HomeMy WebLinkAboutCapital Improv.Summary.pptCity of Iowa City
FY2009 - FY2013
Capital Improvements Program
Funding Summary
Project Category FY2009 FY2010 FY2011 FY2012 FY2013 Total
Airport 4,752,573 3,021,850 7,467,550 2,205,570 1,326,150 18,773,693
Landfill 10,521,572 3,100,000 1,100,000 1,100,000 1,100,000 16,921,572
Parking & Transit 930,000 500,000 - - - 1,430,000
Parks, Recreation & Trails 4,019,852 2,710,000 2,280,000 4,712,500 4,530,000 18,252,352
Public Safety 3,659,250 2,716,400 452,500 572,000 - 7,400,150
Streets, Bridges & Traffic Eng. 12, 313,177 10,147, 500 17, 841, 500 5, 880, 000 5,160, 000 51, 342,177
Misc. Other 3,252,062 555,000 460,000 1,077,000 100,000 5,444,062
Total Projects: 39,448,486 22,750,750 29,601,550 15,547,070 12,216,150 119,564,006
Capital Improvement
Program Funding
by Category
FY2009 - FY2013
Misc.
Other
5%
irking &
transit
1%
Streets, Bridges
& Traffic
Engineering
43%
Public
Safety
6%
rar Ks,
Recreation
& Trails
15%
C-1
City of Iowa City
Capital Improvements Program
Project Category: AIRPORT
Project Name
Airport Runways 7- 25 & 12-30: Rehabilitation
Description The existing pavements on Runways 7-25 and 12-30 have reached the
end of their useful life and are showing signs of pavement distress.
Reconstruction of the southwesterly section of Runway 7-25 and its
intersection with Runway 12-30 will occur in FY2010. Reconstruction of
Runway 12-30 is scheduled in FY2011 and includes replacement of the
runway edge lighting system.
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grants $ - $ 2,870,760 $ 4,110,220 $ - $ -
10 GO Bonds $ - $ 151,090 $ - $ - $ -
11 GO Bonds $ - $ - $ 216,330 $ - $ -
Project Name
Airport Runway 7-25 Parallel Taxiway -Grading, Paving & Lighting
Description A parallel taxiway is needed for the main runway to allow for safe taxi of
aircraft to and from Runway 7-25 and the terminal area as well as to allow
for lower instrument approach minimums for Runway 7-25. Funded by two
separate grants, taxiway grading is scheduled to occur in FY2011, paving
and lighting in FY2012.
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grants $ - $ - $ 2,033,950 $ 2,095,290 $ -
11 GO Bonds $ - $ - $ 107,050 $ - $ -
12 GO Bonds $ - $ - $ - $ 110,280 $ -
Fundinp
$ 7,348,400
$ 7,348,400
Fundinp
$ 4,346,570
$ 4,346,570
c-z
City of Iowa City
Capital Improvements Program
Project Category: AIRPORT
Project Name
Apron Reconstruction & Connecting Taxiway
Description
Fundinp
$1,326,150
$1,326,150
Existing terminal apron is showing signs of pavement failure and needs replacement. In
addition, the ever-growing amount of general aviation traffic using the facility requires expansion
of the apron and provision of additional connecting taxiways with the runway system.
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grants $ - $ - $ - $ - $1,259,842
13 GO Bonds $ - $ - $ - $ - $ 66,308
Project Name Fundinp
Corporate Hangar'L' $1,000,000
$1,000,000
Description
Construct large bay hangar for Fixed Base Operator (FBO) to manage.
Fundinp FY09 FY10 FY11 FY12 FY13
State Grants $ - $ - $ 500,000 $ - $ -
11 GO Bonds $ - $ - $ 500,000 $ - $ -
C-3
City of Iowa City
Capital Improvement Program
Project Category: LANDFILL
Project Name
Eastside Recycling Center
Fundinp
$ 2,081,641
Description The Eastside Recycling Center is located at 2401 Scott Boulevard. Phase I of this
project iincludes overall site preparation, waste oil dropoff, compost pickup, electronic
waste dropoff and improvements to the existing building. Also included is a loading
dock and utilization of precast concrete panels on existing buildings.
•'. _ `- ;.d.~.......«........®.....,...«.~.._...... + ~ sike facaYfties
`~ - -~ - I Y WZ~ Ru.s fro
l+ 4 I
T"~ - - f~ 3rY. HnFi[ F2 1 Es U:Y•ys~..a:r~
r'
s. 5e ~ Bern
...~ I
I .- _ d. FtnC'Yn .ry 4'~AP Eat
.. ~"r -- _ - - -
~ r, 3" ~p,i prPP AaiPe
'+r ~ + "~ _- -.. C I @. Co pns1 Pick-lJp
f r Skl
j ~~~ __ .. ~. b ~. 7. WPa¢Chip Pick-VP
Y7 ~~, ~ I B. ~E,PC[ .N44uta.
f{ ~rn~a nPi SEty
• ~~ ~,
I - >, ~A d s ,E 8,~.~a
~ - .~ r ~e~ I Ey
~;; " - ,a. ~t, wPU~
- _ -- OISM L f St lean
{. ~ i2. Ed A.- A
`$ 33. AW b €iue 'Space
"'~-,. I ~ 1.1. #ip 1 Wit HYrT'•+rdous'
Efl A S+J k Li~•Y 1e!e !: ~'~ Wa E M aifaTreiler
C iCy Pf l ~.r, - ' ~~~
J:rnc 3... tli!~
1rt
Fundinp FY09 FY10 FY11 FY12 FY13
Landfill User Fees $ 81,641 $ 2,000,000 $ - $ - $ -
Project Name
Landfill Cell - FY09
Description
Design and construction of a new landfill cell is expected to extend into
FY2010.
Fundinp FY09 FY10 FY11 FY12 FY13
Landfill User Fees $ 7,000,000 $ - $- $- $-
Fundinp
$ 7,000,000
C-4
City of Iowa City
Capital Improvements Program
Project Category: PARKING and TRANSIT
Project Name
Near Southside Multi-use Parking Facility
Fundinp
$ 200,000
$ 200,000
Description
Allocation for concept planning and preliminary design on a proposed multi-use parking /
commercial /residential facility on the former St. Patrick's Church site on South Linn
Street. This lot was purchased during the spring of 2008 for $3.0 million with a
combination of Parking Impact Fees and an interfund loan to the Parking Division.
Fundinp FY09 FY10 FY11 FY12 FY13
Parking Fees $ - $ 200,000 $ - $ - $ -
Project Name Fundinp
Parking Garage Elevator Upgrades -Capitol & Dubuque St. Garages $ 600,000
$ 600,000
Description
Elevator upgrades at the Capitol and Dubuque Street Garages.
Fundinp FY09 FY10 FY11 FY12 FY13
Parking Fees $ 300,000 $ 300,000 $ - $ - $ -
C-5
City of Iowa City
Capital Improvement Program
Project Category: PARKS, RECREATION AND TRAILS
Project Name
Butler Bridge Pedestrian Trail
Description
Construction of a separated pedestrian bridge on the widened piers of North
Dubuque Street's Butler Bridge. This allows for separated pedestrian and
bicycle travel. This project utilizes Federal STP grant funds.
Fundinp FY09 FY10 FY11 FY12 FY13
State Grants $ - $ 440,000 $ - $ - $ -
Coralville $ - $ 82,500 $ - $ - $ -
10 GO Bonds $ - $ 27,500 $ - $ - $ -
City Park Projects
Old Shop Repairs: Replace roof and rafters on the old park shop, also rebuild adjacent
retaining wall which was impacted by the flood.
Trail Lighting: Install pedestrian lighting on the trail system in City Park.
Fundinp FY09 FY10 FY11 FY12 FY13
10 GO Bonds $ - $ 330,000 $ - $ - $ -
Project Name
Frauenholtz-Miller Park Development
Description
Develop approximately three acres of newly-acquired parkland on Lower
West Branch Road adjacent to the new Saint Patrick's church site. Funding
includes use of Neighborhood Open Space Fees.
Fundinp FY09 FY10 FY11 FY12 FY13
12 GO Bonds $ - $ - $ - $ 223,000 $ -
Neighborhood $ - $ - $ - $ 57,000 $ -
Open Space Fees
Fundinp
$ 550,000
$ 550,000
Fundinp
$ 90,000
$ 240,000
~ 33U,000
Fundinp
~ 280.000
C-6
City of Iowa City
Capital Improvement Program
Project Category: PARKS, RECREATION AND TRAILS
Iowa City Kicker's Soccer Park Funding
FY2010
Soccer Park Shelters: Construct two large park shelters to accommodate park patrons $ 150,000
when large tournaments are hosted.
FY2012
Soccer Park Improvements: This allocation provides for the continued development $ 250,000
and improvement of the Iowa City Kickers Soccer Park. Planned improvements would
create a system of trails to enhance accessibility and create a more park-like
atmosphere to the open space areas of the facility.
Soccer Park Pond: Construct a pond to accomodate a field irrigation system. $ 337,500
$ 737,500
Funding FY09 FY10 FY11 FY12 FY13
10 GO Bonds $ - $ 150,000 $ - $ - $ -
12 GO Bonds $ - $ - $ - $ 587,500 $ -
Project Name Funding
Mercer Pool Solarium Renovation $ 220,000
Description Replace all windows, doors and the ventilation system in the solarium $ 220,000
section of Mercer Pool.
Funding FY09 FY10 FY11 FY12 FY13
11 GO Bonds $ - $ - $ 220,000 $ - $ -
Misc. Park Improvements Funding
Hickory Hill Park -Restroom & Bridge: This project includes construction of a $ 150,000
restroom and replacement of the oldest pedestrian bridge in Hickory Hill Park,
approximately a 50 foot span.
Court Hill Park -Restroom: Construct a restroom in Court Hill Park. $ 95,000
Kiwanis Park -Restroom: Construct a restroom in Kiwanis Park. $ 95,000
College Green Park -Light Replacement: Replace pedestrian lighting system. $ 90,000
Mercer Park & Fairmeadows Park -Sidewalk Replacement: Remove 3,100 lineal $ 85,000
feet of 4' sidewalk and replace with 6' sidewalk.
$ 515,000
Funding FY09 FY10 FY11 FY12 FY13
11 GO Bonds $ - $ - $ 515,000 $ - $ -
c-~
City of Iowa City
Capital Improvement Program
Project Category: PARKS, RECREATION AND TRAILS
Project Name Fundinp
North Market Square Park Redevelopment $ 280,000
Description $ 280,000
Work with the Northside Neighborhood Association and Horace Mann
School to redevelop this 1.5 acre park at the intersection of Fairchild and
Johnson Streets.
Fundinp FY09 FY10 FY11 FY12 FY13
10 GO Bonds $ - $ 280,000 $ - $ - $ -
Project Name Fundinp
Outdoor Ice Rink $ 1,500,000
Description Construct an outdoor ice rink suitable for figure skating or hockey. During $ 1,500,000
warm weather this area would be available for other recreational uses such as a
skate park and/or roller hockey. (Note: Only $700,000 can be funded without
voter approval.)
Fundinp FY09 FY10 FY11 FY12 FY13
13 GO Bonds $ - $ - $ - $ - $ 1,500,000
Project Name Fundinp
Pedestrian Br idge -Rocky Shore Drive to Peninsula $ 1,300,000
Description $ 1,300,000
Construct a pedestrian bridge from Rocky Shore Drive across the Iowa River,
connecting the Iowa River Trail and peninsula parkland trails. This will also
provide greater access to the dog park and disc golf course.
Fundinp FY09 FY10 FY11 FY12 FY13
12 GO Bonds $ - $ - $ - $ 1,300,000 $ -
Project Name Fundinp
Peninsula Park $ 300,000
$ 300,000
Description Development of the lower elevation into a "natural park", with prairie grasses, wildflowers,
native woodlands and trails. Improvements will also provide protection to the City's water
supply wellheads.
Fundinp FY09 FY10 FY11 FY12 FY13
12 GO Bonds $ - $ - $ - $ 300,000 $ -
c-a
City of Iowa City
Capital Improvement Program
Project Category: PARKS, RECREATION AND TRAILS
Robert A. Lee Rec Center Improvements
East Enterance: Reconfiguration of the east entrance, including ramp
accessibility, steps, railing and lighting; replacement of the social hall's
collapsible wall and enclosure of the pool balcony for access by the general
public.
Elevator Replacement -Replace elevator car, hydraulics and controls.
Fundinp FY09 FY10 FY11 FY12
11 GO Bonds $ - $ - $ 295,000 $ -
Project Name
Riverbank Stabilization -City Park
FY13
$ -
Description This project will repair the riverbank along City Park and south of Park Road
Bridge on the eastern shore. The work is eligible for federal funding with a
65/35 match.
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grants $ - $ 310,000 $ - $ - $ -
10 GO Bonds $ - $ 90,000 $ - $ - $ -
Project Name
Sand Lake Recreation Area
Description
This project provides for the phased development of the Sand Lake Recreation
Area located at 4213 S.E. Sand Road (former S&G Materials site). This 180
acre area will include both recreation and conservation components. An Iowa
Community Attraction and Tourism (CAT) grant application is being submitted to
the State of Iowa for this project.
Fundinp FY09 FY10 FY11 FY12 FY13
State Grants $ - $ - $ 1,000,000 $ 1,000,000 $ -
08 GO Bonds $ 500,000 $ - $ - $ - $ -
09 GO Bonds $ 1,000,000 $ - $ - $ - $ -
11 GO Bonds $ - $ - $ - $ - $ -
13 GO Bonds $ - $ - $ - $ - $ 2,000,000
General Fund $ - $ - $ - $ - $ -
Contributions & $ - $ 750,000 $ - $ - $ -
Donations
Fundinp
$ 225,000
$ 70,000
$ 295,000
Fundinp
$ 400,000
$ 400,000
Fundinp
$ 4,250,000
$ 4,250,000
$ 1,500,000 $ 750,000 $ 1,000,000 $ 1,000,000 $ 2,000,000
C-9
City of Iowa City
Capital Improvement Program
Project Category: PARKS, RECREATION AND TRAILS
Project Name Fundinp
Scanlon Gym -Elevated Running /Walking Track $ 880,000
Description Construct an elevated running /walking track in the Scanlon Gym facility.
Fundinp FY09 FY10 FY11 FY12 FY13
12 GO Bonds $ - $ - $ - $ 880,000 $ -
Project Name Fundinp
Scott Park Development & Trail $ 780,000
$ 780,000
Description This project will help develop Scott Park into aneighborhood /regional park,
with the addition of restrooms, some excavation to the detention basin and
construction of a new trail to connect with other trails in east Iowa City.
Fundinp FY09 FY10 FY11 FY12 FY13
13 GO Bonds $ - $ - $ - $ - $ 780,000
Project Name Fundinp
Waterworks Park Hospice Memorial $ 115,000
$ 115,000
Description Develop apark-like Hospice Memorial area in Waterworks Prairie Park for
passive enjoyment and contemplation. Private donations are anticipated in
the amount of $25,000.
Fundinp FY09 FY10 FY11 FY12 FY13
12 GO Bonds $ - $ - $ - $ 90,000 $ -
Donations $ - $ - $ - $ 25,000 $ -
C-10
City of Iowa City
Capital Improvement Program
Project Category: PUBLIC SAFETY
Project Name
Fire Station #4
Fundinp
$ 1,708,923
$ 1,708,923
Fire Station #4 is scheduled for construction in FY2010 at the intersection of North Dodge Street, Scott Boulevard
and North Dubuque Road in the northeast quadrant of Iowa City .
Fundinp FY09 FY10 FY11 FY12 FY13
05 GO Bonds $ 163,923 $ - $ - $ - $ -
10 GO Bonds $ - $ 700,000 $ - $ - $ -
Interfund Loan $ - $ 845,000 $ - $ - $ -
Project Name
Fire Apparatus: The following Fire Department vehicles are scheduled for replacement
with the exception of one new engine for Station #4.
FY09: Pumper (1 ), Engines (2) FY11: Heavy Rescue Truck (1)
FY12: Engine (1)
Fundinp FY09 FY10 FY11 FY12 FY13
06 GO Bonds $ 124,000 $ - $ - $ - $ -
07 GO Bonds $ 102,000 $ - $ - $ - $ -
08 GO Bonds $ 848,102 $ - $ - $ - $ -
09 GO Bonds $ 509,000 $ - $ - $ - $ -
11 GO Bonds $ - $ - $ 452,500 $ - $ -
12 GO Bonds $ - $ - $ - $ 572,000 $ -
Fundinp
$ 2,607,602
$ 2,607,602
C-11
City of Iowa City
Capital Improvement Program
Project Category: PUBLIC SAFETY
Project Name Fundinp
Evidence Storage Facility $ 871,400
Description Construction of a 12,000 square foot facility to house evidence for $ 871,400
criminal trials.
Fundinp FY09 FY10 FY11 FY12 FY13
10 GO Bonds $ - $ 871,400 $ - $ - $ -
Project Name Fundinp
Radio System Upgrade & Migration $ 1,212,225
$ 1,212,225
Description Replacement of radio communication egiupment as necessary to keep the
existing system operational until Joint Communications Center is on-line
and non-emergency users are added on.
Fundinp FY09 FY10 FY11 FY12 FY13
05 GO Bonds $ 12,225 $ - $ - $ - $ -
06 GO Bonds $ 100,000 $ - $ - $ - $ -
07 GO Bonds $ 100,000 $ - $ - $ - $ -
08 GO Bonds $ 600,000 $ - $ - $ - $ -
09 GO Bonds $ 100,000 $ - $ - $ - $ -
10 GO Bonds $ - $ 300,000 $ - $ - $ -
C-12
City of Iowa City
Capital Improvement Program
Project Category: STREETS, BRIDGES
and TRAFFIC ENGINEERING
Project Name Fundinp
420th Street Improvements -Highway 6 to Taft Avenue $ 3,000,000
Description This project includes construction of a sewer main and reconstruction of 420th $ 3,000,000
Street to urban standards east from Highway 6 to Taft Avenue. These
improvements will facilitate expansion of the industrial park. RISE grant
funding of 50/50 may be available for road construction.
Fundinp FY09 FY10 FY11 FY12 FY13
State Grants $ - $ 1,000,000 $ - $ - $ -
Wastewater User Fees $ 500,000 $ - $ - $ - $ -
09 GO Bonds $ 1,500,000 $ - $ - $ - $ -
Project Name Fundinp
American Legion Road -Scott Boulevard to Taft Avenue $ 3,000,000
Description This project will reconstruct American Legion Road to urban standards $ 3,000,000
including an eight foot (8') sidewalk.
Fundinp FY09 FY10 FY11 FY12 FY13
13 GO Bonds $ - $ - $ - $ - $ 3,000,000
Project Name Fundinp
Burlington St. Pedestrian Bridge Rehabilitation $ 350,000
Description This project will rehabilitate the existing pedestrian bridge at Highway 6 and $ 350,000
Burlington Street. This will be a joint project with the Iowa Department of
Transportation and University of Iowa.
Fundinp FY09 FY10 FY11 FY12 FY13
State Grants $ - $ 150,000 $ - $ - $ -
Road Use Tax $ 40,000 $ 85,000 $ - $ - $ -
University of Iowa $ - $ 75,000 $ - $ - $ -
Project Name Fundinp
First Avenue / Iowa Interstate Railroad Crossing Improvements $ 6,392,000
Description $ 6,392,000
This project includes construction of a railroad overpass on First Avenue with
federal funding of $1.7 million.
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grants $ - $ - $ 1,700,000 $ - $ -
08 GO Bonds $ 192,000 $ - $ - $ - $ -
09 GO Bonds $ 1,500,000 $ - $ - $ - $ -
10 GO Bonds $ - $ 2,000,000 $ - $ - $ -
11 GO Bonds $ - $ - $ 1,000,000 $ - $ -
C-13
City of Iowa City
Capital Improvement Program
Project Category: STREETS, BRIDGES
and TRAFFIC ENGINEERING
Project Name Fundinp
Gilbert St. Streetscape $ 310,000
$ 310,000
Description Streetscape improvements including brick, trees, lighting and bike racks on
segments of Gilbert between Prentiss and Burlington Streets.
Fundinp FY09 FY10 FY11 FY12 FY13
10 GO Bonds $ - $ 310,000 $ - $ - $ -
Project Name Fundinp
Interstate 80 Aesthetic Improvements $ 100,000
$ 100,000
Description Landscaping and bridge aesthetic treatments in the Interstate 80 corridor.
Fundinp FY09 FY10 FY11 FY12 FY13
Coralville $ 20,000 $ - $ - $ - $ -
Road Use Tax $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ -
Project Name Fundinp
Lower Muscatine Avenue $ 3,700,000
Kirkwood to First Avenue
$ 3,700,000
Description This project reconstructs Lower Muscatine from Kirkwood to First Avenue,
including the addition of a center turn lane. Also included in the project are
storm sewer, sanitary sewer and water main reconstruction; undergrounding of
aerial utilities and installation of sidewalks on both sides of the street. This
project utilizes federal STP funds.
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grants $ - $ 860,000 $ 860,000 $ - $ -
09 GO Bonds $ 125,000 $ - $ - $ - $ -
10 GO Bonds $ - $ 627,500 $ - $ - $ -
11 GO Bonds $ - $ - $ 627,500 $ - $ -
Contributions $ - $ 300,000 $ 300,000 $ - $ -
C-14
City of Iowa City
Capital Improvement Program
Project Category: STREETS, BRIDGES
and TRAFFIC ENGINEERING
Project Name Fundinp
McCollister Boulevard -Highway 921 to Gilbert Street $ 6,219,436
Description McCollister Boulevard will connect with Mormon Trek Boulevard at Highway 921 $ 6,219,436
and extend to Gilbert Street. This section of paving is 4,000 feet long, including a
500' long bridge over the Iowa River. Prior year expenditures for this project total
$2.4 million.
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grants $ 4,200,000 $ 100,000 $ - $ - $ -
Water User Fees $ 477,000 $ - $ - $ - $ -
08 GO Bonds $ 1,442,436 $ - $ - $ - $ -
Project Name Fundinp
Mormon Trek -Left Turn Lanes $ 3,750,000
Description Construct left turn lanes at major intersections or a continuous center lane $ 3,750,000
through the corridor between Melrose Avenue and Abbey Lane. Federal STP
funds are proposed for this project.
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grants $ - $ - $ - $ 1,500,000 $ -
12 GO Bonds $ - $ - $ - $ 2,250,000 $ -
Park Road & Park Road Bridge Fundinp
FY2011:
Park Road Bridge & Intersection Improvements: Replace Park Road bridge deck, $ 8,000,000
reconfigure lane markings at the Park Road /Dubuque Street intersection and add a right
turn lane on south-bound Dubuque. This project is eligible for federal STP funds.
FY2012:
Park Road -Third Lane Improvement: This project accommodates traffic flow on $ 1,140,000
Riverside Drive and Park Road to Hancher by adding a center turn lane between Lower City
Park entrance and Riverside Drive. The walkway lying on the north side of Park Road
between Upper City park's main entrance and Templin Road will also be replaced at this
time with an 8' sidewalk. Timing of this project will be in conjunction with the Park Road
Bridge Improvement project.
$ 9,140,000
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grants $ - $ - $ 6,400,000 $ - $ -
11 GO Bonds $ - $ - $ 1,600,000 $ - $ -
12 GO Bonds $ - $ - $ - $ 1,140,000 $ -
C-15
City of Iowa City
Capital Improvement Program
Project Category: STREETS, BRIDGES
and TRAFFIC ENGINEERING
Public Works Facility - S. Gilbert Street
Fundinp
FY2010
Fuel Facility: Construct new fuel tanks and fueling island at the South Gilbert St. Public Works
Facility, replacing existing fuel facilities at Riverside Drive. $ 480,000
FY2011
Vehicle Wash System: Construct an automated vehicle wash system for large vehicles $ 440,000
and provide wash racks for the manual cleaning of large vehicles at the South Gilbert Street $ 920,000
Fundinp FY09 FY10 FY11 FY12 FY13
10 GO Bonds $ - $ 480,000 $ - $ - $ -
11 GO Bonds $ - $ - $ 440,000 $ - $ -
Project Name Fundinp
Rochester Avenue Bridge $ 519,000
Description This project will replace the bridge over Ralston Creek and construct sidewalks $ 519,000
on both sides. Financing includes 80/20 in federal bridge funds.
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grants $ - $ - $ 415,200 $ - $ -
10 GO Bonds $ - $ - $ 103,800 $ - $ -
Project Name Fundinp
Scott Blvd Pavement Overlay - Rochester to Court Street $ 400,000
$ 400,000
Description This project includes an asphalt overlay on Scott Boulevard from
Rochester Avenue to Court Street.
Fundinp FY09 FY10 FY11 FY12 FY13
11 GO Bonds $ - $ - $ 400,000 $ - $ -
Project Name Fundinp
Sycamore Street -Highway 6 to the City Limits $ 3,125,000
Description This project reconstructs Sycamore Street to municipal arterial standards between $ 3,125,000
Burns and the City Limits, including sidewalks. The existing portion between Hwy 6
and Burns is converted from 4 lanes to 3 lanes.
Fundinp FY09 FY10 FY11 FY12 FY13
Development Fees $ - $ 100,000 $ - $ - $ -
10 GO Bonds $ - $ 1,930,000 $ - $ - $ -
11 GO Bonds $ - $ - $ 1,095,000 $ - $ -
C-16
City of Iowa City
Capital Improvement Program
Project Category: STREETS, BRIDGES
and TRAFFIC ENGINEERING
Burlington Street -Traffic Control Improvements
FY2010:
Burlington /Madison Intersection and Median: This project includes the initial phase of
the Burlington Street Median project, with construction from the Iowa River to the Madison
Street intersection. Improvements will address pedestrian and traffic flows associated with
the University of Iowa Rec Center, which is slated for completion during the spring of 2010.
Reconstruction of the intersection includes signal improvements, the addition of left turn
lanes and replacement of water and sewer utilities.
FY2011:
Burlington Street Median: Construction of the Burlington Street Median from Madison to
Gilbert Street, including relocation of water and sewer utilities.
FY2013:
Burlington / Clinton Street Intersection Improvements: Construction of left turn lanes is
recommended at the Clinton and Burlington Street intersection in order to reduce the crash
rate. Inclusive of utility improvements, this project is proposed for completion during
construction of the Hieronymous Square project.
qi a F H
tq .- !
~ u..n ~ ~
m
sawce
___ m
Ye
~ ~i
YA
C
. ~ i. ~
w
I ~ = ~ ~ _ H to c ~ rHi
)
,
--__ I~}
/~ ~
E
I DOl16i ~
6~
~.. w
N
B -- ~ .J_~-
!.- ~
~ '~ ~, .- ___v__
r
.'l=°"'A"~,_T".lam' ~-" - 1
I OA'::
t
TER Vi
I ~
rS.", s__ _
a-'%'
- ~ Q
C
"4"~1 ~-
_- -
~
__~
-
- - ~ Rl,1NGT~lP +3T '
f
~ [y
. ~
W. Burlington Street: ~« Ago
~raroti
.
Iowa River to Clinton St. RR;,~o~o
.
, „
~
Hi, ow
REC cErarE~
nananacHn
Fundinp
State Grants
10 GO Bonds
Water User Fees
11 GO Bonds
Wastewater User Fees
13 GO Bonds
Fundinp
$ 1,140,000
$ 1,860,000
$ 1,140,000
$ 4,140,000
FY09 FY10 FY11 FY12 FY13
$ - $ 400,000 $ - $ - $ -
$ - $ 640,000 $ - $ - $ -
$ - $ 100,000 $ 150,000 $ - $ 100,000
$ - $ - $ 1,410,000 $ - $ -
$ - $ - $ 300,000 $ - $ -
$ - $ - $ - $ 1,040,000
$ - $ 1,140,000 $ 1,860,000 $ - $ 1,140,000
C-17
City of Iowa City
Capital Improvement Program
Project Category: MISC. OTHER PROJECTS
Project Name Fundinp
Enterprise Resource Planning (ERP) System $ 1,060,000
Description $ 1,060,000
This reallocates funding previously designated for selection and implementation of two
systems (Payroll/Human Resources Information System and Utility Billing system) to
purchase an Enterprise Resource Planning (ERP) system to address these needs as
well as core functions, including finance and budgeting.
Fundinp FY09 FY10 FY11 FY12 FY13
08 GO Bonds $ 500,000 $ - $ - $ - $ -
Water User Fees $ 224,000 $ - $ - $ - $ -
Stormwater User Fees $ 56,000 $ - $ - $ - $ -
Wastewater User Fees $ - $ 224,000 $ - $ - $ -
Refuse User Fees $ - $ 56,000 $ - $ - $ -
Project Name Fundinp
Geographic Information System Software $ 927,000
Description Procure and install a geographical information system to provide a $ 927,000
comprehensive, interactive database for City facilities, infrastructure records,
permitting, crime and accident data.
Fundinp FY09 FY10 FY11 FY12 FY13
12 GO Bonds $ - $ - $ - $ 927,000 $ -
Project Name Fundinp
N. Gilbert Street Box Culvert $ 360,000
Description Replace box culvert on North Gilbert Street, south of Kimball Road. $ 360,000
Fundinp FY09 FY10 FY11 FY12 FY13
Stormwater User Fees $ - $ 360,000 $ - $ -
Oakland Cemetery Projects Fundinp
Road Resurfacing: Resurface specified roads within Oakland Cemetery as part of the city- $ 100,000
wide biennial asphalt resurfacing program in FY2010 and FY2012.
Cold Storage Building: Construct a 20' x 40' concrete building with attic trusses to be used $ 40,000
for year-round cold storage.
Infant Columbarium and Sculpture: Construct a 64 niche columbarium in the Innocense $ 85,000
section of Oakland Cemetery to accommodate ash urns for cremated infants. Will also
include a sculpture of a mother and infant in a rocking chair. Purchased niches will offset
capital costs over a period of several years. $ 225,000
Fundinp FY09 FY10 FY11 FY12 FY13
10 GO Bonds $ - $ 175,000 $ - $ - $ -
12 GO Bonds $ - $ - $ - $ 50,000 $ -
C-18
City of Iowa City
Capital Improvement Program
Project Category: Recently Submitted Projects
The following projects reflect recent developments in the capital improvement
program which are not included in the FY2010 - 2013 financial plan. Financing for
these projects has not been secured.
Protect Name Funding
420th Street Industrial Park $ 3,500,000
$ 3, 500, 000
Description This project provides for site grading, street and sewer systems infrastructure as
required for the industrial park on 420th Street.
Fundinp FY09 FY10 FY11 FY12 FY13
Interfund Loan $ 3,500,000 $ - $ - $ - $ -
Wastewater User Fees $ 1,500,000 $ - $ - $ - $ -
Protect Name Fundinp
Airport Equipment Shelter $ 150,000
Description $ 150,000
Snow removal equipment was stored in the old United Hangar, which was removed
as part of the obstruction mitigation program for Runway 7-25. The airport is in need
of staorage for their snow removal equipment.
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grant $ - $ - $ 142,500 $ - $ -
GO Bonds $ - $ - $ 7,500 $ - $ -
Project Name Funding
Airport Runway 12-30: Obstruction Mitigation & Part 77 Removals $ 475,000
Description FAA Flight Procedures has LPV approaches planned for Runway 30 at the Iowa City $ 475,000
Municipal Airport. To establish these approaches, removal of obstructions identified
in the Airport Layout Plan has been identified as needed. Removal of these
obstructions will allow for better minimums for the LPV approach.
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grant $ - $ - $ 451,250 $ - $ -
Road Use Tax $ - $ - $ 23,750 $ - $ -
Protect Name Funding
Dodge Street / I-80 Pedestrian Bridge $ 1,800,000
Description This project is currently #47 on the Unfunded Project list and isrovides for $ 1,800,000
construction of a pedestrian bridge over Interstate 80 at North Dodge Street /
Highway 1 in FY2012 - FY2013.
Fundinp FY09 FY10 FY11 FY12 FY13
Federal Grant $ - $ - $ - $ 1,440,000 $ -
Road Use Tax $ - $ - $ - $ 360,000 $ -
C-19
City of Iowa City
Capital Improvement Program
Project Category: Recently Submitted Projects
(Neighborhood Pedestrian Lighting
This annual project will provide pedestrian-scale lighting in neighborhoods.
un inp FY09 FY10 FY11 FY12 FY13
O Bonds $ - $ 100,000 $ 100,000 $ 100,000 $ 100,000
Rohret Road Improvements -Phoenix Drive to City Limits
The project will reconstruct Rohret Road to urban standards.
undinp FY09 FY10 FY11 FY12 FY13
O Bonds $ - $ - $ - $ - $ 2,150,000
Funding
$ 400, 000
Funding
$ 2,150, 000
C-20
City of Iowa City
Capital Projects by Category
- Scheduled for Completion in FY2009 -
FY2009 Estimated
Amended Final /Total
Project Category Budget Project Cost
Airport:
Runway 7 Design, EA, Extension, FAA #10 $ 92,470 $ 1,347,134
Runway 7 Grading FAA #11 & #12 25,961 174,832
Runway 7 Paving/Lighting FAA #14 938,036 1,758,095
Aviation Commerce Park South 750,000 750,094
Hard Surface Floors Bldgs B & C #91-05-OIOW 6,381 84,794
FAA Runway 7 Grading/Obstr Mitigation #3190 608,143 1,734,620
Runway 7-25 Rehab PCC Full Depth Repl 3-19- 1,751,852 1,819,282
Rehabilitate South T Hangar Taxi Lanes 91-0 9,807 167,094
West Terminal Apron Rehabilitation 44,619 440,601
Rehab North Taxilane Access to N T Hangars 172,553 175,050
UI Hangar Expansion 352,751 400,000
4,752,573 8,851,596
Parkina & Transit:
Parking Access Controls for Capitol, Dubuque & Tower Place 630,000 630,000
Paratransit Vehicles* - 607,254
630,000 1,237,254
Parks, Recreation & Trails:
Waterworks Prairie Park 100,000 299,658
Rec Center Window Replacement 35,000 722,161
Mercer Diamond Lighting/Field #3 Improvement 19,265 300,000
Festival Storage/Sidewalk/Shelter/Restrooms (pre-flood) 15,639 260,000
Napoleon Park Restroom & Concession Building 15,626 300,000
Soccer Field Renovation 100,000 100,000
Soccer Park -Other Improvements 39,292 123,895
Napoleon Softball Field Renovation 180,000 180,000
Mercer Aquatic HVAC Replacement 14,375 57,500
Mercer Pool Filter System Replacement 250,000 250,000
Park Shelters 70,000 70,000
Court Hill Trail 643,027 815,676
Rec Center Roof 263,779 330,515
Wetherby Splash Pad 200,000 200,000
1,946,003 4,009,405
Public Safety:
Police Records & CA Dispatch 1,000,000 1,000,000
Police 2007 JAG Block Grant - 69,754
1,000,000 1,069,754
Public Utilities:
Highlander Lift Station Force Main Replacement 450,000 450,000
Rapid Creek Watershed Sewer Service Study 85,000 85,000
Dewey St Water Main 94,000 165,738
(continued on next page)
C-21
City of Iowa City
Capital Projects by Category
- Scheduled for Completion in FY2009 -
FY2009 Estimated
Amended Final /Total
Project Category Budget Project Cost
Public Utilities (cont.):
Golf View Water Main 60,000 150,023
Laurel/Carrot/Highland Water Mains 68,000 170,342
Hwy 218 Water Main Ext-Morman Trek/Isaac Wa 279,000 726,190
Roosevelt St Water Main -Sheridan to Track 73,760 73,837
1700-1800 Morningside Dr Water Main 176,873 176,873
Koser Ave -Melrose to George/Highland Dr W 213,298 276,792
Highland Court Water Main 165,000 168,884
Water Plant Automatic Source Transfer 140,000 140,000
Sandusky Stormsewer 635,000 635,000
$ 2,439,931 $ 3,218,679
Senior Center:
Senior Center ADA Restrooms Renovation* $ - $ 370,000
Senior Center Roof and Tuckpointing 43,000 74,000
Senior Center Boiler & Chiller Replacement 711,107 772,857
754,107 1,216,857
Streets, Bridges & Traffic Engineerin
College St Streetscape 47,000 110,089
Dubuque/Church Radius Improvement 244,864 279,343
Lower West Branch Road Reconstruction 828,000 3,488,644
Gilbert/Bowery/Prentiss -Left turn lanes o 21,877 1,214,836
1,141,741 5,092,912
Misc. Other Projects:
Salt Storage Building 785,000 836,318
Public Works Facility Site Work 280,000 280,000
Remodel Lower Lever City Hall 152,116 155,000
Remodel City Hall Lobby and Revenue 210,000 210,000
City Attorney Remodel* - 225,450
1,427,116 1,706,768
Grand Total -Projects Scheduled for Completion in FY2009: $ 14,091,471 $ 26,403,225
* Funded in prior years, scheduled for completion in FY2009.
c-22
City of Iowa City
Capital Improvement Program
Recurring Projects
FY2009 - 2013
The following allocations have been made for annual improvement and maintenance of
municipal infrastructure, including public streets, bridges, traffic control and park facilities.
Project Type Primary
Funding
Source
FY09
FY10
FY11
FY12
FY13
Bike /Pedestrian Trails Road Use Tax 50,000 50,000 50,000 50,000 50,000
Brick Street Repair Road Use Tax 20,000 20,000 20,000 20,000 20,000
Bridge Maintenance Road Use Tax 60,000 60,000 60,000 60,000 60,000
City Hall -Other Projects GO Debt 140,104 50,000 50,000 50,000 50,000
Curb Ramps Road Use Tax 50,000 - 50,000 - 50,000
Open Space Land Acquisition General Fund 50,000 - - - -
Overwidth Paving /Sidewalks Road Use Tax 30,000 30,000 30,000 30,000 30,000
Parks Maintenance/Improv. GO Debt 473,849 200,000 200,000 200,000 200,000
Pavement Rehab Road Use Tax 535,000 400,000 400,000 400,000 400,000
Public Art GO Debt 150,735 50,000 50,000 50,000 50,000
Railroad Crossings Road Use Tax 25,000 25,000 25,000 25,000 25,000
Sewer Main Replacement Sewer User Fees 300,000 500,000 500,000 500,000 500,000
Sidewalk Infill GO Debt 100,000 100,000 100,000 100,000 100,000
Street Pavement Marking Road Use Tax 185,000 185,000 185,000 185,000 185,000
Traffic Calming Road Use Tax 30,000 30,000 30,000 30,000 30,000
Traffic Signal GO Debt 120,000 120,000 120,000 120,000 120,000
Water Main Replacement Water User Fees 700,000 600,000 600,000 600,000 600,000
Total -Recurring Projects: 3,019,688 2,420,000 2,470,000 2,420,000 2,470,000
C-23