NOTICE OF PUBLIC HEARING
NOTICE OF PUBLIC HEARING ON PROJECT MANUAL
AND ESTIMATED COST FOR THE ASPHALT
RESURFACING 2024 PROJECT IN THE CITY OF IOWA
CITY, IOWA
TO ALL TAXPAYERS OF THE CITY OF IOWA CITY, IOWA,
AND TO OTHER INTERESTED PERSONS:
Public notice is hereby given that the City Council of the
City of Iowa City, Iowa, will conduct a public hearing on the
Project Manual, including the plans, specifications, contract,
and estimated cost for the construction of the Asphalt
Resurfacing 2024 in said city at 6:00 p.m. on the 21 St day of
May, 2024, said meeting to be held in the Emma J. Harvat
Hall in the City Hall,410 East Washington Street in said city,
or if said meeting is cancelled, at the next meeting of the City
Council thereafter as posted by the City Clerk.
This project includes asphalt resurfacing on Park Road
between Rocky Shore Drive and Riverside Drive, asphalt
resurfacing on East Benton Street between Gilbert Street
and Van Buren Street, and chip sealing on Taft Avenue.
Said Project Manual and estimated cost are now on file
in the office of the City Clerk in the City Hall in Iowa City,
Iowa, and may be inspected by any interested persons.
Any interested persons may appear at said meeting of
the City Council for the purpose of making objections to and
comments concerning said Project Manual or the cost of
making said improvement.
This notice is given by order of the City Council of
the City of Iowa City, Iowa and as provided by law.
Kellie K. Grace, City Clerk FILED
MAY 0 7 2024
City Clerk
Iowa City, Iowa
Asphalt Resurfacing 2024 Project Page 1 of 1
Item: 10.a
STAFF PRESENTATION TO FOLLOW :
T
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240- 1826
(319) 3S6-5000
(319) 356-5009 FAX
www.icgov.org
� r
CITY OF IOWA CITY
Asphalt Resurfacing
2024 Project
Public Hearing — May 21, 2024
� f
Project Overviewr
CITY OF IOWA CITY
0777,
• Milling of existing asphalt `�_ `` 747.� �" � '
• Patching existing pavement
• Curb and gutter repairs '
• Curb ramp replacements
• Asphalt overlay r
e
f
Project Locations : '° 4
CITY OF IOWA CITY
1. Park Road
• Mill and overlay '
• Riverside Dr to Rocky Shore Dr r
-
FI
r �{ lU - - w r
2. Benton Street
• Mill and overlay
• Gilbert St to Van Buren StLAW 6.4
=
7.
`r • 4+:•
3. Taft Avenue r 'r
• Chip seal
• American Legion Rd to
Herbert Hoover Hwy ,,.
I.
it
� ftz
CostCITY OF IOWA CITY
Estimated Construction Cost $ 1,350,000
Schedule
Bid Opening June 11, 2024
Award Contract June 18, 2024
Construction July to November 2024
it
� ftz
Project Contact CITY OF IOWA CITY
City of Iowa City Engineering Division, Project Engineer:
Marri VanDyke
(319) 356-5044
MVandyke@iowa-city.org
Questions ?
STAFF PRESENTATION CONCLUDED
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(3 19) 356-5000
(319) 356-5009 FAX
www.icgov.org
o.
NOTICE OF PUBLIC HEARING
NOTICE OF PUBLIC HEARING ON PROJECT MANUAL
AND ESTIMATED COST FOR LANDFILL EQUIPMENT
BUILDING REPLACEMENT PROJECT IN THE CITY OF
IOWA CITY, IOWA
TO ALL TAXPAYERS OF THE CITY OF IOWA CITY,
IOWA, AND TO OTHER INTERESTED PERSONS:
Public notice is hereby given that the City Council of the City
of Iowa City, Iowa, will conduct a public hearing on the
Project Manual, including the plans, specifications, contract,
and estimated cost for the construction of the Landfill
Equipment Building Replacement Project in said city at 6:00
p.m. on the 21st day of May, 2024, said meeting to be held
in the Emma J. Harvat Hall in the City Hall, 410 East
Washington Street in said city, or if said meeting is
cancelled, at the next meeting of the City Council thereafter
as posted by the City Clerk.
This project includes construction of a new Pre-Engineered
Metal Building (PEMB) and associated site elements
supporting use and construction of the new building. The
building program consists of the build out of an internal wash
bay, vehicle bays and an office area with support functions
providing a break room, restroom and shower facilities, and
building utility accessory spaces. In addition to the main
PEMB, a bulk water storage facility will be constructed in
proximity to the PEMB constructed of masonry and a metal
roof.
Said Project Manual and estimated cost are now on file in
the office of the City Clerk in the City Hall in Iowa City, Iowa,
and may be inspected by any interested persons.
Any interested persons may appear at said meeting of the
City Council for the purpose of making objections to and
comments concerning said Project Manual or the cost of
making said improvement.
This notice is given by order of the City Council of the City
of Iowa City, Iowa and as provided by law.
Kellie Grace, City Clerk
C) "c 1
r-
f
Item: 10.b
STAFF PRESENTATION TO FOLLOW :
T
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240- 1826
(319) 3S6-5000
(319) 356-5009 FAX
www.icgov.org
landfill Equipment Building
Replacement Project
Public Hearing — 21 May 2024
CITY
r
OF IOWA
UNESCO CITY OF LITERATURE
Project Location ��'�'���
CITY OF IOWA CITY
UNESCO CITY OF LITERATURE
1 F
---- IWV Road
BuildingNew
top
wadingB
r
4
Project Description
CITY OF IOWA CITY
UNESCO CITY OF LITERATURE
111PON• Demolish •
• Renovations Scale House
— New water service
— Backup power for scale
•
• New Utilities — gas, storm sewer, and water main
• Bulk Fill
•
IIIIII�I ISI '� IIII � III NI
111111 � ■ I .,;•. I ���i� '_m�„._� ism ...mi
Y 1 ��fll , j IIII I I.'� 111 LFII®III IIII
Project Timeline
CITY OF '
UNESCO CITY
CITY LITERATURE
• 2015-2016: Landfill was included in the Public Works Master Plan
• 2018: Initial CIP Project established for 2021
• 2021: Hired SCS Engineers to develop Planning Document
— Short Term (0 — 5 years)
— Medium Term (6 — 10 years)
— Long Term (10 — 50 years)
— Best location for new building
• 2023 : Hired Shive-Hattery to design new building
Existing Buildings
CITY F IOWA CITY
UNESCO•
• CITY OF 1!1 IRATURE
Building A — 1989
— 3 Equipment bays
— Staff Breakroom
— Staff Locker Room
1 ,
a y
v
Existing Buildings
CITY F IOWA CITY
UNESCO�
• CITY OF LITERATURE
Building A — 1989
— Shower
— Restroom
l
/ K
CITY OF IOWA CITY
UNESCO CITY OF LITERATURE
1 • • Bays
r
- I� I
CITY OF IOWA CITY
UNESCO CITY OF LITERATURE
1 • • Bays
r
I
� .tel/. � �,� � �•`
I.
i
N
CITY OF IOWA CITY
UNESCO CITY OF LITERATURE
Building
s�
Existing Buildings
LITERATURECITY OF IOWA
UNESCO CITY OF
• Building B — 1992 -
— 3 Equipment bays
r
I'll
_ — tea , ,
- I
_ t ,
01
1114,
� ��
New
Description
Building
CITY OF •
UNESCO CITY OF LITERATURE
East
- --------- --------- ---------
I
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
• 12, 100 Square Feet
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
• 3 Full Equipment Bays
L -J L _J L J L -J L J
1#711�
• One Partial Equipment Bay
rr
-I_-
*
• Interior Wash Bay
L
O p
• Two Offices Z
• Breakroom
I I 1 I I I I I
I I I I I I I I
• Mudroom/Locker Room
1 I I I I I I I
I I I I I I I I
I I I I I I I I
I I I I I I I I
• Restrooms and Shower
I I I I I I I I
I I I I I I I I
West
—N � q mwu raaxrra.v
O
.wai.RW yy
YWc w �x[IDmu�un - • •J .omrtem suw.nxa gg ..
Ixi� MPOST Wa]P
Lv19�3H
dT '
N
LY]IIP0.4TURL1°Cff ROM H
_
. �_ ® ❑
13
o.e t
R1R1G BIP CFF - -
--------- -------
f a:oFn!_oevP orf e
NOT
MOVE
w.xa w�.xccw xrr.a- �==t=3
1 7
IT� I I
EXTERIOR MEZZANINE EL ABIDIN-LO ING NORTH
EAST ELEVATION ���
momaranaaJ �e.aou�c oorn.uerun i �uva..ow�arRc
WEST ELEVATION ®„
w®�
Bulk Fill Station ..:. ®���
CITY OF IOWA CITY
UNESCO CITY OF LITERATURE
3 ,EU�WATER FILL STATION ISOMETRIC VIEW
Strategic Plan
CITY OF •
UNESCO CITY OF LITERATURE
• Economy •
S S s Ensure appropriate infrastructure is in place for •'
Values
future business growth and development. RACIALEQUITV,
SOCIAL JUSTICE,
-x HUMAN RIGHTS
CLIMATE ACTION •
• Facilities, Equipment, and Technology PARTNERSHIPSµo •
ENGAGEMENT
• Invest in the next generation of public facilities and
equipment to create immediate operational
efficiencies, boost workplace safety, health, and Impact
morale, and improve cross-department
collaboration.
w®�
Budget, Costs, and Funding ..:. ®���
CITY OF IOWA CITY
UNESCO CITY OF LITERATURE
Estimated Construction Costs: • 000
Landfill •
Schedule and Contacts
Schedule Contacts
• Bid Opening: 28 March 2023 Joe Welter, PE, PMP, Senior Engineer
• Award: 4 April 2023 Engineering Division
(319) 356-5144
• Start Date: 15 May 2023 joe-welter@iowa-city.org
• Substantial Completion Date: 15 November 2023
• Final Completion Date: 15 May 2024
Special Thanks to Shive-Hattery, our consultant on this Project
END OF SLIDES
STAFF PRESENTATION CONCLUDED
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(3 19) 356-5000
(319) 356-5009 FAX
www.icgov.org
IU, c.
NOTICE OF PUBLIC HEARING
NOTICE OF PUBLIC HEARING ON PROJECT MANUAL
AND ESTIMATED COST FOR THE FIRE STATION 1
APPARATUS BAY SLAB RECONSTRUCTION PROJECT
IN THE CITY OF IOWA CITY, IOWA
TO ALL TAXPAYERS OF THE CITY OF IOWA CITY,
IOWA, AND TO OTHER INTERESTED PERSONS:
Public notice is hereby given that the City Council of the
City of Iowa City, Iowa, will conduct a public hearing on the
Project Manual, including the plans, specifications, contract,
and estimated cost for the construction of the Fire Station 1
Apparatus Bay Slab Reconstruction Project in said city at
6:00 p.m. on the 21st day of May, 2024, said meeting to be
held in the Emma J. Harvat Hall in the City Hall, 410 East
Washington Street in said city, or if said meeting is
cancelled, at the next meeting of the City Council thereafter
as posted by the City Clerk.
The Project will involve the following: removal and
replacement of structural concrete slab, floor drains, sand-
oil separator, sanitary sewer connection and associate
piping and paving. The project is located at Fire Station 1,
410 East Washington Street, Iowa City, IA 52240.
Said Project Manual and estimated cost are now on file
in the office of the City Clerk in the City Hall in Iowa City,
Iowa, and may be inspected by any interested persons.
Any interested persons may appear at said meeting of
the City Council for the purpose of making objections to and
comments concerning said Project Manual or the cost of
making said improvement.
This notice is given by order of the City Council of
the City of Iowa City, Iowa and as provided by law.
Kellie K. Grace, City Clerk
c'
77
c
co
Item: 10.c
STAFF PRESENTATION TO FOLLOW :
T
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240- 1826
(319) 3S6-5000
(319) 356-5009 FAX
www.icgov.org
Fire Station # 1 Apparatus bay
Slab Reconstruction Project
Public Hearing — May 21St, 2024
,r
"WWI VE 4
CITY OF IOWA
UNESCO CITY OF LITERATURE
1 � Ilk !
Improvements
■ Replace front half of
apparatus bay floor.
• Add code required sand/oil .
separator.
■ Connect floor drains to
sanitary sewer.
Cost and Schedule
CITY OF IOWA CITY
UNESCO CITY OF LITERATURE
Estimated Cost of Construction
• $300,000
Schedule
• Bid Opening: June 121h, 2024
• Award : June 181h, 2024
• Start Date : July 81h, 2024
• Completion : August 261h, 2024
STAFF PRESENTATION CONCLUDED
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(3 19) 356-5000
(319) 356-5009 FAX
www.icgov.org
Item: 10.g
STAFF PRESENTATION TO FOLLOW :
T
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240- 1826
(319) 3S6-5000
(319) 356-5009 FAX
www.icgov.org
t
�' 4 ��Yyl y J♦� �?,.,.'k '�
6 ♦ �T e
CITY PARK POOL
QTY OF IOWA CITY P LA N N I N G
``- - City Park Pool
Design Recommendation
1
May 21, 2024
h.
Fr �'
Project Goals
1. Provide community recreation experiences for a wide range of users.
2. Provide increased independent accessibility to all water experiences.
3. Provide shade in several areas of the deck and some in the water areas.
4. Provide design and operating efficiencies that support the City of Iowa City climate action goals.
5. Maximize efficiency of lifeguards.
6. Promote the vision "Every child learns how to swim."
7. Welcome users of all backgrounds with specific attention to facility entry patterns, shower /
changing and restroom design.
8. Evaluate the potential merging of the outdoor park restrooms and year-round recreation
programming space into the swimming pool facility.
9. Limit the construction area generally within the fence line/site plan of the current pool.
What We Learned
Design Considerations
Preserve Focus Avoid
History Learn to Swim Overlapping
Trees Multigenerational Functions
Open Feel Safety
What We Heard
How We Listened . . .
• 1 . . . . Iunity nput Touchpoints
495 Online Idea Representative Electronic Focus
Idea Generation Generation Focus Group Group
Participants Submissions Participants Submissions
566 Feedback Touchpoints 1,582 Survey Responses
Interest LeveIs of Interest in Pool Design
Each Pool Design
— Random Sample r
d
9
• Most respondents indicated they were OC
interested in seeing Pool Design A (84%)
w
0
• There was also strong interest in Pool
Design B (75%)
a
• Only 23% of residents were interested in
seeing Pool Design D
Pool Design A Pool Design B Pool Design C Pool Design D
Pool Design
■Interested Neither Interested or Uninterested ■Uninterested
Option A
is Recommended
FREE FORM ACTIVITY POOL ATTACHED TO
LAP POOL
• (6) 50-meter lap lanes in 31/2 to 5-foot-deep 1)o
water. Zero Depth entry through activity area STAR TA'R
and integrated accessible stair entry.
Attached organically shaped zero-depth entry
activity pool with depth up to 31/2 feet. Includes
current channel and other bubbler/spray I Po L
features.
Separate deep pool with low and high diving
• boards. Integrated accessible stair entry.
• Estimated 495,600 gallons of water volume
(current City Park pool is 751,575 gallons). This
is 140/b less wat, than the current pool r'
• Maximum Bather Load: 975
Noa,H
• Cost Estimate: $18.39 Million ear..
P�
� srx
STAIR
X
POOL
STAIR
x
x
tl
HW
l llll
"On Deck" Lifeguard Estimates
Light Busy
Open Open
Lap Swim Swim Swim
Current Pool 2-4 7 10-12
Option A 2-3 7 10-14
Option A +2 50 M Lanes 2-4 9 12-15
Option A - Separate Pools 2-3 5 10-12
Current project budget developed
2022 Master
from master plan phase = $1o . 8 _ Plan Concept
million
Concept A preliminary cost
estimate = x18 .39 million
Y '
•
F
♦ iF
m
Projected sources to cover gap : 2024 Concept
• Facilities Reserve Fund Plan
Emergency Reserve Fund
• Internal Loans
Example Items to Consider During Design Phase :
1. Detaching leisure and lap pools
2 . Enhancing 25 meter and/or 50 meter lap swimming
options
3 . Replacing current channel with other recreational
features for young swimmers
4 . Adjusting pool deck size and accommodations
5 . Bathhouse and Filter House modifications
6 . Placement of shade structures
Next Steps
COUNCILAPPROVAL
Arta
DESIGN JUNE 2024 • ,
• Schematic Design
• Design Development
• Construction Documents 4
• Permitting ` :~
BIDDING & CONTRACTS • 2025
• Bid Documents Issued to Potential Bidders
• Pre-Bid Meeting & RFI Responses
• Bids Received & Meetings with Potentially Low Bidders
• Bid Award Recommendations
• Owner/ Contractor Contract
F
CONSTRUCTION APRIL 2025 •
GRAND OPENING MAY 2026
V y
V V
Option A
FREE FORM ACTIVITY POOL ATTACHED TO
LAP POOL
• (6) 50-meter lap lanes in 31/2 to 5-foot-deep
water. Zero Depth entry through activity area °°R
and integrated accessible stair entry. sT�R
• Attached organically shaped zero-depth entry ---
activity pool with depth up to 31/2 feet. Includes
current channel and other bubbler/spray
features.
_ ST IR
• Separate deep pool with low and high diving Sr°
boards. Integrated accessible stair entry. /
• Estimated 495,600 gallons of water volume
(current City Park pool is 751,575 gallons). This
is than the current pool. f=
�cN
• Maximum Bather Load: 975
Cost Estimate: $18.39 Million "°"'"
Option 6 I`
3 SEPARATE POOLS
ZERO DEPTH
• Separate pool with (6) 50-meter lap lanes in
31/2 to 5-foot-deep water. Integrated
accessible sloped entry ramp & stair entry.
• Separate zero-depth entry activity pool with x
PO
° L_
depth up to 31/2 feet. Includes play structure I STAIR w_
and other bubbler/spray features.
o,
• Separate deep pool with low and high diving
boards. Integrated accessible stair entry.
Estimated 458,555 gallons of water volume
(current City Park Pool is 751,575 gallons).
This is 39% less water than the current
pool.
• Maximum bather load: 881
• Cost estimate: $17.94 Million low H.
W1._tl
i
Option C _
"L" SHAPED COMBINED LAP & a
ACTIVITY POOL `
oN
o =
• (6) 50-meter lap lanes in 31/2 to 5-foot-deep a g
water. Zero Depth entry through activity area
and integrated accessible stair entry. _ I—
• Attached rectangular zero-depth entry activity
pool with depth up to 31/2 feet. Includes play
structure and other bubbler/spray features.
• Separate deep pool with low and high diving
boards. Integrated accessible stair entry. -
• Estimated 443,700 gallons of water volumeSOL
(current City Park Pool is 751,575 gallons). This a "
is than the current pool.
• Maximum Bather Load: 825
• Cost Estimate: $17.25 Million °
Option D
REPLACE POOL AND WADING POOL -
w
THE SAME AS CURRENT POOL ` + "
• (1) large pool with separate wading pool.
(9) 50-meter lap lanes with (2) "wings" of `ST"'R
shallow water. Lap Lane depth from 31/2 to
13 feet deep. Diving Area within the lap lane o 0
area. Lap Lanes available during limited "lap p
swim" hours. Open for general swim the
remainder of the day.
• Integrated accessible stair entry at large
pool. No zero-depth entry at large pool. C
Small zero-depth entry at wading pool only.
• Estimated 751,575 gallons of water volume.
This is the same as the current pool.
• Maximum Bather Load: 1,082
LOW HIGH
• Cost Estimate: $19.56 Million ;
1t
r 10 z� <o
J
Comparison Factors
OPTION A OPTION B OPTION C OPTION D
FREE FORM ACTIVITY POOL THREE POOLS "L"SHAPED POOL ORIGINAL
COST $18.39 M $17.94 M $17.25 M $19.56 M
BATHER LOAD 975 881 825 1,082
WATER SAVINGS 34% Less 39% Less 41% Less 751,572 gallons
495,600 gallons 458,555 gallons 443,700 gallons No water savings.
SEPARATE PROGRAM AREAS ✓ ✓ It X
ACCESSIBLE ZERO-DEPTH ENTRY ✓ ✓ ✓ X
CHILDREN ACTIVITY AREA ✓ ✓ ✓ X
25 M LAP LANES X X
Shared Open Swim
50 M LAP LANES 6 Lanes 6 Lanes 6 Lanes 8-9 Lanes
(All 6 for 3-4.5 hrs/day) (All 6 for 3-4.5 hrs/day) (All 6 for 3-4.5 hrs/day) (3-4.5 Hours per Day)
50 M LAP LANES AVAILABLE ALL DAY* 2-3 Lanes All Day* 2-3 Lanes All Day* 2-3 Lanes All Day* X
LOW + HIGH DIVING BOARDS ✓ ✓ ✓ ✓
DECK SPACE FOR CHAIRS + SUNBATHING ✓ ✓ ✓ ✓
ADDITIONAL SHADE ✓ ✓ ✓ ✓
MINIMAL TREE IMPACT ✓ ✓ ✓ ✓
DESIGNED WITHIN CURRENT FENCE LINE ✓ ✓ ✓ ✓
NEW BATHHOUSE + MECHANICAL BUILDING ✓ ✓ ✓ ✓
ADMISSIONS
SPRINKLER
lk ff.
LAPRt--SS LOCKERS,
COMMUNITY
WOMEN ECHMEN
ROOM '"C
NURSING 11, L
AN
JAR
STOR
WENDING
Bathhouse Floor Plan R\
FIRSTAID GOADS,
• Bathhouse design is preliminary and is subject to change.
PbOLMANGI IL I
• Bathhouse plan is the same with all four options.
• Pool mechanical and filtration systems move to a separate building.
• Bathhouse community room is 29'-4"x 25'-0" equaling 773 SF(size of N�TH
small classroom). Ad
o Z 4 iff
STAFF PRESENTATION CONCLUDED