Loading...
HomeMy WebLinkAbout2023-04-04 Correspondence Item Number: 8.a. CITY OF OF IOWA CITY COUNCIL ACTION REPORT April 4, 2023 Memo from City Engineer: Gilbert Street Bridge Replacement Attachments: Gilbert Street Bridge Memo r CITY OF IOWA CITY MEMORANDUM Date: March 30, 2023 To: City Council From: Jason Havel, City Engineer A bid letting was held for the Gilbert Street Bridge Replacement Project at the Iowa Department of Transportation on Tuesday, March 211'. At that bid letting, no bids were received for the Project. City staff is currently working with our consultant to evaluate options for rebidding the project, which is expected to occur later this year. A new bidding process will be initiated once the Project is ready to be rebid. The project generally includes the removal and replacement of the existing four-lane concrete bridge with a new continuous concrete slab bridge over Ralston Creek, designed to meet local and state guidelines for traffic and pedestrians, six-foot sidewalks on both sides, and aesthetic improvements to enhance the neighborhood and views of the creek. Streambank stabilization will occur upstream and downstream of the new bridge with the addition of fabric formed concrete revetment and Class E revetment. Storm sewer will also be upsized from 15" to 30" diameter RCP pipe to provide additional capacity from Court Street to Ralston Creek, where localized flooding during heavy rainstorms has been reported. Water main improvements will also occur immediately north of the bridge to prepare for a future project. In connection with the project, the undergrounding of overhead private utilities within the project corridor will also occur.