Loading...
HomeMy WebLinkAboutMobility Action Steps AdjustedAction• • . ruce Meg drew Shawn Josh Mazahir Fully evaluate the feasibility and funding sources needed for a zero - fare transit system. FY23-24 0 0 0 0 0 0 0 0 Substaintial Progress/Completed Identify additional opportunities for road diets, sidewalk infill, curb cut enhancement, and bike lane installation with a goal of at least two FY23-28 0 0 0 0 0 0 0 0 such projects each construction season. (accessability?) Substaintial Progress/Completed Evaluate with the State of Iowa reverting Dodge and Governor to 2- FY23-28 0 0 0 0 0 0 0 0 way streets Substaintial Progress/Completed Secure federal funding for a relocated transit building that can accommodate future growth in service and electrification of the fleet. FY24-28 0 0 0 0 0 0 0 0 Substaintial Progress/Completed Install additional permanent charging stations for vehicles, bicycles, and electronic devices. FY23-28 Underway 0 0 0 0 0 0 0 0 Explore opportunities to utilize the CRANDIC right-of-way for passenger rail, bus rapid transit, or pedestrian usage. FY23-28 Underway 0 0 0 0 0 0 0 0 Assuming necessary facility accommodations, expand the fleet of electric buses each time a diesel bus is due for replacement and seek FY25-28 0 0 0 0 0 0 0 0 grants that can expedite the conversion. Underway Develop a vision statement for a singular regional transit system with metro Johnson County entities and obtain initial commitments to FY23-25 1.5 study a regional system from each entity's elected officials. Preliminary Planning/Discussion I 1 11 21 1 11 21 2 Consider an on -demand or subsidized voucher system for times and locations in which no fixed route service is available. FY26-28 2.5 1 4 2 1 3 4 1 Fully complete the Safe Streets for All planning process and develop funding strategies to address the most acute roadway safety issues for FY26-28 Am 2.666666667 all users. Not Started 2 S 3 2 1 3 Consider adding or retrofitting bike pathways that are separated from streets or protected utilizing flexible bollards. FY24-28 Preliminary Planning/Discussion 4 3 4 4 4 S 4 Reevaluate the possible benefits of a vehicle and bike-share/scooter FY26-28 4.333333333 1 programs. Not Started S 3 S S 3 S