Loading...
HomeMy WebLinkAbout1975-07-01 Bd Comm minutesj • • 6/25/75 -2- d) building exterior will be brick to compliment that of St. Patr.icks-Church ` e) outside landscaping designed to be aesthetically pleas- ing and complimentary to -the overall plan f) building will, be built with angular effect design,fac- ing NW exposure serving 3 -fold in purpose 1. energy saving device 2. createspocket; for air conditioning 3.`- described interior plans - = g) described interior plans and decor which meet the rel., quirements of HUD h) mainline windows all the way to the floor i) utility structures on top of roof to be designed with - camouflageeffect 2.` Response to Meisel's presentation a) the Committee approves ofthepreliminary Elderly Housing Design "b) the Committee expressed concern _on -the use ofexterior,,, materials and concern with`,utility structures on roof c) the Committeefeelscertain that the accomodations des- cribed,will more than adequately fill the needs of the elderly and will be very pleasant living quarters- 3. Meeting is scheduled for July'2 to review with Welton -Becket - the Washington Street, Lighting -Design andithe Washington Street Amenities; Program. Other discussion items will be: `a) sidewalk design (Larew and;Nusser) -b) cost change orders in regard to the Washington on Street paving and sidewalk' contract (Dick Plastino) c)_ Old Capitol's Mall Development 'in regard to design G. -Adjournment