Loading...
HomeMy WebLinkAbout1975-01-07 ResolutionIX RESOLUTION KC. 75-4 l L. lid , T o r N o 0 �< C � rye O _ O y n n O N l 1 • c- °r. . o m y n = o- m= a n r. Z r� n 2 n a n P n 23 ;I _. O n n C) o o rr Y - n J � �. M. ^ O �� ° �.:... O C7 b y .. f= .- � e) i" - n- 6 _ 0 t3 Fn- Ei r i? i tTCD zt_ Y G n Ir m ~ ~ N n K m L ¢ to o4 CL t G ko :f C2-Co �t}_. tl ♦». !. is / •� i 7 C m N .-. tR". t FBF `F X.� z �•`• Q r _ Q. O .!•� d� 1 o fJ o 1 r o- o .., o' C L r 0 o a o J o \ y n O ID � W O CDri v r /m 0 o i y r! n j m T I`!y_.i.�r"<T'�I�i•TAY":L"[L2Z7..7"�"'T7h7Y7'YY7'Y✓K�7�"7"J""7`7"YJJiFJ'!'JfJ TC' ✓fo-1 It was moved by deProsse and seconded by Davidsen that the Res. be adopted, and upon roll call there were: AYESSCzarnec�i, Davidsen, deProsse, Neuhauser -NAYS:None ABSENT:Brandt u • � RESOLUTION NO. 75-5 RESOLUTION AUTHORIZING CITY TO INCUR COSTS FOR ENTITLEMENT GRANT. WHEREAS, the Department of Housing and Urban Development has issued Rules and Regulations for obtaining Entitlement Grants under the Housing and Community Development Actof1974, WHEREAS, said Rules and Regulations provide that governing bodies may begin to incur costs for the planning and preparation of an application for an Entitlement Grant, WHEREAS, the City Council recognizes that tine Rules and Regulations provide that reimbursement -for 'such costs will be dependent upon the availability of funds to implement program and the submission of a timely application in accordance with application requirements, WHEREAS, the City Council deems it in the public interest to incur costs. NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL. 1. That the City Manager is hereby authorized to =..ncur necessary costs in the planning and preparat.ra of an application for an Entitlement Grant for the City of Iowa City. It was moved by Neu auser and seconded by ilavir1gPn that the Resolution be adopted, and upon roll call there were: AYES: NAYS: ABSENT: X Brandt Czarnecki _ Davidsen _ deProsse Neuhauser Passed and approved this 7th day of ATTEST: City Clerk 19 _75 �' ��jLf1/✓ -�� layor/ RESOLUTION No. 75-6 RESOLUTION ACCEPrING THE WORK Burlington Street Improve- ment Project WHEI?EA.S, the Engineering. Department has recommended that the im- provement covering the construction of Burlington Street Improvement Project as included in a contract between the City of Iowa City and Metro Pavers of Iowa City dated Pebruary 19 1974 , be accepted, AND WHEREAS, the Council finds the improvement is in place and does comply with the requirements for such inproveiments, AND WHEREAS, maintenance bonds have been filed, NOW THEREFORE, BE IT RESOLVED by the City Council of Iowa City, Iowa, that said improvements be hereby accepted by the City of Iowa City, Iowa. It was nnved by deProsse and seconded by Neuhauser that the reolution as read be adopted, and upon roll call there were: AYES: NAYS: ABSENT: Brandt x Czarnecki - X Davidsen x deProsse X Neuhauser X Passed and approved this 7th day of January , 1975 .Ce • 1� � .1��1 Mayor, f% tS' C r . ENGINEER'S REPORT BURLINGTON STREET IMPROVEMENT PROJECT January 7, 1975 To the Honorable Mayor and City Council Iowa City Iowa Honorable Mayor and Councilpersons: contract I hereby certify that the improvements, as constructed in between the City of Iowa City and Metro City, Iowa, dated February Pavers, Inc. a of Iowa 19, 1974, has been completed by said tractor in substantial con- accordance with the plans governing said improvements. - - - and specifications - - the I further certify that the following quantities:` improvements, as constructed, included ITEM DESCRIPTIONUNIT QUANTITY PRICE AMOUNT Burlington & Linn 1. 2. 9" PCC Pavement 7" 13,761.30 sq yd $ 9.50 $ 130,732.35 3. PCC Pavement 6" Integral Curb 1,734.7 sq yd - 8.25 14,311.27 4. 6" PCC Alley4,305 Pavement lin ft - 258.46 sq - .65 8:00 2,798.25 5. 6" PCC Driveway Pavement yd 935.32 sq yd 8.50 2,067.68 6. 7. 4" PCC Sidewalk 16,998.05 sq ft 1.00 7,950.22 16,998.05 8. Asphaltic Conc. Surface - 391.31 ton 30.00 11,739.30 9. Primer or Tack Crushed Stone 170 gal 70 119.00 10. RCP 2000D Storm Sewer 12" 351:5 ton 787 5.20 1,827.80 11. RCP 2000D Storm Sewer 15" lin ft 44 lin ft 14.60 1 4.57 9,916:20 12. RCP 2000D Storm Sewer 18 46 lin ft 16.75 641.08 13. 14. RCP 2000D Storm Sewer 21" 149 lin ft 20.00 5,795.50 2,980.00 15. RCP 2000D Storm Sewer 30" RCP 2000D 432 lin ft 27.50 11,880.00 16. Storm Sewer -36" RCP 2000D Storm Sewer 42" 50 lin ft 432 38.22 1,30L.00 17. Standard Precast Manhole lin ft -..47.00 5 each 20,304.00 18. Special Manhole -600.00 1 3,000.00 19. RA -3 Inlet each 2800.00 2,800.00 20. RA -8 Inlet 0 each -600.00 -0- 21. RA -8 Throat 12 each 950.00 11,400.00 22. Double Alley Inlet 64 lin ft 2 50.00 3,200.00 23. Pavement Removal - each 11,4330.03 600.00 2.00 1200.00 24. 25. Conc. Driveway Removal sq yd q y 2.00 30 066.80 2,866.06 26: Sidewalk Removal - 22,1].8.67 sq Er 13 2,875.43 Au hnl I: PnVo ell1. Removal L P 278.24 ray yd - I..50 417.'36 27. 28. Saw Cut Inlet Removal 1,648.1 lin ft _1,75 2,884. 29. Excavation 14 each 100.00 1,400.000 5,414.5 cu yd _, 2.75 14,889.88 UNIT- OUANTITT PRICE AMOUNT ITEM DESCRIPTION 47:2 cu -ft $ 8.00 $ 377.60 283.40 30. 31. PCC Steps283.4 PCC Step Removal cu ft 1.00' 3.50 365.75 32. Asphalt Curb 104.5 lin ft 46 6.5 lin ft 6.50 3,032.90 33. 30" Curb & Gutter 4; each 906.00 3,600.00 34. RA -6 Inlet 36 lin ft 50.00 1,800.00 35. RA -7 Throat Rod 754.84 lb .38 286.84 36. #4 Paving Reinforcing 1"-3" Rock Compacted in Place none ton 5.25 0 1,210.00 37, 38, San. Sewer Serv. Con. 10.00 121sqsq ft 2.50 0 � 0 39. Exposed Concrete Sidewalk $ 329.921.89 Clintonet 1,797.43 sq yd$ 8.50 $ 15,278.16839.32 1, 7" PCC Pavement 6,456.31 sq ft .13 2. Sidewalk Removal 2,127;62 sq yd 2.00 4,255.24 3, Pavement Removal 8,420.81 sq ft " 2.00 16,841.62 4. 4" PCC Sidewalk 2 each 480.00 960.00 5, Wooden Bench 2 each 900.00 1,800.00 6. Conc. Retaining Wall 787.5 lin ft 6.50 5,118.75 7. 30" Curb & Gutter 200.00 lumps 200.00 200.00 S. 9. Berms 4" Concrete with brick 560.85 s ft 4.50 q 2 00 2,523.83 1,009.54 10. Drive Removal. 504.77 sq yd_ 403.43 s d 8.50 3,429.16 11. 6" PCC Driveway Pavement 4 y 116.5 lin ft 11.75 _ 1,467.90 12. RCP 2000D Storm Sewer 12" 100.1 lin ft 175.18 13. Saw Cut 1: each 600.00 600.00 14. RA -3 Inlet 1 each 600.00 600-00 15. Manhole $ 55,098.70 Dubuque Street 1,665.06 sq yd 2.00 $ 1. -Pavement Removal 5,373.2 sq ft .13 698.52 2. Sidewalk Removal 1,775,24 sq yd 8.50 15,089.54 3, 7" PCC Pavement 6, 207 sq ft 2.00 12,414.00 4. 4" PCC Sidewalk 2 each 480.00 960.00 5, Wooden Bench 2 each 900.00 1,800.00 6. Concrete Retaining Wall 509.3 lin ft 6.50 3,310.45 7. 30" Curb & Gutter 234.9 lin ft .85 199.67 8. Concrete Curb Removal (Islands) 267.62 sq yd 4.00 1,070.48 9, Pavement Removal 200.00 lumps 200.00 200.00 10. - - 11. Berms Concrete with brick 505.48 sq ft 4.50 -191.06 sq 2.00 2,274.66 382.12 12. _4" Conc. Driveway Removal yd - 125.22 sq yd 8.50 1,064.37 13. 6" PCC Driveway Pavement 575.5 lin ft .65 374.08 14. 6" Integral Curb 7.2" 51 lin ft 12.60 642.60 15. RCP -2000D,Storm Sewer 323.5 ].in £t 1.75 566.13 16. Saw Cut 1. ench 66.06 (470•00 17. RA -3 Inlet 1 each 600.00 600.00 18. Manhole to RA6 lump sum 250.00 250.00 19. Conversion RAS $ 45,826.74