HomeMy WebLinkAbout1975-12-23 ResolutionRESOLUTION N0. ,75-436 RESOLUTION AUTHORIZING AMEND?IENT TO CONTRACT DEMOLITION $ SITECLEARANCE 'PROJ.'NO. 4 WHEREAS, the City of Iowa City has awarded a contract to. Shive-Hattery and Assoc: said contract entered into on December 8, '1 - and, 1 WHEREAS, it is deemed that certain changes in the plans and -' -.specifications are necessary due to construction changes. -- NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF IOWA CITY, IOWA: That the contract dated Dec. 8, 1971 entered into by the City of Iowa City and Shive- attery Assoc. for x]ixxawaa=mwtYl4xxof_administerinv Urban Renewal Demolition Contracts with -S.A.S..Equipment Co. on Contract No. 4 hp ampndpd as follows: increasing the "not to exceed" figure from $49,000 to $S9,000 and extends the completion time to May 28, 1976, subject to approval by the DepartmentofHousing and. Urban Development. 2. That the Mayor and City Clerk are hereby, authorized and directed to execute an amendment to said contract_ incorporating the above amendmenta. It was moved by, Brandt and seconded by "Neuhauserthat the - resolution as read be adopted, anduponroll call there were: - AYES: NAYS: ABSENT: x Brandt X - Czarnecki _ x Davi.dse❑ deProsse - .X. xxxejx Neuhauser Passed and approved this 7.3rdday of Dec. 1.975 , ATTEST: > L Gc ti-- J: Mayor City`C rk SHIVE-HATTERY& ASSOCIATES j AMENDMENT NUMBER TWO L 'CITY -UNIVERSITY PROJECT ---IOWA PROJECT R-14. THIS AGREEMENT, entered into this ` 23rd 'day of December , 1975, by and between the CITY OF IOWA CITY, STATE OF IOWA, hereinafter referred to as the _'LOCAL PUBLIC AGENCY" and SHIVE-HATTERY AND ASSOCIATES, INC., hereinafter referred to as the "ENGINEER", WITNESSETH WHEREAS, the Local Public Agency and the._Engineer entered into an Agreement dated December 8, 1971, confirmed by Resoltuion Number 75-20,_ Project R-14,` covering engineering services to be performed in the Project R-14, designated in said:Agreement, -and WHEREAS, the Local Public Agency has determined that work is not completed within the time designated in the original agreement at no fault of the Engineer and wishes to retain the services of the Engineer to complete this: work under the "conditions -of_said Contract Amendment Number], and this`Amendment Number 2. NOW, THEREFORE, the parties hereto do mutually agree as follows: 1. Section 11. TIME OF PERFORMANCE Extended the completion date 150 calendar days to a total of 1,634 days or May 28, 1976. 2. Section III. COMPENSATION - Delete the schedule of hourly rates and insert the following; schedule of hourly rates.: Classification D011air/Hour z- Grade "A" Technician '4.35' - Grade "B" Technician 6.10 Grade "C" Technician 7.40 Grade "D", Technician 8.70 Grade "E" Technician 11.30 Grade l Engineer, 7.25 Grade 2 Engineer 8.30 Grade 3 Engineer 9.60 Grade 4'Engineer 10.45 Grade,_5 Engineer 12.15 Grade 6 Engineer 13.90 Grade 7 Engineer 16.80 Grade 8 Engineer 19.70 3 -Man Survey Crew 20.15 2 -Man Survey Crew 15.90 SHIVE-HATTERY& ASSOCIATES Engineer's Report Engineer's Report Engineer's Report