HomeMy WebLinkAbout1979-11-06 ResolutionR SOII7TION NO. 79-518
M90LUrION ACCEPTING SANITARY SEWER IN
MT. PROSPECT, PART IV
WAS, the Engineering Department has certified that the following
irrProve -nts have been completed in accordance with plans and specifications
Of the City of Iowa City,
Sanitary sewer for Mt. Prospect Addition, Part 4, as constructed
by Knowling Bros. Construction Co. of Iowa City, Iowa.
AND Wi'FRE.A.4, Maintenance Bowls for Knowlina Bros. Construction are on
file in the City Clerks Office,
NOW TI� BE IT RESOLVED by the City Council of Iowa City, Iowa,
that said inlProvwents be accepted by the City of Iowa City.
It was Moved by Balmer and seconded by Erdahl
that the Resolution as read be accepted, arra upon roll call there were:
Received & Approved
By The Legal Depariment
_;a / I - -/y
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
61671
AYES. NAYS: ABSENT:
BALMER
x
DEPROSSE
x
ERDAHL
x
NEUHAUSER
x
PERRET
x
ROBERTS
x
VEVERA
x
Passed and approved this 6th
day/ofd// November 19 79
,
� it "/./C L /ice✓ �
Mayor
-
ATTEST:
_1�2
City Clerc
Received & Approved
By The Legal Depariment
_;a / I - -/y
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
61671
CITY OF
IOWAICIVIC CENTER 410 E. WASHINGTON ST
CITY
IOWA CITY IOWA 52240 (319) 354.180
� I
i[
1
i
ENGINEER'S REPORT
October 31, 1979
Honorable Mayor and City Council
Iowa City
Iowa
Dear Honorable Mayor and Councilpersons:
I hereby certify that the construction of the improvements listed
below have been completed in substantial accordance with the plans
and specifications of the Engineering Division of the City Of Iowa
City. The required maintenance bond is on file in the City Clerk's
office.
Sanitary sewer for Mt. Prospect Addition, Part 4, as
constructed by Knowling Brothers Contracting Company of Iowa
City.
I hereby recommend that the above mentioned improvements be accepted
by the City of Iowa City.
Respectfully submitted,
EugeneA. Di z, P.E.
City Engineer
bj3/11
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
i
�jy 'N,
RESOLUTION N0. 79-519
RESOLUTION ACCEPTING THE WORK
SERVICE BI)TIDING sANITAgy SEWER
PROJECT
WHEREAS, the Engineering Department has recommended that the im-
provement covering the Service Building Sanitary Sewer Project
as included in a contract between the City of Iowa City and
Rick Company of Toledo. Iowa.
dated June 6, 1979 be accepted,
AND WHEREAS, the Council finds the improvement is in place and does
comply with the requirements for such improvements,
AND WHEREAS, maintenance bonds have been filed,
NOW THEREFORE, BE IT RESOLVED by the City Council of Iowa City, Iowa,
that said improvements be hereby accepted by the City of Iowa City, Iowa.
It was moved by and seconded by Erdahl
that the resolution as read be adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
BALMER x
DEPROSSE x
ERDAHL x
NEUHAUSER x
PERRET x
ROBERTS x
VEVERA x
Passed and approved this 6th day of November , 19 79
Ma o���� �/'�-,rsr�
Y
jj
ATTEST:
115 Clerk
Received & Approved
By The Legal Department
-//-/ - 79 �4
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
ao7a.
CITY
OF IOWA
CITY
CIVIC CENTER 410 E. WASHINGTON ST. IOWA CITY IOWA 52240 (3793354-18(3D
ENGINEER'S REPORT
October 29, 1979
Honorable Mayor and City Council
Iowa City
Iowa
Dear Honorable Mayor and Councilpersons:
I hereby certify that the construction of the improvements listed
below have been completed in substantial accordance with the plans
and specifications of the Engineering Division of the City of Iowa
City. The required maintenance bond is on file in the City Clerk's
office.
Service Building Sanitary Sewer Extension as constructed by Rick
Company, Inc. of Toledo, Iowa. The final cost was $19,293.15 the
same as the contract price.
I hereby recommend that the above mentioned improvements be accepted
by the City of Iowa City.
Res�ctfully submitted,
ex,
Eugene A. Dietz, P.E.
City Engineer
bdw1/6
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS•DES MOINES
,
I
i
f
i
II
i
I
i
I
I
I
i
i
;c
I
CITY
OF IOWA
CITY
CIVIC CENTER 410 E. WASHINGTON ST. IOWA CITY IOWA 52240 (3793354-18(3D
ENGINEER'S REPORT
October 29, 1979
Honorable Mayor and City Council
Iowa City
Iowa
Dear Honorable Mayor and Councilpersons:
I hereby certify that the construction of the improvements listed
below have been completed in substantial accordance with the plans
and specifications of the Engineering Division of the City of Iowa
City. The required maintenance bond is on file in the City Clerk's
office.
Service Building Sanitary Sewer Extension as constructed by Rick
Company, Inc. of Toledo, Iowa. The final cost was $19,293.15 the
same as the contract price.
I hereby recommend that the above mentioned improvements be accepted
by the City of Iowa City.
Res�ctfully submitted,
ex,
Eugene A. Dietz, P.E.
City Engineer
bdw1/6
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS•DES MOINES
RESOLUTION NO. 79-521
RESOLUTION AUTHORIZING THE MAYOR TO SIGN AND THE CITY CLERK TO ATTEST
A GRANT OF AN EASEMENT TO NORTHWESTERN BELL TELEPHONE COMPANY FOR THE
CONSTRUCTION OF PEDESTAL TERMINAL IN THE SOUTHWEST CORNER OF CITY
PARK.
WHEREAS, Northwestern Bell Telephone Company has proposed the
removal of two poles and five quy wires in the southwest corner of
City Park in exchange for the right to construct a pedestal type
terminal and control box on a 5 foot by 5 foot concrete pad in the
same area of the park; and
WHEREAS, the City of Iowa City finds it in the public interest to
grant an easement for the construction of said terminal.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF IOWA CITY,
IOWA:
1. That the Mayor be authorized to sign and the City Clerk to
attest the grant of an easement to Northwestern Bell Telephone
Company for the construction of a pedestal terminal in the
southwest corner of City Park.
It was moved by Balmer and seconded by
Roberts that the resolution as read be adopted, and upon
roll call there were:
AYES: NAYS: ABSENT:
X Balmer
X deProsse
X Erdahl
X Neuhauser
X Perret
X Roberts
X Vevera
Passed and approved this 6th day of November I97g,
a
1 p 7 MAYOR
> ATTEST: ,��/ . i C
? CITY CLuERK
�PCEZ7F1t 3 3PPROPFD
� f �T� Ii1�.i'AIgtifl�`IT
rP
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES FIOIMES
. i.
EASEMENT
The City of Iowa City, Iowa, in consideration of the sum of One
Dollar ($1.00), receipt whereof is hereby acknowledged, does hereby
grant to the Northwestern Bell Telephone Company, a corporation, its
successors and assigns, the perpetual right to construct, operate,
and maintain its telephone and telegraph lines consisting of buried
cables and terminals under, upon or adjacent to that certain piece of
real estate hereinafter described, in the following manner:
The placement of a pedestal type terminal and associated cables
mounted on a 5 foot by 5 foot concrete pad located on the East 10 feet
of the West 59 feet of the North 19 feet of the South 49 feet of Sec.
3.
The foregoing right is granted upon the expressed condition that
Northwestern Bell Telephone Company will assume liability for all
damage to the hereinafter described property caused by said
company's failure to use due care in its exercise of the granted
right.
The real estate above referred to is specifically described as
follows:
A tract of land in the SW Corner of Out Lot 5, SW 1/4 SW 1/4 Sec. 3 T
79 N R 6 W in the City of Iowa City, Johnson County, Iowa.
Dated this 6th day of November, 1979.
CITY OFF (IOWA CCIITYY,, IOWA:
ATTEST: �a' �r/rcGr.!' !/6 • vyv—G�
ATTEST: 1 ' eL
CITY CLERK
NORTHWESTERN BELL TELEPHONE COMPANY:
By: 221CGL cr
TITLE
By:
TITLE
VIXI;171D A AUPIZOVED
.)y. uw I= DITIRIL011
MICROFILMED BY
JORM MICROLAB
-, CEDAR RAPIDS -DES MOINES
4
L'
1
RESOLUTION NO. 79-522
RESOIMION AL11'HORIZING EXECI C)N OFAN AMENDED AGREEMENT
WITH CEDAR RAPIDS AND IOWA CITY RAILWAY COMPANY
WHEREAS, the City of Iowa City, Iowa, has negotiated an amended agreement
with Cedar Rapids & Iowa Cit being Railwa Co. a Dopy of said
Reapm
atta to a so u s reference made a -% E ent
WHEREAS, the City Council deeps it in the public interest to enter
into said amended agreement with the Cedar Rapids and Iowa Company for River Corridor Sewer Project City Railway
NOW, "'ORE, BE IT RESOLVED BY THE CITY COUNCIL;
That
t oradC City
lCarepi�oarC�Ra directed execute hamended edR & IRailway
2. That the City Clerk shall furnish copies of said
to any citizen requesting same. cop amended agreement
It Was moved by Balmer and seconded by Roberts the
Resolution be adopted,call there were:
AYES: NAYS: ABSEN r:
X
i BALMER
X DEPROSSE
X ERDHAL
i
X NEUHAUSER
X PERRET
X ROBERTS
X VEVERA
I Passed and approved this 6 t h day of November'
1979.
ATTEST:� � .� ,
Mayor
City Clerk
I
Received & Approved
ByTie Legal Department
s
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES 1101RES
A
1
i
'MENDAIENT TO ) GREEMENT
FILED
1919NOV 20 U 8:39
-R CU
:. r
NSON CO., ,,
The CED R R PIDS 'ND 10h7 CITY R:SLh';Y COMPlNY (neve_
inziter _elle,' the "RcUVZ, y Coapzny) hereby .licenses the CITY
OFION: CITY, SOY.: (hereinclter called "City") to install,
WZ:Lntein, End use storm„ sewer pipe (hereinLfter called "Facil-
ity") in the e,sement describes as follows, and subject to the
terms in the said easement, as well as to the terms that follow
in this document.
This amendment includes the location listeu below,
which is in addition to the other sir (u) locations previo.,sly
liste3 in the oricinc,l Agreement, dated June 27, 1979.
Easei:.ent to instill, m,.intain and use storm sewer,
located as follows:
7.) In CaFitoL Street froin .pprorim:teLy 209 Leet
south oL the south richt-of-way line of Benton Street
to c point approyira,.tely .175 feet south of the soutn
right-of_,,ay line OL Benton Street.
ShouLJ the Licensee Lt my time violate any of said terms
or con,iitions, or use or attempt to use said facility for any
other or .,ifierent purpose then thct above specified, then the
R.L1way Coxpcny m,.y, ct its option, immediately revoke the
License.
For the privileges herein permitted, the City has paid
to the Railway CompEny a fee of One Hundred Dollars ($100.00)
mor prererction of this instrument, receipt whereof is hereby
e rknow led(, c,i .
The ioreroing License is subject to the following condi-
tions.
F'Lrst: The Rzilway Superintendent will be provides,
Prior to beninniny vork, with the nr.r.,c, phone number, tnd eddress
of the city's and contractor's representatives who will oe in
cherge or the sever construction.
Second: The City ,ill require its' contractor to use
c1L re.son.bLe c,re to avoid occident, damage or delay to the
Rr.ilu.y's trains or other property as determined by the Rail-
v:ry's Superintendent or nis representative. The Railway Super-
inlen.,ent or his representative will have jurisdiction over
•onstru(7tion s.-Lety which 1 r.y ,1Lec•t the s.lety of RI ilvay's
OFGrotion and; his decision shell be Line.1. The City she:11 be
ii,.ble for my ._mage incurreu due to sewer construction.
-BEST
257
y ,OOCUMENT
AVAILABLE
-a_
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES 110I1JES
Thire: The RaL1w,}• Company ,•L its' optLon, n.ay require
fligr.rn be present to protect RaiLway's FrOFerty zno inspect
the construction.. The City wiLl rromFtly reimburse the Railway
for E: Fenses incurre,l w iLh the inspection anu f Lacyinc of rile
construction zreus.
Fourth: The said Licensee wiLL wive to the SuFerinten-
cant or the RuiLw..y Cor,:pzny at ieast tan (L0) jays' notice in
writing beiore entering upon the right-of-w•t:y Et each crossing
LOcction of the RziLway Company for construction purposes, or
for the Furpose of making necessary repairs. Work et each
crossing shall be completed c-nd cleaned up to the satisfr.etion
of the Railu:,y's Surerintenuent within thirty (30) days of the
tLma it w„s begun. The Railway Superintendent must be notified
and approve any variation of the completion date. The Railway
Comp„ny reserves the right to judce of the necessity of repeirs
to said facility, and to recruire the Licensee to make such re-
re.irs upon ten (10) uays' notice in writing. In such case, said
Licensee may enter uF.on s-iu right-of-wLy without the teu (t0)
drys' notice rbove referreQ to, rnu snit procee,l torthv.ith to
rake such repairs, and upon laiLure t0 60 30 within Len (L0)
.I:-ys, the Railv,Ly Company she -11 have the right to Duke saiu ru-
pairs anu collect the entire cost thereof from the Licensee.
Tne R..ilway COmpLny reserves the right, in case, in its opinion,
the satuLy of its tracks or property ,remands it, to make emer-
gency reFairs without notice to the Licensee and to collect the
cost thereof from Licensee as herein provided.
Firth: It is understood by the Licensee that said fa-
ciLity is subject to anu ,any increase the dangers and ha.:crus of
the oreration of the railroad of the Railway Company, and that
this License is subject to all risks thereof. The facility it-
seLt shL!Il be and remain the property of the Licensee and any
„nd all clLims caused by its use or maintenance shall be the
responsibility of the Licensee, z.nd not the RaAlway Company.
Si+th: Tne RL,ilw.ay Comrrny reserves the right to use,
occupy an,l enjoy its tre,_ks, property and right-of-way, for such
Furpose, in such manner, an0 at such time as it shEll desire, the
sEme as it this instrument hed not been executed by it. I1 any
such use shzll uecessit..te any chime in the Location or construc-
tion of s&iu 1uciLity, or any pert thereof, such change sha11 be
m,de uy the Licensee, at the e>Fense of the Licensee
01 the R;Ji1%r. y COm c.n upon demand
} 1- y, r.nd the said Riilw.ay ComFLny shall not
be lisbLL to the said Licensee on account thereof, or on account
of any uamuge crowing out of any use which the Railway Company
nlEy make of its scid traeKS, property and right-of-way.
Seventh: Tire Railwi;y Company shell have the ricnht at
any tine by giving ninety (sn) uuys' notice in writing to the
LicansLe to reouire the Licensee, it its e:,jense, to re-arri•nge
or ,.Ove this fr.cillty so i:s to conform to chenoes the RLiLwty
i
aEg,P
DOCUI� 1.E
258 'Avner
-2-
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS•DES IIOIDES
R
m:
cation
Corr ng nay desire to crake in its track urade, track
or Ln or my other cinany,u.: Riil%,E•y Corvfiny miy oesilocationr(I to make
in its rrOFerty c this Foint,
Eic•hth: Tnere _hill be no construction or: the Rafl>way's
ri,nt-of-1,cy oebAeun sunset .nc sunrise, Ilso, the contrc.c.tor
sha11 provic.e lend, bLrLL:E..lus, uernine LiShts, in 2rt other
suit,bla safety eIrIU noes to prevent iccess of uneuthori>eu
}ersons to site N;lere work is. in FroSr,ss,
Nineth. Tae contio(tor sn,ll not stockpile or store
materiol or debris on the right-ol-way of the Railwr,y,
Tenth: The contractor shr.1.L h„ve in force, Public Li-
nousay Insurc.nc•e, per person in the amount of One Hundred
Tnousanu Dollars ($100,000.00) imi per occurence in the ;,vount•
of Three Hunareu Thousa-mi Doll, rs ($300,000.00).
Eleventh: The V•-iver of a o breach of any of the terms
anconfiitons hereof shall be limiter: to tine ict or acts ,on-
st"atiilo such bi-Lach, i.n- shc.11 never be C'OnStr UE:Ci rS Uel.aC a
continuing or pern•,,.nent waiver of eny such terivs or conditions,
or which sh:.11 be anu rer:rin in lull force and ulfect
future acts or herrenings, notuithstzndino mis to
y such veivur,
Tvellth. This License is personal to saiu Licensee and
is not assigni_bLc or trr.rslcr:olu, v.ithout the written consent
or the Railr.i.y Cornpr.ny being first obtainei.
f
IN WITNESS WHEREOF, this instrument is erecuteu this
Jay of ) rnt.' -f. -k—,
CO til l� i I E SEAL CED, R Rr'.PIDS AND IOW;, CITY Rr:ILwAy COMPANY
ATTEST: By
!/
VICE PRESIDENT AND SECRETARY
?s��stznt Secreti-.ry
c
Tne undersignen, the Licensee r•,entioned in the foreooin
License, hereby i,cepts tile m
e .rue, subject to the terms :.nd g
tiont
s therein stred. condi-
By `I�iG�LG• l/ •/ i
WITNESS: 71st ,e.L
(�nl'�ili;1l� SEAL,
2 5 Di BEST
UCUm13iv'L'
.� AVA!L&BLE
PIICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES IIOIOES
8B M I P G LL D ^tlf �i:1:,t1'r
Id -39 -?1 _.. .:.,
0
e�
m�a
•
o .
h " ti
> ,moi
• S`y h y
26v
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
v
ti b�
v v
V
0
V
�
0
v
C
�
tip•
ctt51
•
o .
h " ti
> ,moi
• S`y h y
26v
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
'Q
M
•
o .
h " ti
> ,moi
• S`y h y
26v
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
�
tip•
v�
.•
�
C
c
•
o .
h " ti
> ,moi
• S`y h y
26v
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
W�
t
CEDAR RAPIDS AND IOWA CITY RAILWAY COMPANY
Genera! Offi're
CEDAR RAPIDS. IOWA
0. R. WOODS
vXa. MAVEN:
GE!6:XA1. YI:Yl.XIMENNiJR
October 8, 1979
Mr. Gene Dietz,
City Engineer
Civic center
Iowa City, Iowa 52240
Dear Sir:
Per your conversation with our Alan Courtney and Jim
Gassman, I now learn that there is an apparent void in our
June 27, 1979 storm sewer agreement. We feel that the area
between easement locations (#3) and (#4), as listed on Page 1
of our Agreement, should be included in the Agreement in the
form of an amendment.
Therefore, please have your people execute the attached
amendments, which will cover the area in question, with the
same conditions as listed in the original agreement.
Please return all three (3) copies, and we will execute
them and will return one to you for your records.
Yours truly,
0. �R �GWoo� /
ORW:fp
Encls.
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES 140 RIES
M„
l
i
RESOLUTION NO. 79-523
17-001 '10N AUrMRIZING EXECf1PI0N OF A CONTRACT WITH
SHIVE-HATTERY AND ASSOCIATES
with WHEREAS, the City of Iowa City, Iowa, has negotiated a contract
Shiyt;�� r and A sociates , a copy of said con -�
being attaonea W this Reso uTt3w� and &Y t s reference made a part eo
WHEW -AS, the City Council deans it in the public interest to enter
into said contract with Shive-Hatteri and Associates for soil testin
and surveying services on the North Branch Detention Structure of
Ralston Creek
NOWF '1'MMRE, BE IT IESOLVED BY THE CITY COUNCIL:
1. That the Mayor and City Clerk are hereby authorized and directed
to execute the contract with Shive-Hattery and Associates
2. That the City Clerk shall furnish copies of said contract
to any citizen requesting sane,
It was moved nded
Resolution be adopted, Erdoco-i�__e by Neuha ser the
AYES: NAYS: ABSENT:
X
BALMER
X— DEPROSSE
R ERDAHL
X— NEUHAUSER
X PERRET
X ROBERTS
R VEVERA
Passed and approved this 6th day of November , 19 79
ATTEST: yor
4UCLIeark!:�7L—
Received
& Approved
BY Tho Legal Depalirnent
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MONIES
M :
1
AGRi.HIEN I
This Agreement, entered into this 6th day of November 1979,
between the City of Iowa City, a municipal corporation, Tereinafter
referred to as the City and Shive-Ilattery and Associates, of Iowa City,
j Iowa, hcreinaflr:r referred to as the Consultant.
Such contract of employment to be subject to the following Lei -ins and
conditions and stipulations, to -wit:
The Consultant shall not commit any of the following employment practices
and agrees to prohibit the following practices in any subcontracts.
a. To discharge from employment or refuse to hire any individual
because of their race, color, religion, sex, national origin,
disability, age, marital status, or sexual preference.
b. To discriminate against any individual in terms, conditions, or
privileges of employment because of their race, color,
religion, sex, national origin, disability, age, marital
status, or sexual preference.
I. SCOPE OF SERVICES
The Consultant is to provide the following soil investigation and
surveying services for the North Branch Dam on Ralston Creek.
SOIL INVESTIGATION SERVICES
i
General
1. Provide all labor, material, and equipment to perform soil boring
work at project site, perform laboratory tests, and prepare
+ engineering report.
2. Number of borings: 6 as shown on the attached figure. Additional
borings may be requested by the Engineer if unfavorable soil
conditions are encountered.
3. Location of borings: as shown on the attached figure. All borings
are located on private property. City of Iowa City will obtain
permission of property owner for access of boring rig. Exact
location in field may be varied slightly from locations shown.
Borings may be located approximately by measuring from apparent
property lines as shown on the attached figure. A plan drawing of
the actual boring locations shall be included in the report.
Additional borings may be required in the groin area of the
embankment and it may be necessary to do laboratory permeability
i tests on proposed embankment materials in order to predict seepage
characteristics. The need for these tests shall be coordinated with
Stanley Consultants.
4. Required depth of borings: as shown on the attached figures. Depth
of hole shall be measured from existing ground surface. Consultant
shall determine elevation of ground at boring locations.
5. The engineering analysis and recommendations should include
settlement predictions, seepage characteristics of both natural and
embankment materials, and a stability analysis of emba0ment
materials. The Consultant should provide a typical truss section of
the proposed embankment which will include typical side slopes,
general embankment composition and any special drainage
requirements.
i 13EST
DOCUMENT
AVAILABLE
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOIRES
/;:
6. C011tact the following person at Stanley Consultants 24 hours prior to
starting field borings:
Bennett Reischauer
Stanley Consultants, Inc.
Stanley Building
Muscatine, Iowa 52761
> 319/264-6.312
Drilling Rcyuirements
1. Method of drilling is optional; method shall provide clean hole with
undisturbed soil for sampling.
2. Measure ground water level in all holes except when maximum depth is
reached prior to encountering ground water. Measure elevation when
first encountered and 24 hours after completion of boring.
3. The Contractor shall fill each boring hole after receiving approval
from the Engineer. Boring holes shall be covered until filled.
Sampling Requirements
i
1. In granular soils, obtain 1 3/8 -inch diameter split spoon samples in
accordance with ASTM D1586 (including standard penetration test
records).
i 2. In cohesive soils, obtain 2 -inch diameter thin wall tube samples in
accordance with ASTM D1587. Obtain samples for consolidation tests
with 3 -inch diameter thin wall tube.
I 3. Obtain samples at every 5 -foot depth and at changes in character of
material.
� Testin Rr.cuirements
1. Perform sufficient testing of samples obtained from the borings to
I properly classify soil in accordance with the Unified Soil Classifi-
cation System.
2. Conduct unconfined compression tests, ASTM D2166, on representative
cohesive soil samples, except only maximum strength and initial
moisture and density are required.
3. Perform consolidation tests on samples from Boring Nos. Al, A7., and
A3 per ASTM 02435 (except time versus deformation data is not
required), if needed to estimate settlement of the embankment.
I
i4. Perform sieve analysis of granular deposits encountered per ASTM
D422, except hydrometer analysis portion of test is not required.
I 5. Obtain Atterberg limits per AS1M 0423 and 0424.
i
1 6. Perform standard Proctor compaction test in arcordance with ASIM
D698 on material from borings A4, A5, and A6.
7. Determine natural water content of soil in borrow area,
Soils Report
r ! Submit two preliminary review copies of the Soil Investigation Report to
Stanley Consultants for purposes of coordinating the project construction
requirements with soil conditions encountered. After review, submit ten
final copies of the report to Stanley Consultants and 5 copies to the
City. The report shall include the following:
1. Boring logs which shall include data required by ASTM 01586 as
applicable for tests required under these requirements.
MICROFILMED BY
JORM MICROLAB
! ` CEDAR RAPIDS -DES MOINES
n
3
7.. Results of all uthcr tesLs rv•quired horein.
3. Estimated cohesion and fricLiun angle of soils encountered.
4. Estimated permeability offoundation and embankment material basrd
on examination of material and soil classification.
5. Proctor density curves for embankment material.
6. Estimated shrinkage of borrow material when placed in the
embankment.
7. Estimated amount of settlement after completion of embankment.
8. Recommendations regarding proposed dam design and any special
precautions or additional tests which should be undertaken.
SURVEYING SERVICES
Gr. -neral
chis survey is required for the design of a dry dam on the North Branch of
Ralston Creek in Iowa City, Iowa. Survey notes will be used to develop
final construction plans for the proposed dam.
Survey control shall be as follows:
For horizontal control use the quarter section line running north -
south from Seventh Avenue and for the east -west line use the quarter
section line at approximately the end of Woodridge Avenue.
Vertical control - Shall conform to the elevation used by Tri-State
Aero Engineering Services when they prepared two foot contour maps
for the City of Iowa City. Shive-Nattery shall contact Tri-State to
determine the exact location of these control points.
Baseline Services
Run baseline survey to obtain exact distances and ground profile as shown
on the attached figure. The angles and lengths for the baseline shown on
the attached figure are scaled from the figure and are approximately only.
Orient the survey so that the dam and spillway will be located as shown on
the figure. Complete the loop on the baseline survey so that angles and
lengths can be checked. Locate by stationing and tie baseline to existing
roads, driveways, culverts, utility poles, manholes, creekbed, trees
larger than six inches in diameter, clumps of smaller trees, and other
similar items.
Survey one cross section each 100 feet in the area where the dam will be
built. Cross sections should extend 200 feet on either side of survey
centerline.
Provide sufficient PDT's and PI's to re-establish survey lines at some
future date. Turn angles at PI'S. Reference all PDT's and Pi's with a
minimum of three ties.
C!1:. kSurvex
Run base line survey along creek in area shuwn on attached map, locate
creek from baseline. Determine creek bed profile with a minimum of one
elevation measurement every 50 feet along the centerline of the channel.
Locate by stationing and tie to baseline trees larger than 6 inches in
diameter, clumps of smaller trees, roads, culverts, drainage file
outlets, and other similar items. An existing sanitary sewer is located
adjacent to Ralston Creek. Record invert elevation for each manhole
located within limits of creek survey. Survey one cross section each 100
BEST feet to extend a minimum of 50 feet on each side of center of creek.
DOCUMENT
AVAILABLE
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
i
n r�
land Acquisition
Prepare legal descriptions of land to be acquired by purchase or
easements.
Other
In addition, the Consultant will provide specific consulting or testing
services in addition to any of the above or any other related items at the
City's request.
I1. GEM RAL TI RMS
1. The Consultant or the City may terminate this Agreement upon seven
(1) days notice. If the Agreement is terminated, the Consultant
shall be paid on the basis of work satisfactorily completed and
accepted by the City. The percentage of work completed but not yet
accepted by the City shall be determined mutually by the City and the
Consultant. If the City and the Consultant are unable to agree on
the percentage of completion, the matter shall be resolved by the
iprocedures of the American Arbitration Association,
2. Records of the Consultant's Standard Time Charges pertaining to the
I Project shall be kept on a generally recognized accounting basis and
i shall be available to the Federal government, the City or its
authorized representative at mutually convenient times.
3. This Agreement shall be binding upon the successor and the assigns of
the parties hereto; provided, however, that no assignment shall be
made without the written consent of all parties to said Agreement.
A. It is understood and agreed that the employment of 'the Consultant by
the City for the purposes of said Project shall beexclusive, but the
Consultant shall have the right to employ such assistance as may be
I required for the performance of the Project. Said Consultant shall
be responsible for the compensation, insurance, and all clerical
details involved in their employment.
5. It is further agreed that no party to this Agreement will perform
i contrary to any State, Federal or County law or any of the Ordinances
of the City of Iowa City, Iowa.
j6. The Consultant agrees to furnish all reports and/or drawings with the
seal of a Professional Engineer or Architect affixed thereto where
such seal is required by law.
7. The City agrees to tender to the Consultant all fees and money in
accordance with this Agreement except that failure by the Consultant
to satisfactorily perform in accordance with this Agreement shall
constitute grounds for the City to withhold payment of the amount
sufficient to properly complete the Project in accordance with this
Agreement.
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES IIOIIIES
8.
Should any section of this Agreement tic found to be
invalid, it is
agreed that all other ser.tions shall remain in full force
as though
and effect
severable from the part invalid.
III.
CITY'S RESPONSIBILITY
The
City shall:
1.
Provide full information as to the rr:quirements for the Project.
2.
Designate Richard J. Plastino to act as the City's
with respect to the
representative
BI ST
work to be performed under this
such person shall have complete authority to transmit
Agreement and
instructions,
ROCU MT3NT
receive information, interpret and define the City's policies and
decisions with
AWULAHL.L
respect tomaterials, equipment, elements
pertinent to the work covered by this Agreement.
and systems
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES IIOIIIES
I-
3. A -,-,!-,t I, lie Cc ii vvat ltmIt by pl.u:iug at his di•,pn,al all available
i infor•m•rtiun perLinenL to the ••i Le of the pruject including pr-eviuus
reports and any other da La rel,itive to design and construction of the
Project.
4. Make all provisions for the Consultant to enter upon public and
private land as required for the Consultant to perform his work under
this Agreement.
5. Examine all studies, reports, sketches, estimates, specifications,
drawing proposals, and other documents presented by the Consultant
and render in writing decisions pertaining to the documents within
fifteen (15) days after receipt so as not to delay the work of the
Consultant.
IV. TIME OF PERFORMANCE
The Consultant shall complete the soil investigation portion of the
contract within sixty days after notice to proceed. If soil conditions
prevent access to the site this time period shall be extended upon request
of the Consultant and upon concurrence of Lhe City.
Surveying services shall be coordinated with Stanley Consultants and done
i on a time schedule so that Stanley's work under a separate contract is not
j delayed.
++� V. COMPENSATION FOR SERVICES
I The costs for geotechnical engineering and technical personnel
services, other than field exploration and laboratory testing will
be based on direct personal expense times a 2.19 multiplier. A copy
of the current direct personal expense rate is attached as attachment
number 1. All field exploration and laboratory testing will be
provided at the current standard unti prices a copy of which is
attached as attachment number 2. The total for all laboratory and
soil investigation services shall not exceed $ 6,900.00
Surveying services and other services shall be based upon direct
personal expense times a multiplier of 2.19. There is no "not to
exceed" on this portion of the job.
Reimbursable expenses shall be paid as a separate cost above and
beyond any "not to exceed." Reimbursable expenses shall include the
following:
( a. Expense of reproduction, postage and handling of drawings and
! specifications, excluding copies for Consultant's office use.
The Consultant shall submit monthly statements for services rendered
and for reimbursable expenses incurred, For services based on direct
personal expense x a multiplier, monthly statements will be based
upon actual hours worked. The City shall make prompt monthly
payments in response to these statements.
1
f'
I F
/HFST
if_17
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
(hr, undcrsignel d0 hereby t.Lale Lhat this agreement is axeCuLed in
Lriplivale, as Lhnugh var.h were an original and that there are no oral
ayrcr•ments Lh.it have, not been rcrlur.ed in writing in this instrument.
FOR THE CITY:
MAYOR
AI TEST:
CLEC1 Y CLE
STATE OF IOWA )
) ss
JOHNSON COUNTY
SHIVE-IIATTERY CONSULTANTS
On this (•4 day ofd �y✓�yia, 1979, before me, a Notary Public duly
commissioned and qualified in and for said County and State, personally
appeared,Uyyj/!�: '�`rc, Mayor of the City of Iowa City, Iowa, and Abbie
Stolfus,-City Clerk of said City, each being to me personally known to
be the identical persons and officers named in the foregoing instrument,
who executed the same under and by virtue of the authority vested in
them by the City Council of said City, and each for himself acknowledged
the execution thereof to be his voluntary act and deed for purposes
herein expressed.
IN TESTIMONY WHEREOF, I have hereunto set my hand and notarial seal at
Iowa City, Iowa, the day and year last above written.
��coX.f� �fYcz,CLi�
Notary Public in and for
Johnson County, Iowa
STATE OF =,,,,-n,, )
) ss
COUNTY OF )
On this ay o��, 1979, before me, the undersigned, a
No ry PUblic i a d for said County and said State, personally appeared
j ,, .,•)�. and — to me personally
known, who ing by me duly sworn, did say that they are the��,:,g,"y
and _ respectively, of said corporation; that (the
seal affixed tFlereto is Lhe seal of said) corporation; that said instru-
ment was signed and sealed on behalf of scorporation by authority of
° its Board of Directors and that the said o.6,,nand
i
as such officers, acknowledg the execution of
said instrument to be the voluntary act and deed of said corporation, by
c
it and by them voluntarily executed.
1
Ilot ry Pu in and for said
County a tate "
BES71
� �OCUM�NT
AV,o-11LA13LE
"NG "•i�:i:taJ:'iL'''il'
FIICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES IIOIIIES
J
r
I
I
{
Engineer
3
Grade
9
Engineer
1
J.
5
Engineer
14.08
i
4
Engineer
I
�
I
i
i
I
i
I
I
1
i
j
ATTACHMENT N0, I
DIRECT PERSONAL EXPENSE
(Through December I, 1979)
Grade
7
Engineer
20.30
Grade
6
Engineer
15.58
Grade
5
Engineer
14.08
Grade
4
Engineer
12.02
Grade
3
Engineer
10.75
Grade
2
Engineer
9.82
Grade
E
Technician
11.58
Grade
D
Technician
9.31
Grade
C
Technician
7.22
Grade
B
Technician
5.66
Grade
A
Technician
4.32
3 -Man
Survey
Crew
21.74
2 -Man
Survey
Crew
16.75
SHIVE•HATTERY 6 ASSOCIATES
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS•DES MINES
0
9 f) ATTACIINENT NO. 2
SHIVE-HATTERV & ASSOCIATES
CONSULTING ENG/NEEHS
SCHEDULE OF GENERAL, FIELD AND LABORATORY FEES
JANUARY_ 1
, 1979
GENERAL
i
Mobilization Charges - Based on round trip mileage
From Nearest Office
Private Automobile or Auxiliary Vehicle
Drill
$
Rig (Minimum Charge of $100.00)
.20/mile
Per'Diem Rate (Charge if site is more
1.25/mile
than 40 miles from, naarest offica),
per individual
f All Terrain Vehicle Utilization
25.00/day
100.00/day
Boring Location Survey
'
50.00/hour
Stand -By Time, in excess of normal set-up time, as
a result of clients
request or action
Truck
I
1 All Terrain Vehicle
60.00/hour
75.00/hour
Spccillized Drilling Equipment, Equipment for
Moving Drilling Equipment at Site, Permits, Etc.
Cost + 152
SOILS - FIELD
I
Auger Drilling - Hollow Stem Augers
Structure Boring - Utilizing Standard
Penetration Test (2-1/2 intervals to, 15' 51
intervals to 501, 10' intervals thereafter)
0' - 251
25' - 50'
5.50/Eoot
501+
6.00/foot
6.80/foot
G :,-A PAa'r, 6A y!:iPrjri GFS I1011119 bUMuOuf II IAAnI;eN 10'NA rnY VINIUN
gES'r
Z10CU�
AVp1LAB
!r ... _ .. ,.�,...
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES HINES
k8
Schedule of General Field and Laboratory Fees
lannary 1, 1979
P.nli Two
Auger Drilling -'Solid Augers
Profile Boring - Samples at 5' intervals
to 501, 10' intervals thereafter
i 0' - 25'
25' - 50'
50'+
Profile Boring - Without samples, defining top of
rock and water table
0' - 25'
i 25' - 50'
50'+
Wash Boring, Surcharge
0' - 25'
25' - 50'
50'+
Hourly Drilling Rates
Truck and One Technician
Truck and Two Technicians
All -Terrain Vehicle, Surcharge
11ard Auger Drilling - Through weathered rock or
material consisting primarily of broken rock,
concrete, rubble fill, etc. (Standard Penetration
Resistance > 50 Blows Per Foot)
Rock Drilling
Bitting
Coring, NWV Size
Set Up/Boring
Requiring use of auxiliary water
source, additional
SHIVE•HATTERY& ASSOCIATES
ter.. ._-__ ._---•-.,..�,-.
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS•DES MOINES
$ 5.00/foot
5.50/foot
6.30/foot
4.50/foot
5.00/foot
5.80/foot
.75/foot
1.00/foot
1.25/foot
50.00/hour
60.00/hour
100.00/day
11.00/foot
14.00/foot
17.00/foot
45.00/each
30.00/day
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS•DES NINES
Schedule of General Field and Laboratory Pees
January 1, 1979
Page Three
Samping and Testing
Additional Standard Penetration Tests
$12.50/each
Shelby Tube ("Undisturbed"), 2" or 3"
diameter
12.50/each
Large Volume Bag Sample
15.00/each
Rimac Unconfined Compression Value
4.00/each
[land Penetrometer Value
1.50/each
Vane Shear Value, Torvane
5.00/each
Srismic Refraction Tasting
i
Equipment Cost
100.00/day
j Test
75.00/each
j Slotted Well Point Installation, In Drilled Bore
I hole
I
Set Up/Well Point
60.00/each
Material Cost - 2"
2.50/foot
Material Cost - 3"
4.50/foot
SOILS - LABORATORY
Shelby Tube Extrusion, Sample Preparation, and
Logging
7 .00/each
Natural Moisture Content
2.00/each
Dry Unit Weight, Shelby Tube Specimen
2.00/each
AIALvrbcrg Limits
I
i LL, PL, PI
25.00/set
SL
15.00/each
Mechanical Analysis
Hydrometer
25.00/each
Sieve
20.00/each
Sieve, Washed Over #200
25.00/carh
Combined llydrometer/Sieve
42.50/each
Specific Gravity
20.00/each
Unconfined Compression Testing
Soil
W/0 Stress - Strain Curve
10.00/each
• j W/Stress - Strain Curve
15.00/each
Rock, including cutting and capping
25.00/each
1 SHIVE•HATTERY& ASSOCIATES
1
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS•DES NINES
a
SHIVE•HATTERY d ASSOCIATES
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
Schedule of General, Field and Laboratory Fees
January 1, 1979
Page Four
Compaction Testing (Proctor)
Standard
$65.00/each
Modified
75.00/each
Relative Density, Maximum/Minimum
75.00/each
I
California Bearing Ratio (single point)
70.00/each
Consolidation Testing, including e - log p curve
Loading Cycle - 1/4, 1/2, 1, 2, 4, 8, 16
150.00/each
tsf, Typical
Unloading Cycle - 8, 4, 1 tsf Typical
50.00/each
Additional Load or Unload Increment)
15.00/each
Time Ratio Curve, Per Load Increment
12.00/each
Triaxial Testing
Unconsolidated - Undrained (Q) - 3
Specimens/Test
175.00/test
Consolidated - Undrained (R) - 3
Specimens/Test
225.00/test
Consolidated - Drained (S) - 3
Specimens/Test
2.75.00/test
Additional for Pore Pressure Measurements
175.00/test
Permeability Testing
Falling Head or Constant head
80.00/each
Pock Quality Designation (RQD) Determination
5.00/each
I.emolded Sample for Test Purposes
30.00/each
Unified or AASHTO Classification, Additional
to Required Testing
2.00/each
ph Determination
15.00/each
Sulfate Determination
20.00/each
Other Chemical Contents
On Request
MATERIALS - FIELD
Coring of Concrete or Asphalt
Equipment Cost (per inch diameter per inch
core)
1.25
Generator or Nater Source
15.00/day
Swiss dammer, Compressive Strength
10.00/test
SHIVE•HATTERY d ASSOCIATES
MICROFILMED BY
JORM MICROLAB
CEDAR RAPIDS -DES MOINES
.f
Schedule of General L.ield and Laboratory Fees^
January 1, 1979
Page Five
i
Nuclear Densometer
Equipment Cost - Elourly
Equipment Cost - By Test
Pachometer (size and location of reinforcing steel)
MATRRIALS - LABORATORY
Concrete
Cylinders (6" x 12" Nominal)
Mold
Break, including curing, capping,
and reporting
Hold, cured but not broken
Unit Density
Mix Design
Development of Theoretical Mix Design
Certification of existing design
Trial Batch, including 6 test cylinders
and molds
Cut Specimen
Absorption
Unit Density
Trimming
Break, including curing, capping and
reporting
Block Testing
Single Block - Break
Prism - Break
Absorption
Net Area Determination
Beam Testing
Flexural Strength, including net
area determination
Molding Equipment
SHIVE•HATTERY 6 ASSOCIATES
JORM MICROLAB
CEDAR RAPIDS -DES MOVIES
$ 5.00/hour
100.00/week
3.00/each
25.00/day
.60/each
4.50/each
3.00/each
1.00/each
100•. 00/each
65.00/each
165.00/each
10.00/each
9.00/each
7.50/cut
10.00/each
15.00/each
20.00/each
10.00/each
15.00/each
20.00/each
4.00/each
■
Schedule of General, Field and Laboratory Fees^
January 1, 1979
Page Six
Asphalt
Flash Point Determination $50.00/each
Extraction (Centrifical Method - $10.00
Additional) 55.00/each
With rradation 75.00/each
Marshall Density (3 specimens), mix
provided 30.00/each
Cut Specimen
Unit Density 9.00/each
If more than 3 specimens 6.00/each
Roofing Sample, Quantitative - New Roof 175.00/each
Roofing Sample, Quantitative - Existing 225.00/each
Roof
Aggregates -
Bulk Specific Gravity (SSD) 25.00/each
Absorption 20.00/each
Dry Rodded Unit Weight 18.00/each
MISCELLANEOUS INSPECTION
Caissons, piling, or earthwork inspection will be charged
utilizing standard hourly rates of required technical personnel,
including travel time. Equipment costs will be charged at the
rates outlined above.
Additional o• special testing rates will be quoted on request.
SHIVE.HATTERY 6 ASSOCIATES
JUHM MIGHOLAB
CEDAR RAPIDS -DES Id01NES
i
I