ENGINEER'S REPORT
WASHINGTON STREET SANITARY SEWER IMPROVEMENT
PROJECT
July 81 1975
To the
Honorable Mayor and City Council
-:. Iowa City
Iowa
Honorable Mayor and Councilpersons:
I hereby certify that the improvements, as
constructed in
a contract
between the City of Iowa and Dave Schmitt Construction
Company.of
Cedar
_City
Rapids, dated May 13, 1975, ,has been
completed by
said contractor
_Iowa,
in substantial accordance with.the plans and specifications
governing said
improvements.
I further certify that the improvements, as
constructed,
included the
following quantities:
-UNIT
ITEM
DESCRIPTION QUANTITY
'PRICE
AMOUNT
1.
15" VCP Sanitary Sewer 707 lin ft
$ 26.50
$ 18,735.50
2.
12"`VCP 'Sanitary Sewer 92 lin ft
15.00
1,380.00
3.
10"_VCP.Sanitary Sewer 30 lin ft
13.00
390. 00-.
4. -8"
VCP Sanitary Sewer 29 lin ft
11.50
333.50
5.
4" VCP Sanitary Sewer 22 lin-ft
9.00
198.00
6.
16":CIP Sanitary Sewer 0 lin ft
25.00
_0_
7
48" RCP_Storm Sewer _-90 lin ft-
45.00
4,050.00
8.
Standard Manhole -Depth 46.5 lin ft 60.00
`2,790.00`
9.
Manhole Ring S Cover 7 each
125.00 -
875.00
10.
Removal of Existing Manhole 6 each
350.00
2,100.00
11.
'San. Sewer Service Connection _ 13 each
100.00
'
1,300.00
12.
'66"'x 78" Special Manhole --1 each
3250.00
3,250.00
13.
Abandon 18" Sanitary Sewer, 1 each'
150.00
4.00
150.00
17,313.20
14.
Sand Backfill 4328.3 ton
1319 -yd
1.25 -
1_1648.75'
15.
6" Compacted Rolled -Stone Basesq
16.
Abandon 3'-i "x 41ik Stone Box'
1 each
350.00
350.00
17.
Storm Sewer
Asphalt Mat (2 inches) 0 sq ya3.00
Crushed Rock Bedding 278.3 toi,
5,00
1,391.50
18.
19.
4" CIP Sanitary Sewer 23 lin ft
10.50
241.50
Work Order 113 6" VCP San.
241 lin ft
10.50-'
2.530.50
Sewer
APPROVED CONTRACT AMENDMENTS -
MENDMENTSNo.1
--
925.00
No. 1
1,350.00
No.2
375.00
-
No. 7 -