Loading...
HomeMy WebLinkAbout05-21-2009 Airport CommissionIOWA CITY AIRPORT COMMISSION MEETING AGENDA AIRPORT TERMINAL BUILDING 1801 S. RIVERSIDE DRIVE IOWA CITY, IOWA THURSDAY, MAY 21, 2009 - 6:OOP.M. 1. Determine Quorum 2. Approval of Minutes from the following meetings: April 16, 2009; May 6, 2009 3. Public Discussion - Items not on the agenda 4. Items for Discussion/Action: a. Aviation Commerce Park / Uofl Aircare Facility b. Gilbert Street Land Parcel i. Public Hearing — Lease with Larry Bell ii. Consider a resolution approving lease with Larry Bell c. Private Hangar Construction — Doug Moore d. Farmer's National / Merschman Seeds i. Consider a resolution setting public hearing for lease amendment e. FAA/IDOT Projects - AECOM — David Hughes i. Runway 7/25 & 12/30 1. Consider a resolution authorizing chair to accept FAA grant 4v9-// awards 2. Consider a resolution accepting bids and awarding project ,,z i - /d 3. Consider a resolution approving task order #3 with AECOM tje9-/3 4. Consider a resolution approving task order #4 with AECOM ii. South Aviation Development Study 1. Consider a resolution accepting South Airfield Planning Study iii. 2008 Pavement Rehab (North Taxilanes) iv. Obstruction Mitigation v. Building H — University of Iowa Hangar Expansion f. Hangar #56 — Sublease Request g. Airport "Operations": Strategic Plan -Implementation; Budget; Management h. FBO Staff Report i. Subcommittees' Reports j. Commission Members' Reports k. Staff Report 5. Set next regular meeting for June 18, 2009 at 6:00 p.m. 6. Adjourn MINUTES DRAFT Iowa City Airport Commission April 16, 2009 Iowa City Airport Terminal — 6:00 PM Members Present: Greg Farris, Minnetta Gardinier, Howard Horan, Janelle Rettig, John Staley Staff Present: Sue Dulek, Michael Tharp, Sarah Holecek Others Present: David Hughes, Jay Honeck, Rex Brandstatter, Doug Moore, Larry Bell, John Yeomans, Peggy Slaughter RECOMMENDATIONS TO COUNCIL: None DETERMINE QUORUM: Chairperson Rettig called the meeting to order at 6:00 P.M. Rettig noted that Sarah Holecek is present at tonight's meeting, from the City Attorney's office, filling in for Sue Dulek. APPROVAL OF MINUTES FROM THE MARCH 12, APRIL 2, AND APRI L 14, 2009 MEETINGS: Rettig asked if anyone had any changes to the March 12 minutes. Staley moved to approve the minutes of the March 12, 2009 meeting as submitted; seconded by Farris. Carried 4-0 (Gardinier absent). Rettig asked if anyone had any changes to the April 2 minutes. Farris moved to approve the minutes of the April 2, 2009 meeting as submitted; seconded by Horan. Carried 5-0. Rettig then asked if anyone had any changes to the April 14 minutes. Farris moved to approve the minutes of the April 14, 2009 meeting as submitted; seconded by Rettig. Carried 5-0. PUBLIC DISCUSSION: None. ITEMS FOR DISCUSSION/ACTION: a. Aviation Commerce Park / U of I Aircare Facility - (Staley recused himself as an Airport Commission Member and participated in this discussion as a UIHC employee.) Iowa City Airport Commission April 16, 2009 Page 2 of 8 Staley noted that they met on March 26 and are moving ahead. They first need to obtain two independent appraisals, and have commissioned two firms to do these appraisals. They hope to have this done in the next week or so. Peggy Slaughter noted that one of the firms contacted her today. Slaughter noted some other opportunities, one being a group from Waterloo who is interested in the Aviation Commerce Park lots. She continued, giving the Members a quick update on some of the other interested parties. Slaughter asked if anyone knows the timeframe for the new Wal-Mart store. Tharp noted that the Staples store has to be completed first, and that its due to be open in August or September. Slaughter also noted that they have the listings for the Aviation Commerce Park on www.loopnet.com - a service that "loops" you back to their web site. b. Gilbert Street Land Parcel - Tharp noted that representatives are not present this evening, and that he has not heard anything further from them. Staley moved that they defer this item until the parry's arrival; seconded by Farris. Carried 5-0. c. Private Hangar Construction - Doug Moore - Tharp noted that he spoke to Doug Moore recently. Moore is still gathering information for his proposal. Horan stated that he wanted to make a comment for the record - he believes they need to make it very clear that any sort of reclamation or salvage operation will not be left outside. He believes this is important in considering Moore's proposal. Tharp noted that he has received the same comment from others. Farris asked what zoning considerations would come into play in a situation like this. Tharp noted that the Airport has its own Zoning Board. Holecek responded to the Members' discussion, noting how overlay zoning would come into play here. Horan stated that he would make the motion, if need be, that they do not allow the Airport to become a "junkyard," that there should be no evidence outside of the hangar that there is a salvage operation there. Rettig noted that instead of a formal motion this should be a consensus of the Airport Commission that they are directing Tharp to continue the negotiations with Mr. Moore, keeping in mind that should this come to fruition, there will be nothing outside of the hangar in the form of a salvage operation. d. Farmer's National / Merschman Seeds - John Yeomans spoke to the Commission concerning Merschman Seeds. He stated that they are interested in extending their lease with the Airport. Rettig noted that the current lease expires in February of 2010. He added that Merschman Seeds would like to do some beautification of the area, and in return for taking care of this project, they would like to be able to count on being at the Airport for the next few years. The discussion turned to the impact of the runway closures this season, and Yeomans noted that Merschman is aware of this. Rettig asked Yeomans how the agricultural seed business is doing, and he gave a brief rundown of 2 Iowa City Airport Commission April 16, 2009 Page 3 of 8 tightening margins and struggles with prices. He added that the ethanol business has basically imploded, and that things have changed dramatically over the past year. The discussion turned to lease rates, and Yeomans noted that most are staying at the same rates. Members discussed this briefly with him. Horan noted that a two-year lease would most likely not interfere with any of the Airport's plans, and others agreed with him. Tharp noted that the next thing that would interfere with this area is the perimeter road project, and that is slated for October of 2012. Members then discussed the amount of the current contract - $25,000 - with Tharp explaining how Farmer's National gets a small portion of this for management of Merschman Seeds. Farris stated that he sees no problem in a two-year lease, and Rettig agreed, adding that they need to make sure that the problems seen last year - a gate left open and banners that were left hanging - are addressed ahead of time so that this does not occur again. Members agreed that Dulek would need to review this lease, and that they are interested in pursuing another two years. The discussion moved back to the beautification project that Merschman Seeds is proposing, with Yeomans clarifying what is intended. Holecek noted that they could enter into a Temporary Use of Right -of -Way agreement, which would allow Merschman to use the right-of-way, but contains an indemnification provision in case anything would happen. The topic moved back to what the Airport is charging in this land lease with Merschman Seeds. Yeomans responded to Members' questions regarding the current market price for this type of contract. There was a consensus among the Members to move forward with another two-year lease with Farmer's National and Merschman Seeds. e. FAA/IDOT Projects —AECOM — David Hughes i. Runways 7/25 & 12/30 - Hughes stated that they have been quite busy since the last meeting. There is a pre -bid conference next Tuesday afternoon at 1:30. The bids are due the 29th of this month, and Hughes stated that they plan to have the grant application back to the FAA the following day then. Hughes continued, stating that the phasing plans are set up per some of the previous discussions regarding this. He added that the Airport would not be closed between July 24th and August 3rd, and also August 29th and 30th. The intersection closure has been set for a 28-day calendar period, according to Hughes, and hopefully the weather will cooperate. Gardiner asked for some clarification on the various phases, and Hughes responded. Hughes noted that he should have a better idea of closure dates once they have the pre - construction conference. It was noted too, for clarification, that the Airport itself will not be closed - the runways will be closed - during the upcoming construction period. 1. Consider Resolution #A09-06 Accepting Work for Runway 7-25 Extension (Phase 5) Paving and Lighting - Hughes noted that the project ended up about $7,000 under the initial Iowa City Airport Commission April 16, 2009 Page 4 of 8 construction cost. Farris moved Resolution #A09-07; seconded by Horan. Carried 5-0. ii. South Aviation Development Study — Hughes noted that they did receive comments back from the FAA. The good news is that the FAA is going to treat the South Aviation Development Study as a stand-alone document, which means they do not have to wait for approval on the Airport Layout Plan documents. The bad news, according to Hughes, is that he has been so busy that he has not been able to return this document to the FAA yet. He hopes to get this out early next week. Tharp noted that once the approved documents are returned, they would need to set up a joint meeting with the City Council to present this. iii. 2008 Pavement Rehab (North Taxilanes) — Hughes stated that they have not talked to Pelling yet, but plan to call in the next few weeks to get them back for the needed repairs. iv. Obstruction Mitigation — Hughes asked Tharp if he had received a bill from Mediacom on this. Tharp stated that he had not. Hughes added that they are still trying to complete the United hangar demolition paperwork, as well. Rettig noted that the land around the fence area looks like it is settling, and Hughes stated that he would look at this area to see what is happening. V. Building H — University of Iowa Hangar Expansion — Tharp noted that they ran into some preliminary problems regarding the location of underground utilities, and he briefly filled Members in on this. vi. FY2010 State Aviation Program Grant Application - Hughes explained the four projects that make up this application - the drainage for Hangar A, overlay taxiway leading to runway 2-5, south area pavement maintenance, and pavement maintenance in front of the main terminal building and along the taxiway. Hughes added that they will have to see what the State is willing to fund - it could be just two, it could be all four. Hughes continued to respond to Members' questions as they reviewed the upcoming years' projects. Farris moved to approve the FY2010 State Aviation Grant application; seconded by Staley. Carried 5-0. b. Larry Bell, owner of the property, and Rex Brandstatter joined the Airport Commission meeting at this time. Brandstatter addressed the Members, stating that he hoped everyone had had a chance to review his letter. He noted that the details not addressed in the letter include the length of a lease and any specifics that City code would dictate. Horan asked what type of term they are interested in, and Brandstatter responded that probably something in the 20 to 25 year range, being renewable upon review. Tharp stated that he did some of his own research, and found that $300 a month is a very fair rate. As for the length of the lease, Tharp recommended doing five-year increments, 4 Iowa City Airport Commission April 16, 2009 Page 5 of 8 on a 20-year lease, with a CPI inflator every five years. Tharp added that the best use for this piece of property would be something like this proposal. Horan added that he believes they should make it a "floor of $300" in case the CPI inflator would not go up. Dulek added that they will need to have a public hearing, first of all, and that she and Tharp can work on a lease agreement for the Commission to review. Bell added that his concern is putting $25,000 to $40,000 into something like this and then not having it be feasible after a five-year period. Members continued to discuss this proposal, with unanimous agreement that Dulek and Tharp will begin working on a lease proposal. This led the Commission to discuss when they would need to hold the public hearing. Rettig suggested May 12th at 7:30 A.M., and others agreed. f. Airport "Operations;" Strategic Plan -Implementation; Budget; Management — Tharp began the discussion, stating that the big issue is the City's budget shortfall. This has led to all departments being asked to cut their budgets for fiscal year 2010 and beyond. Tharp continued, stating that he has a memo from the City Manager's office asking for various scenarios, such as 1, 2, and 4% reductions in General Fund budget appropriations. Tharp stated that he believes they will be able to absorb any of the proposed cuts. He added that he would like to have the authority to go ahead and work on this. Members began to discuss this issue, with Tharp responding to questions on what his proposals will be. Staley stated that he could be comfortable with Tharp working on this with the Chair, and others agreed. Rettig then noted that on page 7 there is a line charge for the position of the Economic Development person. She added that she believes this charge should be brought up in light of budget cuts. Farris noted that this has been brought up yearly and that nothing has changed thus far. The discussion turned to some of the items that need attention at the Airport. Tharp noted that the boiler needs to be repaired, in addition to some other items. He stated that he would like to review the capital funds of approximately $70,000 in order to cover these items. Another item is an asphalt overlay of the area at the front of the terminal, which Tharp expects to use a big chunk of these funds. Repairing the back door at the terminal and purchasing paint are the other items that Tharp would like to cover with these fiords. Staley moved to authorize Tharp, with approval of the Chair, to use capital funds to cover the boiler repair, asphalt overlay, door repair, and paint purchase, as discussed above; Horan seconded. Carried 5-0. Rettig then asked if Tharp believes the transition to having Jet Air do the maintenance is working. He responded that after some initial bumps in the road things appear to be working out. The discussion continued, with Members discussing the possible need of a checklist of sorts to make sure the maintenance is kept up in crucial areas. As for the cleaning portion of the contract, Tharp noted that this has improved. The discussion then turned to the strategic plan. Staley noted that he met with Rettig and Tharp to lay out a timeline to get this plan going. They are planning on it going into effect in Iowa City Airport Commission April 16, 2009 Page 6 of 8 July of 2010. Farris suggested they be proactive in the sense that they look at how the Airport can trim the budget, as the City has asked, over a longer time period. Rettig added that the meetings for the strategic planning would start this fall. Rettig then noted that Jet Air's attorney contacted Dulek regarding an FBO management agreement reduction of fees of 50% during the time that the runways are closed. Faros then noted what the Airport pays Jet Air for both cleaning and maintenance each month. This led to a brief discussion among Members, with Rettig stating that she believes this closure is unfortunate but that everyone involved will benefit from this project once it is completed. The Commission Members agreed unanimously that they do not feel the Airport should grant a fee reduction to Jet Air. Gardinier then spoke as a member of the public regarding this issue, stating that it is a bit disingenuous to view the hangars as solely storage space for airplanes without having any expectation that individuals would need runway access. She added that she did some looking around and found a State of Wisconsin Department of Transportation document used for leases, and this document does state that if runways are closed, the lessee will be given credit for the time they are unable to utilize the runways. g. Airport Commission Bylaws - Rettig noted that Members received a memo from Dulek regarding changes to the Airport Commission's bylaws, one being a change from 6-year terms to 4-year terms; the next is to change the "Vice Chairperson" position to "Secretary"; and third would be to delete the requirement that the Vice Chairperson must certify bills for approval. Staley moved to approve the changes to the Airport Commission Bylaws as discussed, seconded by Horan. Carried 5-0. Dulek noted that she will get copies of the revised bylaws to Members once this is updated. h. FBO Staff Report - Rettig noted that she had a message from Jet Air, noting that due to a funeral and travel, no one would be available at tonight's meeting. i. Subcommittees' Reports — Rettig noted that they need another Member for the Budget Subcommittee, now that Hartwig has left. Farris stated that he would serve, and others agreed to this. Farris then spoke to Members about the viewing area and the upcoming plans for this season. Rettig noted that they need to put some concrete stops in so cars are not parked on the sidewalk area here, as it makes the sidewalk hard to use. She also noted that the last parking spot was where they were going to put the bike rack that has still not been installed. She asked that these two items be part of the viewing area tasks, and that they address them this year. Commission Members' Reports — Horan brought up the issue of a grant summary, and asked if Tharp could prepare such a document. He believes this will be a valuable tool for the Airport. Rettig reminded everyone that Iowa City Airport Commission April 16, 2009 Page 7 of 8 Tharp is working on a newsletter and the next one is due out the first part of May, in case anyone has something to add to this next issue. Gardinier asked if the newsletter comes out regularly, and Tharp noted that it was supposed to be quarterly, but that this does not always happen. Rettig noted that it would be helpful to have a "communications intem" to help with some of these new avenues, such as Twitter, Facebook, and the web page. Gardinier asked if anyone had checked with the University on the possibility of graduate students fulfilling such a need. Members agreed that this would be a good idea and would be worth looking into. k. Staff Report — Tharp reminded the Members that next week is the Aviation Conference, Wednesday and Thursday. Gardinier stated that she will be there on Wednesday. SET NEXT REGULAR MEETING: Thursday, May 21, 2009 at 6:00 P.M. A special meeting will be held May 12, 2009 at 7:30 A.M. ADJOURN: The meeting adjourned at 8:31 P.M. Moved by Horan to adjourn, seconded by Farris. Carried 5-0. 7 Iowa City Airport Commission April 16, 2009 Page 8 of 8 Airport Commission ATTENDANCE RECORD YEAR 2009 Betio Dates NAME TERM EXP. 1/8 2/5 2/12 3/12 4/2 4114 4116 5/12 5/21 Greg Farris 3/1113 X X X X X X X Minnetta Gardinier 3/1/15 — — — X X X X Howard Horan 311/14 X X X X O/E O/E X JanelleRettig 3/1/12 X O/E X X X X X John Staley 3/1/10 X O/E X X O/E O/E X KEY: X = Present O = Absent O/E = Absent/Excused NM = No meeting -- = Not a Member MINUTES Iowa City Airport Commission May 6, 2009 Iowa City Airport Terminal — 7:30 AM Members Present: Greg Farris, Howard Horan, John Staley, Janelle Rettig Staff Present: Sue Dulek Others Present: None RECOMMENDATIONS TO COUNCIL: None DETERMINE QUORUM: The meeting was called to order at 7:31 AAL ITEMS FOR DISCUSSION/ACTION: DRAFT 1. Consider a resolution setting a public hearing for a ground lease with Larry E. Bell and Sandra S. Bell. Horan moved to consider Resolution No. A09-08 setting a public hearing for a ground lease with Larry E. Bell and Sandra S. Bell. Farris seconded. Resolution carried 4-0. ADJOURN: Farris moved to adjourn, Horan seconded. Motion carried 4-0. The meeting adjourned at 7: 32 A.M. Iowa City Airport Commission April 16, 2009 Page 2 of 2 Airport Commission ATTENDANCE RECORD YEAR 2009 (Meeting Dates) NAME TERM EXP. 1/8 215 2/12 3/12 4/2 4/14 4/16 5/6 5/21 Greg Farris 3/1/13 X X X X X X X X Minnetta Gardinier 3/1/15 — — — X X X X O/E Howard Horan 3/1/14 X X X X WE O/E X X Janelle Rettig 3/1/12 X O/E X X X X X X John Staley 3/1/10 X O/E X X O/E O/E X X KEY: X = Present O = Absent O/E = Absent/Excused NM = No meeting — = Not a Member Prepared by: Susan Dulek, Assistant City Attorney, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5030 RESOLUTION NO. RESOLUTION AUTHORIZING THE CHAIRPERSON TO SIGN AND THE SECRETARY TO ATTEST TO A GROUND LEASE LARRY E. BELL AND SANDRA S. BELL. WHEREAS, Larry E. Bell and Sandra S. Bell would like to enter into a lease to park vehicles on airport property north of 1565 S. Gilbert Drive; and WHEREAS, public hearing was held on the proposed lease on May 21, 2009; and WHEREAS, the lease of said space is in the public interest. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA CITY, IOWA, THAT: The Chairperson is hereby authorized to sign and the Secretary to attest to the Ground Lease, a copy of which is attached and incorporated herein. Passed and approved this day of ATTEST: SECRETARY It was moved by adopted, and upon roll call there were: AYES: 9 CHAIRPERSON and seconded by NAYS: Appr ved by City Attorney's Office ABSENT: Farris Gardinier Horan Rettig Staley the Resolution be Prepared by: Susan Dulek, Ass't. City Attorney, 410 E. Washington St.; Iowa City, IA 52240; 319-356-5030 GROUND LEASE THIS LEASE agreement made and entered into by and between Larry E. Bell and Sandra S. Bell ("TENANT"), and the Iowa City Airport Commission ("COMMISSION') in Iowa City, Iowa. In consideration of their mutual promises herein, COMMISSION and TENANT agree as follows: I. Leased Area. COMMISSION does hereby lease to TENANT the approximate 10,000 square foot area of vacant land depicted on Exhibit A and legally described in Exhibit B, which are attached and incorporated herein, and located within the runway protection zone legally described in Paragraph 3 below ("Leased Area"). 2. Term. The term of this Lease will be from the date of execution to May 31, 2029. TENANT shall have the option of an additional ten (10) year term, if written notification is given to the COMMISSION by May 1, 2029— Rent for the additional ten-year term if the option is requested shall be based on the "Rent Adjustment" provision described in Paragraph 3 below. In the event TENANT shall continue to occupy the Leased Area beyond the term of this Lease Agreement without executing an agreement for another term, such holding over shall not constitute a renewal of this Lease Agreement but shall be on a month -to -month basis only. 3. Rent. TENANT shall pay $300.00 per month in rent, payable in advance on the first day of each month. A 1.5% late fee ($4.50 per day) for rent not received by the COMMISSION will be charged after the fifteenth (151h) day of each month. Rent for May 2009 shall be $96.00 which is prorated from May 22 to May 31, 2009 and is due June 1, 2009. Rent Adjustments. A consumer price index ("CPI") evaluation shall occur prior to and take effect on May 1, 2014 and thereafter every five years of this Lease and additional exercised options. Said rent adjustment shall reflect the change in the CPI for the previous five (5) year period, unless a downward adjustment would occur. The CPI used shall be the data for the CPI-U, US City Average, All Items Less Food and Energy, Base Period 1982-1984=100. 4. Permitted Use. TENANT shall use the Leased Area for vehicle parking, but only to the extent permitted by FAA regulations, directives, rules, and policies and City of Iowa City ordinances. TENANT shall be responsible for all improvements and future maintenance of the Leased Area. TENANT intends to install either a concrete or asphalt parking lot in the Leased Area. 2 5. RPZ. TENANT specifically acknowledges that the Leased Area is within the runway protection zone ("RPZ") of the Iowa City Municipal Airport and that, as a result, the FAA restricts certain uses within Leased Area. TENANT further acknowledges and agrees that the rights granted to TENANT in this Lease will not be exercised so as to interfere with or adversely affect the use, operation, maintenance or development of the Airport. This Lease shall be subordinate to the provisions of any outstanding or future agreement between the Iowa City Airport Commission and the United States government or the COMMISSION and the State of Iowa relative to the maintenance, operation, or development of the Iowa City Municipal Airport. 6. Indemnification. TENANT agrees to indemnify, .defend and hold harmless the COMMISSION and the City of Iowa City, their officers, agents and employees from and against any and all claims, losses, liabilities or damages, of whatever nature, including payment of reasonable attorney fees, arising from occurrences or accidents within the Leased Area, from the TENANT'S use arising from this Lease agreement, or which may be caused in whole or in part by any act or omission of the TENANT including their agents or employees. 7. Subleasing. TENANT shall not sublease the Leased Area or assign this Lease without the prior written approval of the Commission, which approval shall not be unreasonably withheld. S. Anti -Discrimination. TENANT shall not discriminate against any person in employment or public accommodation because of race, religion, color, creed, gender identity, sex, national origin, sexual orientation, mental or physical disability, marital status or age. "Employment" shall include but not be limited to hiring accepting, registering, classifying, promoting, or referring to employment. "Public accommodation" shall include but not be limited to providing goods, services, facilities, privileges and advantages to the public. 9. Insurance. a. TENANT shall at its own expense procure and maintain general liability and casualty insurance in a company or companies authorized to do business in the State of Iowa, in the following amounts: Type of Coverage Comprehensive General (or Premises) Liability - Each Occurrence $1,000,000 Aggregate $2,000,000 b. TENANT'S insurance carrier shall be A rated or better by A.M. Best. TENANT shall name the COMMISSION and the City of Iowa City, as additional insured. TENANT shall provide fifteen (15) days notice to the COMMISSION before cancellation of said insurance. TENANT shall provide the COMMISSION a certificate of insurance showing compliance with this provision upon execution of this Lease. 10. No Smoking. Smoking is prohibited in the Leased Area. 11. Termination. Except as otherwise provided herein, this Lease may be terminated, without any penalty or further liability as follows: a. Immediately upon written notice by TENANT in the event TENANT determines that TENANT'S intended use of the premises is actually or constructively prohibited through no fault of TENANT. b. Upon thirty (30) days' written notice by either party to the other party if the other party defaults and fails to cure such default within that 30-day period, or such longer period as may be required to diligently complete a cure commenced within that thirty -day period. 12. Notices. Any notice, for which provision is made in this Lease, shall be in writing, and may be given by either party to the other, in addition to any other manner provided by law, in any of the following ways: a. by personal delivery to the Commission Chairperson b. by service in the manner provided by law for the service of original notice, or C. by sending said Notice by certified or registered mail, return receipt requested, to the last known address. Notices shall be deemed to have been received on the date of receipt as shown on the return receipt. (I) If to the Commission, addressed to: Iowa City Airport Commission Iowa City Municipal Airport 1801 S. Riverside Drive Iowa City, IA 52246 (2) If to Tenant, addressed to: Larry E. and Sandra S. Bell 10 Greenview Court West Branch, IA 52358 13. Right of First Refusal. If the FAA releases the Leased Area, thereby allowing the City of Iowa City to sell the Leased Area, and if the City of Iowa City receives an offer for sale of the Leased Area, TENANT shall have forty-eight (48) hours to match the offer in writing. 14. Inte aig_tion. This Lease constitutes the entire agreement between the parties, and as of its effective date supersedes all prior independent agreements between the parties related to the leasing of the Leased Area. Any change or modification hereof must be in writing signed by both parties. 15. Waiver. The waiver by either party of any covenant or condition of this Lease shall not thereafter preclude such party from demanding performance in accordance with the terms hereof. 16. Successors. This Lease shall run with the Property, and shall be binding upon and inure to the benefit of the parties, their respective successors, personal representatives, and assigns. 17. Severability. If a provision hereof shall be finally declared void or illegal by any court or administrative agency having jurisdiction over the parties to this Lease, the entire Lease shall not be void, but the remaining provisions shall continue in effect as nearly as possible in accordance with the original intent of the parties. SIGNED this day of 2009. IOWA CITY AIRPORT COMMISSION TENANT By: By: Janelle Rettig, Chairperson Larry E. Bell By: Sandra S. Bell Howard Horan, Secretary Approved by •t City Attorney's Office COMMISSION ACKNOWLEDGEMENT STATE OF IOWA ) ) ss: JOHNSON COUNTY) On this day of , before me, a Notary Public in and for the State of Iowa, personally appeared Janelle Rettig and Howard Horan, to me personally known, and, who, being by me duly sworn, did say that they are the Chairperson and Secretary, respectively, of the Iowa City Airport Commission; and by authority of said Commission, as contained in Resolution No. passed by said Commission on the day of May, 2009, that Janelle Rettig and Howard Horan acknowledged the execution of the instrument to be their voluntary act and deed and the voluntary act and deed of said Commission, by it voluntarily executed. Notary Public in and for the State of Iowa My commission expires: TENANTS ACKNOWLEDGEMENT STATE OF IOWA ) )ss: JOHNSON COUNTY) This instrument was acknowledged before me on Sandra S. Bell 2009 by Lary E. Bell and Notary Public in and for the State of Iowa My Commission expires: ESTATE JAV 4406.010 I (I b 11 Begnmmg at an iron Pin found at the southwest corner of Lot 12, of Sand Lake Addition to the City of Iowa City, Iowa, according to the plat thereof recorded in Plat Book 10 Page 23, Plat Records of Johnson County, Iowa, 3thence N 00*37'11" E, along the west line of said Lot 12ty, , 95.feet to an iron pin thence S Coun 1" 00 .98 feet to a Point on the northwesterly right-of-way tine of relocated Gilbert Street; thence southwesterly, 69.31 feet, along said northwesterly right-of-way line, on a 1095.83 foot radius curve, concave southeasterly, whose 69.30 foot chord bears S 10°10'00" W to an iron pin found on the south line of said Lot 12; thence N 89°22'49" W, 119.81 feet, to the point of said Sand bake Addition and the W beg nuing, all in accordance with the recorded plat of County, Iowa, subject to easements and restricttionssoofr� in Book ' at page 298, Deed Records of Johnson Prepared by: Susan Dulek, Assistant City Attorney, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5030 RESOLUTION NO. RESOLUTION SETTING A PUBLIC HEARING FOR JUNE 18, 2009, REGARDING THE INTENT TO ENTER INTO A GROUND LEASE AGREEMENT WITH MERSCHMAN SEEDS, INC. WHEREAS, the City of Iowa City, the Iowa City Airport Commission, and Merschman Seeds, Inc. entered into a Lease for an accessway from Mormon Trek Blvd. and the centerline of the southern end of runway 18/36 at the Iowa City Airport ("Leased Premises") for the period of March 1, 2008 to February 28, 2010; and WHEREAS, Merschman wishes to extend the lease term by two years. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA CITY, IOWA, THAT: 1. The Iowa City Airport Commission does hereby declare its intent to enter into the above - referenced amendment to the lease agreement. 2. A public hearing on said proposed amendment to the lease agreement should be and is hereby set for June 18, 2009 at 6:00 p.m. in the Terminal Building, Iowa City Airport, 1801 S. Riverside Drive, Iowa City, Iowa, or if said meeting is cancelled, at the next meeting of the Airport Commission thereafter as posted by the City Clerk. The City Clerk is hereby directed to cause Notice of Public Hearing to be published as provided by law. Passed and approved this day of ATTEST: SECRETARY 2009. CHAIRPERSON Approved by �'� 9' — r g- - ex) City Attorney's Office Resolution No. Page 2 It was moved by adopted, and upon roll call there were: and seconded by the Resolution be AYES: NAYS: ABSENT: Farris Gardinier Horan Rettig Staley RESOLUTION NO. RESOLUTION AUTHORIZING THE CHAIR TO ACCEPT FAA GRANTS FOR RUNWAY 7-25 RECONSTRUCT (PHASE 2) AND RUNWAY 12-30 RECONSTRUCT WHEREAS, the Iowa City Airport Commission has previously applied for Federal Aviation Administration aid in airport related projects; WHEREAS, the Federal Aviation Administration is expected to offer grant(s) to provide funding for the above stated projects; and WHEREAS, it is in the best interest of the Iowa City Airport Commission to accept these grants. NOW, THEREFORE, BE IT RESOLVED BY THE AIRPORT COMMISSION OF THE CITY OF IOWA CITY: 1. The Chairperson is authorized sign and the Secretary to attest to acceptance of FAA grants related to the above mentioned projects. Passed and approved this CHAIRPERSON ATTEST: SECRETARY day of Approved By: City Attorney's Office It was moved by and seconded by Resolution be adopted, and upon roll call there were: Ayes Nays Absent Farris Gardinier Horan Rettig Staley the Prepared by: Michael Tharp, Operations Specialist, 1801 S. Riverside Dr, Iowa City IA 52246 319-350-5045 RESOLUTION NO. RESOLUTION AWARDING CONTRACT AND AUTHORIZING THE CHAIRPERSON TO SIGN AND THE SECRETARY TO ATTEST A CONTRACT FOR THE RECONSTRUCT RUNWAY 7-25 (PHASE 2) AND RECONSTRUCT RUNWAY 12/30 PROJECT. WHEREAS, Metro Pavers, Inc. of Iowa City, Iowa has submitted the lowest responsible bid of $3,413,671.50 for construction of the above named project. NOW, THEREFORE, BE IT RESOLVED BY THE IOWA CITY AIRPORT COMMISSION, THAT: The contract for the construction of the above named project is hereby awarded to _Metro Pavers, Inc._ subject to the condition that awardee secure adequate performance and payment bond, insurance certificates, and contract compliance program statements and that the Commission secure FAA grant funding. 2. The Chairperson is hereby authorized to sign and the Secretary to attest the contract for construction of the above -named project, subject to the condition that awardee secure adequate performance and payment bond, insurance certificates, and contract compliance program statements and subject to the Commission receiving financing. Passed and approved this day of 12009. CHAIRPERSON ATTEST: SECRETARY It was moved by adopted, and upon roll call there were: Ayes and seconded by Nays Approved by rB--�S City Attorney's Office Absent the Resolution be Farris Gardinier Horan Rettig Staley AECOM AECOM 500 SW 7th Street, Suite 301, Des Moines, Iowa 50309 www.aecom.com May 7, 2009 Ms. Janelle Rettig Iowa City Airport Commission 1801 S. Riverside Drive Iowa City, IA 52246 SUBJECT: Reconstruct Runway 7/25 (Phase 2) and Reconstruct Runway 12/30 Iowa City Municipal Airport City of Iowa City, Iowa FAA AIP Project Nos. 3-19-0047-17, 18, & 19 AECOM ID No. 110563 and 111879 Dear Ms. Rettig: We have reviewed the bids received by the City of Iowa City on April 29, 2009, for the above - mentioned project. No errors or inconsistencies were found in any of the bids during the bid review. A copy of the bid tabulation is attached. Two (2) bids were received. Metro Pavers, Inc. of Iowa City, Iowa, submitted the low bid in the amount of $3,413,671.50. The low bid submitted was lower than the Engineer's Estimate by an amount of $1,470,150.50. Metro Pavers, Inc. indicated in their bid that they were able to meet the DBE goal of 10% as specified in the bid documents. They committed to a minimum of 10.62% DBE utilization on this contract. In addition to the above review and tabulation of bids, we requested documentation from Metro Pavers, Inc. regarding the amount of work that they planned to sublet. Based on the information received, Metro Pavers, Inc. currently plans to sublet $2,036,741.40 or 59.7% of the project and will perform $1,376,930.10 or 40.3% of the project directly. This meets the requirement set forth in Section 80-01 of the General Provisions of the Specifications. We recommend award of a contract for Reconstruct Runway 7/25 (Phase 2) and Reconstruct Runway 12/30, FAA AIP Project Nos. 3-19-0047-17, 18, & 19 to Metro Pavers, Inc. of Iowa City, Iowa, in the amount of $3,413,671.50, subject to FAA concurrence. If you should have any questions or need additional information, please contact our office at your convenience. Yours sincerely, Z " 3. ��. David B. Hughes, P.E. Enclosures: As noted cc: Mr. Donald Harper, Federal Aviation Administration (w/enclosures) LAw Mpmje U 1056sW.nUmmWR050709.1V.d= T¢Eulauon OlBo. Ramm4uNon 01 Ru maa y 7d5 (pn..e 2) eO RecOn clicn12J0 bwe DIVWrlN "Ak MW,i Abytl 1 Iowa COy.laae FAA Alp No 11-fL10619 N0, AELOM Pmect 10 6111B)8 Apfi ApNI 30, 2009 nBnvv v Esman. Oil. Pave]e. Nc. StreO Conmuccom Company. Inc, REA1 Ion ED, 1. 1. CIIY.Iowa NO. SPEC NOOESCRIPTION UNIT ESTMAWD OW]RRY UWCOST ESTIMTED COST UNnT COST ESTNWTEOCOST UNT COST ESTIMATED COST OMslonl pMslon ll Tdal gNSIOnI pMilonp Tdal pM¢IOnI DWSWIS 1 Y. DIN]Ivnl DiW51Mll I Tonal 1 2 P-100q.I GP!s MMiRalvrnM Cumobc.l.. COMruggnfiury LS OS I S1 1 3$SOOW.Op S1Z90W00 H35.OpOW j3500.tl.00 fI5f,OW.Op 51880000 S]6.80000 516 .BWOO 33W,CW.W E1]B W].00 E1]5.000 pJ $SSO WOW J P-ID2E.1 Pwerrenl Renwvol LS 0.5 05 I S)O WOW 535 WO.W f35,OW 00 flO W0.00 $]H.B[O 00 $1B<50.00 E19 <SO.W $SB,B00.00 $dp.W000 510 CW'.00 g30,000W Sa00W 00 1 P-103-52 Runw+En eLI M1l Removvl SYO 47SW 400B0 BSbW 3]50 31GG }50.00 j1fi0,9500 3]JI d3306 g2.15 f103125.W 51W 30]50 $RO LRW $R.16 E102115.00 EID330?60 f305 dS250 8 P-1035.3EKKBIaIXpntlM1ola flomoval EA EA S9 ]d f]5W 283SW f2.935.00 5650W $BSW R9]BW $3]1500 SRBOW $8500 E2B15,00 $3315W 5839000 e P.1035.I SIorm Sever gemvvpl LFT 1. 1fi 5000 p 1B $]500 H OW gOW f1350W HSW SB10W 50,00 f01OW E45W fB10W §0.0p $H)p Op P-1WSS Slum Svwr61ru6un Rarmvel Eq J1 RBW 14 B)W 516.00 f01 OW 51],SW.W g1305WPo SS.00 SN BWW 31I,aWW SYI,ZWW HW 5232W Iq f11 WOW 531800.W B P-152�1 Vrtlm¢YivG Ei-�alun CYO 235W BHW ]6 31 WJAp 331 00 H4ppp p3 j)B.OW.W $300W $10IWW 313.iW,W 323aW00 'jI65W f46fOW $1.26p.W SI}OIOW 0 p-152<]LVC 0aNi0 CYD R HM IW 0.UW $332WW H1B2W.W $2]0 H95W,W $RISW.W 3]10W.00 $220 H9.SWW $315W.W E>I WOW 10 P-152-0]Orvi Eirnvlwr OOpr Grant 5 c 57.W f30.650Ap f3}1W,W f11050. 3311p 5106W 0] EtSbCO.W SN550.W g]W SIB650.W ft].BW pp 3]OASOAp 11 Poam Gedenib {FT 6YD LFT LFT LFT 300W]W BWp pS0MDOS.1700 0. eW000p 050 W0 W0 $25W 5).W j},W 51.60 521 },Sp,W 511 B.Lp00 512,OW.W E90W.00 gO.W 51W6WW 512,WO.W f90W Op 331250.W $3W W0.00 5}10.U.00 3100.'V.00 $8.00 32.51 $}.30 E050 $SIWO] fl04WAp 138WW f3W000 $O.W Sfi5,53$.W 513 WO.W f3WJ.00 15100W f144.O1BW 52)6W.W WO.W fOW fR2p $230 E1W IS.1W pJ SB)9W 0] fl]BOOW Hp00W SOW 550.)fi0W g1]BW.W EB W3.00 SS1W.W H2d,]a000 f316Po.W f13 WOW 12 P-ISeb1 Sa Famo 13 P-I5fib.2 Cbv nnE Railorpllvnd Im Fen- 10 P-15Bd351n Fenm gemwvl 10 P.}IB5.1 Ro ckd CanweleA re vle ban Coune 6YD j1.W j9 W30] f90W.00 f1B W000 b005 SS Do ESIW.pO iIOZWW $005 53100 pp ES 1W.00 g10 R00W 1B PA0f8f PorllannCemenl cm-10-O'T,.Im... Ponlantl Lemenl Concele-e'ID¢kneae 6Y0 6YD TON SYO SFT MO I:o)00 ]WO42p H550650 BODD aB000MA 2.= 1B.900 18,11p H.]5 $20W f3OW 5130.W 53W f035 Std6 )]500 32212W 0p Sfi4B5W 00 f10.W0W 390 CO E12I,i5000 f688.56000 SOW $OW SOW 20932500 SWI]6pPo f840500W S10 WOW S..Am.W S2 i9 23]55 $29.In SIfiOan a,11 $)6,)05. -----3 1. ]ISW S154WPo $.5 Snoc $0W $OW SOLO Iel9 ]25W f1 ANGo f651W.W E2]50 $INDO. $150 y59282500 S1a1W.00 S12.00 W SOD.5592025W au fOW SIg4W1B 313 pppW S2,MDO V Pb01d3 10 PZU1-03 A¢Ba4 Trvntllon Pwomenl P flummt D ZO Pd1051 041 qu Ma .Xe ge9MNe 21 Pd20.a3R MaM1L eMw Re!k[Ihv SFF IW EI8,1$SW f14.9ISM fNB50.W 11.55 f40.]65.W $SOAISW 3118fOW $155 3<0165W SSO.HiW 22 PLAS3 Ru `A vclrve SFT SBW 350 3)W )60 93W 10] faWW f3A.W f]50. f1 H5 00 f5]]50 f133]W it ES WW f5»W $12]]Do 3] PA$p6A Ru MOM1r ra i .amcam, SFT 4W0 0 40W $075 511WW sz,mpo HB]SW 1135 "nor CO H025.m $11535W 5135 f)WOW $4615W SI1025W 21 0.ID1d.110{ntlr pemlvrmO Comele Pi qL LFT IFT 434 SBl .1 1375 U.W E45W $92W [U 51990W sow f12.3i5.W 59.200W Efif 815W 32.25 S}?W j10 J500p 31111Op0 §pOJ $2540700 $IOJSp,W $3712500 y225 $2200 310.]50W W.Soo f000 330]0200 SIp.J50.W 33 IWOO 24 0.]015.$21{non gein!onwn Conuolo Pie RCP 3B 0.]O,SJ 30IncB gelnfor-E Lonucle Pi v RCP LFT 404 1,01] 1110 1B]4 SSiPo fJ2815W $59)SSW j920I0.W 5]3.W 318 )01.00 E35.H1.00 521$p0 $3800 $10)1000 f30,15000 540,0]2.W 2] D]01aa, -Inch.- P ul R elnlo2etl Concrele Arul PIe RLP Rainlometl Corrcmla NN PI 0.CP NHnM Reinlor-S Covucle Pl RCP F1vre0EnX Hetlbn LFT LFT EA Ea LFT IBO 0 0 0 6JW 0 LASS 1 t 5&U 1514 We } AB 1 1 11150 $)0.00 WDED $95.00 12LCO.W 125CO.W $2B28000 $1470000 $0.00 SOW SOW $81900.W $000 4346.B10Ap g20W.00 525WW 11f01B000 314 ]W.00 f218 B10.00 53.([O.W 32 OD Sa3.W $SBW AS.W $950W 512WW 31131R00 310.8]500 W E000 5000 E5031000 bOW $194,6`A.W $9W.p0 Et W.Do f610020 $t 9>800 $194 BWW $950W St I. $3600 12.11 $R00 f1,0W.W S1mo 51151400 $12.152,00 f000 $000 $0. 14212.A sum f181,O5fi 00 $,.BWW $I,OW 00 $58664 H2t5]W f1B?OSSW SI,BWM tt aWW 2B 0.)015414{ncfi.2)Inclr 29 0.)OIES 30 0.]0156 U{vyra 2]Incn ReinlomN Cormle A a;12 qC tCron EM 5"an Slog Perlon!M SUMain Oq 15 Mlgi Bvckf ]1 0.]0561 ]2 0.]OSfi3 BiM WnLMualetl SUBLrein OR ]5 LFT 610 e20 SBW i42.0W.W H8,<W,W S99 WW fB JS H4fiT150 HS430.W 3931DI an $8]5 S""N SO H)8SJ LID f919B150 3] 0.1055]SUMnIn Cbvmul Eq 3$ 10 t4B SMOD H130W 59040.00 515 WO.W fS.W fJ,315W f5330.pp fBH45W T535 j]IB1W 55125.00 SB,313.W a 0.]5151 .erin:ake!mR;NG EA 6 ffiW.W j1BCHOW HO.PIpW j3I6W,W $SOOW $14.W0.W $OWD.00 32.,Do f3]0W f1560W HBWW 512a30W JS 0.)51d251um5awerinlpkefor Amarn ArtlrRe FA ] B 15 $l.W]W S1B,WO,W E2]OOp.W53,200W .1.1WW $Ze.OW.W HCW 00 330.'O.W YtO WOW $2),WJ.00 $45,000W ]0 T.W1-S.I Sae6N vn0 Mu4M1i gCRE 2B 9 13 11 fSCW.W Hp WOW §d5 p0000 f55 WO,00 H2O0W 04W00 E3]80000 H2WW $4001 S&WODo S. MSC $44000W TA01.5281p611Rin Cm ACRE 20 13 41 $3,SW.W $1.1b00.00 H2,000.d1 31435W.00 .1 DO 33O1WW $10,300 00 555350.00 $1 ]50,00 E]915000 j18.300.00 Y55 ]5000 3 30 TA055.1 To vllin-OEIaInvtl OrrSXa CYO 3a000 B.Wp dt 32 §Bp0.00 j2]300.00 59 fi00.00 j]2BW,00 $SHOOp SIfi B20W $fi9W 00 $ZJ )8004 SSW.00 f10 B2000 E896000 $2])00.D0 JB L1064t No.0AN'GL-02<C LoOle lnsleAa81n T1pren pucl Bany of ConOUA LFT 15000 0 ppp SSW $12000000 HISW 00 S1H W0.00 Y3.R5 f]B WOW $28.925.00 $1 939W $]35 A0,00000 42BB2500 2000 f100B25W 40 H ANp GnonlnwYleS GmuM ingaAM In Trvmlr LFT 2W0 0 15000 42.50 $3)Wp00 YOW E]1 0W $Og0 S135W.W E0W f1350000 W90 5135W 00 S1JW0W 11 ".3No. L-,W53 111P5.1 Nv.BAY1C2 Rpn Cum, InWakNNinrcM1 E6clrvlLOMuA 2lntlr PVC. SCZatuly a0 LFT LFT t]SW 1].BW 0 0 20W 1].BW f3W f2W WMIUOp SN.SW.W §9W $O.W fBCWW 3345W.W f]60 ft.)0 3)2WW S]],aBpW U. fODo 3)20OW f13.a80W W. 51.]0 Il]W 00 3}]4WW SO,W so. S?iWW 123 aWW 4] 4] L11P52 ElGreplCupup 21rch PVC, 6tlrW UY80 NINE'S LJB1MNrumin!em Runv2 Evv M nm'IhTla Ler¢ LFT FA 2W 23 0 0 t3BW 2W 2M. j1OW I69.CM.SO HCW.W WW 50.W SfiLOW.W H0.V.W y].W 311.W H1400W 32 P4O,W WO SO.W M.WW 328WW 33W 514W Hf aWW S}BWW WW $O.W 541LWW f3.BW.W 44 LA1551 IS L13S52 LS91 Med,u minlem qu EB eL M ilWellow Lcm MCElumintem flurma EE LIMGrvoNfle6 Lana Eq EA EA Eq ]1 18 f0 30 0 0 0 0 3] 31 1fi 11 11 W.W 513W 00 H 000 $BW,W 53)6W.W 53],]!p.W S1B2W.W $11 WW EO,W §pW SOW $OW 3» W $3I,200W S1B200W E112WW S120W $]]p.00 H2500 $fi3000 31BSWW 123630W f1J-0000 Ev 6M 00 SOW gOW 8000 $000 $1SSWW f2 W000 51330000 U,.2.00 $RD.W f]30.00 503500 $fi3000 f,A... 31B SSOW ft]2W 00 gB 63000 SOPo SOW EOW SOW fi0560W ".SOO, 513300W $B BlOW IB L12S5]LEO1 4) .125 LSfi0Elvdnml XvnEFp4e 40 So GRS95 Ld53 gvlmmevclhe Marterw.In SOA pncM1u JO E125W ]>60W 0.00 )SO pO $9000 32)W00 E000 33 )W.W $90W $2]W00 §OW $2100W wa, minc,DNOIonIPM hw nl 2,fi5G 140W S11BI.fi90. ,p0] W SIO O.GW.SO H533.I>f. 341H0]150 31B 4WW f1.H2562W 534<$9H2p0 DOE DO SIDE 10.52% OSE B01% Prepared by: Michael Tharp, Operations Specialist, 1801 S. Riverside Dr. Iowa City, IA 52246 (319) 350 5045 RESOLUTION NO. RESOLUTION APPROVING TASK ORDER NO. 3 WITH AECOM FOR ENGINEERING CONSTRUCTION SERVICES RELATING TO THE RUNWAY 7-25 AND RUNWAY 12-30 RECONSTRUCTION WHEREAS, the Iowa City Airport Commission entered into a contract entitled "Professional Services Agreement" with Earth Tech on December 11, 2008 to provide engineering services Federal Airport Improvement Program Projects; WHEREAS, Part I(A) of said agreement provides that the parties will enter into supplemental agreements for each project; WHEREAS, the Commission and AECOM have previously entered into Task Order Nos. 1 and 2; WHERAS, the Commission and AECOM now desire to enter into Task Order No. 3, a copy of which is attached; and WHEREAS, it is in the best interest of the Commission to enter into Task Order No. 3 NOW, THEREFORE, BE IT RESOLVED BY THE AIRPORT COMMISSION OF THE CITY OF IOWA CITY: 1. The Chairperson is authorized to sign Task Order No. 3 after concurrence with FAA. Passed and approved this day of 2009. CHAIRPERSON ATTEST: SECRETARY It was moved by and seconded by adopted, and upon roll call there were: Ayes Nays Approved By: City Attorney's Office Absent the Resolution be Farris Gardinier Horan Rettig Staley AECOM AECOM 501 Sycamore Street, Suite 222, Waterloo, Iowa 50703 T 319.232.6531 F 319.232.0271 www.aecom corn TASK ORDER NO. 3 REHABILITATION OF RUNWAY 7-25 AND RUNWAY 12-30 IOWA CITY MUNICIPAL AIRPORT IOWA CITY, IOWA FAA PROJECT NO.3-19-0047-17 AND 18 Project Description - See attachment and incorporated herein. Scope of Services - See attachment and incorporated herein. Compensation A. Compensation for services for the Construction Phase shall be a cost plus fixed fee not -to -exceed Two Hundred Seventeen Thousand Dollars ($217,000.00). See attachment and incorporated herein. General Conditions Except as specifically amended by this agreement, services shall be provided in accordance with the Consultant Services Agreement for the Iowa City Municipal Airport between AECOM Technical Services, Inc., and the Iowa City Airport Commission dated December 22, 2008. APPROVED IOWA CITY AIRPORT COMMISSION L:\work\ADMIN\AGREE\PROF\ICAirportTaskOrder3.doc APPROVED AECOM TECHNICAL SERVICES, INC. By Joe A. Becker Date May 7, 2009 SCOPE OF SERVICES FOR REHABILITATION OF RUNWAY 7-25 AND RUNWAY 12-30 IOWA CITY MUNICIPAL AIRPORT IOWA CITY, IOWA FAA AIP 3-19-0047-17 & 18 Project Description The project is described as the Rehabilitation of Runway 7-25 and Runway 12-30 at the Iowa City Municipal Airport, Iowa City, Iowa. The project includes approximately 1,850 feet of Runway 7-25 that remains between the work completed on AIP Project No. 3-19-0047-14 and on AIP Project No. 3-19-0047-16. The project includes approximately 1,400 feet on the north end of Runway 12-30 and a new runway lighting system for Runway 12-30. The intersection of the two runways (7-25 and 12-30) is a part of this project. The rehabilitation will be accomplished by reconstruction of the existing runways with Portland cement concrete pavement with grooving and marking. The work involved in the project will also include pavement removal, excavation, aggregate base course, storm sewer, subdrain, runway edge lighting, and surface restoration. The project will be funded by federal Airport Improvement Program funds. It. General Project Scope The work to be performed by the Consultant shall encompass and include detailed work, services, materials, equipment and supplies necessary to provide construction phase services. The design phase has been completed and the project has been bid. The construction phase services shall be divided into the following tasks: A. Construction Phase 1. Assignment of Construction Manager. This task consists of assigning a project engineer who will coordinate Project activities and will be the principal liaison between the Sponsor, Consultant and regulatory agencies. 2. Assemble Construction Documents. This task consists of assisting the Sponsor in assembling the contract documents for execution by the Contractor and the Sponsor. 3. Pre -Construction Conference. This task consists of attending and conducting a pre -construction conference with representatives of the Contractor, Sponsor, Consultant, FAA and affected utilities. 4. Construction Surveying. This task consists of establishing horizontal and vertical control for the project. In addition, this task includes checking the Contractor survey notes for accuracy and method of staking. Contractor's survey will be checked on a weekly basis, prior to beginning work in the area staked, and periodically for grade and alignment. The survey notes received from the Contractor will be organized, checked, and filed for reference during the project. 5. Shoo Drawings and Submittals. This task consists of reviewing shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the Project and compliance with the information given in the contract documents. Page 2 6. Construction Observation Program. This task consists of preparation of Construction Observation Program which will detail the measures and procedures that are required to assure conformance with the approved plans and specifications. This program will be developed in accordance with the FAA Central Region AIP Sponsor Guide. 7. Construction Assistance. This task consists of answering design interpretation questions from the Sponsor, Contractor, review staff and appropriate agencies. 8. Pay Applications. This task consists of preparing and processing monthly applications for payment to the Contractor and forwarding to the Sponsor for execution with recommendations for approval and payment. 9. Labor and Payroll Reports. This task consists of the reviewing weekly labor and payroll reports for compliance with Davis -Bacon Act, conducting on -site employee interviews, and conducting E.E.O. site inspections. Original documents will be submitted to the Sponsor at completion of project for storage. 10. Testinq of Materials. This task consists of providing field testing and materials testing in accordance with the Construction Inspection Program. A subconsultant will provide quality assurance testing for establishing Proctor values for the base rock and embankment materials and provide acceptance testing for Asphaltic cement concrete pavements. 11. Site Visits. This task consists of providing periodic site visits to the construction site by design personnel at appropriate stages of construction to review the quality of the work and to determine, in general, whether the work conforms with the contract documents. 12. Change Orders. This task consists of coordinating with the Sponsor and Contractor in preparing and processing contract change orders. 13. Pre -paving Conference. This task consists of a meeting with the contractor, quality assurance testing lab, resident project representative and the project manager to discuss the testing requirements and paving plan for the runway extension to assure that controls are in place to meet the project specifications prior to beginning paving operations. 14. Construction Observation. This task consists of providing field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Also included in this task will be the monitoring of DBE participation in the project. Staffing requirements may be adjusted during the Project in relation to the level of construction activity. 15. Intersection Closure Coordination. This task consists of meeting with the Airport staff, tenants, and the Contractor for weekly progress meetings during the construction phase of the project that requires closure of the airfield. The meeting is to discuss project progress, safety, operations, construction issues, and identify upcoming construction schedule. These meetings are required to minimize the time that the airfield will be closed to air traffic. Page 3 16. Non -Compliance Reporting. This task consists of reporting to the Sponsor any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents, and advising the Sponsor of any work that should be corrected or rejected. 17. Contractor Modifications. This task consists of reviewing, evaluating and making recommendations to the Sponsor on suggestions for modifications that have been made by the Contractor. 18. Proiect Files. This task consists of maintaining files for correspondence, reports of the job conferences, shop drawings, and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other Project -related documents. 19. Daily Reports. This task consists of the resident field representative keeping a diary, log book or report for those times on site, recording hours on the job site; weather conditions; data relative to questions of extras or deductions; list of visiting officials and representatives of manufacturers, fabricators, suppliers and distributors; activities; decisions, observations in general and specific observations in more detail when necessary, as in the case of observing test procedures. As part of this task weekly construction progress and inspection reports will be prepared and submitted to the FAA. 20. Punch List. This task consists of conducting a review of the Project near completion and preparing a list of items (Punch List) to be completed or corrected. 21. Final Review. This task consists of performing a field observation of the completed Project before a final application for payment is processed for the Contractor. 22. Proiect Closeout. This task consists of assisting the Sponsor with Project completion and final closeout documentation from the Contractor for the FAA by providing a statement covering the following. a. Sponsor Certification for Final Acceptance b. Final Outlay Report —Standard Form SF-271 C. Final Project Cost Summary d. Final Construction Report 1) Brief narrative of work accomplished as well as any excluded items. 2) Summary of key milestone dates — Receipt of Bids, NTP, Substantial Completion, Contract Date, Final Inspection, Final Acceptance. 3) Explanation of liquidated damages (if required). 4) Statement of compliance with contract labor provisions (payroll reviews, complaints, etc.) Reference AC 150/5100-6. 5) Summary of final contract quantities. 6) Explanation of underruns and overruns. 7) Change Order Summary. Page 4 8) Testing Report Summary including a copy of all acceptance test results. 9) Final Inspection Report including signature of consultant. 10) Contractor's Final Statement of Completion — typically submitted as the final payment request. e. Summary of DBE Utilization 23. Record Drawings. This task consists of providing the Sponsor with a copy of Record Drawings of the construction plans for the Project based on the construction observation records of the review staff and Contractor showing those changes made during construction considered significant. Two copies of the Record Drawings in electronic and reproducible format will be provided to the Sponsor. One electronic copy would be for the FAA. Electronic drawings shall be in MicroStation V8 format. Task does not include updating of the Airport Layout Plans. 24. Proiect Administration. This task consists of office administration and coordination of the project. Interoffice meetings, general day-to-day administrative responsibilities, and typing of interoffice memoranda and minutes of meetings are included in this task. L:\work\ADMIN1AGREE\PRORICTaskOrder3Scope.doc IV. V. Rehabilitation of Runway 7-25 & Runway 12-30 Iowa City Municipal Airport Iowa City, Iowa FAA Project No. 3-19-0047-17 & 18 CRS Services Consultant Cost Summary Direct Labor Cost Category Hours Rate/Hour Senior Professional 52 $79.00 Project Professional 264 $64.00 Staff Professional 168 $37.00 CADD Operator 60 $25.00 Senior Technician 850 $29.50 Technician 494 $22.00 Project Support 116 $19.50 2004 Payroll Burden and Overhead Provisional Costs Direct Project Expenses Amount $4,108.00 $16,896.00 $6,216.00 $1,500.00 $25,075.00 $10,868.00 $2,262.00 165.00% $66,925.00 $110,426.25 Category Units Rate/Unit Amount Mileage 2200 0.550 1,210.00 Per Diem 0 30.00 0.00 Lodging 0 55.00 0.00 Copier 1400 0.06 84.00 Plan Copier 170 0.50 85.00 GPS 55 25.00 1,375.00 Geodimeter 66 12.50 825.00 Miscellaneous, Other 500.00 $4,079.00 Earth Tech Estimated Actual Costs Subcontract Expense Terracon. - Testing Services Estimated Actual Costs Fixed Fee Maximum Amount Payable Rounded $181,430.25 $181,400.00 $190,400.00 $26,600.00 $217,000.00 Rehabilitation of Runway 7-25 & Runway 12-30 Iowa City Municipal Airport Iowa City, Iowa FAA Project No. 3-19-0047-17 & 18 CRS Services Staff Hour Estimate Item No. Description Senior Prof Project Prof Staff Prof CADD Operator Senior rechniciarTechniciar Project Support Totals 1 Assignment of Construction Manager 0 2 Assemble Construction Documents 4 8 8 20 3 Pre -Construction Conference 2 2 4 4 Construction Surveying 136 136 272 5 Shop Drawings and Submittals 12 16 12 40 Construction Observation Program 16 8 24 6 Construction Assistance 8 100 40 148 7 Pay Applications and Reimbursements 10 10 8 Labor and Payroll Reports 40 40 9 Testing of Materials 8 8 16 10 Site Visits 8 16 8 32 11 Change Orders 4 6 16 12 4 42 12 Pre -Paving Conference 4 4 6 14 13 Construction Observation 610 320 930 14 Intersection Closure Coordination 80 80 15 Non -Compliance Reporting 4 4 8 16 Contractor Modifications 4 4 8 17 Project Files 24 24 18 Daily Reports 72 32 104 19 Punch List 2 4 8 14 20 Final Review 2 4 8 14 21 Project Close-out 8 12 24 12 8 64 22 Record Drawings 8 16 40 64 23 Construction Administration 20 12 32 Total Construction Phase Services 1 52 264 168 60 850 494 116 2 004 Prepared by: Michael Tharp, Operations Specialist, 1801 S. Riverside Dr. Iowa City, IA 52246 (319) 350 5045 RESOLUTION NO. RESOLUTION APPROVING TASK ORDER NO. 4 WITH AECOM FOR ENGINEERING CONSTRUCTION SERVICES RELATING TO THE RUNWAY 12-30 RECONSTRUCTION WHEREAS, the Iowa City Airport Commission entered into a contract entitled "Professional Services Agreement" with Earth Tech on December 11, 2008 to provide engineering services for Federal Airport Improvement Program Projects; WHEREAS, Part I(A) of said agreement provides that the parties will enter into supplemental agreements for each project; WHEREAS, the Commission and AECOM have previously entered into Task Order Nos. 1-3; WHERAS, the Commission and AECOM now desire to enter into Task Order No. 4, a copy of which is attached; and WHEREAS, it is in the best interest of the Commission to enter into Task Order No. 4 NOW, THEREFORE, BE IT RESOLVED BY THE AIRPORT COMMISSION OF THE CITY OF IOWA CITY: 1. The Chairperson is authorized to sign Task Order No. 4 after concurrence with FAA. Passed and approved this CHAIRPERSON ATTEST: SECRETARY day of It was moved by and seconded by adopted, and upon roll call there were: Ayes Nays 2009. Approved By: City Attorney's Office Absent the Resolution be Farris Gardinier Horan Rettig Staley AECOM AECOM 501 Sycamore Street, Suite 222, Waterloo, Iowa 50703 T 319.232.6531 F319.232.0271 www.aecom.com TASK ORDER NO. 4 REHABILITATION OF RUNWAY 12-30 PHASE 11— FAA ECONOMIC RECOVERY FUNDS IOWA CITY MUNICIPAL AIRPORT IOWA CITY. IOWA FAA PROJECT NO. 3-19-0047-19 Project Description - See attachment and incorporated herein. Scope of Services - See attachment and incorporated herein. Compensation A. Compensation for services for the Construction Phase shall be a cost plus fixed fee not -to -exceed One Hundred Sixty -Seven Thousand Dollars ($167,000.00) See attachment and incorporated herein. General Conditions Except as specifically amended by this agreement, services shall be provided in accordance with the Consultant Services Agreement for the Iowa City Municipal Airport between AECOM Technical Services, Inc., and the Iowa City Airport Commission dated December 22, 2008. APPROVED IOWA CITY AIRPORT COMMISSION L:%workW DMINVAGREEIPROFtICTaskOrder4.doc APPROVED AECOM TECHNICAL SERVICES, INC. By �� Joe A. Becker Date May 7 2009 SCOPE OF SERVICES FOR REHABILITATION OF RUNWAY 12-30 (PHASE 2) IOWA CITY MUNICIPAL AIRPORT IOWA CITY, IOWA FAA AIP 3-19-0047-19 Project Description The project is described as the Phase 2 of Rehabilitation of Runway 12-30 at the Iowa City Municipal Airport, Iowa City, Iowa. The project includes approximately 2,500 feet of Runway 12-30 that remains south of the work completed on AIP Project No. 3-19-0047- 17 and 3-19-0047-18. The rehabilitation will be accomplished by reconstruction of the existing runways with Portland cement concrete pavement with marking. The work involved in the project will also include pavement removal, excavation, aggregate base course, storm sewer, subdrain, and surface restoration. The project will be funded by federal Economic Recovery funds. II. General Project Scope The work to be performed by the Consultant shall encompass and include detailed work, services, materials, equipment and supplies necessary to provide construction phase services. The design phase has been completed and the project has been bid. The construction phase services shall be divided into the following tasks: A. Construction Phase 1. Assignment of Construction Manager. This task consists of assigning a project engineer who will coordinate Project activities and will be the principal liaison between the Sponsor, Consultant and regulatory agencies. 2. Assemble Construction Documents. This task consists of assisting the Sponsor in assembling the contract documents for execution by the Contractor and the Sponsor. 3. Pre -Construction Conference. This task consists of attending and conducting a pre -construction conference with representatives of the Contractor, Sponsor, Consultant, FAA and affected utilities. 4. Construction Surveying. This task consists of establishing horizontal and vertical control for the project. In addition, this task includes checking the Contractor survey notes for accuracy and method of staking. Contractor's survey will be checked on a weekly basis, prior to beginning work in the area staked, and periodically for grade and alignment. The survey notes received from the Contractor will be organized, checked, and filed for reference during the project. Page 2 5. Shop Drawings and Submittals. This task consists of reviewing shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the Project and compliance with the information given in the contract documents. 6. Construction Observation Program. This task consists of preparation of Construction Observation Program which will detail the measures and procedures that are required to assure conformance with the approved plans and specifications. This program will be developed in accordance with the FAA Central Region AIP Sponsor Guide. 7. Construction Assistance. This task consists of answering design interpretation questions from the Sponsor, Contractor, review staff and appropriate agencies. 8. Pay Applications. This task consists of preparing and processing monthly applications for payment to the Contractor and forwarding to the Sponsor for execution with recommendations for approval and payment. 9. Labor and Payroll Reports. This task consists of the reviewing weekly labor and payroll reports for compliance with Davis -Bacon Act, conducting on -site employee interviews, and conducting E.E.O. site inspections. Original documents will be submitted to the Sponsor at completion of project for storage. 10. Testing of Materials. This task consists of providing field testing and materials testing in accordance with the Construction Inspection Program. A subconsultant will provide quality assurance testing for establishing Proctor values for the base rock and embankment materials and provide acceptance testing for Asphaltic cement concrete pavements. 11. Site Visits. This task consists of providing periodic site visits to the construction site by design personnel at appropriate stages of construction to review the quality of the work and to determine, in general, whether the work conforms with the contract documents. 12. Change Orders. This task consists of coordinating with the Sponsor and Contractor in preparing and processing contract change orders. 13. Pre -paving Conference. This task consists of a meeting with the contractor, quality assurance testing lab, resident project representative and the project manager to discuss the testing requirements and paving plan for the runway extension to assure that controls are in place to meet the project specifications prior to beginning paving operations. 14. Construction Observation. This task consists of providing field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the Page 3 contract documents and that completed work appears to conform to the contract documents. Also included in this task will be the monitoring of DBE participation in the project. Staffing requirements may be adjusted during the Project in relation to the level of construction activity. 15. Non -Compliance Reportina. This task consists of reporting to the Sponsor any work believed to be unsatisfactory, faulty or defective or does not conform to the contract documents, and advising the Sponsor of any work that should be corrected or rejected. 16. Contractor Modifications. This task consists of reviewing, evaluating and making recommendations to the Sponsor on suggestions for modifications that have been made by the Contractor. 17. Proiect Files. This task consists of maintaining files for correspondence, reports of the job conferences, shop drawings, and sample submissions, reproductions of original contract documents including addenda, change orders, field modifications, additional drawings issued subsequent to the execution of the contract, Engineer clarifications and interpretations of the contract documents, progress reports and other Project -related documents. 18. Daily Reports. This task consists of the resident field representative keeping a diary, log book or report for those times on site, recording hours on the job site; weather conditions; data relative to questions of extras or deductions; list of visiting officials and representatives of manufacturers, fabricators, suppliers and distributors; activities; decisions, observations in general and specific observations in more detail when necessary, as in the case of observing test procedures. As part of this task weekly construction progress and inspection reports will be prepared and submitted to the FAA. 19. Punch List. This task consists of conducting a review of the Project near completion and preparing a list of items (Punch List) to be completed or corrected. 20. Final Review. This task consists of performing a field observation of the completed Project before a final application for payment is processed for the Contractor. 21. Proiect Closeout. This task consists of assisting the Sponsor with Project completion and final closeout documentation from the Contractor for the FAA by providing a statement covering the following. a. Sponsor Certification for Final Acceptance b. Final Outlay Report — Standard Form SF-271 C. Final Project Cost Summary d. Final Construction Report 1) Brief narrative of work accomplished as well as any excluded items. Page 4 2) Summary of key milestone dates — Receipt of Bids, NTP, Substantial Completion, Contract Date, Final Inspection, Final Acceptance. 3) Explanation of liquidated damages (if required). 4) Statement of compliance with contract labor provisions (payroll reviews, complaints, etc.) Reference AC 150/5100-6. 5) Summary of final contract quantities. 6) Explanation of underruns and overruns. 7) Change Order Summary. 8) Testing Report Summary including a copy of all acceptance test results. 9) Final Inspection Report including signature of consultant. 10) Contractor's Final Statement of Completion — typically submitted as the final payment request. e. Summary of DBE Utilization 22. Record Drawings. This task consists of providing the Sponsor with a copy of Record Drawings of the construction plans for the Project based on the construction observation records of the review staff and Contractor showing those changes made during construction considered significant. Two copies of the Record Drawings in electronic and reproducible format will be provided to the Sponsor. One electronic copy would be for the FAA. Electronic drawings shall be in MicroStation V8 format. Task does not include updating of the Airport Layout Plans. 23. _Project Administration. This task consists of office administration and coordination of the project. Interoffice meetings, general day-to-day administrative responsibilities, and typing of interoffice memoranda and minutes of meetings are included in this task. L:\workWDMINWGREE\PROF\ICTaskOrder4Scope.doc IV V. Rehabilitation of Runway 12-30 Iowa City Municipal Airport Iowa City, Iowa FAA Project No. 3-19-0047 - 19 CRS Services Consultant Cost Summary Direct Labor Cost Category Hours Rate/Hour Amount Senior Professional 48 $79.00 $3,792.00 Project Professional 144 $64.00 $9,216.00 Staff Professional 146 $37.00 $5,402.00 CADD Operator 40 $25.00 $1,000.00 Senior Technician 710 $29.50 $20,945.00 Technician 394 $22.00 $8,668.00 Project Support 110 $19.50 $2,145.00 $51,168.00 1592 Payroll Burden and Overhead Provisional Costs 165.00% $84,427.20 Direct Project Expenses Category Units Rate/Unit Amount Mileage 1800 0.550 990.00 Per Diem 0 30.00 0.00 Lodging 0 55.00 0.00 Copier 1200 0.06 72.00 Plan Copier 150 0.50 75.00 GPS 50 25.00 1,250.00 Geodimeter 60 12.50 750.00 Miscellaneous, Other 500.00 $3,637.00 Earth Tech Estimated Actual Costs $139,232.20 Rounded $139,200.00 Subcontract Expense Terracon. - Testing Services Estimated Actual Costs Fixed Fee Maximum Amount Payable $7,500.00 $146,700.00 $20,300.00 $167,000.00 Rehabilitation of Runway 12-30 Iowa City Municipal Airport Iowa City, Iowa FAA Project No. 3-19-0047 -19 CRS Services Staff Hour Estimate Item No. Description Senior Prof Project Prof Staff Prof CADD Operator Senior TechniclarTechniciar Project Support Totals 1 Assignment of Construction Manager 0 2 Assemble Construction Documents 4 8 8 20 3 Pre -Construction Conference 2 2 4 4 Construction Surveying 110 110 220 5 Shop Drawings and Submittals 12 16 1 12 40 6 Construction Observation Program 16 8 24 7 Construction Assistance 8 60 30 98 8 Pay Applications and Reimbursements 10 10 9 Labor and Payroll Reports 40 40 10 Testing of Materials 8 8 16 11 Site Visits 8 16 8 32 12 Change Orders 4 6 16 12 1 4 42 13 Pre -Paving Conference 8 4 4 16 14 Construction Observation 500 250 750 15 Non -Compliance Reporting 4 4 8 16 Contractor Modifications 4 4 8 17 Project Files 20 20 18 Daily Reports 60 30 90 19 Punch List 2 4 8 14 20 Final Review 2 4 8 14 21 Project Close-out 8 12 20 20 8 68 22 Record Drawings 4 8 20 32 23 Construction Administration 16 10 26 Total Construction Phase Services 48 144 146 40 1 710 394 110 1592 Prepared by: Michael Tharp, Operations Specialist, 1801 S. Riverside Dr, Iowa City IA 52246 319-350-5045 RESOLUTION NO. RESOLUTION ACCEPTING THE WORK FOR THE SOUTH AIRFIELD PLANNING STUDY WHEREAS, the Airport Commission previously entered into supplemental agreement No. 4 with Earth Tech (presently AECOM) for the south airfield planning study'; and WHEREAS, the study has been approved by the FAA and is forwarded as complete by AECOM. NOW, THEREFORE, BE IT RESOLVED BY THE IOWA CITY AIRPORT COMMISSION THAT: Said study is hereby accepted by the Iowa City Airport Commission. Passed and approved this CHAIRPERSON ATTEST: SECRETARY day of It was moved by and seconded by adopted, and upon roll call there were: Ayes Nays Approved by City Attorney's Office Absent Farri s Horan Gardinier Rettig Staley 2009. S - r 1--�S the Resolution be A UB� A va A Michael Tharp From: Edmonds, Terry D [terry-edmonds@uiowa.edu] Sent: Thursday, May 14, 2009 9:17 PM To: Michael Tharp Subject: Iowa City Airport Hangar 66 Michael; I am writing to seek approval to sub lease a portion of hangar 56 for a second aircraft. Mr. John Donovan has an ultralight aircraft that will fit in the back part of the hangar by the garage door. Hangar 56 is large but odd shaped and only a small airplane like an ultralight will fit as a second aircraft. This is a short term arrangement as Mr. Donovan will be removing the aircraft in the fall. Mr. Donovan would reimburse me for the rent portion of the hangar he uses. I believe this kind of arrangement is in alignment with airport policy of using hangar space as efficiently as possible for aircraft use. Please present this request to the Airport Commission. Terry Edmonds 4125 180th St NE Solon IA 52333 PH 319-541-3437 5/18/2009 Airport Maintenance Activity and Cost Report. Month of: April Date Maintenance Needed Action Taken Required Parts/Equipment Cost 04/03/09 Hangar #60 light bulbs out Bulbs Replaced 2 120w bulbs INV 04/05/09 Rwy 12/30 Bulb out Bulb Replaced 1 Runway bulb INV 04/10/09 Rwy 12/30 Bulb out Bulb Replaced 1 Runway bulb INV 04/12/09 Fluids low in Mowers Fluids Serviced Gear, hyd, and motor oil INV 04/13/09 Automated gates need serviced Chains greased Chain oil INV 04/14/09 Automated gates need serviced Gearboxes oiled Gear oil INV 04/16/09 Taxi way and parking area potholes Asphalt patched Asphalt N/A 04/16/09 Skid Steer has a Flat Tire placed on bead Ratchet Strap, Air compressor INV 04/08/09 Rwy 12/30 Bulb out Bulb Replaced 1 Runway bulb INV 04/20/09 0 turn mower, flat tire Tire patched 1 Tire patch kit INV 04/23/09 Rwy 12/30 Bulb out Bulb Replaced 1 Runway bulb INV 04/23/09 Mow Section 1 a 1a mowed — Toby 0 Turn N/A 04/24/09 Mow Section 1 b 1 b Mowed — Kirk 0 Turn N/A 04/24/09 Mow Section 3a 3a Mowed — Pat Bat -wing N/A 04/25/09 Mow Section 2 2 Mowed — Kirk 0 Turn N/A 04/26/09 0 Turn Mower Maint. Due Taken to streets NIA N/A 04/27/09 Skid Steer Maint. Due Taken to streets N/A N/A 04/28/09 Mow Section 3b 3b Mowed — Ehren Bat -wing N/A 04/28/09 Mow Section 4a,b,c 4a,b,c Mowed — Ehren Bat -wing NIA 04/28/09 Mow Section 4d,e,f 4d,e,f Mowed — Kirk Bat -wing N/A 04/28/09 Case Tractor & Bat -wing Maint. Due Taken to streets N/A N/A 04/28/09 Mow Section 1 1 Mowed — Pat 0 Turn N/A 04/29/09 Mow Section 5a,b 5a,b Mowed — Kirk Bat -wing NIA 04/30/09 Mow Section 5c 5c Mowed — Ehren Bat -wing N/A Amount to be reimbursed to Jet Air: $0.00 *Paid for or Purchased by Mike Tharp INV — in inventory Michael Tharp From: Mark W Vita [mvita@hertzcom] Sent: Thursday, May 14, 2009 10:03 AM To: Michael Tharp Cc: Jeffrey Homer Subject: RE: Hertz Lease at Iowa City Airport Follow Up Flag: Follow up Flag Status: Red Michael: In that event, please consider this e-mail an exercise of the option by Hertz. Thanks. Mark W. Vita Director, Properties & Concessions The Hertz Corporation 2170 S. Mannheim Rd. Des Plaines, I1. 60018 (847) 375-6511 -Phone (847) 759-7466 -FAX e-mail: mvita@hertz.com "Michael Tharp" <Michael-Tharp@iowa-city.org 05/14/2009 09:55 AM Mark, To "Mark W Vita" <mvita@hertz.com> cc "Jeffrey Horner" <JHorner@hertz.com> Subject RE: Hertz Lease at Iowa City Airport My apologies for the delayed response. The existing lease which expires July 31 2009, contains an extension option for hertz. If you choose to exercise the option the lease would extend to July 31, 2010. That notice should be sent as soon as possible (lease says 90 days advanced notice). Based on the language, it's my understanding that the terms would remain the same. Mike Michael Tharp, C.M. operations Specialist Iowa City Municipal Airport 1801 S. Riverside Dr Iowa City, IA 52246 Phone: (319) 356 5045 1 Fax: (319) 351 1290 -----Original Message ----- From: Mark W Vita [mailto:mvita@hertz.com] Sent: Friday, May 08, 2009 11:56 AM To: Michael Tharp Cc: Jeffrey Horner Subject: Hertz Lease at Iowa City Airport Michael: Please provide me with the terms for a one year extension to our current lease. If Hertz can stay on at the same rent as we currently pay I feel confident we will renew for another year. Thanks. Mark W. Vita Director, Properties & Concessions The Hertz Corporation 2170 S_ Mannheim Rd. Des Plaines, I1. 60018 (847) 375-6511 -Phone (847) 759-7466 -FAX e-mail: mvita@hertz.com This message (including attachments) may contain information that is privileged, confidential or protected from disclosure. If you are not the intended recipient, you are hereby notified that dissemination, disclosure, copying, distribution or use of this message or any information contained in it is strictly prohibited. If you have received this message in error, please immediately notify the sender by reply e-mail and delete this message from your computer. Although we have taken steps to ensure that this e-mail and attachments are free from any virus, we advise that in keeping with good computing practice the recipient should ensure they are actually virus free. --------------- This message (including attachments) may contain information that is privileged, confidential or protected from disclosure. If you are not the intended recipient, you are hereby notified that dissemination, disclosure, copying, distribution or use of this message or any information contained in it is strictly'prohibited. If you have received this message in error, please immediately notify the sender by reply e-mail and delete this message from your computer. Although we have taken steps to ensure that this e-mail and attachments are free from any virus, we advise that in keeping with good computing practice the recipient should ensure they are actually virus free. 2 Monthly Expense Report - April '09 Check Requests During Month Approved Check Requests 4/6/2009 AECOM (Runway 12-30 Econ Stim) 4/62009 Jet Air (Maintenance/Cleaning Contract) 4/62009 Jet Air (Maintenance Supplies Reimbursement) 4/62009 AECOM (Hangar H Rehab) 4/6/2009 AECOM (North T-Hangar Taxilanes) 4/6/2009 AECOM (Runway 7.25 Phase 2 Design) 4/62009 AECOM (Runway 7-25 Rehab) 4/6/2009 AECOM (Runway 7-25 Reconstruct) 4/6/2009 AECOM (Runway 7-25 Paving and Lighting) 4/27/2009 LL Pelling (Asphalt) 4/27/2009 PIP (business cards) 42712009 Metro Pavers (Runway 725 Paving and Lighting Estimate # 8) 4/27/2009 AECOM (Runway 725 phase 2 design) 4/2712009 AECOME (Runway 12/30 Reconstruction 4/272009 AECOM (Runway 7.25 Paving and Lighting) Capital Projects Pending Expenses Airport Operating Expenses City CIP Fund Expenses Total Expenses Construction Contracts South Economic Study -ALP Update South T-Hangar Taxilane Runway 7.25 Paving United Hangar Runway 7-26 Reconstruct and Alternate North T-Hangar Ta)ilane Rehab Total Pending Expenses Airport Funds CIP Funds $57,200.00 $5,000.00 $137.87 $956.62 $161.33 $104,580.00 $1,016.45 $1,817.58 $5,387.71 $129.65 $22.50 $70,835.28 $17,430.00 $57,200.00 $1,721.71 $5,137.87 $171,119.69 - $176,257.56 Project Bid Amount Paid During Month Paid During FiscalYear Paid To Date %Paid $15,000.00 $1,291.95 $13,726.07 91.5 $140,794.15 $98,935.64 $98,935.64 70.3 $1,347,586.13 $385,360.59 $1,341,228.72 99.5 $103,060.00 $94,562.69 $94,562.69 91.8 $1,449,848.70 $1,347,843.15 $1,347,843.15 93.0 $163,726.00 $153,843.43 $153,843.43 94.0 $0.00 $0.00 REVS: 05.18.09 12:37:00 Account ------------------------------------------ 7600 Airport CONTRIB & DONATIONS 362100 Contrib & Donations Page: 1 Iowa City General Ledger System FY 2009 Revenue Reporting For the period 04.01.09 to 04.30.09 Estimated YTD Period Revenue Revenue Revenue Remainder t ----------------------- ----------------------------------------------- ------ Total CONTRIB & DONATIONS OTHER MISC REVENUE 369100 Reimb of Expenses 369900 Miscellaneous Other Income Total OTHER RISC REVENUE INTEREST REVENUES 381100 Interest on Investments Total INTEREST REVENUES RENTS 382100 Land Rental 382200 Building/Room Rental Total RENTS ROYALTIES & COMMISSIONS 384200 Vending Machine Comm 384900 Other Commissions Total ROYALTIES & COMMISSIONS TRANSFERS TRANSFERS FROM GOVERNMENTAL ACTIVITIES 393120 General Levy Total TRANSFERS FROM GOVERNMENTAL ACTIVITIES Total TRANSFERS Total Airport ttt GRAND TOTAL tit 250.00 -250.00 ------------ ------------ ------------ 250.00 ------------ -250.00 ------ 28486.25 -28486.25 200.00 -200.00 ------------------------ ------------ 28686.25 ------------ -28686.25 ------ 1000.00 1477.21 308.33 -477.21 147.72 ------------ ------------ 1000.00 ------------ 1477.21 ------------ 308.33 -477.21 ------ 147.72 30700.00 32131.64 6955.93 -1431.64 104.66 226000.00 181234.33 16657.00 44765.67 80.19 ------------------------ 256700.00 ------------ 213365.97 --- 23612.93 --------- 43334.03 ------ 83.12 168.00 61.20 7.20 106.80 36.43 20000.00 15459.10 4540.90 77.30 ------------------------ 20168.00 ------------ 15520.30 ------------ 7.20 4647.70 ------ 76.96 130000.00 ----------------------- 108333.30 10833.33 21666.70 83.33 130000.00 ------------ ------------ 108333.30 ------ 10833.33 - ----- 21666.70 ------ 83.33 ------------ 130000.00 ------------ 108333.30 ------------ 10833.33 21666.70 ------ 83.33 ------------------------ 407868.00 ------------ ------------ 367633.03 ------------ 34761.79 40234.97 ------ 90.14 ------------ 407868.00 ------------ 367633.03 ------------ 34761.79 40234.97 ------ 90.14 E%PE: 05.18.09 12:36:29 Account -------------- 7600 Airport AIRPORT 560100 Airport Operations SALARIES & WAGES REGULAR SALARIES & WAGES 411000 Perm Full Time 412000 Perm Part Time 413000 Temporary Employees Total REGULAR SALARIES & WAGES OTHER WAGES 414100 Overtime Wages 414300 Term -Vacation Pay 414400 Term -Sick Leave 414500 Longevity Pay Total OTHER WAGES Page: 1 Iowa City General Ledger System FY 2009 Expense Reporting For the period 04.01.09 to 04.30.09 YTD Period Appropriated Expenditures Expenditures Encumbrance Balance t Used -------- ------------------------ ----------- ------------------------ ------ Total SALARIES & WAGES EMPLOYEE BENEFITS GROUP INSURANCE 421160 Health Insurance 421200 Dental Insurance 421300 Life Insurance 421400 Disability Insurance 421500 Unemployment Compensation Total GROUP INSURANCE SOCIAL SECURITY CONTRIBUTIONS 422100 FICA Total SOCIAL SECURITY CONTRIBUTIONS RETIREMENT CONTRIBUTIONS 423100 IPERS Total RETIREMENT CONTRIBUTIONS 38611.00 17790.38 20820.62 46.09 22601.00 22997.03 2501.52 -394.03 101.74 10000.00 5101.89 4898.11 51.02 ................... 71214.00 ............................................. 45889.30 2501.52 25324.70 64.44 1000.00 473.28 526.72 47.33 1251.50 -1251.50 1720.57 -1720.57 1050.00 437.50 612.50 41.67 ------------ ------------ 2050.00 -- 3882.85 --------- ----------- ------------ -1832,85 ------ 189.41 73264.00 49772.15 2501.52 23491.95 67.94 7280.00 4360.56 285.62 2919.44 59.90 490.00 270.32 17.70 219.68 55.17 198.00 139.18 .85 58.82 70.29 460.00 132.45 14.10 327.55 28.79 832.00 -832.00 .................................................................. 8428.00 5734.51 318.27 2693.49 68.04 5605.00 3110.56 183.63 1994.44 66.20 ------------ ------------ 5605.00 ------------ 3710.56 ------------ 183.63 ------------ 1894.44 ------ 66.20 4652.00 2762.93 158.84 1889.07 59.39 ................................................................. 4652.00 2762.93 158.84 1889.07 59.39 C EXPE: 05.18.09 12:36:29 Iowa City General Ledger System FY 2009 Expense Reporting For the period 04.01.09 to 04.30.09 YTD Period Account Appropriated Expenditures Expenditures ------------------------------------------------------ ----------------------------------- 7600 Airport (CONTINUED) AIRPORT (CONTINUED) 560100 Airport Operations (CONTINUED) EMPLOYEE BENEFITS (CONTINUED) OTHER EMPLOYER BENEFITS 424500 Monthly Cellular/PCS Allowance Total OTHER EMPLOYER BENEFITS Total EMPLOYEE BENEFITS PROFESSIONAL & TECHNICAL SERVICES PROFESSIONAL SRRVICRS 432020 Annual Audit 432060 Consultant Services 432070 Management Services Total PROFESSIONAL SERVICES DATA AND COMMUNICATION SERVICES 435056 Delivery Services 435060 Legal Publications Total DATA AND COMMUNICATION SRRVICRS TRAINING & EDUCATION 436030 Transportation 436050 Registration 436060 Lodging 436080 Meals Total TRAINING & EDUCATION INSURANCE 437010 Comp Liability Insurance 437020 Fire & Casualty Insurance 437030 Worker's Comp Insurance 437041 Bonding & Other Insurance 437042 Fidelity Bond 437200 Loss Reserve Payment 137.50 Page: 2 Encumbrance Balance t Used ------------------------ ------ 137.50 ----------------------- ------------ ------------ ------------ ------------ 137.50 ------------ -137.50 ------ 18685.00 ------------ ------------ 12345.50 660.74 ------------ 6339.50 ---- - 66.07 554.00 927.63 -373.63 167.44 5000.00 5000.00 9000.00 ------------ 4500.00 4500.00 50.00 ------------ 14554.00 ------------------------ 5427.63 ------------ 9126.37 ------ 37.29 36.98 -36.98 12.00 214.78 24.32 -202.78 1789.8 ------------ ------------ 12.00 ------------ ------------ 251.76 24.32 ------------ -239.76 ------ 2098.0 900.00 900.00 400.00 400.00 500.00 500.00 150.00 150.00 ------------------------------------------- ------------ ------ 1950.00 1950.00 8578.00 5000.00 3578.00 58.29 16893.00 9640.03 7252.97 57.07 73.00 90.00 -17.00 123.29 928.00 875.00 53.00 94.29 5000.00 5000.00 100.00 E%PE: 05.18.09 12:36:29 Account Iowa City General Ledger System FY 2009 Expense Reporting For the period 04.01.09 to 04.30.09 YTD Period Appropriated Expenditures Expenditures ----------------------------------------- - 7600 Airport (CONTINUED) AIRPORT (CONTINUED) 560100 Airport Operations (CONTINUED) PROFESSIONAL & TECHNICAL SERVICES (CONTINUED) INSURANCE (CONTINUED) Total INSURANCE UTILITY SERVICES 438010 Stormwater Utility Charges 438030 Electricity 438070 Heating Fuel/Gas 438080 Sewer Utility Charge 438090 Water Utility Charge 438100 Refuse Collection Charges 438110 Local Phone Service 439120 Long Distance Service 438130 Wireless Phone Service Total UTILITY SERVICES Total PROFESSIONAL & TECHNICAL SERVICES REPAIR & MAINTENANCE BUILDING REPAIR & 1AINTENANCE SERVICES 442010 Other Building Repair & Maintena 442020 Structure Repair & Maintenance S 442030 Heating Equipment Repair & Maint 442040 Cooling Equipment Repair & Maint 442060 Electrical & Plumbing Repair & M 442070 Bldg Pest Control Services Total BUILDING REPAIR & MAINTENANCE SERVICE EQUIPMENT REPAIR & MAINTENANCE SERVICES 443050 Radio Equipment Repair & Mainten 443090 Other Equipment Repair & Mainten ----------------------- 31472.00 20605.03 Page: 3 Encumbrance Balance o Used ------------- ----- 10866.97 65.47 7104.00 6619.60 591.96 484.40 93.19 15530.00 9531.84 78.57 5998.16 61.38 8680.00 7539.51 552.88 1140.49 86.86, 1475.00 1373.77 80.88 101.23 93.14 1321.00 1213.16 79.49 107.84 91.84 1200.00 965.00 99.00 235.00 80.42 264.00 676.92 -412.92 256.41 30.00 42.60 2.75 -12.60 142.00 -3.45 3.45 ----------------------- 35604.00 ----------- 27958.95 -•--------- 1485.53 ------------ 7645,05 - 78.53 ------------------------ 83592.00 ------------ 54243.37 ------------ 1509.85 ------------ 29348.63 ------ 64.89 7500.00 7966.36 -466.36 106.22 4000.00 4460.27 -460.27 111.51 500.00 1657.80 -1157.80 331.56 1959.00 449.23 1509.77 22.93 500.00 264.59 235.41 52.92 431.00 339.50 33.95 91.50 78.77 ----------------------- 14890.00 ------------ 15137.75 ------------ 33.95 ------------ -247.75 ------ 101.66 1600.00 813.00 1299.38 ------------ ------------ Total EQUIPMENT REPAIR & MAINTENANCE SERVIC 2413.00 1299.38 1600.00 -486.38 159.83 -- ------------------------ ------ 1113.62 53.85 E%PE: 05.18.09 12:36:29 Page: 4 Iowa City General Ledger System FY 2009 Expense Reporting For the period 04.01.09 to 04.30.09 YTD Period Account Appropriated Expenditures Expenditures Encumbrance Balance % Used 7600 Airport (CONTINUED) AIRPORT (CONTINUED) 560100 Airport Operations (CONTINUED) REPAIR & MAINTENANCE (CONTINUED) TECHNICAL SERVICES 445030 Nursery Service -Lawn and Plant C 445080 Snow and Ice Removal 445110 Testing Services 445140 Outside Printing 445230 Other Technical Services Total TECHNICAL SERVICES INTRA-DEPARTMENT SERVICES 446100 City Attorney Chargeback 446130 ITS-PC/Peripheral Support Charge 446140 ITS -Computer Replacement Chargeb 446160 ITS-Network/Internet Chargeback 446200 Photocopying Chargeback 446220 Phone Service Chargeback 446280 Telecom Move/Add/Change Chargeba 446300 Phone Equipment/Line Chargeback 446320 Mail Chargeback 446350 City Vehicle Replacement Chargeb 446360 City Vehicle Rental Chargeback 416370 Fuel Chargeback 446380 Vehicle Repair & Maintenance Cha Total INTRA-DEPARTMBNT SERVICES MISCELLANEOUS SERVICES & CHARGES 449055 Permitting Fees 449060 Dues & Memberships 449120 Equipment Rental 449140 Tools Rental 449360 Interest Expense Total MISCELLANEOUS SERVICES & CHARGES 300.00 300.00 21500.00 4500.00 -21500.00 1900.00 1205.10 694.90 63.43 139.00 457.60 -318.60 329.21 5121.00 5121.00 ------------ ------------ 7460.00 ------------ 23162.70 ------------ 4500.00 ------------ -15702.70 ----- 310.49 4036.00 1768.96 2267.04 43.83 400.00 400.00 100.00 633.00 527.80 52.78 105.20 83.38 360.00 300.00 30.00 60.00 83.33 455.00 286.11 24.84 168.86 62.89 612.00 481.40 48.14 130.60 78.66 121.00 77.00 -121.00 913.00 775.00 77.50 138.00 84.88 706.00 483.61 74.79 222.39 68.50 14176.00 11631.28 1179.58 2544.72 82.05 143.00 143.00 -143.00 4861.00 3834.47 50.26 1026.53 78.88 3516.00 5979.74 1841.03 -2463.74 170.07 ------------------------ 30668.00 ------------ 26732.40 ------------ 3598.92 -----_---- 3935.60 ------ 87.17 65.00 -65.00 525.00 625.00 -100.00 119.05 250.00 250.00 250.00 250.00 61294.00 38245.86 3824.59 23048.14 62.40 ------------ --- 62319.00 --------------------- 38935.86 ------------ 3824.59 ------------ 23383.14 ------ 62.48 EKPE: 05.18.09 12:36:29 Page: 5 Iowa City General Ledger System FY 2009 Expense Reporting For the period 04.01.09 to 04.30.09 YTD Period Account Appropriated Expenditures Expenditures Encumbrance Balance % Used ------------------------------------------------------------------------------------------------------------------- ------ 7600 Airport (CONTINUED) AIRPORT (CONTINUED) 560100 Airport Operations (CONTINUED) REPAIR & MAINTENANCE (CONTINUED) MISCELLANEOUS SERVICES & CHARGES (CONTINUED ----------- Total REPAIR & MAINTENANCE ------------ 117750.00 ------------ 105268.09 ------------ 11957.46 ------------ 12481.91 ------ 89.40 OTHER PURCHASED SERVICES (CHANGE TO OFFICE SU GENERAL SUPPLIES 452010 Office Supplies 859.00 533.82 325.18 62.14 452030 Minor Office Equipment/Furniture 642.00 642.00 452040 Sanitation & Industrial Supplies 1821.00 1500.00 500.00 321.00 ------------ 82.37 ------ ------------ Total GENERAL SUPPLIES ------------ 3322.00 ------------ 2033.82 ------------ 500.00 1288.18 61.22 BOOKS & PERIODICALS 454020 Subscriptions 1870.00 2036.00 -166.00 108.88 454040 Books, Magazines, Newpapers ------------ --------- ------- - -------- ------ Total BOOKS & PERIODICALS 1870.00 2036.00 -166.00 108.88 COMPUTER & PRINTING SUPPLIES 455110 Software 91.00 -91.00 455120 Misc Computer Hardware 500.00 500.00 ------ ------------ Total COMPUTER & PRINTING SUPPLIES ------------ 500.00 ------------ 91.00 ------------ ------------ 409.00 18.20 ------------ Total OTHER PURCHASED SERVICES (CHANGE TO OFF ------------ 5692.00 ------------ 4160.82 ------------ 500.00 ------------ 1531.1E ------ 73.10 OPERATING SUPPLIES AGRICULTURE SUPPLIES 461040 Other Agriculture Chemicals 364.00 137.87 137.87 226.13 37.88 ------------ Total AGRICULTURE SUPPLIES ------------ 364.00 ------------ 137.87 ------------ 137.87 ------------ 226.13 ------ 37.88 CHEMICAL & LAB SUPPLIES 463200 Other Chemicals & Supplies 199.98 -199.98 ------------ Total CHEMICAL & LAB SUPPLIES ------------ ------------ 199.98 ------------ ------------ -199.98 ------ E%PE: 05.18.09 12:36:29 Account --------------------------------------------- 7600 Airport (CONTINUED) AIRPORT (CONTINUED) 560100 Airport Operations (CONTINUED) OPERATING SUPPLIES (CONTINUED) FUELS & LUBRICANTS 465020 Gasoline 465030 Diesel Fuel 465060 Lubricants Page: 6 Iowa City General Ledger System FY 2009 Expense Reporting For the period 04.01.09 to 04.30.09 YTD Period Appropriated Expenditures Expenditures Encumbrance Balance 8 Used -------------------------------------------- ------------------------ ------ Total FUELS & LUBRICANTS REPAIR & MAINTENANCE SUPPLIES 466020 Lumber/Hardware 466030 Paint Supplies 466040 Plumbing Supplies 466050 electrical Supplies 466060 Other Construction Supplies 466070 Other Maintenance Supplies Total REPAIR & MAINTENANCE SUPPLIES EQUIPMENT REPAIR & MAINTENANCE SUPPLIES 467020 Equipment Repair & Maintenance S 467160 Other Vehicle Repair & Maintenan Total EQUIPMENT REPAIR & MAINTENANCE SUPPLI SURFACING MATERIALS 468020 Concrete 468036 Asphalt 468050 Sand Total SURFACING MATERIALS OTHER SUPPLIES & EQUIPMENT 469010 Traffic Control Improvement Supp 469190 Minor Equipment 469200 Tools 469210 First Aid/Safety Supplies 469260 Fire Bat & Refills 133.52 -133.52 373.88 -373.88 101.00 ------------ 101.00 ------------ 101.00 ------------------------ 507.40 ------------ -406.40 ------ 502.38 27.01 -27.01 23.00 23.00 6.00 6.00 349.00 19.53 329.47 5.60 838.00 838.00 589.00 ------------ ------------ 69.38 ------------ 519.62 11.78 1805.00 ------------ 115.92 ----------- 1689.08 ------ 6.42 650.00 650.00 73.00 ------------ ------------ 73.00 723.00 ------------------------ ------------ 723.00 ------ 153.00 153.00 600.00 600.00 54.00 ------------------------ 58.35 -4.35 108.06 807.00 ------------------------ 58.35 ------------ 748.65 ------ 7.23 106.00 330.00 -224.00 311.32 888.00 99.00 789.00 11.15 58.98 -58.99 57.00 57.00 111.00 78.50 32.50 70.72 EBPE: 05.18.09 12:36:29 Account Page: 7 Iowa City General Ledger System FY 2009 expense Reporting For the period 04.01.09 to 04.30.09 YTD Period Appropriated Expenditures Expenditures Encumbrance Balance 4 Used ---------------------- - -------------- ------------------------ ------------ ------------ ------ 7600 Airport (CONTINUED) AIRPORT (CONTINUED) 560100 Airport Operations (CONTINUED) OPERATING SUPPLIES (CONTINUED) OTHER SUPPLIES 6 EQUIPI4ENT (CONTINUED) 469320 Miscellaneous Supplies 469360 Food and Beverages Total OTHER SUPPLIES & EQUIPMENT Total OPERATING SUPPLIES IMPROVEMENTS OTHER THAN BUILDING IMPROVEMENTS OTHER THAN BUILDING (GREATER 473010 Contracted Improvements Total IMPROVEMENTS OTHER THAN BUILDING OTHER FINANCIAL USES 490150 Operating Subsidy 490160 Misc Transfers Out 490190 Interfund Loan Total OTHER FINANCIAL USES Total Airport Operations Total Airport 451.65 277.79 85.53 1162.00 1103.66 277.79 ------------------------------- ------------ 4962.00 2123.18 415.66 70390.00 8114.00 -------- ------------ ------------------------ 70390.00 8114.00 8359.00 6965.80 28486.25 56426.00 19354.20 ---------------------- 64785.00 -- 54806.25 ------------ ------------ 439120.00 290833.36 ------------------------ 439120.00 290833.36 -451.65 -85.53 58.34 94.98 2838.82 42.79 62276.00 11.53 -------- ------ 62276.00 11.53 696.58 1393.20 83.33 -28486.25 1935.42 37071.80 34.30 -------- ------------ 2632.00 ------------ 9978.75 ------ 84.60 -------- ------------ 20177.23 ------------ 148286.64 ------ 66.23 -------- ------------ 20177.23 ------------ 148286.64 ------ 66.23 E%PE: 05.18.09 12:36:29 Page: 8 Account 7600 Airport (CONTINUED) AIRPORT (CONTINUED) 560100 Airport Operations (CONTINUED) WEER FINANCIAL USES (CONTINUED) Iowa City General Ledger System FY 2009 Expense Reporting For the period 04.01.09 to 04.30.09 YTD Period Appropriated expenditures Expenditures Encumbrance -------- ------- - ---- ------------ ------------ ------------ Balance 4 Used ------------ ------------ ----------- ---------------------- ------ GRAND TOTAL t*+ 439120.00 290833.36 20111.23 148286.64 66.23 TRID: 05.18.09 12:37:46 Iowa City General Ledger System Revenues Detail FY 2009 Detail Reporting For the period 04.01.09 to 04.30.09 Page: 1 Trans Date Trans Type Report# Source Description Debit Credit ----------- 7600 Airport ---------- ------------ -------- ----------------------------------------------- ----------- 560100 Airport Operations 381100 Interest on Investments 04.30.09 Allocation 090512112822 Apr interest allocation 308.33 Total Interest on Investments ------------ ------------ 308.33 382100 Land Rental 04.09.09 Payment 090409093333 00012589 1-6\TOYOTA OF IOWA CITY\PAYMENT 6717.00 04.27.09 Misc Pymt 090504171849 70-14\ARMED FORCES RESRRVE\AIRPORT 238.93 Total Land Rental ------------ ------------ 6955.93 382200 Building/Room Rental 04.01.09 Payment 090401092008 00012628 1-8\BUTLER JOHN\APR 09\HANGAR #36 168.00 04.01.09 Payment 090401092008 00012628 1-8\BUTLER JOHN\APR 09\HANGAR #37 168.00 04.01.09 Payment 090401092008 00012632 1-12\SCHMEISBR RUSS\APR 09\HANGAR 204.00 04.01.09 Payment 090401092008 00012636 1-22\PATTSCRULL RICHARD\APR 09\HAN 229.00 04.01.09 Payment 090401092008 00012707 1-13\ADVANCED INFONBERING\PAYMENT 110.00 04.02.09 Payment 090402091920 00012630 1-18\N6226W INC\APR 09\HANGAR #49 173.00 04.02.09 Payment, 090402091920 00012658 1-11\ROOF KBITH\APR 09\HANGAR #32 512.00 04.06.09 Payment 090406095017 00012644 1-16\FARRIS GREG\APR 09\HANGAR #29 148.00 04.07.09 Payment 090407093106 00012599 1-2\FIELD HOWARD\APR 09\HANGAR #54 168.00 04.07.09 Payment 090407093106 00012624 1-34\YEAGBR DAN\APR 09\HANGAR 117 148.00 04.07.09 Payment 090407093106 00012624 1-34\YBAGER DAN\APR 09\HANGAR #26 148.00 04.07.09 Payment 090407093106 00012629 1-35\HARTWIG RANDY\APR 09\HANGAR # 168.00 04.07.09 Payment 090407093106 00012641 1-21\TEARSB DAVID\APR 09\HANGAR #4 168.00 04.07.09 Payment 090407093106 00012687 1-10\LUST GARY\APR 09\HANGAR 04 141.00 04,07.09 Payment 090407093106 00012687 1-10\LUST GARY\APR 09\HANGAR #21 148.00 04.00.09 Payment 090408091559 00012627 1.9\MASCARI RICK\APR 09\HANGAR #30 148.00 04.08.09 Payment 090408091559 00012662 1-4\OPERATOR PERFORMANCE LAB\APR 09 1330.00 04,08.09 Payment 090408091559 00012662 1-4\OPERATOR PERFORMANCE LAB\APR 09 168.00 04.09.09 Payment 090409093333 00012622 1-10\IOWA CITY FLYING CLUB\APR 09\H 168.00 04.09.09 Payment 090409093333 00012673 1-7\ALEXIS PARK INN 6 SUITES\APR 09 141.00 04.09.09 Payment 090409093333 00012678 1-3\WINGNUTS\APR 09\HANGAR #48 1008.00 04.10.09 Payment 090410095009 00012619 1.9\BULLERS JONATHAN\APR 09\HANGAR 141.00 04.10.09 Payment 090410095009 00012621 1.7\BULGARELLI ➢AVID\APR 09\HANGAR 148.00 TRID: 05.18.09 12:37:46 Iowa City General Ledger System Revenues Detail FY 2009 Detail Reporting For the period 04.01.09 to 04.30.09 Trans Date Trans Type Report& Source Description ----------- ----------------------------------------------------- 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) 382200 Building/Room Rental (CONTINUED) 04.10.09 Payment 090410095009 04.13.09 Payment 090413095444 04.14.09 Payment 090414093706 04.14.09 Payment 090414093706 04.14.09 Payment 090414093706 04.14.09 Payment 090414093706 04.14.09 Payment 090414093706 04.15.09 Payment 090415101710 04.15.09 Payment 090415101710 04.15.09 Payment 090415101710 04.15.09 Payment 090415101710 04,15.09 Payment 090115101710 04.15.09 Payment 090415101710 04.15.09 Payment 090415101710 04.17.09 Payment 090417131622 04.17.09 Payment 090417131622 04.17.09 Payment 090417131622 04.17.09 Payment 090417131622 04.17.09 Payment 090417131622 04.17.09 Payment 090417131622 04.17.09 Payment 090417131622 04.17.09 Payment 090417131622 04.17.09 Payment 090417131622 04,17.09 Payment 090417152155 04.17.09 Payment 090417152155 04.17.09 Payment 090417152155 04.21.09 Payment 090421101252 04.22.09 Payment 090422110428 04.27.09 Payment 090427092817 04,28.09 Payment 090428102839 04.28.09 Payment 090429102939 04.28.09 Payment 090428102839 00012634 1-10\OCEENFELS TRANSFER\APR 09\HANG 00012626 1-10\BALL DAN\APR 09\HANGAR #27 00012606 1-10\RUYLE JOHN\APR 09\HANGAR #33 OD012617 1-5\RANBY CHARLES\APR 09\HANGAR 91 00012642 1-12\ZUBROD ROY\APR 09\HANGAR #20 00012674 1-21\VRANEK DOUGLAS\APR 09\HANGAR 00012704 1-3\ROAR BRIAN\APR 09\HANGAR #19 00012387 1-17\FULL JHRRY\MAR 09\HANGAR #45 00012623 1-9\HOLLY FORREST\APR 09\HANGAR 91 00012637 1-1\NB IA PHYS THERPY ASSOC\APR 09\ 00012637 1-1\NE IA PHYS THERPY ASSOC\APR 09\ 00012663 1-15\WIECHERT RONALD\APR 09\HANGAR 00012671 1.11\FLANAGAN JAMBS\APR 09\HANGAR 00012708 1-18\YELDER ROY\APR 09\HANGAR 818 00012597 89-1\MILLER RICHARD\APR 09\HANGAR 00012633 89-4\FISHBAUGH JUSTIN\APR 09\RANGA 00012638 89-5\ALLBNDER PATRICR\APR 09\HANGA 00012645 89-6\EDMONDS TERRY\APR 09\HANGAR @ 00012654 89-10\SQUADRONS OP\APR 09\HANGAR 95 00012657 89-11\GURNBTT DON\APR 09\HANGAR $3 00012666 89-13\SINGLETARY ROBERT\APR 09\HAN 00012683 89.15\SWANSON NAOMI\APR 09\HANGAR 00012702 89-18\MEADS JAMBS N\APR 09\HANGAR 00012659 3.12\JBT AIR INC\APR 09\BUILDINGS D 00012665 2-11\STEARMAN\APR 09\BANGAR 147 00012677 3-12\JBT AIR\APR 09\HANGAR #60 00012667 1-25\SAPPHIRE VISTAS LLC\APR 09\HAN 00012640 1-29\CHALBLEY BEN\APB 09\HANGAR 11 00013088 2-10\POLASEI MICHABL\MAY 09\HANGAR 00013008 2-14\SCHMBISER RUSS\MAY 09\HANGAR 00013637 2.11\POWERS ROBBRT\MAY 09\HARGAR 00013045 2-6\DOWNES 6 ASSOCIATES\MAY 09\HANG Page: 2 Debit Credit 204.00 148.00 358.00 141.00 148.00 141.00 148.00 204.00 148.00 198.DO 174.00 192.00 168.00 148.00 168.00 174.00 168.00 313.00 168.00 310.00 141.00 141.00 148.00 3926.00 168.00 174.00 148.00 148.00 148.00 204.00 141.00 168.00 TRID: 05.18.09 12:37:46 Iowa City General Ledger System Revenues Detail FY 2009 Detail Reporting For the period 04.01.09 to 04.30.09 Page: 3 Trans Date Trans Type Report# Source Description Debit ----------------------------------------------- Credit ------------ ----------- 7600 Airport (CONTINUED) ---------- ------------ -------- 560100 Airport Operations (CONTINUED) 382200 Building/Boom Rental (CONTINUED) 04.28.09 Payment 090428102839 00013083 2-13\ADVANCED INFONEERING\PAYMBNT 110.00 04.28.09 Payment 090428110851 00012635 9-1\LACINA DAVB\APR 09\HANGAR #57 198.00 04.29.09 Payment 090429093312 00012985 2-10\BRUMLEY JAMBS\MAY 09\HANGAR # 148.00 04.29.09 Payment 090429093312 00013004 2-9\BUTLER JOHN\MAY 09\HANGAR #36 168.00 04.29.09 Payment 090429093312 00013004 2-9\BUTLER JOHN\MAY 09\HANGAR #37 168.00 04.29.09 Payment 090429093312 00013005 3-10\HARTNIG RANDY\MAY 09\HANGAR # 168.00 04.29.09 Payment 090429093312 00013006 2-7\N6226M INC\MAY 09\HANGAR #49 ------------ 168.00 ------------ Total Building/Room Rental 16657.00 384200 Vending Machine Comm 04.22.09 Misc Pymt 090422110433 1-39\AMERICAN BOTTLING\VENDING COMM ------------ 7.20 ------------ Total Vending Machine Comm 7.20 393120 General Levy 04.30.09 Journal 090422104025 007528 Airport Prop Tx Supp\Apr Budgeted T 10833.33 Total General Levy 10833.33 ------------ ------------ Total Airport Operations 34761.79 TRID: 05.18.09 12:37:46 Iowa City General Ledger System Revenues Detail FY 2009 Detail Reporting For the period 04.01.09 to 04.30.09 Page: 4 Trans Date Trans Type Report# Source Description Debit Credit ----------- ---------------------- ------------------------------------------------------- --------- 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) Total Airport 34761.79 TRID: 05.18.09 12:37:46 Trans Date Trans Type - ---------- ---------- 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) *** GRAND TOTAL "t Page: 5 Iowa City General Ledger System Revenues Detail FY 2009 Detail Reporting For the period 04.01.09 to 04.30.09 Report# Source Description Debit Credit --------- -------- ----------------------------------- --------------------- 34761.79 ------------------------ ------------------------ TRID: 05.18.09 12:37:36 Page: 1 Iowa City General Ledger System Expenditures Detail FY 2009 Detail Reporting For the period 04.01.09 to 04.30.09 Trans Date Trans Type Report# Source Description Debit Credit --------------------- 7600 Airport ------------ ----------------- -------------------------- ------------ ------------ 560100 Airport Operations 412000 Perm Part Time 04.10.09 Old Sys 090409010011 490303\CIC PAYROLL RECAP\PAYROLL 10 1359.72 04.24.09 Old Sys 090422010008 490535\CIC PAYROLL RECAP\PAYROLL 24 1141.80 Total Perm Part Time ----------- - ------------ 2501.52 421100 Health Insurance 04.08.09 Journal 090422104025 007526 APR HEALTH INSURANCE\CIC HEALTH INS 285.62 Total Health Insurance ------------ ------------ 285.62 421200 Dental Insurance 04.08.09 Journal 090422104025 007525 APR DENTAL INSURANCE\CIC DENTAL INS 17.70 Total Dental Insurance ------------ ------------ 17.70 421300 Life Insurance 04.01.09 Journal 090422104025 007527 APR LIFE INSURANCE\CIC LIFE INSURAN .85 Total Life Insurance ------------ ------------ .85 421400 Disability Insurance 04.08.09 New Vouch 090409030154 06721762 Check:643253\NADISON NATIONAL LIFE 14.10 Total Disability Insurance ------------ ------------ 14.10 422100 FICA 04.10.09 Old Sys 090408010011 4100599\FICA\CITY CONTRIBUTION 100.15 04.24.09 Old Sys 090422010008 4240599\FICA\CITY CONTRIBUTION 83.48 Total FICA ------------ ------------ 183.63 423100 IPERS 04.10.09 Old Sys 090408010011 4103599\IPERS\CITY CONTRIBUTION 86.34 04.24.09 Old Sys 090422010008 4243599\IPERS\CITY CONTRIBUTION 72.50 Total IPERS ------------ ------------ 158.84 TRID: 05.18.09 12:37:36 Page: 2 Iowa City General Ledger System Expenditures Detail FY 2009 Detail Reporting For the period 04.01.09 to 04.30.09 Trans Date Trans Type Report# Source Description Debit Credit ----------- ---------- ------------ ------------------------------------------- ------------ ------------ 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) 435060 Legal Publications 04.22.09 New Vouch 090423030128 06722678 Check:643767\IOWA CITY PRESS CITIZB 24.32 ------------ ------------ Total Legal Publications 24.32 138010 Stormwater Utility Charges 04.15.09 Journal 090422104025 007524 057-095-03\STORMWTR\4.15.09 Bill Da 591.96 ------------ ------------ Total Stormwater Utility Charges 591.96 439030 Electricity 04.22.09 New Vouch 090423030128 06722691 Check:643793\MIDAMBRICAN RNBRGY%R 78.57 Total Electricity 438070 Heating Fuel/Gas 04.22.09 New Vouch 04.22.09 New Vouch 04.22.09 New Vouch Total Heating Fuel/Gas 439080 Sewer Utility Charge 04,15.09 Journal 04.15.09 Journal 04.15.09 Journal 04.15.09 Journal Total Sewer Utility Charge 438090 Water Utility Charge 04.15.09 Journal 04.15.09 Journal 04.15.09 Journal 04.15.09 Journal 04.15.09 Journal ------------ 78.57 090423030128 06722692 Check:643793\MIDAMBRICAN ENERGY\GAS 10.00 090423030128 06722700 Check:643793\MIDAMBRICAN ENERGY\GAS 98.24 090423030128 06722742 Check:643794\MIDAMBRICAN ENERGY\GAS 444.64 552.88 090422104025 007524 057.120.00\SEWER\4.15.09 Bill Date 24.51 090422101025 007524 057-118-03\SBWBR\4.15.09 Bill Date 16.13 090422104025 007524 057-117-00\SBWBR\4.15.09 Bill Date 32.09 090422104025 007524 057-115.00\SBWBR\4.15.09 Bill Date 8.15 ------------ ------------ 80.88 090422104025 007524 057-120-00\WATBR\4.15.09 Bill Date 18.67 090422104025 007524 057-118-03\WATBR\4.15.09 Bill Date 12.39 090422104025 007524 057-117.00\WATER\4.15.09 Bill Date 24.35 090422104025 007524 057-115-00\WATBR\4.15.09 Bill Date 16.47 090422104025 007524 057-095-03\WATBR\4.15.09 Bill Date 7.61 Total Water Utility Charge 79.49 TRID: 05.18.09 12:37:36 Trans Date Trans Type Iowa City General Ledger System Expenditures Detail FY 2009 Detail Reporting For the period 04.01.09 to 04.30.09 Report@ Source Description Page: 3 Debit Credit 7600 Airport (CONTINUED( 560100 Airport Operations (CONTINUED) 438100 Refuse Collection Charges 04.14.09 New Vouch 090415030033 06722051 Check:643426\ALLIED WASTE SERVICES\ 74.00 04.14.09 New Vouch 090415030033 06722051 Check:643426\ALLIED WASTE SERVICES\ 25.00 Total Refuse Collection Charges 438120 Long Distance Service 04.01.09 Ph Lon Dst 090501113823 00004019 APR LONG DIST CHGBH Total Long Distance Service 442070 Bldg Pest Control Services D4.08.09 New Vouch 090409030154 06721799 Check:643227\BANEEYE PEST CONTROL I Total Bldg Peat Control Services 445080 Snow and Ice Removal 04.13.09 New Vouch 090414030008 06721940 Check:643497\JRT AIR INC IOW\SNOW R Total Snow and Ice Removal 446140 ITS -Computer Replacement Chargeback 04.01.09 IT Repl 090406135513 00004025 APR ITS RBPL CHGBCE Total ITS -Computer Replacement Chargeback 446160 ITS-Network/Internet Chargeback 04.01.09 IT Int/Nwk 090402160547 00004031 APR ITS NETW/INTRNET 99.00 2.75 ------------------- 2.75 33.95 ------------------- 33.95 4500.00 ------------ ------- 4500.00 52.78 ------------ ------- 52.78 30.00 ----------------- ------ Total ITS-Network/Internet Chargeback 30.00 446200 Photocopying Chargeback 04.30.09 Journal 090505172207 007587 MAR PHOTOCOPY\CIC CENTRAL SERVICE C 24.84 ------------ ------------ Total Photocopying Chargeback 24.84 446220 Phone Service Chargeback 04.30.09 Qwest Chrg 090501104348 00005032 Apr Qwest Charges 48.14 Total Phone Service Chargeback 48.14 TRID: 05.18.09 12:37:37 Trans Date Trans Type ----------- ---------- Page: 4 Iowa City General Ledger System Expenditures Detail FY 2009 Detail Reporting For the period 04.01.09 to 04.30.09 Report# Source Description Debit Credit --------- ------------------------------------------------------- --------- 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) 446280 Telecom Move/Add/Change Chargeback 04.30.09 IT Ann Sup 090504090205 00004024 APR PHONE SERV Total Telecom Move/Add/Change Chargeback 446300 Phone Equipment/Line Chargeback 04.01.09 Ph Equipmt 090501113823 00004018 APR PHON EQUIP CHGBB Total Phone Rquipment/Line Chargeback 446320 Mail Chargeback 04.01.09 Mail 090402105154 00400048 MAR POSTAL CHARGES Total Mail Chargeback 446350 City Vehicle Replacement Chargeback 04.30.09 EQ Repl 090504101048 00004006 APR REPLACEMENT COST Total City Vehicle Replacement Chargeback 446360 City Vehicle Rental Chargeback 04.30.09 EQ Oper 090504101048 00004007 APR OPERATION COST Total City Vehicle Rental Chargeback 446370 Fuel Chargeback 04.30.09 EQ Div 090504101048 00004008 APR DIVISION FUEL Total Fuel Chargeback 446380 Vehicle Repair & Maintenance Chargeback 04.30.09 EQ Div 090504101048 00004008 APR DIVISION SERVICE Total Vehicle Repair & Maintenance Chargeback 449360 Interest Expense 04.30.09 Journal 090422104025 007532 Corp Hangar Loan Int\Apr Interfund 04,30.09 Journal 090422104025 007532 Airprt SR Hangar Int\Apr Interfund 04.30.09 Journal 090422104025 007532 Airprt SW Hangar-Int\Apr Interfund 143.00 ------------ ------------ 143.00 50.26 ------------ ------------ 50.26 1841.03 ------------ ------------ 1841.03 1904.56 991.02 929.01 TRID: 05.18.09 12:37:37 Iowa City General Ledger System Expenditures Detail FY 2009 Detail Reporting For the period 04.01.09 to 04.30.09 Trans Date Trans Type Report# Source Description ----------- ---------- ------------ -------- ----------------------- 7600 Airport (CONTINUED( 560100 Airport Operations (CONTINUED( 449360 Interest Expense (CONTINUED( Total Interest Expense 452040 Sanitation & Industrial Supplies 04.13.09 New Vouch 090414030008 06721939 Check:643497\JET AIR INC IOW\CLEANI Total Sanitation & Industrial Supplies 461040 Other Agriculture Chemicals 04.13.09 New Vouch 090414030008 06721941 Check:643497\JET AIR INC IOW\AIRPOR Total Other Agriculture Chemicals 469320 Miscellaneous Supplies 04.21.09 P-Card 090506141731 15100411 MENARDS IOWA CITY\MICHAEL THARP 04.21.09 P-Card 090506141731 15100412 MHNARDS IOWA CITY\MICHAEL THARP 04.21.09 P-Card 090506141731 15100413 MENARDS IOWA CITY\MICHAEL THARP 04.21.09 P-Card 090506141731 15100414 MENARDS IOWA CITY\MICHARL THARP 04.21.09 P•Card 090506141731 15100415 LOWBS #01688+\MICHARL THARP Total Miscellaneous Supplies 490150 Operating Subsidy 04.30.09 Journal Total Operating Subsidy 490190 Interfund Loan 04.30.09 Journal 04.30.09 Journal 04.30.09 Journal Total Interfund Loan Total Airport Operations 090422104025 007528 Econ Dev Coord 10%\Apr Budgeted Tra 090422104025 007532 Corp Hangar Loan Prn\Apr Interfund 090422104025 007532 Airprt SH Hangar Prn\Apr Interfund 090422104025 007532 Airprt SW Hangar-Prn\Apr Interfund Page: 5 Debit Credit ------------ ------- ------------ ------------ 3824.59 ------------ 3824.59 500.00 ------------------------ 500.00 137.87 ------------------------ 137.87 149.35 74.28 19.08 21.70 13.38 ------------------------ 277.79 696.58 -------------------- 696.58 1095.44 338.98 501.00 -------- ------------ 1935.42 -------- ------------ 20177.23 TRID: 05.18.09 12:37:37 Iowa City General Ledger System Expenditures Detail FY 2009 Detail Reporting For the period 04.01.09 to 04.30.09 Page: 6 Trans Date Trans Type Report# Source Description Debit Credit ---------------------------------------------------------------------------- ------------ --------- 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) 490190 Interfund Loan (CONTINUED) ------------ ------------ Total Airport 20177.23 TRID: 05.18.09 12:37:37 Iowa City General Ledger System -Expenditures Detail FY 2009 Detail Reporting For the period 04.01.09 to 04.30.09 Trans Date Trans Type Report# Source ----------- ---------- ------------ ------- 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) 490190 Interfund Loan (CONTINUED) "' GRAND TOTAL ttt Page: 7 Description Debit Credit --------------------------- ------------ ------------ 20177.23 ------------------------ ------------------------