HomeMy WebLinkAbout1975-01-07 ResolutionIX
RESOLUTION KC. 75-4
l
L.
lid ,
T o r N o 0
�<
C �
rye O _
O y n n O N l 1
•
c- °r. .
o m y n = o- m= a
n r.
Z r� n 2 n a n P n 23 ;I
_.
O n n
C) o o rr Y
-
n J
�
�. M. ^ O �� ° �.:...
O C7 b y .. f= .- � e) i" - n-
6 _
0 t3
Fn- Ei
r i? i tTCD zt_
Y G n Ir m ~ ~ N
n K m L ¢
to
o4 CL
t G ko :f
C2-Co
�t}_. tl ♦». !. is / •� i 7 C m N .-. tR".
t FBF `F X.� z �•`• Q r _ Q. O
.!•� d� 1
o fJ
o
1 r o- o
.., o'
C L r 0 o a
o
J o \ y n O
ID � W O
CDri
v r
/m
0 o i y r! n
j m T
I`!y_.i.�r"<T'�I�i•TAY":L"[L2Z7..7"�"'T7h7Y7'YY7'Y✓K�7�"7"J""7`7"YJJiFJ'!'JfJ TC' ✓fo-1
It was moved by deProsse and seconded by Davidsen that the Res. be adopted,
and upon roll call there were: AYESSCzarnec�i, Davidsen, deProsse, Neuhauser
-NAYS:None
ABSENT:Brandt
u
• �
RESOLUTION NO. 75-5
RESOLUTION AUTHORIZING CITY TO INCUR COSTS FOR ENTITLEMENT
GRANT.
WHEREAS, the Department of Housing and Urban Development
has issued Rules and Regulations for obtaining Entitlement
Grants under the Housing and Community Development Actof1974,
WHEREAS, said Rules and Regulations provide that governing
bodies may begin to incur costs for the planning and preparation
of an application for an Entitlement Grant,
WHEREAS, the City Council recognizes that tine Rules and
Regulations provide that reimbursement -for 'such costs will be
dependent upon the availability of funds to implement program
and the submission of a timely application in accordance with
application requirements,
WHEREAS, the City Council deems it in the public interest
to incur costs.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL.
1. That the City Manager is hereby authorized to =..ncur
necessary costs in the planning and preparat.ra of
an application for an Entitlement Grant for the
City of Iowa City.
It was moved by Neu auser and seconded by ilavir1gPn
that the Resolution be adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
X Brandt
Czarnecki
_ Davidsen
_ deProsse
Neuhauser
Passed and approved this 7th day of
ATTEST:
City Clerk
19 _75
�' ��jLf1/✓ -��
layor/
RESOLUTION No. 75-6
RESOLUTION ACCEPrING THE WORK
Burlington Street Improve-
ment Project
WHEI?EA.S, the Engineering. Department has recommended that the im-
provement covering the construction of Burlington Street
Improvement Project
as included in a contract between the City of Iowa City and
Metro Pavers of Iowa City
dated Pebruary 19 1974 , be accepted,
AND WHEREAS, the Council finds the improvement is in place and does
comply with the requirements for such inproveiments,
AND WHEREAS, maintenance bonds have been filed,
NOW THEREFORE, BE IT RESOLVED by the City Council of Iowa City, Iowa,
that said improvements be hereby accepted by the City of Iowa City, Iowa.
It was nnved by deProsse and seconded by Neuhauser
that the reolution as read be adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
Brandt x
Czarnecki - X
Davidsen x
deProsse X
Neuhauser X
Passed and approved this 7th day of January , 1975
.Ce • 1� � .1��1
Mayor,
f%
tS' C r .
ENGINEER'S REPORT
BURLINGTON STREET IMPROVEMENT PROJECT
January 7, 1975
To
the Honorable Mayor and City
Council
Iowa City
Iowa
Honorable Mayor and Councilpersons:
contract
I hereby certify that the improvements, as
constructed in
between the City of Iowa City and Metro
City, Iowa, dated February
Pavers, Inc.
a
of Iowa
19, 1974, has been completed by said
tractor in substantial
con-
accordance with the plans
governing said improvements. - - -
and specifications
- -
the
I further certify that the
following quantities:`
improvements, as
constructed,
included
ITEM
DESCRIPTIONUNIT
QUANTITY
PRICE
AMOUNT
Burlington & Linn
1.
2.
9" PCC Pavement
7"
13,761.30 sq yd $ 9.50
$ 130,732.35
3.
PCC Pavement
6" Integral Curb
1,734.7 sq yd
- 8.25
14,311.27
4.
6" PCC Alley4,305
Pavement
lin ft
- 258.46 sq
- .65
8:00
2,798.25
5.
6" PCC Driveway Pavement
yd
935.32 sq yd
8.50
2,067.68
6.
7.
4" PCC Sidewalk
16,998.05 sq ft
1.00
7,950.22
16,998.05
8.
Asphaltic Conc. Surface
-
391.31 ton
30.00
11,739.30
9.
Primer or Tack
Crushed Stone
170 gal
70
119.00
10.
RCP 2000D Storm Sewer 12"
351:5 ton
787
5.20
1,827.80
11.
RCP 2000D Storm Sewer 15"
lin ft
44 lin ft
14.60
1 4.57
9,916:20
12.
RCP 2000D Storm Sewer 18
46 lin ft
16.75
641.08
13.
14.
RCP 2000D Storm Sewer 21"
149 lin ft
20.00
5,795.50
2,980.00
15.
RCP 2000D Storm Sewer 30"
RCP 2000D
432 lin ft
27.50
11,880.00
16.
Storm Sewer -36"
RCP 2000D Storm Sewer 42"
50 lin ft
432
38.22
1,30L.00
17.
Standard Precast Manhole
lin ft -..47.00
5 each
20,304.00
18.
Special Manhole
-600.00
1
3,000.00
19.
RA -3 Inlet
each 2800.00
2,800.00
20.
RA -8 Inlet
0 each -600.00
-0-
21.
RA -8 Throat
12 each
950.00
11,400.00
22.
Double Alley Inlet
64 lin ft
2
50.00
3,200.00
23.
Pavement Removal
- each
11,4330.03
600.00
2.00
1200.00
24.
25.
Conc. Driveway Removal
sq yd
q y
2.00
30 066.80
2,866.06
26:
Sidewalk Removal
-
22,1].8.67 sq Er
13
2,875.43
Au hnl I: PnVo ell1. Removal L
P
278.24 ray yd
- I..50
417.'36
27.
28.
Saw Cut
Inlet Removal
1,648.1 lin ft _1,75
2,884.
29.
Excavation
14 each 100.00
1,400.000
5,414.5 cu yd _,
2.75
14,889.88
UNIT-
OUANTITT
PRICE
AMOUNT
ITEM DESCRIPTION
47:2 cu -ft $ 8.00
$ 377.60
283.40
30.
31.
PCC Steps283.4
PCC Step Removal
cu ft 1.00'
3.50
365.75
32.
Asphalt Curb
104.5 lin ft
46 6.5 lin ft 6.50
3,032.90
33.
30" Curb & Gutter
4; each 906.00
3,600.00
34.
RA -6 Inlet
36 lin ft 50.00
1,800.00
35.
RA -7 Throat
Rod
754.84 lb .38
286.84
36.
#4 Paving Reinforcing
1"-3" Rock Compacted in Place none ton 5.25
0
1,210.00
37,
38,
San. Sewer Serv. Con.
10.00
121sqsq ft 2.50
0
� 0
39.
Exposed Concrete Sidewalk
$ 329.921.89
Clintonet
1,797.43 sq yd$ 8.50
$ 15,278.16839.32
1,
7" PCC Pavement
6,456.31 sq ft .13
2.
Sidewalk Removal
2,127;62 sq yd 2.00
4,255.24
3,
Pavement Removal
8,420.81 sq ft " 2.00
16,841.62
4.
4" PCC Sidewalk
2 each 480.00
960.00
5,
Wooden Bench
2 each 900.00
1,800.00
6.
Conc. Retaining Wall
787.5 lin ft 6.50
5,118.75
7.
30" Curb & Gutter
200.00 lumps 200.00
200.00
S.
9.
Berms
4" Concrete with brick
560.85 s ft 4.50
q 2 00
2,523.83
1,009.54
10.
Drive Removal.
504.77 sq yd_
403.43 s d 8.50
3,429.16
11.
6" PCC Driveway Pavement
4 y
116.5 lin ft 11.75
_ 1,467.90
12.
RCP 2000D Storm Sewer 12"
100.1 lin ft
175.18
13.
Saw Cut
1: each 600.00
600.00
14.
RA -3 Inlet
1 each 600.00
600-00
15.
Manhole
$ 55,098.70
Dubuque
Street
1,665.06 sq yd 2.00
$
1.
-Pavement Removal
5,373.2 sq ft .13
698.52
2.
Sidewalk Removal
1,775,24 sq yd 8.50
15,089.54
3,
7" PCC Pavement
6, 207 sq ft 2.00
12,414.00
4.
4" PCC Sidewalk
2 each 480.00
960.00
5,
Wooden Bench
2 each 900.00
1,800.00
6.
Concrete Retaining Wall
509.3 lin ft 6.50
3,310.45
7.
30" Curb & Gutter
234.9 lin ft .85
199.67
8.
Concrete Curb Removal
(Islands)
267.62 sq yd 4.00
1,070.48
9,
Pavement Removal
200.00 lumps 200.00
200.00
10.
- - 11.
Berms
Concrete with brick
505.48 sq ft 4.50
-191.06 sq 2.00
2,274.66
382.12
12.
_4"
Conc. Driveway Removal
yd
- 125.22 sq yd 8.50
1,064.37
13.
6" PCC Driveway Pavement
575.5 lin ft .65
374.08
14.
6" Integral Curb
7.2"
51 lin ft 12.60
642.60
15.
RCP -2000D,Storm Sewer
323.5 ].in £t 1.75
566.13
16.
Saw Cut
1. ench 66.06
(470•00
17.
RA -3 Inlet
1 each 600.00
600.00
18. Manhole
to RA6
lump sum 250.00
250.00
19.
Conversion RAS
$ 45,826.74