing Commission. ending discussion with the VIII. Staff reports were prepared for a rezoning application and two .subdivision plats. Due to vacation schedules, -limited work. was accomplished on revisions to the Zones. Special use requirements M1 and M2 Industrial for elderly housing."facilities were developed in draft form. Five hundred and sixty-one signs were inspected,,' 214 non -conforming ains were no ted ,.;and 9 signs were brought ig :into conformity with the were ordinance`provisions. DEPARTMENT OF HOUSING A '# ♦5 ND URBAN DEVELOPMENT OMAHA AREA OFFICE " UNIVAC BUILDING, 7100 WEST CENTER ROAD RKOION V11 - OMAHA, NEBRASKA 68106' Ruom 300 P.d... 1 Ofr1c. 11u11di., 22 911 W.l.ul nn..1 January -1976 figrt" 70, Mr. Dennis Kraft P=EIVM, ' 1A'N 2 3 1976 7.2CMR Community Development Director CIowa Civic Center 410 East Washington Iowa City, Iowa 52240 Dear Mr. Kraft: This will follow up on the Meeting 1976, attended b held in the Area Office on January 20 and Messrs. y He en, John Lloyd, and Ms. Debbie Rauh of :-Larry Heeren, John Lloyd, and_William Shoemaker ofuthetArea ' Office. The main to of the meeting Of Your ,Urban Renewal Project No. IOy7II Ras the; closeout and final settlement of'the project were discussed and are 14• The followin and necessar related here for` g major aspects y action: your information 1• In -order for financial settlement and closeout of R-14 to be . accomplished, the disposition of all project land must be complete and the purchase amount deposited into the Temporary Loan Repayment It is our understanding that the redeveloper, Old is to purchase and take title to all Capital;ation March 1 ItaO Association, 1976. Prior to the trans_fcrpofperty under its:option by . of all; abstracts and determination of clear title,is to be done ownership, the updating by the City. 2• It is necessary for the City to determine its course of action within the next few days regarding the ,refinancing'Of market loan notechase which will in April`1976. the land Private Purchase amount from the redeveloper is critical -'in this regard, in order for this Office to 'know the amount of loan to schedule for private market refinancing, if any. 3• All outstanding activities in the R-14 project must be resolved prior to closeout, either by completion or through transfer of the responsibility for their Completion.Development Block Grant program. Specifito Your Community, proceedings on app cally, the roximately 15 pa setti,condemnation rcels should be'conaidered inng a closeout date for the Urban Renewal project. We aware that you are not presently able to;assign an exact figure on the parcels until such time as are made b Purchase y the court. In order to have funds°ndevaimn tlentowards. purchase REMVED.JIIN 1 2 1976 CITY OF NEW ORLEANS IU I OFFICE OF THE MAYOR ( �' ^ *6 l Iif. • - - PRIDE BUILDS NEWORLEAM January 2, 1976 -MOON LANDRIEU - - - -- - MAYOR Re: Food Day Dear Colleague: Plentiful, wholesome food, good nutrition and sound health - should be within the reach of everyone. Yetasyou and i know, many people are finding it 'ever harder to ;meet these basic needs. - Rising prices, global shortages, ;and lack`of.nutrition education mean that millions in America and around the world can't get a nourishing meal on the table: To highlight this problem and: to push for concrete change, the Center for Science in the Public Interest, `a -non-profit' organization headed'by scientists, is sponsoring FOOD DAY. FOOD' DAY, April 8,_1976,_a national -day of action on the food crisis, will be a time for Americans--who:eat their way.through $200- billion worth of food each year --to learn about; problems in the - food supply and to get involved in solving them. Food Day 176 will focus particular attention on food policies at the state and local level Food Day.organizers are urging local governments to work with citizens groups, people, churches, unions and farmers to formulate realistic and responsible policiesreflecting humanneedsand available resources. Local food programs can include support for farmers markets, buying clubs, urban gardening, modern nutrition education in schools, supermarkets, and Community Centers; and maximum participation in federal food programs.,; I invite you to join me now in promoting this worthy project by I' sending asletter of endorsement to Food Day, Center for Science in the Public Interest, 1779 Church St., N.W., Washington_,D.C. -20036; and by appointing a coordinator of;Food Day activities`. If you will include the name of'your _coordinator,'th'e Center will send additional materials on Food Day directly to him. Last year „official endorsements from Jackson, Mississippi to Honolulu, Hawaii helped bring the first _Food Day to the attention of _millions of Americans.` Won't you add your voice `to;make Food Day '76 'an even greater success? Sinc ely, Da�'�. 0�/Yl oon Landrieu ML/NW/jb - "An Equal Opporfunity Employer" rronp .no matt*= ..bis An 2...nC.`0r, is _il� __a._?OS<'J�_j �.A;'O�Y•al _ C=..Mad : 9 Me matter! IMIZA, - JCi:A.,'10R alltl. iJ?:OC BJII is to-..:: itt_ !,:Ilsel- ,__- UZ tin , OUJ.. 1 .. 3_+st;i tLl'.... into accountn.l nc s ,L3a L- L'J_O , jival o. participation of gcotPl",a._r1Je_'i, flow :of U<•J. t 1.';I f t7V11 - J...Cil, 474'33.Ai1 _.itC..^<j -'. �„Gup C'�OU D3 JC..,]vl Qpara::+_ th i..0'}t- C3xIL`C002Y (af Cactitcnnaa C1__3ned zo e;ctnb- Z..:3:2 { ..'lti -2. d111l3 i:.:t-. (3 J�"i 1-�i^ •q, 7!3b9iz/.L1,: Fo;'gJ'L'L"..,^. -f aC.;i'.:: -thia vioa.-” A.S..- F....- tir__ It_ Y. eta.) awn 0010 , t it-. L':z-ti .t ?CO rolcount land bal, 1bi''G.1 ,-;>:l.titlw (tb L...ica, c. n, ar:a cor __, ca) n::i 1].oc? x (%ow you 'rozl _on it). % Z'S '1` L3'f l.r_ CYi t it Zea l 114 2 t;'. QA l4 1 LL0 i n;_11 it. is ] tri AOt ;fa 3 r.-Id } t?y.i:! E�. L i ...? cn.. ,x.4:.4 P_ Da t,o'r.. Irl71h a grou- t the Initial El _a;a j 0: t';?•S{AO; d1 '?._.n?l (at 1-this - Otago, the ont l ide , ULS vo'ttld !:a 1 v of • �r: in pr-- r .1? a t1- ..ic e> con:;iiis tion), of ranchIng a c,.i:i+a ; oInt _ (='" '-:._.l_ I] :,c•:_1ri ^ter Stta`1t:,i;:), r<ztti 'Oa CIi'J 3o 5,'i "?t' for ...LI, t �011�Ja Co? t ;!'1 n13, uhap: 9 F.a3 411=09 an4l e'cat Cti tb a Variety of LCI Arai Liza 'i°1C:ifA1C' 1Ve is iii t113'i_ 111:. Ai LtC ItIa_ tp_ •: ^t�'•ai (:; �,r `+Y' J +. ;1=.. t1loY Cil) PeC.' �s1�D ai o2ter. L6_eadad Qot b: caus "._S S to I: de3l7:171th a,: ]- 1al-:%-o tart`tont 7_catr3a tUE1 pror: s:! of ti1 �3: gtni;7 171;:% 'CL ::`.-.:1:143 :3 n.ne :T rw_ri tL}0it- Z.LL f a , .i1S,ITA It-(1: - A group 0-Qndle in at .:z:: a Con' l wow VIg tvuarv3 M"tualil t_.1d9T3`JCTi r's_i1 t coad !J.tjc' t1V`t, praca'JJ it )r-.-.t„_O?7, and making. deciniona. '.f v7:.':it _ i R:_ ner uZ :.a[Li'>i'lual i 333` inZ tBC'):: own ender, not liatonillg to A-}:: .'_:? "-, and C2.3'.' .. E-.!Oll tbn h v'. -,feral'-W th, =-tiS t�.xo ttt r rauy ;�� fco,.r_r.:i' a t t:,.J ;.o,:, - _ ?lb. has An st:rea3r'% .ni2 :!ea'_rten .^_`3. o_ n 3;rz.,l-13 !,.Stt W I•a_ sagaaand, ralnZorcad. and continue ASeals 14:1 -a group to not Mathoulm wall .nt>t also ba s_as3_1 ..r'-3 "'c2oarnd. Any f:'_oup CDZMAcad ro WoMa., mot' At r-.:.r._.30al CEO-, Chi CAA Of Zona. City, : ter,_ J-Jt__tuta of a._.?_;._ saC%1.i.: 1;- ..:.._'_^.3tive 1.0 na. US:brnC.tc.).-cera l� a _ .-aNfl, 01 those. Ca er.I-1.1rai1 Cho gro L1`J. to 1cJ_Ic torr r _ ..r 7.' t '. t , t. 7. i'.I ', .... /. ..> l - - r L.,.at it t,id: a r. C... 1.... _ f._ t"-'-2t ...:7 ATd.`to na.1 to 1',Intrn t'1 ii.c_ any o3_n-�zo, t.z:cs ti-c3 and e__s,:Y. The My of W a My halt r'.,_al.aaci otaff assistance from the , +:' t_1::_ of WWI �:,ii : Afga Lra to :';`Y.'!. 71th atkne ;roup:: In ,..?'.14 My on a short t_o_ d ba33u tt o on learning Co e_ 0.,'.0 - their p rocaan . aud. d vylop sk:;I.'_c to. help. their ara _ nC% 7317. ?f d?ei 4d, thto curvice 1u. available ' tows City 'Awncil no a -'moi 1�0 huh thea loco_ha reaourcen and 31cillin tf Sr LJ3 71 .lito c_ „n and clalieas facing - `city ..3rV- �[=. r Ci-_- In ADMINISTRATION 10-1 CENTRAL EQUIPb1EM' REPAIR FACILITY PROJECT- - -Initial Cost $ 2;500,000` Annual -Future Burden wideterminod Net Annual Future Burden: undetermined Thisprojectwill provide for the construction of anew central equipment repair facility to maintain and house City owned equipment. The existing shop and service facilities are 'con- sidered to be inadequate for current levels of maintenance operations and storage. A consultant's study of the existing facilities and suggested alternatives -will be.completed by May 1976.` 10-2 CIVIC CENTER FLOOD PROOFING PROJECT (deleted) Initial Cost $ 30,000 Annual Future Burden undetermined Net Annual Future Burden undetermined` This project will provide for the flood _ proofing of the Civic Center since the lower ". level could be inundated during times of _ severe flooding by Ralston Creek. This project was included in the FY 76-80 CIP -: but was deleted from the FY 76 operating ; budget—It was not included in the -:> FY 77-81 CIP. Considering the frequency of the 20 year storm, 'which `would create a water level deep enough for flooding of the Civic Center, itis recommended that sand bags be used rathar than -expensive construction of a well point system. 10 CIVIC CENTER AIR CONDITIONING PROJECT (deleted) - Initial Cost $ 25;000 Annual Future Burden Net Annual Future Burden - _0_ This project would correct defficiencies that are present in the existing air conditioning_ and air handling facilities of the. Civic Center. The correction of the deficiencies would make for more efficient and comfortable working conditions during thesummer months: for the employees located in the.Civic Center. This project was not considered to be of a high enough priority for inclusion in the FY 77-81 CIP. - 1 - - COMMUNITY DEVELOPyENr PROGRAM 20-1 LOIV-INCOME.HOUSING PROJECr:(deleted) Initial Cost $ 1,650,000 Annual Future Burden undetermined Net Annual Future Burden " undetermined This project provided for the design and construction of low-income and/or elderly housing and was listed as the #1 priority in the Community Development section of the FY 76-80 CIP.Since that time, Old Capitol Associates has received an allocation for 62. units of housing for the elderly and Mid- " States Development' Corp. has`receivedan allocation for an additional 64 units. The total of 126 units exceeds the number of 100 " units outlined in Project 20-1. Therefore, this project, as described, was deleted from the FY 77-81 CIP. , 20-2 RALSTON CREEK PLANNING Initial Cost $ 80,000 Annual Future Burden -0- -` Net Annual Future Burden -0- This project will provide for the investi- gation of possible approaches to the resolution of flooding problems on Ralston Creek. A study by,a consultant, which will ,- provide structural and nonstructural solu- tions to the ''flooding, -is-currently under- - way and will be completed by July 1977. Project 44-12 titled "Ralston Creek Project" provides for implementation'of the suggested solutions. 20-3 URBAN`REDEVELOPMENT PROJECr(deleted) Initial Cost $. 1,450,000 Annual Future Burden " undetermined` Net Annual Future Burden, undetermined This project was included in the FY 76-80 CIP to provide' for _undefined redevelopment projects within Iowa City; and was dependent upon expected future federal legislation and 'funding ;to- replace 'the `Urban Renewal and Community Development programs.which existed at that time. This project has - currently been replaced by specific pro- grams that have resulted from recent ' federal legislation governing urban re- development and housing. 2 777 20" ELDERLY HOUSING PROJECT _ Initial Cost$ 3,385,000 Annual Future Burden undetermined-: Net Annual Future Burden undetermined This project will provide for the design ' and construction of 120 units .of housing for low-income elderly residents of Iowa City.- Recent data ,indicates a deficiency in the amount of sound, decent housing for low income elderly residents of Iowa City. The housing assistance plan for Iowa City, which was filed as part of the FY 7S Housing and Community Development -, ACT (HCDA) application indicates that there are severalhundred low income elderly families that need _subsidized housing. 50 of the 120 units would be`of'the con- gregate housing type and the remaining 70 would be conventional housing for the - elderly. It is intended -that this project _ be funded under Section 8 -of the -Federal Housing Act. ^. 20 ARCHITECTURAL BARRIERS REMOVAL PROJECT Initial Cost $ 100,000 - Annual Future Burden _0_ - Not Annual'.Future Burden This project will provide for the determination of the ,type and extent of architectural barriers which - inhibit accessibility by elderly and handicapped persons to public buildings, streets and walks, and recreational facilities. Remedial actions will then be identified and a program ofconstruction to remove the barriers will be implemented., 3 20 SKILLS UNLIMITED WORKSHOP PROJECT Initial Cost -000 Annual Future Burden - -0- Net Annual Future Burden This project will provide funds for the acquisition `($60;000) and rehabilitation _ ($15,000) of a building located on the North - cast corner -of -the intersection of Van Buren and Washington Streets. Goodwill Industries of Iowa City is presently providing an environ- ment -in which low and moderate income.citizens can enjoy art, craft, and work activities that are not otherwise available to them, but their present building.has been sold. The purchase of this building will allow for - the continuance and broadening, of this,, program to provide opportunities and/or facilities for community art and craft and to promote cultural activities for the disadvantaged; utilizing the people of::the community as resources of special knowledge. f 20- RIVER CORRIDOR STUDY Initial Cost $ 50,000 Annual Future Burden -0- Net Annual Future Burden ° -0- This project will provide for an in-depth study of the Iowa River corridor in theIowaCity area to aid-in,the planning offuturedevelopment within, the corridor, as well as to aid inplanning 'the recapture"and -revita-- lization of the Iowa River as an open space resource, for the community. 3a • • PUBLIC SAPLIY PROGRAM 30-1 ANIMAL'SHELTER REPLACmwr PROJECT :< Initial Cost $ 175,000 Annual Future Burden 22,500 Net Annual Future Burden 17,500 This project will provide for the design and construction of,a new animal shelter to more adequately house animals and to provide for proper handling and care so that state -certifi- cation of the shelter may be obtained. The present facility is unadequate, unsafe and structurally unsound.' It is unfeasible to - - perform the modifications necessary to bring the existing shelter up to the state'certifi- cation standards. Cost figures do not include site acquisition since it is intended that a City owned sitebeused. 30-2 PUBLIC SAFETY 1EADQUARTERS PROJECT Initial Cost $ 525,000 . Annual Future Burden undetermined __ Net -Annual Future Burden undetermined. This project will provide for a comprehensive _- study of the space requirements of the Police and Fire Departments. The study is to provide preliminary..plans detailing remodeling and/or additions to the Civic Center which might be deemed necessary in order to provide; adequate space for the Police and Fire operations. _ This study will allow for an evaluation to be made of the merits of utilizing the Civic'Center and performing the necessary modifications versus constructing a new joint law enforcement facility in conjunction with the County. $500,000 is provided for the Civic Center modifications or for the City's share of a new, joint facility. ----- 30-3 FIRE TRUCK ACQUISITION Initial Cost $ 62,000 Annual Future Burden 600 - Net Annual Future Burden 600 - - - This item will provide funds for the acquisition of a- pumper :truck. The pumper will replace a 12 year old pumper which willbemoved to reserve and which will in turn replace a'30 year old pumper that will be retired. :The; purchase of this pumper will continue the upgrading'of.the Fire Department's first line and reserve equip- ment and is consistent with <the Insurance Services Office's recommendations. 4' ; 30 POLICE STATION REMODELING PROJECT Initial Cost Annual Future Burden 10,000 Net Annual Future Burden - 00 5 500 This project will provide for remodeling of the lower level of the present Police Depart- ment to provide for a women's locker room.' A -locker room with adequate toilet facilities is necessary to accommodate newly employed female officers as wellasto provide adequate facilities for future female officers that may be employed. The following two remodeling projects, costing $40,000, were not included -in the:CIP pending the completion of the Police and Fire space study scheduled under Project 30-2 titled "Public Safety Headquarters Project'. 1)'_ Remodeling of the air exchange system in the firing range. This would eliminate a possible danger to users' health occasioned by the high concentration of lead fumes that can not be removed`.by the present air ' flow system. _ 2) Remodeling of the upper level to provide for additional office space. Adequate office, record storage, and public space'must.be provided to maintain the present level of operation of the Police Department. 30 FIRE DEPARTMENT OFFICE ADDITION PROJECT (deleted) '- Initial Cost $ 21,000 Annual Future Burden - Net Annual Future Burden 600-'. 600 This project will provide for the enclosing of a parking; area adjacent to the Fire Department on the northwest.for.office space. Present office space isconsidered`to be inefficient and very inadequate for the existing staff requirements. This project was not.included in the CIP pending the completion of the Police and Fire space study.scheduled under Project 30-2 titled "Public Safety - Headquarters Project". 5 �' Y 30 TRAINING TOWER PROJECT Initial Cost $ 300,000 Annual Future _Burden 1,200 Net Annual Future Burden 1,200 This project will provide -for -the construction of a'five story training tower and associated facilities. This project will greatlyJmprove the training capabilities oftheFire Department, especially in the training of-laddering buildings. 30 TRAFFIC SIGNAL EMERGENCY ACTUATOR ACQUISITION Initial Cost _ - $ 55,000 Annual Future Burden - 1,000 Net Annual Future Burden 1,000 This item will provide funds for the -purchase of equipment which will allow emergency fire vehicles to control traffic signals so that signalized intersections can be safely nego- tiated in emergency situations. This equip- = ment will provide a greater margin of safety to citizens,:Fire Department personnel ,and equipment. 30 WMN FIREFIG11TER'S LOCKER ROOM PROJECT(deleted) Initial Cost undetermined' Annual Future Burden undetennined'r Net Annual Future Burden undetermined This project will provide for the_design,and construction of a women's restroom and'locker room facility. This project will provide the required facilities for women who may join the Fire -Department at a future date. This project was not included in the CIP pending the completion of the space study scheduled -in Project 30-2 titled "Public Safety Headquarters Project". 6 TRANSPORTATION PROGRAM_= TRAFFIC CONTROL -41-1 R-14 SIGNALIZATION IMPROVu4-NfS (deleted) Initial Cost $ 90,400 Annual Future Burden undetermined Net Annual Future Burden undetermined -- This project provided for:.the installation - of traffic signals in and adjacent to the _- R-14 Urban Renewal Area.. This project was included-in`the FY 76-80 CIP and thepresent installations are considered to have: been completed. -Future signalizations inthe R-14 area will be included in specific street ; projects so this project designation! Will no longer be valid. 41-2 R-14 STREET LIGHTING IMPROVEMENTS (deleted)_ Initial Cost $ 118,000. Annual Future Burden undetermined Net Annual Future Burden undetermined This project provided for the installation of street lighting in and around the R-14 Urban Renewal Area. This project was included in the FY 76-80 CIP. It is recommended that this project not be,included in the FY 77-81 CIP, since future street lighting will be included within specific R-14 street and mall%improve- ment_projects. This project designation will - - no longer be valid. =. 41-3 STREET LIGHTING IMPROVEMENTS (deleted) Initial Cost $ 80,000 Annual Future Burden undeteiinined:" NetAnnualFuture Burden undetermined This; program will provide for a continuing program for street lighting throughout the City. This project was included in the FY 76-80 CIP, but it was not included in the FY 77-81 CIP because no independent street lighting projects are foreseen except those that are ;. a part of the Urban Renewal Amenities Program. 4174 TRAFFIC SIGNALIZATION PROJECTS (deleted) Initial Cost $ , 150,000 Annual Future Burden undetermined Net Annual Future Burden undetermined This project provided for the construction and installation of traffic; signals in various undesignated parts of the City. This project -was included in the FY 76-80 CIP. Specific projects have been identified for consideration and in- clusion in the FY 77-81 CIP which will supersede and replace this project. 41 EAST -WEST ONE WAY COUPLET PROJECT #1 Initial Cost _ $. 56,000 '< -Annual Future Burden 2,500 2,500 . Net Annual Future Burden, This.project will provide for overhead mast -arm signalization and, physical interconnect of five intersections: Jefferson and Clinton, Jefferson - effersonand'Dubuque, and Dubuque,Jefferson and Gilbert, Market and Dubuque, and Market and Gilbert. Three of these intersections are presently; signalized but are in need of upgrade. All five of the=intersections will be handling increased volumes of traffic and they have ; high accident experience; of thetype -a which can be corrected by this type of signalization._ 41EAST-WEST ONE WAY COUPLET PROTECT N2'; Initial Cost $ 30,800 2,000 Annual Future Burden 2,000 Net Annual Future Burden This project will provide for the replacement of the existing-pedestal.mount signals at four intersections with overhead mast -arm signals as well as -provide for physical interconnect with the intersections to the west on the one-way coupler (refer to 41- ). Current: accident experience indicates that the pedestal mountings do not provide sufficient advanced warning and visual cueing`for.drivers to react to the signals. . Overhead mast -arm signals would reduce the acci- dent experience.` The four intersections are: - Jefferson'and'Dodge, Jefferson and`Governor, Market and Dodge, and Market and Governor. 41 SYCAMORE AND HIGHWAY N 6 BYPASS INTERSECTION IMPROVIIMENf Initial Cost $ 16,500 " 500 Annual°Future Burden 500 Net Annual Future Burden This improvement will provide for improving the geometrics and signalization of this intersection. This improvement will include mast -arm installation, left turn storage on the'east leg and _separate traffic actuated left turn phasing to reduce accident experience, to improve; safety and promote traffic flow. 41 GILBERT AND BOWERY - PRENTISS INTERSECTION IMPROVOC-NT Initial Cost $ 23,000 Annual Future Burden - 500:- Net Annual Future Burden 500 This improvement will provide for the"signalization of this intersection.- Signalization will alleviate the congestion and unsafe traffic conditions that exist at this offset intersection by providing side street entry to Gilbert and safe `left turn movements from Gilbert. - MASS TRANSPORTATION 42-1 BUS ACQUISITION - Initial Cost S 519,450 Annual Future Burden 71,500 Net Annual Future Burden 51,500-, This project will provide funds in the amount of $219,450 for -the purchase of three additional buses in accordance with the recentlysubmitted UDfrA Mass Transit Grant Application. The three buses will provide continued service_to the Wardway area and provide increased rush-hour service to several areas of the community. - This project will also provide $300,000 to be used for future changes and/or expansion of the transit system depending on future goals and the availability of Federal assistance. 42-2 BUS SHELTERS Initial Cost $ 170,000' Annual Future Burden 5,000 Net Annual Future Burden - 5,000 ' This project willprovidefor the construction of approximately 30 shelters of various sizes throughout the City in accordance with the: UMTA Mass Transit Grant Application submitted by the City. The ,purpose of this projectisto provide shelter from the weather for City bus passengers. 42-3 -'BUS STOP SIGNING PROJECT (delete) Initial Cost $ 25,000 Annual Future Burden 1,000 Net Annual Future Burden 1,000_ This project provided for bus stop signs throughout the City of Iowa City as requested 9 in the Lt4TA Mass Transit Application Grant submitted by the City. This project-. .would - enhance the convenience; and; safety of the Transit System for its passengers. Safety Of the operation would be improved by allowing drivers to concentrate on safe opera- tion rather than continuously watching for - passengers along the route. This project was not considered to be of a high enough priority for inclusion in the FY 77-81 CIP. 42-4 CMIUNICATIONS EQUIPMENT Initial Cost $ 27,900 Annual Future Burden -. Net Annual Future Burden 4,000 4,000 Thisprojectwill provide for the purchase of communications equipment for the buses. purchased under project 42-1 as well as`installa- tion on presently owned vehicles.Some of the benefits that would be derived from this; project would include better security for passengers and drivers,' betterresponseto mechanical problems, and better schedule adherence. AIRPORT 43-1 TIE -DOWN AREA PROJECT (delete) Initial Cost $ 20,000` Annual Future Burden Net Annual Future Burden undetermined undetermined_ This project will provide for the construction of additional hard surfaced tie -down and parking areas for eleven transient aircraft; supplementing the existing space for eight aircraft.The _ construction of this project "is contingent upon - the ability to fund this project from operating revenue. 43-2 T -HANGAR PROJECT Initial Cost $ Annual Future Burden 80,000 - -- - Net Annual Future Burden -0- -0- This project will provide for the construction of - a ten unit T -hangar and asphalt apron. The hangars '- will be used to provide storage for additional base aircraft at the airport and are -projected -to produce a $3,000 annual revenue. The construction of this - project -is contingent upon the ability to fund this project from operating revenue: 10 STREHTS'AND STORM SEWERS 44-1 R-14 STREETS AND STORM SEWER IMPROVEMENTS Initial Cost $ 1,000,000 Annual Future Burden undetermined _ Net Annual Future Burden undetermined This project will provide for the reconstruction of streets and storm sewers in the R-14 Urban' Renewal Area as part of the City's contribution to the program as designated in the Urban Renewal Redevelopment Plan. The streets scheduled for reconstruction are as follows: FY 79 (Summer 1978) al Clinton-Washington to Burlington $400,000 FY 80 (Summer 1979) Capital Street-College to Burlington $1S0,000 Fy 81 (Sumner 1980) Capital Street-Washington to College $150,000 Washington-Clinton to Madison $300;000 44-2 R-14 PEDESTRIAN WAYS, MALLS AND OPEN SPACE IMPROVEMENTS Initial Cost $ T555,000` Annual Future Burden undetermined' - Net Annual Future Burden undetermined These improvements will include street plantings, malls, 'the Dubuque-College fountain, `open `spaces =`and other pedestrian ways as part of the R-14 Urban Renewal Project as delineated in the Urban ° Renewal Redevelopment Plan.; The following malls will be constructed as part of theseimprovements: FY 77 (Summer 1976) - Dubuque Mall-Washington to College $855,000 College Mall-Dubuque to Clinton FY 79 (Summer1978) College Mall-Dubuque to Linn $300,000 FY 80 (Summer 1979) - Dubuque Mall-College to Burlington $400,000 44-3 R-14 TREES AND PLANTINGS IMPROVEMENTS (deleted) Initial Cost $ 85,800- Annual Future Burden undetermined Net Annual Future Burden- undetermined These improvements providedfor street trees and plantings as part of the-R-14 Urban Rede- ede-velopment'Program.` velopment Program. This project was included Il `' ill the FY 76-80 CI P. 11-14 street trees and -- plantings will he included within._ specific future street and mall projects; so this 44-3 project number will no longer be valid. 44-4 R-14 SIDEWALK IhIPROVD93NTS (deleted) Initial Cost Annual Future Burden $ 119;800 Net Annual Future Burden undetermined undetermined This project provided for the construction of sidewalks . as part of the R-14 Urban Renewal Program. This project was included in the FY 76-80 CIP and is now incorporated into project 44-2 titled R-14 Pedestrian Ways, Malls -and Improvements. -open Space. 4475 ASIJIALT RE-SURFACINC'IbiPROVr. I,r Initial Cost Annual Future Burden $ 750,000 Net Annual Future Burden 70- -0- - This improvement will provide for an annual _ program of resurfacing of the City's streets which are in a deteriorated condition by re- habilitating and/or adding to existing surface to preserve the large investment system, in our street would be spent annually for this: improvement. improvement. 44-6 SIDEWALK ASSESSMENT PROGRAM Initial Cost Annual Future Burden $ 650,000 Net Annual Future Burden -0- -0- This :project provides for the annual construction and reconstruction of side- walks on a priority basis. The majority of the costs of this program are assessed to adjoining property owners.'$130,000 would-be,spent annually for the reconstruc- tion of sidewalks -with the City's share totalling $20,000 annually. 'This program was deferred until 'FY 80 due to the work- load generated by Urban Renewal;.projects. 44-7 CITY'S SHARE EXTRA WIDT11 PAVING (deleted) Initial Cost Annual Future Burden $ 25,000 Net Annual Future Burden undetermined undetermined This project provided funds for the City!s -share of the cost associated with requiring : _ A extra depth or extra width paving through new subdivisionsunder development.: This project is being deleted from :the C11' and will only be included in the operating budget in - the future. - - 44-8 MUSCATINE AVENUE IMPROVVEMENT Initial Cost $ 550,000 Annual Future Burden -0- -0- Net Annual Future Burden This improvement will provide for the complete reconstruction of Muscatine Avenue from First Avenueto Scott Blvd. including -the,- intersec- - tion at First Avenue. This improvement will replace the badly deteriorated roadway and is justified by..future_traffic projections forecasted by the Area Transportation.Study. 44-9 _ GILBERT COURT STORM SLIVER-(conpleted). Initial Cost $ 50,000 undetermined Annual Future Burden undetermined - Net Annual Future Burden This improvement will provide adequate storm sewage capacity in the Gilbert -Court area lying generally south of Kirkwood Avenue and cast of Gilbert. This project was included in the FY 76-80 CIP and was completed in FY. 76. 44-10 BENTON STREET• BRIDGE SIDSIALK PROJECT (FY 76 completion) Initial Cost $ 20,000 undetermined Annual Future Burden undetermined ; Net AnnualFutureBurden- This project will provide for the replacement of the sidewalk on the Benton Street bridge. The sidewalk is presently in very deteriorated conditionandneeds immediate attention to continue providing pedestrian access -across -the Iowa River. This project was included in the FY 76-80 CIP and was scheduled for FY 76. The plans and specifications are completed and; the construction will take place in the`sumumer of 1976 so this project will not be included in the FY 77-81 CIP. 44-11 BIKBBVAY PROJECT Initial Cost $ 732,000 - Annual Future Burden 10,000 10,000 Net Annual Future Burden This projectwill provide for the annual design and construction of various clasSes:of bikeways 13ed and facilities throughout Iowa City. Bicycling is the second most popular form of transportation in the Iowa City, -area and affords many advantages including:,l) the bicycle as a non-polluting"form of transportation; '2)_it lessens the degree of - - parking and traffic congestion in the central part of_Iowa _City; 3); it is consistent with the University of Iowa's pedestrian orientedcampus; 4) itis a healthful form of exercise. ' The' implementation of the proposed bikeways plan will enhance the safety of bicycling in Iowa City by reducing the many bicycle -auto and bicycle -pedestrian conflicts that presently exist. 44-12 RALSTON CREEK PROJECT Initial Cost $ 3,300,000 Annual Future Burden 150,000 Net Annual Future ,Burden 150,000 This project will provide for the elimination of periodic flooding of Ralston Creek which causes several hundred thousand dollars worth of damageandcreates health and safety problems during flooding. A study of -the flooding by a consultant will be completed by July 1977 and will provide structural and nonstructural solutions to the flooding. - A' definitive program to control the flooding will be outlined and implemented at that time. 44-13 MUSCATINE-COURT CULVERT PROJECT (deleted) Initial Cost $ 280,000 Annual Future Burden -0- Net Annual Future Burden -0- This-project provided for the replacement of the culvert at the intersection ofCourtand Muscatine with a larger structure to more adequately handle Ralston Creek flood waters.'- This project was included in the FY 76-80 CIP but was not included in the FY 77-81 CIP'so that -'it may be ; coordinated with the. Ralston Creek Watershed Management Plan. 44-14 SCOTT BOULEVARD IMPROVEMENT Initial Cost -_ $ 3,550,0001 Annual Future Burden undetermined Net Annual Future Burden undetermined This improvement will provide for the construc- tion of a -four -lane facility on Scott Boulevard from -Highway N6 to'Highway 'Hl. The benefits and - 14 ' impact of this imp will. be more fully understood after -the completion of the Area Transportation Study being done by the Johnson County Regional Planning Commission. It -is recommendedat this time that this project be deferred -until the Area Transportation Study is ompleted: completed.- 44 44 JEFFERSON BUILDING VAULT REPAIR PROJECT Initial Cost Annual. Future Burden 65,000 Net Annual ruture,Burden -0- 0- -0- 70- This project Thisproject will provide for the reconstruc- tion of the structural vault top which is located under the public sidewalk at.the- Jefferson Building.The existing vault top has deteriorated to the point where its structural capabilities are questionable and has become a potential pedestrian hazard. Also, a new sidewalk call is necessary to maintain conformity of design with the R-14 Urban Renewal Project, but tileexistingstructural vault top will not support the - - dead load of the required 4`i.nch concrete sidewalk. A portion of the assessed to the cost may be property owner. 44 MORMAN TREK BOULEVARD INIPROVI.IILW Initial Cost Annual Future Burden $" 155;000 Net; Annual Future Burden - -. -0- _ 0 - This improvement will provide for the asphalting Of Norman Trek Boulevard from Benton Street south to the City limits. This improvement will be done in two stages with earthwork and drainage being done in 1976 and paving in 1977. Approximately 800 vehicles per day, use this route as a cut-off to the southwest' of - part the County. The County has pavedtheirportion of the road which continues on south. - 44 PAVING ASSESSNII:Nr PROGRMI Initial Cost Annual Future Burden ' $ 170,000 - Net Annual Future Burden -0- -0- This project will provide for the construction Of streets and alleys with the majority of ,the cost paid for by the adjoining owners. property This project is composed of the following four distinct pavings: 15 • • F 1) South Riverside Drive- A dirt road presently used by industrial traffic. Maintenance is difficult. $110,000 2) Dodge - Lucas Alley -_A gravel alley -that has - drainage problems _which cause minor flooding. _ $9,500 3) Muscatine Alley- Property owner requested paving. $10,500 4) Sycamore Street- This is an assessment for paving from the end of'the.present pavement to the south end of the subdivision onthewest side of the road. $40,000" The City share of these projects would total $25,000.- 44 SPRUCE STREET STORM SEIVER PROJECT Initial Cost $ 20,000 Annual Future Burden undetermined Net Annual Future Burden undetermined This project will provide for the installation of drainage pipe.and area inlets north of Spruce Street along the railroad right -or -way to alleviate minor "flooding _in back yards of - -- residences adjacent to this area. :This project was deferred, however, if`this is considered to be a highneighborhood priority a special, ` assessment project should be considered. - 44 HIGHWAY 6-218-1 INTERSECTION DIP Initial Cost $ 400,800 - Annual Future Burden Net Annual Future Burden 500 500 _ This improvement will provide for improving _ the geometries and signalization of this intersection. The capacity, of this inter- section is exceeded by existing traffic volumes and in 1975 this intersection recorded the - highest accident experience in the City. In the event the State does not participate in this project, it is recommended that only improved signalization be contemplate.d($39,200). - 44 RIVERSIDE AND BENTON INTERSECTION IMPROVEbEN£ Initial Cost $ 78,000 Annual Future Burden _0_ Net Annual Future Burden This improvement will provide -,for improving the ;geometrics`and:signalization at;this '16 intersection. The intersection does not have the capacity to handle exising volumes of traffic. Left -turn lanes on the east: and west legs coupled with improved si mP gnalizati.on'will greatly improve.the efficiency of this - - intersection as well as reduce the accident experience:When final plans for this improvement are drawn, additional right-of-way may need to.be acquired which is not included in the $78,000 estimated cost. 44 KEOKUK AND HIGIRVAY H6 BYPASS INTERSECTION IMPROVEMENT Initial Cost $ 245,000,. Annual Future Burden Net Annual Future Burden 500= 500 This improvement will provide for improving the geometries and signalization atthisintersection and the relocation of the._east leg of the frontage road (Hollywood) to the south. A left turn lane will be added in the_west leg of Highway k6 Bypass and improved signalization-would provide full traffic actuation.. Relocation of Hollywood will reduce the congestion in the Keokuk and Highway 06 Bypass intersection. - 44SERVICE BUILDING LOT ASPHALT PROJECT ' Initial Cost $: 4,000 Annual Future Burden Net -Annual Future Burden 0 _0_ This project will provide for the surfacing of the City Service Building Lot to provide additional hard surface for vehicle and material storage. Presently, materials and equipment -are stored on a'dirt -surface which turns to mud, making work in the area difficult. 44 SCTH1vt EL SEWER PROJECT Initial Cost $ Annual Future Burden 5,000 Net Annual Future Burden Undetermined Undetermined` This project will provide for --the extension of a storm sewer and a rebuilding of the outlets -to. minimize the erosion of the backyard at 9 S. Mt. Vernon Drive, 17 r'. 44 HIGHWAY A6 and #218 STORM SEWER PROJECT Initial Cost $ 300000 Annual Future Burden Undetermined - Net Annual Future Burden Undetermined': This project will provide funds to reimburse° the University of Iowa for a storm sewer reconstructed under Highway 6-218 in the vicinity of the Law Library in the _Fall, 1975. By.resolu- tion #75-121, the City agreed to: reimburse the University 18.6% of the total project cost not to exceed $30,000. 44 UNIVERSITY -LAKE DEVELOPMENT BIKEWAY PROJECT Initial Cost $ 2,500 Annual Future Burden -0- Net Annual Future Burden: -0- This project will provide for the construction of a six foot wide public bicycle path and walkway through the University LakeDevelopment as a link in a major bicyclepath proposed-in- roposed in`the thepreliminary' bikeway plan. The City would. be responsible for paying the cost associated :with paving a six foot wide walk rather than: the required four foot wide walk.' The ',Planning and:Zoning.Commission recommended that this - project be undertaken. .. 44 PARK ROAD BRIDGE PROJECT Initial Cost '' $ 130,000 - Annual Future Burden = -0- - Net Annual Future Burden -0- 0-This Th tsproject will pruvide for the rcconstructiun of the Park Road Bridge deck. Portions of the deck willberemoved and the entire deck will be overlayed with concrete. Deterioration of the deckhasoccurred due to the rusting of reinforcement steel caused by salt and corrosion.: 17a PARKING SYSTEM 45-1 PARKING FACILITY NUMBER 1 PROJECT Initial Cost $ 5,350,000 Annual Future Burden undetermined Net Annual Future Burden undetermined - This, project will provide for the design andconstruction of a shopping arcade parking garage as part of the Urban,Renewal.Project: It will be constructed in two stages and .will " provide for at least one thousand automobiles in Blocks 83 and 84 in accordance with the Urban Renewal Redevelopment Proposal:" 45-2 PARKING FACILITY NUMBER 2 PROJECT Initial Cost $ 3,210,000 Annual Future Burden - undetermined Net Annual Future Burden- undetermined This project will provide for the construction of a multi -story facility in conjunction with a hotel in Blocks 63 and 64 as part of the Urban Renewal Redevelopment Proposal: IMIROM1rNI'Al. 1'Rtrl1171 ON I'ROGIWI IY)um'ION CONIU01. 51-1 11-I4 SANITARY SnVLR IMPROVUff.NI;S Initial Cost Annual Future Burden $ 1242000 Net Annual Future Burden -0- 0--0-These -0- Theseimprovements provide for the construction of sanitary_ sewers through- out the R -14 -Urban Renewal Area. The - City is under contractural obligation with Old Capital Associates to ensure that the sanitary sewers in this area are in operating good condition. Much of the sanitary sewer system in the downtown R-14 Urban Renewal Area is of.late 1800 to early 1900 vintage and is in poor condition. -In "addition, this is a good time to repair or replace -these sewers because of the street improvements being performed. 51-2 RIVER CORRIDOR TRUNK SEWER IMPROVEMI?NI' Initial Cost Annual Future Burden $.4;085,000 Net Annual Future Burden " Undetermined undetermined This improvement provides for the construc- tion of a trunk sanitary sewer from the sewage.treatment plant north along the east side of; the Iowa River to Kimball Road, a river crossing, and an extension to the intersectionof Taft Speedway and North Dubuque Street. This improvement is'nec- essary because the existing east side and west side trunk sewers are currently over- loaded in certain regions, and require immediate relief for present and future loads to prevent surcharging of raw sewage into the Iowa River. There are areas in the north: part of Iowa City which are unable to develop because': of lack of sewer and areas_ which are currently on septic systems. This sewer will provide sanitary sewer for some of these areas and a point of connection for sewers required to developotherareas. - 51-3 SANITARY SEWER ASSES 34ENT PROMCPS (deleted) Initial Cost Annual Future Burden $ 150,000 Net Annual Future Burden 7 -- undetermined undetermined; These projects' provided for the construe - tion of sanitary sewers throughout Iowa City Is as required with the cost assessed tojproperty owners. This project was included in:the"FY 76-80 CIP but it recommended that it not:beiincluded in the FY 77-81.CIP. Rather than planning for an annual. assessment program, each project should be analyzed when requested and budgeted accordingly., 51-4 GRIT RIMOVAL FWIP ENI' IMPROVDIEN' (deleted) Initial Cost $ 75,000 Annual Future Burden undetermined` Net 'Annual Future Burden undetermined- This project provided for the replacement and modernization of grit removal equip- ' - ment at the.pollution controlplant.This project was included in the FY 76-80 CIP and ,- - is now incorporated into the waste treatment facilities project: 51-5 WEST PARK LIFT STATION INIPROVIMENI'_(FY 76 completion) Initial Cost $ 60,000 Annual Future Burden undetermined Net Annual Future Burden undetermined This improvement will provide for a new lift station to replace an existing lift station which is obsolete and rapidly. becoming unserviceable. This project__was included in the FY `76-80 CIP:and was scheduled for FY 76. The plans are being prepared with construction to take place following their completion. 51-6 TERTIARY TREATMENT PROJECT (deleted) Initial Cost $ 400,000 Annual Future Burden -,, undetermined Net Annual Future Burden undetermined' This project provided for the necessary treatment plant modifications required by 1979 by Federal and State law to'signifi- cantly;reduce pollutants in the .plant! s effluent. This project was included in the__ FY 76-80 CIP<and is now incorporated into - the waste treatment facilities project. 51 wASTE TREATMENT':FACILITIES IMPROVEMENT < Initial Cost _ $20,780,000 - Annual Future Burden undetermined Net Annual Future Burden undetermined" This improvement will provide for the_ study and evaluation of the 'existing waste treatment, plant and sewer system and for the improvement to the plant and collection system or ;for the construction of a newsewagetreat- ment plant, which ever is more cost>effective. This _improvement _will bring the _Iowa City sewage „ system ,under ,compliance with new State and Federal laws that regulate the operation and maintenance of sewage collection and treatment systems and -control -the discharging Of Pollutants into streams and rivers.` 51 SOUTHWEST INTERCEPTOR SEWER REPAIR PROJECT' Initial Cost Annual Future Burden $ 55,000undetermined Net Annual Future Burden , - undetermined This project provides for the replacement of man holes and the slip lining of a stretch of sanitary sewer that has decayed because of - - If S (Hydrogen Sulfide) attack. -A solution to - the HZS attack is presently being investigated and will be implemented before the repair project takes place. 51 SCOTT BOULEVARD SANITARY SEWER PROJECT Initial Cost Annual Future Burden $ 20,000 --, Net Annual Future Burden undetermined _ undetermined This project will provide sanitary sewer from existing City sanitary sewer to ;the boundary of a proposed new development along Scott Boulevard. -This-sanitary sewer has - been requested by the developer and is to be paid for entirely by him for the purpose of, providing sanitary sewer service only to the area of the new development. 51 POLLUTION CONTROL MAINn3NMcE SHED (deleted) - Initial Cost Annual Future Burden $ 35 000, Net Annual Future Burden undetermined undetermined This project provided for the construction of a building to store equipment presently kept; outside. This project would increase operational efficiencies by providing a base of operation for the sewer maintenance crew and a central equipment: storage point. The project would also provide economy by reducing weather induced equipmentwear. This project was not considered to be of a high enough priority for inclusion in the FY 77-81 CIP. _-- 20 51 POLLUTION CONTROL ASPHALT SURFACING PROJECT (deleted) Initial Cost Annual Future Burden $ 40,000 Net Annual Future Burden -0- This project provided for the resurfacing with asphalt of the -0- drive at the Pollution Control Plant. This project would alleviate a:continuing maintenance problem by improving the existing crushed rock drive which does not stand up well in periods of wet weather. This project would-` also Provide for better aesthetics and, general housekeeping at the Pollution Control Plant. This project was not considered tobe-of:a high enough priority for inclusion in'the FY 77-81 CIP. WATER TREATMENT 52-1 R-14 WATER IMPROVEM WS Initial Cost Annual_Future Burden $ 95,000 Net Annual Future Burden undetermined undetermined This improvement provides for the -continuation of reconstruction of water: mains in and adjacent to the R-14 Urban Renewal area in accordance with the City's contract with Old Capitol Associates'--: to provide adequate water -pressure -for -new con- struction and fire prevention in this area. 52-2 NEW SUBDIVISION WATER MAIN IMPROVEMES Initial Cost - - Annual Future -Burden - $ 593;500 = Net Annual:Future Burden undetermined undetermined This improvement provides for the annual installation of water mains in new subdevelop- ments. The cost is completely absorbed by; the developer, with the exception of oversized water main. The City's share involves additional costs associated with requiring a larger main than is needed to serve the immediate 'subdivision.- 52-3 REd(M READ WATER METER PROJECT Initial Cost Annual Future Burden $ 360,000: Net Annual Future Burden undetermined - undetermined. This project calls for the continuation_of -the purchase and conversion of water meters to remote read. This project will -improve the efficiency and accuracy, of the meter reading operation as well as improve customer service. 2 52-4� TWO-INCH WATER MAIN REPLACEMENT • PROJECT -Initial Cost - Annual Future Burden $ 70;000 Net Annual Future Burden `undetermined undetermined This project provides for the replacement of old two-inch galvanized water main throughout the City of Iowa Cit inadequate size and are<ineextremel arese mains of condition.- The mains will be replaced with new cast iron pipe, six inches and larger in size to provide proper pressures and flows. 52-5 WATER MAIN LOOP TIE-IN PROJECT Initial Cost Annual Future Burden- $r 588,500 Net Annual Future Burden undetermined undetermined These projects will consist of five separate main extensions which will involve providing a closed loop water main system throughout the City. The five areas are: `Sycamore 1 Street, Benton Street, Highway Rochester Avenue and Scott Blvd. The closed loop: system will provide for a uniform distribution of water at nearly equal pressure throughout the community with a limited number of dead- end mains and will also provide for improved fire protection. 52-6 WATER PLANT 'SLUDGE TREATMENT PROJECT Initial Cost Annual Future Burden $ 66',000 Net Annual Future Burden undetermined undetermined The project will provide for a study to find the most cost effective method of -dis- posing of the sludge produced during the water treatment, process and for the design and construction of required disposal facilities. State and federal law restrict the present method of discharging the sludge - into, the river, so an alternate sol be found. on must 52-7 WATER DISTRIBUTION SYSTEM CONTROLS PROJECT (deleted) Initial Cost Annual Future Burden $, _25,000`. Net Annual Future: Burden -0- This project provides for a monitoring and control system to be displayed on a console 22 at _the Water Treatment Plant for better - monitoring :and control of tile water `distri- - - bution system. This project was included in the IY 76-80 CIP, but was but not included in the, FY 77-81 CIP experience with existing controls has shown that`the distri- bution system can be monitored and controlled by existing equipment. 52-8 FAST SIDE WATER STORAGE PROJECT -Initial Cost _ Annual Future Burden $ 455;000 Net Annual Future Burden -- 7,500 undetermined This project will provide for a water storage tank and pumping capacity on the cast side of Iowa City. :-This -projectrwould:bring water Pressure and fire protection on: the northeast part of the City in line with the rest of Iowa City's water distribution system and prc= vent, the further deterioration of water pressure as this part, of Iowa City continues to develop. $25,000 in provided in FY 77 for site 52 WATER DISTRIBUTION YARD ASPHALT SURFACING PROJECT (deleted) Initial Cost Annual Future Burden$ 8,500 Net Annual Future Burden -0- -0- - This project provided for an asphalt surface on the water distribution yard. Theasphaltsurface would improve general housekeeping by;prevcnting mud and rock from being tracked out onto Gilbert Street during periods Of wet weather and would prevent an annual expenditure for crushed rock surfacing. This project was not considered to be of a high enough priority for inclusion in the FY 77-81 CIP. 52 WATER DISTRIBUTION STORAGE SHED (deleted) Initial Cost Annual Future Burden $ 6,000' Net Annual Future Burden -0- This projectprovided for the construction of a storage shed at the water distribution'. yard. The shed would house, equipment now stored outside, and would reduce weather -induced equipment de- terioration. This project was not considered to be of a high enough priority for ;inclusion in the FY 77-81 CIP. 23 ,.- REFUSE DISPOSAL 53-1 SANITARY I.AM)FILL LAM) ACQJISITION (completed) Initial Cost 22,79p0 Annual Future Burden Net Annual Future Burden -0- This project provided for payments on the new. Sanitary -.Landfill. This project was included ' in the FY 76-80 CIP,=and was scheduled for FY 76. The final payment for; the land has been - made. S3 LANDFILL ROAD ASPHALT SURFACING PROJECT (deleted) Initial Cost $- 60,000' Annual Future Burden 70- Net Annual Future Burden -0- This project provided for the surfacing of the crushed rock landfill road with six inches of asphalt in two phases. The _present crushed rock road becomes,extremely.muddy during inclement - weather, and creates dusty conditions during hot dry weather - causing poor working conditions, severe vehicular wear and an unattractive City _ facility. A permanent asphalt surface would also reduce the maintenance expenses currently assn- _ ciated with a crushed rock road. This project was not considered to be of a high enough pri- ority for inclusion in the FY 77-81 CIP.` 53 RESOURCE RECOVERY STUDY (deleted) Initial Cost $ 30,000 Annual Future Burden -0_ Net Annual Future Burden -0- This study would provide information concerning the economic and environmental feasibility of alternatives to landfill solid waste. 'Present guidelines suggest a landfill is the most eco- nomical disposal method for Iowa City. Ibis project was not considered to be of a high enough priority for inclusion inthe 77-81 CI P. CEMETERY 54-1 CBE-MRY ROAD IMPROVEMENT Initial Cost $ 10,000. Annual Future Burden Net Annual Future Burden- -0- This improvement will provide for the upgrading s of the existing Cemeteryroads. The roads are in a badly deteriorated condition and must be upgraded ,to Facilitate maintenance and to provide a smooth and unbroken surface -for vehicular= traffic. 54 cimil-r1!RY I:X1)iWS1oN I'R(111i(.T (deleted) Initial Cost " Annual Future Burden $ 40,000 Net Annual`Future Burden '0' This project provided for the acquisition of an additional 1.22 acre parcel of land for Cemetery expansion known as the Zetek property. This - Property p perry would`allow'the Cemetery to meet the demands for burial spaces and; to provide a more complete service by providing`a choice of buriallocations. This project was.not included in the FY 77-81 CIF because it was felt that alternate parcels of land should be considered for Cemetery_ expansion. 25 .:- LEISURE AND CULTURAL OPPORTUNITIES PROGRMf PARKS AND RECREATION 61-1NEIGID30RIlOOD PARKS IMpROV54ENTS (deleted) Initial Cost Annual Future Burden 400,000 " Net Annual Future Burden undetermined undetermined This item provided for a series of improvements to parks throughout the community Specific facilities and equip- ment were to, be determined by the Parks and Recreation Commission. This project was included in the FY 76-80 CIP: Specific projects have been identified for considera- ation and inclusion in the FY 77-81'CIP which will;supercede and replace this project. 61-2 PUBLIC TREE PLANTING PROJECT Initial Cost Annual Future Burden 153,000 ` Net Annual Future Burden ` '0- This project will provide for thecontinuationof the existing City program to, provide :for trees on City property such as street :right- of-ways, parks and the Cemetery.' Trees lost to -damage and disease are.,replaced'and addi- - tional trees are added to provide a more aesthetically pleasing appearance to the City, and toassistin atmosph temperature emperature control., 61-3 - SOUTH SIDE PARK ACQUISITION (FY 76 completion) Initial Cost Annual Future Burden $.: 50,000 Net Annual Future Burden undetermined undetermined This project will provide for the purchase of neighborhood parks as identified in a,recent " staff study for neighborhoods south of'Hwy.` 6 By -Pass. This project was included in the FY 76-80 " CIP`and was scheduled for FY 76. The purchase is presently contingent upon the receipt of HCDA, funds or alternative funding. 61-4 RECREATION'CENM PLANNING PROJECT (deleted) Initial Cost Annual Future Burden $ - 15;000 - Net Annual Future Burden: undetermined undetermined This project provided for the design of an addition to the Recreation Center and a 26 redesign ofe adjacent parking .lot. This• - project was included in the.FY 76-80 CIP and was scheduled for FY 76c These 'funds will be used in the acquisition of the Northeast Side Park, Project 61-5. 61-5 EAST SIDE PARK ACQUISITION (completed) initial Lost $ 35,000": Annual Future Burden undetermined Net Annual Future Burden undetermined This project provided for the purchase of an Eastside neighborhood park. This project was included in the FY 76-80 CIP, and was scheduled for FY 76. The park was purchased in FY 76 as scheduled. 61-6 RIVERFRONT ACQUISITION - - Initial Cost $- 200,000'- Annual Future Burden 10,000 Net Annual Future Burden 10,000 This project will provide funds for the purchase of approximately 150 "acres of a 300 acre parcel known as the Showers property located south of. Iowa City -along the Iowa River betweenSand' Road and Highway 218. It is assumed that 150 acres will be purchased in-FY,76,-'($200,000) and that this will complete the purchase of available riverfront property south of Iowa City. This project follows_ the; recommendation of a Stanley Consultants report. Future annual burden would be contingent upon_the level of development desired along the river. 61-7 RECREATION CENTER PROJECT Initial Cost $ 100,000` Annual Future Burden 2,500`; Net Annual Future Burden undetermined This project would provide for the design and construction of a'4011 X'85" addition consisting of four handball courts,to the existing Recreation Building. It is: indicated that the most pressing need -for indoor sports facilities at the present time is for: handball courts and the Recreation Center expansion was the Ml need listed in the 1970 Burke_ plan.: The expansion would use the existing heat plant and shower and locker rooms,, but it would take some of the existing parking spaces and would need to be flood -proofed since it will be in the:. Ralston Creek flood plain. This project was deferred pending the settlement of.a question concerning ownership of the land.east Of the Recreation Center. 27 61 WILLOW CREEK PARK SHELTER PROJECT; Initial Cost -Annual Future Burden $ 25,000 Net Annual Future .Burden 4,000 4,000 This project will provide for the construction of a picnic shelter with restrooms'at the start of the Willow Creek Nature: Trail This project would expand park facilities in southwest Iowa City as the 1970 plan recommends to geographically counterbalance Mercer Park in southeast Iowa City, and it would provide the Recreation Division with a building from which to_ -operate a`supervised summer playground: - 61 HICKORY BILL NATURE PROJECT Initial Cost Annual Future Burden $: 125,000 Net Annual Future Burden 8;000 undetermined This project will provide for the purchase of 17 acres of wooded land including two structures north of Hickory Hill Park.Theexistinggarage, could probably be used as a workshop while the _ larger barn could be used for exhibit space, a classroom, etc. Utilities and parking are avail- able. This project was listed as the b3, priority in the 1970 Burke Report. Also, a: flood' control Of Ralston Creek would indicate'a purchaseofa large portion of this tract may be desirable for water retention.- etention. 61 61 -WILLOW CREEK PARK -TENNIS COURTS PROJECT Initial Cost - Annual Future Burden $ 50,000 Net Annual Future Burden 1,500 1,500 This; project will provide for the construction of four tennis courts at Willow Creek Park. The construction_ of these will courts provide some geographic balance in court location and help meet the rising demand for tennis courts.' 61 SOUTH HOLLYWOOD bWQOR PARK SHELTER PROJECT Initial Cost Annual Future Burden $ 30,000 Net Annual Future Burden 4,000 4,000; This project will provide for.the construction of a picnic shelter with restrooms at South Hollywood Manor Park. 'shelter The will provide shade, rain protection, will house picnic tables 28 and will provide a building from which the - Recreation Division would; like to operate" a -supervised summer playground program. This - project is in agreement with the -Burke Report and °the -1974 Community Development Staff Report, entitled "Neighborhood Park Study, Hollywood Manor Area.. 61 MERCER PARK TENNIS COURT LIGHTING PROJECT Initial Cost $ 12,500 Annual Future Burden `Burden 2,000 Net Annual Future 2,000 This project provides for the addition of -lights ,. - for: the six existing tennis courts at Mercer Park. It is estimated that the lighting would provide an additional 500 hours of annual use, and would be cheaper and more practical than constructing' - several additional courts. - - 61 ARTIFICIAL ICE RINK PROJECT Initial _Cost $ '500,000 Annual Future,Burden 36,500: Net Annual Future Burden _0_ This project would provide for the design and -- constructionof an ice rink complex with an 85' X 200 ice surface. There is a shortage of winter recreation facilities in Iowa City. An artificial ice rink would provide for continued ice skating.; - from approximately November l through March indepen- dent of the weather. The purchase of.a site isnotincluded in this project's estimated cost. 61 WEST SIDE SWIMMING POOL PROJECT Initial Cost $ 250,000 Annual Future Burden 24,000. Net Annual Future Burden 9,000 11 This project will provide for the design and construction of a swimming pool on the west or southwest side of Iowa City. This project would provide a pool in closer proximity, to residences on the west and southwest and would relieve overcrowding at the MercerParkpool. _ 29 :_ _ 30 61 CITY PARK SI17i IMPROV34EM Initial Cost $ 182,500; " Annual Future Burden undetermined Net Annual Future Burden ;undetermined This project will provide for immediate improvements at City Park to obtain maximum usage; of the Cith Park by all age groups at the community level. The City,` Park is the oldest and most viable community park in the City, but needs to be improved to increase its usefulness. LIBRARY 63-1 NEW LIBRARY PROJECT Initial Cost - Annual Future Burden $ 3,020,000 Net Annual Future Burden undetermined undetermined This project will provide for the design and construction of a new Main 'Library ,Building - to replace the existing building which is 70 years old. The present building has a lack `adequate of seating, shelving, work andofficespace. The six -level design, inefficient floor plan, and the absence of an elevator cause operational inefficiencies and make the building inaccessible to the handicapped. A final report of the building consultant will be available in the late Spring, 1976 which" will provide a detailed building program and site recommendations: 30 �ity of lows! `C It# MEMORANDUM - DATE:January 30, 1976 -TO: CITY COUNCIL FROM:. NEAL BERLIN, CITY MANAGER RE: FY 77-81 CAPITAL IMPROVEMENT PROGRAM Attached is the proposed FY 77-81 Capital Improvements Program for the City of Iowa City. :It has been prepared in two basic parts. Part I contains summary charts and detailed project forecasts.by year and Part II; contains a detailed narrative description of each project contained' within the current CIP, all new projects submitted for possible inclusion in the FY 77-81 _CIP, and action taken on each. The attached CIP reflects the priorities identified by the City Council in last r year's document, the staff's perception of the current City Council's priorities. as obtained by the staff in the goals and objectives discussions,` modifications- " required for the insertion of new mandated projects, and 'alterations 'made by the staff due to estimations of workload capacities. The City Council's role at this point is two-fold: 1.) To review the 'document in order to obtain a working knowledge-of the identified projects, the::relationship to past'CIP's, and the general' position of the City. 2.) To be prepared to identify those areas in which they disagree with _the ;priorities and sequencing of projects. Alternatives to these priorities should be noted and discussed to allow `amend- ment 'of this proposed document. As in the past, this proposed CIP should be considered to be a working document for the purpose of forecasting the City of, Iowa City's long-term capital_ projects. Undue _'emphasis should not be placed on'the FY 77-78-years; the focus of the attention' should be on the total five year`. period. Adjustments in the priorities and scheduling can and will-be made' at the Council's direction:' In general, you will find that this CIP relies leas on operating`-revenue than we have in the past because of the tight-situation in the'General:Fund operation and maintenance area Revenue: bonds-projections remain basically- the same as {. in the; past; however, the general obligation bond"funding`.has;increased signi- ficantly.- The major reason for the GO increase is the input of a major revision of the Waste Treatment facilities in the year FY '77-79, at a coat of approximately 4 million dollars in general obligations. This expenditure -on:the-treatment- plant-coupled he;treatmentplant coupled with the projected 4 million dollar GO issue for the River Corridor Trunk Sewer has made a major impact on our bonding capacity. We have not fore-,- i casted any input of federal revenue sharing since the federal; program formally- terminates December ormally_terminates`December 31,:1976. Federal and state grants and aid have: increased significantly basically because-of the waste treatment facility contribution in . FY'77-79. The major new source of funding reflected in the Capital Improvements Program this year„is the rHousing `6 CommunityDevelopmentAct. We have; forecasted and attached an HCDA Project Summary Sheet which details the projected use of these" i To: City Council January -30, 1976 Page 2 funds over the entire length of the CIP period. ,In developing these figures, -we have included only projects.which:were funded -.in the. original grant application, noting the subsequent year commitment made at that time:and the projects which were identified in last ,year's CIP as federal assistance unspecified. In the summary sheet, we have projected the _total HCDA income to the City of $8;242098. If all projects as identified are completed, the ;total allocation to the City - remaining uncommitted at this point is $1,919,498. It must be noted,, however, that this -amount does not take into account any.administrative cost of: the program past the first year's application,-- any continuance of the housing and rehabili-" tation programa, any commitment to the parks acquisition'and development area past FY 77, i.e. annual'$80,000,'any .extension of the Comprehensive Plan past the first submission, or any possible alternative funding chosen by the,Council for the Urban Renewal R-14 Project. ,The Council may want to consider the total, five year,HCDA allocation as itrelates to several of the major "construction Projects oftheCity during the same period. Items forconsiderationwould be - the River Corridor Trunk Sewer Improvement, Waste Treatment Facilitiesimprove- ments, Ralston Creek Project, and the City's bonding commitment to Urban Renewal R-14. It should be noted in the proposed FY 77-81 Capital Improvements Program that the, allocation of Road Use Tax to the Streets' function remains constant at $150,000 per year for the lastfour years of this particular period. The funding of this function remains dependent upon the availability of_Road.Use Tax monies and,:, as noted in FY 77,ra surplus of monies is not available over and above the cost of operation of the Traffic Control and Streets Maintenance Divisions.. Therefore,,no asphalt resurfacing' program will be' attempted in FY 77. The Council's decision in the FY 76 Budget to utilize SRoad _Use Tax to fully _fund the Traffic Control and 'Street 'Maintenance area has required a total commitment of existing Road Use Tax 'Funds in the operation and maintenance .budget. 'Future funding of asphalt resurfacing programs and Streets and Traffic' Control' capital ' projects through the use of_Road_Use Taxis questionable-4s'can be seen -by the ` increased use of general obligation bonds within this area. In general, -the -proposed CIP reflects a rather aggressive construction schedule for a City of our size, -and -a significant increase'in our utlization of general .S obligation debt. The City remains within its statutory debt limitations as noted in the State of Iowa Constitution, Article XI, Section III, and the Iowa City Fiscal Policy limits as noted in paragraph 5 of that policy. Nealii` City Manager NB:bc 4: III II - A ir. Ab. W Wiw Wiwi w • r CO 11.10 ;O!CD = CD, I m -A i11 C= -n II w r+ -rl a, � co cu-: ;cr -h m 0 t 31C -1c+ 00,0 o n (D r+ r-1 -s (A t CD E-1 rit r+ 1rt C+ Ln - c Ln: Ln -Tj 7 I-(.. r+ 0):W �cu cu Ln a) C+ n' a =r m ;x Il CD C�, U3 ct fo -h i i CO 0 C+ Cr CD C Im-n,-n r- N r-. OPC DD. m of (D rD 0 n (D -a r 1ru Lo C+ ;a C+ C+ 0 m (D ; 0 -h a `.mo -- 1 C�. h 0 C+ to C 0 -1 0 to (D M. �.Jr- ito < ;-.v (D a 1-0 (D r) n 0 co M! 0 W, Ol (D a ro pr C+ (D (D M -S 1 < 0. to -S :3 0 0 C+ 0--4+ 0. o C+ .0 C+. ! *kz T- C+ C+. r1a J6 %0 %I JU th tq i* CS 42 III II - CONVIUNITY DEVELOP+IL'Yf PROGILLM 20-1 LAW-INCOMEi IIOUSING PROJECT.(deleted) T:: Initial Cost i 'Annual Future Burden $ 1,650,000 Net Annual Future Burden Lindetermined ; undetermined' This project provided for the design and construction of` ]ow'incom -and/or'-'eldcrly - housing and; was listcd`as the'H1 priority in ''•r r I" the Communify'Development'section"of the I7Y 76-80 CIP. Since that "time; Old Capitol " t Associates has received an`all.ocaiion 'for-62'` units of housing for`, the cldcrly`and M.id States Ikvelopment'Corp, has'receivcd'an' > r: allocation for-an'additional"64 uniis:�'Tbd total of 126unitsexceeds the number of 100 units outlined in Project 2071. ,Therefore this project, as'described`was deleted from- .. ;;the FY 77-81'CIP. 20-2 ;RALSTON CREEK PLANNING Initial Cost Annual Future Burden " ; i_, r 91,4083 Net Annual l'vturc'Burden--0- urden 0-'Ibis 'Ibisproject will. provide for'the'inve_sti`- -` '• ." gation of possible apprdacfies`torthc' resolution of flooding"roblems` on Ralston`''' ` �j ,J • l got Creek. A study by a consultant; provide structural and'nonstructural' sole E: tionstothe flooding;` is currently'undei r ''I, 0. way and will be completed by'July 1977` d11 Project 44-12 titled "Ralstoh"Creek Pro]ect" = r . provides for implementation`'of-the suggested _ r solutions. 20-3 URBAN REDEVELO'T ENr=PROJECT`(deleted) i. Initial Cost $:1,450,000 Annual Future Burden Tr:lmdetermined Net Annual Future Burden undetermined This project was included ii=thc FY'-76=80 -- CIP to provide for uidefined'redevelopment •' ^= r r- = projects within :Iowa City and'was depeniient upon expected -_future federal legislation and funding to rcplace'the UrbanfRencwaT r t _.i'- and Communit Develo' - Y pment programs, which existed at that tune::-;This`projectlias' ' = currently been replaced,by'." ec fie P prop- LL , grams that have resulted from'recent'r federal legislation governing urban rc-' -development and housing. 2 zo• � ; _ ELDERLY HOUSING PRQIECP Initial Cost .,. Annual Future Burden ;. 1' $r3 385 000 Net Annual Future: Burden 1— mined ' undetermined This project will provide for, the design t ' and construction of 120 units of housing for low-income elderly residents of Iowa City.Recent data indicates'a deficiency' in the, amount of sound, decent housing for low income.elderly residents of Iowa City.- The housing assistance plan.;for Iowa City, which was filed -part -Of ' ` .. , as Of the' FY 75 Housing and Comnunity;Development ACP (HCDA) application indicatesjfiat there.: are several hundred low. income elderly families that need subsidized housing. 50 of the 120 units would be,of ihe, con gregate housing type;and the -remaining „` 70 would be conventional housing for the elderly. It is intended l that this project befundedunder Section 8 of the Federal Housing Act... _ 20 ARCIHTECIURAL BARRIERS REMOVAL PIUMCT Initial Cost Annual Future Burden $ 100,000 Not Annual Future Burden -0- _ -0- This project will provide for the determination of the type and extent of architectural barriers which inhibit accessibility by"elderly and handi- capped persons to public buildings, streets and - walks, and recreational facilities. 'Remedial- actions will then be identified and a'program Of Construction to remove the barrierswillbe implemented. 20 SKILLS UNLIMITED WORKSHOP PROJECT Initial Cost Annual Future Burden $ 75,000 Net Annual Future Burden -0- -0- This project will provide funds for the acquisition ($60,000) and rehabilitation _($15,000) of,a.building located on the northeast corner of the intersection of Van Buren and. Washington Streets. Goodwill, Industries of Iowa City is presently providing an environment in which low and moderate income -citizens can enjoy art, craft, and work activities that are not otherwise available to them,"but their present 3 + building has been sold. -The purchase of this building will allow for the continuance and :. Broadening or this program toprovideopportune- ties an( faci.litics for community-artLand craft,. - ''and to promote culturaL actidities'forIthe A is' I ' utilizing the people of the community advantaged, resources`of speciate knowledge (_ as t 1, , _. .• ZO _, RIVCIt CURRIM11 STUDY $ ( 50,000 Initial Cost-'0- - Annual Future Burden -_- -0- 0_Net-Annual Net AnnualFuture Burden This project will provide for an in depth study of the Iowa River corridor inthe`Iowa'Cityrarea'to aid in the planning of future`-development within j+l the corridor, as well as to,aid m planning the of the Iowa River''{ recapture and-revitalization for'the community as an open space resource it ,.., I i PUBLIC SIT -Fry PROGRAD1 30-1 ANIM&L SHELTER REPLAC . IMENr.`PROJECT InitialCost Annual Future. Burden F7 TL $ 175,000 Net Annual Future,.Burden t r,; ::;22,500 This Project Project will provide for the,desi construction of a new animal shelte adequately house anir-,to mo a .. mals and.. to: for proper handling and z _ care so,that_state Certifl --_ -- --cation of the shelter may be obtained. ,The, present facility is unadequate, unsafe and structurally unsound,'; It s.:unteasible to.:. perform the modifications necessary to bring the existing shelter -up to the ,state certifi- cation standards. Cost figures do;. site acquisition sincnot include e it is_intended that. a: City owned site be used. 30-2 PUBLIC SAFETy 1111 �QUIIRTL•RS PROJECT Initial Cost Annual Future Burden,5251000 ` Net Annual Future Burden "'' undetermined This project will provide for undetermined a'Comprehensive study of the _space,requirements of - the Police, and Fire :Departments.,. preliminary ' plans dT17e;:study is�,.to.1prov de additions tetailing�_remodeling.and/or; t o the Civic Centerawhich..might be, deemed necessary in order to provide' adequate space for thc?Police;and Fire; operations:, This study will allow for an evaluation to be made of the merits of utilizing the Civic Center, and performing the necessary , versus constructing new modificatia ons ,, -° ;a facility in ' conjunction with1thelCoiutyorcement $500,000 is provided ifor the.Civic Center., _ modifications or for the City.Ss share„of new joint Facility. a . 30-3 FIRE TRUCK ACQUISITION ' Initial Cost r_ Annual Future Burden;: ;_$, GZ 000 1..,, Net Annual Future Burden 600 This item will provide funds for the acquisition of'a > 600 pumper truck. The pumper will replace a 12 year old pumper which will be P be movedto reserve and which will in .turn reI Pumper that will be retired. The purchase of this pumper willent' continue the upgrading of the Fire Department's first line and reserve,equip- ment and is consistent with the Insurance Services Office's recommendations. - S } 30 POLICE STAT104N REMODELING PROJECT Initial Cost $..-- 25;000- Annual Future Burden i,< .; t •.':` 500 Net Annual Future Burden 500 This project will provide for remodeling.of,:_: r, the lower level of the present: Police ment to provide for a women's locker room. A lockerroomwitFi adequate toilet facilities "= _ is necessary to, accommodate newly 6mployed; Fic female officers as well'`as to provide +• -• " adequate facilities for -future female officers that may be employed.1' ` The Collowing two remodeling 'projects ;'costing; $40,000, were not included"in'the CIP>pending= the completion of th'e' Police and `Fire' space study scheduled under Project -30 -2' -titled "Public Safety-Headquarters';Project" 1) Remodeling of the air exchange system in the firing range.. This would eliminate possible danger to users' health occasioned _ by the high concentration of lead fumes - that can not be removed by the _presenti-air I --i• • `- ' - flow system. 2) Remodeling of the upper'ievel"to,`provide-for' '• •' additional officeaces t`<Adequate!office P record storage, and ,`public'space must be•�-' ' provided ,to maintain the'present�level of operation of: the Police Department: " s- 30 FIRE DIiPARTMENT OFFICE ADDITION PIZOJECP;r (deleted) . Initial Cost ' $P14 27,000 Annual Future Burden 600 Net AnnualTvture Burdon _, _ dL ; ... ..: s 600 This project will provide for'the enclosing• -' of a parking arca adjacent `to the Pre- F tic Department on the northwest for office -space:= - Present office 'space -is `considered to be: inefficient and very.: inadequatefor the " - : �% • i."! � 's'` existing staff requirements. This project was •�-not included in the CIP pending the completion ", i'•r= of the Police and Fire space study scheduled under Project -30-2 titled "Public Safety Headquarters Project"'. TRANSPORTATION PROGRAM TRAFFIC CONTROL • 41-1 R-14-SIGNAI,IZATION-INIpROVhWWrS (deleted) - Initial Cost _t Annual Future Burden $ 30,740 = 'undetermined_ Net Annual Future Burden ., undetermined - Thls- project - P 1 provided`.For,the_;instillation J of. traffic signals ---'In ;and adjacent to'th: It -14 Urban Renewal -Area. This project was included in the'FY'76-80'CIP and the"'.-th,prese"' installations are considered .to havebeen,_:....- completed. Future signaliiatons in!the'' R-14 area will be included in specific street projects so this project designation will = no longer be valid. 41-2 R-14 STREET LIGHTING=I14PROVFTTNTS ;(deleted) L Initial Cost $ 79,830 Annual Future Burden Not Annual-Future`Burden imdetgrmined - = undeterminedc This project provided -for the installation of'" street lighting in and around the R-14 Urban Renewal Area. This project. was.incltuled in the FY 76-80 CIP. It is recommended�thaf`this;;- project not_.be includedinthe FY 77-81 CIP, since future streetlighting will be included --;"-within .-within:-specific R-14 street and mall' -;improve - projects. This project designation will`1 1no longer be valid. 41-3 STREET LIGHFING IhIPROVDMS (deleted) Initial Cost 1 1 Annual Future Burden $ w 80,000 Net Annual Future, Burden undetermined undetermined _ This program, will provide for'a`continumg =' program for street lighting throughout the City. This project was included in -the FY 76-80 CIP, but it was.not included in the FY 77-81 CIP because no independent street lighting projects are foreseen except, those that are a part of the Urban Renewal Amenities.Program. 41-4 TRAFFIC SIGNALIZATION PROTECTS (deleted) Initial Cost ` Annual Future Burden $ 25;000 Net Annual Future Burden undetermined undetermined This project provided for the construction and installation, of traffic signals in':various - 8 41 GILBERT AND B• RY - PRENTISS INTERSECTION IMP�VEbQaII i t Initial Cost 00 $' 23�00 Annual Future Burden Net Annual Future`Burden 1 P.l 500 This improvement will provido for.the.signalization Of this intersection. Signalizatfon wt].1 .111e I.; the congestion and unsafe traf[ic conditions that - exist at this offset intersection by providing " side street entry to Gilbert and safe left turd'; movements from Gilbert. MASS TRANSPORTATION " 42-1 BUS ACQUISITION 1: Initial Cost' $ 519,450 Annual Future Burden, 71,500 NetAnnual':Puture,Burden '_51,500 This project will provide funds in.the'amount' of $219,450'f6r the purchasd`of. three`additional: buses in accordancewith the-recently;'submitted MITA Mass Transit Grant Application. :'Tile three i :• ..buses ;will provide continued service to the - Wardway area and provide increased rush-hour ' " ''•' _service to several areas of the community" - Ibis project will also provide $300;00 to be" used for future changes,,and/or.;expansi,on_ or tile transit system depending on future goals* and the availability of Federal_ass.istancc:' 42-2 BUS SIELTERS Initial Cost.. ' ;$"1:1170 000 Annual Future Burden Net Annual Future Burden " 5 000 , ;''` 3= 51000 - This project :wilL provide for _the -construction' of approximately 30 shelters of_various sizes ' throughout the City in accordance:with`the UhR'A Mass Transit Grant'Application'submitted by the; ,City " The purpose of,this,project isto provide shelter from the weather fo`r City bus'' i - passengers. 42-3 BUS STOP SIGNING PROJECT (delete) Initial Cost:_: Annual Future`Burden ,. $ 25,000 Net Annual Future Burden 000 t 1;000 This project provided for bus stop signs { 11, throughout the City of'Iowa City as requested - 10 in the UMTAMa�Transit Application Gr • submitted by the ant Cit would enhance the -convenie ce t % andssafety,' Transit System for its passengers. 91a -the of, the operation would be ' Improved by - allowing drivers .to -concentrate on safe. opera tion rather than continuously watching .for:• passengers along the route. This' ... was not considered ,to be. Project'' priority for inclusion in the FYg77 g1uCIPr: 42-4 CONMNICATIONS EQUIP1%ff1,II _ Initial Cost Annual Future BurdenS $ .;-27,900 Net Annual Future Burden f -.,.4;000 This project will provide for the purchase of communications 4,000; equipment for the_buses under project 42-1, r tionpurc on p as well,as installa , tion on presently owned vehicles. Some of -ah- benefits.that:would ':` 4}` fi u be derived from this,progect would .include better -security for -passengers and drivers, better response -to mechanical problems;` and better schedule adherence. AIRPORT , 43-1 TIE-D(XVN AREA PROJECT - Initial Cost Annual Future Burden $ 20,000 Net Annual Future Burden- tmdetermined �- _ i,. undetermined This project :will pro of additvide for ahe construction ional hard _surfaced -tie down attdparkin `1 areas for eleven transient aircraft `s the existing `space for eight aimiaaft,,.�T}pie�coi tgng struction this of project is. contingent upon fund this project from a revenue.: '— operating•; revenue., -_ , •. _ ', 43-2 T-IUVcM PROJECT Initial Cost " R Annual Future Burden $ 80,000 - Net Annual Future Burden :- -07 This This project will r` ten unit T- P °vide for the eonstruction`of and -0- =•x will;be_used to prow de str hangars orage age fhalt or addiThe aircraft at the airport and are pro7ecfed.to, r a $3,000 annual revenue. o P, odu`ce Project is contingent this Tthe,abil upon tytionfuf this Project from ;operating ,revenue s' 11 :I in the FY-76-80 CIP R-14 street trees-and plantings-will 'bc .included within specific _. future street and mall-projects, So-,this 44-3 ' project number will no longer be valid. 44-4" R-14 SIDEI4ALK IMPROVEMENTS (deleted) _; Initial Cost- 119,800 Annual Future Burden _$,., undetermined Net Annual Future Burden -, undetermined This project provided for the construction.of.,., sidewalks as part ofithe R-14:UrbanRenewal , Programa` -This project was in the FY '76 80 ,included CIP and is now incorporated info project 4,4 titled R-14 Pedestrian Ways, Malls.and`Opcn Space Improvements. 44-5 ASPHALT RESURFACING IMPROVEMENT Initial Cost Annual Future Burden -0- Net Annual Future Burden i -0- Ibis improvement will provide for an annual program of resurfacing of.,the ,City' s,streets which; are in a deterioratedconditionjby re- habilitating and/or adding to,existing;surface; to preserve the largeinvestment in our_, street-. _ t system. The $150,000-scheduled_._to bc'spent._. annually for-this improvement is contingent "- upon the availability of Road UseTaxFunds.- 44-6 SIDDIALK ASSES9ffWr PROGRMI ' Initial Cost $ 260,000 Annual Future Burden -0- Net Annual.Future Burden -0- This project provides for the,annual construction and-rcconstn�ction of si.dc-, , walks on a priority-.basis.• ;Thc:majority - of the costs of..this program are assessed �• , to :adjoining property owners. $130,00-0 would be `spent-annually;for,:the reconstruc- - tion of sidewalks with, the, ,City,'s share,;` totalling $20,000 annually,;.;,This program. was deferred until FY 80 due.to the;work load generated by Urban Renewal projects. , 44-7 CITY'S SHARE EXTRA WIDTH PAVING (deleted) 1 Initial Cost `,51 25,000 Annual Future Burden ,t ,undetermined Net Annual Future BurdenFili undetermined This project provided'; funds for-the,City',si.; r,• share of the cost-associated with,requir n,g `i extra depth.axtra width paving through • new subdivisions under -development.` his '_:. r ;..: project is being deleted from tlic`CIPland, will. only: Ix; included in the operating budget"in - the future. 44-8 MUSCATINE AVF Mi IMPROVIMEW." _ � r Initial Cost Annual Future Burden $:550, 000 -Net Annual Future Burden -0_ _ This improvement will provide `-for, `the: complete reconstruction of Muscatine'Avenue-from°First Avenue to Scott Blvd .'including the�intersec- tion'at First Avenue.This improvement_will': replace the badly deteriorated roadway and -,is. justified by future traffic' projections forecasted by the Area Transportation Study. - 44 -9 FILBERT COURT STORh1 SFIVGR (Completed) initial Cost Annual Anal Future Burden - -' 616 00 `` Net Annual Future Burden - undetermined This improvement will provide.`adequate storm'`: sewage capacity in the'Gilbcrt-Court area• ' lying generally south of Kirkwood'Aven'ue and east of Gilbert-'Mis`project1was included in the FY 76-80 CIF'and was'c ompleted 'in'FY ' z: 76. ; 44-10, BIiNTON S7RIi(T BRIDGE SIDEWALK PROJECT (FY 76 completion) Initial Cost T Annual Future Burden $20,000 _ ,::;;..undetermined Net Annual Future Burden s undetermined This project will provide for the replacement of the sidewalk on the Benton='Street'bridge.- The sidewalk is presently in' very "deteriorated' condition and needs; immediate'attention to ' continue providing pedestrian-access`�across.the Iowa River. This --project was included in the FY 76_-80 CH) and was scheduled''for FY:76."-+The; plans and specifications are completed and the construction will take place iri the"' �ummmer of +. so this _1976 project wil_1 not }ie included in the FY 77-81 CIP. 44-11 BIKE{VAY PROJECT Initial Cost $ 744,000 - Annual- Future Burden Net Annual Future Burden crt". ; ]0,000 -*;' 10,000 This project will provide for the 'annual design and construction of various classes'df"bikeways' _c .} 14 E and facilitic•hroughout:iowa City;.,yAic cl' • is the second most; Y popular form; .ing_;: in; the Iowa City area t and; affords mrui�advzrn ges,; including: '1) the bicycle -as a, non-pollutingifonn; form of transportation; 2) it lessens the ,degree of parking and traffic congestion;inr,thc'.centralpprt Of Iowa City; 3)_it,is-consistent with.the University e of Iowa's pedestrian oriented campus;: q) it is healthful form of exercise:.,, - The`�plementationrof_ the proposed bikeways Y plan will enhance the safety of bicycling =in Iowa City by reducing the man - bicycle -auto and bicycle -pedestrian presently exist. conflictsythai, 44-12 RALSTON CREEK PROJECT Initial Cost Annual Future Burden 3,300,000 Net Annual Future Burden 1." x;150, 000 This project will provide for, the elimination Of periodic flooding Ralston,Cieek 150,000 -of which_` causes several -hundred'•thousand,doiiars„worth ;- of damage and creates health -and safety problems during flooding...A; tudy,<oe- the flooding by a consultant .will; be c by July 1977, and will :provide",struccturaleand- nonstructural solutions to the floc- - definitive program to control the flooding will be outlined and 1 cost figures �P emented at,; that" -tine gores represent an estimate of the . ,77he r. expected expenditures. �. IN - 44 -13 44=13' ANSCATINE-COURT CULVERT PROJECT (deleted) ..;;, Initial Cost - Annual Future Burden $ 280, 000 Net Annual Future -'Burden -0- - This Pr oject provided for the replacement of the culvert at -0- the intersectionrofCourt. and . ;r with a larger.structure.to hMuscatine more ;.adequately; andle Ralston Creek flood waters., - This project .. was included in -the FYa76-80;.CIP but was included :not:: .. in the FY 77-81 CIP so that it mabe coordinated with the Ralston Creek Watersh edy Management Plan. T I f 44-14-1:SCOTT BOULEVARD lMPROVEMENT Initial Cost Annual Future:Burden $ 3,550,000 Net Annual Future Burden undetermined i -,undetermined This improvement ._- will provide"£or the -construe-` tion 2-o- - of a four lane facility on Scott Boulevard from Highway N g Y 6 to Highway N1, `The_benefft' I and ' 15 impact of this :improvement•will be moro:.full • r understood after theicomplotimu of'thb,Aron'=': t Transportation<Study>he}ng' done liy.,thWJohnson County ,Rogional`Plvuii.ng,Coimnission.•3>Tt is ~--'. recommended at this= -time that= -this= project be deferred until the Area Tr uiaportation': Study."is , completed. r 44 JEFFERSON BUILDING VAULT REPAIR PROJEC,1' Initial Cost Annual Future Burden _p_ Net Annual`, Future Burden _p_ This project will provide for the reconstruc='" r ,tion of the structural vault top -which -is - 3ocated under the public sidewalk at the Jefferson Building. The existing vault,'top' has deteriorated to the point where'its structural capabilities are inadequate' and has; become a potential' pedestrian! hazard.-: - Also, a new sidewalk cap is'necessary'to maintain conformity of design 'with-ethe`1114•. _ Urban Renewal Project,:but -the-cxi ting structural vault top will not support,,thc. dead load of the required 4 inch concrete sidewalk. A portion of tile! cost;-may<be assessed to the property owner:- - ., 44 MO-RNIAN TREK BOULEVARD IMPRMT4ENT,. Initial Cost F„ $ . ;1155 000 Annual Future Burden , p Net Annual'Future Burden -0- pThis' This 4 improvement will provide for the asphalting.:1 ( ',:.,. of Morman Trek Boulevard fromBentonStreet south to the City limits. This:impiovemcnt will be done in two stages with earthwork and drainage being done'"the first .year and :pavinga- the next.- Approximately 800�vehicles=per_:day use this`route'as a.cut-off`to the-'southwestc:. part of tile County. The County has paved their , portion of the road which'continues=on"south.- =.- 44 PAVING ASSESS4Wr PROGRAM Initial Cost . $ 170,000 Annual Future Burden _. .,,. p Net Annual Future Burden . _p_ ` This project will provide for the construction - 6f streets and alleys with the majority of4the cost paid for by the adjoining propertyowners: This project is7composed: of the. followingifour. distinct pavings: 16 F - intersection.'Jllie intersection does'not have the capacity to, handle'existingivolumes ' of traffic. Left turn -lanes -on the-east,and; - west legs coupled with improved `signaliiation will greatly -improve the efficiency',of,,this intersection, as: well,as:reduce the accident . experience. When final plans for this_improve- ment are drawn, additional right-of-waylmay need to be acquiredwhich in'not:included in the $78;000 estimated cost. 44 KEOKUK AND HIGIRVAY R.,6 -BYPASS INTERSECTION 'IMPROVEMENT--,• Initial Cost:;' " $ '246,000 Annual Future Burden " -_": Soo -= Net Annual Future Burden Soo This improvement will provide for improving the geometries and-signalization at:this, , - intersection :and the relocation of the east `leg of the frontage road (Hollywood) to the south. A left turn lane will be addediin�,the`, ',;;. iwest`leg of Highway N 6 Bypassand 1improved;,: ' signalization would provide full traffic actuation. Relocation. of Hollywood will,reduco the congestion in the-' Keokuk and Highway M Bypass intersection.. 44:: SERVICE BUILDING LOT.-ASPIRLT PROJECT :;.. Initial Cost 4,000 Annual Future Burden ,•. ;- ,_;_. Net Annual Future Burden -0- project will provide for the surfacing of the City Service Building Lotto provide additionalf: 'hard surface for vehicle and 'material storage:_,_ .:;•;- Presently, materials and equipment ire"stored,'on." -.i..._; a dirt surface which turns to mud, making work in the area difficult._; 44 SCHDIMEL -SEWER PROTECT Initial Cost n $ 1.:.5,000 - Annual Future Burden .. ?,undetermine]." Net Annual Future Burden .-.:: ... .:=i undetermined This project will provide for'•the extension of " a storm :sewer and a rebuilding of the:outlets' Icy_.. s to minimize the 'erosion''of the .bac "ard at _- 9 S. Mt. Vernon Drive. 18 I . , 44 HIGHWAY 96 and-#218„STORM ShYEi2 PROJECT;;` ,;; _ . ,.; ;- <•, ; Initial Cost ,$, 30,000 Annual Future Burden }..undetermined Net Annual Future Burden un"dctcrmined This project will provide funds to reimburse - -. the University of Iowa for a storm sewer. :reconstructed under Highway 6-218 in the ;. vicinity of the Law Library in the,Fal;l 1975. - By resolution 975-121, the City agreed to reimburse the University;18.6t-of,the, total - -- project cost not;to exceed $50,000. .,} 44 UNIVERSITY LAKE DEVELOPf IENf �BIIQ34AY. PROJI.CT Initial Cost $ 2,500 Annual Future Burden -0- - Net Annual Future Burden This project will provide for the construction of a six foot wide public bicycle path and walkway through the University Lake Development as a link in a major bicycle path proposed in the preliminary bikeway plan. The City would be responsible for paying the cost associated , with paving a six foot wide walk rather than the required four foot wide walk.- The Planning and Zoning Commission recommended that this project be undertaken. 44 PARK ROAD BRIDGE PROJIicf Initial Cost - - $ 130,000 Annual Future Burden -0- Net Annual Future Burden -0- This project will provide for the reconstruction of the Park Road Bridge deck. _ Portions''_of the - deck will beremovedand the entire deck will be overlayed with concrete. Deterioration of the deck has occurred due to the rusting of reinforcement steel caused by -salt and corrosion. PARKING SYSTIM 45-1 PARKING FACILITY NUIGER 1 PROJI:CT Initial Cost $ 5,3501000 = Annual Future Burden undetermined Net Annual Future Burden undetermined - This _project will provide for; the design z tea, .. !ST and construction of: a shopping arcade,.parking garage as part of the Urban Renewal Project. 19L _, It will be constructed-in two StagCS"and will provide for at least one thousand automobiles ; in blocks 83-and 84 in accordance with the ' "Urban `Renewal Redevelopment Proposal 45-2 -PARKING FACILITY NUMER 2 PRoji. s$+3�210,000 Initial Cost undetermined Annual Future Burden' ' ,; undetermined Net Annual Future Burden This project will provide for the construe tion of a multi-story facility in conjunction with a hotel in block 63 and 64 as part of the Urban Renewal Redevelopment Proposal. '. 20 �* _J- ENVIRONMENTAL PROTFCTI0N:PROGRMI- POLLUriON CONTROL 51-1 R-14 SANITARY SEWER "IMPROVEW-NT Initial Cost $ -Annual Future Burden :. .:" 186,302 - ,. .. -nl-' Net Annual Burden 1 t 1iL.5 —D ,Future _0_ , These improvements provide for the - construction of sanitary; sewers througli- out the R-14 Urban Renewal Area. The City is under contractural, obligation -, with Old Capital Associates to"ensurerthat the sanitary'sewers - in this'a.rea;are'in good operating condition.,.":Much•of'.the a; sanitary sewer system' in the- downtown� R 14.<:. Urban Renewal Area is of late 1800 to early-. 1900 vintage and is in poor condition: -- _51-2 RIVL'R CORRIDOR TRUNK SEWER IMPROVEMENT I; Initial Cost Annual Future Burden 'Future :undetermined° Net AnnualBurden undetermined.` This improvement provides for the construe -i. f = tion of a trunk sanitary sewer -=from the-, t r ; sewage treatment plant north"along?:the`east.""': ,; ?rr, side of the Iowa River to XimbalP Roa& and across the peninsula.- This ,improvement ist" ' necessary because the existing sewers .are currently overloaded in certain regions "and require immediate relief for`present and future loads to prevent overflowing'of'raw sewage into the Iowa River. There are areas in -the north part of Iowa City which are unable to develop because of lack of -sewer :-:i; and'areas which are currently on systems. This sewer will provide sanitary sewer for some of these areas '•-and .a'point 'connection of for sewers.requi.rcd to ddVdlop ; other areas. 51-3 SANITARY SLIVER ASSESSMENT PROJECTS Cdeleted) - A c� Initial Cost $ Annual Future Burden 150,000 Net Annual Future Burden T undetermined i ;.undetermined 1: "These projects provided for the construe- `tion•'of sanitary sewers throughout Iowa City _ .. 21 as required with the cost assessed to prop ort• s - owners. This project was includedinthe FY-7(i-80 CIP but-it .is`recommended that it not be included in the FY 77-81 CIP.Rather than planning for_= an annual assessment program,::'.each* ; project; hould `'- -be analyzed when requested and budgeted: accordingly. 51-4 GRIT RITKIVAL EQIjwmiN'f:TNIPROMEMr (deleted) _;; ,. , i�;,,,f•�, . r $ 75,000 Initial Cost Annual. Futuro Burden undetermined Net Annual Futuro Burden undetermined , This project; provided for the_; replacement and modernization of grit removal equip- is ment at the pollution control_plant'.:-This- - project was included in the FY'76-80 ClRi and,; project is now incorporated' into .thcrwaste`treatment.- facilities project.• 51-5 NEST PARK LIFT STATION IMPROVEMENT (FY 76 completion) Initial Cost $ 60,000 Annual Future Burden Net Annual Future Burden r.,... }codetermined :undetermined This -improvement will provide for a new lift station to replace an: existing ._., lift station which is•obsolete and:rapidly. becoming unserviceable. .This project: was .. - included in the FY 76-80 CIP. and.was scheduled for FY 76:' .The, plans are being, - prepared with construction to-take place r. following their completion.:: -tilt 51-6 TERFIARY TREATMENT-PROJECT.(deleted) $z 400,000 Initial Cost - „ undetermined Annual Future Burden "• tmdetermined, Net Annual Future Burden'--:. :.; „ ,, Ibis project provided-for -the-necessary treatment plant modifications required by. 1979 by Federal and State law to signifi- c cantly reduce pollutants in the plant's effluent. This project:was included.in the,,-_.±, F-:rr. FY 76-80-CIP and is now incorporated' into the waste treatment facilities project. 51 WASTE_TREATMINF FACILITIES IMPROVEMEYF. „ Initial Cost :' ::; $20,872,000 undetermined Annual Future.:Burden _ undetermined Net Annual Future Burden This improvement will provide for the study and evaluation of the existing:waste 22 treatment plant and -sewer system: and".for i,the:,1'1, fr improvement -to the plant and collection system or for the construction of -a now- sewage treat-'. . ment plant, whichever is more cost effective.>z, , This improvement will bring the Iowa City , -1 . _ . •s n.t.'- sewage system,under compliance, with new. State and rederal laws thati regulate tile)operation and maintenance of sewage collection, and .', treatment systems and!control-.the.di";charging:r-, -- of pollutants into streams andrrivers. -,i,;;,•.-, ..7 P I S1 soUiwsr INTERCEPTOR SUVE-11: R1 -PAIR PROJECT, Initial Cost Annual Future Burden _ -,.undetermined Net Annual<Future'Burden -. :=-; undetermined-' This project provides for the replacement of man holes and the slip lining of a stretch - - - - - of sanitary sewer that has decayed because.of: HZZS (Hydrogen Sulfide) attack.' A solution to 'the 112S attack is presently being investigated: , and will 'be`implemented before the repair. '- project takes place. 51 SCOTT BOULL•UARD SANITARY Sr1VERPROJECT.: Initial Cost Annual Future Burden ;.undetermined Net Annual suture Burdenundetermined 'this project will provide sanitary sewer from existing City sani.tarysower'to'-the boundary of a.proposed new development' along Scott Boulevard. This sanitary sewer has - - _ . _ '`been requested by the developer and is "'to be paid for entirely by him for-thezpurpose .. ofproviding-sanitary sewer -service :to the area of the new development' 51 POLLUTION CONTROL MAINTENANCE SHED; (deleted).•. r,.. - Initial Cost`,35,000 Annual Future -Burden - undetermined Net Annual -Future'Burden _ ..... r_;_ rundetermined This project provided for the construction of a buildingtostore equipment. presently ." 7 , kept outside. This: project would increase operational efficiencies by providing ,r.r a=base of operation for the sewer maintenancef;. t ,; ;;•r :; `° crew and a central' equipment storage, point.-.; The project would also provide economy by - reducing weather`induced;equipment,wear. r•, _•;, This`project"was not considered to:be:of high enough priority: for. inclusion: in' the,-_.; FY 77-81 CIP.... 23 iw • 52-4 TWO-INCA WATER IN REPLACM-W. PROJECT-a , . „ Y : t Initial Cost� ',70,000 Annual Future Burden - , un3etennined Net Annual Future Burden,.;. -: undetermined _ ., This project provides, for the replacement of old two-inch galvanized water main throughout the City of Iowa City. These mains arc' of inadequate size and arc in extremely poor., condition. the mains will be-replaced with -new cast iron pipe, six inches and larger in , size to provide proper pressures and flows ` 52-5 WATER MAIN LOOP TIE-IN PROJECT" Initial Costt $618 000 , Annual Future_Burden ;.undetermined Net Annual Future:-Burden.: uui$etermined ,,; These projects will consist of five separate main extensions, which willinuolve5providurg .r a closed loop water main system throughout ; ,, the City. -The five:-areas are:,-z Sycamore , Street, Benton Street,-Jiighway.l, Rochester Avenue and Scott Blvd. ;`'lhc closed;loop,system; will provide for a uniform distrihution of water at nearly equal pressure throughout ead the community with a limited number of; dead- end mains and will also provide for.'.improved ,' end fire protection. r1 52-6 WATER PI.ANr:swDGE TRE-AlmgJT pRa1hCf, , - >, Initial Cost a $ '"72 000 Annual Future Burden undetermined Net Annual-Future_Burden, _ undetermined The project will provide fora study+to find the mostcosteffective method of'disr, posing of the sludge produced during the water treatment process;and,for thejde_sign.. , and construction of required disposal """ ' facilities. State and federal law restrict the present method of discharging theisludge :. f 3i51•r x`> into the river, so an alternate solution must, ' -4 be found. 52-7 WATER DISI'ItTBU1`,ION SYS11M CONlIZOIS PROJECT (deleted); . Initial Cost.t. ; _ - 1f - Annual Future Burden +25,000 ;' , -0- Net AruivaT`Future Burden, 1 _^ sl -0- - This project provides for a monitoring and control system to be displayed on -a console Z5 It, •. at the Water Treatment Plant for'better .,st monitoring and control of the water-distri- bution system. This project was :included in >a the FY-76-80 CIP,-but was not`includedin• •• '' tu,.,;, the -FY 77-81 CIP because experience'wi h existing controls has shown: that the''distri- bution system 'can'be'monito•red`and'controiled' by existing equipment: " 52-8 EAST SIDE WATER STORAGE PROJECT. ` Initial Cost } $ .'455,000 Annual Future Burden' _ 7,500 Net Annual Future Burden undetermined This :project will provide for a water 'storage tank and pumping capacity on the 'cast :side of=• + '.:€n; Iowa'City. Thisprojectwould bring water i:" pressure and fire protection on the'northeast part of the City in line with the rest of J1<�,r, - -- - Iowa City's water dis*trlbutlon-'system and*'pre- -' vent the further deierioration"of water=pressure > -is this part of Iowa`City'continues-to develop, r - $25,000 in provided in FY 77 ,for"site';acquis t* -, t 52 WATER DISTRIBUTION YARD ASPHALT SURFACING TROJECT (deleted)'- Initial Cost i I V-71 Cl $ .,8,500 Annual Future Burden , -0- Net Annual Future`Burden .:.-, -0- This project provided for an asphalt surface: on the water distribution yard. The asp halt' surface- would improve general housekeeping by preventing mud and rock from being tracked out-onto Gilbert -i r ,,,Street during periods of wet weather and-would prevent an annual expenditure for"crushed"rock r...:' :. surfacing. This project was not considered to be of'a high enough prioi#y`forTinclusion in the FY 77-81 CIP. S2 WATER DISTRIBUTION•STORAGE'SI®',(deleted) :r. Initial Cost - i$ 6,000 Annual Future Burden. Net Annual Future'Burden This project provided for the. _construction of REFUSE DISPOSAL 53-1 SANITARY LANDFILL LAND ACQUISITION'(completed) , i r InitialCost i., Annual Future Burden $i ?t . 22'90 Net Annual Future Burden _0_ This project provided for payments new ,on'the Sanitary Landfill This project was" included in the FY 76-80 CIP,.and was..scheduled for FYi„ 76. The FinalYoma nt Lor ` been P the land. has, , made. _ 1 53 LANDFILL ROAD.ASPLLALT SURFACINC, PROJ]iCT (deleted) ", Initial Cost $ 60,000 . Annual Future Burden - _0_ Net Annual Future Burden -0- This project provided for theof the crushed rock landfill road with six inches of asphalt in two phases. The present crushed rock road becomes extremely muddy during inclement weathor, and creates dusty conditions during hot dry weather -'causing poor working conditions, severe vehicular wear, and an unattractive City facility. A permanent asphalt surface 'would also - reduce ,the maintenance expenses currently asso- ciated -with a crushed rock road. This 'project was not considered to be of a high enough pri- ority for inclusion in the FY 77-81 CIP. 53 RESOURCE RECOVERY STUDY (deleted) Initial Cost $ 30,000 Annual Future Burden Net Annual Future Burden _0_ This study would .provide information concerning the economic and environmental feasibility of -alternatives to landfill solid waste. 'Present guidelines suggest a landfill is the most cco- nomical:disposal method for Iowa City. .,It is proposed -that -this project be undertaken by the Regional Planning Commission. - CITIECERY 54-1 C13ti11 TERY ROAD INIPROVINENrr Initial Cost $ Annual Future Burden 10,000 Net Annual Future Burden 0 -0- This improvement_ will provide for the upgrading of the existing Cemetery roads. The roads are in _ 27 _ a badly deteriorated condition and must be upgraded to facilitate maintenance and to -- = provide a smooth and unbroken surface'for vehicular traffic. s4 CFI Il m -'Ry upmsioN-Ptzoiii (deleted) Initial cost S' 40,000 Annual Future Burden - 0- Net Annual Future"Burden " "0- This project provided for ,the acquisition of an additional 1.22 acre parcel of land'for Cemetery expansion known as the Zetek property. This property would" allow;the,Cemetery;'to meet the demands for burial spaces'and to`provide ', amore completeservice by providing a'choice - of burial locations. This project was not included in thc'FY 77-81 CIP because it was*'., '. felt that alternateparcels of land';should��"" - ,- - --be considered for Cemetery expansion.,_, '. .. ..�' r t r- y 28 t, LEISURE AND CULTURAL 0A7UNITIES PROGRAM • PARKS AND RECREATION 61-1 NEIGHBORHOOD PARKS IMPROVEM1¢r([S Initial Cost Annual Future Burden ° $: <160,000. Net :Annual Future Burden ` undetermined ; c}mdetermined This item provided for a series of improvements to parks throughoutrthez. community. Specific facilities and equip- ment are to be determined in conjunction with the Parks and Recreation`Commi`ssion. 61 Z PUBLIC TREE PLANTING PROJECT Initial Cost Annual Future Burden $% 168,000 Net Annual,rut6re Burden" -0 -0- This project will, provide for the continuation Of the existing City; program to provide. -for' trees on City property sub as' -street right-. Of -ways, 'and-the parksCemetery. •Trees-, lost to damage and disease are replaced; -and addi-: - tional trees are'added'.to providela``more aesthetically.'- pleasing appearance -,to the City, ...... - and to assist `in atmospheric "temperature control. 61-3 SOUTH SIDE PARK ACQUISITION (FY 76 c, ompletion) r Initial Cost ;; Annual Future Burden .-irf 50, 000 _ r.� - Net Annual Future `Burden undetermined undetermined This' project will provide for the purchase of 1," ,. ,3 neighborhood parks as identified in a; recent staff study for neighborhoods _south' of, Hwy.i.6 By -Pass. This project was :included in the; FY 76 80 CIP and was scheduled for FY il 76 - The '. purchase is presently coritirigent.upon the;receiptrof_HCDA n funds or alternative funding '' _. 61-4 RECREATION CENTER PLANrNING PROJECT (deletred) Initial Cost i Annual Future Burden r. 15, 000 Net Annual Future `Burden " -`` ' tmdetermined i, .undetermined This project provided 'for the desgn of, ` addition to the Recreation Center'and2a r_ redesign of the.'adjacent=parking lot +-cThisr ;. _ project was included; in the FY 76-80''CIP, r and was scheduled for FY 76.These funds will be used in the acquisition of the Northeast Side Park, Project 61-5. 29. - • � i:. . }.r ., lL. ., 61-5 EAST SIDE PARK ACQUISITION (completed) Initial Cost a•;;. $ 35,000 , Lk Annual Future Burden undetormined Net Annual Future Burden undetermined .This project provided for the purchase. -,o{ r an Eastside neighborhood park. This project was -included in the 1Y 76-80 CIP, and, was . scheduled_ for FY 76. The park was purchased in FY 76 as scheduled. 61-6 RIVER CORRIDOR ACQUISITION �., Initial Cost- $__400 ,000 Annual Future Burden 10,000 ' Net Annual Future Burden :',, 10,000 This project will provide funds for the purchase of approximately 150 acres of a 3,00, acre parcel known as the 'Showers -propertyjocatedjsouth;ofi -Iowa City along the -Iowa River,between-,Sand;Road - �. and highway 218. -It. is assumed that:i50,acres_ will be purchased.in FY 76, ($200,000) and that; f this will _complete .-the ,purclme of availablc his". riverfront property' south1..of.- Iowa City._ This".- project follows the recommendation;of,a Stanley project Consultants.report. Future -,annual burden would, -.,--.-%-;.- , be contingent upon the level of development desired along the: river. 61-7• RECREATION CENTER PROJECT Initial Cost 100,000 Annual Future Burden ,-2,500 Net Annual Future;Burden..;. - iundetermined JI i This project would provide.for-the design and construction oft a :40" X, 85'; ,addition consisting of :four, handball ,courts to'the existing Recreation -Building.... It, is indicated 1 .1 that the most pressing need for indoor: sPorts,-v, i _ facilities at the present time is for handball courts and the RecreationCenter; expansion; was , the kl need listed in the 1970 Burke plan. The` r; =_ expansion would use the existing heat plant_;;, shower and locker rooms, but it would take _:f• some of the existing, parking spaces •and would f.;...L,..r.:; need to be flood -proofed since it,will be in the Ralston Creek;,flood.plain.;,This=project.. _: 1 was deferred pendingahessettlementfof. a ,:., «;r question concerningowners'nip of theland,east of the Recreation Center , i 30 :,AW 61 - WTLLOW CREEK PARK SHELTERPROJECT Initial Lost ,; 000 Annual Future Burden` 4,000 Net Annual Future 'Burden. ^, �M "c &- _ 4,000 project- P t, n Ibis pwill rovi.de'for the constructio of`a picnic shelter with restrooms atthestart of the Willow Creek Nature,Trail.,_This,project would expand park facilities' iii �southiaest' Iowa ' .i City as the 1970 plan recommends to geographically counterbalance Mercer Park in 'southeast Iowa. City, '.f•� - and`it would provide the Recreation Division' w'th `a building from which to operate afsupervised'summer' playground. 61 HICKORY HILL NATURE PROJECT Initial Cost _ = $ 125,000 Annual Future Burden` t -- - :8,000 Net Annual Future Burdeni = ='undetermined -- This project will provide for the pu'rchase-of ,:17 acres of wooded land including two structures _ north of Hickory Hill Park. The existing garage r - could probably be used as a`workshop while the ' rlarger barn could be used for exhibit_'space',' a classroom, etc.. Utilities and parking are avail- able. This, project was `hs'ted as the'N3 priority in the 1970 Burke Report Also; a�"fl'ood'control -j: T_.; - of Ralston Creek would indicate a --purchase of fa c - large portion of this'tract may-be"de'sirable-Ifor water retention. ------ ; V,:- 61 WILLOW CREEK PARK-TENNIS;COURTS'PROJECT t1 Initial Cost $ 50 000 Annual Future Burden =`i ='e ....r, 1,500 ` Net Annual Future Burden 1,500 This ,project 'will ,provide fortheconstiuctionu- , Iluf.` of four tennis courts at Willow Creek, Park'!); The construction of these courts: will provide some geographic balance in 'court Socationand help,;, fr _ - meet therising•demandfor tennis courfs ' =: 3. 61 ,_ SOUTH HOLLYWOOD.MANOR~PARK' SHELTER1PROJECT : 4. Initial Cost- ost Annual Annual Future Burden Net Annual Swv.,,.,....,ti 41000 Future Burden Qf ,.-....., G �1 �-� � 4,000 This project will provide for the construction of a -picnic shelter -with -restrooms at'South Hollywood Manor Park. The shelter -will provide shade, rain protection, will house picnic tables, 31 - 61 CITY PARE: SITE INIPROv1•MIEWS Initial Cost - Annual Future Burden `_182,500 Net Annual Future Burden undetermined Undetermined.. This project will provide for immediate improvements..at City Park to obtain maximum usage of the _City -Park by all age groups at the communitylevel.The City Park is the oldest and most viable community park in the City, but needs to be improved to increase its usefulness. LIBRARY - G3-1 NOV LIBRARY PROJECT Initial Cost _ -- Annual future Burden $ 3,034,200 Net Annual Future Burden undetermined undetermined This project will provide for the design and - construction of a new Main Library building to replace the existing building. -",The _ present building has a lack of adequate seating, shelving, work and office space. The six-level design; inefficient floor Plan, and the absence of an elevator cause operational inefficiencies andmakethe building inaccessible to the handicapped. A final report of the building consultant will be available in the late Spring of 1976 which will provide a detailed building program and site recommendations. <. 33