HomeMy WebLinkAbout1979-05-01 CorrespondenceI
n
April 25, 1979
Mayor Robert Vevera and Council Members;
Woodfield's DBA Ambrose Lovetinsky Inc. is
petitioning the City Council of Iowa City to open
for business'on Sundays for dancing and sale of
non alcoholic beverages.
All alcohol will be out of sight, liquor systems
will be turned off as well as the beer tappers.
only soft drinks will be served. There will be a
cover charge and hours will be approximately 7-11 PM.
No cigarettes will be sold. We would like persons
of 9th grade and older to attend.
Sincerely yours,
Harry Ambrose
oa�O
APR 2 61979
ABBIE S70LFUS, CMC
CITY CLERK (3)
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES IIOIIIES
".
May 2, 1979
Mr. Marry Ambrose
c/o Woodfield's
223 East Washington
Iowa City, Iowa 52240
Dear Mr. Ambrose:
The City Council, at its May 1, 1979 meeting, approved your request
to open on Sundays for dancing and the sale of non-alcoholic beverages.
That approval is contingent upon the conditions that 1) the minimum
age for patrons be 16 years, and 2) that closing time be no later than
11:00 P.M. These are the same conditions upon which Council approved
a similar request from another Iowa City liquor establishment last
year.
Sincerely yours,
Neal G. Berlin
City Manager
is
cc: City Clerk v
/ MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES FIOIRES
City of Iowa Cit -1
MEMORANDUM
Date: April 26, 1979
To: Neal Berlin and City Council
From: Dick Plastino, Director of Public Works
Re: Equipment Service Building Complex Impro e t Projects
Over the next several months and several years the City Council will be
considering many different sets of plans and specifications for improve-
ments to the service building.
In order that Council feels comfortable about these projects I did want
to give an overview of the entire project.
A few years ago we made a decision not to bond three to four million
dollars for a new complex. Instead, we chose to improve our present
facility in small incremental pieces. This approach makes it necessary
that we let many different contracts.
This summer the Council will be approving plans and specifications for
the following projects:
1. Sanitary sewer service line to pump station $25,000
Truck wash facility $55.000
Renovation of modular units $62,500
Sanitary Sewer Service Line. The sanitary sewer on Riverside Drive
is very shallow and we are not able to serve the interior of the
service building complex by hooking onto to this line. It is
necessary togo to the pump station that lies south of the service
building on Riverside Drive. This sanitary sewer line will serve
the 12,000 square foot addition now being built, the new truck
wash, and the .future transit facility.
Truck Wash Facility. The City presently has no facilities to wash
any vehicle larger than a automobile and pickup truck. The City is
incurring high depreciation costs due to salt corrosion on all
sheet metal and all operating equipment including salt spreaders,
hydraulic components, frames, body panels, chains, hydraulic mechan-
isms, etc.
Renovation of Modular Units. This will complete the modular units
that were transferred from Clinton Street. After we are completely
done with the modulars we will have the equivalent of a 40 -year
building at a cost of from $20 to $25 per square foot. This is
very reasonable.
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
M_
3
2
2. Summer of 1980.
Fuel island facility
Vehicle storage buildings
Locker room remodeling and Traffic
Engineering remodeling
Machine room and equipment offices
$40,000
$50,000
$40,000
$70,000
Fuel Island Facility. The gas and diesel pumps are scattered all
over the service building yard and the gas pump is located in one
of the most congested parts of the yard. The new fuel island
facility will serve both Transit and the rest of the equipment
fleet. It will be located in a position so that vehicles will be
able to move into the fuel island area without blocking traffic in
the rest of the service complex. We will put in larger storage
tanks and the fuel island will be covered.
Vehicle Storage Buildings. At the present time the City has no
covered storage. We have rented the 4-H grounds building the last
few years but this is very uneconomical. We lose time moving back
and forth from the 4-H grounds and our heating bills have been
running approximately $500 per month during winter weather. All of
our salt spreaders and garbage trucks as well as most of the City's
equipment operates with hydraulic equipment. Hydraulic equipment
does not work well on winter mornings when the temperature is from
zero to 30 degrees below zero.
order toTodeligg. In
provide a cons_ lI dated locationefornthe erigm
eEquipment Division
parts room, bus repair area, and general repair area, Traffic
Engineering will move into another area of the service building.
construcwe
tion ofutheU12m000 squaresfoothis repairmre area. er aThe fpresentg
undersized engine rebuild and transmission rebuild area will stay
where it is temporarily but these funds will allow us to have a
full sized and fully equipped machine room for Transit engine
rebuilds, transmission rebuilds, brake turning, etc.
I
Summer of 1981.
Salt stockpile cover
Landscaping and fencing
Salt Stockpile Cover. This will allow us to cover our exposed
stockpile. At the present
cent of ttime we are loosing three to four per -
he stockpile through leaching, most of this leaching goes
straight into the Iowa River.
..a�����eNina ang rencinq. These are the final amenities to finish
off the service building complex and provide security. We will be
doing some planting with this summer's project around the outside
of the facility abutting Highway 6 and Riverside Drive. Additional
funds will complete interior landscaping.
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOIeCS
3
I suspect that the employees at the service building complex, the City
staff, and perhaps even the City Council are frustrated with the seem-
ingly slow progress of the equipment service building construction. To
put things in perspective it may help to remember that not one single
thing was done to the service building complex from the time it was
built in 1957 until about 1976. We are taking the lowest cost approach
to renovate a 20 year old facility that received no periodic maintenance
during the life of the facility.
City. Council is doing the right thing from the viewpoint of the tax-
payers and the viewpoint of the City staff and employees. Facilities
are being constructed which will allow us to provide services to citi-
zens under reasonable working conditions. We have not bonded a three to
four million dollar structure; instead we will provide a facility for a
total cost of approximately $800,000. The only deficiency is the long
time span necessary to accomplish this in a piecemeal fashion.