Loading...
HomeMy WebLinkAbout1979-06-26 Info PacketCIty of Iowa Ci j ' `G MEMORANDUM Date: June 21, 1979 To: City ouncil ° From: Neal Berlin, City Manager Re: Revised Transit Routes and Schedules These revised transit routes and schedules will be discussed at the informal Council determine if it consession of June 25. The Council will be asked to curs with the proposed changes under two circumstances: 1. If the "delayed" State funding becomes available. 2. If the State funding is not available and fares have to be increased to cover the additional cost. Both alternatives are discussed in detail, herein. In response to the demands being placed upon the transit system by expanding ridership, increasing traffic congestion, and general City growth, it is necessary to revise the network of bus routes if we are to continue providing the level of transit service the citizens of Iowa City have come to expect. Major route and schedule revisions have been needed for at least the past two (2) years, perhaps longer, but more pressing needs have always delayed their implementation. The crisis of this past winter has made us painfully aware that these revisions can wait no longer. Since early Spring, discussions have been ongoing within the Transit Division regarding possible route and schedule realignments. The following proposal represents a synthesis of ideas from the drivers, the staff, and the Transit Manager. It also has been reviewed by Keith FI hriese on. This plan d of the Johnson County Regional Planning Commissioes not Purport to solve all of the problems the transit system has encountered, or is likely to encounter, but it does attempt, within the constraints of equipment and budget limitations, to alleviate as many as possible. The new bus routes and schedules are designed to accomplish five objectives: a• To provide adequate time for each route so that drivers can provide safe and comfortable transportation on the posted schedules during normal driving conditions. b• To alleviate severe rush-hour overcrowding, so that persons are not left standing at the curb and hopefully not crowded in under "crush" conditions. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOIRES 1336 HAYWOOD D afi 4 FOSTER 0.D. OLLW O 9 ..n 90OWAY 1J ANION DI. _. . 6-I9 I ]J1J "`^ "- J <q_ = U W W T ARIURY D0. G M•7 ARIZONA AVE 11 PP�•'/'��j'� �� r go i` G M D ARTHUR ST ..GHJ H] GILIEAi .._...G� li Z CORALVI LLE * E IIIH SI GILBERTS GILIEAT ST. ... LEAI ST. INDUSTRIAL F0. K NDCNTER ¢ w i CENTER AVE ST.... H By PARK * BAKER ST. H•9 . GINTER AVE .. -H-A-7 IN 0 DR. oA�• c o C ..I7 16610,44 OR 5T. OS.6 0 v a r GLEASON DR .... ,51 CN Sr FAIRCHILD ST * w JC O Lr id .. RETARD ST. EJ BEDFORD C. A- E.1 E F•7 O U I ` -10 BEECH SL Gd4 GLENDALE RD _. E7 / <I AVE . DJ BELLA GLENDALE IEA. f t .,E•t Ee \ V RENT VISTA -2 BENTON C1 G) ON GLENN OR. AVE. T ' O\ _ AVE. G•65 GLENVIEW b 7 CLARK ST..... . -4 �•, PENTON T. PENTON 57. W -2.1 B 6 71H # GOULD 21ST AVE 1 + k SLACK SPRINGSCl. .E GRANADA CT.. C) GRAND AVE. Etl RkD 'C 7 N HAYWOOD D afi 4 FOSTER 0.D. OLLW O 9 ..n 90OWAY 1J ANION DI. _. . 6-I9 _ "`^ "- J <q_ = U w w OVA�l ARIURY D0. G M•7 ARIZONA AVE 11 GPAR r go MO D ARTHUR ST ..GHJ H] GILIEAi .._...G� <'Y;> CARVER ST. HALLEY ASH .. .. ASHLEY DRIVE H•7 GILBERTS GILIEAT ST. ... LEAI ST. F0. K NDCNTER ASHWOOD OR E9 GILMORE Ci . CENTER AVE ST.... ws�• D•E.$ BAKER ST. H•9 . GINTER AVE .. -H-A-7 T. 0 DR. IANGOI D0. .66' GLEASON AVE ..I7 5T. OS.6 UNGOA CI GLEASON DR .... I.7 < G -D ANTELT RD GD GLENDALE •... id .. RETARD ST. EJ BEDFORD C. GLENDALE CI GLENDALE CT.... E.1 E F•7 ,\ ` -10 BEECH SL Gd4 GLENDALE RD _. E7 / <I AVE . DJ BELLA GLENDALE IEA. f t .,E•t Ee \ V RENT VISTA -2 BENTON C1 G) ON GLENN OR. AVE. T ' O\ _ AVE. G•65 GLENVIEW b 7 CLARK ST..... . -4 �•, PENTON T. PENTON 57. W -2.1 GOIfVIFW AYE. GOVERNOR 51. N C� 6 0 D -2.3 7 GOULD 31 1 CLINTON ST SLACK SPRINGSCl. .E GRANADA CT.. C) GRAND AVE. Etl RkD 'C 7 N BLOOMINGTON ST EJ.6 GSb O F I* E IO EBY ST BOWLING GREEN y Y t Jl o w ELST N N.1 •�. 51. v IUDFORD D0. Q COLLEGE C7 COLLEGE CT PL. f•7 ..F•1 GRAND AVE.S. F] GRANT CT F.7 AVE �. ' < LO < BRIGHTON .N IRSTOL DR._11a y .I F 14 GRANT ST FG•7 BROADWAY 57 BROOKFIELD DR. 4 O oMAMAS U HAYWOOD D afi 4 FOSTER 0.D. OLLW O 9 ..n 90OWAY 1J CARRIAGE HILL C CLL ST G•IR '. GY 9- 'G '�� "`^ "- J <q_ U w w OVA�l 11 S GPAR go MO •• < <'Y;> CARVER ST. HALLEY &ART M LEAI ST. F0. K NDCNTER CENTER AVE ST.... ws�• D•E.$ - �` �' [ LVII� T. 0 DR. NE-ROO I\I` 1CHURCH 5T. OS.6 WEST ROSU4COMCLAPP 3 < Z Si.. .. RD M <I Cf.. .,E•t Ee HIGH r o it ox' J.. _ AVE. I CLARK ST..... . -4 �•, '� 0 31 ARI40TJ CLINTON ST -FG DGS GRANADA CT.. C) GRAND AVE. Etl 7 N O J CLOVER ST. 11 GRAND AVE. Ci. F-3 Jl o w ELST N Lp 51. v Q COLLEGE C7 COLLEGE CT PL. f•7 ..F•1 GRAND AVE.S. F] GRANT CT F.7 �. ' < LO < COLLEGE ST. F 14 GRANT ST FG•7 4 O oMAMAS U COLORADO AVE J. GRANTWOOD OR. 1.7 fjr, C TON ST. n� CARRIAGE HILL C CLL ST G•IR '. GY 9- 'G '�� "`^ "- J <q_ U w w OVA�l 11 S ',y .`. MO •• RIVE CARVER ST. G H•71 :D = q -G S. &ART W C7 J' F0. K NDCNTER CENTER AVE ST.... ws�• D•E.$ - �` �' [ LVII� T. 0 DR. NE-ROO I\I` 1CHURCH 5T. OS.6 WEST ROSU4COMCLAPP Si.. .. RD Cf.. .,E•t Ee HIGH •,,CLARK AVE. I CLARK ST..... . -4 �•, '� 0 �< CLINTON ST -FG DGS GRANADA CT.. C) GRAND AVE. Etl 7 N CLOVER ST. F G-9 GRAND AVE. Ci. F-3 o w ELST N Lp 51. Q COLLEGE C7 COLLEGE CT PL. f•7 ..F•1 GRAND AVE.S. F] GRANT CT F.7 �. ' < LO < COLLEGE ST. F 14 GRANT ST FG•7 4 O oMAMAS U COLORADO AVE J. GRANTWOOD OR. 1.7 fjr, C TON ST. COLUMBIA DR E.9 GRASLOW DR H•I Vp,x'�� 3 G CONCORD CA LONKLIN ST E9 G6 GREENWOOD DA. G.) GAEN MTN DR.. ED 1Ljj ... D RWI DA w KNOLL D0., U DOUGLAS ST CORNELL AVE F.v GR155EL PL.. 1 GS '$- - V "• ARBU O COTTON ... CORONWOO6 H d H6 GROVE ST. D-1 GUILDFORD Cl.... H•9 d Y: U U r V DO COURT ST....... F.1.9 HAFOI DA } = o . COURT Si. PL CIEIGHTON.ST f•7 E•1 '., 'E•Ig(O O < t MALLET St....Dd o IN Imo, o P Z { ' CCIRIESTVIEW • F e HARLOCKE Si G) HARRISON R • - E70 GESTWOOD Cl.E1 ST F-4.5 HASTINGS AVE 9 �' T i A' CROSBY LN. 67 HAWTHORN SHORING TSiF, cl DAVENPORT S7 E4.6 ..E4 HEATHEN CT [1• OANGO 1 CENTN DAVIS ST.... DARTMOUTH ST H 1.6 F•10 HEINZ RD .. J.Y HIGH P•] WCON DR ST. .E7 HAFQR OBERLIN ST, V r : C/, R EANESi Si. Y -wAl ERf DEARBORN ST DE FOREST EG.1 HIGHLAND AVE.H5.7 LUCAS N LUCAS ST S DG6 OLIVE CT. ....... OLIVE ST. (.).; G 6` EDf G] .. DENBIGH DR H 6 7 ..HJ HIGHLAND CT HIGHLAND DR "" H.S LUKIRK ST -,-G.6 ..N 6 . _, OLYMPIC CI. M S A r DEAWIN DIANAEWEY .G7 C•D-6 ..G.1•] HIGHWOOD 0.] LUSK MACIRIDE RD .E] G -I ORCHARD S7.. OTTO ST. IS E.7 S7 NS' . CT ,. DIANA CT.. H•S HILLSIDE DR.F9 HOLLYWOODB.MAGGAAD MADISON N ST EG1 G•6 .. PAGE ST. .'•,.,�GS6 PALMER j' DUNS G•S BLVD Nd d 7 MAGOWAN EJ Cl... PARK PLACE ..1.7 7} C D•7 ,O ..... DODGE•ST- CT G7 HOLT AVF '."" D'1 HOW AVE MAHASKA CT ..D G•) .... PARK AD G3J *' DODGE ST. N DODGE ST. S. D G -S GS. E-6 HOWELL Si ....G 6 MAHASKA OR MAIDEN LN GZ F HS PARK ST PA AKVIEW AVE, E... ,H 4 DOUGLAS CT G)J HUDSON AVE ...,. GJ HUTCHISON DE.] AllV MALA AVE ..... H.1 PARSONS Si t0 ...E•7 V. Thy DOUGLAS 51 DOVER Sf. G)•1 GH•9 INDUSTRIAL PK RD, MANOR DR .H.1 C.D•7 PEARL 57 FENFAO DR .F:6 .. DOWNEY H IOWA AVE ..E1.6 JACKSON AVE MAPLE Ed .... PENKRIOGE DA, H.7 RONALDS ST S6 /•� V DUIUpUE AD R DUIUOUE Si. N .CG.S .... 4.7 JEFFERSON 5f _ E67 MAPLEWOODLA MARCY S7 G910 PENN CIA PICKAAD S7. ... ...D .E9 ROOSEVELT ST G6 IOWA CI NIC P L At PORT 4 ' DUNLAP CT. 0 G•S ...9 JESSUP CIA ..-F•G•1 JOHNSON MARIETTA AVE ,H•6 . G•7 .. PINE ..E16 0.OWLAND CT H•7 AUNWELL ST. F.G 7 TOWER CT.._.. G•7 \ DURHAM R EASTWOOD DR .H•9 C DJ . . G -1S JUNIPER OR .. .GTO MARKET 51 MAYFIELD AD E/5 F.1 PIN ECREST RD. .. PLEASAN7 ST. G9 RUSSELL 00..._ E6 SAMUEL .1.7 TRACY LA. LU '\ KENWO DR .. G.1 KEOKUK ST. PLUM ST. . DR. Mi6 SAND LAKE D0. 56 TRIANGLE H4 TUDOR Il DR. f ) EB n, DINGALEDDRR H•9 7 C. ..._.•F'9 KEOKUK CT H•d MEADOWST FG9 POST R0, ., .. .. ED SAND RD H-1 5 TULANE AVE to ELIZABETH 57 E6' KEOKVK ST. H-6 MELROSE AYE _ p ), POTOMAC OR . . FI SANDUSKY AVE Id UNION PL. .F E-6 , ELLIS AVE. ._ EMERALDE AYE D E1 KESWICK DR ... G.1 MELROSEIClCT F 7 P0.RADIRIE DU CMEINI.� ... fEYONOURVAVE G 6 flfiON AVE. f...........M,; TO, G I.7 • KIMBALL AVE. . ..C.6 KIMBALL RD CID MELROSE PL MEMLER CT FS PRENTISS ST. .. PRINCETON Ci. 6 .. -4.5 SHAMROCK DR. E 1 ' UPIANDRAVE G•I0 VALLEY AVE.. ..F S . EJ i �O ERNESTL ST KINE70N . MIAMI DR .. ,.E•7 19 PRINCETON RD, SM ERIOAN AVE... G EJ VAN EUREN N ...G -S / i ESSEX ST .,, ESTHER Si H,I H•1 D AVE. KIRKWOOD AVE .GSE -S KIAKWOOD Cl.... G•6 MICHAEL MILLER AVE ...Gd G•) PROSPECT Pl. .. RADCLIFF _.E-1 SHRADER RD.. .. f.7 SOU7MGATE AVE. . F-9 VAN BUREN I,S VA SITY N H15 ST S .GS .. FJ •• . ESTAON ST KIRKWOOD CT ....G,d MONAOE ST .. AVE.. RAVEN CR CA. .F•9 SOUTH LAWN D0.. E.9.10 G 9 VE T17RA AVE ..5/ / EUCLID AVE, .G•I H-6 ; KNOLLWOOD DA 14 KOSER MONTROSE AVE ...G•7 EJ RAVEN SPRING ST .I0 SPRUCE ST. VILLA G E GREEN EVENS ST. .. E.6 AVE ...F•6] LAFATETTE 57 M•d MORNINGSIDE DR. ,F] RAYENCRESI OR. F.1.10 SPRUCE 57 , �.IS N-0 VILLAGE N•ID H. T FAIRCHILD ti FAIR MEADOWS Ede .... LAKESIDE DR J•B MOSS MOTs ST. ...04 REGAL LN ... .... ... ..J/ f1ANFORO AVF.. .. f•9 VIRGINIA RD DR 9d0 1.5.6 WHEAION RD. AST.. _, FA BLVD -' IAKEVIFW OR _.G'7 LAURA MT. VERNON CL . .E6 EB RENO Si 0.1CNARDS Si D.EJ SfEVENS fT. ANN DR. _ WAKE . G.E-10 WHITING..C.56C.6 FERNDALE RD FFRNDALE AD. , F 7 51 ....H-6 MT. LIN AVE DA.. MUILIN AVE F-1 ... RIDER Sl ...... ...E•L/ .E•7 ST CIEMENIS ST. ... 96 G6 WALES FOREST Si. AVE AVE, CT D SL F•7 GB G•7.1 FERSON AVE. F•9 D.E) LEAMEA Cf F•Z MUSCATINC D ] RIDGEUND AVE. RIDGE D Ed ST MAITMIAS ALLEY C•6 WALNUT .. .. WILLIAM $T. .......GMB E Sf.... G•S-6 WILLIS DR D•] F . GJ•1 . FLORENCE .._ G6 IpE ST Df) LEXINGTON AVF' EGd-0 AD..._. AIOGE SL LCdS ST ED ST G7 WARWICK .. .. ST. .. CIR ...HA WILSON ST F7 MSI. .. _ FOREST GLEN . is AVE..D.E.) VE MYRTLE AVE , _G.l4 .-....,.. RIDGEVIEW A....G N6 50MM17 S7 I SUMMIT STN ".FGS WASHINGTON _... PK WILLOW ST .. G9 I ST. _ .,G•7.1 . H•7.1 RI FOSTER RD...._. FRANKLIN . Id LIND NI Cf. ","R7 NEVADA AVE NEWTON - JJ MIDGEWAY OR, ......E.1 SUNSET Si '.[•D 6 AD, F. ...... .F 19 WINDSOR CT ..,. C•1 J Si..... H 1 . ......GH•7 FRIENDLY AYE. N 6-0 LINDEN RD ... F•9 AD NORMANDY OR .. E1.1 C.DI RIDGEWOOD N. RIVER .. 1.5 SWEET IRIAA AVE. f•0 WASHINGTON .E•1 IST AVE'.EEHJ 5TON , F19 F. WjNSTON . NDSIIII ST, f G•1.10 LINN ST. DGS LINEN ST S G•H-S NORTH SL •. D-7 fT _...,D•E)/ RIVERSIDE CT. SYCAMORE ST F 4 UFT SPEEDWAY 73 0.0Ei DS ,,,.-" .Ed IST ST DR. .H / WOODLAWN ......,....E -t ]ND AVE .G3 FN 1 HI IN iRONI Si. .. GARDEN SL p,l ... LOWEE H04WO DCI OAKCAFST F.9 .... RIVERSIDE CT. 5. ..... ....G/ iALWRN CI C WAYNE G•7 HT1 WOOORIDGE AVE E•7 TEND 57. H5 . GEORGE F,7 F .Nd LOWELL 57 .. ,F7 OAKLAND AVE ... G•7 RIVERfIOE OR. ST WEBSTER 1•f WEEBER ST. ST. _..G S WOODSIDE DR..... G•) )RD AVE..F. I H S .. 6 EO AGElCN'N IS, EI LOWER MUSCATINE OAKUWN AVE F.G 6 1.6 AIVE0.SIDE DR. N 00 AT AD... 0 .4 TAYLOR DROD .. -1'E WELLESLEY G•7 WOODSIOE Pl..._ ..G•I 7A0 57. WAY WOOLF AYE. El 4TH AVE G•H.1 to IN Dt.......,....G•1 •• -G 1.7-0 (OWER W BRANCH OAKNOLL DA .. .. G-7 ROCHESTER AYE.. Efil TEG DRQ 67 WESTERN RO .F•9 _ .D .L/ WRIGHT G S STH AVE _.. F•H•7 A0. ......E 910 OAK PARK CT OAKAIDGE AVF. .FG•) ROCHESTER CT.... ,E7 iEMPIIN AD .H•I WESTGATE CI .G.I WYLDE GREEN dT1H1 AVE G-7 .... ,. D./ ROCKY SMOKE DA 6: - 7EARACE RD F.G 4 WEESiMINIf 1 ER ST F.1 AVE..CT. .'EG•7 ... YEWELL SL ... .GMT 7TH 2 g 4 JVTIM IVnvl iUL riG CEDAR RAPIDS -DES NOINCS **JK 0 "'is 10 JP J(iI** ****R}✓f 0 T F9.10 T G GREEN fs*0 /E' LAKE OA �'R� JILJ OIT59 *OFALVILLEAL 1 CORALVILLE STANFORD AVE,. SSE F.9 W I;1I T HBS6 W U T • F'7 D' LAUREL fE LEANER Cf E iH 57 s x CORALVILLE * II a N Bf INDUSTRIAL PARK S� < HA CCd D ST. SDA C i i I r k` , FRryF//EE hC � v D C R N A7 FAIRCHILD ST ?c W W < > ... F•7 WILLIAM ST. MIIA D . E-) IND Pg. DR * w Jr OVTQc G V Pi D.EJ MYRTLE AVE ,. E G-6 ,1 ...1 RIDGE Si RIDGEWAY < IND 1. G-9 -3 Df DA G•9 { DOD .G-7 y LLLL,f)•F .GS6 WILLIS DR. H9 WILSON ST. m G k - H67 x - "'F;9 NEVADA R NORMAN 7TN H 6.7 p HIST AVE • - t PK, WILLOW S7. P .9 WINDSOR IW I E. li F. 7 GJ•ID ARSURYSDR." "1 ARIZONA AVE ,. ARTHUR ST. .. ._... ASH .................... ASHLEY DRIVE ._. ASHWOOD DR.... TAKER ST. ._,_.... IA N CRI OA.._._. (ANGOR CI... 9ARTELT AD..,_. NYAND_ST__....... nSTwn al G 5.6 LAKESIDE DA "'is MOSS ", D./ T F9.10 T G GREEN VILLAGE ......... /E' LAKE OA �'R� MOTT Sf. .. E6 RENO fL G•7 i STANFORD AVE,. SSE F.9 R. HBS6 W U T • F'7 D' LAUREL fE LEANER Cf / "'F6 N AYE H•z r1 DA.FC•7 tI ER D4 RIDERRAS 05 . �,.�. E1.1 ANN DR'; - CLEMENSAIlEYC6 p�S WAKE FOREST AVE. FIR WHITING NI INGNAVE., CCd D ST. > O K iTT-777-H .. MUSCATINE AVE. RIDGELAND AVE. RIDGE RD DES ,9 C15 ST. SiREI WARES ST. ..... ALNUf SL ... F•7 WILLIAM ST. MIIA D . E-) IND Pg. DR I 1S AVE LINCOLN AVk D.EJ MYRTLE AVE ,. E G-6 ,1 ...1 RIDGE Si RIDGEWAY -.H 6 IND 1. G-9 -3 Df DA G•9 { DOD .G-7 y LLLL,f)•F .GS6 WILLIS DR. H9 WILSON ST. .. D•f F fi. _...F7 H $l. - H67 LINDEN RD - "'F;9 NEVADA R NORMAN DA H 6.7 p G I SUMMIT ST N SUNSET ST ..F.G6 PK, WILLOW S7. P .9 WINDSOR .. G•9 I ST. E. li F. 7 GJ•ID LINN Sf LVE. �. EJ'1 1/ C DI • .E7 IS SW EC7 BRIAR AV E., i G7 F.9 WASHINF+ TON PL CT ) F WIN Df OR DR. YPARUM _ ON St. 4.6� w_ _fF.GS NORTH S7. un.w...... _. D J 0.1VEIILDE [� DE•71 SYCAMORE ... SI. . H7 G - _ F19 W'INiION DR. Ed ISI Si 0"'a 9 { NA AVE -.-IJ I 1iE. -. ... S IJ iu pROSR vU• - .-G IS► .!t 6 F f.v E AVE... E DR C40 GP w "� ,. COUNlY RO E HILLST J. G:; G H,M _ s :• U iVE" rN G•IABR)��!!-_..' a o C) IL r f. .D E6 ' MAT E i. OC RD•9) ST. D.S:6 WEST ROSE e U C LVI)Y' G D" DR. RIAHER I. .�._... ....E.6 HIGH RD. SPE'. : CO ....,. .. F G.6 GRANADA CL G.GRAND AVE. C.tS f.7-/ 3 w 0 V . T W CT. I. . L S__... Cf. F- .F.GA GRAND AVE. S. ... F•7 GRAND AVE. S. , F.) N w ti" w ELST N R: w S T. PL.... ST. i0 AVE. F 7 GRANT Cf, ... F.1.7 GRANT ST. J. ........FJ . F. F•7 s" < ID - 2 GRANTWOOD DR.. - I DR. .. ,E•v GRASLOW OR.. 1.7 p1 lUl ul oMAHAS 'L C G TON ST. CR. I Si 'DR.. ...H'I I �hAO SLS... i AVE.... ....G6 GRIN -F •9 GRISSEL PL.. R C.. D WI A m OAKNOLL DR, 0d, H6 GROVE ST GUILDFORD Cf. D1 VE ARIU v 1. . PL....... ,. FH.v HAFOA CA.._... _F7 HAFOA DR. H.9 ". N.I i x 0 U V O IN. ST...... .9 HALLEY ST. _..........PI HARRISON el GRA % 0 SL0 LA PE _ /._.�... F1 ST. ... HARRISON G,7 IN a 0 ND CL .. ST..._... . I,1 HASTINGS AVE.... F.1•S S'. I- R, O , eI x CFO IT ST''l • i'1.6 HAWTHORN HEATHER Ci .9 ,,,, E.7 " Ci i IM ST.F•10 I'6 HEINZ RD HIGH .E•1 -.J'9 LUCON DA R ..fJN OSI 0.LIN S7 a^NG l ST, F GJ H67 HIGHLAND AVE P'7 H 57 LUCAS Si, N LUCAS Si. S D•G.6 OLIVE CT E'16' Cl.OR DA. .H./ HIGHLAND Cf HIGHLAND DR.. HS I.7 lUK1AK Si. ....Gd .. H.6 OLIVE ST OLYMPIC CI ggpp EDI AL R. _.G .0 D I HIGMWOOD .. HILLSIDE T RUSK ..... MACIRIDE RD .- EJ G.I ORCHARD Sf OTTO ST .... q.S G 1 ...... .. H•S - _ G3 IIYD F E'9 MADISON N MAGGAAD ST FG-/ Gi PAGE ST ,, 'E -I .. ,G.S 6 Q, - E7 HOLT VR H,1,6, 7 D'1 MAGOWAN . DE1 PARK CI PARK PLACE �� Ty 0R Ci N. C•7 HOTZ AVE D.G-S HOWELL SI. - G;6 MAHASKA CT MAHASKA DR .. G•7 G7 PARK RD PARK ST .0 p ] pv0 CT. ' G ] / HUDSON AYE, G•] MAIDEN AVE... F�H•I VE. Si, G, ,/ INDUSTRIAL TAYEL PK AD.. D.EI MALL OR. NO PARSONS Si PEAR ST � E 7 AO . " GH.9 IOWA JACKSON AYE J-9 E46 MANOR DA MAPLE .. CD) PENFRO DR PENKIN.DR. .. F.6 >OWA�� ID.. 7, N C6J .. D G.S JEFFERSON ST G•7 MAPIEWOOD I.A.G9,10 PENN .N.1 RONALDS ST, 051 I CI F-0 JOHNS N ..f•G'S JOHNSON 6 1 MARCY SL MARIETTA AVE . H•6 G•7 PINEARD Sf. .. E•9 H 6 ROOSEVELT ST, ROWLAND Cf. G6 T H F ' N, . JUNIPER DR C..G.9 p.G.S GIO MARKET ST. .. E.4 5 PINECRESI RD, ....H-7 , G.9 RUNDELL ST. RUSSELL DR, F.'E'l 7 TOWER CT.... G 7 OA KENWO DER . KEN WOOD DA. ,G.I MdEAN Sf4D ,f.1 D:) / PLEASANT ST. PLUM E 6 SAMUEL DR.. ,17 TRACY I.A. 1 Fd Si, -H•} f.9 MEADOW ST " FF Si 1156 SAND LAKE DR. .1.6 H�1 PL. TUDOR DR. , E-6 KESWIC 57. - D KIMBALL H;6 MELROSE AVE.. MELROSE CI 7.6 F] POTOMAC "DR E:1 1 SAND RD. . H-I•S E 1 TULANE AVE. .. E-10 Avf. F I DA, . „ . KIMBALL AVE, .G. G6 ._ F. PRAIRIE DU CHEIN SCOTT ALVpAVE. 6 UNION EI ' ' G-1-2 G I KILIIALL RD. C KIRK ON GREEN 0.5 6 MELROSE PLT MEMLEA CT _ EJ pRED. SL A^ 6 F,45 SEYMOUR AVE. SHAMROCK DA. ..F1 G 6 RD. AVE... F./ _,. . H'I KIRKWOOD AVE KIRK H.7 G 56 MICHAEL 11 PRINCETON CL PRINCETON AD. E.1 FB SMEAIOAN AVE. SHERI D0. G-10UPLAND G VALLEY AVE..,. E/ AN BUREN S7 N D-G.I . - H•9 WOOD CL ... G•1 RNOLLWOOD TDR. G.6 I MILLER AVE. G;1 PROSPECT Pl.. AVE. F.7 RD, SOUTHGAIE AVE. F, 19 VAN BUREN ST S G•S • H'6 KOSEA MONROE ST. ... MONTROSE AYE G•7 RADCLIFF ' F9 -.0.9.10 SOUTH LAWN SPRING SL DR. G9 VENSI❑RAHAVE ".1.1 ,RVE _ E6 LAFAYEf1E ST' p,1, ) MORNINGTIDE DR F7 F7 RAVEN ST.CA R -F1 SPRUCE Cf G 7 VILLAGE GREEN L HAYWOOD I FOSTER RD. jK CT. " IYATLE AVE RIVERSI N S.1 ERNEST 4S E/'E LAKESIDE DA "'is MOSS ", D./ REAGALCRHfT DR. F9.10 SPRUCE S7 VILLAGE ......... /E' LAKE OA �'R� MOTT Sf. .. E6 RENO fL J1 STANFORD AVE,. SSE F.9 R. HBS6 W U T • F'7 D' LAUREL fE LEANER Cf / "'F6 MT VERNON OR MULLIN AVE ER D4 RIDERRAS 05 . �,.�. E1.1 ANN DR'; - CLEMENSAIlEYC6 p�S WAKE FOREST AVE. FIR WHITING NI INGNAVE., CCd D ST. D,E.t ] G:6 LEE SI LIXE L KIN(iTON .. MUSCATINE AVE. RIDGELAND AVE. RIDGE RD DES ,9 C15 ST. SiREI WARES ST. ..... ALNUf SL ... F•7 WILLIAM ST. C*. G H1 E ST I 1S AVE LINCOLN AVk D.EJ MYRTLE AVE ,. E G-6 ,1 ...1 RIDGE Si RIDGEWAY -.H 6 Si - SUMMIT ST .G-7 WARWICK LIR. WASHINGTON .GS6 WILLIS DR. H9 WILSON ST. .. D•f F fi. _...F7 H $l. - H67 LINDEN RD - "'F;9 NEVADA R NORMAN AVE. RIDGE WAY OR, .... G I SUMMIT ST N SUNSET ST ..F.G6 PK, WILLOW S7. P .9 WINDSOR .. G•9 I ST. E. li F. 7 GJ•ID LINN Sf 9 NORMANDY DR. Y EJ'1 1/ C DI RIDGEWOOD LA. RIVER SL .E7 IS SW EC7 BRIAR AV E., i G7 F.9 WASHINF+ TON PL CT ) F WIN Df OR DR. E•7 I E7 IST A' ___ E6 LINII fi S _GHS _fF.GS NORTH S7. un.w...... _. D J 0.1VEIILDE [� DE•71 SYCAMORE ... SI. . H7 WASHINGTON S7 WAFcou.,... _ F19 W'INiION DR. Ed ISI Si SKIT W. DUBUpDE Bi �I 8 '1 EH AVE a f,L U f �rki. HALLEY 3 N �a E fI F•7 G•7 G1 G 77 GIA G•hl H•70 N• rE." FGS .� /I 1 OEJ �fM At M0 » J IF r RZR io dUMLWul CORALVILLE RIFW < < r N r\ o n CORALVILLE * E LITH ST I EST INDUSTRIAL yA PARK F7 't I wI or W e Jf p I a F * Sr FAIRCHILD ST # C{ aTC UO }1ST AVE - • - w HFF,,.0p OIERLIN ST NSAVE. 11.7 144 IOWA CITY F' STNEFT G4 EGA .. _.CINY ALPINE CT. . __._...G•10 FI: At DA._...._ ...GI .A AMBER LN. _........ JO CALVIN AVE. .,. AVE AMERICAN LEGION E9.1 , IE ... AAINC.. i ST. _G PAGE ST.._.... ARBOR CIA. ... .......10 6 C44P... U! ARBOR DA. ._... GIO \ ABILITY GA.GHQ ' ARIZONA AVE.E. _.. Id , F-9 ARTHUR Sl. .... G H.9 GILBERT ASM. . _.. _. HQ GIUEE RI ASHLEY DRIVE ._ _N1 ISILI ERT St. ASHwOOD OA. .. .. EJ GILMORE Ci......_._ BAKER ST...... - H�9 GINTER AVE. IANCWFi DR. .._.. 16 .......N GLASON AVf... BANGOR Cl. .......N.} GLEASON DR....... BARTELT AD. _... .GG GLENCAEST..._... BAYARD ST.... _.. Ed GLENDALE Cl. �. BEDFORD Cr. _..... H,1 ... GLENDALE Cr. . € BEECH ST. ........_..GIO _ GLENDALE RD, IELDON AVE. ..,.._0.4 GLENDALE TER. TELA VISTA .. .__D.5 GLENN OA. BENTON Ci. ..... .. GQ GLENVIEW AVE. +Y RENTON ST.. ... G4.5 BENTON ST. %V G.}.9 GOLFVIEW AVE. 1 .... IACKHAWK Si. DQ'1 GOVEANOI Si. N. C 1 GOULD IACR $/AINGS Cl. E} ILOOMING}ON Si. E-1.6 GRAND AVE. I BOWERY Si. .... _GS.6 CLOVFA SL BOWLING GREEN GRAND AVE. Ci. IIAOrOBD DR........ H.I PI BU 6n nrt SURN. St - w HFF,,.0p OIERLIN ST NSAVE. 11.7 144 S. F' 9YINGION RD.... CALIFOR N.. G4 EGA KOSEA AVE FI: CALVIN AVE. I .A AFAYETTE Sl' CALVIN AVE. .,. AVE G _G -I --"'" E9.1 CALVIN CL .... ... TOM'S PAGE ST.._.... CAROLINE AVE. C44P... U! AVE. IALAURA CARRIAGE OR.. CARRIAGE HILL. C•P G•]! RD. , F-9 CA4AOL ST. G'Y! IE, D.EI GJ CAAVEA ST. GILP EN AILINCOLN CEDAR ._..._....ErV ! I,f F6 A CENTER AVE.... G•1�0.0 l0j0N T..10 FI CENTER ST. .DEF WEST 141 RO►LUr %VE. RC CHURCH S. curl St....... ..,056 FL HIGH RD. Sr. FG CLARK Cf.. FI H•S FFA CALK ST... FGI GAANADA Cf. C L C%NTON Si.. DGS GRAND AVE. I HSI HSI CLOVFA SL _. RG -9 GRAND AVE. Ci. G COLLEGE CT. ... F) GRAND AVE S.... G4 /t. I / 166 SEYMOUR AVE. F) COLLEGE ST. F CABANA SL• F. PRINCETON CL COLORADO AVE. Jdl GRANTWOOD DA... C St, D S1 COLUMBIA 04. .E9 GRASLOW DR. GI CONCORD CA. f9 GREENWOOD 04. 4AvfN CR. CORNELLNKLIN IT... .G6 GREN MTN. DA. F.S SPRUCE Ci. CO AVE....... FIT GAISSfL /L.. A. .PI COTTON , .. CORONw006 H S H.6 G40YE ST... GUILDFORD Cl... RENO SI COURT ST. .. V49 HAFOA CI.. ... E ] 1 it. ANN DA, COURT ST. PL........ _FQ ... HAFOR 04, D 1 CREIGHTON ST... If HAIIET Si. RIDGE ii. CRESCENT .. H.6 HARLOCKE ST. G I SUMMIT ST. N C Q[STVIEIVIEW ..,�... _ .PIP HARRISON SI..... F E}.9 CIESIWOOD CI... E.1 HASTINGS AVE.... AIVEA Si ..PLI.9 CROSBY LN ..I.1 HAWTHORN f9 TAFT SPEEDWAY,.( DAVENPORT ST E46 . HEATHER Cf. GQ DAVIS S1.. It HEINZ AD - H DARTMOUTH ART O UTT SIST 6I HIGH -' GO 1EETEAS CI, G:1 F HIGHLAN HI DE FOREST Hit HIGH AND Cf.E AOC[Y SHO EI OR. D EI TERRACE AIN D -"F: DENBIGH DR, H4 HIGHLAND DR. G. DERWIN DR. GQ HIGHWOOD DEWEY SL.. C -0I HILLSIDE OR. DIANA CT....... . H -S HOLLYWOOD DIANA ST. GS DILL ST. .. EQ HOLY AVK, Hdj DODGE ST. Cf. C•1 HOTZ AVE. DOOGF ST. .-OGS HOWELL IF DOWGIEST. CT ...G E.. S G14 H,T,M60N DG DOY[A ST. S'.. INDUSTRIAL PK. AD.E _GNI 0 Ht JACKSON AVE G OUIVpUE AD.... Cda , JEFFERSON Si. E' OUIVDUE Si. N.. D -GS JESSUP CIA. FC F1 JOHNSON ST. N. D G EAItM004I119 DA.. CPS KAINLIN OR. G EASIWOOD DA..... G1 KfNw000 III I i.TES T.IRKWOOD KNOILWOOD IDR. HFF,,.0p OIERLIN ST .w:E TDF GI OLIVE Cf. 1, IE. HH KOSEA AVE FI: OLYMPIC Cl ES AFAYETTE Sl' H I GI E9.1 LAKESIDE DR. JI TOM'S PAGE ST.._.... LAKEVIEW OR .. Gd AVE. IALAURA DR. ...RI RD. , F-9 LAUREL SL REAMER Ci. HI FI IE, D.EI GJ LIE S1 IEKINGTONAVE.. D.E1 DPN EN AILINCOLN AVL E1 F6 CDT LINDEN CT .. FI GN4 LINDEN AD ,.,F-1 F.9 %VE. Hit LINN S1 _.DGS 'G Sr. FG -0F I IINN Sr. S H•S FFA S. G1 RUSSELL DR... L F4 LOWELL Si.. iJ HSI HSI FGI LOWOt MUSCATINE A.CIA, EI AD. _.. GI II -..... G4 IOpER W. BRANCH R0. 166 SEYMOUR AVE. F) 610 J U CT i.TES Fl HFF,,.0p OIERLIN ST .w:E TDF DG6 OLIVE Cf. pp G6 OLIVE ST 6 4 EDI H6 OLYMPIC Cl ... ...H S E.1 ORCHARD Si. GI G -I OTTO ST. El EG -9 PAGE ST.._.... ..._.G5t G6 D -E) PALMER Cl.1,/ PARK PLACE G0.] Py US GQ PARK RD GQ PARK Si _C•14 f HS PARKVIEW AVE ..._HI ,LS H E PEAALO ON Sf SI F6 CDT PENFRO DR _ FI PENKRIDGE OR. .,H.1 RONALDS SI, 5940 PENN CBR.._ .. ..E9 ROOSEVELT SL N�6 PICKAAD Si.._ H-6 ROWAND Ci. G5 /INE H9 RUNDELL $I. I FFA S. G1 RUSSELL DR... PLEASANTPINECIEST, ILUM IIT SL. SAMUEL Ea DR, Dli i HSI HSI F -G4 IOfi A0. EJ SANG AD. FIT POTOMAC OR. F 1 SANDUSKY AVE, _ [J PRAIRIE DU CHEIN SCOTT BLVD. F.] R0. 166 SEYMOUR AVE. F) IRENTISS Si, F4 SHAMROCK DR. EJ PRINCETON CL E1 IHERIDAN AVE, I 1 PLO C St, D S1 G PROSPECTT F 1 IOUIHGIA EOAVF. GI RAYEN Fi AVE. PI SOUTH LAWN DR. G1 4AvfN CR. Ft 10 SPRING ST. Fa RAVEN Si F.S SPRUCE Ci. I.F RAVENCRESI UI I V 10 SPRUCE ST. .PI REGAL LN J1 SIANfOROAVE. EL RENO SI ...OL -0 STEVENS DR. E 1 RCHARDS St. ... E ] 1 it. ANN DA, i 1 I ADEA SS , _E l SI. CLEMENTS ST. D 1 AI DGEAND AVE. AI DOE 10. DE IT. MATTHIAS ALLEI IC4 STREI ST. G61 RIDGE ii. NA SUMMIT it, F G19 RI DGfVIEw AYE... G I SUMMIT ST. N C JI AICIS WAY D_ . -_E0 SUNSET SL F E}.9 AI DGEWOOD LA. LS SWEET IAIAA AVE. AIVEA Si ..PLI.9 SYCAMORE ST,., D.} AIVEISIDE Ci f9 TAFT SPEEDWAY,.( F9 RIVERSIDE CT S. G I TAIWAN CT. GQ RIVERSIDE OA ...GNI IANGLEW06D ST... 'G6 RIVERSIDE DR. N. OG4 TAYLOR DR, A I ROBERTS RD. GO 1EETEAS CI, G:1 1.00HESIER AVE.. EU 1!G OR.. ..D4 AOC[Y SHO EI OR. D EI TERRACE AIN D -"F: L RD. OAKHOLL DR. aim IA CT. —I IYATLE AVE NIVEASII 5.1 `A 'N / IOWA CINIC P L At PONT ..L. .. G.1 641 1• FL. Fl i E. E i0 FO E6 IT. F 6 E. ... EQ St. N. D S ST. S. G S S. F-4 RE..... VE... i BEEN / X 10 IR H,9 10 WHEATON RD G�1 A St.F1 Sr AVE, GH1 WHITING AVE .,GSA E 10 V: HITING AVE Cl. C St, D S1 ";;(;,j -.. F•I WILLIAM ST. .GSI WILLIS DA .Cd CHI E SL FSI G11 DN JN /K. H9 WILSON Sit. _.D�] ..FQ HSr GIB G,T4 WILLOW SI. _F,F9 WINDSORINSt.N G 1 EJ JS1 .MHR JN PL. SL.44 ..F•1 WINDSOR DA TA WCODLA EJ IST AVE EQ ISI It H 11 II OA _ 1.9 WOODAWN N HG9 ... ..E6 IND AVE ...E.GS WOODSIDE AVE. WOOOSIOE DA.... EQ IND ST. GQ IAD AVE. _F�H,1 HS WAY ... G1 WOODSIDE PL GQ ]RD S] 1 F. A H I I WOOL' AVE. 0 E BIH AVE, G.H I I. >.. G�I WYLDE GREEW GS 61H AVE. E(IJ E4 if. ,,..Fd TEWELL `SI... GHI ;iH AVE, EG�7 CL WESTINGHOUSE Iowa City, Iowa, and Vicinity "IT GI �RHowes 4 i0 WEST BRANCH 1" / t ST. UOSER t CEMEIER HILL PARR It; OR. RGETOWN CIR. VERNON Ct. NLAI D 2 T' \ Fy uD ; LYA V 1;:• t� i OOH,WFY $/AUC% t _ GOOD \ `Milk e AI LL2H, EROOKWOOD DR. C•S' �Q( 4 YM/IC Cl. �R HOLLYWOODwooD-#gv a v vNo`oA,1(w�1• z PSR 6 EATER SANDUSKY SEASON N AVE. 3 Oa VA CITY 5 ROUTES #v Ns AVEOR. oa• LAKESIDE t Benton — Lakeside Emmommi Manville Heights - E. College i 3 hester —Mall mommom North Dodge — Towncrest 2, m keye Apts. — N. Dubuque ** 1st Ave. Coralville away — Goodwill m m Lantern Park & 10th St. Dotted -line ToutOS are slleelel UID%. Consult schedules. 3 •'i .- CORA W ILLS STREETS CHAMPION HILLS Si EMERSON $I FAIRCHILD Sr FAIRVIEW RD HEMPHILL DR HIGH ST HILLCREST OR HUGH$ Sr SUMMIT HILLS DA IST AVE ST ST 2ND AVE 2ND AVE IL 2ND ST 1RV AVE IAD AVE PL ITN AVE OH $I STH AVE DN AVE IL STN ST STH ST IL $TH AVE 4TH ST 1111 AVE YTH ST SIH AVE ITH Sr ITN AVE RH ST IOTH AVE IOM R 11TH AVE PTH ST NTH AVE IITH AVE PRH AVE PRH AVE 11TH AVE NTN AVE RD, fF tom* Pic AMERICAN LEGION AD. LEGEND STREET% AND ROAD$ STATE HIGHWAYS U.S. HIGHWAYS INTEERR�PA E HIGHWAY \ EA LROA I CEMETERIES PARKS �rgWATERWAYS POINTS OF INTEREST SCHOOLS mm�vm ,v2.. m-. au rwmr., w n..•..» • r».ter �n..mmv w. 0 R. ST ApN < a0 Oa W r rI NIA OR. � TI � a0 SAM EL w ? o " O<< CA VCAROLIHE A H R. � (1y 3 C KIM# AVE E Si. Cl. 1" / t ST. UOSER t CEMEIER HILL PARR It; OR. RGETOWN CIR. VERNON Ct. NLAI D 2 T' \ Fy uD ; LYA V 1;:• t� i OOH,WFY $/AUC% t _ GOOD \ `Milk e AI LL2H, EROOKWOOD DR. C•S' �Q( 4 YM/IC Cl. �R HOLLYWOODwooD-#gv a v vNo`oA,1(w�1• z PSR 6 EATER SANDUSKY SEASON N AVE. 3 Oa VA CITY 5 ROUTES #v Ns AVEOR. oa• LAKESIDE t Benton — Lakeside Emmommi Manville Heights - E. College i 3 hester —Mall mommom North Dodge — Towncrest 2, m keye Apts. — N. Dubuque ** 1st Ave. Coralville away — Goodwill m m Lantern Park & 10th St. Dotted -line ToutOS are slleelel UID%. Consult schedules. 3 •'i .- CORA W ILLS STREETS CHAMPION HILLS Si EMERSON $I FAIRCHILD Sr FAIRVIEW RD HEMPHILL DR HIGH ST HILLCREST OR HUGH$ Sr SUMMIT HILLS DA IST AVE ST ST 2ND AVE 2ND AVE IL 2ND ST 1RV AVE IAD AVE PL ITN AVE OH $I STH AVE DN AVE IL STN ST STH ST IL $TH AVE 4TH ST 1111 AVE YTH ST SIH AVE ITH Sr ITN AVE RH ST IOTH AVE IOM R 11TH AVE PTH ST NTH AVE IITH AVE PRH AVE PRH AVE 11TH AVE NTN AVE RD, fF tom* Pic AMERICAN LEGION AD. LEGEND STREET% AND ROAD$ STATE HIGHWAYS U.S. HIGHWAYS INTEERR�PA E HIGHWAY \ EA LROA I CEMETERIES PARKS �rgWATERWAYS POINTS OF INTEREST SCHOOLS mm�vm ,v2.. m-. au rwmr., w n..•..» • r».ter �n..mmv w. Phone Numbers for other types of transportation: e Super Cab,lnc 1-0380 yellow Che Cab Co., Inc. 337-3131 Airport U urine Service to Cedar Rapids Airport 337- y uses Union Bus Depot 337-2127 r✓ I Iowa City was the first state capital of Iowa, from 1846 to 1857. The original capitol building is now owned by the University of Iowa and was restored to its original condition for the 1976 Bicentennial Celebration. It is a national historical landmark. Y' :Papulation - Iowa City 47,744 Johnson County - 75,025 (both special census of 1974) A y t S� i 4yy c11. i-UNIVERST70F IOWA CAMBUS SERVICE r;q Clockwise (R Route) • .c Counter -CI wise (Blue Route) mmm ...Hawkeye. ute ----- tl`' ,Aft 8:30 p. Interdorm xpress Route Between Ea and West Side dormitories z°"Oakdale R to Pentacrest ' { All bus at to marked with bus el � e MAIN DOWNTOWN BUS STOPS Washington St. J n r ,Complrmerttliof the Cdy. of. Iowa Cityand the Iowa.City Chamber of Commerce These three systems serve you: to anyone who wishes to ride. Phone 363-66 . CORAL LE 36 cents. Free transfers to Iowa City but . Pho 361-7711. IOWA cents. Free transfers to Coralville buses. P e -6336. All Iowa Cit oralville fares are paid when passengers boardthe s.s ersare encouraged tohave correct change to's ed I dt g I we City buses and Coralville passengers us ave corM%change. lovya City and Coralville.bu t at each inters n to load and unload passengers. iversity of Iowa'9V buses stop at points thatare ed with Cambus signs. ossible to reach easy walking distance of almost any poin I%tran y f. and Coralvllleandonthe UniversityofIowa campusg the three transit systems in greater Iowa City. The point for all three systems is at Clinton and Washington% Streets In the downtown business district. Children under the age of five may ride free in both Iowa City and Coralville. F® MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOIIIES i. p ;a E' Y i i I e. z !� To provide service wtihin three blocks of as many residences as possible. Proximity to a bus stop, rather than frequency of service, appears to be the primary factor influencing transit ridership. To extend service to several newly -developed areas of the community, which heretofore have not had good access to the transit system. To retain service as much as possible along those routes currently operated by the transit system, so that persons who have made housing, employment and transportation choices based on transit, will not be adversely affected. The proposed system includes fourteen (14) individual routes, operated as seven (7) route pairs. Buses would be through -routed, allowing crosstown trips without transferring. During the day all routes would operate on 30 -minute headways, except for Wardway-North Dubuque, which would only run every 45 minutes. Evening service would be hourly until 10:00 PM. For the present, part of the buses would be downtown on the hour and half- hour, part on the quarter hours. Once the new downtown transit interchange is in operation, all but two routes would be downtown simul- taneously, fifteen minutes before and after the hour. The attached map and following narrative show and describe the proposed route changes: I. HAWKEYE APTS. (Light Green) This route would remain the same as presently operated, except that it would be operated as an "express" from Mormon Trek Blvd. to the University. This will reduce the time required for this very long run, so that it can reasonably be operated in the 30 minutes allotted. Persons along Melrose Avenue now riding the Hawkeye Bus would be served by the new West Benton route. 2. WEST BENTON (Light Blue) This route is completely redesigned to improve service to the area of Iowa City south and west of University Heights. This route would serve Mark IV Apartments, areas along Melrose Avenue formerly served by the Hawkeye Bus, the newly developed area south of West Benton Street, and University Heights. Direct service would be provided to the North Entrance of University Hospital. 3. OAKCREST (Pink) This new route serves the Seville area of West Benton Street and Oakcrest est Benton bus. Running separate brrouteptosthis neighborently served by r neighborhood wouldWprovide adequate rush-hour capacity and permit abandonment of the ineffective "West Side Special" tripper. This route duplicates the original West Benton route operated before service was extenxed to Mark IV in 1975. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 9 i I i i I C. d. e. z !� To provide service wtihin three blocks of as many residences as possible. Proximity to a bus stop, rather than frequency of service, appears to be the primary factor influencing transit ridership. To extend service to several newly -developed areas of the community, which heretofore have not had good access to the transit system. To retain service as much as possible along those routes currently operated by the transit system, so that persons who have made housing, employment and transportation choices based on transit, will not be adversely affected. The proposed system includes fourteen (14) individual routes, operated as seven (7) route pairs. Buses would be through -routed, allowing crosstown trips without transferring. During the day all routes would operate on 30 -minute headways, except for Wardway-North Dubuque, which would only run every 45 minutes. Evening service would be hourly until 10:00 PM. For the present, part of the buses would be downtown on the hour and half- hour, part on the quarter hours. Once the new downtown transit interchange is in operation, all but two routes would be downtown simul- taneously, fifteen minutes before and after the hour. The attached map and following narrative show and describe the proposed route changes: I. HAWKEYE APTS. (Light Green) This route would remain the same as presently operated, except that it would be operated as an "express" from Mormon Trek Blvd. to the University. This will reduce the time required for this very long run, so that it can reasonably be operated in the 30 minutes allotted. Persons along Melrose Avenue now riding the Hawkeye Bus would be served by the new West Benton route. 2. WEST BENTON (Light Blue) This route is completely redesigned to improve service to the area of Iowa City south and west of University Heights. This route would serve Mark IV Apartments, areas along Melrose Avenue formerly served by the Hawkeye Bus, the newly developed area south of West Benton Street, and University Heights. Direct service would be provided to the North Entrance of University Hospital. 3. OAKCREST (Pink) This new route serves the Seville area of West Benton Street and Oakcrest est Benton bus. Running separate brrouteptosthis neighborently served by r neighborhood wouldWprovide adequate rush-hour capacity and permit abandonment of the ineffective "West Side Special" tripper. This route duplicates the original West Benton route operated before service was extenxed to Mark IV in 1975. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 9 3 4. WARDWAY (Dark Green) This route is the same as the current Wardway route, except that the Y extension presently operated to the trailer parks south of Moore Business Forms would be discontinued. (This extension is currently averaging only eleven (11) passengers per day - less than one person per trip). The Wardway bus would be operated every 45 minutes, and paired with North Dubuque. I 5. MALL (Red) fThe Mall bus would rerouted via South Clinton Street, Kirkwood Avenue 1 and Lower Muscatine Road directly to the Mall. This routing will take much route pair lto function ess time nreas nablythe nwelleevenldurinng rush-hour.owing the Those parts of the present Mall route that would be bypassed would be covered by other new routes. 6. LAKESIDE (Light Blue) The Lakeside bus would operate via South Gilbert Street and Highway 6 Bypass to Fair Meadows, Lakeside and Bon Aire. This routing shortens the time required and also reduces capacity problems, which should ' allow the elimination of our"Lakeside Express" tripper. Several trips daily would be run to Goodwi 11, as the Goodwill bus will no longer operate. The routing allows flexibility to serve the new Hy - Vee complex on Highway 6 when it is completed. 7. SYCAMORE (Dark Blue) 1 This new route replaces parts of the present Mall and Lakeside routes, and also penetrates the poorly served areas southeast es K - Mart. The route operates outbound via Gilbert Street, Bowery Street, South Dodge Street, and Keokuk Street; loops through Highway 6 camore rreand Hihland Avenue- then turns downtown by the saTaylor Drive, me routestreet This routing bypasses the K -Mart parking lot, travels Highland Avenue only in one direction, and I avoids the Summit Street bridge, all of which are difficult to traverse with a bus. i 8. TOWNCREST (Pink) The Towncrest route is realigned to travel both inbound and outbound via Muscatine Avenue. This routing will shorten significantly the time required for the run, and will better serve the residents along Muscatine Avenue. The neighborhood southwest of Muscatine Avenue currently served by the Towncrest bus will be covered by another route. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES .'_.-19 - 4 r1 9. EAST COLLEGE (Yellow) The East College route will be moved south from East College Street to Burlington Street, Muscatine Avenue, and Court Street. This change will shorten the time required, will provide additional service in the Burlington -Muscatine corridor, and will lend itself very well to the addition of an extra peak -period tripper. The bus would no longer operate to the front of City High, but would serve the school just as well at Court and Fourth Avenue. The East College Street area would be covered by a new route. 10. SEVENTH AVENUE (Light Green) This new route would serve a large area of the near east side presently covered by several different routes. This bus, running out only as far as Seventh Avenue, should ease capacity problems in the east side sorority/fraternity area and reduce the need for additional east side tripper buses: This route would initially operate on College Street, but with the repair of the Washington Street bridge, would move to Washington Street. 11. ROCHESTER (Red) it The Rochester route itself would not be changed, but it would be coupled with a much shorter Mall route, which should make the overall i pair infinitely more workable. 12. . NORTH DODGE (Dark Blue) The North Dodge route remains unchanged except that it utilizes North i Gilbert Street and Church Street, rather than duplicating the Rochester service on Jefferson and Market Streets. This realignment penetrates the densely populated near northside, which previously has not been well served. The two morning and two afternoon trips to ACT and Westinghouse would be resumed. 13. NORTH DUBUQUE (Dark Green) I This route would be unchanged, although the level of service is reduced by dropping to 45 -minute headways. This route has a relatively low ridership, as it serves only the Mayflower Apartments and Forest View Trailer Park, the area south of Park Road being much better served by CAMBUS. I 14. MANVILLE HEIGHTS (Yellow) i This route would be unchanged, although shortening the East College route would allow this end to adhere closer to the posted schedule. This proposal requires that fourteen (14) buses, rather than the present twelve (12), be on the street all day, plus one additional bus in the i MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 5 evening. Even though several of the "tripper" buses should no longer be needed, the net result will be an increase of $76,720 in operating expenditures. Assuming present trends continue, approximately forty percent of this cost, or $30,680, will be available through the farebox; the remainder must be raised from other sources. Federal transit assistance will be of no help at the present time. Section 18 of the Surface Transportation Act of 1978 provides operating and capital assistance for small systems such as ours, but this money has already been allocated exclusively for capital projects. Large-scale Federal operating assistance will be available under the UMTA Section 5 program, but only after we achieve SMSA/Urbanized Area designation. It now appears that increased transit assistance based on this designation may not be available until after the 1980 census, or October 1, 1981. There apparently are only two reasonable funding alternatives. First, the City has not yet received the bulk of its FY78 State transit assistance, because $66,800 was held back by State auditors. We have been informed that the auditor's exception has been overruled by the Director of IDOT'S Public Transit Division. Assuming this is correct, this money could be used to finance the service expansion. These funds have not been programmed, and therefore could be used to meet these additional service needs. If for some reason the auditor's ruling stands, and the City is unable to successfully pursue its claim, by litigation, if necessary, the only remaining funding source would be an increase in fares. The fare increase can be justified by several factors. First, the service improvements brought about by additional routes will benefit almost every area of the community, as overcrowding should be alleviated and schedule adherence should improve. Second, the costs of operation, most notably fuel but also labor, parts and supplies, have risen dramatically since the last fare increase in 1976. State transit operating assistance for FY80 will fall short of our request by about $25,000. (Because revenues have increased and the State has postponed several capital projects, we should be able to stay within our overall budget). The reason given for this shortfall is that the State has less money to appropriate this year than last. Because the City is one of the few recipients being awarded more than last year, and is also benefiting from additional capital funding for three new buses, supplemental funding is out of the question. On the local level, the transit budget allows very little room for service expansion. In order to maximize State assistance the budget was drawn very tightly - there is almost no "fat" that could be converted to this purpose. Likewise, any reapportionment of funds to favor transit will surely result in a cutback of services or projects in the other City departments affected. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 6 To continue operating our existing routes with twelve buses, augmented by "trippers" during peak periods, is simply not a choice. To attempt to do so will invite repetition of the crisis of this past winter. We have had to turn people away on one route already this summer, and several other routes are now carrying capacity loads at peak hour, even though school is out. This demand is unprecedented. When the student population returns in August, we will be swamped. If the basic fare is raised to 354, $12.00 for a monthly pass, which is the current Coralville rate, an additional $80,000 will be generated. (This projection assumes that for every 10 percent increase in fares, ridership decreases by five percent). The additional revenue would provide ample resources for the two new bus routes and would also provide a cushion for increasing diesel fuel costs, which will approach $100,000 for FY80. It is requested that the City Council consider these recommendations and respond with questions and suggestions. If the general framework is acceptable we will. immediately begin the task of reorganizing our internal operating structure. Final decisions on route alignments, however, cannot be delayed beyond the end of June, if the monumental task of rewriting all our maps and schedules is to be completed in time for the beginning of the Fall Semester. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES ^'City of Iowa CIC) I-- MEMORANDUM I i r � I 'i 1; _ _ I I I I Date: June 19, 1979 To: City 4nager Council From: Ci Re: Lafayette Street Bridge Several weeks ago the question of the Lafayette Street bridge was discussed at Council meeting. The records indicate that late in 1974 the staff recommended that the Lafayette Street bridge be abandoned and that it would cost $195,000 to replace it. Mrs. Frieda Hieronymus appeared at that time indicating the lack of a bridge was detrimental to the area. Subsequently, the matter was referred to the Planning and Zoning Commission and during April 1975, the Planning and Zoning Com- mission recommended that the bridge be vacated and removed. The City Council approved the recommendation. jm1/12 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 133/ City of Iowa Cit MEMORANDUM DATE: June 22, 1979 TO: City Council FROM: Dennis R. Kraft, Director of Planning F, Program Development Jim Hencin., CDBG Program Coordinator J RE: Status of Neighborhood Site Improvements In response to your questions concerning particular aspects of the Neighborhood Site Improvements, we have prepared a series of memoranda (attached). We call your attention to the following items of concern: 1. Net change in housing stock --.Small Cities Project Area 2. Alley paving -- Northside Area 3. Bus stop shelters and benches 4. Sidewalk repair program If there are additional questions, we will be available to answer them. DRK/JH/ssw Attachments MICROFILMED BY JORM MICROLAB CEDAR RAP IDS- DES ?101 RES /33y l °z3 i i. i Ari City of Iowa Cit MEMORANDUM DATE: June 22, 1979 TO: City Council FROM: Dennis R. Kraft, Director of Planning F, Program Development Jim Hencin., CDBG Program Coordinator J RE: Status of Neighborhood Site Improvements In response to your questions concerning particular aspects of the Neighborhood Site Improvements, we have prepared a series of memoranda (attached). We call your attention to the following items of concern: 1. Net change in housing stock --.Small Cities Project Area 2. Alley paving -- Northside Area 3. Bus stop shelters and benches 4. Sidewalk repair program If there are additional questions, we will be available to answer them. DRK/JH/ssw Attachments MICROFILMED BY JORM MICROLAB CEDAR RAP IDS- DES ?101 RES /33y l r V "1 City ©t Iowa CV_'� MEMORANDUM DATE: June 8, 1979 TO: Dennis Kraft, Director of Planning F, Pro am Development FROM: Jim Hencin, CDBG Program Coordinator RE: Net Change in Housing Stock -- Small Cities Project Area Seventeen housing units (12 structures) located in the Lower Ralston Creek Neighbor- hood are scheduled for acquisition under the Small Cities CDBG project. These 17 units consist of 6 owner occupied and 11 renter occupied units. Staff review of housing conditions suggest that 4 of the units, all single family houses, possibly could be moved to other sites. The remaining 13 would be demolished. As you are aware, a site located in the project area is to be created for the purpose of developing 10 new units of multi -family housing. We would therefore anticipate a net loss of 3 housing units from the project area. It should be noted that during the interim, while HUD is reviewing the Small Cities application, staff will be assessing the potential for relocation resources, including vacant lots, in the areas immediately adjoining the Lower Ralston Creek Neighborhood. The two housing projects for the handicapped and elderly proposed in the downtown represent additional relocation resources which would be close to the Lower Ralston Creek Neighborhood. JH/ssw MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1101NES "1 City ©t Iowa CV_'� MEMORANDUM DATE: June 8, 1979 TO: Dennis Kraft, Director of Planning F, Pro am Development FROM: Jim Hencin, CDBG Program Coordinator RE: Net Change in Housing Stock -- Small Cities Project Area Seventeen housing units (12 structures) located in the Lower Ralston Creek Neighbor- hood are scheduled for acquisition under the Small Cities CDBG project. These 17 units consist of 6 owner occupied and 11 renter occupied units. Staff review of housing conditions suggest that 4 of the units, all single family houses, possibly could be moved to other sites. The remaining 13 would be demolished. As you are aware, a site located in the project area is to be created for the purpose of developing 10 new units of multi -family housing. We would therefore anticipate a net loss of 3 housing units from the project area. It should be noted that during the interim, while HUD is reviewing the Small Cities application, staff will be assessing the potential for relocation resources, including vacant lots, in the areas immediately adjoining the Lower Ralston Creek Neighborhood. The two housing projects for the handicapped and elderly proposed in the downtown represent additional relocation resources which would be close to the Lower Ralston Creek Neighborhood. JH/ssw MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1101NES E June 20, 1979 To: Dennis Kraft From: x iI -City of Iowa Cit' MEMORANDUM Date: June 20, 1979 To: Dennis Kraft From: Jim Hencin Re: Alley Paving -- Northside Area Our staff has looked into the question of paving two alleys located adjacent to St. Wenceslaus Church and Zion Lutheran Church in the Northside Area. These alleys were scheduled for paving under our Neighborhood Site Improvement project following requests from residents and review and concurrence -by CCN. We have determined that since both churches provide a "community" service, i.e., Congregate Meals for the elderly, and thYs generates a considerable amount of traffic, there was certain validity in paving the adjacent alleys at City expense (using CDBG funds). According to our review, the alleys in question provide the principal•access to these churches. Bette Meisel has stated that Congregate Meals for the elderly will be continue to be served even beyond the time when the new senior center is opened. jm3/2 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES e�)Clty of Iowa CIC' MEMORANDUM y Date: June 20, 1979 p To: Dennis Kraft From: Jim Hencin x Re: Bus Stop Shelters and Benches Following the June 4 discussions with the City Manager and City Council s concerning bus stop shelters and benches under the Neighborhood Site Improvement project, our staff met with Hugh Mose and Dick Plastino. The ideas and desires which came out of the June 4 meeting were related to .both Dick and Hugh. The result is a revised list of locations (see attached memorandum) wheit te new shelters and benches will be placed, still in keeping with the needs expressed by residents and CCN. You will note that a shelter at S f Clan and Oakland have been added. The totaheri- 1 package is to be bid within the next one to two weeks. jm3/4 ,f a - tt m MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1401NES :1 City of Iowa City MEKWORANbum Date: June 15, 1979 1 To: Hugh Mo::tino From: Dick Re: Bus Stops and 5 r purchased by HCDA Funds Hugh, the HCDA account has several bus stop benches and shelters. I would like you to go ahead and purchase the shelters in conjunction with Purchasing. You will have to make sure Purchasing is plugged in with Pat Keller and follows HCDA competitive bid guidelines. Then, have Ed McGinnis work with you to place the pads for these shelters. Once again, you will need to check on the purchasing guidelines and advise Ed on how much competitive bidding he needs to do. By neighborhood the locations are as follows: Longfellow 1. Sheridan and Oakland bus stop shelter - $2,500 2. Court and Muscatine bus stop shelter - $2,500 Creekside 1. Muscatine Avenue across from Creekside Park. (on the E Street right-of-way by Ralston Creek) bus stop shelter - $2,500 (NE Corner) 2. Second Avenue and Court Street (part of Hoover School) - $2,500 3. Second Avenue and Muscatine bus stop shelter - $2,500 4. Morningside Drive and Court Street bus stop shelter - $2,500 Northside Neighborhood Four benches and one shelter as follows: (Total $3700) 1. Church and Dodge - shelter 2. Market and Van Buren 3. Governor and Market 4. Gilbert & Church MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES City of Iowa Ci^'l MEMORANDUM DATE: June 22, 1979 TO: Dennis Kraft, Director of Planning and Program Development FROM: Jim Hencin, CDBG Program Coordina RE: Sidewalk Repair Program Staff has prepared a draft sidewalk repair assistance program which would apply to the Northside and Hickory Hill Neighborhood Site Im- provement areas. Please see the attachment. The essence of the program is that two categories of persons are eli- gible for either full or partial payment of sidewalk repair costs: 1. Participants in the Section 8 program or owner occupants who are either elderly, handicapped or low and moderate income are eligi- ble for full payment under the program, i.e., 100% of actual repair cost paid by CDBG funds. 2. Owners or rental properties whose tenants are elderly, handicapped or low and moderate income (excluding students) may be eligible for half payment, i.e., 50% of actual repair costs paid by CDBG funds. Since the Sidewalk Repair Program for these two areas is tied to the enforcement of the City's sidewalk maintenance ordinance and not all residents will qualify for assistance, some provision will have to be made to pay for these repairs if a property owner decides not to. We suggest that general City funds be used for this purpose; however at this time we do not know the exent of their need. This will probably not be determined until the sidewalk inspector issues notices to prop- erty owners. JH/id Attachment MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES NEIGHBORHOOD SITE IMPROVEMENT SIDEWALK REPAIR PROGRAM (to be carried out in the Northside and Hickory Hill areas) As a part of the Neighborhood Site Improvement Program sidewalk repairs will be carried out in several areas. In two of these areas (Northside and Hickory Hill) this program will be carried out through enforcement of the sidewalk ordinance. This ordinance basically grants the City Engineer the authority to mark those pieces of sidewalk which need repair and then notify those residents whose property that sidewalk is located on that they must either have the sidewalk repaired, or the City will have it done for them and bill them. The Commmunity Development Block Grant funds budgeted to the Neighborhood Site Improvement Program will be used to provide Sidewalk Repair Assistance (SRA) to those residents who cannot afford to pay for repairs themselves. In order to be eligible for SRA, a resident must be of low and moderate income, elderly, or handicapped (according to HUD definitions). These persons will be eligible for 100% assistance. Renter occupied units will be able to receive 50% assistance if they have low and moderate income, elderly or handicapped tenants and the owner certifies that he will not increase the rent more than what is required due to inflation for a two year period. The following is the process which will be used to carry out the NSI sidewalk repair program: 1.1 A sidewalk inspector will be hired by the Department of Public Works using Community Development Block Grant funds from the NSI program. 2. Bids will be let for the repair of sidewalk in the Northside, Hickory Hill, Longfellow, South Central and Creekside areas. 3. The sidewalk inspector will walk all sidewalks in the areas requiring repair, marking each panel which needs to be replaced, keeping track of where the panels are located and how many are marked. In the Northside and Hickory Hill areas, the number of panels which must be replaced will be listed by address. 4. All properties where repairs are required will receive a notice to that effect from the City Engineer. This notice will state that the property owner has 30 days in which to repair the sidewalk, or the City will do it and assess the cost to the property owner on their next annual taxes. The notice will also include an explanation of the SRA program, what the eligibility requirements are and where to go to apply. 5. Any person who meets the eligibility requirements for the SRA program will be able to apply for assistance at the ;Civic Center. Sidewalk repair for their property will then MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOIIIES z be completed and charged to the CDBG program. In all cases where property owners are not eligible for assistance, the property owner will either arrange for his own sidewalk repairs or allow the City's, contractor to make the repairs. In the latter case, the resident will then be billed for -repairs. If the resident does not wish to pay for the repairs at that time, the City will pay for the repairs out of the general fund, and the cost will be assessed to the property owner on'his taxes along with 10% interest ori the nonpaid balance. The assessment will cover a period of years determined by the Council, and will be returned to the general fund. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 140114ES t' No ELIGIBILITY REQUIREMENTS , All residents of the Northside and Hickory Hill areas are eligible for financial assistance if they fall into one of these categories: 1. Section 8 Participants: Landlords or households who are participating in the Department of Housing and Urban Development's Section 8 Housing Assistance Payments Program are eligible for a full grant payment for sidewalk repairs. Certification of Section 8 participation must be presented. 2. Elderly or Handicapped Residents: Residents who are 63 years of age or older or are handicapped are entitled to full grant payment for sidewalk repairs. Landlords with tenants who are elderly or handicapped are eligible for grant payments of one-half of his/her sidewalk repairs. A. Elderly applicants must: 1) submit proof of age, 2) submit proof of home ownership. B. Handicapped applicants must: 1) submit proof of handicap (visual certification by processing employee may suffice), 2) submit proof of home ownership. C. Landlords must: 1) submit proof of lease to elderly or handicapped tenants, 2) prove that tenants are elderly or handicapped. 3. Low or Moderate Income Households: Residents whose total household income, including interest accumulated from assets, falls into one of the following categories are entitled to full grant payment for sidewalk repairs. Landlords renting to low or moderate income residents (excluding students) will be entitled to a grant payment of one- half of the cost of the sidewalk repairs. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES 140114ES 5 or more $0-$15,500 i i i i x i I 1 'CRY of Iowa Cv ) )�fi MEMORANDUM DATE: June 22, 1979 TO: City Council � FROM: Dennis R. Kraft, Director of Planning $ Program Development RE: Zoning Ordinance Schedule Inthat the City Council has indicated an appreciable interest in the timely adoption of the new Iowa City Zoning Ordinance, it is necessary at this time to establish a schedule and procedures to be followed by the Planning and Zoning Commission and the Department Procedure utilized in the adoption of the Comprehensive Plan, i.e., one where the of Planning and Program Development staff. It is also apparent that the wereComprehensive Plan Coordinating Committee literally reviewed every word and punctuation rk in every draft of the Plan, would be far too time consuming. If this procedure to be followed, probably twelve to sixteen months would be needed for a complete review of the Zoning Ordinance. Zoning It is recommended that the Council endorse the concept whereby the Planning and elementsof Commission the Zoning Ordinance and efurther that decisions t theLegal and oPlanning sstaffs tbee -given the responsibility of doing the actual drafting of the ordinance. One method of doing this would be for the staff to utilize a matrix format which will enable the ready comparison of the various permitted uses, height, yard and bulk regulations of the various zones. As a part of this procedure, it is anticipated that draft materials which will periodically be sent to the Planning and Zoning Commission will also be sent to various interested community organizations including the Chamber of Commerce, the Iowa City Homebuilders, the Iowa City Board of Realtors, and applicable City boards and commissions as well as the Department of Housing and Inspection Services. All of the above mentioned groups will be given an opportunity to make their comments on the substantive elements of the Zoning Ordinance to the Planning and Zoning Commission probably within a two-week time frame. Once all of the basic decisions have been made on the ordinance, a final draft will be prepared for review by the Planning and Zoning Commission prior to the time of public hearing being held on the ordinance. All of the above mentioned work should be able to be completed during a four month period (September -December, 1979). The Planning staff will be available to discuss this subject with the City Council at Mondays informal session. DRK/ssw MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 1333 ."City of Iowa Cite MEMORANDUM Date: June 22, 1979 To: City Council From: Dennis Kraft, Director'of Planning and Program Development Marianne Milkman, Planner/Program Analyst' Re: Sturgis Corner Boat Ramp After ifive nterviewing Muscatine, atine, Iowan was engineering consultant skedto pr pare the detailed designs and specifications for the Sturgis Corner Boat Ramp, because of their extensive experience with boat ramp design. On Friday, June 15, 1979, Bill Klatt of Stanley Consultants presented preliminary plans for the boat ramp at Sturgis Corner for discussion with Gene Dietz and Marianne Milkman. The plans indicated severe problems for the site as follows: 1. Parking for only five cars with trailers can be provided. If all the trees are cleared from an additional 120 feet of riverfront area and a retaining wall is constructed, parking for 10 additional cars without trailers could be provided. (The cost of this additional parking 'is not included in the cost estimate.) 2. In order to allow usage of the ramp with 1,000 cfs outflow from the Coralville Reservoir the ramp would need to be built 40 feet into the river. The Iowa Natural Resources Council may consider this to cause undue obstruction of the river channel. (With a minimum flow of 1,000 cfs the ramp would be usable on an average all but about one month during the year in late August/September.) 3. Almost all trees on this portion of the riverbank would have to be removed which is a costly procedure since some of the trees are very large. 4. Cost estimates which include ramp construction, tree removal, grading, fill, an asphalt parking area, gravel access road and design costs are close to $40,000, contrary to the $32,000 budgeted on the preliminary recommendations of Engineering. Bill Klatt indicated that his engineers had looked at a variety of ways of constructing the ramp and providing parking and this design was the best one feasible. The State Conservation Commission is unwilling to provide matching funds for a ramp and parking providing less than 15 to 20 car/trailer MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOVIES 133el I i I I i i � I i a i parking spaces. In their experience, boat ramps attract large numbers of fishermen and recreational boaters and the Commission generally plans for parking for up to 30 cars and trailers for a single lane boat ramp. The Conservation Commission will have marine fuel tax funds available for boat. ramp construction in FY80. In addition to requesting a construction permit and matching funds from the State Conservation Commission, regulations also require us to obtain permits from the U.S. Army Corps of Engineers, the Department of Environmental Quality, and the Iowa Natural Resources Council. An environmental assessment is required by the U.S. Corps of Engineers, the other agencies only require preliminary designs. On Monday, June 18, the preliminary boat ramp design presented by Bill Klatt was discussed by Dennis Kraft, Dennis Showalter, Jim Hencin, and Marianne Milkman and the consensus was that it would appear to be inappropriate to construct the boat ramp at the Sturgis Corner site, particularly since Mace Braverman of Southgate Development Company had already expressed concern about people parking on the Sturgis Corner road if parking for the boat ramp was inadequate and in that the Iowa State Conservation Commission would not cost share in the project without the provision of 15-20 car/trailer parking spaces. Alternate Locations The Riverfront Commission wants to emphasize the location of a boat ramp and parking area below the Burlington Street dam and as close to the dam as feasible. Alternate sites for a ramp below the dam are now being investigated at three principal locations which might be satisfactory: 1. Napoleon Park. This site would be about 1 3/4 miles downstream from the Burlington Street dam and therefore rather far away from the dam. Parking would be available. 2. Pollution Control Plant. This site does not appear to be very desirable for reasons of topography and liability. 3. Sturgis Ferry Park. This site has excellent possibilities with plenty of potential parking. However the condition and distance of the landfill from the river will have to be investigated and the question of ownership of this park must still be resolved. Stanley Consultants will assist in the preliminary engineering analysis of these and any other possible boat ramp sites. All sites will be evaluated according to accessibility, distance from the Burlington Street dam, feasibility, cost and so on. The evaluations will be presented to the Riverfront Commission for a recommendation. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOIRES 3 r� r Eligibility of the Project:for CDBG Fundin Federal Regulations: Section 570.201 C 2 indicates .that recreational facilities are eligible activities. Section 570.302 requires that an applicant certify that its Community Development program has been developed so as to give maximum feasible priority to activities which will benefit low and moderate income persons or aid in the elimination of slums and blight or be of particular urgency. Section 570.302(b)3 states that an application shall be presumed to principally benefit low and moderate income persons where not less than 75% of therp ogram funds are used for projects principally benefitting low/moderate income persons. Section 570.302(b)l states that all projects and activities must either principally benefit low and moderate income persons (or aid in prevention or elimination of slums and blight...). These regulations are somewhat contradictory and open to interpretation. The Riverfront Improvements Project was not in the original 4th year application but was included by the City Council in the 4th year budget amendment as part of the 10% local option changes permitted by HUD without their review. HUD will not review the project until our Performance Report in January 1980. The regulations for this report will be published this fall. We are of the opinion that this project is probably an eligible activity but will pursue the matter further in order to be 100% certain. jm3/20 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES i R f.� l City of Iowa Cit;~' MEMORANDUM Date: June 20, 1979 To: Neal Berlin and City Council From: Dick Plastino Re: 1) Hot Mix Overlay, 2) Chipseal and 3) Pulverize/Chipseal Work List for Summer of 1979 Council allocated $272,397 in capital outlay for asphalt resurfacing and chipseal. Approximately $87,000 of this is needed to .balance over expenditures in the Street Division for the year which ends June 30, 1979. This means a total of $185,000 is available for street work this summer. HOT MIX OVERLAY This program consists of applying two to three inches of asphaltic concrete to existing streets to improve 'rideability and structural defects. The list prepared by Public Works is shown below: Cost Hollywood - Sycamore to Taylor $32,657 Alley between Dubuque and Linn south of Iowa $ 5,659 Grove Street - Beldon to Riverside $13,088 Lee Street - River to Highwood $ 7,639 Ridge - Virginia to approximately 1658 Ridge $ 3,487 Kimball - Governor to approximately 440 Kimball $ .5,194 Riverside Drive - River Street to approximately the entrance to the EC Mabie Theater $ 7,894• Dodge Street - 800 through 900 block - install super -elevated curb $50,000 NOTE: This cost is only approximate. Preliminary and final design have not been done on this super -elevation. There appear to be significant design problems matching driveways and handling drainage. This has been traditionally a high accident location and we would like to have a try at designing a super -elevated section. This is being done in concert with citizen requests in the area. We*'will attempt to get State participation in this project. Subtotal: $125,618 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 1335 2 _ CHIPSEAL The chipseal program would be similar to that run a few years ago. You may remember it by the use of brown stone as the aggregate. Many citizens of Iowa City are not fond of this program but there are a few alternates that seal the street against moisture penetration and yet are low in cost. 9 Slurry seal has been used but we feel that it is not the best product; it is brittle and it often strips off of the road. It does not appear to seal cracks as well as chipseal. The other alternate is to do nothing. While this will eliminate the problem of the loose rock, it does lead to short and long-term deteriora- tion of the streets. Public Works strongly suggests that we adopt this program. In this period of skyrocketing asphalt prices, chipseal represents a real bargain. There will be complaints from bicyclists and there will be complaints from adjacent property owners. We believe that the benefits of the program offset the perceived disadvantages of the program. The list is as follows: Dodge - Governor to Burlington $11,048 possible. e. NOTE: will attempt to get State participation on this portion if Muscatine and Burlington to First Avenue $ 8,318 Subtotal: $38,494 PULVERIZE AND CHIP The City currently has some rural type roads which have received several oilsealS in high maintenance hlareas s and aafast er years. they hereach se cta ionce certain s of roads pointy ery of deterioration there is no alternate except to grind up the very thin pavement, add asphalt oil, and apply a chipseal. The roads proposed for this treatment are as follows: MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES Cost Summit Street - Kirkwood to College $ 5,678 Church Street - Dubuque to Dodge $ 3,553 Seventh Avenue - Court to Rochester $ 4,414 Woolf - River to Newton $ 2,172 River - Blackhawk to Woolf $ 1,516 Ridge - Virginia to Dubuque $ 1,795 Dodge - Governor to Burlington $11,048 possible. e. NOTE: will attempt to get State participation on this portion if Muscatine and Burlington to First Avenue $ 8,318 Subtotal: $38,494 PULVERIZE AND CHIP The City currently has some rural type roads which have received several oilsealS in high maintenance hlareas s and aafast er years. they hereach se cta ionce certain s of roads pointy ery of deterioration there is no alternate except to grind up the very thin pavement, add asphalt oil, and apply a chipseal. The roads proposed for this treatment are as follows: MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 3 Cost Bad portion of South Sycamore south of California Avenue $ 3,150 Rohret Road - entire road from Mormon Trek west of the City limits $18,240 Subtotal: $21,390 GRAND TOTAL: $185,502 A member of Council had requested that Seymour Avenue also be overlayed. Public Works agrees that this road is in need of overlay; however, all of the roads listed on the proposed program appear to be higher priority. Public Works would also suggest that the cost of the asphalt project this year not exceed approximately $185,000. The remainder of the funds are needed to balance the budget year which ends June 30, 1979. In addition, there is no guarantee at this point that this coming winter will be an easy one for the Street Division budget. As opposed to last year, this year we do want to provide some slack throughout the year in the budget to handle unanticipated expenditures. This past year we have put the road use tax fund well into the red. We are starting off the new fiscal year attempting to provide some slack throughout the year so that there is a surplus of some sort at the end of the next fiscal year. At this point, Council should give direction to the Public Works Department to adopt the program as specified or make changes. We do want to get this bid very soon so that the work can be done during August and September. bdw3/8-10 cc: Craig Minter Gene Dietz Denny Gannon Rosemary Vitosh FIICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 1 -City of Iowa Cit MEMORANDUM Date: May 25, 1979 To: Neal Berlin and City Council From: Gene A. Dietz, City Engineer Re: Manpower Analysis/Engineering Division As part of the activity analysis in the Engineering Division FY79 budget, I made some estimates regarding how manpower was phases in the office. divided among various Based on hours worked which was converted into take home salary earned, the following percentages were produced: FUNCTION ESTIMATE ACTUAL A. CAPITAL IMPROVEMENT PROJECTS 52% 44.1% B. SUBDIVISION 22 8.1 C. MAPS, RECORDS, FILING, CLERICAL 0 6.8 D. ADMINISTRATIVE 0 3.6 E. DEPARTMENTAL REQUESTS 10 6.4 F. AGENCY'REQUESTS 0 1.0 G. CITIZEN REQUESTS 8 4.2 H. VACATION, SICK LEAVE, HOLIDAYS, COFFEE BREAKS, AND TRAINING 8 26 One of the main objectives in performing this analysis was to determine the amount of funds spent on subdivision projects. The first graph summarizes the table above for the actual use as it occurred in the calendar year 1978. Although fairly close on capital improvement projects, I was indeed quite a ways off on subdivision projects. The 8.1 percent shown for subdivisions represents approximately $14,300 in labor costs incurred by the Engineering Division. The other figures are relatively self-explanatory and the only other surprise came on what I termed 411. The "H" category was a more descriptive term for overhead. Approximately 26 percent of the labor budget was utilized in this fashion. The average person in the Engineering Division receives as a benefit approximately 50 days of time away from work. This is broken down as follows: 15 days vacation, 11 holidays, 17 days coffee breaks, 5 days sick leave, and 2 days training. This average of 50 days represents 19 percent of the personnel budget for the Engineering Division. The balance MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 140INES 133t� 2 or difference between the 19 percent and the 26 percent (7 percent) has several explanations. First of all, there can be a certain amount of error in the time keeping system. Also, we had a maternity leave in the division and a rather severe winter which limited the amount of time the survey crew could be in the field. The second graph was a brief rundown of how time was spent while working on capital improvement projects. This is perhaps more informative to my staff but I have shown it since we did develop the information. The total amount of money spent on labor in the division for capital improvements projects was approximately $78,000. I believe this compares very favorably to what might have been spent if these projects had been done by private consulting firms. Assuming that on an average project a consultant will receive approximately ten percent of the construction budget in fees, for the salary paid we would have been able to do approximately $780,000 to worth of projects. I will not attempt to list the projects that were completed during the calendar year 1978. However, the figure of $780,000 compares to one project the size of the Muscatine Avenue project from First Avenue to Scott Boulevard. The third graph provides a comparison of how funds were spent in subdivi- sions, i.e.,. inspection, review, etc. Again, I had anticipated that this function would have been significantly higher' in time spent. During the calendar year 1978, of the approximately $14,000 devoted to subdivisions, we did collect the figure of $6,906 in inspection fees. Instead of collecting only approximately 25 percent of the time spent suggested in my budget submission, we do in fact collect approximately one-half. I do not see any great change occurring in this area since subdivisions seem to be slowing down somewhat from the peak that occurred a few years ago. If you have questions about specific areas of this report, I will be happy to discuss it with you in more detail. bdw4/8-10 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES FONCT/ONS A - CAP/TOL /AWROVEM£NT PROJECTS L FUNCTION FUNCTIONAL RESOURCE ALLOCATIONS 1.978 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES i, 'T/VE T/ME PHASE CAP/TOL 1MPROVE4fENT PRO✓ECTS 1978 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES A b 5 �. n X b a 4 J Z I' I. 3 W ~ h 2 a 3 / 2 W W W 2 Q W b 1 ♦ V • u u W � FFNSE 5118DIVISIONS 1978 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES City of Iowa citta MVMj13=M0RARjbUM Date: June 18, 1979 To: Neal Berlin and City Council From: Dick Plastino, Director of Public Works Re: Salt Policy -- Council Referral The City Council had wished to discuss the salt policy for the upcoming winter. Two winters ago the Public Works Department was applying a mixture of almost 100% salt. Due to roadside vegetation damage and budgetary constraints the Department changed to a mixture of one-half salt, one- half sand this past winter. This mixture appears to balance the con- cerns of budgetary constraints, roadside damage, and service to the citizens. This upcoming winter we would plan to continue with the mixture one-half to three-quarters parts sand to salt. We would propose to continue the Policy of salting and sanding all arterial, collector and bus routes streets and in addition all residential streets deeper than 4%. Council tentatively scheduled this for informal discussion. If such informal discussion does not occur to change the above policy, we will implement the policy automatically. cc: Craig Minter jml/9 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES /337 'City of Iowa Cit. MEMORANDUM Date: June 20, 1979 To: City Council From: Dick Plastino Re: Petition From Residents in 1600 Block of Broadway to Change No Parking Anytime Signs to the Opposite Side of the Street Public Works has investigated this situation and we would recommend against changing the'signs for the following reasons: 1. The 1600 block of Broadway is a deadend. Regardless of which side vehicles park on, the driver must ultimately turn around in a driveway. I,n the petition it was stated it was counterproductive to turn around in a driveway. 2. All of the fire hydrants are on the west side of the street. This is the .side of the street on which parking has been prohibited. 3. During the winter snow plowing season there is more safety and efficiency in having parking always 'removed on the same side of the street. A snow plow driver operating during adverse conditions may not notice that parking was switched to the other side of the street in this one block and may plow into the rear end of parked cars. In summary, Public Works would recommend that parking continue to be prohibited on the west side of the 1600 block of Broadway. If Council agrees with this position we will contact the residents involved and explain the decision to them. cc: Jim Brachtel jm2/24 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES 1338 City Of Iowa CHI MEMORANDUM Date: June 21, 1979 To: Neal Berlin and City Council C� From: Eugene A. Dietz, City Engineer Gr Re: Chauncey Swan Parking Lot Addition Attached for your information are seven drawings that represent several alternatives for a parking facility to be constructed in the proposed vacated site of the U Smash 'Em building. In addition, the seventh drawing proposes to construct a parking facility between the alley and the existing small parking lot in the Plaza itself. The seven alternatives as proposed by Shive-Hattery & Associates are in conjunction with the demolition project. The total estimated cost ranges from approximately $36,000 to approximately $50,000. These figures would include the demolition costs as well as new construction for the finished facility. Alternate N4 in addition to being the least cost, also provides a facility that would more nearly duplicate the existing parking facilities in Chauncey Swan Plaza and the proposed lot across the alley. The cost is shown at $36,850 (excluding landscaping). The proposed 14 parking spaces across the alley from the U Smash 'Em site has been estimated at $28,600. This would attempt to provide a mirror image for the improvements as compared to the existing facility. One of the large costs involved with duplicating the existing facility is the lighting. That phase of the construction is estimated at $15,000. It may be well to point out that the estimated costs as provided by Shive-Hattery do not include lighting for any of their alternatives. If lighting is desirable in a similar fashion to the existing facilities, it may cost approximately $10,000 to $15,000 above the estimated con- struction costs for Alternates 1 through 7 as estimated by Shive-Hattery & Associates. If it is found to be desirable, the total package to demolish the U Smash 'Em building, revamp the site as a parking lot, and construct a new facility across the alley would cost approximately $65,450. If lighting the U Smash 'Em site would be desirable, this figure would then be approximately $75,000 to $80,000. These estimates are in a very preliminary form and it is entirely pos- sible that some savings measures could be accomplished in the area of lighting in particular. The primary reason to submit this information to you is to get a con - census regarding which alternate of those submitted by Shive-Hattery appears most desirable. Once this particular alternate is selected, I can authorize Shive-Hattery to proceed with the demolition contract and MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES IIOINES 1339 Y 1 i 1 .d j 1 I the site Can be cleared. The actual be part 0f the demolition contract butaakcertain amount uof�backfill nand saving of some of the existing foundation walls will be necessary. makes it essential that a preliminary parking lot plan is approved at I Will bavailable discuss thesealternates tin more detailhe July 2, 9 informal Council session to jm4/8 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1401NES 1 s 4 5 D 1� IP !Qi B,P/CK BU/LD/ D 59.57' 63.50' a3B� 0 q BUS DEPOT 19 Spaces r COLLEGE STREET ,/P t. e-.) — ESTIMATED CONSTRUCTION COST Demolition $22,200 Grading e I r I 4,000 A.C. Paving 7,700 Subtotal $ 5, 00 Contingency 4,600 TOTAL $50,100 Cost/Space i i 1 s 4 5 D 1� IP !Qi B,P/CK BU/LD/ D 59.57' 63.50' a3B� 0 q BUS DEPOT 19 Spaces r COLLEGE STREET ,/P t. e-.) — ESTIMATED CONSTRUCTION COST Demolition $22,200 Grading 11,900 Retaining Wall 4,000 A.C. Paving 7,700 Subtotal $ 5, 00 Contingency 4,600 TOTAL $50,100 Cost/Space $ 2,653 Shire-Haffery 6 Assoclafes S^N Consulting Engineers �--, Cd -r tyid, • I•-- C111• Davuu..l D.I. A1 Dot nlne, Wbvgw hrt Abdiw Vinn,t Dr�r• Reviev MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES I9011JES s<•I• /•1_ fldtl 6�� A'S Rett tier /VON Retaining Wall // 1 1 1 1 1 1 I I 1 I I I I lyl 16 Spaces 41 aTq/A//NG h BR/CK BU�/0/ y (Listing Foun- S{0 gation Wall) I I I I I I I I I I I I I I I I I O 14G� 19 �9 1 95 1 Y M c I 86Y '� b O 38' I N A. N I6 , BUS DEPOT �! 4.27' 4 M1. N pi h• 19 A.13.08' 92.35' I �SLoPE414awwT Cf 3 .?ETA/AMAla WALL Alt. N2 /.5�? 7-9'.t.2i 30' l Alt. N3 3 i I l i COLLEGE STREET ESTIMATED CONSTRUCTION/acc) COSTS Alternate N2 Alternate H3 Demolition $22,200 Demolition $22,200 Grading 2,700 Grading 6,500 Railing 3,400 Railing 3,400 A.C. Paving 7,700 A.C. Paving - 7,700 Subtotal $33 ,000 Subtotal S39�p Contingency 3,600 Contingency 3,980 TOTAL $3900 TOTAL $ 3Tj 77 -FO $ 2,475 Cost/Space $ 2,736 Shiva -Hallen & Assoeiales sYL'N S.N Conwlllnq EnginearsCdo Rapid, • log CII/ D««prl Ddu 4 /Z )9 Sed• /"e30' Dra S. Des Melnso-Du6ugw • Fort Madison Vl~ Dr'." M.A.O. IId1 R«Y p'S93 Ro.io.d R. Re. R•.Iri« NONE MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOIIIES ill _ h h a 19 h X19 e �p511 ESTIMATED CONSTRUCTION COST Demolition $22,200 J ,V C 1j •-01W-- j-__ ,ID sy(, b T(E111% yVWLIIINGIFOUNDATION WAL li r nl B /CAf ,PO WNG I I I I I I I I WI\ I ` I �18' ig�P "il 89.57' °ii Mw 63.50' as8' q N BUS DEPOT W /2 FpSCC5 7' h 3 COLLEGE STREF_ T _ _ ESTIMATED CONSTRUCTION COST Demolition $22,200 Grading 5,200 Railing 700 A.C. Paving 5,400 Subtotal $33,500 Contingency 3,350 _0 TOTAL T3 -6-,T5 Cost/Space $ 3,070 Shire-HaHery & Associates JgLTE.eN%�7E ¢ s'^N Consuhing Engineers D.I. 4- C.L, ■qIJ, I... CII/ D.'..P. �..L 1p' D., Moron Dubugw 1.1 /err .diwn Vlnlsn S R.vh,w.d I 1 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 140111ES I D + � �9 � PgvEO gccEY l 45r —�� 14 9 Z9 iA B01Z D/ W t° 1,G �.v. � k y s 16p, a M 19.19^1�. 1 b N 69.57' n I .� h I� V �♦11 D' 4. MN fO � 4J.. 5'0 /f f 7?F5 416" BUS OEPOi' N 422, 'siEp'Q7WA/ 1. V 4. A. 10 N I� wv A? 41.35' 44Y �w A8 Saes W � I 3 21.3o' h .V 7 COLLEGE STREET ESTIMATED CONSTRUCTION COST Demolition $22,200 Grading 7,900 R. R. Ties 3,000 Railing 500 A.C. Paving 5,500 Subtotal $39,100 Contingency 3,910 TOTAL $ 3{ p Cost/Space $ 2 389 I SA N Shive-Hafferr & Associates T6'orwrE F Consulting Engineers Cod-, t.yl• I... cltr • D...q.rt D.1• R /Z %9 S..I. D.r M.in.r . Dubuqu.. Fort Madirrn .Dr..n /•r777 VY,M M.A.O. COP71 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES Z vr..1.9 No !79 2IB-2 ■ I I I I 1 I i I I I i D + � �9 � PgvEO gccEY l 45r —�� 14 9 Z9 iA B01Z D/ W t° 1,G �.v. � k y s 16p, a M 19.19^1�. 1 b N 69.57' n I .� h I� V �♦11 D' 4. MN fO � 4J.. 5'0 /f f 7?F5 416" BUS OEPOi' N 422, 'siEp'Q7WA/ 1. V 4. A. 10 N I� wv A? 41.35' 44Y �w A8 Saes W � I 3 21.3o' h .V 7 COLLEGE STREET ESTIMATED CONSTRUCTION COST Demolition $22,200 Grading 7,900 R. R. Ties 3,000 Railing 500 A.C. Paving 5,500 Subtotal $39,100 Contingency 3,910 TOTAL $ 3{ p Cost/Space $ 2 389 I SA N Shive-Hafferr & Associates T6'orwrE F Consulting Engineers Cod-, t.yl• I... cltr • D...q.rt D.1• R /Z %9 S..I. D.r M.in.r . Dubuqu.. Fort Madirrn .Dr..n /•r777 VY,M M.A.O. COP71 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES Z vr..1.9 No !79 2IB-2 ■ y njYi / S9 E aavta quer-� 45 IN �a 19 0. y9y M 1 �c.1�9�>:—__ - ._.r'�--- 1D 1DD• y 9g4�. p�9'4 Z/.34' Proposed Re[a Hing Wall •� '� � � � 3 i � I I I I 1 rr 1 B ekk I All 211A 6A r1 106 Retaining Wall ( 1sting Foundatio Wall) �I �-- � �u9 �a.� n l 814 1 Bb, 19' 4.' h s° o. e MH 63.50' 0 39' � h a 3 v le, ails DEPOT N .27' � 4 A•qb, .N W.V. A/3 aB' 41.35' A go spaces s'. I 2130' I h i •V i 7 UJ COLLEGE sTREEt /rJT tw C. I ESTIMATED CONSTRUCTION COST Demolition $22,200 Grading 5,000 Retaining Wall 800 Railing 2,400 A.C. Paving 6,300 Subtotal $36,700 Contingency 3,670 TOTAL $10,370 i Cost/Space $ 2323 ' �OL�ER�f/IITE G sti.a I Shire-HaNery do Assocleles 1 SANConsulling Engineers �1 9 C.MI Ryib • Iw0 CII• Duuprl D.I. ¢ /Z 79 S<0i0 /��=30• Dn�lq H. D.. Mein" • Nbuq" . Fon M Imn - Vin" Once M. A.O FI011 b.h A'S93 Reri.wed ,g p,r 11.-1110- NONE /7N2�B-2 is .. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOVIES II i j i i t I I i i i 1 I i I ESTIMATED CONSTRUCTION COST 1. I I -u a �I N ly', BUS DEPOT A' hM1 0' ./•% �Q Al yp /3.OB' 1. 3 a>7�P•A�WN I W /6 s/oaces 34 7' _COLLEGE STREET (PCCj ESTIMATED CONSTRUCTION COST Demolition $22,200 Grading 3,500 R. R. Ties 3,400 Railing 2,400 A. C..Paving 6,300 Subtotal $31,F00 Contingency 3,780 TOTAL $$ i�p Cost/Space $ 2 598 I Shlve-Haffery 6 Assoclafes AZTERAWre 7 1 S�N Consulting Engineers Cd.r fyld' . lo., CII1 • D....... D., AMin . WrAw . F.,1 Modlwn . Vlnwn D MICROFILMED DY JORM MICROLAB CEDAR RAPIDS -DES MOINES Estimated Construction Cost_* Grading $ 3,000 Curb & Paving 1,500 Retaining Wall (RR ties) 500 Lighting 15,000 Subtotal 26,000 Contingency 2 600 28,600 Cost/space $ 1,828 *Landscaping by City (use existing) *Meters by City MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES GILBERT STREET NORTH+ SCALE: 1"=20' EXISTING PARKING ----- PROPOSED PARKING o PARKING METERS 0 LIGHT POLES CHAUNCEY SWAN PLAZA PARKING LOT ADDITION - 1979 Public Works/Engineering Division VEENSTRA & KIMM May 14, 1979 Honorable Mayor and Council City of Iowa City Civic Center 410 East Washington Street Iowa City, Iowa 52240 We submit, herewith, our report on the Sanitary Sewerage System Facility Plan, Part 2 - Sewer System Evaluation Survey, Section 2 - Footing Drain Tile Testing and Civic Survey and Related Phases. This report has been prepared in accordance with our agreement with you. This is the third in a series of reports that will constitute the final Facility Plan for the City of Iowa City. The first report was entitled Part 1 - Infiltration/Inflow Analysis. That report included findings that there was excessive infiltration/inflow in the Iowa City sewer system and also included a recommendation that the City proceed with a Sewer System Evaluation Survey. The second report was Part 2 - Sewer System Evaluation Survey, Section 1 - River Corridor Sewer and Part 3 - Complete Waste Treatment System Plan, Section 1 - Water Pollution Control Plant. A final report, entitled Part 2 - Sewer System Evaluation Survey, Section 3 - Analysis Report and Part 3 - Complete Waste Treatment System Plan, Section 2 - Trunk and Interceptor Sewers will complete the Facility Plan. Subsequent work will include implementation of the Facility Plan including design and construction of the recommended improvements. This report includes additional findings of the Sewer System Evaluation Survey. The report deals primarily with the results of footing drain tile testing and the Civic Survey relative to the prevalence of footing drain tile within the City. In addition, the report includes a discussion of correlation television of certain sewers which was used to confirm that footing drain tile flow was reaching the sanitary sewers. The report also includes a discussion of night flow measurements in selected sewers, measured flows at certain metering manholes and groundwater level measurements. All of these tasks were undertaken to determine the magnitude of infiltration/inflow to the sewer system from footing drain tile. 13 SSD MICROFILMED BY JORM MICROLAB CEDAR RAPIDs•DEs HOIREs Honorable Mayor and Council May 14, 1979 Page 2 The findings of the studies covered by itis report indicate that the largest single source of infiltration/inflow ent,!rs the sanitary sewer system through footing drain tile. Therefore, in general, the major cause of hydraulic overload in the sewer system and treatment facilities is the flow from footing drain tile. The studies covered by the report also indicate that peak flows to the treatment facilities are not a direct function of rainfall intensity. Weather conditions, groundwater levels, time of year and duration of rainfall also affect peak flows to the treatment facilities. A rainfall with a five-year recurrence interval (two inches of rainfall in one hour) was used in the Infiltration/Inflow Analysis as a basis for calculating the highest hydraulic loadings in all parts of the sanitary sewerage system. Subsequent studies indicate that this is not the sole criterion to be recognized for establishing the required hydraulic capacity of a sanitary sewerage system. Peak hydraulic loading on a system may occur with rainfall with a lower recurrence interval than five years. High loadings may be related to rainfall of lesser intensity but because of antecedent (prior) weather conditions, the lesser intensity rainfall more materially affects the hydraulic loading on the sewerage system. A rainfall event with a five-year recurrence interval occurring in March or April will generally have a more significant effect on sewage flows than a comparable rainfall during the drier summer months. This is because of the lack of evapotranspiration during the spring, there may be a large amount of snow on the ground, the frost is leaving or the ground may be saturated. The studies indicate that peak flows occur at the water pollution control plant during rainfall of relatively long duration resulting in the peak direct inflow and the peak footing drain tile discharge occurring simultaneously. The report outlines the results of the footing drain tile tests made in Iowa City, Ankeny and Urbandale. Results of the tests made on individual properties indicate similar patterns in all three cities. Based on the results of the studies, a figure of seven gallons per minute (gpm) per footing drain tile is recommended for the design of main and outfall sewers. The design of submains and lateral sewers should be based on about 13 gpm for each footing drain tile. The report also includes the results of the Civic Survey to determine the numbers of footing drain tile connected to the sanitary sewer system. While the results of the survey were not entirely based upon the information provided by residents, it is estimated that there are 7,356 footing drain tile in the study area. It is estimated that at least 5,455 are connected to the sanitary sewer system. MICROFILMED BY JORM MICROLAB UPAR RAPIDS•DF.s I10II1ES Honorable Mayor and Council May 14, 1979 Page 3 Several options were considered for the disposal of footing drain the flow it lieu of continued discharge to the sanitary sewerage system. The most desirable option for disposal is a specially constructed storm sewer system. The estimated project cost for providing facilites to discharge the 7,356 installations to the storm sewer system is estimated at $29,463,000. The present worth is estimated at $30,045,000. The present worth cost for providing for each footing drain the is, therefore, about $4,100. The cost to remove one gpm of footing drain tile flow from the sanitary sewer system is about $575. It is not cost-effective to remove the footing drain tile flow. It is more economical to transport the footing drain tile flow through the sewer system and treat it at the treatment facilities. Further studies will be based on sizing of sewers and treatment facilities to include footing drain tile flow. The removal of other sources of infiltration/inflow will be based on additional cost-effectiveness studies regarding each source. Complete recommendations as to sewer systems which should be rehabilitated and systems which should be supplemented or enlarged to handle future flows will be included in the Analysis Report for the Sewer System Evaluation Survey and the final Facility Plan. CV A�KIMM _ vL rJ. W. Kimm JWK:jgt 11639 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES ROIDES , '? City of Iowa C y y' XT DATE: Junr 21 , .1979 TO: Neal Berlin, City Manager FROM: Harvey D. Miller, Police Chief RE: North Side Street Lighting You asked for comment on the memo of May 21, 1979 written by the Director of Public Works in regard to street lighting policy. While I cannot make judgements as to the averagerhorizontal footcandles and the like needed to illuminate an area matter of fact, I don't even know what the term means), I do have some comments on lighting and the personal safety of residents and visitors to the north side of Iowa City with that area bounded on the south by Jefferson Street. My comments are based upon a truism 4hat has proven to have more fact than folklore, "Crime wants darkness." Crime in the north end of Iowa City has the character- istics and exhibits the classifications of the popula- tion group. In the Campus/Dormitory area assaultive crimes; intoxication; vandalism; (if and when reported), auto accidents; and a variety of crimes with a sexual connotation occur. As the northside progresses east through the older neighborhoods breaking and entering; window peeking; and to a lesser extent, vandalism predominate. Increased street lighting might decrease crime in this area. However, lighting experiment; aimed toward (:he reduction of crime in Norfolk, Virginia; Wilmington, Delaware; Virginia Beach and Fairfax County, Virginia indicate that an initial but short duration reduction in crime occurs. An alteration in the types of crime comm- itted has been the most significant result of these experiments. Assaultive crimes and those of a sexual connotation have not been reduced significantly. A marked, but temporary reduction in breaking and entering has been noted. In many of these lighting experiments the costs of increased lighting exceeded the costs of the property crimes. Again, the significant results from the experiments, as I see them, was the fact that the nature of the crimes in the affected areas was alter- ed and that the reduction in numbers of crimes was tem- porary. The majority of the above experiments were conducted in relative secluded business areas. F� MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOVIES 13 1f/ A couple of cities in Illinois have experimented with increased neighborhood lighting of a different nature. Combined with neighborhood watch, target hardening, and crime awareness efforts, a number of porchlights on each block have been placed upon a single circuit separate from the household electric meter, controlled by a time clock and come on at certain hours of dark thus offering block lighting as well as designating a place of refuge for a Person fearing a criminal attack. In addition, alley lighting in those areas where multi -dwelling unit parking is pro- vided has been increased by public and private cooperation. Adequate parking lighting is a code requirement while secluded, dark areas remain the governmental responsibility. The idea here is to provide a personal feeling of security. Whether or not personal safety is increased by lighting alone or through a combination of the above factors is important arguable. I suggest that the combination of factors is more than any essential, butonlysonelfactor. factorthatAshouldebelconsidered is any overall crime prevention plan. The Police Department is eager to assist in any way we can to improve public safety in the north end. We do not have the resources to institute a meaningful, continuing crime prevention program in the region. We cannot add duties to the units without additional resources. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 140INES N City of Iowa cin'' DATE: June 21, 1979 TO: Neal. Berlin, City Manager FROM: Harvey D. Miller, Police Chief RE: Serving Minors at the Copper Connection /jam 1v Some time ago I recommended that Council schedule a hearing for the suspension or revocation of the beverage permits of the Copper Dollar for service to minors. We have been unable to locate the bartender alleged to have served the minors. While techincally the owner of the establishment can be charged with the violation, it is my opinion, as a result of the investigation that the bartender in question acted in direct opposition to the expressed orders of the manager of the Copper Dollar and other employees. Finally, ownership of the establishment recently changed and I have no desire to unfairly penalize the new owners. Consequently, I respectfully suggest that my request for a hearing on suspension or revocation of these permits be withdrawn. I shall certainly keep you and Council advised of any violations that might arise in this establishment in the future. Indeed, I will make recommendations as to courses of action to be taken should violation arise. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 1341 ■ r') City of Iowa C j MEMORANDUM OATS: June 22, 1979 TO: City Council FROM: Rosemary Vitosh, Director of Finance RV RE: Reduced Refuse Fee The attached memo from Nancy Heaton, City Treasurer, describes our proposal for administration procedures and eligibility requirements for a reduced refuse fee program. In prior discussions on this, the Council has indicated favoring elimination of the $2 monthly refuse fee for low-income residents. If Council approves of the administration and eligibility criteria, we will then need a final decision on how much the fee will be reduced. After talking with the various representatives of the agencies who will be assisting us on verification of eligibility, I feel thati we have a compre- hensive program.planned which will provide financial relief to those who really need it. From .figures obtained from the various agencies, it appears that a maximum of 1,600 individuals could be eligible for the reduced fee. However, this number will be reduced by those individuals who qualify for more than one agency's program and by those who live with others who would not be eligible for the reduced fee. Following Council approval, we will be publicizing the program with press releases and ads placed in both the Press -Citizen and The Shopper. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES 1401NES 13q-3 { TO: FROM: City o4 Iowa C. TI" *Fes , . DATE: Rosemary Vitosh, Director of Finance Nancy Heaton, City Treasurer 'AtL June 22, 1979 RE: Reduced/Free Refuse Charge for Low -Income Persons When the program first was discussed we used the terms low-income, elderly and handicapped. During the planning process, including discussion with persons from the Social Security administration and the Social Services office, I feel that low-income or income guidelines should be the criteria. This would include the elderly and handicapped with financial limits while guidelines by age or handicap would or could possibly include persons with income well above the average. Further, only persons who have the utilities in their names and do not live with persons not eligible for the program should be considered. The areas in which I recommend that specific guidelines be adopted are administration, and eligibility as follows: A. Administration of the program I. The program be extended to all low-income persons who are eligible according to the eligibility criteria of the programs listed below. 2. That sufficient notice be published so that this can be a strictly voluntary program and the responsibility for signup for the service be that of the person to receive the service. That the service will have to be renewed annually due to the many circumstances, such as change of status, that can effect the eligibility. 3. Each person desiring the service must sign a release of information form. Then on a monthly (or reasonable) basis a listing with attached releases will be sent to the appropriate department for verification of status. This will then be transmitted back to the City and the person shall be set up for the service if eligible. Anyone not eligible would be informed by letter from the City Treasurers office. B. Eligibility and the programs whose guidelines would be used for establishment of eligibility 1. Iowa Disabled and Senior Citizens Property Tax and Rent Disbursement Claim - persons who file this with the Iowa Department of Revenue can present a copy of that form for the last period on file to become eligible. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES M0IIIES t -2- 2. Supplementary Social Security Benefits - I discussed this with Jack Higgins and it is the only social security Program strictly on financial need. His office can verify by Social Security number as provided on the sheet listing and release form. I Title XX - As we discussed with Ron Larsen, Social Services, the benefits for the category of all services are estab- lished on incomes which are 50% of the state median income and set by a state committee with the Governor's approval. 4. Recipients of the ADC and Food Stamp Programs - Darla Brooks of the Social Services department discussed this with us. I think we were in agreement that all persons on these programs would be at income levels similar to the other two programs and should be eligible for the reduced/ free fee. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES N I I -2- 2. Supplementary Social Security Benefits - I discussed this with Jack Higgins and it is the only social security Program strictly on financial need. His office can verify by Social Security number as provided on the sheet listing and release form. I Title XX - As we discussed with Ron Larsen, Social Services, the benefits for the category of all services are estab- lished on incomes which are 50% of the state median income and set by a state committee with the Governor's approval. 4. Recipients of the ADC and Food Stamp Programs - Darla Brooks of the Social Services department discussed this with us. I think we were in agreement that all persons on these programs would be at income levels similar to the other two programs and should be eligible for the reduced/ free fee. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES N `)City of Iowa C10� MEMORANDUM DATES June 21, 1979 TO: City Council p J FROM: Rosemary Vitosh, Director of Finance F' RE: General Fund Balance Projection In reviewing the fund balance for the General Fund and projecting ahead to year end, it appears that we can expect a fund balance of approximately $1,050,000. The attached schedule on projected fund balance was taken from the FY80 Budget Document. The last column was added to show changes in projections. The deficit resulting from the State Transit Grant will not occur as Hugh Mose and I have received approval from DOT for amendments to the grant which reduce the local subsidy amount. This allows us to use local funds for the $50,000 transfer to the Transit Replacement Reserve and for the installation of the ventilation system. (These were both considered ineligible expenditures by the DOT for funding from the State Grant.) We were not able to get approval in this way to cover the funding for the purchase of the two buses. Instead, we will pay for the buses out of the Transit Replacement Reserve. The transfer -in from Special Assessments is lower because actual receipts for FY79 came in lower than originally projected. The additional receipts over budget consist of many items with the largest ones being: Liquor Profits $. 26,874 Bank Franchise Tax 23,133 Interest Income 25,000 Fines, Magistrates Court 25,000 L100,007 The transfer needed to fund the Equipment Division deficit is as follows: FY78 Deficit $(426,412) Already Transferred From: General Fund 76,905 Enterprise Funds 67,490 To Be Transferred From: General Fund 282,017 $ -0- The transfer from the Enterprise funds was based upon those funds' pro- portionate share of prior years' charges and amounts to about 16% of the total deficit. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1I0INES 13*�/ The FY78 deficit in Refuse Collection was increased by a deficit expected in FY79 also. The charges for maintenance of the garbage trucks exceeded what was originally budgeted and this will cause a budget overrun for FY79. Actual expenditures are expected to fall short of the budgeted amount by $60,000. This takes into account possible encumbrances and carryovers at year-end which will require amendment of the FY80 budget as the cash expen- diture will not be disbursed until FY80. The bonds posted with the County Clerk of Court cover judgements against the City which have been subsequently appealed (back rent on parking lot, Stevens case). These bonds are actually Certificates ofDeposits being held by the Clerk of Court. These show up on our accounting records as investments in the General Fund but are restricted in that the funds are not available for general operations. The advantage to using certificates of deposit's rather than purchasing performance bonds is that the City will receive interest income on these funds until the appeal is settled. Therefore, $716,509 is the projected available fund balance as of June 30, 1979. In comparison with our prior projection of $436,371, it appears we have approximately $280,000 of unallocated monies. I must point out that actual year-end figures could vary somewhat as these are only estimates at this time. We have projected a $240,000 budget overrun for the Streets Division. Originally we anticipated having available Road Use Tax monies due to several RUT funded projects costing less than budgeted. However, we now have received all RUT monies for FY79 and we are under budget by $53,000 (4%). When the State increased fuel tax, we amended our receipts budget based upon the per capita estimates received from the DOT. The available Road Use Tax monies has thus dropped to $21,500. This can be used to offset a portion of the Street's budget overrun. I would recommend using $100,000 of the General Fund balance and looking to the FY80 Street's budget to fund the remainder of the deficit. Public Works has indicated that a reduction will be made in the capital outlay purchases for Streets and that the asphalt resurfacing and chipseal pro- gram can be reduced. The combination of these two actions could free up enough funds to cover most of the remaining deficit. I hesitate to recommend using more of the General Fund balance because of funding needs for the Senior Center remodeling and possible future expenditures for Recreation Center parking. Finance will be working closely with Public Works in monitoring the Street's budget in FY80 so that another deficit does not occur. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES I FUND BALANCE PROJECTION GENERAL FUND I 01-31-79 06-15-79 j i PROJECTIONS _ PROJECTIONS 06-30-79 Balance Per FY80 Budget Document $1,109,480 FY79 Budget Revisions: Expenditures - Encumbrances $(210,589) Carryovers (52,506) Amendments 312,762) (575,857) Receipts - i General Revenue Sharing $ 145,105 i RUT 209,172 354,277 Fund Balance Per Amended Budget i $ 887,900 $ 887,900 Items Which Are Not Included in Budget Revisions: Receipts: FY79 State Transit Grant - Actual $ 164,293 { Per Budget 250,000) (85,707) -- Refund on Workmen's Comp. Premium 49,000 49,000 U of I Fire Protection Contract - Actual $ 217,518 Budget 225,000) (7,482) (7,482) ' Transfer from Special Assessments: I To Zero Out Working Capital $ 175,788 Estimated Additional at Year End 60,000 235,788 232,000 Additional Receipts Over Budget -- 143,482 Expenditures: Back Rent on Rec Ctr. Parking Lot (125,000) -- Transfers to Fund Deficits: Equipment Division - Total Deficit $(426,411) Included in Amendments 132,242 (294,169) (285,000) Refuse Collection ( 23,959) (27,391) Expenditures Under Budget -- 60,000 $ 636,371 $1,052,509 j Restricted Balance: Bonds Posted with County Clerk of Court-- 174,000 Tort Liability Balance 200,000) 162,000 i { $ 436,371 L_716,509 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 140INES IJ MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES 1 i - CAPITAL IMPROVEMENT PROGRAM 1. INTRODUCTION In the FY80-84 CIP, the City Council determined what projects can be realistically accomplished in the next several years on the basis of anticipated revenues, City priorities and the Council's willingness to issue essential corporate purpose bonds or seek voter approval of general corporate purpose bond issues. w.� The City Council first determined which projects it would like to see funded in FY80. Secondly, all projects not funded in FY80 were automatically shifted to the next fiscal year unless the Council designated a specific year for the project or desired to eliminate i the project from the five year plan. The final CIP document therefore reflects a five year plan for providing capital improvements commensurate with the fiscal policy 'I I and the needs of Iowa City. I In fiscal year 1980, authorizations of $3,800,058 in essential corporate purpose bonds are proposed. II. CIP SCHEDULING CONSIDERATIONS JCapital improvement programming is the planning, coordination, and scheduling of public fiscal improvements for a community over a period of years. The scheduling is developed according to priorities 'i based on need, desire and importance of such improvements to the community within the constraints of the City's ability to finance as well as having the staffing to design and administer the projects. Essentially, the CIP is a legislative and management tool to facili- tate the scheduling, planning and execution of a series of public improvements over a five year period. Usually the development of a CIP begins with the proceeds from a current or recently updated comprehensive plan. On May 30, 1978 the City Council adopted the — Comprehensive Plan for Iowa City. This plan presents an analysis of needs and desires of the community over an intermediate to long- range time span, and translates these needs and desires into prescribed action programs and services that can be performed by City government. The fiscal year 1980-84 capital improvement projects are in keeping I with the direction and programs of this Comprehensive Plan. i — III. FISCAL POLICY CONSIDERATIONS A concept of sound financial planning is of equal importance to — fiscal planning, and is critical for the success of any program whether it be public or private. As a result, the Capital Improvement Program is a determination of 1) the levels of capital projects, and 2) the sources of financing those projects. In determining the scheduling of programs for completion within the next five years, MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES ,._ MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1101IIES ii i I j scheduling of programs for completion within the next fiveyears, it was necessary to deal with the City's financial resource limita- tions; both those that have been _ established by State law, and those that have been adopted as policy by the City Council as a guide to future City expenditure and indebtedness. It is the I latter limitation to which the City Council addressed itself in 1973 by the formal adoption of a fiscal policy that is aimed at controlling and regulating the property tax levy for debt service on general obligation bonds used to finance capital expenditures. The 1979 revised fiscal i policy provides a more comprehensive method of financing the many capital projects which the City needs. 1 Adherence to this fiscal policy can be expected to provide the following advantages: I. Investors interested in City of Iowa City bonds can refer to a fiscal policy and rely on it in making decisions on whether to buy obligations of the City in C and determining the interest rate that they will bid. A formally approved fiscal policy ! has a strong bearing on the City's ability to maintain and j improve on its credit rating. 2. The property tax levy for debt service on which there is no State imposed maximum limit J can be projected and regulated to either remain relatively constant or to increase at an even controlled rate. I ] 3. Planning for public improvements normally takes place over a period of years. Nearly always, funds are spent for engineering and right-of-way prior to the �1 years in which actual construction takes place. The fiscal policy can establish amounts of J money which will be spent for several years in the future for best improvement public facilities planning and make it possible to r time and funds on those priority projects which iconcentrate J . can be financed and constructed within the City's financial limitations. 4. A very significant advantage of a formal fiscal policy is to I demonstrate the need for additional revenue sources in future years by matching expenditures and indebtedness permitted by such a fiscal policy against a much greater need for additional public improvements. IV. APPLICATION OF FUNDS The funding of the projects included in the FY80-84 CIP can be categorized into the four �i major categories of: — i I. operating revenue 2 ,._ MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1101IIES n 2. bond issues (general obligation, revenue and special assessment) 3. State and Federal grants for assistance 4. special revenue (revenue whose use is restricted to specific types of projects). The City strives to secure and utilize funds other than operating revenue and general obligation bonds to the maximum extent practical, and utilize general obligation debts within the parameters of the fiscal policy. As the "Summary By Source Of Funds" chart on page 39 illustrates, operating revenue and general obligation debts account for 41.8 percent of the funding for the five year FY80-84 CIP. Of the remaining sources, State and Federal grants account for 55.4 percent of the five year total, revenue bonds account for 2.7 percent, and miscellaneous revenue accounts for the remaining .1 percent of the projected five year total of $50,370,464. 3 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DE: MOINES i s I Ili I I J I IJ I I i I � J I - J IJ I -1 , I �1 I I J I I n 2. bond issues (general obligation, revenue and special assessment) 3. State and Federal grants for assistance 4. special revenue (revenue whose use is restricted to specific types of projects). The City strives to secure and utilize funds other than operating revenue and general obligation bonds to the maximum extent practical, and utilize general obligation debts within the parameters of the fiscal policy. As the "Summary By Source Of Funds" chart on page 39 illustrates, operating revenue and general obligation debts account for 41.8 percent of the funding for the five year FY80-84 CIP. Of the remaining sources, State and Federal grants account for 55.4 percent of the five year total, revenue bonds account for 2.7 percent, and miscellaneous revenue accounts for the remaining .1 percent of the projected five year total of $50,370,464. 3 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DE: MOINES i FISCAL POLICY ANNUAL OPERATING EXPENDITURES I. BALANCED BUDGET: The budget of the City of Iowa City shall be drawn so that es- timated revenues and anticipated expenditures are equal. (State law requirement) 2. TAX CEILING: The budget of the City of Iowa City shall be drawn so that tax J revenue in the general operating fund does not require a tax levy in excess of the limit established by State law. i _J 'A 1 J i J J w CAPITAL EXPENDITURES I. DEFINITION: A. Capital Improvements - Capital items of a relatively permanent nature, such as buildings, and other attachments or improvements to land which are intended to remain so attached such as storm drains, sewers. and streets. Capital improvements have four characteristics: (1) They last a long time. (2) They are relatively expensive. (3) They usually don't recur annually. (4) They result in fixed assets. B. Capital Expenditures - Those expenditures for public improvements and their preliminary studies and the acquisition of property or equipment for new public improvements. Capital expenditures are expenditures for capital improvements and shall be financed under the provisions of this fiscal policy and planned in terms of the five year Capital Improvement Program. Excluded from capital expenditures are operating expenditures; those annual expenditures which are necessary to the maintenance of the city, the rendering of services, and providing for normal operations. 2. PROJECT ANALYSIS: Capital improvement projects for the five year period shall be analyzed for the following: (1) Compatibility with the Comprehensive Plan. (2) Revenue source - A clear distinction shall be made between tax supported and self -supported bonds (G.O. versus revenue bonds). All projects supported by revenue bonds must 4 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOVIES demonstrate ability to develop sufficient income to repay their costs and costs associated with financing. In addition, proposed revenue sources shall be analyzed in terms of whether the revenue can be used for the proposed project and the probability that the revenue will be available. (3) Compatibility with the City Council's goals. 3. MAXIMUM LIMITATIONS ON GENERAL OBLIGATION BONDS: The following two maximum limitations shall apply to general obligation bonds: A. Debt Limit: Debt incurred as a general obligation of the City of Iowa City shall not exceed constitutional or statutory limits: presently 5% of the market value of the taxable property within the corporate limits as established by the City Assessor. (State law requirement) B. Borrowina Reserve: A minimum of 20% borrowing reserve, or debt margin, shall be maintained to meet emergencies, and if so used, the bonds shall be retired as soon as reasonably possible in accordance with the provisions of this fiscal policy. 4. CEILING ON DEBT SERVICE: Debt service charges payable from the general tax levy shall not exceed 25% of that levy in any one fiscal year. 5. FINANCING: As a general rule financing of capital improvements shall meet the following guidelines: A. General property tax and operating revenues, to the extent available, shall be used for capital project financing. B. When general property tax and operating revenues are not available under the maximum tax rates permitted by law or deemed advisable by the Council, financing of capital projects and replacements may be accomplished by the use of bonds as outlined in Section 6 hereof. C. Every effort shall be made to seek out state or federal grants or assistance to offset a portion of the cost of capital projects. 3 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES I I! J L 6. BOND ISSUES: A. General obligation bonds - Bonds shall be.pf a serial type and general obligations of the City of Iowa City. They shall have a maximum maturity of 20 years. The maturity schedule shall provide for level principal amortization payments insofar as practicable. B. Revenue Bonds - Revenue bond financing shall be determined after first reviewing whether the use of revenue bonds could be more advantageous than financing with general obligation bonds. Revenue Bonds shall be issued in accordance with the following: (1) Amortization of principal and interest shall require no more, including reserves, than approved estimates will provide from net revenues to be available. (2) In so far as possible, debt service, after the project has been completed and in operation for one full fiscal year, shall be level within practical constraints each year. (3) All revenue bonds for public purposes shall be sold at public competitive bidding in accordance with the requirements of Chapter 76, Code of Iowa as amended. The first fiscal policy was adopted by motion of the City Council at its regular meeting on June 5, 1973. This revised policy was adopted by Council motion on June 19, 1979. N MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES PROJECT SUNSET STREET BENTON TO PENFRO GRAND AVENUE WIDENING LINN STREET IMPROVEMENTS CENTRAL BUSINESS DISTRICT ALLEY PROJECT NORTH BRANCH STORM WATER DETENTION CITY SHARE EXTRA -WIDTH PAVING SCOTT P.OULEVARD/PHASE I SCOTT BOULEVARD/PHASE II. BURLINGTON STREET BRIDGE IOWA -AVENUE BRIDGE CAMP CARDINAL ROAD BRIDGE SOUTH GILBERT STREET IMPROVEMENT CBD STREETSCAPE/PHASE II WASTEWATER TREATMENT FACILITY IMPROVEMENT PROJECT RIVER CORRIDOR TRUNK SEWER IMPROVEMENT BENTON/RIVERSIDE INTERSECTION IMPROVEMENT EASTSIDE WATER STORAGE TANK WATER PLANT SOLIDS DISPOSAL FIRE TRAINING TOWER PROJECT fj VOTER APPROVAL (V) I COUNCIL APPROVED (C) TOTAL { i CITY OF IOWA CITY FY1980-1984 CAPITAL IMPROVEMENTS PROGRAM GENERAL OBLIGATION BOND AUTHORIZATION SCHEDULE TOTAL FY80-84 $ 32,000 10,000 564,000 126,000 300,000 300,000 850,000 650,000 880,000 731,000 216,000 417,000 1,000,000 10,699,994 FY80 $ 32,000C $ 10,000C 10,000C 300,000C I 001000 850,000C 200,000C 417,000C 1,000,OOOC FY81 302,000C 116,000C 50,000C 450,000C 40,000C 731,000C FY82 FY83 FY84 262,000C -- -- 50,000C 840,000C 347,058C 2002,939C 6,049,998C 400,000 400,000C 134,000 134,000C -- 770,000 -- -- 880,000 300,000 -- -- -- 3 8nn nFa 3,791,939 $ 19,259,994 $3,800,058 $3,791,939 7,201,998 $7,201,998 50,000C 18, Dom 2,199,999C 300,000V 300,000 2,267,999 $2,567,999 770,OOb 880,000C 770,000 1,128,000 $1,898,000 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES FEDERAL AID RIVER CORRIDOR TRUNK SEWER BIKEWAY & HANDICAPPED CURB CUT PROGRAM BIKEWAY PEDESTRIAN TRAIL -EAST SIDE RIVER SOUTH GILBERT STREET IMPROVEMENT ROCKY SHORE BIKEWAY WASTEWATER TREATMENT FACILITIES IMPROVEMENT BUS STOPS, SIGNS & SHELTERS TRANSIT OPERATION & MAINTENANCE FACILITY NEW SOUTHWEST.PARK WILLOW CREEK TENNIS COURTS COMPLETION OF CITY PARK BIKE TRAIL 00 ROAD USE TAX COMPLETION OF CITY PARK BIKE TRAIL 'EQUIPMENT SERVICE BUILDING IMPROVEMENT .. BIKEWAY & HANDICAPPED CURB CUT -:PROGRAM 'BIKEWAY PEDESTRIAN TRAIL -EAST SIDE RIVER CONCRETE STREET & CURB REPAIR DUBUQUE STREET IMPROVEMENTS HOUSING & COMMUNITY DEVELOPMENT ACT ROCKY SHORE BIKEWAY FIICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES IIOIIIES TOTAL FY80-84 FY80 FY81 FY82 FY83 FY84 $ 1,500,000 $ 1,500,000 $ -- $ -- $ -- $ -- 56,000 14,000 14,000 14,000 14,000 -- 21,000 21,000 -- -- -- -- 133,000 133,000 -- -- -- -- 70,000 70,000 -- -- -- -- 21,620,003 1,271,766 4,133,236 11,891,000 4,324,001 57,927 57,927 -- -- -- -- 1,056,000 48,000 1,008,000 -- -- -- 40,000 -- 40,000 -- -- -- 30,000 30,000 -- -- -- -- 21,000 21,000 24,604,930 3,166,693 5,195,236 11,905,000 4,338,001- $ 91000 $ 91000 $ -- $ -- $ -- $ -- 323,200 94,500 142,300 86,400 -- -- 24,000 6,000 6,000 6,000 6,000 7,000 7,000 -- -- -- -- 345,090 76,120 81,450 85,520 49,750 52,250 5 000 713,290 -- 5,000 -- -- 52.250 55,750T 7, 3 92,620 $ 30,000 $ 30,000 $ -- $ -- $ -- $ -- FIICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES IIOIIIES SPECIAL ASSESSMENTS BENTON STREET SIDEWALK ELLIS AVENUE ALLEY STATE AID RIVER CORRIDOR TRUNK SEWER SOUTH'GILBERT STREET IMPROVEMENT WASTEWATER TREATMENT FACILITIES I r IMPROVEMENT BENTON/RIVERSIDE INTERSECTION 'IMPROVEMENT BUS'STOPS;'.SIGNS & SHELTERS' TRANSIT,OPERATION & MAINTENANCE FACILITIES ,o OPERATING REVENUE ANIMAL SHELTER EQUIPMENT SERVICE BUILDING IMPROVEMENT SANITARY SEWER/CITY STREETSCAPE `PHASE II WASTEWATER. TREATMENT FACILITIES IMPROVEMENT BUS STOPS, SIGNS & SHELTERS TRANSIT OPERATION & MAINTENANCE FACILITY PARKING GARAGE "B" AIRPORT -AUTO PARKING AREA j REVENUE BONDS CITY OF IOWA CITY FY1980-1984 CAPITAL IMPROVEMENTS PROGRAM TOTAL FY80-84 FY80 FY81 FY82 FY83 FY84 $ 5,100 $ 5,100 $ -- $ -- $-- 15,000 15,000 -- -- -- -- 20,100 20, TOO T $ 100,000 150,000 1,380,003 134,000 7,241 132,000 1,903,244 $ 187,000 104,300 55,000 300,000 7,241 132,000 985,000 15,000 1,785,541 $ 100,000 $ -- $ -- $ -- S -- 150,000 -- -- -- -- i 81,176 263,825 759,002 276,000 -- 134,000 -- -- -- -- 7,241 -- -- -- - 6,000 126,000 478,417 389,825 759,002 276,000 $ -- $ 187,000 $ -- $ -- $ -- I. 43,000 57,700 3,600 -- -- I 55,000 -- -- -- -- �i 300,000 -- -- -- -- 7,241 -- -- -- _ 6,000 126,000 -- -- -- 985,000 -- -- -- -- 15,000 1,411,241 370,700 3,600- PARKING GARAGE "B" $1,170,500 $1,170,500 $ $ $ $ 10 UNIT T -HANGAR 100,000 100,000 AIRPORT -SHOP BUILDING65,000 65,000 -- -- -- -- ,335,500 1,335,500 $- b -- i MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1401PIES 7771 7771 GENERAL REVENUE SHARING CIVIC CENTER HEARING & AIR CONDITIONING SWIMMING POOL MERCER PARK RESTROOMS ADDITION TO RECREATION CENTER WILLOW CREEK TENNIS COURT NEW SOUTHWEST PARK OUTDOOR FIRING RANGE ` PRIVATE CONTRIBUTIONS -OTHER BIKEWAY PEDESTRIAN TRAIL -EAST OF:,RIVER ROCKY SHORE BIKEWAY o CRANDIC BRIDGE SIGNAGE GRAND TOTAL TOTAL FY80-84 FY80 FY81 FY82 FY83 FY84 $ 281,165 162,500 35,000 120,000 30,000 40,000 36,200 704,865 $ 2,000 5,000 6,000 13,000 $ 81,165 $ 50,000 $ 50,000 $ 50,000 $ 50,000 -- 162,500 -- -- -- 35,000 -- -- 120,000 -- -- -- 30,000 -- -- 40,000 -- -- -- 36,200 -- -- -- �i 146,165 408,700 -50,000 50,000 T 50,000 $ 2,000 $ -- $ -- $ -- $ -- 5,000 -- -- -- -- 6,000 13,000 $10.593.794 510,391.150 =119,52Q. 52Q. $7 287 7F0 $2.0 np,2M MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 14010ES I PROJECTS PUBLIC WORKS Public Works Administration CIVIC CENTER HEATING, VENTILATING & AIR CONDITIONING This project will provide for replacement or extensive remodeling of the air conditioning/heating system in the Civic Center. It will also provide for energy conservation retrofitting projects which provide actual cash pay back in ten years or less. The systems in the Civic Center operate inefficiently and are extremely high on energy consumption. RALSTON CREEK SOUTH BRANCH DETENTION STRUCTURE The purpose of this project is to provide for the construction of nine dry bottom detention dams for water detention during heavy rainstorms. Under existing runoff conditions, implementation cr the south branch detention project would lower projected south branch 100 year storm flows at College Street from 2700 cubic feet per second to 1930 cubic feet per second, a 29% reduction. LINN STREET IMPROVEMENTS The purpose of this project is to replace Linn Street from Iowa Avenue to Burlington Street. Linn Street is the remaining street which has not been improved in the major urban renewal development and will necessitate some reconfiguration in the block between Washington Street and College Street; bicycle racks need to be placed along Linn Street near the Library and City Plaza; curbline changes may need to be made near the Senior Center, as well as some changes in street lighting; modest plantings and street furniture are also included in the total cost of this project. FA - FEDERAL AID $A - STATE AID i ORS - GENERAL REVENUE SHARING RUT -ROAD USE TAX 11 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 140INES TOTAL COST .F Y 1960-84 281,165 PRIOR TO FY1980 SCHEDULE FOR THE FIVE—YEAR PERIOD FY1980 FY1901 FY1982 FY1983 FY1984 88,835 GRS 81,165 GRS 50,000 GRS 50,000 GRS 50,000 GRS 50,000 GRS 605,900 HC 302,000 GO 262,000 GO GO -GENERAL OBLIGATION BOND SP - SPECIAL ASSESSMENT RB - REVENUE BOND OR - OPERATING REVENUE HC - HOUSING 8 COMMUNITY DEVELOPMENT ACT 12 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MORTES PROJECTS CENTRAL BUSINESS DISTRICT ALLEY PROJECT The purpose of this project is to provide for upgrading and replacement of alleys in the Central Business District (CBD). Due to extensive streetscape improvements the alleys serve as major goods delivery areas. The paved surfaces have deteriorated seriously. The project cost estimate includes removal and replacement of deteriorated pavement, removal of encroachments, and modest aesthetic improvements including security lighting. NORTH BRANCH STORM WATER DETENTION STRUCTURE The purpose of this project is to construct a dry bottom detention dam to provide for water detention during heavy rainstorms. Under existing runoff conditions and based upon preliminary hydraulic ,computations, implementation of the proposed detention project will lower projected rural or rural equivalent north branch 100 year storm flows at Jefferson Street from 3500 cubic feet per second to 1400 cubic feet per second, a 60% reduction. Reduction rates attributed to this project would be greater at points closer to the project and diminish at points downstream from the uncontrolled urbanized areas as the watershed becomes greater. RIVER CORRIDOR LAND IMPROVEMENT The purpose of this project is to acquire land adjacent to east and west side of Iowa River as part of the goal to preserve riverfront land for public use area. FA - FEDERAL AID GRS - GENERAL REVENUE SHARING SA - STATE AID RUT - ROAD USE TAX 13 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES I1011JES TOTAL COSTJ F Y 1980-84 126,000 300,000 n PRIOR TO FY1900 SCHEDULE FOR THE FIVE—YEAR PERIOD FY1980 FY1981 FY1982 FY1903 FY1984 10,000 GO 116,000 GO 750,000 HC 300,000 GO 75,000 HC 00 - GENERAL OBLIGATION BOND SP - SPECIAL ASSESSMENT RB - REVENUE BOND OR -OPERATING REVENUE HC - HOUSING B COMMUNITY DEVELOPMENT ACT 14 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES PROJECTS STREET SYSTEM MAINTENANCE BENTON STREET SIDEWALK be The purpose of this project is to construct sidewalk tween Teg and Estron on the south side of Benton Mebetween Benton and Kathlin Drive on the east side of Estron. This project will provide for a continuous safe route from new housing areas to Ernest Horn Elementary School utilizing all weather hard surface. GRAND AVENUE WIDENING The purpose of this project is to widen Grand Avenue east of Byington to provide two through traffic lanes. At the present time Byington Avenue is two lanes one-way but is bottle -necked down to one lane at the intersection with Grand Avenue. CITY SHARE EXTRA -WIDTH PAVING PROJECT The purpose of this project is to provide the City's share of the cost of extra width paving in new subdivisions. Cityic feet. The private developers cover the cost of 28 feet wide paving, the City pays for the cost of paving in excess of that amount. The City could eliminate this as a City expenditure by repealing the ordinance and passing the cost back to the purchasers within the development. Parking restrictions might also reduce the need for extra width paving. FA • FEDERAL AID SA - STATE AID ORS - GENERAL REVENUE SHARING RUT - ROAD USE TAX 15 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES NOINES 10,000 300,000 GO- GENERAL OBLIGATION BOND RB - REVENUE BOND HC - HOUSING s COMMUNITY DEVELOPMENT ACT 16 SP - SPECIAL ASSESSMENT OR -OPERATING REVENUE MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES PROJECTS TOTAL COST .FY198o-84 EQUIPMENT SERVICE BUILDING IMPROVEMENT PROJECT 427,500 Development of the equipment service garage at the Riverside Drive site began over 20 years ago. Originally, it functioned primarily as the Street Division maintenance yard. As the city equipment fleet increased in size and as other functions were added to City services, the facility was expanded and modified. It should be noted that in the past 15 years the City's motorized equipment fleet has increased three -fold while the maintenance facility has remained fundamentally unchanged. This project will remedy safety deficiencies, poor working conditions, lack of storage, lack of washing facilities, and lack of warehouse and office facilities. BIKEWAY AND HANDICAPPED CURB CUT PROGRAM 80,000 Curb cuts will be made at appropriate locations to make sidewalks accessible to bicycles and wheelchairs. This project will provide for approximately 80 curb cuts throughout the community, with initial locations along First Avenue, Benton Street, and Park Road. This project relates to the Comprehensive Plan transportation policy of "developing a safe, continuous bikeway system which will encourage the use of the bicycle for transportation and recreation by all age groups." Funding for this project is 70% federal (Federal Aid Highway Act) and 30% Road Use Taxa BIKEWAY PEDESTRIAN TRAIL - EAST SIDE OF RIVER I 30,000 This trail would link the existing trail along North Dubuque Street (north of Park Road) with the trail along the river south of the Music School footbridge to Madison Street. It would take bicyclists off the North Dubuque Street hill (south of Park Road) and considerably ease the flow of traffic on this street. This trail is part of the continuous green belt river trail shown in the Comprehensive Plan, the Stanley River Corridor Study, and the Preliminary Bikeways Plan. FA -FEDERAL AID SA - STATE AID GRS - GENERAL REVENUE SHARING RUT - ROAD USE TAX 17 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOIRES PRIOR TO SCHEDULE FOR THE FIVE-YEAR PERIOD FY1980 FY1990 FY1981F3,600 Y1982 FY1983 FY1984 189,892 RUT 94,50ORUT 142,300 RU6,400 RUT 146,170 OR 43,000 OR 57,700 OR OR I14,000 6,000 21, 000 FA 2,000 * 7,000 RU' 14,000 FA I 14,000 FA� 14,000 FA 6,000 RU 6,000 RU 6,000 RU' GO -GENERAL OBLIGATION BOND RB - REVENUE BOND SP - SPECIAL ASSESSMENT HC - HOUSING B COMMUNITY DEVELOPMENT ACT OR -OPERATING REVENUE * - University of Iowa 18 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOVIES PROJECTS TOTAL COST I.FY[900-84 CONCRETE STREET AND CURB REPAIR 1 345,090 This project is designed to repair concrete street defects City-wide beginning on arterials and bus routes in FY80, residential streets in FY81 and FY82 and curb repair beginning in FY83 and continuing for 10 years to FY93. Field inspection in September 1978 indicated a repair program of $76,120 for the worst sections of the City's concrete arterial and bus routes. SUNSET STREET - BENTON TO PENFRO 32,000 The purpose of this project is to complete the inside two lanes of Sunset Street. This street will be an arterial street connecting Highway 1 to Benton and Melrose. After completion•of Sunset Street, Wylde Green Road will be terminated in a cul-de-sac and returned to a residential access road. SCOTT BOULEVARD/PHASE I 850,000 This project will provide a 31 foot wide roadway from Highway 6 to American Legion Road. This project is needed to provide access from the developed areas on the east edge of the city north of Muscatine to the industrial development on the south. SCOTT BOULEVARD/PHASE II 650,000 This project will provide a 31 foot wide roadway from American Legion Road to approximately Court Street. Phase I and Phase II projects provide for construction of secondary arterial streets. According to the Comprehensive Plan, these streets serve a dual function of circulation and access. Phase II will also provide a permanent street surface on the top of the proposed storm water detention structure over the east branch of Ralston Creek. FA - FEDERAL AID SA -STATE AID ORS - GENERAL REVENUE SHARING RUT - ROAD USE TAX IF MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOIIIES 1 I, PRIOR TOSCHEDULE FOR THE FIVE-YEAR PERIOD is FY1980 FY1980 FY1981 F FY1982 FY1983 FY1984 76,120 RUT 81,450 RUT 85,520 RUT 49,750 RUT 52,250 RUT i t i 32,000 GO -i 850,000 GO 200,000 GO 450,000 GO I j I J i J i 00 - GENERAL OBLIGATION BOND SP - SPECIAL ASSESSMENT RB - REVENUE BOND OR -OPERATING REVENUE HC - HOUSING B COMMUNITY DEVELOPMENT ACT 1 r li ! 20 N' - MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES PROJECTS BURLINGTON STREET BRIDGE This project would provide for a study to determin needs and subsequent design and reconstruction ofthe I eastbound bridge over the Iowa River on Burlin Street. An extensive rehabilitation project appea a must for this structure due to its age and the high amount of traffic passing over this bridge. IOWA AVENUE BRIDGE _ This project would completely rehabilitate the existing Iowa Avenue bridge over the Iowa River. An extensive rehabilitation project as recommended by the engineering consultant is required for this structure due to its age and the high amount of traffic passing over this bridge. CAMP CARDINAL ROAD BRIDGE 216,000 This project would completely replace the existing bridge on Camp Cardinal Road over Clear Creek. This structure currently few properties, but the road south of the bridge is a dead end. The repairs - accomplished in FY79 extended the life of the structure only five years. The bridge is currently osted for ten tons. With this in mind, a new structure at this site must be considered. DUBUQUE STREET IMPROVEMENT 5,000 The purpose of this project is to widen the pavement slightly and straighten the curve on Dubuque Street near the intersection of Brown. Due to narrow lanes, the slight curve near the intersection of Brown Street on Dubuque tends to be somewhat dangerous. — This improvement would necessitate purchasing R.O.W. SOUTH GILBERT STREET IMPROVEMENT 700,000 The purpose of this project is to realign and pave South Gilbert at Highway 6 and 1.1 miles south. This project was approved by Council in FY79. _ FA • FEDERAL AID ORS - GENERAL REVENUE SHARING ` SA -STATE AID RUT - ROAD USE TAX 21 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 11010ES I j SCHEDULE PRIOR TO FOR THE FIVE-YEAR PERIOD FY1980 FY1980 FY1901 FY1962 FY1993 FY1984 �r140,000 GO 840,000 GO i I 731,000 GO �.J j j J 18,000 GO'' 198,000 GO I J 5,000 RUT 1 700,000 FA 133,000 FA 300,000 GO 150,000 UST P 417,000 GO r I 3 OO - GENERAL OBLIGATION BOND SP - SPECIAL ASSESSMENT R8- REVENUE BOND OR -OPERATING REVENUE ! HC - HOUSING S COMMUNITY DEVELOPMENT ACT V Ii - 22 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOIRES M PROJECTS TOTAL COST I.FY1980-841 ROCKY SHORE BIKEWAY 1 105,000 The purpose of this project is to provide a bikeway on the west side of Rocky Shore Drive that will connect the Finkbine Bikeway with Normandy Drive and the bikeway through City Park. This project will provide a safer trail for bicyclists along Rocky Shore Drive. CBD STREETSCAPE - PHASE II 1,000,000 The purpose of this project is to provide streetscape improvements on Washington, Clinton, Burlington and Capitol Streets adjacent to blocks 83 and 84. The redevelopment of the CBD (Central Business District) and construction activity on blocks 83 and 84 will cause a need to repair or replace major portions of Washington and Capitol Streets. Parking ramp construction will necessitate replacement of sidewalks on Burlington 'and Clinton Streets. Because the modulars have been located in the right-of-way, major repair/replacement .has been deferred. The preliminary budget allocation (FY79) of $500,000 will not replace the essential items included in the project area. FA - FEDERAL AID SA - STATE AID ORS - GENERAL REVENUE SNARING RUT - ROAD USE TAX 23 MICROFILMED BY JORM K41CROLAB CEDAR RAPIDS -DES MOINES GO -GENERAL OBLIGATION BOND SIP - SPECIAL ASSESSMENT RB - REVENUE BOND qR_ OPERATING REVE�{UE HC-14OUSINOS COMMUNITY DEVELOPMENT ACT Local fun S Project Green) USTEP - Urban -State Traffic Engineering Program 24 FIICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 25 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES j PROJECTS TOTAL COST I F Y 1990-84 SANITARY SEWER/CITY STREETSCAPE - PHASE II — I 55,000 i The purpose of this project is to replace the badly deteriorated sanitary sewers in Clinton (Burlington to Washington) and Capitol Street (Burlington to College) prior to reconstruction of the streets in Phase II of the Streetscape Project. ELLIS AVENUE ALLEY 15,000 Thprose of s roect is o intall six inch thickuconcrete teast-West inlalleyJrunning and connecting j Ellis Avenue and Ridgeland Street between and running parallel with Moss and McLean. POLLUTION CONTROL _ WASTEWATER TREATMENT FACILITIES IMPROVEMENT PROJECT 34,000,000 The purpose of this project is to construct a wastewater treatment facility to meet federal and state regulations governing discharge of wastewater. RIVER CORRIDOR TRUNK IMPROVEMENT PROJECT 2,000,000 �~ This improvement provides for the construction of a $4,000,000 trunk sanitary sewer from the present .sewage treatment plant to Taft Speedway. The existing east and west side trunk sewers are currently overloaded and require immediate relief for present and future loads to prevent discharging of raw sewage into the Iowa River. This trunk sewer will also provide sanitary sewer for some areas on the north side that are unable to develop now because the ` of lack of sewer. The G.O. Bond Issue will be abated by sewer revenues. TRAFFIC ENGINEERING CRANDIC BRIDGE SIGNAGE ` 6,000 The purpose of this project is to install overhead signs in advance of Iowa Avenue Crandic Railroad Overpass to ` warn of law bridge. This location has a history of accidents involving trucks. The installation of overhead signs in advance of this overpass should help — reduce the truck accident experience. FA - FEDERAL AID ORS - GENERAL REVENUE SHARING SA -STATE AID ` RUT -ROAD USE TAX 25 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES PRIOR TO FY1980 1 1 SCHEDULE FOR THE FIVE-YEAR PERIOD E8,000 FY1980 FY1961 FY1982 MON FY1984 OR 55,000 0 15,000 5 215,000 0 1,271,766 F 4,133,236 F 11,891,000 F 4,324,001, F 615,000 GO 81,176 S1 263,825 SII 759,002 S 276,000 S 1,237,500 F 300,000 Of 2,102,939 G 6,049,998 G 2,199,999 82$00 S 347,058 G .1,500,000 F.A 1,500,000 FA 100,000 SAI 100,400 SA 400,000 GO 400,000 G 6,000 GO - GENERAL OBLIGATION BOND RS -REVENUE BOND HC - HOUSING a COMMUNITY DEVELOPM NT ACT * - Private (Hawkeye Wholesale 25 SP - SPECIAL ASSESSMENT OR -OPERATING REVENUE FIICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MORTES PROJECTS BENTON/RIVERSIDE INTERSECTION IMPROVEMENT PROJECT This project would provide for the resignalization of this intersection, in addition to the addition of left -turning lanes on Riverside Drive and Benton and extension of lanes on Benton, thereby reducing congestion and increasing safety at this location. MASS TRANSPORTATION BUS STOPS, SIGNS AND SHELTERS This project would provide for bus shelters of various sizes at approximately 20 locations throughout the City, and bus stop signs at every stop. The signs will cost about $7 each for material and $18 each in installation costs, for a total of $13,400. The small prefabricated bus stop shelters cost $2750 each installed. Federal and state assistance is available, reducing the local share to 30% of the total cost. TRANSIT OPERATION AND MAINTENANCE FACILITY A new transit garage is needed for the following reasons: 1. The existing garage is too small for our current fleet. 2. The mechanics must work in the bus storage area, which is very inefficient, especially in winter. 3. Office space is entirely inadequate - four persons work in an area 7' x 181. 4. The existing building has almost no room for parts storage or automatic bus cleaning equipment. 5. The building cannot be expanded because of its design and its placement on a very small lot. FA - FEDERAL AID SA - STATE AID GRS - GENERAL REVENUE SHARING RUT - ROAD USE TAX 27 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES 1401NES TOTAL COST _ .F Y 1960-64 268,0001 72,4091 1,320,0001 r&I PRIOR TO FY1980 SCHEDULE FOR THE FIVE-YEAR PERIOD FY1980 FY1961 FY1982 FY1903 FY1984 33,750 GO 134,000 GO 33,750 USTE 134,000 USTE 57,927 FA 7,241 SA 7;241 OR 48,000 FA 1,008,000 F 6,000 SA 126,000 S 6,000 OR 126;000 0 GO -GENERAL OBLIGATION BOND SP - SPECIAL ASSESSMENT RB - REVENUE BOND OR -OPERATING REVENUE HC- HOUSINGS COMMUNITY DEVELOPMENT ACT USTEP — URBAN -STATE TRAFFIC ENGINEERING PROGRAM 28 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 140I11ES i WATER PROJECTS EAST SIDE WATER STORAGE TANK As the city continues to grow on the east side, water pressure will continue to drop with resulting poor -service to residents and with a negative impact on firefighting capability due to substandard water flows. Installation of a 2,000,000 gallon tank on the north side of Rochester will allow adequate fire flows and will provide better water pressure in the area. The site has been acquired. WATER PLANT SOLIDS DISPOSAL The purpose of this project is to terminate solids dumping into the Iowa River. Permits issued in accordance with the National Pollutant Discharge System set forth effluent limitations for discharge of process waste from water treatment plants to surface waters. At the municipal water treatment plant, all process wastes are now discharged to the Iowa River. After the river corridor construction is completed, the city will be expected to start working toward complying with the effluent limitations set forth in our discharge permit. LIBRARY PUBLIC LIBRARY BUILDING The purpose of this project is to provide for the construction of a new two-level building of 46,850 square feet. This project has already been approved by the voters. The total cost includes computerization ($300,000) and furnishings ($270,000) and making the building accessible to the handicapped. FA -FEDERAL AID SA - STATE AID GRS - GENERAL REVENUE SHARING RUT - ROAD USE TAX 29 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES TOTAL COST F Y 1960-84 770,000 880,000 la r1 PRIOR TO FYI990 SCHEDULE FOR THE FIVE-YEAR PERIOD FY1980 FY1991 FY1982 FY1903 FY1964 770,000 GO 880,000 GO 3,500,000 G 00 - GENERAL OBLIGATION BOND 9P - SPECIAL ASSESSMENT RB - REVENUE BOND OR - OPERATING REVENUE HC - HOUSING B COMMUNITY DEVELOPMENT ACT 30 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES PROJECTS TOTAL COST I.FY1980-84 PARKS AND RECREATION .SWIMMING POOL 162,500 This project is needed to provide additional swimming facilities. For this project to be successful, it needs to be shared with the school district - both the cost of construction and maintenance - with the city paying approximately 25% of both and operating the pool in June, July and August. This would free the Recreation Center pool for its intended use which is to serve the general public. Completion of this project will be contingent on the purchase of the Recreation Center lot. MERCER PARK RESTROOMS 1 35,000 This project provides for a restroom building for the ball diamond area of Mercer Park including a concession stand and maintenance storage. Mercer Park has developed into a sports complex with five ball diamonds,'four of them lighted, six tennis courts, a playground, and a swimming pool. Current restroom facilities are terribly inadequate. This building would be located in the ball diamond area close to the existing maintenance shed. ADDITION TO RECREATION CENTER 1 120,000 This project would provide for the design and construction of a 40' x 85' addition to the Recreation Center for four handball courts. Handball courts are the most needed indoor sports facility for the city. The addition can be heated by the existing boilers. Some of the existing parking spaces would be eliminated and the addition would need to be flood -proofed since it is in the Ralston Creek flood plain. Completion of this project will be contingent on the purchase of the Recreation Center lot. WILLOW CREEK TENNIS COURTS 60,000 The city has 12 tennis courts at the present time and should have 48, based on national standards. Tennis is one of the fastest growing sports in the U. S. and is a lifetime sport. Four tennis courts in Willow Creek Park will give some geographical FA - FEDERAL AID SA - STATE AID ORS - GENERAL REVENUE SNARING RUT -ROAD USE TAX 31 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES ps GO -GENERAL OBLIGATION BOND SP - SPECIAL ASSESSMENT RB - REVENUE BOND OR -OPERATING REVENUE HC- HOUSING 0 COMMUNITY DEVELOPMENT ACT BOR -Bureau of Outdoor Recreation 32 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES ?10IIIES r i I ��1 �.1 .J -i J n �J =.t i� i A li r ps GO -GENERAL OBLIGATION BOND SP - SPECIAL ASSESSMENT RB - REVENUE BOND OR -OPERATING REVENUE HC- HOUSING 0 COMMUNITY DEVELOPMENT ACT BOR -Bureau of Outdoor Recreation 32 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES ?10IIIES PROJECTS TOTAL COST I.FY1900-84 FA - FEDERAL AID SA - STATE AID GRS - GENERAL REVENUE SHARING RUT -ROAD USE TAX 33 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOVIES NEW SOUTHWEST PARK 80,000 This project is a new park, approximately eight acres, southeast of Willow Creek Park, to be used for a sports field and neighborhood park. Because of the nature of Willow Creek Park, it is preferable to have open field sports activities in another location. COMPLETION OF CITY PARK BIKE TRAIL 30,000 At the present time, the bike trail in City Park is in three sections: a new trail from Park Road to the river which follows the new road, the road along the river which the bicycles share with motorized traffic, and a rock path in the west part of the park. POLICE OUTDOOR FIRING RANGE 36,200 This project will provide the Police Department with a facility in which they could properly train in the use of firearms. The City presently has no such facility. ANIMAL CONTROL SHELTER 187,000 Inadequacy, poor design, unsanitary and dangerously unhealthy working areas, lack of isolation facilities, inadequate locker and personal facilities for employees, and failure to meet minimum state law requirements are reasons why this facility is needed. FA - FEDERAL AID SA - STATE AID GRS - GENERAL REVENUE SHARING RUT -ROAD USE TAX 33 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOVIES Uv -GENERAL OBLIGATION BOND SP -SPECIAL ASSESSMENT RB -REVENUE BOND OR -OPERATING REVENUE HC- HOUSING S COMMUNITY DEVELOPMENT ACT BOR - Bureau of Outdoor Recreation 34 PIICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES IIDRIES F } ]f I 1.� I 1 1 J 1 .J J 1,1 1 I M I f, 1 G �+ t ti 1 i r Uv -GENERAL OBLIGATION BOND SP -SPECIAL ASSESSMENT RB -REVENUE BOND OR -OPERATING REVENUE HC- HOUSING S COMMUNITY DEVELOPMENT ACT BOR - Bureau of Outdoor Recreation 34 PIICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES IIDRIES L/ L _ aa.+ I I I PROJECTS FIRE TRAINING TOWER PROJECT This protect provides for the construction of a five -story training tower with a two -stall engine room. Present training sessions are held on streets and parking lots and this lack of facilities hampers effective training. PARKING PARKING GARAGE "A" PROJECT The purpose of:this project is to provide for the construction of a 900 -car parking garage at Capitol and Burlington Streets. This ramp is the first of two the City is to provide as part of Urban Renewal construction. PARKING GARAGE "B" PROJECT The purpose of this project is to construct a 450 - car space parking garage at Dubuque and Burlington Streets. This is the second of two parking facilities the City is to provide as part of the Urban Renewal construction. AIRPORT 10 UNIT T -HANGAR PROJECT The purpose of this project is to provide aircraft storage for additional base aircraft.at the airport. PARKING EXTENSION - PHASE I The purpose of ,this project is to increase hard surface parking for transit aircraft to eliminate hazardous situations on the ramp immediately in front of the terminal building. This is the last Portion of this project which was started in 1974. FA - FEDERAL AID SA - STATE AID GRS . GENERAL REVENUE SNARING RUT - RDAD USE TAX 35 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1101NES TOTAL COST FY1ea0-84 300,000 I 2,155,500 100,000 PRIOR TO FY1980 SCHEDULE FOR THE FIVE-YEAR PERIOD FY1990 FY1981 FY1982 FY1903 FY1994 300,000 GO 1,000,000 0 3,102,750 R 985,000 OR 1,170,500 RB 100,000 RB 16,100 SA 6,900 OR 00 -GENERAL OBLIGATION BOND SP - SPECIAL ASSESSMENT RS - REVENUE BOND OR - OPERATING REVENUE HC - HOUSING & COMMUNITY DEVELOPMENT ACT 36 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES 1401RES PROJECTS TOTAL COST F Y 1880-84 AUTO PARKING AREA SURFACING PROJECT The purpose of this project is to make a similar 15,000 parking area on the south side of the terminal building equivalent to the one on the north side of the building. Due'to an increase in usage of the Airport there is limited hard surface parking for Airport patrons. SHOP BUILDING ^_ The purpose of this project is to provide space for 65,000 aircraft maintenance and repair. The existing facility is not adequate for present operations. The new building _ would meet all safety codes without limiting the use of i the building (e.g. painting of aircraft). I � I iI j i FA - FEDERAL AID SA - STATE AID GRS - GENERAL REVENUE SHARING RUT - ROAD USE TAX I i 37 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS-DES ?I01NES -GENERAL OBLIGATION BOND SP -SPECIAL ASSESSMENT -REVENUE BOND OR -OPERATING REVENUE • HOUSING B COMMUNITY DEVELOPMENT ACT 38 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES 110I11ES i r I -j I i g a PROJECTS CAPITAL IMPROVEMENTS PROGRAM SUMMARY BY SOURCE OF FUNDING GENERAL OBLIGATION BONDS SPECIAL ASSESSMENTS STATE AID OPERATING REVENUE FEDERAL AID ROAD USE TAX GENERAL REVENUE SHARING REVENUE BONDS PRIVATE CONTRIBUTIONS HOUSING & COMMUNITY DEVELOPMENT ACT FA -FEDERAL AID SA - STATE AID ORS • GENERAL REVENUE SNARING RUT • ROAD USE TAX MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES TOTAL COST .FY1980-84 t; I F, .�i i 19,259,994 7. 20,100 1,903,244 i 1,785,541 24,604,930 713,290 704,865 1,335,500 13,000 i 30,000 i $50,370,464 aj I r`1 rl) PRIOR TO SCHEDULE FOR THE FIVE-YEAR PERIOD FY1990 FY1981 FY082 FYI983 FY1904 FY1980 3,800,058 3,791,939 7,201,998 2,567,999 11898,000 20,100 -- -- -- -- 478,417 389,825 759,002 276,000 -- 1,411,241 370,700 3,600 -- -- 3,166,693 5,195,236 11,905,000 4,338.,001 -- 192,620 234,750 177,920 55,750 52,250 146,165 408,700 50,000 50,000 50,000 1,335,500 -- -- -- -- 13,000 -- -- -- -- 30,000 -- -- -- 10,593,794 10,391,150 20,097,520 7,287,750 2,000,250 GO- GENERAL OBLIGATION BOND 9P - SPECIAL ASSESSMENT RB - REVENUE BOND OR -OPERATING REVENUE HC - HOUSING B COMMUNITY DEVELOPMENT ACT G[] MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES I401NE5 i MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MORIES City of Iowa C1 MEMORANDUM Date: June 22, 1979 To: Honorable Mayor and City /Council /J� From: Assistant City Manager ( , / v Re: Quarterly MBO Reports �L All third quarter MBO reports are enclosed in this week's packet. There was not ample time on the informal agenda for scheduling all departments separately. It is suggested that you review the enclosed reports and determine what department staff persons, if any, you would like scheduled for further informal discussion regarding the content'of the reports. It would appear that Council informal agenda time can be scheduled much more efficiently this way. cc: Department (leads jm5/27 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 110IRES 13Y6 MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: THIRD FY79 DECISION UNIT: REFUSE Fiscal Year Objectives: 1. To obtain a one man side loader designed for one man operation and put it into operation on a trial basis by September, 1978. 2. To evaluate a pilot program of aluminum and steel cans recycling and turn it over to private contractor by October 1978. Work Completed: 1. The vehicle which was to be placed in operation November 1978 was delivered not in accordance with specifications and a considerable delay has developed in receiving a replacement unit? It appears at this time that earliest that such a vehicle can go in operation would be October 1979. 2. Program economics - completely unfeasible at this time. Program has been discontinued. Expenditures Budget Year -to -Date % 6000 174,951 119,989 68.6 7000 1,907 2,765 145.0 8000 116,289 93,748 80.6, 9000 29,375 53,602 182.5* TOTAL 322,522 270,104 83.7 F *Equipment replacement fund MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES I3�6 Is ■ MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: THIRD FY79 DECISION UNIT: EQUIPMENT DIVISION Fiscal Year Objectives: 1. Establish night shift preventive maintenance program for both transit and general equipment facilities. 2. Gain and maintain financial control of division. 3. Establish daily operator inspection procedure. 4. Reorganize the division and delegate some supervisory responsibilities to "working foremen." 5. Establish an effective and controlled parts inventory. Work Completed: 1. Night shift program is quite well established. Parks and Cemetery can be brought into the PM system on June 1. We will start doing half of the police cars on a test basis as soon as we move into the new buiding. 2. Still not accomplished (see Analysis). 3. Excellent progress made. A sound responsive system is now in use for operators in Streets/Refuse to report defects and to have them repaired in a timely fashion, usually on the night shift to prevent downtime. 4. This is a hugh success owing to the efforts of the shop supervisor, parts/rebuild tech and transit lead mechnic. By shortening the "span of control" we are able to supervise every task with a person who is committed to the goals of the organization. 5. The last step still remains in that the parts inventory must still be physically inventoried and catalogued. There is virtually no way to do this until we expand parts storage into the new building in mid- season. Analysis: Major factors bearing on the financing problems we continue to have are: 1. Inventory additions - in the past year we have added a large number of parts to our inventory in order to keep Transit, Refuse and Streets functions on the road. Without these parts we would not have made it through the winter without major service interruptions. 2. Equipment costs running well over projections because of poor specifications and rough use. As an example during the month of January dump trucks, snow plows and sanders cost us $19,324 to operate with corresponding income from charges of $5594. The Finance Director plans a review of the operating fund after the March cost figures come in, but we will probably not know what adjustments are necessary until after the low cost/high usage months of April, May and June. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES /-IN MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: THIRD FY79 DECISION UNIT: STREETS Fiscal Year Objectives: I. To reduce citizen complaints through preventative programmed maintenance. 2. To improve cleanliness of streets through revised sweeping frequencies. 3. To obtain in-depth analysis of street systems operations by September 1978. 4. To construct and renovate eight modulars at service building by June 1979. Work Completed: 1. FY79 v. FY78 shows a reduction in repair complaints of 53.5%. 2. • Level of service is approximately the same in FY79 as it was in FY78. 3. Division has acquired costing data. Productivity has been doubled in certain areas such as concrete repair. A preventative maintenance program which includes both structural repairs such as asphalt overlay and preventative maintenance programs such as street sealing has been developed. 4. Three modulars have been renovated and plans being prepared for other five. Analysis: 1. Preventative program. maintenance permits time projections for project completion and catches problems before complaints are made. 2. Experiencing many mechanical breakdowns with the old sweeper making the establishment of revised frequencies undependable. New sweeper is ordered. 3. Implementation of the preventative maintenance program will allow stabilization of work programs. Expenditures Budget Year -to -Date A 6000 7000 8000 See Attached Memo 9000 TOTAL 734,644 784,351 107 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 140114ES MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: 'THIRD FY79 DECISION UNIT: TRAFFIC ENGINEERING Fiscal Year Objectives: 1. To reduce signal and street light corrective maintenance call outs by 10%. 2. To develop and implement systematic scheduling of signal and street lighting preventative maintenance. 3. To improve cross street identification with large street name signs at major signalized intersections by September, 1978. 4. To modernize electrical system for Park Road Bridge street lighting system by June, 1979. 5. To relocate vehicle detector loops at intersections where deficient installations exist, by October, 1978. 6. To install plastic arrows in turn lanes in lieu of painted arrows by September, 1978. 7. To provide a program of traffic and accident analysis to determine trends and problems and propose corrective action. Work Completed: 1. Corrective maintenance was up 60% over second quarter but down 25% over first quarter. 2. Signal system 80% complete FY79. 3. 75% of target intersections are converted. 4. No work completed, work to commence fourth quarter. 5. Two intersections completed, five left to complete. 6. Fifteen lanes connected, 10 left to complete. 7. Program on going. Expenditures Budget Year -to -Date % 6000 141,902 86,140 60.7 7000 132,943 •85,950 64.6 8000 145,012 99,012 68.3 9000 40,268 6,988 17.4 TOTAL 460,125 2884238 62.6 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1101tIES I� e"S MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: THIRD FY79 DECISION UNIT: PUBLIC WORKS ADMINSTRATION Fiscal Year Objectives: I. To change schedule of division head meetings from random occurrence to bi-monthly meetings for idea and information exchange by July 1, 1978. 2. To change solid waste equipment from two man vehicles to one man vehicles to lower cost per ton for refuse collection by May, 1979. 3. To hold meetings for division employees on a quarterly basis for information exchange by July, 1979. 4. To provide educational opportunities for division heads for the purpose of upgrading skills in public communications, productivity, management/union relations, and technical aspects of Public Works. Work Completed: 1. No action taken. 2. See Refuse report. 3. No action taken. 4. Attendance by Street Superintendent, Traffic Engineer, Water and Sewer Superintendent, Transit Manager and City Engineer at seminars and conferences. Analysis: I. Sufficient contact by phone and in person on a daily basis eliminates need for meetings. 2. See Refuse report. 3. Adequate time not available for Public Works Director to meet quarterly with seven divisions and 140 employees. 4. Public Works division heads are high caliber managers. Coordination and level of ability are high. Expenditures Budget Year -to -Date _% 6000 43,067 32,119 75 7000 335 521 155 8000 29,980 5,604 185 9000 --- 9,917* -- TOTAL 48,657 48,161 99 *Cost of moving modulars MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES FIOIMES I MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: THIRD FY79 DECISION UNIT: WATER Fiscal Year Objectives: 1. To flush all City -owned hydrants by June, 1979, to remove sedimentation from the system. 2. To install 1,000 Outside Remote Readers by June, 1979. A total of 5,700 have been installed and approximately 6,000 more will be installed. 3. To complete UR -14 Water Main Project by October 1978, by constructing mains on Washington from Clinton to Capitol and on Capitol from Washington to Burlington. 4. To continue to treat all water to meet State of Iowa Standards. Work Completed: ' 1. • All hydrants have been flushed. All dead end mains and hydrants were flushed twice since the start of FY79. 2. Have installed 774 outside readers since the start of FY79. The third quarter of FY79 was slowed down due to the extreme cold weather and snow. 3. UR -14 Water Main Project for October 1978, has been delayed until May . of 1979; due to grades and location of new buidings. 4. We are meeting all State of Iowa regulations. Analsysi: 1. Water usage was down about 10% for third quarter of FY79. 2. In the third quarter we had 27 water main breaks. All holes have been refilled. Expenditures Budget Yeart-to-Date % 6000 344,562 237,570.52 68_ 94 7000 241,627 109,194.34 46.65 8000 243,649 102,743.53 73.45 9000 270,228 258,924.00 95.82 TOTAL 1,100,066 748,653.13 68.05 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER- THIRD FY79 DECISION UNIT: ENGINEERING DIVISION Fiscal Year Objectives: I. Remove subdivision review from a crisis basis to a systematic schedule with a response time for initial review of: preliminary plats (5 working days); construction plans (10 working days) and final plats (5 working days). 2. Design and reconstruct intersection of South Gilbert Street and Highway 6 Bypass including Gilbert Street to Sand Road by November, 1978. 3. Perform field work, coordinate R.O.W. Acquisition, and prepare plans and specifications for Scott Boulevard between Highway 6 and Muscatine Avenue in a completed form and ready for bidding by March, 1979. 4. Complete routine maintenance contracts prior to September, 1978, for the following projects: landfill excavation, asphalt resurfacing project and concrete repair. S. Schedule construction activities such that a minimum of one full-time inspector devotes 85% of time inspecting subdivision cohstruction for quality control. 6. Complete second phase of microfilming process for Engineering Records by July, 1979. 7. Develop a time keeping system to determine how division budget is spent among construction projects, subdivisions, citizen requests, etc. Work Completed: 1. No change. 2. Plans completed and approved by IDOT-R.O.W. Acquisition underway by PPD. 3. Field work approximately 10-15% complete. 4. Asphalt resurfacing project completed - October 1, 1978. Landfill excavation will be skipped this year since adequate space is still available. Concrete repairs are being done by Street Division. 5. Based on August salary, approximately 70% in 1978. 6. Approximately 70% complete. 7. 12 months of records available, see attached report. Analysis: 1. This goal was much too ambitious for an individual division. It is believed it would take Council set guidelines to developers on submission dates to avert the crisis situation being experienced. 2. Due to IDOT decisions, this project has had significant delays - primarily due to R.O.W. acquisition. A fall, 1979 construction start seems attainable at this time. 3. This project is behind schedule approximately six months. Additional work items, plus delays in the Gilbert Street project have been the MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES Ido RTES rd N primary cause for this. Also, as an internal priority, the division will begin work on the Riverside -Benton intersection prior to Scott Boulevard. 4. Landfill project was rescheduled due to other priorities and the fact that landfill space is available. 5. We were not able to achieve the goal, no improvement is forseen in 1979 since there wil be a definite slow down in subdivision work this year. 6. Delays in obtaining contract experienced in Finance has precluded even the first phase of filming. However, this has not caused any particular problem in the division and both phases of filming should be completed by the end of the fiscal year. i 7. See attached report. Expenditures Budget Year -to -Date % 6000 201,087 136,003 68 7000 7,166 3,808 53 18000 24,668 15,211 62* 9000 4.984 5.576 112* TOTAL 237.905 161.259 68 *Equipment charges I, 1 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOVIES n MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: THIRD FY79 DECISION UNIT: TRANSIT Fiscal Year Objectives: 1. To build off-peak ridership through increased transit marketing. Emphasis will be placed on radio and newspaper advertising, group presentations and special promotions to be conducted by June, 1979. 2. To .maintain schedule adherence through better road supervision by September, 1978. 3. To reduce the frequency of accidents and the dollar amount of damage claims and to reduce citizen complaints through more comprehensive driver training by June, 1979. 4. To pursue Federal grants for two-way radios, replacement buses, bus stop signs and shelters, and a transit garage feasibility study by September, 1978. 5. To renovate existing bus barn by increasing parts storage, installing ventilators, and cleaning and painting by June, 1979. Work Completed: 1. In the third quarter transit ridership rose 11.1% over the same period last year. Because ridership was already exceeding our expectations . and our ability to handle the crowds, we did very little marketing. We did, however, conduct a campaign to encourage people to ride off- peak, with some success. 2. Schedule adherence was terrible throughout the quarter. Slippery streets, narrowed roadways, and severe overcrowding combined to make on -schedule operation impossible. Our efforts at road supervision focused largely on keeping the buses running thirty (30) minutes apart, rather than on time. 3. The number of accidents was up substantially over past winters,; in January and February transit buses were involved in twenty-two (22) reported accidents. Virtually all of these collisions were fender - benders, and in none was the bus put out of service. In the month of . March, when conditions had improved, we experienced only two (2) accidents, both unavoidable. Citizen complaints regarding driver deportment were rare, although we received record numbers of schedule complaints. 4. Working with Keith Friese of the Johnson County Regional Planning Commission, we completed and submitted our UMTA Section 3 capital grant application. Because this grant was for buses only, we then included in our State Transit Assistance Application a request to use Section 18 UMTA money for radios, signs and shelters. Dick Plastino has been working directly with the State and Federal Governments in laying the groundwork for the bus barn replacement project. 5. The bus barn ventilation project was completed in January. Parts storage capability has not been increased, due to a decision by the Equipment Division to move a large part of the body parts inventory out of the bus barn. During the third quarter no time was available to clean up and paint; all effort was directed toward providing transit service. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES I401nES MICROFILMED BY JORM MICROLAB CEDAR RAPIOS•DES MOVIES MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: THIRD FY79 DECISION UNIT: RECYCLING Fiscal Year Objectives: 1. To provide recycled paper pick up on a schedule identical to solid waste collection pick up. 2. To determine the cost effectiveness of the program by measuring expenditure and revenues. Work Completed: I. Since the Streets/Sanitation Division has assumed collection the schfuse ick u. 2. The eincome dule ahas etotaled en t$504.00 while ical to thePersonnel and colmlodity expenses alone have totaled $4,387.00. Analysis: 1. The present collection methods and schedule are satisfactory. 2. The program is not cost effective and will require a large subsidy if continued. Expenditures Budget This Quarter 6000 0.0 4,249 — 7000 0.0 138 8000 . 0.0 0.0 9000 0.0 0.0 TOTAL 0_0 4,387 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 110111ES MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER: .THIRD FY79 DECISION UNIT: POLLUTION CONTROL Fiscal Year Objectives: 1. Provide input in planning and designing new treatment plant. 2. Clean 15 miles of sanitary sewers with reoccurring problems by July 1, 1979. 3. Set up preventive maintenance program for storm water detention basins by July 1, 1978. 4. Expand televising program to include new subdivisions as well as continuing to televise problem areas by July 1, 1978. Work Completed: 1. Facility plan has been submitted to E.P.A. and I.D.E.Q. 2. We have cleaned 9.3 miles of sanitary sewers since July 1, 1978. 3. This program has been set up and is functioning. 4. We have televised an additional 835 feet of sanitary sewer and identified some problems that will be corrected. Analysis: We believe we are progressing satisfactorily toward meeting our goals and objectives. Expenditures Budget Year -to -Date % 6000 261,556 183,575 70.2 7000 64,035 27,342 52.6 8000 133,525 90,085 60.6 9000 24,400 10.557 43.3 TOTAL 483,516 311,559 64.4 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1101RES W1 MANAGEMENT BY OBJECTIVES DEPARTMENT: PUBLIC WORKS QUARTER:., THIRD FY79 DECISION UNIT: LANDFILL Fiscal Year Objectives: 1. To ensure revenues equal expenses. 2. To continue compliance with state landfill regulations. Work Completed: 1. Landfill volumes have dropped approximately ten percent since dumping fees were instituted. Sale of the old landfill compactor will allow revenues to keep pace this year. 2. a. All inspections have passed with only minor notations of noncompliance. b. Our compaction efforts have been improved since the first part of November 1978 when an operational change was made to assure better compaction. Analysis: 1. Steadily rising fuel, repair and personnel costs will require an increase in dumping fees for FY80. 2. a. It is felt that the improved compaction methods being utilized will prolong the life of the landfill. Expenditures Budget Year -to -Date % 6000 81,920 59,550 72.7 7000 12,792 10,535 82.3 8000 58,160 45,567 78.3 9000 57,070 23,633 41.3 TOTAL 209,942 139,285 66.3 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES 140INES MANAGEMENT BY OBJECTIVES DEPARTMENT: FINANCE QUARTER: THIRD FY79 DECISION UNIT: FINANCE ADMINISTRATION Fiscal Year Objectives: 1. To analyze the accrual accounting system after a six month use period to determine its effectiveness and usefulness to City staff. March, 1979. 2. To review the fiscal policy and make recommendations by December, 1978. 3. To provide a risk management program of accident prevention, insurance purchasing, and claims adjustment by December, 1978. Work Completed: 1. The accrual accounting system is not yet set up. Computerization of the accrual accounting format is expected to be completed by June, 1979; it is anticipated that an analysis of the system can be made late in FY80. 2. Council reviewed a revised fiscal policy during budget sessions. The final revisions will be discussed with Council -in June. 3. A safety committee has been formed and will be defining its duties and procedures prior to the end of FY80. Analysis: Much of Finance Administration's time during the third quarter was devoted to the preparation of the FY80 budget, Council budget discussions, and the marketing of the $5,500,000 G.O. bond issue. Expenditures Budget Year -to -Date % 6000 $132,224 $ 41,610 31_ 5 7000 740 741 100.1 8000 8,610 6,448 74,9 9000 311,691 210,033 67.4 TOTAL $453,265 $258,832 57.1 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES I40InE5 MANAGEMENT BY OBJECTIVES DEPARTMENT: FINANCE QUARTER: THIRD FY79 DECISION UNIT: WORD PROCESSING Fiscal Year Objectives: 1. Train employees on equipment - ongoing. 2. Develop procedures for Center use - July, 1978. 3. Orient all staff to the Center - ongoing. 4. Perform typing assignments in timely manner - ongoing. 5. Maintain records of Center usage - ongoing. Work Completed: 1. Operators learned advanced machine applications now that basic training is complete." 2. Objective complete. Procedures open to revision as better work methods are discovered. 3. 2 Park & Recreations division .heads phased onto dictation system. Open "house was held on first 'anniversary to acquaint staff with Center. 4. Turnaround of dictated and revisions of dictated work now averages 2.3 hours. 5. Work begun to adjust recordkeeping to adapt to charge back process at start of,new fiscal year. Analysis: Phase in of additional staff,to central dictation system has been reduced in anticipation of workload increase due to long vacant positions now beginning to be filled. Expenditures Budget Year -to -Date % 6000 $45,036 $30,786 68.4 7000 5,626 2,612 46.4 8000 15,446 8,286 53.6. 9000 19,795 15,337 77.5 TOTAL $85,903 $57,021 66.4 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES 110I11ES C i I i i f j, i' MANAGEMENT BY OBJECTIVES DEPARTMENT: FINANCE QUARTER: THIRD FY79 DECISION UNIT: ACCOUNTING Fiscal Year Objectives: 1. Study the current activities in the division, such as accounts receivable and assisted housing rent checks, in order to determine the feasibility of additional computerization. January, 1979. 2. Provide all departments and divisions with enough information and guidelines to enable them to have a complete understanding of accrual accounting. October, 1978. 3. Implement an orientation procedure to familiarize new department and divsion heads with the Accounting Division's activities and abilities. March, 1979. 4. Phase in increased key -entry activity during FY79 to handle an estimated 30% growth in EDP systems. June, 1979. Work Completed: 1. Report on activities has been prepared. 2. No activity this quarter. 3. List of major division activities with descriptions has been prepared. 4. The additional key -entry operator is being continually' exposed to additional applications. Analysis: Accrual accounting has not been implemented, however, computer programming is progressing and fixed asset lists from most City departments are in and have been reviewed for completeness. Expenditures Budget Year -to -Date % 6000 $ 88,159 $ 63,181 71.7 7000 1,144 767 67.0 8000 47,857 37,048 77.4 9000 3,010 2,863 95.1 TOTAL $140,170 $103,859 74.1 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES 1 i I i' I j, I 0 MANAGEMENT BY OBJECTIVES DEPARTMENT: FINANCE QUARTER: THIRD FY79 DECISION UNIT: TREASURY Fiscal Year Objectives: 1. Develop schedule for and coordinate cash flow for maximization of interest on idle funds by August, 1978. 2. Computerize traffic tickets by June, 1979. 3. Work toward obtaining 90% actual readings for utility billings and prepare public information handouts by December, 1978. Work Completed: 1. Opened savings accounts for Police and Fire Retirement checking accounts. 2. Met with Sta-Fed representative and provided information on present procedure and forms used plus steps necessary for computer program. Contacted DOT about a tape of all available license k's. They can supply one to be used by Sta-Fed. 3. Worked on procedure in which meters will not be removed except for sale, maintenance or minimum of 30 days. Will mail a copy to all landlords on file and obtain names as needed from assessor's office. Analysis• 1. Interest income can be obtained from funds not available for long term investment. 2. Computerization of traffic fines is progressing within 30 days of schedule. 3. Implementation of "no -removes" program will increase the efficiency of outside readers by allowing better scheduling of service work and billing. Expenditures Budget Year -to -Date % 6000 $137,344 $ 99,812 72.7 7000 1,592 1,064 66.8 8000 51,806 27,477 53.0 9000 812 778 95.8 TOTAL $191,554 $129,131 67.4 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES MANAGEMENT BY OBJECTIVES DEPARTMENT: FINANCE DECISION UNIT: CENTRAL PROCUREMENT & SERVICES QUARTER: THIRD FY79 Fiscal Year Objectives: I. Rewrite Purchasing Manual to detail to Departments requirements for consistent purchasing support. January 1, 1979. 2• Increase competitive bidding by increasing number of specifications for City used commodities (15%). June 39, 1979. 3. Conduct a study with Northwestern Bell and an independent telephone company to encompass present telephone system vs. new and Northwestern Bell vs. independent company for service and cost savings. Proposed November 15, 1978. Recommendation March 1, 1979. 4. Produce a 30% increase in impression volume and turnaround time in the Print Shop by reorganizing work flows and procedures. June 30, 1979. Work Completed: I. Preliminary draft typed and reviewed by Finance Director. Revisions are being made and a second draft will be sent to Departments for review by May 15, 1979. 2• All outside printing is being coordinated by buyer and then sent out for competitive bidding. Departments are urged to contact the Central Procurement & Services Department to first see if state contract offers items needed; if not items are handled by the bidding process. 3. No activitiy at this time, waiting on outcome of Davis Building Contract and proposed office changes before proceeding. 4. The Print Shop has not increased its overall volume, but all City work is being printed inside with little going to outside vendors that could be done inside. Procedure changes have been made in an attempt to cut down on the waste factor in the Print Shop mainly due to overruns. Analysis: The completion of spent on priority the above projects, objectives has been delayed due to time being i.e. i system and microfilm program. Police generator, tornado warning siren Expenditures Budoet Year -to -pate 6000 $55,538 $38,164 _ 68.7 7000 1,642 888 54.1 8000 35,818 22,130 61.8 9000 16,000 8,317 52.0 TOTAL $106.998 $69,498 63.8 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -OLS MOINES h MANAGEMENT BY OBJECTIVES DEPARTMENT: FINANCE QUARTER: THIRD FY79 DECISION UNIT: PARKING ENFORCEMENT Fiscal Year Objectives: 1. Maintain effective enforcement of on and off street parking facilities and to operate the municipal lot. 2. To maintain the level of revenue at approximately the same as FY78 through enforcement. Work Completed: During the third quarter of FY79 tickets issued decreased from 27,987 in FY78 to 16,627 in FY79. The municipal lot operated during the third quarter with an increase in usage from 75,357 in FY78 to 79,363 in FY79. - Many meters were inoperable or inaccessible during January and February due to the severe weather. Analysis: The months of January and February severely hampered the workings of the parking system. The number of violations cited by Parking Enforcement attendants during January was down to 3,086 due to 18 working days being totally or partially missed due to severe weather and its effect on the meter system. Parking revenue was down during the quarter from $86,742.39 FY78 to $78,285.74 during FY79. January's totals reflect this loss. Area January 1979 Calendar Year 1978 Average Quads $ 6,887 $10,496 Lots 5,749 7,818 Municipal Lot 6,142 8,483 Total $18,778 $26,797 Monthly totals during February and March met or exceeded the average if the Washington lot and the Recreation lot are subtracted. Parking Enforcement met its objectives for the months of February and March but fell far short during the month of January. The severe weather of this winter prevented Parking Enforcment from meeting its goals and objectives during this quarter because of its impact on our operations during the month of January. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES i�) w I V o000 7000 8000 TOTAL V, MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES MANAGEMENT BY OBJECTIVES FDEPARTMENT: FINANCE QUARTER: THIRD FY79 NIT: PARKING OPERATIONS AND MAINTENANCE Fiscal Year Objectives: To expand the meter cleaning and repair program in order to decrease trouble calls. Work Completed: In the third quarter of FY79 we received 859 reports of defective meters as compared to 675 in the third quarter of FY78. 511 of the reported meters were found to be defective compared to 420 during the same period in FY78. 78 vehicles were impounded in connection with the Traffic Bureau as compared to 138 during FY78. It should be noted that we could not tow for approximately five weeks during this quarter due to no tow trucks being available. During February the Recreation Center lot and the Washington lot were closed. Meters and posts were removed in the Washington lot and meters only in the Rec lot. The remaining meters on the east side of the 100 block of S. Capitol Street and on the south side of the 10 block of E. Washington Street `were removed. All meters in the central business district were converted from 10 and 15 cents per hour to 20 cents per hour. Analysis: Maintenance to the meter system during this quarter was limited to trouble calls. and the cleaning of 90 Duncan manual meter timers in the CBD. The timer cleaning was done in connection with the rate change. We anticipate trouble calls on the meters in the CBD because of alterations made to them during the changeover. These calls should decrease in the next three to six months. The effect of the•rate change can be seen in the total of the quads for the month of March. During 1978 the average monthly total before quads was $10,496. During the month of March the quads totaled $16,505. The rate restructure cannot be seen in the lot totals for March as they were not completed until March 30. Expenditures Budget Year -to -Date % 6000 E 47,415 $31,835 67.1 7000 4,856 7,897 162.6 8000 27,018 38,105 141.0 9000 867,507 18,150 2.1 TOTAL $946,796 $95,987 10.1 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES f") MANAGEMENT BY OBJECTIVES DEPARTMENT: HOUSING AND INSPECTION SERVICES QUARTER: THIRD DECISION UNIT: BUILDING INSPECTION Fiscal Year Objectives: - To provide accurate information to the public regarding the codes and ordinances affecting building and alterations. - To provide print review on all residential structures, all alteration plans and some commercial structures. - To perform all code required field inspections. - To reduce citizen complaints by 50% of 1978 levels. - To improve record keeping systems by utilizing microfilming and computer data processing. Work Completed: - Have completed in-service training sessions this year incorporating several out of state speakers and training literature. - Have begun compiling data to develop a Maintenance Code for commercial structures. - Redrafted all permits to reflect new fee schedules and ease of. documentation. - Hosted the 17th annual I.A.B.O. seminar with 41 Building Officials in attendance despite very poor weather. The Senior Building Inspector was elected as the Vice President of the organization. - Citizen complaints have shown a small increase due to the change in weather. - Consolidation of files undertaken to initiate microfilming. - Hired Mr. Willard "Woody" Kendall as Zoning Inspector to bring the building division to' full compliment. Woody reflects over 25 years experience in the construction field. Analysis: - Number of Building Permits - dollar amounts. -- 73,$5,504.602. - Number of citizen complaints vs. number of corrective orders through field observations - 25/163. - Number of field inspections performed. -- 1211 Expenditures Budget This Quarter % 6000 $ 87,079.00 $63,462.69 72.87 *7000 1,976.00 2,009.09 158.57 **8000 10,758.00 20,172.99 106.43 9000 13 21500 9 461.23 71.59 TOTAL$113,028:00 61,340.80 *Includes reimburseable costs -- Code book purchased for resale. **Includes fees advance and recoverable -- plan check fees. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 136 MANAGEMENT BY OBJECTIVES FFe NT: HOUSING & INSPECTION SERVICES UNIT: HOUSING INSPECTION QUARTER: THIRD ear Objectives: vide Housing Code information to the public. ond to all citizen complaints of alleged violations of the ing Code within 24 hours after receiving complaint. ide licensing inspections & enforcement on all rooming houses apartments outside federally assisted areas (CDBG). ide fire protection inspections on multiples and rooming houses. leted: - Maintained monthly scheduling/permit system. - Inspectors participated in HIS departmental in-service training sessions. - 75% of the 10,000 plus Housing and Building records have now been purged of out dated documents and transferred to microfilm. - Held meeting with Fire Department to detail items and code references appropriate for citations by Housing Il-ispectors: Analysis: "Number of inspections performed 3rd quarter - 652. Number of reinspections performed 3rd quarter - 290. Number of orders issued - 127. Number of compliances - 251. Number of court cases - (charges filed) 2. Number of placards - 1. Expenditures Budget This Quarter _% 6000 $33,706.00 $17,892.19 53.08 7000 665.00 330.98 80.140 8000 6,094.00 4,845.55 53.76 9000 300.00 80.00 26.66 TOTAL 40.765.00 23,148.72 53.3 *Two inspectors resigned during third.quarter. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES MANAGEMENT BY OBJECTIVES DEPARTMENT HOUSING AND INSPECTION SERVICES QUARTER THIRD DECISION UNIT ASSISTED HOUSING Fiscal Year Objectives: - Section 8 - Existing Housing - Presently authorized 334 units. Continue to provide assistance to the maximum number of families within program restrictions. - Manage Autumn Park - Continue to act as Managing Agent for the 64 units of Elderly Housing known as Autumn Park. - Provide input to Housing Assistance Plan and the Annual Performance Report as required by the Plan. - Provide advice and assistance to both profit/non-profit organizations whose goal is to produce housing for low-income families. - Provide administrative support to the Iowa City Housing Commission. Work Completed: - Section 8 - Existing Housing - Authorized 334 units. On January 1, 1979, 326 units were under lease, and as of March 31, 1979, 329 units were under lease. The increase in the total number of units reflects only a small part of the activity. During the period, 19 units were removed from the program and were replaced by different units. Annual financial reviews, unit inspections, and lease extensions were completed for 87 families. An application for an additional 50 units of Section 8 Existing was submitted on February 9., All administrative requirements to include the public hearing have been completed and approval is anticipated sometime in April.. - Autumn Park Apartments - The contract with Midstates Development; Inc. to provide management for this 64 units of Section 8 New Construction was officially terminated March 31, 1979. All records, files, etc. were released to Midstates during the first week of April. - HAP - Completed. - Public Housing - Action continued on the application for 48 units of Public Housing utilizing "Turnkey" method of production on preselected sites. HUD responded to our request for preliminary site approval and after a special visit to all the sites, in conjunction with representatives from the Council and Housing Commission, gave preliminary approval on 7 sites that will provide for only 28 units. Further action on this program will be taken during the next reporting period. - The Housing Commission met on January 10, January 25, February 7, and March 7, 1979. One new member was appointed and one current member was reappointed. City Clerk has been advised to take action that will culminate in the appointment of 1 more member. Primary actions of the MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOVIES Commission were centered around changes to the Housing Maintenance and Occupancy Code, and the rewrite of the Housing Rehabilitation Program, approval of Housing Assistance Plan, and Recommendations regarding the backing of Housing Appeals Cases. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES r Housing Rehabilitation Program Quarterly Report 1/1/79 - 3/31/79 Goals through 6/30/79: I. Complete cases now in progress. 2. Phase out Johnson County contract. 3. Reserve $150,000.00 for multifamily 312 loan. 4. Initiate Home Winterization -Emergency Repair Program. 5. Process 10 to 15 cases under new program. Activities: 1/1/79-3/31/79 City For Quarter To Date M of Inquiries 12 444 Under Contract 56 Structures out to Bid 5 Funds Escrowed $57,623.00 $493,664.82 Completed Contracts 8 36 Surveys: 5 Interviews: 3 Presentations: 5 Johnson County Structures under Contract: 4 Structures Pending: 10 Funds Escrowed: $40,000 Completed Contracts: 0 Surveys: 8 Comments: 1. Jim Leighton, Construction Specialist, terminated his employment with the City effective 3/16/79. Staff presently consists of 1 Construction Specialist and 1 Finance Specialist. 2. Two 312 loans were applied for during March 1979. Both were approved by HUD with closings in April. The loans total $42,050.00. These cases are to be completed by 6/30/79. 3. There is a 17 -unit cooperative in the 403 area which is in need of rehabilitation. Funds were requested for this project during March, as a 312 multi -family loan. Approximately 50% of the owners are elderly women living alone. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOIRES a I . E J d MANAGEMENT BY OBJECTIVES DEPARTMENT: POLICE QUARTER: THIRD DECISION UNIT: ADMINISTRATION AND TRAINING Fiscal Year Objectives: Statement of FY79 Objectives a. Improved response time. b. Improved emergency response. C. Enhanced citizen/police contacts through effective training. d. Reduce complaints of poor provision of police services. Work Completed: a. No change from last report. b. No change from last report. C. In addition to the items mentioned in the last report, thirty-six (36) of in-service training in basic police operations has been offered. d. One complaint of improper service has been received and received and received. The compliant has proven unfounded in every respect including an adjudication of guilty. Reason for Exceeding or not Exceeding Deadlines: No change -- even in verbiage -- from the prior report. Year to Date Expenditures: Budgeted Encumbered $64,944 $54,024.09 Measurement Devices: No change from the previous report. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 13S 6 MANAGEMENT BY OBJECTIVES DEPARTMENT: POLICE QUARTER: THIRD DECISION UNIT: PATROL AND TRAFFIC Fiscal Year Objectives: Statement of FY79 Objectives No change from the previous report. Work Completed: With the exception of increasing totals of citizen/police generated requests for service and Police Department response the same explanations of completed work apply here as applied in the report for the previous quarter. Reasons for Exceeding and not Exceeding Objectives: previous. Most of the previously stated objectives have been achieved and in most instances exceeded. The reason for achieving and exceeding the objectives is simply because they.were based in reality and within the personal and. resource capabilities of the department to achieve. Year to Date Expenditures: Budgeted Encumbered $694,092 $502,142 Measurement Devices: Measurement devices are the same as those detailed in the report for the previous quarter. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 110111ES MANAGEMENT BY OBJECTIVES DEPARTMENT: POLICE QUARTER: THIRD DECISION UNIT: DETECTIVE INVESTIGATION Fiscal Year Objectives: Statement of FY79 Objectives No change from the previous report. Work Completed: No change in objectives A, 8 and C in previous report. In regard to D, an intern will be assigned in the near future fur case follow-up. Reasons for Exceeding or not Exceeding Objectives: No change from the report for the immediately prior quarterly report. Year to Date Expenditures: Budgeted Encumbered $140,607 $112,600 Measurement Devices: With the exception of statistical changes, the measurement devices are precisely the same as those used in previous quarterly reports. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES 1401NES t4„ MANAGEMENT BY OBJECTIVES DEPARTMENT: POLICE QUARTER: THIRD DECISION UNIT: RECORDS AND COMMUNICATIONS Fiscal Year Objectives: Statement of FY79 Objectives a. No change from previous report. b. No change from previous report. C. Computerize complaints. Work Completed: a. No change from previous report. b. No change from previous report. C. While the project to computerize records on a shared -time basis with Johnson County was abandoned because of high continuing costs, an application for LEAA funds was submitted in March for computerized word processing equipment with storage, retrieval and computation capabilities. Reasons for Exceeding or not Exceeding Deadlines: No change from the previous quarterly report. Year to Date Expenditures: Budgeted Encumbered $113,066 $95,357.97 IIICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES Bud eted $1,180,999 ALL DIVISION FINANCIAL SUMMARY Encumbered Percent Expended $789,062 67.326 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES 110INES 0 s , k i i i Bud eted $1,180,999 ALL DIVISION FINANCIAL SUMMARY Encumbered Percent Expended $789,062 67.326 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES 110INES 0 DEPARTMENT DECISION UNIT '`1 MANAGEMENT BY OBJECTIVES FIRE ADMINISTRATION Fiscal Year Objectives: QUARTER THIRD 1. Weekly meetings with each decision unit. 2. Respond to all serious fires and direct the overall operations of extinguishment and continue to have all fires investigated and their causes determined. 3. Reevaluate reporting systems and investigate feasibility of computer- izing and microfilming report and records by June 1979. 4. Replacement of obsolete radio equipment by June 1979. 5. Update departmental Rules and Regulations. Work Completed: I. A total of 91 directions meetings with decision units. 2. A total of 77 fires were investigated. Cause was determined on 100% of fires investigated. 3. The new reporting system has been implemented and appears to be working quite well. Information to date regarding departmental use of computers cannot be justified. The need, costs and benefits are still being evaluated regarding the microfilming of records and reports. 4. The new communication equipment has been installed resulting in a very much impressed communication system regarding improvement in range and previously difficult locations. 5. Rules and regulations have been drafted and copies given to the union and City administration for comments. July 1st has been scheduled for date of implementation of new rules and regulations. Analysis: 1. All decision units are receiving supervisory direction at regular intervals. 2. Information part of our regarding the cause of fires is publicized Fire immediately as 3. Much of the Prevention Week. work on objectives has been completed and appears to be on schedule. progress Expenditures Dudget This Quarter % 6000 7000 $37,269 $28,162.43 75 8000 4,261 20,350 908.37 6,687.23 22 9000 TOTAL 1,880 _ 1,634.93 33 87 $63,760 4%37,392.96 54 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES 1314 MANAGEMENT BY OBJECTIVES DEPARTMENT FIRE QUARTER THIRD QUARTER DECISION UNIT SUPPRESSION 1322.0 Fiscal Year Objectives: I. To maintain at a dependable level and reduce vehicle down time. 2. To control emergencies that arise. 3. To continue to fully utilize personnel through the use of modern I equipment and application of latest techniques. Work Completed:. 1. Daily inspection and maintenance of Fire Department equipment. a. Total down time for vehicles has been reduced by 43%. b. A total of 12 personnel have been to special schools at Ames, ` Iowa dealing in preventive maintenance on valves M.S.A. masks and pumps used in the fire service. 2. The department has 33 firefighters registered as journeyman with the Department of Labor, with 5 more still in the apprenticeship program. a. Active classroom and hands on training is continuing. Analysis: I The above goals and objectives have been proceeding on schedule. At this time we are happy that our Suppression Division is on schedule. Expenditures Budget This Quarter % J 6000 $733,853 $546,140.46 74 7000 31,514 13,127.92 42 8000 11,730 9,755.83 83 9000 37,788 35,218.10 93 TOTAL $814,885 $604,242.30 74 j I , i MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES IIOINES MANAGEMENT BY OBJECTIVES DEPARTMENT FIRE QUARTER THIRD DECISION UNIT PREVENTION Fiscal Year Objectives: 1. To develop a standard inspection form for mercantile inspections. 2. To continue to investigate all fires and determine fire cause. 3. To increase Public Relations Programs and maintain the same level of Fire Prevention Programs. Work Completed: i1. Mercantile forms are still on the top priority with'research still being compiled. A total of 498 inspections have been completed this quarter. 2. Fire investigations have had no problem with the good help of the 4 line officers. During the third quarter 77 fires were investigated - ' with 100% of the causes being determined. 3. Very fortunately our community does not have a large arson problem at this time but there is an upward trend that our Fire Department is much aware of. Analysis: Fire inspectors from the State Fire Marshal's Office completely inspected all University buildings. Several of our fire officers assisted these j people and added much to their experience. Our Public Relations and Fire Prevention Programs are ongoing and continue to be well accepted. All fire causes have been investigated and determined. Our new forms will be completed by July 1, 1979. Expenditures Budget This Quarter % 6000 $19,990 $14,517.71 73 7000 1,600 516.61 32 8000 1,200 683.33 57 9000 2,279 404.67 18 TOTAL $25,069 $16,122.32 64 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1401NES K ! MANAGEMENT BY OBJECTIVES DEPARTMENT FIRE QUARTER THIRD DECISION UNIT TRAINING 1324.0 Fiscal Year Objectives: 1. To have a department well trained in the art of fire suppression (ongoing). 2. To reduce non-productive time (ongoing). 3. Continuation of all programs dealing with the safety of the property and lives of Iowa Citians (ongoing). 4. To provide training through a course in Cardio Pulmonary Resuscitation. 5. To have a minimum of five (5) trained as Instructors in Cardio Pulmonary Resuscitation. C6. Continue the National Apprenticeship Program (ongoing). Work Completed: 1. We are still carrying the increase in training hours the men are participating in. 2. Men from the department have attended conferences in Memphis, Ames and Des Moines. An all new aspect of fire suppression and general preventive maintenance. 3. Both the ongoing blood pressure screening program and the Cardio Pulmonary Resuscitation programs offered the public are successful. 4. The Apprenticeship Committee has certified thirty-three firefighters as journeymen firefighters. They are registered with the Federal - Labor Commission and the. International Association of Fire Chiefs. { Analysis: 1. All phases in the training systems are working out very well. The personnel involved are putting an extra amount of effort in the program and the end result is very satisfying. f 2. Two more schbols were attended by Fire Department personnel dealing with the general as well as the specific Fire Department functions. 3. It is quite evident the department is still very much in need of a training area and facility. Expenditures Budget This Quarter % 6000 $18,701 $14,559.70 .78 7000 800 32.93 .04 8000 1,000 .00 .00 9000 1,000 .00 .00 j TOTAL $21,502 $15,151.79 .70 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES N 1 �— MANAGEMENT BY 013JEClIVES Ocpa rtill ent-- Decision Unit — �u1LaLle Quarter--Lbltd. - r•Y vtr 9 Work completed: 1. One cultural event trip held, one cancelled and one planned for spring -50% com. 2. One trip for mentally rutarded held; probaly will not continue due to cast -50% com 3. Youth intern life guard program 100% com. 4. Special populations volunteer program has 10 "Friends" matched 6 serving. 100% com 5. An attempt to expand file water safety program to Mercer Pool failed. 6. A "New Games" class held a mini festival and a special New Games day is planned for summer playgrounds in .July. 7. Cued softball. program 5nCOSSFUl with 11 teams. 100% cunt. Analysis: Staff is satisfied Utat programs have developed as planned and most objectives met. Recreation programs noticing a drastic chnnge to the more physlr.nl with greater public awarness and encouragement. An every increasing struggle to keep pace with the demand for services and facilities. Expenditures Fiscal Year Objectives: This Quarter % 1. Provide more cultural event LrLps for the general public, Increase to 2; comp. 6/7! 2. CaadnCt out-of-sLato trips for the mentally retarded. lucrease from I. Cot; com. 6/; 3. Ocvclop an intern program for youth life guards. 'Train minimum of 2 pcople;com. 6/; 4. Develop a youth volunteer corps to work with special populations. Recruit minimum 2,444.00 Of two volunteers; com. 5/79. 9000 8,151 5. lixpand the f;nnlly wntiu• sarety program to Mercer Park pool. Program offered at Cit) 284,891.94 Park pool only now. Cum. 8/78. 6. Conduct a community wide "New games" festival. Self -measuring; com. 6/79. 7. Offer more co-ed programs for adults. Establish a recreation softball league composed of men's and women's teams; com. 9/78. Work completed: 1. One cultural event trip held, one cancelled and one planned for spring -50% com. 2. One trip for mentally rutarded held; probaly will not continue due to cast -50% com 3. Youth intern life guard program 100% com. 4. Special populations volunteer program has 10 "Friends" matched 6 serving. 100% com 5. An attempt to expand file water safety program to Mercer Pool failed. 6. A "New Games" class held a mini festival and a special New Games day is planned for summer playgrounds in .July. 7. Cued softball. program 5nCOSSFUl with 11 teams. 100% cunt. Analysis: Staff is satisfied Utat programs have developed as planned and most objectives met. Recreation programs noticing a drastic chnnge to the more physlr.nl with greater public awarness and encouragement. An every increasing struggle to keep pace with the demand for services and facilities. Expenditures Budget This Quarter % 6000 296,971 199,261.62 67.098 7000 42,908 23,621.70 55.052 8000 77,687 52,750.62 67.901. 9500 'Transfer 2,444.00 9000 8,151 6,814.00 83.597 Iota] 425,717 284,891.94 66.920 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1401IIES 13 fig U I MNAGEMENT BY OBJECTIVES Department Parks & Recreation Decision Unit Parks Quarter, _ 1/1/79 to 3/31/79 Fiscal Year Objectives: 1) Improve refuse handling and reduce citizen complaint by utilizing standard size containers, plastic liners, and can racks: Oct. '78 2) Establish an endangered plant species area: On-going 3) Stabilize the bank of the small pond in City Park: Dec. '78 4) Install water systems (drinking fountains) in 5 parks: June'79 5) Development of riverfront property (Napoleon Park): On-going - 6) Construct four (4) tennis courts in Willow Creek Park: June 179 Work completed: 1) Objective accomplished; some barrels are still being used 2) No additional progress 3) Some fill dirt has been hauled to site. Bids for concrete paver blocks will be taken within 30 days. 4) Drinking fountains have been installed in four (4) park areas to date. 5) Turf has been established on the ball field areas; one (1) diamond is near completion with backstop installed. Filling and leveling Of fill dirt continues at the north end of park. 6) No progress. Analysis: 1) Objective has improved trash handling and reduced letter by 252 or more. 2) Progress will be slow. Objective will be long range. 5) Improvements will continue as resources and time allows. G) Objective is to be funded in FY 180. Expenditures Budget This Quarter % 6000 Current YTD 203,866 137,677 67.533 1000 34,033 16,546 48.618 11000 46,148 29,324 63.550 9000 44909 18,417 41.010 Total + 17,403 (transfers) 3.8,956 - 2.19 7 � � U_6_87 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1401NES A f MANAGEMENT BY OBJECTIVES DEPARTMENT: PARKS AND RECREATION QUARTER: TNIRO a ? DECISION UNIT: CEMETERY Fiscal Year Objectives: I. Reduce work projects outside cemetery, i 2. Maintain established public relations program. ' 3. Provide for future care of unique cemetery fixtures. 4. Reduce funeral time to increase time for record keeping and ' administration training. Work Completed: (9 months comparison) 1. Monthly average for time (percentage) spent outside the cemetery r corresponding period FY78 = 10 percent. ` FY79 = 11 percent. 2. Public relations - fine. 3. Plans underway for annual monument repair? I� 4. Leadership training sessions reinstated. F Analysis: Percentage of time spent outside the cemetery is increasing rather than the desired decreasing. All other goals are being achieved. I Expenditures BuLq This Quarter % 9 Months % 6000 47,004 817 2 30,750 65 7000 8,195 475 6 2,764 34 1 8000 10,076 468 0 2,784 28 i 9000 11,827 704 6 4,750 40 TOTAL 77,102 88,764 11 41,04A 53 I e 1 I i I I , MICROFILMED BY JORM MICROLAB CEDAR RAPIDS-DES MOINES MANAGEMENT 13Y OBJECTIVES DEPARTMENT: PARKS AND RECREATION QUARTER: THIRD DECISION UNIT: FORESTRY AND NURSERY Fiscal Year Objectives: 1. Reduce cemetery crew hours on outside forestry projects by 5 percent. 2. Increase by 10 percent street tree trimming to be done by contractors. 3. Monitor Weed Ordinance with updating. 4. Reduce ordinance violators by increased publicity. 5. Maintain and increase informational service to other departments and divisions. Work Completed: (comparison on 9 months basis) 1. Outside forestry, FY78 = 261.5 hours. FY79 = 221.5 hours. 2. Street trees trimmed, FY78 = 822 trees. FY79 = 51 trees. 3. Weed Ordinance (new) adopted llugust 22, 1978. Search for contractors to mow for City has been futile. 4. Solved weed and forestry problems, FY78 = 436. FY79 = 660. 5. Informational service to other units provided as requested. Analysis: 1. Outside forestay was reduced by 15 percent. 2. Street tree trimming down 94 erp cent . 3. Weed Ordinance - minor problems. 4. Ordinance violators increased by 5 percent. ce - 5. Informational serviokay. *Bad weather affected winter trimming. Catch up will be realized (partially) in 4th quarter. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOrREs 11 ■ Expenditure Expenditures Budget This uarter % to date % 6000 14,735 3,683.75 25 11,051.25 75 7000 876 204.72 23 310.00 35+ 8000 35,663 2,033.26 5 22,105.00 62 9000 1,045 .00 0 914.00 87 TOTAL 52,319 5,921.73 11 34,380.25 66 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOrREs 11 ■ t MANAGEMENT BY OBJECTIVES Fisca PARKS & RECREATION 9 it ADMINISTRATION %-- 3rd i Objectives: semination of information from the Council, CitY Manager,rtment and division heads and the Parke and Recreation Commission to appropriate division heads and divisions. 2. Systematic monitoring of divisions to ensure that each is function- ing at top capacity,for the whole 12 month period. 3. Ensure uniform evaluation criteria as much as possible for all employees of the department. 4. To develop a set of guidelines for each division so that it can be determined whether work has been clone, and done satisfactorily. i 1 Work completed: 1. Ongoing. Almost no complaints from public. } 2. Ongoing. Leisure needs surveyand Cit divisions are doing a good job. City-wide survey indicates that ? 3. Little done to date. This needs to be done in coordination with � the Personnel Director. 4. Partially completed. Park division has a list of projects priori- tised and check off system to see if projects are on schedule. s Analysis: Various meLhods of communication arc being used - staff meetings, reproducti.ons of pertinent information, consultations, etc. Expenditures Budget Year to Date 7 Year to Date 6000 38,017 27,678 73 7000 1,620 4.21 .026 8000 2,500 859 34 9000 0 0 Total 42.,137 28,547. 67.736 MICROFILMED BY JORM MICROLAB �- CEDAR RAPIDS•DES Ido RIES Fg.;;.... I 'I J I i MANAGEMENT BY OBJEcrivuS Department PARKS AND RECItGAT101\1 Decision Unit GOVMU MENT BUILDINGS Quarter 3rd Fiscal Year Objectives: To promote high moralo for the custodian in order to decrease rapid turnover. Work Completed: There continues to be a high turnover rate. Analysis: When this budget was written, there was to be one custodian, a Main- tnenance Worker III, the balance of custodial work was to be clone by contract. This approach was changed - the Senior Maintenance Worker from the Recreation Center is in charge of maintenance, and we have two Maintenance Worker I's. There appears to be a number of possible reasons for continued high turnover, including low salary, transfer for medical reasons and the policy regarding hiring of relations. The budget is slightly overspent because of a number of reasons, including: 1. Sick leave used, 2. All of capital outlay already encumbered, and 3. High maintenance costs for air conditioning units and for roof repair. I expect to be able to balance the budget by the end of the year. Expenditures 6000 7000 8000 9000 Total Budget 11,204 5,7G6 60,147 2,100 79,217 Year to Date 18,101 4,903 36,1.61 3,52.7 64,692 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES % Year. to Date 161. 85 63 167 76 ®I i DSpAR MLNT: DECISION UNIT: W -55 -0 -TA LEGAL MANAGDENr BY OBJECTIVES QUARTI'M: THIRD-FY79 Fiscal Year Cbjectives: I. Continue the preventive law program. 2. Attend meetings of the major city boards and commissions in order to improve procedures and aid members in understanding the legal contacts in which the board or commission functions. 3. Provide for an efficient indexing storage and retrieval system of Previously (xirpleted legal research. 4. Crain a more thorough familiarity with federal statutes cases and regulations pertaining to federally funded city programs and other activities with federal legal implications. Work Completed: Litigation: Niccola v. City, filed (fatality at railroad crossing), Stevens v. City, trial (surface water drainage and loss of access) decision pending; Eaton v. City, hearing on temporary injunction; Christian Retirement Services V. City (property tax litigation); Connors v. City; write brief for City v. Braverman; appeal of Rock Island v. City (So. Market Square); City v. Rock Island (Sundt St. bridge rail crossings); preparation for State v. Vevera. Small claims: Bokassa v. City (bus incident); Coogan v. City (sewer back-up). Negotiations in Grist v. City. Administrative Hearings: AFSM v. City (prohibited practice); Edberg v. City (termination of employee), City v. ACr (Electrical Board); Preparation for Hwy 518 litigation. Urban Renewal: work on disposition of Blocks 83 and 84. Conveyance for jail site. Claims: 129 filed; 82 dispositions (1st Ave. watermain break, snow plow damage, towing). Research on Barbie Ble.lirs (strip search). Review and draft contracts including public library. Draft model lease. Draft ordinances in- cluding human rights amendments and snow ordinance. Interview and hire 2 Assistant City Attorneys. Expenditures Budget This Quarter % 6000 69,772.00 44,963.04 64.443 7000 3,623.00 2,420.07 66.797 8000 62,968.00 35,622.46 56.572 9000 40.00 0.00 0.0' Total 136,403.00 83,005.57 60.853 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES t10INE5 MANAGEMENT BY OBJI.f,TIVL5 Department L'iIy Cicrk Decision Unit One F, Two Quarter Th i rd FY 79 Fiscal Year Objectives: 1. To accomplish day to day workload and meet legal require- ments with present staff. 2. Work with administration to establish meaningful rewards to stimulate employees, by July 1979, non-union. Work.Completed: 1. We are meeting legal requirements regarding nubli cation of notices, ordinances and Council minutes. Additional workload because of new open meetings law. 2. Expandable binders are available for the Code, will be distributed (exchanged) when the 1st supplement arrives. 3. Clerk worked two full days and two part days reviewing records stored in the retention room, during the big clean-up. 4. The new reader -printer arrived, and we were all instructed in its use. After three days of research, prepared copies Of the levies for all G.O. Bond issues for the County Auditor, as they could not locate earlier issues. S. Attended an additional six night budget sessions F, prepared minutes. 6. Microfilm was moved from storage in the Cemetery Bldg. to a special room at the Library. Several codes were damaged when U Smash Em roof caved in. 7. Clerk worked two days on updating Manuals, F, Deputy several hours on refiling recorded items. Analysis: 1. Because of heavy workload, Cemetery personnel completed work on our cemetery files to finish un their project. 2. Deputy City Clerk has resigned effective 5/24/79. 3. Clerk attended spring workshop of Towa Municipal pin. Officers in Des Moines. 'rh ree Expenditures Budget 19it�C Quarter % 6000 41,981 31,040 73.939 7000 1,648 1,031 62.54 8000 42,271 14,574 34.48 9000 981 0 0 Total 86,881 46645 53.69 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES MANAGEMENT BY OBJECTIVES DEPARTMENT: PLANNING & PROGRAM DEVELOPMENT . DECISION UNIT: ADMINISTRATION QUARTER:THIRD FY79 Fiscal Year Objectives: 1. To enable all decision units within the department to meet their objectives as enumerated in their decision packages. 2. To foster a higher level of supervisory and administrative performance by all division heads. 3. To identify and obtain additional federal and state funding. 4. To ensure that all federal program requirements are met in a timely manner. 5. To facilitate activities which will enhance the local tax base. 6. To facilitate the completion of the Iowa City Senior Center. 7. To provide for effective implementation of the Comprehensive Plan. 8. Coordination of State and Federal programs. 9. To efficiently prepare research and background reports and analyses for various ad hoc projects as assigned by the City Manager or as requested by boards, commissions, or the City Council. 10. Coordinating plans and policies with adjacent local units of government. 11. Maintaining liaison with community organizations. Work Completed: I. Staff resources and each decision unit's workload priorities were analyzed. Existing staff was assigned primarily to crisis projects, i.e. Small Cities Pre -application, 5th Year CDBG Application, Annual CDBG Performance Report, City Plaza and Streetscape Phase II, Parking Ramp. Other budget objectives were scheduled to be met during the fourth quarter after staffing levels increased to levels established in the FY79 budget. 2. In order to improve the supervisory and administrative performance, division heads began managing employee workload 'monthly, using a project chart listing proposed tasks to be accomplished each month. Follow-up activities record which tasks were actually accomplished. 3. The Small Cities Pre -application for $530,000 (during FY80) was submitted to HUD 1-24-79; thereafter on 4-6-79 the City was invited to submit a full application. The 5th Year CDBG Application for $935,500 (for FY80) was submitted to A-95 review agencies 2-17-79 and to HUD 4- 6-79. A request for bikeways funding was submitted to Iowa D.O.T. Additional sources for senior center funding were investigated. The staff assisted JCRPC efforts to get Iowa City reclassified to SMSA status. 4. Federal requirements are being met in some areas; however, recordkeeping and project monitoring is lagging because of current understaffing. 5. No significant actions have been taken relative to local tax base enhancement, with the exception of the facilitation of downtown redevelopment. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 14011JES 13V6 6. Senior Center furnishings bids were let in March. The project had been shut down from December I to February 15, pending a decision from HUD regarding approval of the Ecumenical Housing Corporation's elderly housing project. 7. The Comprehensive Plan is being used for decision making by the City Council and the Planning and Zoning Commission. 8. Iowa City assisted State officials in developing the Urban Revitalization legislation. The Act potentially can complement currently funded federal HUD programs. 9. The two primarily ad hoc projects, undertaken during the third quarter, have been qualifying Iowa City for for Standard Metropolitan Statistical Area (SMSA) status and gathering information for the Freeway 518 issue with Iowa D.O.T. 10. Work is being conducted on a continuous basis with the Johnson County Regional Planning Commission, University of Iowa administration, and the Johnson County government. 11. Several newsletters and press releases have provided updated information to community organizations about Planning and Program Development activities. Analysis: The administrative unit directs the department, coordinates department activities with other City activities and acts as a liaison to the community regarding City Planning and Program Development. The organizing and directing activities carried out during the third quarter enabled all crucial deadlines to be met in spite of a significant level of understaffing. The three operational divisions have each described their progress toward meeting objectives. The three reports attached specifically identify objectives met. Because six additional planners are currently being hired to begin work in April, progress toward meeting all planned objectives will be made. Routine recordkeeping and more thorough research and analysis of problems is expected during the fourth quarter. Expenditures Budget This Quarter %YTD 6000 31,906 6,103.15 67 7000 1,550 270.31 28 8000 11,575 276.37 20 9000 Total 45,031 6,649.83 54 MICROFILMED BY JORM N41CROLAB CEDAR RAPIDS•DES t10i14ES N MANAGEMENT BY OBJECTIVES DEPARTMENT: PLANNING AND PROGRAM DEVELOPMENT DECISION UNIT: PLAN ADMINISTRATION QUARTER: THIRD Fiscal Year Objectives: R 2 3. To review, analyze and prepare recommendations on all applications submitted for rezoning, subdivision, site plan, and variance approval making a determination whether development proposals compliment or conflict with the Comprehensive Plan. Prepare appropriate amendments to the Comprehensive Plan and implementation ordinances to reflect any changes in the City Council's development policies with respect to new developments or a misunderstanding of the implications of the plan upon adoption. Monitor development activities including: (a) advising developers of the impact a development may have upon the Comprehensive Plan; and (b) maintaining a current data base with which to amend the Comprehensive Plan to reflect a change in trends and conditions. Work Completed: The above objectives are of a continuous nature in the Plan Administration decision unit and are occurring essentially on schedule throughout the fiscal year. Analysis: Subdivision plat submissions, rezoning applications, Large Scale Residential and Non -Residential Development plans have been reviewed to determine whether proposed developments are consistent with the Comprehensive Plan and ordinance requirements. This review and processing has been done in a timely manner even though there have been numerous submissions filed and thorough analyses prepared. Approximately 60 percent of Don Schmeiser's time has been devoted to the drafting of a new zoning ordinance. This activity was not an objective of this decision unit at the time of budget preparation. The objective was to prepare appropriate amendments to the implementation ordinances rather than to actually develop the ordinance. Less of his time was devoted to preparation of the zoning ordinance than the previous quarter essentially because of (a) more applications being processed and (b) further revision in the revised Tree Regulations. Although most of the staff's time has been consumed by the above activities, technical assistance to the City Council, City Manager, boards and commissions, and other departments has been provided upon request. An over abundance of technical assistance would, however, impinge upon the above activities. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOVIES MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOVIES MANAGEMENT BY OBJECTIVES DEPARTMENT: PLANNING AND PROGRAM DEVELOPMENT DECISION UNIT: DEVELOPMENT PROGRAMS QUARTER: THIRD Fiscal Year Objectives: ACTIVITY OBJECTIVES: I. a. To insure full compliance with the provisions of the le' redevelopment contracts including design reviews, time schedules, and other terms and conditions. b. Complete City Plaza by October 31, 1978. C. Complete the Block 83 parking structure by August 31, 1979. d. Complete the planning for Washington and Capitol Streets by December 31, 1978; start construction by April 1, 1979; and complete construction by August 30, 1979. e. Complete plans for the Block 64 parking structure by April, 1979; begin construction by August, 1979; comnlete construction by September, 1980. f. Perform all Design Reviews within the 40 -day periods specified by contracts. g. Lease at least 25 percent of available City Plaza lease space by June 30, 1979. 2. a. Develop economic development strategies and policies for City Council consideration and adoption, by December 30, 1978. b. Establish a program to assist the Chamber of Commerce and other community groups which are seeking to facilitate economic development in Iowa City by December 30, 1978. C. Establish an ongoing program to provide information, evaluation, technical data, and other assistance to firms which may be seeking to locate or operate in Iowa City, by June 30, 1979. 3. a. Evaluate all capital improvements for impact on and conformance to community development plans and policies. b. Coordinate the Capital Improvement Program evaluation to maximize the analysis of information concerning competing capital projects. C. Provide technical assistance to the Manager and Council in evaluating and establishing priorities for capital projects. d. To acquire or dispose of land as directed by the City Council in a timely manner and consistent with applicable state and federal regulations. Work Completed and Analysis: Downtown Redvelopment: Activity in the downtown increased in the third quarter, as spring construction work began. The status of the private redevelopment projects is set forth below: a. Under contract: Eleven contracts have been executed. Contracts Tor Parcel 64-1 (Hotel) and 82-1b (North Bay) are being negotiated. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES 1401NEs b. Design Review: Ten design reviews have been completed by the Design Review Committee and the City Council. Parcel 82-1b had a design review completed; but because the development is being redesigned, the re -review is in progress. Two parcels, 93-2 (Lovetinsky) and 102-2 (Old Capitol Associates), will not have construction on them at this time. C. Conveyances: Title to nine parcels has been conveyed to the redevelopers. Conveyance of Parcels 103-3 and 83-84 is scheduled for early in the fourth quarter. Conveyance of Parcels 64-1 and 82-1b is not yet scheduled. d. Construction Start: Construction has begun on six parcels. Construction on the remaining five parcels is anticipated as follows: 64-1 not scheduled - expected spring, 1980 82-1b not scheduled - expected summer, 1979 93-3 expected mid -summer, 1979 102-3,4 expected midsummer, 1979 103-3 expected spring, 1979 e. Construction Completion: The College Block Building is complete. Pentacrest Garden Apartments is complete except for site work. Hawkeye Barber Stylist is complete except for finishing the front facade. Expected completion for the other eight parcels is as follows: 64-1 May, 1981 (Hotel) 82-1b Summer, 1980 (North Bay) 83-84 October, 1980 (Old Capitol Center) 93-3 Summer, 1980 (Rath) 101-1 October, 1979 (Perpetual) 102-1 September, 1979 (Mod Pod) 102-3,4 Mid -summer, 1980 (First Federal) 103-3 Spring, 1980 (Capitol House) Attached is a chart showing a tabulation of the above information. City Plaza construction has resumed. Completion is expected in July, 1979. Inspection of winter damage is being carried out and corrections by the contractor have started. Areas of brick work which need corr9ction have been identified. The preliminary plans for the street paving for the CBD Streetscape Improvement Project, Phase II have been approved. The project schedule breaking the project into three packages has been prepared. Preparation of final plans and specifications for the underground utilities and street paving on Capitol and Washington Streets is underway. The Block 83 parking ramp construction is continuing on schedule. Design of the Block 64 ramp is continuing on schedule. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES MOINES I ( Real Property Acquisition: The first appraisals for the South Gilbert Street Project have been completed and forwarded to IDOL Second appraisals on four parcels are underway. The IDOT review of the first appraisals is underway, with review expected to be complete in April. Acquisition is expected to begin in late April or early May. Economic Development: Preliminary data gathering concerning Iowa City's economic condition is complete. Data analysis and tabulation is complete. The Economic Development Profile has been prepared in draft form. Completion of the profile is expected in April. General Comments: Several applicants for position vacancies in the division were interviewed. Job offers were made to fill both vacant positions, and the vacant half position. One new employee, Richard Etter, has begun work. A second employee who will work in Development one-half of his time will start April 9, and the third new employee is expected to begin work April 23. The backlog of work caused by staff shortage has already been significantly reduced. Fourth quarter progress toward objectives is expected to be back on the normal schedule. Expenditures Budget This Quarter %YTD 6000 $22,779 $6,425.38 60 7000 2,300 44.81 11 8000 16,300 178.66 5 9000 -0- -0- Total $41,379 $6,648.85 35 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES I40INES Design 'arcel B Developer Contract Review Conveyance Const. Start Const. Compl. MICROFIL,70 BY JORM MICROLAB CEDAR RAPIDS -DES 6101HES 64-1 Dey Building Corp. No Yes No No No 81-1 Hawkeye Barber Stylist Yes Yes Yes Yes Yes (except sign and facade) 82-1a College Block Partners Yes Yes Yes Yes Yes 82-1b Northbay Construction No No No No No I83-84 Old Capitol Associates Yes Yes No Yes No 93-1/ Pentacrest garden Apartments Yes Yes Yes Yes Yes 101-2 (except plantings) 93-2 Lovetinsky Yes n/a Yes n/a n/a 93-3 Rath Yes Yes Yes No No :i 101-1 Perpetual Savings F, Loan Yes Yes Yes Yes No 102-1 Mod Pod Yes Yes Yes Yes No 102-3,4 First Federal Yes Yes Yes No No M« 103-3 Capitol States Associates Yes Yes Yes No No n? I TOTAL 11/2 10/1 9/4 6/5 2/9 2 n/a 2 n/a 2 n/a `- MICROFIL,70 BY JORM MICROLAB CEDAR RAPIDS -DES 6101HES MANAGEMENT BY OBJECTIVES DEPARTMENT: PLANNING AND PROGRAM DEVELOPMENT DECISION UNIT: CDBG PROGRAM DEVELOPMENT AND ADMINISTRATION THIRD Fiscal Year Objectives: (summary) 1. Citizen Participation: Plan and implement a citizen participation program. 2. Program Administration: Schedule activities to encourage timely performance, monitor project performance, plan FY80 goals and objectives, budget FY80 funds, complete fifth year grant application. 3. Planning: Develop information recovery system for planning data, prepare environmental review records for each project, plan comprehensive strategy suitable for Small Cities Grant application. 4. Program Development: Develop neighborhood site improvements program in four neighborhoods, plan interior spaces for Senior Center, plan for management of Senior Center, budget resources for Senior Center, and schedule activities to facilitate grand opening December, 1979. Work Completed: I. Citizen Participation: The citizen participation program is progressing as planned. The Committee on Community Needs (CCN) has monitored the submission of the fifth year CDBG application, the Small Cities Grant application, Senior Center progress, the new Housing Rehabilitation program, and Energy Conservation program during the third quarter of this program year. One CCN person has been assigned the responsibility of providing a liaison between individual projects and the Committee on Community Needs. 2. Program Administration: Staff time limitations have prevented monthly performance statistics from being gathered for each of the CDBG programs as stated in the objective. Likewise, quarterly file updates for each program compliance activity have not been completed. The fourth objective listed in the FY79 budget document states that FY80 projects' goals and objectives will be reviewed and approved by the City Council. This was accomplished on February 5, 1979. Objective number 5 in the FY79 budget states that $4.5 million will be encumbered by June 30, 1979. Staff limitations have not allowed routine monitoring of budgets nor expenditure levels. The fifth year CDBG application was submitted to A-95 review agencies. Comments were received. The application has been subsequently submitted to HUD. MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOIIIEs 3. Planning: The information retrieval system was not established 'by January 1, 1979, as scheduled. Progress on this activity is not scheduled at this time. Two additional Environmental Review Records (ERR) were prepared during the third quarter. No evaluation reports comparing project costs to benefits were completed. A Small Cities pre -application was submitted to HUD on January 25, 1979. The. target neighborhood to be revitalized is bounded by Kirkwood, Gilbert, Harrison, Linn, and Dubuque Streets. The October re- application is for $2 million over a three year period 1979 to September 1982. The document received the highest number of points in the HUD ranking and Iowa City was invited to submit a full application in June 1979. 4. Program Development: A detailed schedule of Neighborhood Site Improvement activities was developed and mailing lists compiled. The input process, proposal prioritizing and City Council review are expected April through June. Four new areas will be served. Scheduling of improvements in Longfellow and Northside areas will continue. Senior Center activities continue. Bids were awarded for furniture and equipment to be purchased with Title V funds. Floor plans and cost estimates for the renovation of the post office structure continued. The Senior Center Commission Bylaws were drafted and five positions advertised. The Council of Elders continued to plan programs and activities for the center; and established "standing rules" for their group. Ben Weise,atsocial inform Johnson County elderly implemented a rural outreach program of the program. The Senior Center Coordinator vacancy was advertised. The Nelson Center project was defined and an environmental project and contract was drafted. With HUD approval, be completed by June 30, 1979. The acquisition of a substandard structure to be rehabilitated and reused as a center for victims of spouse abuse was explored. An environmental review is being written. The Riverfront Commission has been reviewing project ideas in order to encumber $75,000. The Rocky Shore Drive trail and riprahverthe itboat ramp are currently being considered by the Commission;. owe is not certain that HUD can approve these projects to be implemented complying with current regulations. Analysis: In view of the resources available, the staff has performed in a very productive manner. Most tasks have been completed in a timely manner in MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES I401REs spite of understaffing. The primary disadvantage of long-term short staffing is that routine activities which were temporarily delayed tend to be permanently put off, thereby creating a situation which utilizes extensive time, effort and money in resolving audit findings and leading program files. Monthly monitoring of compliance activities is not taking place, and analysis of program cast effectiveness has not yet been initiated. The short-term impact of this type of program administration will not be easily recognized, however, the long-term impacts could be significant. Three new Planner/Program Analyst I's begin in April, somewhat remedying the situation. Expenditures f. i i r �I %YTD 6000 $114,000 I.' i i 7000 3,500 252.19 i i f spite of understaffing. The primary disadvantage of long-term short staffing is that routine activities which were temporarily delayed tend to be permanently put off, thereby creating a situation which utilizes extensive time, effort and money in resolving audit findings and leading program files. Monthly monitoring of compliance activities is not taking place, and analysis of program cast effectiveness has not yet been initiated. The short-term impact of this type of program administration will not be easily recognized, however, the long-term impacts could be significant. Three new Planner/Program Analyst I's begin in April, somewhat remedying the situation. Expenditures Budget This Quarter %YTD 6000 $114,000 $22,241.38 60 7000 3,500 252.19 33 8000 36,500 4,053.79 51 9000 1,000 -0- -0- Total $155,000 $26,547.36 58 MICROFILMED BY JORM MICROLAB CEDAR RAPIDS•DES 140114ES ■ July 23, 1979 Mr. and Mrs. Michael A. Rittenmeyer 831 3rd Avenue Iowa City, Iowa 52240 Dear Mr. and Mrs. Rittenmeyer: Your let'�er regarding the property at 831 3rd Street was furnished to the, City_ Council at its informal meeting of June 25, 1979. You expressed concern about the proposed construction of low cost housing on this property. The City will take no action to build on this lot until a reply is received from the U. S. Department of Housing and Urban Develop- ment concerning other sites. Thank you for expressing your views to the Council. Your letter will certainly be taken into consideration when a final decision is made. Sincerely yours, Neal G. Berlin City Manager Is / cc: City Clerk ✓ MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES M0114ES Juno 25,1979 To Mayor Vevera and City Council Members: Early this year we purchased the property at 831 3rd Ave. which is adjacent to F street. One of the reasons we purchased this property was that wo knew that F street :,:as vacated. Neighbors told us they had been informed by the city attornoys'office that nothing could be built on this property duo to a high pressure gas line under the street. We and previous owners of our property have maintained the north half of this vacated street for many years. We have now been informed thnt the city intends to build one and possibly two houses for use by low income families. 11 At the time the Low Rent Housing Authority was established by a vote of the people, the voters were promised that the City of Iowa City would never o►tn any low income housing property. We strongly object to the city being the landlord of any group of people regardless of income. We are extremely concerned that if this project goes ahead there will be irreparable damage done to our property due to increased run off of storm water. Will this development be covered under the Storm Water Management Ordinance? Vie would be intrested in purchasing the north half of F street vacated abutting our property. Vlo would appreciate ,your prompt attention to this matter. 831 3rd Ave. Iowa City, Ia. 351-5359 Sincerelyyours Michael A. Rittenmoye, Helen L. Rittonmeyer F11CROFILMEO BY JORM MICROLAB CEDAR RAPIDS -DES 1401HES 1347 1 I 1 I 1 1 i -i A I I I i i jI i I [7E IVCD n G MA t.t REF. NO. New Hampton, Iowa April 14, 1979 Honorable Robert A. Vevura, Payor City of Iowa City Iowa City, Iowa 52240 Dear Payor Vevera: Please excuse my delay in acknowledging your letter of April 4th. I just returned from a vacation trip. 1 missed our last meeting but am enclosing a page from the minutes of that meeting wherein the inatLer was dlscueoscd and the staff directed to prepare ,in order on the subJert at our meeting April 17th. A copy of that proposed order, which I received yesterday, is enclosed. My understanding is that a delegation of city officials Plans to be present. They will be given an opportunity to to speak of course. _. Most sincerely, I Robert It. Rigler Chairman MIR JUILSIA IWbAIll IIANHAIIAOUNN DONAI IIA OANIINLR „xun Gp D", AIONrp Ccnni Ilxlmb COMMI5SIOIIFR5 '.VIILMMI. WMIAlll Melrop• "0111AUR IIIGUN AIIAIIII16M5 bmv lMnDlrnr nuwllnn MICROFILMED BY JORM MICROLAB CEDAR RAPIDS -DES MOINES D RIO:r 11 VA II OIIIIFF Rad OA f r....r IN DEPARTMENT OF I RANSPORTATIOLIxn�. rm AGE t\ ITEM I COMMISSION OPDER ':' 1AFF ACTION DPrisionlBureaulOL'ice P1anI1j17cJ F, Research D1V1510n_._____—_-___ IlmrdOrder No.__._______ SubmiIIed by. C._ I_hlacGtILiv ray----Pnonc NO.__gfi--1(,GO _---tnccUnD Dale. TITLE: Arterial 518 - Irma City Bypass - Location 5IJILUS i!eport DISCUSSION I BACKGROUND: The Arterial Highway 518 improvement project in Johnson Comity was discussed at the Transportation Connn(ssion hleeting on October 3, 1978, when a delegation from the City Council of Iowa Cil:y proposed that the route be relocated to a more westerly alignment around Iowa City and that the Melrose Avenue Interchange be eliminated. These changes would be in accordance with the new City Comprehensive plan. The Staff was asked to review these concerns and consider an alternate alignment. Such an alternative was reviewed at the October 17, 1978, Couunission i•leeting, but no further decision was made. At the November 2, 1978, Commission fleeting a representative of the Iowa City Council indicated that :hey would be willing to consider such a proposal. The question of the I•lelrose Interchange was also discussed. The Commission passed the following resolution: "Staff complete 518 as far west of the original staff proposal as is feasible within the watershed area and the two north and south control points, including the construction of the Melrose interchange." The north and south control points were identified as the 1-80/380 interchange, on the north and near the location of the approved Iowa 1 interchange, on the south. Per this directive, Staff initiated a further Study to determine the justification for such an alternative. Upon completion the study was reviewed by Staff. At the February 26, 1979, Project Review hleeting, Staff, including representatives of the FNMA Division Office, concluded it was not feasible to revise the location and reconmended that the Department proceed with the alignment as presently approves( by the Transportation Commission, the FIIWA and the U.S. District Court. This recommendation was relayed to local city, county, and regional planning officials at a meeting held in Iowa City on March 22, 1979. PROPOSAL I ACTION RECOMMENDATION: The Comnission reaffirm its decision to pursue development of the prP.sently approved alignmeiiL of Arterial 518 west of Iowa City. COMMISSION ACTION I STAFF ACTION: Moved by __—.— .�__.__soeonded by.._—_____ ...___ ._._......_ _ MICROFILMED CY JORM MICROLAB CEDAR RAPIDS -DES MOINES Volo Ayo Nny Pass Busker ------ Dunn _.__Dunn --_— '.--- -- Gardner _—... IdcGrdll— Ilipler —_– -- Thoms vml Dndl ..._.._. _.. _._ ..–_._.. 1 I i =1 G-79-520 Bob Goodvin, Di.•tcetot, Geoehaf. Coatse.e D.ivi.simt, bni.c6ed .t.ite Comni6s.itin an s.tati tics pe:,UL: ntng to .that Div-ision. Ile Said .that he ii stUt ill the I.>tocess 06 hieing ato.then attthney. 1'aese.n.tey t teae. wee eight attoaneys and one inves.tigatoa on the Generale Counset zta16. Thele wte. 30.4 cowt,t eases; $29 utite.ion in Cinbif.i.ty, rehich does no.t .includc cases sur.h ns I-380 and City o6 Okoboji, which have no dot.fw: amount. we wte haldti.ly ig nplvwxuratef90 drivel's License nevucati0;l healiulgs pea month. Since J:Ltif 23, $8.7 nt lfion in ituusu.its have been disposed oS uu.th $950,000 paid out. This is a payout nate 06 app.%ox.ininte.e.y It percent. .It. GDodw.in Aeviewcd the Indian L00110u.t case, Ilighlay 518 tvtotutd Town City. Thin case w,ts j.ihs.t 6i.ted on Jtute 15, 1972, in Fedcvtat Di6t,,Uct Cottat. Ort Augltst 28, 1972, .the Fede.&LE Di,stvtic.t Co'v t enjoi.ncd .tile. Iowa S.tatr_ Iligluuny Conmuss.iou 6nom ally 6w -Xi m ccvutatc,tion oa pwtchnse o6 night o6 wag beeawse .tile EIS was aueed not s«SSic.ient. This case axis appeated to .the Count o6 Appeaf6 and appaoximatety one year inlet, .tile Cott.tt o6 Appenes upheld tine Dis.0lict Cotutt aILCUIg .tha.t .tile te;tnLbL. 06 .tine IWjec.t fuULc nut au16.ici.e.nt. Tile Cott•t.t heed .that -tile tivoilZmi. zhouCd be. extended 6a0tn hightotij 92 up to I-80. The putiod 6aom Oetobet 1973 thtough '.!ahch 1978 mu spent paepwt,itng a neva EIS, C.lAcuta iug it and obtaining appaovats. Tine Cowtt has aeviewed tile. ETS, appaoved it and Ons P.LSted tite .injumadott. In ally tmttsmit .that nota cha.Cteltges the EIS, toe a•te •ill a strong position because e.6 .the Cotvt,t appaovat o6 .the EIS. Conuni.ssiouen Gwtdnct questioned 16 the DOT's stattvte has been weakened by tine 6ac,t .that .tile Conunission asked 6o.t possibee consideanti.on on ano.thut. a.utmnent west 06 .tile o.tdgi/mC ai.ignnient• 1•!a. Goodati.n said he Jett we should aecognize that this ETS at-Lcady has Count appaoval., and tine DOT tuoaed pnobabty be bett.eA OSS no.t to dev.fate 6hom .tine aphtoved 'EIS• Couxri sm .ontJt Gcvtdneh asked .i6 the CORMIli.SSdoll shouCd hcnSS.ihm .tinc.i,t 1 -)0.5 -Won on tile. oniginae. aUgntnentt. Mit. Goodwin said that tine ConunCssion shoutd pnoi tbey hMS6ihtn .tile atignment as de.tetmined by .the EIS. Conuni sionm Dann asked that such an oadeA be paehented .to tic Conmission (it its next meeting. Th.i.s item boa ­injo•v,;i MICROFILMED BY JORM MICROLAB