Loading...
HomeMy WebLinkAbout2009-07-24 Resolution"~ Prepared by: Ron Knoche, City Engineer, 410 E. Washington St., Iowa City, IA 52240, (319)356-5138 RESOLUTION NO. 09-240 RESOLUTION SETTING A PUBLIC HEARING ON JULY 31, 2009 ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATE OF COST FOR THE CONSTRUCTION OF THE 404 HAZARD MITIGATION PROPERTY ACQUISITION DEMOLITIONS PROJECT -CONTRACT 1, DIRECTING CITY CLERK TO PUBLISH NOTICE OF SAID HEARING, AND DIRECTING THE CITY ENGINEER TO PLACE SAID PLANS ON FILE FOR PUBLIC INSPECTION. BE IT RESOLVED BY THE COUNCIL OF THE CITY OF IOWA CITY, IOWA: That a public hearing on the plans, specifications, form of contract, and estimate of cost for the construction of the above-mentioned project is to be held on the 31S' day of July, 2009, at 12:00 p.m. in the Emma J. Harvat Hall, City Hall, Iowa City, Iowa, or if said meeting is cancelled, at the next meeting of the City Council thereafter as posted by the City Clerk. 2. That the City Clerk is hereby authorized and directed to publish. notice of the public hearing for the above-named project in a newspaper published at least once weekly and having a general circulation in the City, not less than four (4) nor more than twenty (20) days before said hearing. 3. That the copy of the plans, specifications, form of contract, and estimate of cost for the construction of the above-named project is hereby ordered placed on file by the City Engineer in the office of the City Clerk for public inspection. Passed and approved this 24th day of ATTEST: CIT LERK ,- ~ --U~ Pwenglreslsetph-404h azmRig alion d emo709. doc City Attorney's Office Resolution No. 09-240 Page 2 It was moved by O'Donnell adopted, and upon roll call there were: AYES: and seconded by NAYS: Champion the Resolution be ABSENT: x Bailey x Champion x Correia x Hayek _~ O'Donnell x Wilburn X Wright wpdata/glossary/resolution-ic.doc