Loading...
HomeMy WebLinkAbout1975-09-23 CorrespondenceIOWA RIVER CORRIDOR STUDY • - PHASE TWO - THE RIVER PLAN - PRELIMINARY DRAFT REPORT Table of Contents Page INTRODUCTION . . PART ONE"- CRITERIA FOR PLAN DEVELOPMENT • • • • • `• • • • • • . 1 Goals and Objectives• • • 1 10 Potentials. 14 Critical Problems . . . . . . . . . . . . . . .': 19 Secondary Concerns. 20 Institutional =Capabilities . .`. . . .' . • • • • • • • • • .. Legal Capabilities. . . ,, . . . . . . . :- ... . 20 Organizational Capabilities . . . . .. • • .. • • , • . . 21 22 FinancialCapabilities. Desire and Awareness - 25 • PART TWO - THE RIVER PLAN 26 Plan of Desired Achievements:,. . . . . . . .. . . . . 27 Northern Corridor -Unit . . 27 Urban/University Unit •' -'• •- 29---- 9Southern_Corridor_Unit. Southern-Corridor Unit . . .' • . • •- • • • • • • 32 '34 Management/Implementation Plan. . . . . . • -34 Management Tools. . . . . .. . .. . . `_ 34 Acquisition. .:. 38 River Corridor Overlay_ District. . . . . . . . . . . . . .< 47 Public/Private Cooperation". .' . . . .`. . . . . . . Voluntary Protection 50 Summary. . . . . . . . . . . . . . . . . . . . . . ' . . . . 52 53 Management Structure. . . _. . . . . . . . . . . . . . . . . . . 55 - , Considerations . . . . .`.. . . . . . . . . 60 Special Problems or Proposals .'. . . . 60 Gravel Extraction Proposal 61 Shore] ine'Erosion. 62 Limestone Extraction Operation `,Parkway '• 62 River Corridor .. . . .. . .-. . . . . . . 62 Boating Use of the River . . . ... . . . . . . . . . .. Figures • Number Title 3t* Plan of Desired llchievements -'Northern Corridor Unit 4 Plan of Desired Achievements - Urban/University Unit 5 Plan of Desired Achievements - Southern Corridor Unit Northern Corridor - Implementation Urban/University Corridor - Implementation -, g Southern Corridor_ - Implementation `Figures l and 2, Potentials and Critical Problems are not reproduced at this -'time but can be found as figures la and lbinthe Phase One Report. • 1. Goals. - • To protect and preserve the Iowa River as a natural drainageray and source of water. • To promote and 'develop -the use of- land along the river for overall, -compatibility.: •< To make the most of the scenicpotentialand aesthetic values of the Iowa River and the flood plain -adjoining it. • -To develop to the fullest the recreational capacity of the river and flood plain.: • To heighten awareness of the Iowa River as a part of the 'heritage of this community. ` • To ensure that use of the river can be enjoyed by all in the safest possible way. 2. objectives: • To develop land use policies that will guide the appropriate development and redevelopment of the Iowa River area and environment. • Preserve and increasen ..open spaces and greeareas along both banks of the river and acquire scenic wooded sites to conserve them. • Identify and preserve unique or outstanding topographical or geological_ features of the river._ e Develop scenic areas and outlooks. -. 0 Expand opportunities for aquatic activities such as boating and fishing.; • 2 • • In conjunction with other parties, public or private, acquire riverfront and flood plain property ,for public use and enjoyment. • Provide; greenway linkages between riverfront activities so as to furnish uninterrupted walking and cycling along the river and flood plain. • Improve public access along the river and flood plain. • Reduce all forms of pollution to the lowest possible level. • Preserve and interpret,, historic landmarks and sites' along the river. • Emphasize safe water practices and conduct on the part of - all users. • To increase cooperation and participation of 'all interested wparties; public and private alike, in the management and development of the Iowa River and flood plain. B. Coralville - Coralville Planning Commission: Coralville has not adopted specific goals and objectives relating to riverfront develop- ment,- however, statements from their comprehensive plan of 1965 and the 1970 update indicate concern for the wise utilization of the natural resources. • Skilful land planning will be -required -to -assure that developments in these areas (steeply sloping; hillsides) - are designed to fit the terrain in an attractive manner. However, with careful planning disadvantages can be turned to advantages.' For example, a few of the numerous drainage- • 3 - • • Provide a system of walking, cyclin g, and equcstrlan trails, connecting points of historic, scenic, recreational, architectural, cultural, natural, or landscape interest. • Provide a system of greenways in new neighborhoods which connect neighborhoods to schools and open spaces, and implement a similar pattern where possible in existing neighborhoods. • 'Preserve and improve open space, wooded areas and public accesspoints along Old Man's Creek, _-Clear C reek, Ralston Creek, Snyder Creek, _Rapid Creek, Muddy Creek, and Mill Creek watersheds. • Provide a continuous green area on both sides of the Iowa River in Johnson County, with additional public access to, and utilization of the river in order to preserve and enhance its natural beauty. • Provide community and/or neighborhood recreational " facilities within easy access ,walking tand cycling for all .- age 'groups. • ,Provide a system of regional parks, primarily to the east, west, and south of Iowa City to alleviate user pressure on - -Lake MacBride and Coralville Reservoir Facilities. • --Encourage developers to dedicate appropriate areas to provide neighborhood open space for each new residential area in the 'reg ion. • Establish a program to identify and preserve woodland areas, scenic vistas, and historic sites throughout the region. G • •,provide for a vigorous program of land acquisition in prepara- _tion for the establishment of land bank to create open spaces in advance of the development of urban areas and to direct - developmentina more flexible and advantageous manner. • Investigate alternative methods of acquisition, including but not limited to -negotiated -purchase -or condemnation of access or scenic easements;. purchase of developmentrights; dedication; and; joint ownership by different, agencies. ' • "Employ a variety of techniques to ensure protection of unique topographical and geological features -such as ravines, wooded area, streams, and river banks. • Investigate -the full range of financial resources available` to implement the plan and determine priorities for _acquisi- tion and development.- 3.- Residential Goals: • Provide a variety of housing types, styles, costs, and densities, in a. pattern of convenient, -well-planned, and aesthetically pleasing_. surroundings, respecting the natural environment. ` 4. Residential Objectives: e -Preserve and utilize natural features of the landscape by careful and imaginative site design and development. • Discourage the proliferation of poorly planned.develop- ment on the rural land and high densities on the periphery of the urban area. • "Planned • Require Unit Development" and site review approaches for residential development-redevelopment.- • Plan patterns of single and multiple family; homes,:-schools, - -- parks, and other community facilities connected by convenient and attractive open space systems and non-vehicular access- ways. Industrial Goals: - •Plan so that all industries will be responsible members of the Johnson County regional community and enhance the quality of life. 6. Industrial Objectives: - •- Establish criteria for the selection of land for new • industrial development so as to minimize the detrimental effect on the environment. • ;Provide development ordinances that establish industrial performance standards for the protection of the environment; and to periodically revise such ordinances so as to reflect technological advances which result in greater protection to the community. •' Encourage the development of ordinances which will regulate the design and ,location of new industrial areas. 7. Commercial Goals: • - Locate commercial areas which shall be convenient and access- ible to their trade areas and in proper functional and aesthetic relationship to adjacent-land-uses and the >circula- tion system. • • Develop and maintain attractive facilities exhibiting high "standards of architectural design, site development and graphic identification. 8. Commercial_ Objectives: • ` Revise ordinances to incorporate the highest design and, development standards to assure that existing and future commercial areas are 'developed and redeveloped in a"manner whichcompliments the community as an attractive and convenient environment. • Require all commercial developments'' to provide landscape plantings and pedestrian amenities; :and to encourage pro- vision for facilities -for -community activities. •- Encourage the adoption of Planned Commercial District regulations to guide and control all commercial development and redevelopment. 9. Miscellaneous Goals: • Encourage and request that University planning and projects on housing, transportation, parking, and other areawide concerns be coordinated with overall areawide plans; and be -_ responsive to needs of the -students, faculty, staff, and the community.. • Encourage and request the University to develop, adopt, and - implement a long-range comprehensive development plan, subject to periodic review. • 10. Miscellaneous Objectives: • Encourage the location of new elementary schools as part of an open space network of park facilities and pedestrian/ bicycle pathways to serve,a surrounding residential area. • Encourage the location of new secondary schools so as°to maximize safe and convenient access to pedestrians, bicycles, and transit; and where possible to complement other public open space. • Encourage planning for the potentialjointuse of parking facilities by neighboring activities such as churches/ schools, churches/shopping centers, schools/parks, etc. II. Potentials • The following is a description of the most positive factors identified ::-in-the-inventory upon which a development plan can be structured. The -factors.-are illustrated on Figure 1.0) A. significant areas with natural scenic qualities worth, preservation. - Within the study area, the Iowa River Corridor exhibits many of the river landscape qualities characteristic of the Iowa and I Midwest landscape. Natural scenic features include wooded 'bluffs, hillsides, flood plains, and rolling agricultural lands. Considerable quantities of rock outcroppings--occur-on-these-wooded-bluffs--and (i)This figure is not reproduced at this time but can be found in The Phase One Report, Figure la. The figure will be -reproduced for the Final Plan. 10 • hillsides. Where little or no 'development has occurred, these areas provide desirable wildlife habi-tat. The largest concentration of naturalscenicareas lie north of the County W66 (Butler)bridge n Johnson County. However, a significant amount of undisturbed natural beauty exists within Iowa City at a location known locally as the "peninsula." There are pressures for development in portions of these areas. The development pressures for the "peninsula" will increase with the advent of:_the'Iowa River -Corridor Trunk Sewer ' scheduled for construction (approximately 1977) from an area :south to Taft Speedway. Although not initially considered naturally scenic, further investigations of the McCallister Estate (Shower's property):reveal areas of natural beauty. The undeveloped portions 'of this river- -:- front exhibit undisturbed areas of typical flood plain vegetation. In addition to being valuable wildlife habitat, these areas have considerable potential for nature study. B. Quality topography and tree cover unspoiled by urban development. -Overlapping areas of natural scenic qualities are those areas which exhibit especially scenic and unspoiled' topography and ''tree cover. The combination of topography and tree cover create the most natural and obvious -definition -of -the river corridor; the walls of _ the corridor. With its tendency to erode under exposure, the steep topography presents serious limitations for urban development and - is therefore most valued for its scenic quality. The tree canopy -found on these teep_sJopes is`generally hardwood deciduous trees • lI • such as oak, maple, and hickory as well as the softwood-, linden. Understory (small) trees include dogwood, serv_iceberry, and redbud. .- This combination of plant material prevent erosion and runoff while` contributing a'wide variety of; color, form, and .texture to.the scenery of the riverfront. ?, C. Significant historical heritage: -_- Both Iowa City and Johnson County, are rich in history, initially as a settlement for the Poweshik and Wapashiek Indians, then as the seat of government for the state of Iowa, a center for trade and commerce, and finally as an educational and --industrial community. All;: have given this area and -specifically -the river corridor, a vast heritage to recognize and build upon. Some of the features which could be utilized include: the Capitol grounds, ' • the Terrill Mill site, the Napoleon toimsite, Indian villages, ferry, crossings, and the first stage route and road. These historical sites should be preserved and interpreted for greater' awareness of our past. - D. -Scattered major land holdings still undeveloped.. Several large land holdings exist along the river which have not yet been developed. These lands constitute more than 75 percent of_all_remainIng undeveloped shorelands within, the study area. This fact will facilitate future acquisitions as proposed in the.plan. Additionally these large tracts can be more effectively planned and developed by private interests than can small parcels. • - 12;. ' • car bodies, and other debris). This -dump ng of rubble has prevented and/or destroyed essential streamside vegetation. Uses which have been particularly detrimental to the natural qualities of the river landscape include industrial and commercial uses -such ascement and asplant plants, industrial storage yards, car washes, auto repair shops, and mineral extraction operations. In some cases, residential uses have had a detrimental affect_on the quality of the riverfront. Generally, the closer the homes arp to the river, the more adverse is the impact: Public uses including sewage - treatment plants and public works facilities have also had a detrimental affect. g, Flooding of 1. developed property and flood plain land use controls which do not restrict development, but allows the development to • be raised above flood levels. Although Coralville Reservoir reduces peak river flows, flooding remains a serious problem in the study area. This, in part, is due to the uncontrolled watersheds of Rapid, Muddy, Clear, Ralston, and willow Creeks. Residential uses directly south of the Coralville Reservoir, in Coralville, and along Taft Speedway in Iowa City are most seriously affected. Recreational land in Iowa City and Coralville also are inundated. Flooding problems can be caused either indirectly by resultant flood conditions such as seepage, sanitary sewer, or septic tank backup, erosion, siltation, and water pollution or directly, • 15 • by inundation and the force of surging waters.` Problems associated with flooding will -increase .as the watershed areas continue to urbanize. As development -occurs, the ani:)unt of- f water water falling on impervious surfaces and runoff increases. Flood ,storage capacities do not generally exhibit corresponding increases, and frequently decrease as development is permitted to occur in the flood plain. C. Encroachment by highway and rail transport upon the river corridor. _ Both highways and rAil lines crowd the river's edge at several locations in the corridor. :These featureshavehad both an indirect and direct _adverse affect on the river. Indirectly, these transportation facilities have generated development which has no relationship with the river and, therefore, have abused --it. By locating immediately._adjacent`the-r-iver,their-.impact, has been to directly block physical access and, in the case of train storage areas, block visual access to the river. Dubuque Street north-of`Park- Road -exists within the flood plain and..; -- has on occasion been closedbecause` of°flooding. Having_;highways located close to the river has significantly increased surface runoff. Future transportation facilities will have to give more serious' consideration to these adverse impacts on the river. - corridor. 16_ • : D. Significant to severe shoreline erosion. Shoreline erosion is a- continual_ problem along all rivers. The construction of-CoralviIle Reservoir may -`have increased :the severity of this problem, however, due to the increased saturation of the river banks resulting from longer, higher river flows. Considering the serious effect of the shore line erosion and the complexity of determining the cause and effect relationships, it is recommended that -the Riverfront Commission request the Corps of Engineers to -evaluate the, problem in detail and _ recommend alternate solutions to the problem. Certainly, "the development of structures and the clearing of vegetation near the river's edge contributes significantly to the 'problem and the degree of impact.__ • E. Land use intensification beyond the capabilities of the soils to support development. -_ Although detailed soils information for -the study area is not presently available, it can be concluded from -a knowledge of the general soils contained in the corridor that many areas are,severaly limited in their capability to _support urban development. These areas._include all of the land within the 100 -year floodplain and all _slopes over 18 percent. Clearly if development is to occur in these -areas -in the future, detailed soils analysis should accompany each development proposal. 17 • F. Mineral extraction sites past and present which have _done irrepairabie damage to the landscape. Sand, gravel, and limestone resources exist within the river corridor. The past extraction of these minerals has resulted in the despoilation of -numerous -acres. The 1968 reclamation act requires reclaimation procedures be undertaken for all extraction operations after 1968. With regard to .future extraction operations, three questions need to be answered:': 1) Is the operationjustified in light of the demand for the resources, 2) what impact: will it have on the river and surrounding environment, and.3) will. beneficial land uses be possible after the extraction has ceased? • G. Present land development patterns which are developing to the detriment of the river corridor. In addition to the, problems previously discussed which imply undesirable development patterns, additional development has taken place which if continued, will have 'an adverse impact on the corridor. These developments can generally be classified as "urban sprawl" and are essentially residential developments which are consuming or encroaching upon areas of unique scenic beauty. if permitted :to=continue unchecked, the scenic qualities of the river landscape will become so diluted that at best, it"will 'be just another niceurban residential area. 18 • Both municipal agencies and the county -have similar authority to purchase property thru negotiation or condemnation and to receive gifts or dedications. They have the authority and responsibility to operate and maintain lands so acquired for public benefit. Thru the use of zoning ordinances, special use permits and development and building regulations these agencies can regulate private-development--,,- rivate development:for forpublic health, safety and welfare. Some of these techniques are not presently being utilized to -their -fullest potential, particularly specialusepermits and planned unit development concept. B. Organizational capabilities All of the local agencies involved have .the staffing capabilities to acquire, operate and maintain Iands. -with In the Corridor. Except_ for utility and street' projects a majority of anticipated municipal- • and acquisition could be handled as functions of the local park recreation department/commission. The County Conservation Board has a similar capacity on the county level. Any new acquisitions could` could require additional staff under the existing structure _(e.q., new park maintenance employees). Regarding resource definition and management, both the -Iowa City Department of Community Development staff and the Johnson County Regional Planning Commission staff have professional` background necessary for such a task. Any additional resource definition necessary could be supplied by -state and federal agencies-(e.q., United States Geological Survey, USGS; Soil Conservation Service, SCS; Iowa Natural Resources Council, INRC; and others). Depending on work load, etc. additional staff might be anticipated. • 21 • C. Financial capabilities Eachofthe local agencies: -have implied legal powers for, the financing of acquisition or development projects within the - corridor as well as the operating and maintenance of such projects. For illustration purposes potential financial sources for Iowa City are shorn below. It can be anticipated that the other agencies have similar and different potential iources. - 1. Operating Revenues ' - Primary source of funds for "operating -revenues comes from _ property taxes. The present general operating budget for Iowa City requires a tax levy of 30 mills, the imposed limit under state law. According to projections made by the city finance • office this situation requiring the maximum levy limit will continue until approximately 1980. After 1980, tax benefits from urban renewal 'will become apparent thus making it possible - to allocate funds from this source for riverfront improvement; acquisition, -development, or operation and maintenance. 2. General Obligation .-Bonds --- -- General :._obligation -bonds -are -bonds sold under .voter authoriza-- tion t 11 o finance projects which have either an "essential corporate purpose" (e.g., the construction ofbridges, streets, etc. and the equipping of fire, police, sanitation, street,`and civil defense departments)ora "general corporate purpose" (e.g. construction of civic buildings, acquisition/construction' o` • - J7 • civic buildings, acquisition/construction of parks, etc.). The fiscal policy for Ions City places the two following maximum limitations on general obligation bonds: - 1) Debt limit: Debt pledged as a general obligation of the city of Iowa City shallnotexceed 5 percent of the market value of the taxable property within the corporate limits as established by the city assessor (state law requirement).- 2) Borrowing reserve: A Minimum of 20 percent borrowing- reserve, or debt margin shall be maintained to meet '- emergencies. General obligation bonds already authorized and those anticipatedunder the approved 1976-1980-capital improvement program will.,approach the maximum debt limit capacity until the late 1970's at which time the 24 million dollar urban renewal, central business-district-development coupled with the normal city growth willl-permit authorization of new bonds. 3. Housing and Community Development-Act Funds The Housing and Community Development Act went into effect in 1974. This Act consolidated the previous federal programs for urban renewal,` housing and open space. Under the act the city of Iowa City.:was entitled to $2,061,000 in 1975 and ;a total of 58,2441000 during the 5 year life of the`act. Although - Iowa City is entitled to these monies, specific projects which meet 'federal guide lines must be submitted to the Department of Housing and Urban Development (HUD) before funds are actually approved for use by the city. Projects requiring; the full •. amount at the first year entitlement were suVAOtted, W hl'iw �3 • favorable impact and approved contingent to a environmental assessment.- Among the approved projects was 5200,000 for riverfront acquisition. To retain use of the $200,000 the city must reach an agreement with a property owner or institute condemnation procedures within -fiscal 1975• Additional `river - front acquisition thru 1979_%ould also be eligible for HCDA funds 4`. Federal Revenue Sharing-Funds- haringFundsFederal Federalrevenue sharing funds available to Iowa City-thru 1976 -have been tentatively committed for projects other than riverfront acquisition. However, if Congress extends the Revenue Sharing Program beyond 1976 some of,these-additional funds could be utilized for acquisition and development within • the river corridor. I 5. Bureau of Outdoor Recreation, Land and Water ConservationFunds The Iowa State Conservation Commission' administers_ the Land and Water Conservation Fund (LAWCON) for the Bureau of Outdoor -- Recreation (BOR). The annual LAWCON Fund, apportionment for local` entities within the State of _Iowa is_$750,000. Grants to local entities amount to 50 percent of project costs for acquisi— tion or development. Each eligible project is evaluated; against every; other eligible project in the state based, on a numerical rating system established by the State Conservation Commission Screening Committee. Acquisition and development of riverfront lands are ' eligible for LAWCON Funds pending -the -approval of an updated • Parks, Recreation and Open Space Plan. 24 '' 25 • 1) West side of -the river preferred from Coralville Reservoir to W-66 county bridge (Butler Bridge), east side of river W-66 bridge to Interstate 80. 2) Trail system should :have the flexibility to move close to the river where shorelines not endangered and away from the river for variety and scenic considerations. 3) Trail should minimize, as -much as possible, conflict between residential and public use. c. A river and trail access park should be provided neac'W-66 bridge. 1) Park to have access from county road W-66'. 2) Should have picnicking, parking, docking and eventually restroom facilities. • : 3) Size recommended: 3 to 7 acres. '- d. A primitive camping area in the vicinity of Rapid Creek. 1) Access to the area to be by boat or trail only. - 2) Size recommended: 10-15 acres. e. Undeveloped river walls (steep slopes). f. Undeveloped flood prone areas. Maintenance of ravines as natural drainage ways. h. A major northern corridor picnic park in the -area of the homes existing'; in the floodway south of Coralville Reservoir. is A visual buffer from existing limestone extraction operations and a lessening in noise generated from the operation. • 24 Zz • j. A neighborhood park for the property across from the lime- stoneextraction operations (if the area were developed as residential). 1) Ideally, should be located adjacent to river trail system. - - 2) Include picnic and play facilities. 3) Recommended size: 5-7 acres. k. Parkway; type road from County W-66 and the access road to the Coralville Reservoir. -_ 1. Visually desirable intersections of major traffic ".lanes and the river. M. Private development thought to be most compatible is'agri- cultural and residential. However, urbanization of the northern • should corridor be delayed until adequate provision for public utilities can-be made.- ade. B. B. Urban/University Unit - Interstate 80 to U.S.- No. 6. The Urban/University corridor is the most heavily developed corridor'.unit. However a significant area of=undeveloped land exists within the so called "peninsula". in Iowa City. The basic development concept for this unit is to provide and/or maintain a visuallypleasingpleasing riverfront that has both passive and active riverfront uses. < Disturbances` to the riverfront should be minimized in undeveloped areas particularly those ofuniquenatural beauty. Major construction should be avoided in areas exhibiting - 29 • natural limitations of steep wooded slopes, unstable soils, and flooding hazards. Development or-redevelopment-in-areas already heavily developed (Park Road to U.S..-No.-_-6)_ must recognize the - river as the areas most significant: natural: resource. Plans for public and private improvement here should include the enhancement of the riverfront and public, access via walkways,;-viewing plazas, landscaping,,etc. Development of the riverfront between Park Road and U.S. No. 6 should allow construction ofretaining walls, walkways, planters, and riverfront plazas to the rivers edge. Although the character of the river at this location should be very much urban, the river must continue to be the dominantelement.' The desired achievements for this unit are outlined below and are illustrated on Figure 4. - -l. Desired Achievements: - a. River access for the launching and landing of small water craft. Areas to be provided at all existing and proposed riverfront parks. b. Linear trail/walkway system along east side of the river from Interstate 80 to Park Road and along both Sides from- Park Road to U.S. No. 6. c. Access to the linear trail system from Coralville via a pedestrian bridge over the old Coralville power dam. d. A riverfront community park across from the old Coralville power dam within the "peninsula" on the Iowa -City side of the river. 30 1) To provide a safe means for boating bypass of old • Coralville power dam. 2) To provide park facilities including play fields, play areas, picnic_areas, restrooms, access, and, parking. j) To serve as access and rest stop for linear trail system. 11) Size recommended. 15-20 acres. e. A neighborhood park in the vicinity -of Taft Speedway. 1) To provide play area, ball fields, picnic facilities, restrooms', access, and parking.` 2) To provide access to and from linear trail system. 3) Recommended size:. 5-7 acres. f. Preservation of the scenic river wall (steep wooded slopes) in the vicinity of "Lovers Leap.,, • g. Maintain vegetative riverfront and undeveloped flood prone areas. h. Provide and maintainactive and passive development within the University District. i-;- More compatible riverfront use in the old power dam area of Coralville. _Suggest -either---park and open space, residential or special commercial (i.e., restaurants, miotel, spec ialty shops, recreation oriented retail shops, or other uses which would emphasize and/or need the river). j. Within existing residential areas not subject to flooding, maintain uncluttered, neat, vegetated riverfront. • �1 32 •, k. The removal of residential dwellings'from flood prone areas. River _visabi,l_ity from Public' horoughfares. m. Compatible commercialdevelopment-between-Burl ingtonStreet and U.S. No. 6 with increased public access and use areas. n. Parkway designation for the following segments of existing- streets: • Dubuque Street;_Interstate 80 to Park Road - • Park Road; Dubuque Street to Riverside Drive • Riverside Drive; Park Road to junction of U.S. No. 6 and U.S. No. 218 • 'U.S. No. `6;'from U.S.` No. 218 to Sand Road C. Southern Corridor Unit - U.S. No. 6 to Southern Project Boundary. - • The southern corridor provides opportunities to reestablish the river as the focal point for future development and redevelopment. Buildings must be kept away from the very easily erodable riverbanks. New development needs to respond to function 'of the natural systems = ' particularly the wetlands and woodlands. As the southern gateway '- to the loo -a City metropolitan community, proposed development should enhance the visual a -- ppeal of the area. Figure 5 illustrates the desired achievements. -listed below. - 1. Desired Achievements a. A major multiple -use, south end, community park. 1) Provide active and passive -uses including: sports fields, tennis courts, ice skating ponds, picnic facilities,' bridal trails, nature study areas, nature • trains, day camp area, restrooms, access, and parking. 32 • 2) North end of `park would recall the 'historically significant Napoleon townsite. 3) Park could be linked via footbridge to the Mesquckie Landfill Park on the west. -Side of ,the river. 4) Recommended size: 200-300 acres. ` b. Openvisualawareness of the river from U.S. No. 6 and No. 218. A linear trail system that utilizes parkways somewhat away C. from the river. Existing streets/road which should receive - pa rkway:..designation are: Sand -Road: from U.S. No. 6 south Riverside Drive from U.S. No. 6 to 11 Mesquakie`Park. d. An undisturbed or restored natural vegetated shoreline. • ' Development which respects and is in harmony with fragile e. resources of the river :corridor. Development could include residential, commercial, or industrial uses. - 33 • I1. Management/Implementation Plan The Management/Implementation Plan is -divided -into four sections to describe the methods involved in obtaining the desired achievements for the river corridor, Section One discusses the management tools that will be utilized to implement the Plan.- A management structure is recommended in Section Two and priority_.considerations for public action are -discussed in Section Three. The final section discusses special considerations, problems, or p proposals relating to corridor development. A. Section One - Management Tools. Management tools -that will -be utilized to obtain the desired achievements of the Plan are: • Acquisitionoflands for public use. • • Adoption of a special'River Corridor Overlay_ District that establishes Principles and -Standards as criteria for all future development and redevelopment. - • Cooperation between Public Agency and Private Developer. - •, Voluntary commitment by land owners who plan no new development. These management tools are examined in the following discussion.' Figures 6, 7 and 8 illustratehowthese tools.will be utilized for each of the_three corridor units. 1., Acquisition - Perhaps the most effective management tool is acquisition of lands for parks, open space, water, sewage, other utility and transportation facilities. • 34 • a. Lands for parks, open space and historic purposes: Public agencies have the responsibility to acquire land for"parks,'open space and 'historic preservation. The river corridor provides opportunities to acquire park lands that fulfill multiple functions. Parks recommended in the Plan; of Desired Achievements fulfill various combinations of the following objectives and therefore should be acquired. • 'Provides needed or anticipated recreational opportunity. • Provides access for river activities. • Preserves historic'site(s). • Projects -'unique natural scenery and desirable • scenic views. • Protects steep hills subject to erosion. • Provides educational opportunities. • Maintainsflood storage capacity. Acquisition of -these -parks must necessarily be in fee simple. A continuous linear 'trail system is proposed in the Plan of Desired Achievements. It anticipated that portions of -the trail system will have to be acquired while other portions may be obtained thru dedication of land for open space. Dedication is recommended in areas subject to development in the near future. "Cooperation between Public Agency and Private Developer" page 47 • 35 discusses the dedication concept. Acquisition is proposed _. for those areas not subject to development in the near future. To ensure the preservation of the unique scenic qualities of the Northern Corridor Unit north'of W-66 bridge,, land across from the proposed linear trail should be acquired. Here possibilities for dedication, scenic easement or development easement (i.e.. purchase of development rights should be investigated with property owners. However,.purchase of less than fee simple title often results in costs approaching outright acquisition without the flexibility of future public use. Acquisition • - of lands through condemnation should be considered as the final a)ternative: b. Acquisition of land for water, sewage, other utility, facilities. To the extent possible, land obtained to be utilized for utilities or transportation within -the corridor should also be available for open space or recreational- ecreationsl=uses uses(e.g., bicycle and hiking trails). For that reason utility extension in the corridor should be coordinated with The Riverfront Plan and new development proposals. Items relating -to -utility dedication are mentioned under, - "Cooperation between Public Agency and Private Developer." 36 - • c. River crossings. No new river crossings are presently planned for .the corridor although some future crossings have been investi— gated and may be anticipated. :Therefore the following general policies should be adopted regarding river crossings. • Bridge crossings should be minimized and constructed_ only if they fulfill a recognized transportation need. (Regional Transportation Plan). • Bridge location should consider the natural` - features of the area; slope, flooding, soils, drainage, geology, and vegetation. • Crossing where theriverchanges direction • should be avoided. • Bridges should not be -located -in areas exhibiting unique natural features'. - • Bridge design should harmonize with the desirable qualities of the river landscape. -Consideration should be given to form, color, material, and landscaping. • Bridges should frame rather than block river vistas. _ • Bridges should allow views up and down the river. • .Bridges should be designed to permit pedestrian' crossing with maximum safety and ease. To the extent possible, separate pedestrian and vehicular • - activities. - 37 • d. A priority schedule for public acquisition is discussed in the Third Section of this Management/Implementation Plan. 2. Establishment of a Special River Corridor Overlay District with adopted -Principles and Standards serving as criteria for development and redevelopment. By its nature, the River Corridor contains lands which are sensitive to urban development. -These lands can be classified as; water courses, wetlands, hillsides, and woodlands. Improper use of the'sensitive areas result in losses of both intrinsic environmental values and losses to the economic and social welfare of an area. Destruction • or disturbance of these areas can result in creating hazards such as flooding and landslides, or destroying water quality and thus public water supplies. The direct cost of not protecting these areas can be high.In the private sector, costs may include the reduction of property value.or the actual destruction of property; in_ -the public sector, they - include providing expensive flood protection systems, - finding alternative water sources or insta_1_ling expensive water purification systems. ,To protect these sensitive areas -and thus -the -public and private investment in develop- ment it is recommended that a special River Corridor Overlay District be established. In order .to ensure the proper fitting of urban development within the -River Corridor • 38 • District, principles and standards are recommended which _ will serve as criteria for development. This system will permit flexibility in development while ensuring the realization of desired achievements and the protection of natural systems. a. Principles and Standards: In order to fit urban development into a highly - aesthetic and sensitive river corridor_landscape, - principles and standards will address two major concerns; - 1) Natural Systems and 2) Visual/Land Use Relation- -__ ,--- - ships. _ Natural _System - Principles and standards recommended the protection of the natural systems have three •--for -: basic; objectives: - - a.)- Control of erosion, runoff -end -sedimentation - - to prevent=land destruction and promote voter -. - quality. b.) Maintenance of river, _capacity as a major natural drainage system. - c.) Preservation of plant resources and habitat (fish, animal and human). - Natural System Principles • Plans for development should be fitted to the topography, soils, and vegetative cover to create the least erosion potential_. possible. • 39 • • Development within the corridor shall not detrimentally affect or destroy natural features such as wetlands, steep hillsides, or %-,00ded areas, but will preserve and incorporate such features into -the "develop- ments site 'design. • There shall be no indiscriminate removal of trees or other natural vegetation. •` When land is exposed -during development, exposure should be kept to the shortest - possible time. • The smallest practical area of land should` - be exposed at any one time during development. • 0 Critical areas exposed during construction ' should be protected with temporary vegetation - and/or --mulching. • Where inadequate vegetation exists,; adequate temporary or permanent vegetation should be established. • The speed and direction of runoff water should be controlled and released safely to`down- stream areas. • Provisions shall be made to effectively accommodate the increased runoff caused by - changed ;.soil and surface conditions during and after development. • 40 • Sediment basins (debris basins, desiltong basins,•;or silt traps), should -be-installed- einstalledand-maintained and maintainewhere needed to remove sedi- men C from runoff waters and from land under- going development.7- •`'Permanentprotective vegetation should be installed as soon as possibleduring develop- ment. " • An undeveloped buffer zone preserving vegetation shall be maintained adjacent to the river. • Structures susceptible to flood damage should not be permitted in the flood plain. • - • No development should be permitted if unstable - soil conditions exist. • Development should be discouraged in the flood plain by granting special consideration ` for density transfer. Natural Systems Standards • All development plans shall include provisions for the control of sediment and runoff during construction. - •All development plans 'shall require proof that the soil is suitable for the intended develop- . -,Ment. • • All developmentplans shall show existing topography and proposed grading changes. - • All cut and fill operations involving an. - area -greater than 8,000 square feet shall require a grading permit. • Grading permits shall `be -required for all cut and fill_ operations in the flood plain. • All development plans shall show existing - - vegetation -(including -brief description of - kind and size) -and proposed clearance patterns. • ` Clearance permits shall be required when =- - total clearance is to exceed 30 percent of • : the proposed development site.or an area greater than 2'acres. • Clearance permits shall be required for all tree cutting operations in the fIood' plain. ' - • - Roots of remaining trees shall not be covered with more than 6 inches of - fill unless specific provisions for the supply of air and water are taken. • Precautionary' methods -shall -be used to pro- tect against, root damage due -to paving, site alteration, -and cut -and fill operations. h2 • Visual/Land Use Principles' •, Land use within the corridor'-ust respond to the needs of the entire metropolitan area. • Land use permitted within the corridor should not have a level of activity, noise, smelI,l_ vibration, etc., that would be considered - excess, in an institutional or residential situation. : • Land uses must respect the sensitive nature of -the river environment. G. Land uses shall be permitted which will not degrade water ;quality.- - • Land uses shall be permitted which heighten • an awareness of and 'increase public exposure to the river. • Land uses that destroy_or significantly reduce potential for future desirable land uses shall not be permitted. • Existing noncompatible uses should be modified to conform the above principles or, should be replaced. • _To help ensure the preservation of water quality and retain the unique and scenic nature of the corridor, developments should be fitted to the natural features of the land. .`Structures • 44 - • should be clustered or concentrated in those areas of the "site most suitable for develop- ment, with areas less suitable being utilized for low density activity or left as natural open 'space. • Buildings shall harmonize rather than overpower the landscape, (i.e., they shall not be so obtrusive as to detract from their surroundings). • Locate no structures where damage could result from flooding. • Locate structures so as to provide adequate open space for view, air circulation, and movement. • • Location of structures shall maintain the visual aspect of the corridor (i.e.,- the -- ground form of the corridor should not be lost because of structural development). •, Locatebuildings topreservetrees and other vegetation that stabilize and-enrich-soil, - moderate effect of winds and storms, absorb Pollution, and provide shade tand relief from hot weather. - • Locate on the rivers edge only those buildings which .specifically require that location. - 145 . Visual/Land Use standards • - Existing public utilities and facilities shall -be of adequate capacity:to meet the - requirements of the `proposed development, or firm plans to bring them up to the required capacity -shall have been approved by local governments prior to granting - approval of the development. - - • Site design shall incorporateopportunitiesfor access to and 'along `the river. • Buildingsshall not cover more than one-third - of the -lot area. • Buildings shall be arranged -.to provide visual • -_ penetration to and from the river. • To the extent possible parking, storage lots, and other similar uses shall' be oriented away ; from the river. • Mounding, landscaping, and/or architectural treatments shall be utilized -to buffer and - -- -screen undesirable -elements from from view. =. • -Extraction operations shall require a permit. - • _Proposed developments fronting on the river - - - --will be required -to -dedicate a minimum 100 foot wide natural buffer as public open space. • 46 • between the administering public agencies and the private developers is still necessary. The planned unit-development-(P.U.D.) or planned areadevelopment(P.A.D.) is potentially the most important tool to realize wise private development ofthecorridor. This concept envisions maximum - cooperation betweenprivate developer and public " agency. A P.U.D. is intended to encourage ingenuity - ngenuityand:.innovation and Innovationin site planning and design. By utilizing -this -concept it is possible to fit develop- ment -to the natural terrain and landscape, which is frequently not possible under the lot -by -lot he- development. This is especially important in the - river corridor river"corridor where a high premium is placed on both -preservation of 'water quality and the retention of a unique and scenic environment.._ Planned unit developments are=refinements-of the- -'-zoning concept. Under, this process a large tract of land is; treated as a'unit. Land useanddensity are regulated for. the entire parcel rather than any single part of it. P.U.D.'s can encompass any or all of the following: cooperative concepts: : • Density, transfer systems - These are the most elementary forms of the planned unit develop- ment technique. Minimum lot sizes and yard 48 - -_ requirements are reduced, but permitted • building types and overall densities do not , change.- This approach leads' -to the clustering technique with its emphasis on common open space. ::_It is an included feature of the following three approaches. • 'Mixed residential types, no densityincrease - these forms of density transfer allow the developer some flexibility in deciding upon a -- - mix of single family and multi -family housing types.._ - • -Mixed residential types, density increases allowed,- these" permit both a:varietyof • residential types and an increase in overall density of the area to be developed. .Density, -increase-features can either be tied to specified and quantifiable conditions, suchas; the amount of open-space,`or-can be tied to a bonus system ` which considers such judgemental features as site patterns, designandlandscaping, but which may be open to _legal challenge • Mixed use projects - these cover the widest range of possibilities `including commercial and -- possibly even, -industrial uses.` Residential _ density -increases may or ma not be allowed. - -_ • 19 Another kind of public/private cooperation is •involved in "land banking" procedures. Land banking involves the "purchase of land by a public agency for the future resale to private developers. The land may be either developed or undeveloped. In the case of developed land, --existing structures are cleared and sites made ready for new development., The public agency would place limitations on the kind of land use and other development requirements. In the river corridor these development requirements would include provisions for public access to and along the river. Provisions for this public access could be provided through a cooperative effort by the : public agency and the private developer. • y. Voluntary; Protection Public acquisition, -regulation -of -private development and public/private cooperation can yield the necessary riverfront access and activity areas. There are areas along the river corridor, however, which do not require public access or acti- vity. These are primarily areas of existing compatible land use or areas where no significant new development is anticipated in the near future. 50 - • These areas must be maintained or improved to thebenefit of the river corridor. In order to , accomplish this objective.the;_following guidelines are presented. • Buffer or screen -visually -undesirable '- elements with landscape or architectural matterials. • Maintain as much native riverside plantings as possible. • Do not locate storage areas within view of the riverfront. • Do`everything-possible to harmonize structures with surroundings. • • Limit clearing sous not to change river views, create erosion problems or contribute to additional runoff. To help realize a well maintained riverfront- the -agencies involved should be prepared to provide assistance and advice to land owners who desire to manage their property to the benefit of the river environment. Phase Three of the Iowa River Corridor Study will also address possible design solutions to typical riverfront problems faced by`the 'private land owner. 51 - 181` • B.- Section Two - Management Structure. - The -Iowa River Corridor is the -most significant natural resource within the Johnson County, Iowa City metropolitan area. The effects of this natural system go beyond jurisdictional boundaries. For example; pollutants dumped into the river in Johnson County affect the treatment necessary by Iowa City and the University of Iowa, fill or development within the flood plain within Iowa City affect the flooding frequency and hydraulic characteristics in Coralville, development of undeveloped areas in the northern corridor increase runoff and erosion thus raising the flood frequency and lowering water quality for all areas to the south; and finally the recreational and scenic potential for - each unit of the river offers`a unique variety of experiences • for all people living within the region. This interrelationship s 1. uggests a coordinated, unified approach to the management struc- ture. Investigations have failed to reveal an existing structure capable of dealing with acquisition, operation and maintenance, and regulationofthe corridor resources. Therefore, it is`re- commended that ;local agencies form a -contractual agreement for the joint exercise of governmental powers as authorized under Chapter 28 E'of the Code of Iowa. This contractual agreement would ensure the maximum utilization of acquisitionpowersand Uniform regulating controls. In essence, however, each agency would act within its own jurisdiction to fulfill ;its • 5z toward realization of desired achievements. In addition, -it is • recommended that a River Corridor Commission be established as part of this agreement to act as a catalyst, to maintain momentum and to coordinate the implementation of recommendations. This Commission would also work to achieve private donations that would aid in realizing desired achievements. The>Commission would also initiate bond issues or budget request for acquisi":ion and develop- ment projects. Professional staff with expertise in site planning, architecture, or landscape architecture should be available to assist the Commission in its evaluation of development proposals. It can be anticipated that a contractual agreement of this nature will take time to establish. In the interim, it is suggested that local jurisdictions proceed to implement recommendations on their own. 54 • • C. Section Three - Priority Considerations for Public Actions. Priority considerations are concerned with short-range action (1975-1980) and long-rangeaction (1980-2000). These actions concern the implementation of legal procedures, acquisition of public lands, and development. The -actions outlined below involve recommendations for only Iowa City. As other juris- dictions express a„desire-to participate in a river corridor program, additional priority considerations could -be outlined. 1. Short -Range Actions`- 1975-1980 a. Legislative or planning actions: 1.)' Adoption of the River Corridor Plan. - - 2.) Adoption -of RiverCorridor Overlay District incorporating principles and standards as • guidelines and criteria for development and -- redevelopment. 3.) Adoption of a new:more definitive Planned Unit Development ordinance. 4.) Establishment of a contractural agreement - be [ween all corridor jurisdictions for the - joint exercise of governmental powers in the corridor. b. Acquisition: 1.) Purchase of park sites: a.) Acquire park sites; estimated acreage, 230-327. 55 • 2.) Anticipate expenditure of $1501000-$250,000 during first five-year period. d. Summary - Initiate legislative and planning action to "get the ba .11 rolling" on _a -local level while working toward -total joint cooperation. Over pro- gramming and planningwill be necessary to maintain' flexibility in utilizing committed HCDA_funds if condemnation is, to be avoided. Although $1,240,000- $1,700,000 is recommended for expenditure during the - first five years anticipate an actual expenditure of 51,000,000-$1,250,000 as a result of over programming. 2. Long -Range Actions -, 1980-2000 a. _Legislative or planning actions: • 1.) Review and`update'Corridor Plan to incorporate -_ new legislative, technological, and planning capabilities. 2.) Introduce bond issue for the completion of acquisition and development. b. Acquisition: - lr) Complete purchase of park sites: - a.) Estimated acreage: 20-30 (this would be acreage which was not able to.be purchased - - 1975-1980). b.) Estimated present day cost $150,000- $225,000. • - 57 — 2.) Complete purchase of land banking proposal: • a,) Continue acquisition of developed property on both sides of river between Burlington Street and U.S. 96. b,) Estimated acquisition costs for the + 45 acres: $3,500,000- c.) Property to be resold to developers during ; this period. 3,) Purchase of housing in floodprone.areas: a,) Purchase homes as they go on market. b.) Estimated present day market value $600,000-$700,000 - 4,) Development of river corridor parks: a,) Of the 300-350 acres of river corridor •- parks, figure 100-125 acres developed moderately heavy (i.e. ballfields,-tennis courts, picnic, roads, parking, etc.). For this -figure,; -$12,000 per acre construction costs resulting in $1,200,000-$1,500,000 estimated expenditure. Figure 200-250 acres low level development (nature areas, trails, res trooms,`etc.),,figure $2,000 per resulting in $400,000-$500,000 esti- acre mated expenditure. _ 58 • •_ b.)' Tota lestimated expenditure for park development -$1,600,000-$2,000,000.__ - _ 5.) Development of linear trail system: a.)- Anticipated length of trail to be developed: + 8 miles. - b.) Trail surface -to vary, from crushed compacted stone in northern end to paved walks from University -area 'south. c.)- Estimate construction costs; $95,000-$120,000. 6.) Summary of_`1980-2000 estimated expenditures.* •'Acquisi_tion** $4,100,000 S4, 200,000 • Development Parks 1,600,000 2,000,000 • Develo ment Trails 95,000 120,000 p • TOTAL 1980-2000 $5,795,000 -$6,320,000 *Costs do not include any estimate for erosion protection. **Costs do not include park acquisition becuase these are included in first five -,year program. • 59 • D. Section Four - Special -Problems -or Proposals.- I. Proposed -sand -and gravel extraction operation immediately south of Iowa City: - - In the past mineral extraction operations have contributed to the degradation of economic and scenic values of the river corridor. The Reclamation Act of 1968 attempts to solve one of the problems associated with such operations; reclamation of the land. This act, however,_does not address other problems associated with extraction operations, namely the visual and physical impacts on adjacent land uses and the river. There- fore, if mineral extraction is to be permitted within the corridor, it should be done on a'special `or conditional use, permit basis. To be eligible for a special permit, the • extractioncompany should fulfill the fol lowing`requirements: -- • Extraction operation shall comply with all the principles and standard previously described for the River Corridor Overlay District. • Provide proof of need. • Provide plans illustrating' possible future uses based - on anticipated extraction. • Provide plans showing the functional layout for the operation and techniques to be utilized for buffering and screening. Included as a part of this plan will be the location of storage and stockpile areas, location 60 • of machinery and equipment areas, building location(s) and transportation and circulation movements. The plan shall also discussmeasures to be taken to minimize traffic:problems. Final permit shall be subject ,to the approval of plans by -local -governmental agency. If properly- planned, the proposed extraction operation could contribute additionalpotential to the southern corridor unit. Future land usealternativesinclude: •."Park and ;recreation as an addition or supple- ment to proposed south end park. • Residential. - - • Office park. • However, the "burden of proof and justification must be the developers. The operation should be permitted only after - the developer has agreed to the conditions imposed by the local agency. 2. Shoreline Erosion: Shoreline erosion is a continual problem associa11 ted with all midwestern rivers. The causes and solution(s) to.the erosion problem are beyond the scope of this study. It is recommended, therefore, that the local jurisdictions request the Army Corps of Engineers prepare an indepth study of the problem which would result in recommendations of alternate solutions. 61 3, Existing Limestone Extraction Operation. • Recommend negotiations with River Products for a 50-75 foot landscape easement. Suggest River Products consider dedication of such an easement with public responsible for restoring bank and slope and agencies - - providing necessary maintenance. 4. Proposed River Corridor Parkway. Parkway would be continuous from the northern to the southern end of -the project. Parkway would be appropriately landscaped and would provide for the vehicular inspection of the landscapes typical to the Speed limits on the Parkway should be river corridor. reduced to allow for more casual viewing of river corridor scenery. Southern portions of the Parkway significant and would incorporate would be historically for bicycling and walking. Design considerations walkways for the Parkway drive will 'be examined in Phase Three. -5, Boating Use of the River. The Iowa River` -is a narrow river with shorelines subject erosion. Because of the associated threat to to serious riverbank stability and boating safety, power boating conditions should be prohibited. All other creating wake of slower speed boating such as canoes, row boats, types be encouraged by providing rafts, paddleboats, etc. should additional river access at all park sites. G2 In _. 1 �H r « ti s y _. 1 _�. �. {; ��* .A s.� r, t j ,�; ��=- �� �a ''_'. �� ���'` ,,:_,.: `9:�++"✓ � - a i'.' I` S ,�. _. _::-_: ti �� T � z �; C � Z �� 2, r�rF . �_ - T5i -� ,.. _�. �. {; ��* .A s.� r, t j ,�; ��=- �� �a ''_'. �� ���'` ,,:_,.: `9:�++"✓ � - a i'.' I` S ,�. _. _::-_: ti �� T � z 3 �1 �l �. p 7 F�'' .� k 1 - Y � � � [ 6 -r Y�.. .7 ,..n �� : s �'. : - i T�_ S .J _. t�-.__ �1 CJ • • CFTC Yl City High school JI Iowa City Iowa 5220 L -1 City Council Iowa City civic center Washington Street Iowa City, ;Iowa Dear Sirs; the attention that theriashacans1in St has come to our the cityrrostnumber. city., There. are 35 _ o£ trash cans in the area between Burlington and Iowa and Clinton which are in the downtown deficiency of_cana. In one block on and Linn. In this area there is no Washington and College there are ix trash cans. Clinton _street between side of Clinton you will .not £ind`a only, in ct If you cross the street to the south n ar limited to tareasY.nWewbelieve single can. The trash cans are that trashea surrounding there are no trash cans in the Good laces to start would,. through thecity. p cans should be spread out If trash cans are there people will use be in areas such as Towncrest. them and we believe this will be a step fcrwarWei were told by thecity made is this; citfor One more point that should be 20 dollars. If youcan spend S12,500 that each trash can costs about each eras, willing to keep this city clean by adding two you should be - a few trash cans. _ _ _ Signed, j 1 • _ OFFICES • _ `LAW r HAWKEYE LEGAL AID SOCIETY - E - _ 114 East Prentiss - T[LEPMOM[ 114 .:, _ ,. (312) :351-8370 .: ---THOM" H. MCMUPRAY.-DIPCCTOR �- _ IOWA CITY. IOWA 52240 - - - JOHN M. C"MMAM .. -: snvsA A. Lards- JOMM M. MAKER. September 12, 1975 Ms. Abbie Stolfus _ City -=Clerk of Iowa City_ -- Civic Center- Washington Street Iowa -City, Iowa 52240 RE: Suspension of taxes for Jan A Slavik Dear Ms. StOlfus: This office is assisting Jan A. Slavik of 930 Iowa Avenue in seeking.`a_suspension-of his property taxes. -_ - Enclosed with this letter is a petition for suspension and an additional information form signed by Mr. Slavik. - It is my understanding that according to the provisions of Section 427.8"of-the Iowa Code, this - -petition-first needs to.be acted upon by the City Council -and then `forwarded 'to the County Auditors' Office for presentation to the Board of Supervisors for final approval. - Is is customary or.advisable for Mr. Slavik-or a representative of this office to personally make any, presentation to the City; Council? Please let me know if 'there- is any -,,,additional information you need. Thank you. -.Sincerely yours, - �• ��� H. McMur Thomas Enclosures TMsw,— cc: Jan A.>Slavik 930 Iowa Avenue Iowa City, Iowa