HomeMy WebLinkAbout1975-12-23 ResolutionRESOLUTION N0. ,75-436
RESOLUTION AUTHORIZING AMEND?IENT TO CONTRACT
DEMOLITION $ SITECLEARANCE 'PROJ.'NO. 4
WHEREAS, the City of Iowa City has awarded a contract to.
Shive-Hattery and Assoc:
said contract entered into on December 8, '1 - and,
1
WHEREAS, it is deemed that certain changes in the plans and
-' -.specifications
are necessary due to construction changes.
--
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF IOWA CITY, IOWA:
That the contract dated Dec. 8, 1971 entered into by
the City of Iowa City and Shive- attery Assoc.
for x]ixxawaa=mwtYl4xxof_administerinv Urban Renewal Demolition
Contracts with -S.A.S..Equipment Co. on Contract No. 4
hp
ampndpd
as follows:
increasing the "not to exceed" figure from $49,000 to $S9,000
and extends the completion time to May 28, 1976, subject to
approval by the DepartmentofHousing and. Urban Development.
2. That the Mayor and City Clerk are hereby, authorized and directed
to execute an amendment to said contract_ incorporating the above amendmenta.
It was moved by, Brandt and seconded by "Neuhauserthat the
- resolution as read be adopted, anduponroll call there were: -
AYES: NAYS: ABSENT:
x
Brandt
X -
Czarnecki
_ x
Davi.dse❑
deProsse -
.X.
xxxejx Neuhauser
Passed and approved this 7.3rdday of Dec. 1.975
,
ATTEST: > L Gc ti-- J: Mayor
City`C rk
SHIVE-HATTERY& ASSOCIATES
j AMENDMENT NUMBER TWO
L 'CITY -UNIVERSITY PROJECT
---IOWA PROJECT R-14.
THIS AGREEMENT, entered into this ` 23rd 'day of
December , 1975, by
and between the CITY OF IOWA CITY, STATE OF IOWA, hereinafter
referred to as
the _'LOCAL PUBLIC AGENCY" and SHIVE-HATTERY AND ASSOCIATES, INC., hereinafter
referred to as the "ENGINEER", WITNESSETH
WHEREAS, the Local Public Agency and the._Engineer
entered into an Agreement
dated December 8, 1971, confirmed by Resoltuion Number
75-20,_ Project R-14,`
covering engineering services to be performed in the Project
R-14, designated in
said:Agreement, -and
WHEREAS, the Local Public Agency has determined that
work is not completed
within the time designated in the original agreement at
no fault of the Engineer
and wishes to retain the services of the Engineer to complete this: work under
the "conditions -of_said Contract Amendment Number], and
this`Amendment Number 2.
NOW, THEREFORE, the parties hereto do mutually agree as follows:
1. Section 11. TIME OF PERFORMANCE
Extended the completion date 150 calendar days to a
total of 1,634 days
or May 28, 1976.
2. Section III. COMPENSATION -
Delete the schedule of hourly rates and insert the
following; schedule of
hourly rates.:
Classification
D011air/Hour
z- Grade "A" Technician
'4.35'
- Grade "B" Technician
6.10
Grade "C" Technician
7.40
Grade "D", Technician
8.70
Grade "E" Technician
11.30
Grade l Engineer,
7.25
Grade 2 Engineer
8.30
Grade 3 Engineer
9.60
Grade 4'Engineer
10.45
Grade,_5 Engineer
12.15
Grade 6 Engineer
13.90
Grade 7 Engineer
16.80
Grade 8 Engineer
19.70
3 -Man Survey Crew
20.15
2 -Man Survey Crew
15.90