HomeMy WebLinkAbout2025-01-22 CIP Presentation�Wl ll
„,Y a � Capital Improvement Plan 2025 - 2029
Llli W 1•-1%% LM
CIP Timeline
August 1, 2024
September 13,
2024
September 17,
2024
September 19,
2024
October 1, 2024
October 3, 2024
December 6,
2024
January 8, 2025
CIP request forms
are sent to
departments
CIP request forms
are due to the
Finance Department
Finance Department
produces a
preliminary CIP
report
CIP committee
reviews projects and
amends the
preliminary report
Finance Department
produces an
amended CIP report
CIP committee
reviews the amended
report and makes
final adjustments
Finance Department
compiles the final
CIP report
CIP report is
submitted to City
Council
Budget Information
FUNDING SOURCE SUMMARY
WATER FUND - S14,070,0W
WASTEWATER FUND S10,979.000
TRANSIT i:UND - S3,450,D49
TAX 1NCPIMCNT FINANCING • 52,4 0,ODO
STORMLVATER FLJMD - 53,155,400
ROAD USE TAX FUND - S17,13A,D00
RFVfNUEr 60HDS - S8,500,00U
PARING WND - S7,935,050
OTHER STATE GRANTS • SIZ409,750
GO BONDS GENERAL PURPOSE, S10,955.01W
AIRPOR1 W N D - S 1. 241,804
- . CONTRIBUTIONS & DONATIONS 51,405.000
EQUIPMENT FUND-57,700,000
FACILITY REPLRCIMENT PC SERVE • S21,280.000
FEDERAL GRANTS • S47,938,942
G ENERALL FUND - S3, 711 r900
GO BOND5•ESSENTIAL PURPOSE • S65r298,0W
CATEGORY SUMMARY
W.w'""R- •any 91$,TM"
waFrrWdiS*TrrsinKn S - S77 529,
Trenxit Op-6— - 521,d7-' 0GW
Swmt Operwuom-579A37,001
Project Information
Airport - Si1,747,SIS
Egpipmanc 31Z000.000
incemrOnFRratian S5Wwo
Hre Si T,555,900
Gavemmenl 9uildin$s 53,378_500
Landril . L5,359,2W
Gihro7 - 5e05,0aa
Forking OF,7a1 k.,F - %725.0"
pi-ks W ind m+ ,Kc - 313.+90.OW
ppY[e-S1,47S.W
0 ublk Moo Aami-i $moon-SM.000
Reaeaupn - S7 8.xn0,000
'use Operatror-s - S1,597,5W
seniortenter SS,40WO
5wrmwa[er 57-905,0W
Capital Impro...
w
De... All I Ongoing II Annual II Airport II Fire II Library II Senic
Airport Apron Expansion
A3473 - Airporl
Total Budget: $1,450,000
- 4
1 _
Powered by Esri
� r 1
►r:ilsN
l
CITY OF IOWA CITY
Capital improvement projects involve
the construction, purchase, or
renovation of city facilities or property.
The City annually updates and issues
a five-year capital improvement
proqram (CIP). Additional informati—
LVP Runway 7/25 Pavement Repairs Details All Projects (List)
Capital Improvement Dashboard 2025-2029
Capital Improvements 2025 - 2029
4 . Ar � •
A,
t.,•.. .G •: �l o
� 1W l•�11' :FdGWL
.Ilelroce AYe'"'��
�'.✓I:.s. i' i< L • /'fir a?a :i
Airport Apron Expansion
A3473 -Airport
Total Budget: $1,450,000
Runway 7/25 Pavement Repairs
A3474 - Airport
_,/ Total Budget: $300,000
Runway 12/30 Pavement Repairs
A3475 -Airport
Total Budget: $167,000
Terminal Building Remodel/Reconstruction
/-U'=� f3II�ill
Total Budget: $8,200,000
Department W
Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
E
w
x
YM E! Fdd
W rand• •� I
All
®' 1
CITY OF IOWA CITY
+ UNESCO CITY OF LITERATURE
as _i
Capital improvement projects involve the construction, purchase, or renovation of city facilities
property. The City annually updates and issues a five-year capital improvement program (CIP).
Additional information is available online at https://www.icgov.org/budget.
Select a project to the left to get started.
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
a SIM,. E J[-fWsun St - -
1i11 4 , 9 yR
rye -3 i y
lrrx
E Iowa Ave 6_0;21
jor
. � I Ur,,
l� t ��� Tn'
_�L� 1;V I I;_ �'
rr
Ai"
Senior Center Facility Exterior Improvements
1 [ K1001 - Senior Center
l
Landfill Equipment Building Replacement
L3328-Public Works
The
<N ) �
Center
iow� Cott/JGMxSOM C u.ry �JENIDR C a
)y Esri
11 Senior Center Facility Exterior Improvements
K1001 -Senior Center
Necessary building envelope repairs include rebuilding the stone parapets and cornices, roof
flashing improvements, stone fagade pointing and sealing, painting and sealing exteriorwooc
and refurbishing historic wood framed windows. The Improvements are based on
recommendations from the 2020 Accessibility Study and the 2021 Master Plan.
The total budget is $0.
2 Recreation Center Improvements
R4351 - Parks
Terrell Mill Skate Park Redevelopment
R4372 - Parks
—Details All Projects (List) is
Capital Improvements 2025 - 2029 Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
Landfill Equipment Building Replacement
Senior Center Facility Exterior Improvements L3328 - Public Works
<,� K1001 - Senior Center
A new building will be constructed in addition to assessing overall traffic flow, potential
compost facility changes and potential future methane use infrastructure locations.
Landfill Equipment Building Replacement
L3328 -Public Works
_7Recreation Center Improvements
R4351 - Parks
i
Terrell Mill Skate Park Redevelopment
iw*-A R4372 -Parks
4
The total budget is $0.
Details All Projects (List) 40
Capital Improvements 2025 - 2029
`4
& ,
k '
I
k
!y yh`A
r ..
Senior Center Facility Exterior Improvements
K1001 - Senior Center
Sol
Landfill Equipment Building Replacement
L3328- Public Works
Recreation Center Improvements
1-2 R4351 - Parks
Terrell Mill Skate Park Redevelopment
R4372 - Parks
Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
.� ■ i
33
f•.
rrJ6'k�'T -
Powered by Esri
�v Recreation Center Improvements
R4351 - Parks
FY25 - RALRC Structural Cables, Mercer Pool UV Disinfection System, Mercer HVAC Chiller
Replacement, FY26 Remodel of RALRC former racquetball courts/game room including Gym
HVAC Unit, FY27 RALRC Upstairs ADA Remodel - Restrooms, Kitchen & staff offices; FY28
Mercer/Scanlon Parking Lot Storm/flooding issue
The total budget is $0.
Details All Projects (List)
E13
Capital Improvements 2025 - 2029 Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
0 1W
Senior Center Facility Exterior Improvements
K1001 - Senior Center
Sol
Landfill Equipment Building Replacement
L3328- Public Work,
-7Recreation Center Improvements
R4351 - Parks
i
0. Terrell Mill Skate Park Redevelopment
'k
R4372 - Pdrk,,
Terrell Mill Skate Park Redevelopment
R4372 - Parks
Renovation of skatepark and access paths. Addition of bicycle pump track.
The total budget is $0.
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
- . . - !;E- - a `771r T� I I
Powered by Esri
Terrell Mill Skate Park Redevelopment
R4372 - Parks
Mercer Park Ball Diamond Improvements
R4374 - Parks
College Green Park Playground
R4385 - Parks
Mercer Park Ball Diamond Improvements
R4374 - Parks
Atwo-phase project including field playability enhancements, safety improvements, increased
accessibility, newfence lines, shade structures and complex amenities including the
concession area, entrance and plaza area.
The total budget is $0.
Details All Projects (List) is
Capital Improvements 2025 - 2029
Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
4 -41 -
lr Washington St - _ _ _ - 'f -- -
.
d
pi
Terrell Mill Skate Park Redevelopment
R4372 - Parks
! `" A Mercer Park Ball Diamond Improvements
In R4374 -Parks
College Green Park Playground
R4385 - Parks
College Green Park Playground
R4385 - Parks
This project replaces the playground at College Green Park.
The total budget is $0.
Details All Projects (List)
L7U
Capital Improvements 2025 - 2029
MR4385 - Parks
Court Hill Trail - Beech Street to Scott Boulevard Replacement
I M R4397 - Parks
New Park Development
R4409 - Parks
Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
- I ON �-- - �1�1, I W I %,--
Powered by Esri
v Court Hill Trail - Beech Street to Scott Boulevard Replacement
R4397 - Parks
Replacement of the 1 /4 mile segment of Court Hill Trail from Beech St to Scott Blvd. Current 11
ftwide asphalt trail to be replace with 10 ftwide concrete trail.
The total budget is $0.
2024 Annual Pavement Rehabilitation
i
53824 - Public Works
Details All Projects (List) is
Capital Improvements 2025 - 2029
R4385 - Parks
Court Hill Trail - Beech Street to Scott Boulevard Replacement
R4397 - Parks
New Park Development
R4409 - Parks
Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
.r•
MASTER PLAN
'r
•
Powered
by Esri
�v
New Park Development
R4409 - Parks
Funding to develop new neighborhood parks in emerging or underserved locations. 2024
location at newly acquired parcel along Shannon Dr. to include a park shelter and playground
The total budget is $0.
iii.
2024 Annual Pavement Rehabilitation
53824 - Public Works
Details All Projects (List) is
Capital Improvements 2025 - 2029
M
Court Hill Trail - Beech Street to Scott Boulevard Replacement
R4397 - Parks
New Park Development
R4409 - Parks
2024 Annual Pavement Rehabilitation
62 53824 -Public Works
Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
2024Annual Pavement Rehabilitation
S3824 - Public Works
Annual appropriation for resurfacing roadways and alleys including asphalt, concrete, and
brick.
The total budget is $0.
Details All Projects (List)
Capital Improvements 2025 - 2029
W 1 Dwa Av^
Dubuque Street Reconstruction
53939 - Public Works
Muscatine Avenue Pedestrian Crossing
T3065 -Public Works
Digester Complex Rehabilitation
V3151 -Public Works
Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
Powered by Esri
ev Dubuque Street Reconstruction
53939 - Public Works
This project is part of the downtown streetscape master plan. This project reconstructs
Dubuque Street from Washington to Iowa Avenue. The project also improves sidewalk
pavement, addresses critical utility updates, and enhances the retail environment with
streetscape components. Project also includes alley improvements, lighting, and wayfinding.
The total budget is $0.
Details All Projects (List)
Capital Improvements 2025 - 2029 DepartmentJ!
All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
HYNEE
li:3i1 l FSj.
Muscatine �ie
t• � _ ,rt t k„:1T
• i �� ; j.S Y �Townci�st Lni
N M
Dubuque Street Reconstruction
53939 - Public Works
Muscatine Avenue Pedestrian Crossing
13065 - Public Works
Digester Complex Rehabilitation
■ V3151 -Public Works
Powered by Esri
ev Muscatine Avenue Pedestrian Crossing
T3065 - Public Works
The project includes installation of an accessible mid -block crosswalk with pedestrian refuge
areas on Muscatine Avenue between Wade Street and Williams Street, and construction of
pedestrian circulation areas for the installation of new bus shelters.
The total budget is $0.
Details All Projects (List)
Capital Improvements 2025 - 2029
Dubuque Street Reconstruction
53939 - Public Works
Muscatine Avenue Pedestrian Crossing
13065 - Public Works
Digester Complex Rehabilitation
® V3151 -Public Works
Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
Digester Complex Rehabilitation
V3151 -Public Works
This project will have multiple phases to rehabilitate and improve the digester complex. The
phases will include new process related structures and equipment to mitigate struvite
formation and improve sludge quality. General building and equipment improvements includ,
heat exchanger replacements, digester cover repairs and/or replacement, sludge recirculatior
pumps and piping, electrical, instrumentation and controls upgrades.
The total budget is $0.
Details All Projects (List)
Capital Improvements 2025 - 2029
Digester Complex Rehabilitation
V3151 -Public Works
Wastewater Digester Gas Improvements
V3184-Public Works
Fire Station #2 Roof Replacement
Z4412-Fire
Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
Wastewater Digester Gas Improvements
V3184 - Public Works
This project includes a new process to treat the digester gas to pipeline quality and
infrastructure necessary to transport conditioned gas to the pipeline network. Additionally, a
High Strength Receiving Station will be installed for additional biogas feedstock.
The total budget is $0.
Details All Projects (List) is
Capital Improvements 2025 - 2029
�.W
Digester Complex Rehabilitation
V3151 -Public Works
Wastewater Digester Gas Improvements
V3184-Public Works
Fire Station #2 Roof Replacement
24412 - Fire
Department All Annual Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
k,
Fire Station #2 Roof Replacement
Z4412 - Fire
Design and replace the 2009 pitched standing seam metal roof above common area living
quarters.
The total budget is $0.
Details All Projects (List)
Capital Improvements 2025 - 2029
Fiber Infill & Cameras
14721 - Finance
Total Budget: $500,000
Annual Stormwater Improvements
M3631 -Public Works
Total Budget: $1,200,000
City Hall - Other Projects
R4129 - Parks
�Rv9t Total Budget: $250,000
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
Ell
~,
rI AM
Parks Annual Improvements/Maintenance/ADA
Fiber Infill & Cameras
14721 - Finance
Provides for the expansion of the City's fiber optic network and creation of redundant fiiber
optic rings, placement of cable underground when opportunities arise, expansion to unservec
facilities. ITS always includes our original partners (Johnson County, ICCSD, University of Iowa)
when planning expansion and redundant routes. Also may include additional video cameras.
The total budget is $500,000.
2025
$100,000
2026
$100,000
2027
$100,000
2028
$100,000
2029
$100,000
Details
All Projects (List)
Capital Improvements 2025 - 2029
A
Fiber Infill & Cameras
14721 - Finance
Total Budget: $500,000
Annual Stormwater Improvements
M3631 - Public Works
Total Budget: $1,200,000
City Hall - Other Projects
R4129 - Parks
V1Total Budget: $250,000
Parks Annual Improvements/Maintenance/ADA
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
— as —r=..,-oar
F.
:V - - �-
q;j
Annual Stormwater Improvements
M3631 -Public Works
This is an annual projectthatwill repair and/or improve storm water infrastructure throughout
the City.
The total budget is $1,200,000.
2025 $240,000
2026 $240,000
2027 $240,000
2028 $240,000
2029 $240,000
Details All Projects (List)
Capital Improvements 2025 - 2029
'A
Y a E WashinBmn Sly rn ` ;w. srllMF
Fiber Infill & Cameras
14721 - Finance
Total Budget: $500,000
Annual Stormwater Improvements
M3631 -Public Works
Total Budget: $1,200,000
City Hall - Other Projects
71
- R4129 - Parks
7 Total Budget: $250,000
Parks Annual Improvements/Maintenance/ADA
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
n
3
ri
C City Hall - Other Projects
R4129 - Parks
FY25-27 HVAC System (AHU 2) in mechanical room 2nd floor north court, FY28-29 HVAC
System (AHU-3) on the roof of the 3rd floor north court
The total budget is $250,000.
2025 $50,000
2026 $50,000
2027 $50,000
2028 $50,000
2029 $50,000
Details All Projects (List)
Capital Improvements 2025 - 2029
iota3 budget: b[bu,uuu
Parks Annual Improvements/Maintenance/ADA
R4130 - Parks
Total Budget: $330,000
Intra-city Bike Trails/Bridges
R4206 - Parks
Total Budget: $1,050,000
Annual Recreation Center Improvements
R4330 - Parks
Total Budget: $250,000
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
Parks Annual Improvements/Maintenance/ADA
R4130 - Parks
Annual funding for small capital projects and improvements throughout park system. Priorities
per the 2017 Park Master Plan are: Park Signs, Site Furnishings, Shelter/Facility Maintenance,
Court Maintenance, Partner Opportunities for Small Projects and Emerging Opportunities and
Needs.
The total budget is $330,000.
2026 $50,000
2027 $80,000
2028 $100,000
2029 $100,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
iry E College st
I l a y
E Burlinglnn Sr Highway e -
it J � � � � , •,� 7 -
I �
ya '-wIlll otal budget: I[bu,uuu
Parks Annual Improvements/Maintenance/ADA
R4130 - Parks
Total Budget: $330,000
Intra-city Bike Trails/Bridges
R4206 - Parks
Total Budget: $1,050,000
Annual Recreation Center Improvements
R4330 - Parks
Total Budget: $250,000
Intra-city Bike Trails/Bridges
R4206 - Parks
Annual appropriation for the construction or repair of bike trails. 2024-25 allocated to Iowa
River Corridor Trail Bridges north of Benton St. (2 years of funding combined), 2026: Willow
Creek bridge at West High and Kiwanis Park bridge, 2027: replace 0.5 miles of Willow Creek
Trail south of West High, 2028: replace 0.25 miles of Sycamore GreenwayTrail connection to
Sycamore St., 2029: replace 1 mile of Iowa River Corridor Trail from Napoleon Parkto Hwy 6
including bridge.
The total budget is $1,050,000.
2025 $250,000
2026 $200,000
2027 $200,000
2028 $200,000
2029 $200,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
ram.
64
E College stW.
` v,
Jifflo
AN q M
M 7 . -
— — --
r�i . E $ur6ngfnn 5i � liigliway 1 r
Powered by Esri
iota! L%ciget: lz5u,uuu w Annual Recreation Center Improvements
R4330 - Parks
Parks Annual Improvements/Maintenance/ADA
R4130 - Parks
Total Budget: $330,000
Intra-city Bike Trails/Bridges
R4206 - Parks
Total Budget: $1,050,000
Annual Recreation Center Improvements
R4330 - Parks
Total Budget: $250,000
Renovations and updates to address structural, aesthetic and operational concerns from
facilities studies and long known ADA access issues and improve use of the community
recreation centers for the public. 2026: Resealing Exterior Windows at Mercer/Scanlon, 2027:
Cosmetic improvements to Mercer/Scanlon Lobby, 2028: New master key system for
Mercer/Scanlon & RALRC, 2029: RALRC replace acoustical panels in Gym.
The total budget is $250,000.
2025 $50,000
2026 $50,000
2027 $50,000
2028 $50,000
2029 $50,000
Details All Projects (List) 40
Capital Improvements 2025 - 2029
b
Imperial CL..
Oil
pir— R4330 -Parks
Total Budget: $250,000
Annual Contracted Tree Planting
R4380 - Parks
Total Budget: $150,000
Annual Traffic Signal Projects
53814 - Public Works
Total Budget: $1,500,000
Traffic Calming
53816 -Public Works
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
i l �
+
Powered by Esri
ev Annual Contracted Tree Planting
R4380 - Parks
Annual contracted tree program for additions to street trees, neighborhood infill and park tree
plantings. Areas of emphasis include low income neighborhoods as well as neighborhoods
that lost trees to the Emerald Ash Borer or the 2020 Derecho storm.
The total budget is $150,000.
2025 $30,000
2026 $30,000
2027 $30,000
2028 $30,000
2029 $30,000
Details All Projects (List)
Capital Improvements 2025 - 2029
R4330 - Parks
Total Budget: $250,000
Annual Contracted Tree Planting
R4380 - Parks
Total Budget: $150,000
Annual Traffic Signal Projects
53814 - Public Works
Total Budget: $1,500,000
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
mot.. auana or
3 _ . � � ,f .. � � -� .. _ = I�-•ear, y u"-
n Di
rq—�I
ed by Esri
�v Annual Traffic Signal Projects
53814 - Public Works
This is an annual project to replace or add traffic signals at intersections with outdated traffic
signal equipment or at dangerous and uncontrolled intersections.
The total budget is $1,500,000.
2025 $300,000
2026 $300,000
2027 $300,000
2028 $300,000
2029 $300,000
Traffic Calming
53816 -Public Works Details All Projects (List)
1113�;F,A 40
Capital Improvements 2025 - 2029 DepartmentTIMM
All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
�RflV.
Ishi St
Traffic Calming
53816 - Public Works
Total Budget: $250,000
Curb Ramps-ADA
53822 - Public Works
;' Total Budget: $500,000
Annual Pavement Rehabilitation
53824 - Public Works
f Total Budget: $11,925,500
Details All Projects (List) 40
R'
Powered by Esri
ev Traffic Calming
53816 - Public Works
Annual appropriation for traffic calming projects
The total budget is $250,000.
2025 $50,000
2026 $50,000
2027 $50,000
2028 $50,000
2029 $50,000
Capital Improvements 2025 - 2029
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
Ly•. :nil 6'i . -; rrALJ:': 4p
r An� °' � -
Cr
Ln
Powered by Esri
v Curb Ramps -ADA
53822 - Public Works
Traffic Calming
53816 - Public Works
Total Budget: $250,000
Annual appropriation for the construction of ADA accessible curb ramps.
The total budget is $500,000.
2025
$100,000
Curb Ramps-ADA
2026
$100,000
53822 - Public Works
1-"
2027
$100,000
Total Budget: $500,000
2028
$100,000
.
2029
$100,000
A Annual Pavement Rehabilitation
53824 - Public Works
f Total Budget: $11,925,500
Details All Projects (List)
Capital Improvements 2025 - 2029
Traffic Calming
53816 - Public Works
Total Budget: $250,000
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
Annual Pavement Rehabilitation
53824 - Public Works
Annual appropriation for resurfacing roadways and alleys including asphalt, concrete, and
brick.
The total budget is $11,925,500.
Curb Ramps-ADA
2025
$2,145,100
53822 -Public Works
2026
$2,345,100
2027
$2,345,100
Total Budget: $500,000
2028
$2,545,100
2029
$2,545,100
Annual Pavement Rehabilitation
53824 - Public Works
Total Budget: $11,925,500
Details
All Projects (List)
Capital Improvements 2025 - 2029
M
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
Chr,rch 5[
r
=
wd
y
r i
k f
a
_
J
Curb Ramps-ADA
53822 - Public Works
Total Budget: $500,000
Annual Pavement Rehabilitation
a
53824 - Public Works
Total Budget: $11,925,500
Underground Electrical Facilities
S3826 - Public Works
Total Budget: $1,088,500
Powered by Esri
v Underground Electrical Facilities
53826 - Public Works
This is an annual projectto convertoverhead electrical systems to underground. Dubuque
Street, Riverside Drive, and Gilbert Street are currently the priority corridors for
undergrounding electrical facilities.
The total budget is $1,088,500.
2025 $217,700
2026 $217,700
2027 $217,700
2028 $217,700
2029 $217,700
Details All Projects (List)
Capital Improvements 2025 - 2029
f . +r,
53826 - Public Works
Total Budget: $1,OB8,500
Bicycle Master Plan Implementation
Awal S3827 - Public Works
CITY BYCLE MASTER n Total Budget: $200,000
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
T• \
IOWA CITY BICYCLE MASTER PLAN
Esri
—�v Bicycle Master Plan Implementation
S3827 - Public Works
This is an annual projectto implementthe recommendations of the bicycle master plan.
Improvement projects include construction of bike lanes, bike boulevards, and otherfeatures
that will improve streets to promote equal access and usability for all modes of transportation.
Projects also fund the conversion of 4-lane roads into 3-lane roads in certain areas that are
highly used by all of the various modes of transportation.
The total budget is $200,000.
Annual Bridge Maintenance &Repair
2026
$50,0002027
4A
S3910 - Public Works
$50,000
2028
$50,000
Total Budget: $1,500,000
2029
$50,000
Parking Facility Restoration Repair
—
w�d
T3004-Transportation
Details
All Projects (List)
-- al
Total Rudnet $5500.0n0
Capital Improvements 2025 - 2029 Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
T
53826 - Public Works
Total Budget: $1,OB8,500
Bicycle Master Plan Implementation
53827 - Public Works
(MBICY'CLEMASfER Total Budget: $200,000
Annual Bridge Maintenance & Repair
53910 - Public Works
Total Budget: $1,500,000
Parking Facility Restoration Repair
d T3004-Transportation
1 Total Rudnet $55o0.0n0
v Annual Bridge Maintenance & Repair
53910 - Public Works
This provides for the biennial inspection and preservation of Iowa City's bridges including
major repairs and restoration.
The total budget is $1,500,000.
2025 $300,000
2026 $300,000
2027 $300,000
2028 $300,000
2029 $300,000
Details All Projects (List)
0
Capital Improvements 2025 - 2029
Annual Bridge Maintenance & Repair
53910 - Public Works
Total Budget: $1,500,000
Parking Facility Restoration Repair
® T3004 - Transportation
Total Budget: $5,500,000
Transit Interchange and Bus Stop Improvements
T3059 - Transportation
Total Budget: $125,000
Annual Sewer Main Replacement
vvini %Ai —I, -
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
le
41
ip
41
i
+ ?�
Parking Facility Restoration Repair
T3004 - Transportation
This annual project includes concrete restoration, application of concrete sealants, repair of
control and expansion joints in addition to other parking facility specific repairs.
The total budget is $5,500,000.
2025 $1,000,000
2026 $1,000,000
2027 $1,000,000
2028 $1,250,000
2029 $1,250,000
Details All Projects (List) 40
Capital Improvements 2025 - 2029
Annual Bridge Maintenance & Repair
53910 -Public Works
oral Budget: $1,500,000
-1 Parking Facility Restoration Repair
Oil Vk T3004 - Transportation
1� Total Budget: $5,500,000
Transit Interchange and Bus Stop Improvements
T3059-Transportation
Total Budget: $125,000
Annual Sewer Main Replacement
vvini chir�ni„ri,�
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
I, rt G N N"
C i r
Iowa Ave w =
E -..r
ae r. � � - .A91sr
5ts--
Powered by Esri
ev Transit Interchange and Bus Stop Improvements
T3059 - Transportation
To improve pedestrian safety and traffic flow at the downtown interchange and improve
amenities at transit stops throughout the community as recommended through the 2019-202(
Transit Study planning process. This project will include annual bus stop repairs and amenity
installations including concrete pads, benches, trash containers, lighting, information
amenities, and bike racks.
The total budget is $125,000.
2025 $25,000
2026 $25,000
2027 $25,000
2028 $25,000
2029 $25,000
IDetails All Projects (List) 4
Capital Improvements 2025 - 2029
- ioiai ouuyeL. .p i,joo,uoo
Department All Ongoing Airport Fire Library Senior Center Parks Police Public Works Transportation On the Radar
nnual Sewer Main Replacement
V3101 - Public Works
A
Parking Facility Restoration Repair
This project consists of annual sanitary sewer repairs and preventive maintenance throughout
_
VL' T3004 -Transportation
the sewer system. Work include sewer lining, spot repairs and manhole lining and
..'`_
Total Budget: $5,500,000
g
replacement.
The total budget is $2,500,000.
Transit Interchange and Bus Stop Improvements
2025 $500,0002026
$500,000
73059-Transportation
2027 $500,000
Total Budget: $125,000
2028 $500,000
2029 $500,000
Annual Sewer Main Replacement
V3101 - Public Works
Total Budget: $2,500,000
Details All Projects (List) 40
Capital Improvements 2025 - 2029
1
Airport Apron Expansion
A3473 - Airport
Total Budget: $1,450,000
WRunway 7/25 Pavement Repairs
n A3474 -Airport
ii Odoi Total Budget: $300,000
Runway 12/30 Pavement Repairs
A3475 - Airport
Total Budget: $167,000
Department All Ongoing Annual Fire Library Senior Center Parks Police Public Works Transportation On the Radar
l
1
Powered by Esri
AirportApron Expansion
A3473 - Airport
This project adds additional apron space for aircraft parking, reducing the need for parking or
closed runways for larger jets and high traffic events.
The total budget is $1,450,000.
2027 $800,000
2028 $650,000
Terminal Building Remodel/Reconstruction Details All Projects (List) is
Capital Improvements 2025 - 2029
Airport Apron Expansion
A3473 - Airport
Total Budget: $1,450,000
Runway 7/25 Pavement Repairs
-Airport
Totaotall BBudget: $300,000
Runway 12/30 Pavement Repairs
A3475 - Airport
Total Budget: $167,000
Department All Ongoing Annual Fire Library Senior Center Parks Police Public Works Transportation On the Radar
PP '. r-., low
Runway 7/25 Pavement Repairs
A3474 - Airport
Runwayjoint and crack sealing and pavement repairs to the west half of runway 7/25.
The total budget is $300,000.
2026 $300,000
Terminal Building Remodel/Reconstruction Details All Projects (List) is
Capital Improvements 2025 - 2029
EL
Department All Ongoing Annual Fire Library Senior Center Parks Police Public Works Transportation On the Radar
)y Esri
C, Runway 12/30 Pavement Repairs
Airport Apron Expansion A3475 -Airport
A3473 - Airport
Total Budget: $1,450,000 Runwayjoint and crack sealing and pavement repairs to the west half of runway 12/30.
The total budget is $167,000.
Runway 7/25 Pavement Repairs
A3474-Airport
Total Budget: $300,000
Runway 12/30 Pavement Repairs
A3475 - Ai rpo n
Total Budget: $167,000
2026 $167,000
Terminal Building Remodel/Reconstruction Details All Projects (List) is
Capital Improvements 2025 - 2029
JIB
Runway 12/30 Pavement Repairs
A347 5 - Ai rpo r i
Total Budget: $167,000
Department All Ongoing Annual Fire Library Senior Center Parks Police Public Works Transportation On the Radar
WM%Iff(
Terminal Building Remodel/Reconstruction
Moil"478 - Airport
Total Budget: $8,200,000
" Airport Solar
A3481 -Airport
Total Budget: $465,545
ev Terminal Building Remodel/Reconstruction
A3478 - Airport
This project is to replace the current terminal building with a new building to increase
operational space and accommodate future growth. Phase 1 will consist of a environmental
and historical reviews, design and bidding. Phase 2 will include demolishing the exisitng
building and constructing a new terminal/entrance gateway.
The total budget is $8,200,000.
2027 $700,000
2028 $7,500,000
Details All Projects (List)
Capital Improvements 2025 - 2029
411111111r �iII11111111111111F
Runway 12/30 Pavement Repairs
A347 5 - Ai rpo r i
Total Budget: $167,000
Terminal Building Remodel/Reconstruction
A3478-Airport
Total Budget: $8,200,000
�* Airport Solar
A3481 -Airport
Total Budget: $465,545
Department All Ongoing Annual Fire Library Senior Center Parks Police Public Works Transportation On the Radar
,, -
E9!' +
00
Powered by Esri
ev AirportSolar
A3481 -Airport
Installation of 2 solar arrays to provide a renewable energy source of power for the airfield
lighting and generally, occupied and active buildings.
The total budget is $465,545.
2026 $465,545
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Fire Library Senior Center Parks Police Public Works Transportation On the Radar
A3481 -Airport v Taxiway Maintenance -Seal/Crack Repairs
Total Budget: $465,545 A3482 - Airport
Taxiway Maintenance - Seal/Crack Repairs
A3482-Airport
®- Total Budget: $300,000
HVAC Upgrade
A3483 - Airport
Total Budget: $325,000
Route and seal pavementjoints, perform crack sealing/joint repairs and other related
pavement maintenance to the runway taxiway.
The total budget is $300,000.
2028 $300,000
Fuel Storage Tank Fill Cabinet Replacement
_i� ° A3484 - Airport
Details All Projects (List)
P
Total Budget: $470,000 is
Capital Improvements 2025 - 2029
0
Department All Ongoing Annual Fire Library Senior Center Parks Police Public Works Transportation On the Radar
r-,
�
Arrr
! A3481 -Airport
Total Budget: $465,545
YiK'
Taxiway Maintenance - SeaVCrack Repairs
A3482 - Airport
Total Budget: $300,000
HVAC Upgrade
A3483 -Airport
Total Budget: $325,000
Fuel Storage Tank Fill Cabinet Replacement
P ° A3484 - Airport
Total Budget: $470,000
v HVAC Upgrade
A3483 - Airport
The current HVAC system was redone as part of the 1990s remodel and is 30 years old. This
will begin an evaluation and replacement of the current system as it struggles to keep the
building temperature stable during excessive heat or cold periods. This work will also include
additional buildings in which the airport is acting as the landlord.
The total budget is $325,000.
2025 $325,000
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Fire Library Senior Center Parks Police Public Works Transportation On the Radar
® 1—di ouuy—.Pau,vvu
T Fuel Storage Tank Fill Cabinet Replacement
A34B4 - Airport
Total Budget: $470,000
Wildlife Assessment
A3485 - Airport
Total Budget: $40,000
Tractor Broom
A3486 - Airport
Total Budget: $30,000
�>,+rMW o rc.i .r
" A6
Powered by Esri
Fuel Storage Tank Fill Cabinet Replacement
A3484 - Airport
This project would replace the fuel cabinets at the fuel storage farm. One cabinet exists for
each of the types of fuel (Jet -A, 1001-L) available at the airport. Project could be split into 2
phases for costs.
The total budget is $470,000.
2029 $470,000
Details All Projects (List)
Capital Improvements 2025 - 2029
1—di ouuy—.Pau,vvu
Fuel Storage Tank Fill Cabinet Replacement
A3484 - Airport
Total Budget: $470,000
Wildlife Assessment
A3485 - Airport
Total Budget: $40,000
Tractor Broom
A3486 - Airport
Total Budget: $30,000
Department All Ongoing Annual Fire Library Senior Center Parks Police Public Works Transportation On the Radar
- - wj"
Wildlife Assessment
A3485 - Airport
A wildlife assessment of the airport conducted by the USDA. This project would conduct a
wildlife assessment and provide a report of wildlife encounters at the airport as well as allow
the airport to pursue additional funding streams to manage wildlife encounters. Recently an
elk made its way onto the airfield, but was able to be redirected offthe site. The Airport in the
past has managed deer, fox, coyote, dog, and various bird encounters.
The total budget is $40,000
2025 $40,000
Details All Projects (List)
Capital Improvements 2025 - 2029
® 1—di ouuy—
.�au,vvu
Fuel Storage Tank Fill Cabinet Replacement
E A3484 - Airport
E Total Budget: $470,000
Wildlife Assessment
A3485 - Airport
Total Budget: $40,000
Tractor Broom
A3486 - Airport
J'A Total Budget: $30,000
Department All Ongoing Annual Fire Library Senior Center Parks Police Public Works Transportation On the Radar
:. a
;rt
ar r r
Powered by Esri
v Tractor Broom
A3486 - Airport
Purchase a broom attachment for tractor to aid in runway clearing during snow events and
removal of rocks or other debris which could be a danger to aircraft.
The total budget is $30,000.
2025 $30,000
Details
All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Annual Airport Library Senior Center Parks Police Public Works Transportation On the Radar
� .x1 1�., � !'x
I TLC - -IJOJ
hk
' L
11
Fire Apparatus Replacement Program
Z4406-Fire
Total Budget: $1,850,000
Fire Station #5 Construction and #3 Replacement
14411 - Fire
Total Budget: $15,000,000
Rehab of Sleeping Areas & Alerting System Station'!
Z4413 - Fire
Total Budget: $710,000
I
®
Flooring/Furniture Station 1
Fire Apparatus Replacement Program
Z4406 - Fire
To ensure an operational fleet of frontline and reserve fire response vehicles. The cost of the
nextfire apparatus to be replaced is now costed at $1.8 million.
The total budget is $1,850,000.
2025 $1,850,000
Details All Projects (List) is
Capital Improvements 2025 - 2029
fin. -,}'yam-- � � �—�-�• �
Department All Ongoing Annual Airport Library Senior Center Parks Police Public Works Transportation On the Radar
41
!11r-�- � .... � Jul _. � _a�r" a.'•C�.'a�7'., a� .i�"� C �C � ��\'��. L
Fire Apparatus Replacement Program
Z4406 - Fire
0-6 Total Budget: $1,850,000
Fire Station #5 Construction and #3 Replacement
Z4411 - Fire
Total Budget: $15,000,000
Rehab of Sleeping Areas & Alerting System Station1
Z4413 - Fire
Total Budget: $710,000
® Flooring/Furniture Station 1
ev Fire Station #5 Construction and #3 Replacement
Z4411 - Fire
The project is to construct a new Fire Station #5 and construct a new replacement Fire Station
#3.
The total budget is $15,000,000.
2027 $500,000
2028 $14,500,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Annual Airport Library Senior Center Parks Police Public Works Transportation On the Radar
Y N
1 ra ( � ; `m IR•
` c w � a c7ii r Fw
r. jr, A
v - l
ck I
y
Fire Apparatus Replacement Program
Z4406 - Fire
0-6 Total Budget: $1,850,000
Fire Station #5 Construction and #3 Replacement
Z4411 - Fire
Total Budget: $15,000,000
Rehab of Sleeping Areas & Alerting System Station1
Z4413 - Fire
Total Budget: $710,000
Flooring/Furniture Station 1
r _'-" 9
I
Rehab of Sleeping Areas &Alerting System Station'!
Z4413 - Fire
This project is designed to meet the needs of our current employees at Fire Station 1 to
provide a private sleeping space and to construct non -gender specific shower/restrooms. Ten
sleeping rooms to be constructed of materials that can be repurposed or resold when the fiina
facilities plan is implemented. Project includes the following elements- demolition of existing
non -private sleeping areas, demolition of current gender specific restroom/shower areas,
construction of non -gender specific shower/restroom facilities, installation of ten prefabricate(
sleeping rooms with doors.
The total budget is $710,000
2025 $710,000
I
Details All Projects (List)
Capital Improvements 2025 - 2029
ANIL
" 771
1
V f • � Qi�: I J l� jr
t �F
.. sG
Fire Station #5 Construction and #3 Replacement
Z4411 - Fire
Total Budget: $15,000,000
Rehab of Sleeping Areas & Alerting System Station1
Z4413 - Fire
1-d
Total Budget: $710,000
10 Flooring/Furniture Station 1
Z4414 - Fire
Total Budget: $95,000
Department All Ongoing Annual Airport Library Senior Center Parks Police Public Works Transportation On the Radar
w rrii
Flooring/Furniture Station 1
Z4414 - Fire
The previously budgeted fire station 1 flooring and furniture replacement funds were
reallocated to the fire station 1 sleeping area remodel. The current flooring and office furniture
have exceeded useful life and need to be replaced. The current flooring represents a tripping
hazard in multiple locations while the office furniture is non ergonomic in designed and is in
poor condition.
The total budget is $95,000.
2026 $95,000
Details All Projects (List)
Capital Improvements 2025 - 2029
,fie � •�
rt� 1 1f'N
Department All Ongoing Annual Airport Fire Senior Center Parks Police Public Works Transportation On the Radar
a4 IBM
V
c IS
'p� � VJ • S- � � ��
W Burlington St Fftgh�wa-y �t-1 1 E Bu'rlington'S1 Hil:Uiway'I
Carpet and Furnishings Replacement
Total Budget: $805,000
Carpet and Furnishings Replacement
B4343 - Library
A multi -year projectto replace carpeting and some furnishings in large areas of the Library.
First floor has 31,000 sf of carpet and second floor has 39,000 sf. Problematic in -floor wiring
will be addressed to allow more flexible use and eliminate fixed public computer stations.
Additionally, original Teen Space cabinetry, general -use study tables, and some lounge seatini
will be refurbished or replaced. The project will focus on sustainable, durable materials and
flexible space use.
The total budget is $805,000.
2026 $805,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All H
Library ® Parks Police Public Works Transportation On the Radar
IM
_E lowaA Y �v4yb,,, ,x
si
y:.
s44,
'✓8
— — p^ . - o E Waslilnliloii S!. � "` • � �-. �.� �1�"^ f��f
23*4
oo m V
Senior Center Interior Improvements Project - Phase 1
K1003 -Senior Center
Total Budget: $2,300,000
DASenior Center Interior Improvements - Phase 2
K1004 - SeniorCenter
Total Budget: $2,700,000
y
Powered by Esri
K1003 - Senior Center
Senior Center Interior Improvements Project - Phase 1
The interior building improvement projects will focus on sustainability and life cycle cost
improvements, with a goal to reduce The Center's carbon footprint. The Improvements are
based on recommendations from the 2020 Accessibly Study and the 2021 Master Plan.
Projects include ADA improvements, architectural and cosmetic work, wayfinding and signage
and upgrades to mechanical and electrical systems.
The total budget is $2,300,000.
2026 $2,300,000
Details All Projects (List)
Capital Improvements 2025 - 2029
c
n
s V.
s 'all
Senior Center Interior Improvements Project - Phase 1
K1003 - Senior Center
Total Budget: $2,300,000
Department All Ongoing Annual Airport Fire Library ® Parks Police Public Works Transportation On the Radar
u E Iowa Ave jjs {
Senior Center Interior Improvements - Phase 2
K1004-Senior Center
D Total Budget: $2,700,000
allege S[
Esri
Senior Center Interior Improvements - Phase 2
K1004 - Senior Center
The project entails comprehensive upgrades to the Senior Center, focusing on ADA
compliance, code adherence, and architectural, mechanical, and electrical enhancements
across all floors. Key improvements include a new ADA-accessible vestibule on East
Washington Street, sustainable upgrades to reduce the carbon footprint, and enhancements
guided by the 2020 Accessibility Study and 2021 Master Plan.
The total budget is $2,700,000.
2028 $2,700,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
:Highway.G Eft � 6
— y
Vie, 3 J ` + '1�ir- �`• �1 .•. o�
iA-
IN
TF
IW , . r�'4 � �, ��. ~.,.-. y,Hc3lyw❑ou 8rdri , _" �
- s
Highway 6 Sidepath - Broadway Street to Fairmeadows Boulevard
- R4227 - Parks
Total Budget: $1,700,000
City Park Pool Replacement
R4229 - Parks
Total Budget: $17,500,000
" Palisades Park Development
R4346 - Parks
30
$ Total Budget: $250,000
City Park Shelters & Restroom Replacement
Highway 6 Sidepath - Broadway Street to Fairmeadows Boulevard
R4227 - Parks
Construction of a sidepath extension along Hwy 6 between Broadway St and Fairmeadows
Blvd and along First Ave from the south side of Hwy 6 to Lower Muscatine Rd. This is the final
major segment of the Highay 6 trail.
The total budget is $1,700,000.
2025 $200,000
2026 $1,500,000
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
IL ML�MwiR �"7EJ
Highway b Sidepath - Broadway Street to Fairmeadows Boulevard
124227 - Parks
Total Budget: $1,700,000
City Park Pool Replacement
R4229 - Parks
Total Budget: $17,500,000
Palisades Park Development
R4345 - Parks
30
L Total Budget: $250,000
i
City Park Shelters & Restroom Replacement
.red by Esri
v City Park Pool Replacement
R4229 - Parks
Replace City Park Pool with new outdoor swimming pool and bathhouse.
The total budget is $17,500,000.
2025 $17,500,000
Details All Projects (List)
Capital Improvements 2025 - 2029
a -
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
e!WWW. Westside Park
f Development
a �p \ (\
t� Coronado Ln' .`�• r �.__..-....._-.�.. -.,,
._7L i -
+ r
2017 Iowa City Parks Master Plan Districts Map
Powered by Esri
ev Palisades Park Development
Highway 6 Sidepath - Broadway Street to Fairmeadows Boulevard R4346 - Parks
124227 - Parks
Improvements in soon to be acquired location in the Palisades Subdivisions to include
Total Budget: $1,700,000 playground, shelter, or other park features.
City Park Pool Replacement
R4229 - Parks
Total Budget: $17,500,000
Palisades Park Development
R4346 - Parks
Total Budget: $250,000
City Park Shelters & Restroom Replacement
The total budget is $250,000.
2026 $250,000
Details All Projects (List)
Capital Improvements 2025 - 2029
iota3 budget: IZSU,000
City Park Shelters & Restroom Replacement
R4358 - Parks
Total Budget: $1,450,000
Napoleon Park Softball Fields 5-8 Renovation
®R4362 -Parks
Total Budget: $600,000
Event Facility Improvements
R4381 - Parks
Total Budget: $200,000
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
City Park Shelters & Restroom Replacement
R4358 - Parks
This project will demolish 6 picnic shelters in Lower City Park, 4 shelters in Upper City Park anc
1 restroom in Lower City Park. These will be replaced with 1 large and 4 small shelters in Lowe
City Park, 1 large and 2 small shelters in Upper City Park, 1 new restroom in Lower City Park,
and renovate one existing restroom in Lower City Park. The replacement facilities will be in
locations further from the river as outlined in the Lower City Park Master Plan and in locations
of Upper City Park that account to the tree canopy and new pool layout.
The total budget is $1,450,000.
2026 $1,450,000
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
iota3 budget: IZSU,VUU
City Park Shelters & Restroom Replacement
R4358 - Parks
Total Budget: $1,450,000
Napoleon Park Softball Fields 5-8 Renovation
14362 -Parks
Total Budget: $600,000
Event Facility Improvements
R4381 - Parks
Total Budget: $200,000
ev Napoleon Park Softball Fields 5-8 Renovation
R4362 - Parks
This project will renovate and enhance fields 5-8 at the Napoleon Park Softball Complex. The
project will include the laser grading infields, the addition of drainage tile, new outfield turf,
backstop hoods, and replacement of the path system throughout the park.
The total budget is $600,000.
2026 $600,000
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
iota3 budget: IZSU,VUU
City Park Shelters & Restroom Replacement
R4358 - Parks
Total Budget: $1,450,000
Napoleon Park Softball Fields 5-8 Renovation
_ R4362 - Parks
'otal Budget: $600,000
Event Facility Improvements
R4381 - Parks
Total Budget: $200,000
v Event Facility Improvements
R4381 - Parks
Planned staining of TTRA Lodge and H2O Buildings.
The total budget is $200,000.
2029 $200,000
Details All Projects (List)
17 U
8
Capital Improvements 2025 - 2029
Benton Hills Playground Replacement
R4384 - Parks
Total Budget: $250,000
eR
ADA Elevator Improvements
R4388 - Parks
Total Budget: $675,000
N. Market Square Playground Replacement
R4389 - Parks
Total Budget: $300,000
Reno Street Park Renovations
R4390 - Parks
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
by Esri
ev Benton Hills Playground Replacement
R4384 - Parks
This project replaces the playground at Benton Hill Park. Site constraints keep this as a smaller
piece of equipment.
The total budget is $250,000.
2028 $250,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
I
MW
A,
y. EYyasNinptori St. ++d► '+ y- "[• '*1�1 - - v,
tIT+rff,*� i
Benton Hills Playground Replacement
R4384 - Parks
Total Budget: $250,000
ADA Elevator Improvements
K4388 - Parks
Total Budget: $675,000
N. Market Square Playground Replacement
R4389 - Parks
Total Budget: $300,000
Reno Street Park Renovations
R4390 - Parks
4 WO
IF
Esri
�v ADA Elevator Improvements
R4388 - Parks
Elevators in City Hall, Senior Center, RobertA. Lee Recreation Center need ADA operating
system updates including braille, visible and verbal signals to indicate which elevator car is
available, its direction, and when it has reached a designated floor.
The total budget is $675,000.
2026 $400,000
2027 $275,000
Details All Projects (List)
Capital Improvements 2025 - 2029
e
,n
z
i
rar. w[
Benton Hills Playground Replacement
R4384 - Parks
Total Budget: $250,000
dl�rs7
ADA Elevator Improvements
R4388 - Parks
Total Budget: $675,000
N. Market Square Playground Replacement
R4389 - Parks
Total Budget: $300,000
Reno Street Park Renovations
R4390 - Parks
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
Church 51}r
Powered by Esri
ev N. Market Square Playground Replacement
R4389 - Parks
Replace playground at North Market Square Park. This includes replacing rubber mat surface
with engineered wood fiber. Adjacent elementary school playground has poured in place
surfacing.
The total budget is $300,000.
2026 $300,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Y _ V.
.:#'~ it •; -
t Fafrciiild 5t
i e
Reno Street Park Renovations
R4390 - Parks
Total Budget: $300,000
Westside Park Land Acquisition
R4392 -Parks
Total Budget: $1,225,000
Mercer Shelter Replacement
R4400 -Parks
1
Total Budget: $150,000
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
OFFIRM
ceaar sa�A
3 h +
\ f y\
-- - • A. Powered by Esri
ry Reno Street Park Renovations
R4390 - Parks
Replace playground at Reno Street Park. Add ADA compliant paths, park furnishings and fenc(
to community garden.
The total budget is $300,000.
2029 $300,000
Details All Projects (List) is
Capital Improvements 2025 - 2029
�..7py^�
hdReno Street Park Renovations
R4390 - Parks
Total Budget: $300,000
Westside Park Land Acquisition
R4392 - Parks
Total Budget: $1,225,000
MRMercer Shelter Replacement
R4400 -Parks
Total Budget: $150,000
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
R
Powered by Esri
v Westside Park Land Acquisition
R4392 - Parks
This project is to acquire property in the future growth and annexation areas west of Highway
218 between Rohret Road and Highway 1.
The total budget is $1,225,000.
2025 $1,225,000
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
r y
. a C J�
Bradford -Dr
ter-
� 7
l� l � �� a • T � ! Z
ImReno Street Park Renovations
R4390 - Parks
Total Budget: $300,000
Westside Park Land Acquisition
R4392 - Parks
�. Total Budget: $1,225,000
Mercer Shelter Replacement
R4400 -Parks
Total Budget: $150,000
ev Mercer Shelter Replacement
R4400 - Parks
Replacement of Shelter #2 at Mercer Park.
The total budget is $150,000.
2027 $150,000
Details All Projects (List)
Capital Improvements 2025 - 2029
R4400 - Parks
1 •_
Total Budget: $150,000
Parks Storage Building
R4401 - Parks
Total Budget: $250,000
", Carson Lake Park
R4403 - Parks
Total Budget: $2,700,000
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
ev Parks Storage Building
R4401 - Parks
Construction of 50'x60' pole building with concrete floor for Parks equipment storage.
Location is planned for south end of the soccer park.
The total budget is $250,000.
2029 $250,000
RALRC Structural Cables
R4406 - Parks
Details All Projects (List)
Tntal Budnet .$,2.50 000 40
Capital Improvements 2025 - 2029
R4400 - Parks
1
Total Budget: $150,000
Parks Storage Building
R4401 - Parks
s
Total Budget: $250,000
"�, Carson Lake Park
R4403 - Parks
Total Budget: $2,700,000
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
-r:• - Rare cr ['�i sceca, Tnomugnrares
in
1
,a t•
�2e 4 r
��� �� ■r
I a
I
I•-ta'W oi
1 ' moo
v Carson Lake Park
R4403 - Parks
3
_ �IJ
rywgnwav� ./
SOUTHWEST PLANNING DISTRICT
Rahret South Subarea
Future Lend Use Map
October 2022
This project will construction a new lake west of Highway 218, south of Rohret Road.
The total budget is $2,700,000.
2025 $250,000
2026 $2,450,000
RALRC Structural Cables
R4406 - Parks
Details All Projects (List)
Tntal Budnet .$,2.50 000 is
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
,. -
777
w� E Caflege St I —
PT. 41
F� m —
�t�e E Buriingtar,it 1 Highway 7
1
1 a Carson Lake Park
K4403 - Parks
Total Budget: $2,700,000
RALRC Structural Cables
R4406 - Parks
Total Budget: $250,000
Mercer & RALRC HVAC Replacement
R4407 - Parks
• - Total Budget: $200,000
Columbarium Construction/Expansion
ILIL... Dnnno D-,I,-
Poweredby Esri
w RALRC Structural Cables
R4406 - Parks
Replace aging post construction structural cables on RALRC pool area to maintain structural
integrity of the building.
The total budget is $250,000.
2027 $250,000
Details All Projects (List)
Capital Improvements 2025 - 2029
y
43
0 5t 4 rI
Carson Lake Park
Ii R4403 - Parks
Total Budget: $2,700,000
RALRC Structural Cables
R4405 - Parks
Total Budget: $250,000
Mercer & RALRC HVAC Replacement
R4407 -Parks
- Total Budget: $200,000
Columbarium Construction/Expansion
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
v Mercer & RALRC HVAC Replacement
R4407 - Parks
Replacement of Mercer/Scanlon Gym/Entry HVAC Chiller and replacement of 2 rooftop HVA(
units for RALRC Gym.
The total budget is $200,000.
2025 $200,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Il F:a Vi�Viilri �t i :.)
Columbarium Construction/Expansion
R4408 Parks
"4
Total Budget: $720,000
RALRC Roof
R4412 - Parks
Total Budget: $905,000
UV Disinfectant System for Pools
R4413 - Parks
Total Budget: $150,000
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
y
Powered by
v Columbarium Construction/Expansion
R4408 - Parks
Design and construction of a new Columbarium structure for single and double cremation
niches. The scope of this project may or may not include the expansion of the current
Forestview Columbarium.
The total budget is $720,000.
2026 $720,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
E College St
tea' w.1• .-a
10
44 A m G 1I
E Burliriulon St I Highway t _ 9 y
.i' � �'k+ � =7 •^--•• - _ ter^ � ' - � � ,.
Powered by Esri4
iftColumbarium Construction/Expansion
R4408 Parks
Total Budget: $720,000
RALRC Roof
R4412 - Parks
Total Budget: $905,000
UV Disinfectant System for Pools
R4413 - Parks
Total Budget: $150,000
RALRC Roof
R4412 - Parks
Replace or repair the RALRC roof.
The total budget is $905,000.
2026 $905,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
I AIR.., _ 1.
�. • ,� �, 7 .. E College 5t�
3
- [ f3ur�ro rlinn St! Highway 7
- • O �
n. t
o.
-.vA'
16 Columbarium Construction/Expansion
R4408 Parks
Total Budget: $720,000
RALRC Roof
R4412 - Parks
Total Budget: $905,000
10 UV Disinfectant System for Pools
R4413 - Parks
Total Budget: $150,000
v UV Disinfectant System for Pools
R4413 - Parks
Add ultra -violet water disinfection system to Mercer and RALRC indoor pools.
The total budget is $150,000.
2028 $150,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Tr T—
R4413 - Parks
Total Budget: $150,000
Mercer Scanlon Tuckpointing
R4414 - Parks
Total Budget: $700,000
Mercer Scanlon Roof
R4415 - Parks
Total Budget: $300,000
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
,
«�WIN
Mercer Scanlon Tuckpointing
R4414 - Parks
Repair masonry tuck pointing on Mercer -Scanlon Builidings.
The total budget is $700,000.
2029 $700,000
Office Addition - Police Investigations
R4416 - Parks Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
1Aik�1 _
-Fa ford or.
i
r -
In
� • 'fir
R4413 - Parks
Total Budget: $150,000
Mercer Scanlon Tuckpointing
R4414 - Parks
Total Budget: $700,000
Mercer Scanlon Roof
R4415 - Parks
Total Budget: $300,000
Office Addition - Police Investigations
R4416-Parks r^^
v Mercer Scanlon Roof
R4415 - Parks
Replacement of the roof over the Mercer -Scanlon lobby, locker rooms and meeting rooms.
The total budget is $300,000.
2028 $300,000
Details All Projects (List)
Capital Improvements 2025 - 2029
rtk--ii -A
� f
Office Addition - Police Investigations
R4416 - Parks
Total Budget: $63,500
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
LNCity Hall Fire Alarm and Strobe Upgrade
R4417 - Parks
Total Budget S75,000
Harlocke Hill Park Playground Replacement
3 R4418 - Parks
Total Budget: $75,000
Park Paving Improvements
R4419 - Parks
v Office Addition - Police Investigations
R4416 - Parks
Repurposing the former secretary entryway area in Police Investigations to an enclosed office.
The total budget is $63,500.
2025 $63,500
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
_iL
Fi
.N.�
r`[
Imi-
cc
if
J
7:
E Colle a 5r"
Office Addition - Police Investigations
R4416 - Parks
Total Budget: $63,500
City Hall Fire Alarm and Strobe Upgrade
R4417 - Parks
Total Budget- $75,000
Harlocke Hill Park Playground Replacement
3 R4418 - Parks
Total Budget: $75,000
Park Paving Improvements
R4419 - Parks
R4417 - Parks
City Hall currently has several eras of fire alarm systems that are designed to connect and alert
the full building when an emergency is detected. Upon reports and subsequent investigation
following the August 12, 2024 building evacuation, triggered by a fault sensor, no strobes
were observed in the northwest portion of the basement, 1A, 1, 3, and Floors 1 & 2 of the
police department and fire department. Additionally, no dialer is present.
The total budget is $75,000.
2025 $75,000
Details All Projects (List) 40
Capital Improvements 2025 - 2029
Office Addition - Police Investigations
R4416 - Parks
Total Budget: $63,500
City Hall Fire Alarm and Strobe Upgrade
R4417 - Parks
Total Budq.ei- S75,000
Harlocke Hill Park Playground Replacement
3 R4418 - Parks
Total Budget: $75,000
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
�I
Powered by Esri
ev Harlocke Hill Park Playground Replacement
R4418 - Parks
Harlocke Hill Park playground is one fo the oldest playgrounds in the park system and is due
for replacement.
The total budget is $75,000.
2029 $75,000
Park Paving Improvements ,
Details All Projects (List)
R4419 - Parks 40
Capital Improvements 2025 - 2029
Harlocke Hill Park Playground Replacement
Aq R4418 -Parks
Total Budget: $75,000
Park Paving Improvements
R4419 - Parks
Total Budget: $730,000
01 Ped Mall Fountain Replacement
R4420 - Parks
Total Budget: $500,000
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
! ET. Cil, •SAS •. ._,
ev Park Paving Improvements
R4419 - Parks
Parking lot and road overlays within the parks. 2026: Mercer Athletic; 2029: Scott Park
The total budget is $730,000.
2026 $380,000
2029 $350,000
Details All Projects (List)
Capital Improvements 2025 - 2029
r
W Washington St, _ - - • •..
r_r� �� I .! _' t ."'fir •.
Sr
7 _
Library Piz:_ M
H(II LL
1 l6i r�
r-ri Burlingron St! Highway 1
- -S 7-
Harlocke Hill Park Playground Replacement
Wqq R4418 - Parks
Total Budget: $75,000
Park Paving Improvements
R4419 - Parks
Total Budget: $730,000
Ped Mall Fountain Replacement
R4420 - Parks
Total Budget: $500,000
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
L `
... 1.I to • � � ttt- 1 .� - ,. ,.�..�,
v Ped Mall Fountain Replacement
R4420 - Parks
Replace Ped Mall Fountain granite pavers with stamped concrete, rebuild or replace fountain
operating and disinfecting systems.
The total budget is $500,000.
2026 $500,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Park Paving Improvements
R4419 - Parks
Total Budget: $730,000
ifPed Mall Fountain Replacement
R4420 - Parks
Total Budget: $500,000
Hwy 1/6/Riverside Trail
R4421 - Parks
Total Budget: $750,000
Department All Ongoing Annual Airport Fire Library Senior Center Police Public Works Transportation On the Radar
IN W .M,
INw�e
Powered by Esri
v Hwy 1/6/Riverside Trail
R4421 - Parks
This project constructs approximately 2,800 feet of 10' wide trail along Hwy1 /6 generally from
Gilbert Street to Orchard Street with pedestrian signals at the intersection of Riverside Drive. h
also includes approximately 250 feet of sidewalk connecting the existing sidewalks on
Riverside Drive north of Hwy 1/6 to the new trail south of Hwy 1 /6. The project also includes
the addition of an ADA crosswalk on the west leg of Hwy 6 at Gilbert Street. This is a final
missing gap in the Hwy 1 /6 Trail system and completes this 20+ year project.
The total budget is $750,000.
2028 $750,000
Details All Projects (List)
Capital Improvements 2025 - 2029
r'
tM
4
M
Department All Ongoing Annual Airport Fire Library Senior Center Parks Public Works Transportation On the Radar
0
*..
_ w
..Y. E Cullepa St,
Body Cameras & In -Car Video Systems
Y4446-Police
Total Budget: $125,000
Animal Shelter Standby Generator
Y4447 - Police
Total Budget: $100,000
Animal Shelter -Training Annex
+{� Y4449-Police
Total Budget: $1,250,000
E fovea A
It
Yyi
0
'_4y, O ` -17 a
pin A�, -41-10L A _W%1& �i..
Powered by Esri
Body Cameras & In -Car Video Systems
Y4446 - Police
RFP for acquisition and purchase of new body -worn and in -car camera hardware and software
to replace the current system that is at end -of -life. A new cloud -based system would also
provide digital evidence management that was the basis of the original Y4446 project.
The total budget is $125,000.
2025 $125,000
Details All Projects (List) is
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Parks Public Works Transportation On the Radar
Powered by Esri
ev Animal Shelter Standby Generator
Body Cameras & In-Corvideo Systems Y4447 - Police
Y4446-Police
Total Budget: $125,000 This project provides a natural gas generator at the Animal Shelter which would be able to
provide a safe and comfortable environment for the animals during any kind of power outage,
The total budget is $100,000.
Animal Shelter Standby Generator
Y4447 - Police 2025 $100,000
Total Budget: $100,000
Animal Shelter -Training Annex
Y4449-Police
Total Budget: $1,250,000
Details All Projects (List) is
Capital Improvements 2025 - 2029
f--
Body Cameras & In -Car Video Systems
Y4446-Police
Total Budget: $125,000
Animal Shelter Standby Generator
Y4447 - Police
Total Budget: $100,000
Animal Shelter -Training Annex
Y4449-Police
Total Budget: $1,250,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Public Works Transportation On the Radar
i
Esri
ev Animal Shelter -Training Annex
Y4449 - Police
The Friends of the Animal Center Foundation have confirmed they will provide funds to add a
dog training annex to the existing Animal Care and Adoption Center to aid in the City's
performance of training dogs housed at the facility, as well as providing the Shelter multi -use
space.
The total budget is $1,250,000.
2025 $170,000
2026 $1,080,000
Details All Projects (List) 40
Capital Improvements 2025 - 2029
10 Compost Pad Improvements & Expansion
L3333 - Public Works
Total Budget: $4,000,000
19 Landfill Dual Extraction System Expansion
L3335 - Public Works
Total Budget: $689,250
'7MI Site Flow Improvements
I_ ■
L3348 - Public Works
Total Budget: $50,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
Compost Pad Improvements & Expansion
L3333 - Public Works
The landfill six -acre compost pad will be backfilled in multiple areas to fill large pits. An asphal
layer will be added to cover the rock and a seal coat will be applied to prevent liquids from
seeping. A seal coat will be added to cover the raw millings on the eastern half of the pad that
has not been sealed in the past.
The total budget is $4,000,000
2025 $4,000,000
J Landfill Future Cell - Northeast Expansion Details All Projects (List) is
Capital Improvements 2025 - 2029
Compost Pad Improvements & Expansion
L3333 - Public Works
Total Budget: $4,000,000
10 Landfill Dual Extraction System Expansion
L3335 - Public Works
Total Budget: $689,250
Site Flow Improvements
a L3343 - Public Works
_ Total Budget: $50,000
i Landfill Future Cell - Northeast Expansion
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
Landfill Dual Extraction System Expansion
L3335 - Public Works
This project includes the design and installation of an expansion of the Landfill Dual E tractior
System, which was originally constructed in 2018. This project will expand the current system
(13 pneumatic pumps and 4 solar pumps) to include pumps in 8-9 additional wells and add
SCADA monitoring to the proposed new and existing pumps.
The total budget is $689,250.
2027 $689,250
Details All Projects (List)
Capital Improvements 2025 - 2029
Compost Pad Improvements & Expansion
L3333 - Public Works
Total Budget: $4,000,000
Landfill Dual Extraction System Expansion
L3335 - Public Works
Total Budget: $689,250
c Site Flow Improvements
Jy L3348 -Public Works
Total Budget: $50,000
i Landfill Future Cell - Northeast Expansion
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
DN ED)
..� ----, • • BDLN WATER FlLL STATION
• � NEW imitoP'DUi LF iNG
_ NE W GCAL£ 1
I STORM WATER C.0,NTROLS23
Y � 1 E PANSION AREA , I — I COMPOST
I ARE4
uti
_ �' PAVING WIItAfY'13
I.
—INGAREMAINS �- �- T- A
% - -: 9UILOINGe OEMOL15NE0 F 06
-- ---- ---- ---- --_WXRE ENEO —LINED) I
A I
FY33 I 1
I — ACANE4 \\ ,FMLUNED)
Powered by Esri
v Site Flow Improvements
L3348 - Public Works
Site traffic flow improvements including improved wayfinding signage and the relocation of
the oil shed for increased efficiency in traffic flow.
The total budget is $50,000.
2026 $50,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Landfill Future Cell - Northeast Expansion
L3349 - Pubiic Works
Total Budget: $1,050,000
Cell FY23 Horizontal Gas Collectors
L3350 - Public Works
y Total Budget: $570,000
Refuse Truck
L3351 -Public Works
Total Budget: $400,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
ev Landfill Future Cell -Northeast Expansion
L3349 - Public Works
The project consists of designing and building the next landfill cell in the Northeast Expansion
Area of the site. A preliminary project will be needed in advance of the cell construction to
move haul roads, groundwater wells, and other site features.
The total budget is $1,050,000.
2028 $75,000
2029 $975,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Landfill Future Cell - Northeast Expansion
L3349 - Pubiic Works
Total Budget: $1,050,000
r Cell FY23 Horizontal Gas Collectors
L3350 - Public Works
�! Total Budget: $570,000
Refuse Truck
L3351 - Public Works
Total Budget: $400,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
r.
3rw
y
71
Powered by Esri
v Cell FY23 Horizontal Gas Collectors
L3350 - Public Works
This project adds horizontal gas collection wells to the current landfill cell, Cell FY23. It makes
sense to install these collectors in the second half to the last third of the life expectancy of the
cell. Given the estimated cell lifespan (nine to eleven years), these collectors should be
installed around 2028.
The total budget is $570,000.
2028 $70,000
2029 $500,000
Details All Projects (List)
Capital Improvements 2025 - 2029
I _ m
e z s�v
4
- R
r -
Landfill Future Cell - Northeast Expansion
1ML3349 - Pubiic Works
Total Budget: $1,050,000
Cell FY23 Horizontal Gas Collectors
L3350 - Public Works
ATM„ Total Budget: $570,000
er
' Refuse Truck
L3351 -Public Works
Total Budget: $400,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
Who
Refuse Truck
L3351 -Public Works
This project adds a fully automated truck to the Refuse collections fleet which will allow for an
additional route to meet expanded demand.
The total budget is $400,000.
2028 $400,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Trash Truck Upgrade
L3352 - Public Works
Total Budget: $200,000
Recycling Transfer Station
1 3353 -Public Works
Total Budget: $997,500
Rundell Street Pump Station Vault Modifications
M3634 - Public Works
Total Budget: $655,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
ev Trash Truck Upgrade
L3352 - Public Works
This project upgrades an existing rear -load packer truck for a new fully automated trash truck.
The increased efficiency will help bridge the expanded service demand prior to an additional
collection route being added.
The total budget is $200,000.
2025 $200,000
River Street Storm Sewer Improvements
M3635 - Public Works Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Transportation On the Radar
Trash Truck Upgrade
L3352 - Public Works
Total Budget: $200,000
Recycling Transfer Station
1.3353 -Public Works
= Total Budget: $997,500
Rundell Street Pump Station Vault Modifications
M3634 - Public Works
Total Budget: $655,000
v Recycling Transfer Station
L3353 - Public Works
This project provides a hoop building for curbside and drop-off recycling storage and
equipment to load and transport the materials to the materials recovery facility. "Other"
includes a compactor with three receiver bins, a skid steer to load the compactor, a roll -off
truck and a pull -behind "pup" trailer to haul materials to the materials recovery facility.
The total budget is $997,500.
2025 $100,000
2027 $897,500
River Street Storm Sewer Improvements
M3635 - Public Works Details All Projects (List)
40
Capital Improvements 2025 - 2029
3 _ ,ra r
c
7 r = ca
Trash Truck Upgrade
L3352 - Public Works
Total Budget: $200,000
Recycling Transfer Station
3353 -Public Works
.otal Budget: $997,500
inRundell Street Pump Station Vault Modifications
M3634 - Public Works
Total Budget: $655,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
T '7 R" ...
4.
• . 2f-
3wvered by E
sri
C Rundell Street Pump Station Vault Modifications
M3634 - Public Works
The project will reconstruct the top of the vault and modify the hatches in order to
accommodate ADA compliant sidewalks. It will also include replacement of the trash rack
screen, control panel and modifications to the generator electrical connection.
The total budget is $655,000.
2025 $655,000
River Street Storm Sewer Improvements
M3635 - Public Works Details All Projects (List)
Capital Improvements 2025 - 2029
River Street Storm Sewer Improvements
M3635 - Public Works
I'm Total Budget: $990,000
Peterson Street Storm Sewer Improvements
M3637 - Public Works
Total Budget: $60,000
Equipment Maintenance Facility Replacement
P3953 - Public Works
Total Budget: $12,000,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
River Street Storm Sewer Improvements
M3635 - Public Works
This project will replace existing open ditch drainage with storm sewer pipe along the west
side of River Street, north of the lower Lincoln School parking lot. A five -foot -wide compliant
sidewalk will replace the existing walk.
The total budget is $990,000.
2025 $140,000
2026 $850,000
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Transportation On the Radar
River Street Storm Sewer Improvements
M3635 - Public Works
Total Budget: $990,000
Peterson Street Storm Sewer Improvements
M3637 - Public Works
Total Budget: $60,000
by Esri
ev Peterson Street Storm Sewer Improvements
M3637 - Public Works
This project will replace approximately 430 linear feet of corrugated metal pipe with reinforces
concrete pipe.
The total budget is $60,000.
2025 $60,000
Equipment Maintenance Facility Replacement
P3953 - Public Works
Total Budget: $12,000,000
Details All Projects (List) 40
Capital Improvements 2025 - 2029
River Street Storm Sewer Improvements
M3635 - Public Works
Total Budget: $990,000
'- it 4k ` Peterson Street Storm Sewer Improvements
M3637 - Public Works
Total Budget: $60,000
` Equipment Maintenance Facility Replacement
P3953 - Public Works
Total Budget: $12,000,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
i
E.,
_ / Mr'clrs!�r Blvd
v Equipment Maintenance Facility Replacement
P3953 - Public Works
Construct a new Equipment Maintenance Facility on the public works campus to replace the
old, dated facility at the corner of Highways 1 & 6.
The total budget is $12,000,000.
2026 $12,000,000
Details All Projects (List)
Capital Improvements 2025 - 2029
EE[T61.1 Budget: $60,000
s �) Equipment Maintenance Facility Replacement
13953 - Public Works
Total Budget: $12,000,000
Entrance Way Improvements
P3988 - Public Works
Total Budget: $300,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
1]
v Entrance Way Improvements
P3988 - Public Works
This project improves the landscaping at the City entrance ways on North Dubuque Street anc
North Dodge Street including entrance signage on North Dubuque.
The total budget is $300,000.
2028 $300,000
Court Street Reconstruction
S3946 - Public Works
Total Budget: $9,100,000 Details All Projects (List) 40
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Transportation On the Radar ,��, a o`
�F:� dA l._--. h Y -.. ._ .•�. - - -' _ •• - ��c YJ��aA.CI
PC
ITT -r-air
^ •}i, 4g�J� � � . _ rrF - i • . _ ter! '••. - �. -- � +• � � - _
" w I ~ •^\
Total Budget: $60,000
Equipment Maintenance Facility Replacement
P3953 - Public Works
Total Budget: $12,000,000
Entrance Way Improvements
P3988 - Public Works
Total Budget: $300,000
Court Street Reconstruction
S3946 - Public Works
Total Budget: $9,100,000
v Court Street Reconstruction
53946 - Public Works
This project will reconstruct Court Street from Muscatine Avenue to 1 st Avenue.
The total budget is $9,100,000.
2025 $4,550,000
2026 $4,550,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
y
•Fairchild si �'' ` NW
PF F 'I
r t7, 4
alb 7
. +�..rf.
Gavvi'!-'(w tit
A�
XF
l
Dodge Street Reconstruction - Governor Street to Burlington Street
S3952 - Public Works
Total Budget: $20,100,000
Market Street & Jefferson Street Two -Way Conversion
53953 - Public Works
Total Budget: $5,000,000
N. Gilbert Street Reconstruction
53955 - Public Works
Total Budget: $2,500,000
Taft Avenue Reconstruct -American Legion to Lower West Branch
._._ 4, atlwt+L _ —
_
Powered by Esri
Dodge Street Reconstruction - Governor Street to Burlington Street
53952 - Public Works
Reconstruction of Dodge Street from Governor Street to Burlington Street. This will be a joint
project with the DOT, and will include new street pavement, sidewalk, utility improvements an[
other associated work.
The total budget is $20,100,000.
2026 $150,000
2027 $19,950,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
.[rkr:_AF4
AIL
113
-oil
fly-:f•--;;��- z" ��.. 1 �a�g.. �•_ ...��. - y.
_ E JeRerson 51• - ��OM
MMW
Market St
i tea-••. ►w- ;"4'.1�: pti rar ' p4■
r Powered by Esri
,. Market Street & Jefferson Street Two -Way Conversion
Dodge Street Reconstruction - Governor Street to Burlington Street 53953 - Public Works
53952 - Public Works
Total Budget: $20,100,000
Market Street & Jefferson Street Two -Way Conversion
53953 - Public Works
� Total Budget: $5,000,000
N. Gilbert Street Reconstruction
53955 - Public Works
Total Budget: $2,500,000
Taft Avenue Reconstruct -American Legion to Lower West Branch
Jefferson u
Conversion of Market Street and Jefferson Street from one-way to two-way corridors. The
project includes new traffic signals, pavement markings and signage necessary to implement
the conversion. The conversion is intended to generally take place between Madison Street
and the eastern termini of the one-way streets - exact limits subject to further evaluation. This
project will also add electrical outlets to each of the pedestrian level light poles on Linn Street
from Jefferson Street to Bloomington Street.
The total budget is $5,000,000.
2027 $425,000
2028 $4,575,000
Details All Projects (List)
Capital Improvements 2025 - 2029
t F'),k R-1
Dodge Street Reconstruction - Governor Street to Burlington Street
53952 - Public Works
Total Budget: $20,100,000
Market Street & Jefferson Street Two -Way Conversion
01 53953 - Public Works
Total Budget: $5,000,000
N. Gilbert Street Reconstruction
53955 - Public Works
Total Budget: $2,500,000
Taft Avenue Reconstruct -American Legion to Lower West Branch
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
N. Gilbert Street Reconstruction
53955 - Public Works
Reconstruction of N. Gilbert Street from south of Kimball Road through the intersection with
Brown Street. Improvements to inlcude new sanitary sewer and stormsewer extensions,
replacement of minor sections of water main and fire hydrants, PCC roadway paving on N
Gilbert Street, brick reconstruction at Brown Street and N Gilbert Street intersection, sidewalks
retaining wall repairs, and private utility undergrounding.
The total budget is $2,500,000.
2025 $2,500,000
Details All Projects (List)
Capital Improvements 2025 - 2029
V;
M Total Budget: $2,500,000
Taft Avenue Reconstruct -American Legion to Lower West Branch
53959 - Public Works
Total Budget: $12,200,000
Oakdale Boulevard Extension -Alignment Study
-P. 53960 - Public Works
Total Budget: $100,000
Burlington Street Bridge Replacement
53963 - Public Works
Total Budget: $10,075,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
Powered by Esri
ev Taft Avenue Reconstruct -American Legion to Lower West Branch
53959 - Public Works
Reconstruction of Taft Avenue from American Legion Road to Lower West Branch.
The total budget is $12,200,000.
2027 $8,500,000
2028 $3,700,000
Details All Projects (List)
Capital Improvements 2025 - 2029
- 44,,, �
m
� J
f l gv �
Total Budget: $2,500,000
T Taft Avenue Reconstruct -American Legion to Lower West Branch
S3959 - Public Works
Total Budget: $12,200,000
Oakdale Boulevard Extension -Alignment Study
S3960 - Public Works
\, Total Budget: $100,000
Burlington Street Bridge Replacement
S3963 - Public Works
Total Budget: $10,075,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
b r
tVeo� so wa ra � -
by Esri
v Oakdale Boulevard Extension -Alignment Study
S3960 - Public Works
Obtain consultant services to perform an alignment study for the Oakdale Boulevard extensio
east of Highway 1.
The total budget is $100,000.
2026 $100,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Ar
:nano, - opt
Melrose Ave �i'=�.::f�j0`�.
Total Budget: $2,500,000
? Taft Avenue Reconstruct -American Legion to Lower West Branch
p 53959 - Public Works
Total Budget: $12,200,000
Oakdale Boulevard Extension -Alignment Study
53960 - Public Works
\ Total Budget: $100,000
Burlington Street Bridge Replacement
is 53963 -Public Works
Total Budget: $10,075,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
IA
v Burlington Street Bridge Replacement
53963 - Public Works
This project will replace both the eastbound and westbound Burlington Street bridges with
one new bridge over the Iowa River. In addition, the project will include repair or replacement
of the existing pedestrian overpass at Riverside Drive, realignment of Grand Avenue west of
Riverside Drive, reconstruction of portions of Grand Avenue, Byington Road and Melrose
Avenue, and investigation of the feasibililty of eliminating the existing dam. This project will be
a joint project with the DOT.
The total budget is $10,075,000.
2025 $1,050,000
2026 $3,300,000
2029 $5,725,000
Details All Projects (List)
17 U
Capital Improvements 2025 - 2029
Camp Cardinal Road / Kennedy Parkway - Pedestrian Accomodations
53981 -Public Works
Total Budget: $320,000
North Dodge Street/ACTCircle- Signalization
53982 - Public Works
Total Budget: $450,000
Iowa Avenue Improvements
53983 - Public Works
Total Budget: $2,650,000
Pedestrian Refuge Island Project
S0.9R7 - Pnhlir WN lrc
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
4117,�
IIIt��
v Camp Cardinal Road / Kennedy Parkway - Pedestrian Accomodations
53981 - Public Works
This project will remove existing right turn bays and install pedestrian refuge islands on Camp
Cardinal Boulevard at Kennedy Parkway.
The total budget is $320,000.
2027 $320,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Camp Cardinal Road / Kennedy Parkway - Pedestrian Accomodations
J1 53981 - Public Works
Total Budget: $320,000
North Dodge Street / ACT Circle - Signalization
53982 - Public Works
Total Budget: $450,000
Iowa Avenue Improvements
53983 - Public Works
Total Budget: $2,650,000
Pedestrian Refuge Island Project
S0.9R7 - Pnhlir W—lrc
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
v North Dodge Street/ACTCircle- Signalization
53982 - Public Works
This project will install traffic signals for motorists/pedestrians at the North Dodge Street /ACT
Circle intersection.
The total budget is $450,000.
2025 $450,000
Details All Projects (List)
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
r 11 '� - Syr I If
let,
-"* TO
_7
L r i \
Powered by Esri
Camp Cardinal Road / Kennedy Parkway - Pedestrian Accomodations w Iowa Avenue Improvements
53981 - Public Works 53983 - Public Works
Total Budget: $320,000 This corridor is a part of the downtown streetscape master plan. The scope of the project is
pavement repair on Iowa Avenue from Clinton Street to Gilbert Street. The project also
I d d' 'd Ik d I- ;I" d
Capital Improvements 2025 - 202S
�. •,... v Ago:
North Dodge Street / ACT Circle - Signalization
53982 - Public Works
Total Budget: $450,000
Iowa Avenue Improvements
S3983 - Public Works
Total Budget: $2,650,000
nc u es repair an Improvements to sl ewa s an cur ramps, utl Ides an streetscape
amenities.
The total budget is $2,650,000.
2027 $300,000
2028 $2,350,000
Pedestrian Refuge Island Project Details All Projects (List) is
,� S0.9R7-PnhlirlNnrlrc
Capital Improvements 2025 - 2029
Pedestrian Refuge Island Project
53987 - Public Works
Total Budget: $78,000
Friendship St, Evans St, Manitou Tr Sidewalk Infill
53988 - Public Works
Total Budget: $100,000
ImBenton Street Trunk Sewer Improvements
V3162 - Public Works
Total Budget: $155,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
Pedestrian Refuge Island Project
53987 - Public Works
Construction of (7) pedestrian refuge islands at strategic locations to calm traffic and provide
safe refuge for pedestrians crossing the street. Locations are as follows: Melrose/Emerald,
Keokuk (S. of Hwy 6), Dodge Street (near Hyvee), Sycamore/Lakeside, Muscatine/South lawn,
Court/Westminster, and Lakeside/Miami.
The total budget is $78,000
2025 $78,000
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Transportation On the Radar
UF
q-E Market si 'UWO&M
' • '7[. h�pr:` * k ih j
qV
tiINW-—�1
- -- t`o E Jefferson s[
- r i III` j q - ".' a w• `�i.�, _ �� �
.i E iowa K`000yawn TR• yr 1: �{��� - ��'
Pedestrian Refuge Island Project
53987 - Public Works
Total Budget: $78,000
Friendship St, Evans St, Manitou Tr Sidewalk Infill
S3988 - Public Works
Total Budget: $100,000
Benton Street Trunk Sewer Improvements
V3162 - Public Works
Total Budget: $155,000
,�{ { r �/`^,�W ► ice. �
v Friendship St, Evans St, Manitou Tr Sidewalk Infill
53988 - Public Works
This project will involve the construction of sidewalk along 603 Friendship Street, 20 Evans
Street and 931 & 955 Manitou Trail.
The total budget is $100,000.
2025 $100,000
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Transportation On the Radar
Pik-
r
Y E -.. � ----' Ir
Westgate Or - 1 ,. �•' -A
—.-zw Benton St
Pedestrian Refuge Island Project
53987 - Public Works
Total Budget: $78,000
Friendship St, Evans St, Manitou Tr Sidewalk Infill
53988 - Public Works
ft,l Total Budget: $100,000
M
Benton Street Trunk Sewer Improvements
V3162 - Public Works
Total Budget: $155,000
[Powered by Esri
�v Benton Street Trunk Sewer Improvements
V3162 - Public Works
Reroute the Benton Trunk sewer from Emerald Street to Westgate Street through green space
and a parking lot. This will allow access for future maintenance and removes the sewer from
under and close proximity to an apartment complex. The project will increase the sewer
capacity at Emerald Street and remove a capacity restriction (pipe diameter) at Emerald Street
The total budget is $155,000.
2028 $155,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Total Budget: $78,000
Friendship St, Evans St, Manitou Tr Sidewalk Infill
53988 - Public Works
Total Budget: $100,000
Benton Street Trunk Sewer Improvements
V3162 - Public Works
Total Budget: $155,000
isNapoleon Lift Station Improvements
V3169 - Public Works
Total Budget: $325,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
ev Napoleon Lift Station Improvements
V3169 - Public Works
Rehabilitate selected equipment at the Napoleon Lift Station including the bar screen crawler
assemblies with electric drive units, provide screening washer compactors, role off, air
handling system and rebuilding of the NPPS Pumps #1 and #6 pumping assembly's and
replacing associated electrical or mechanical appurtenances as necessary.
The total budget is $325,000.
2028 $325,000
Details All Projects (List)
17 U
Capital Improvements 2025 - 2029
=N=a
ANIIIIA Aeration Equipment Improvements
V3174 - Public Works
Total Budget: $3,328,000
Wastewater Treatment Facility Improvements
Wk,- V3175 -Public Works
Total Budget: $162,000
HVAC Replacement
V3177 - Public Works
Total Budget: $200,000
Rotating Drum Thickener Replacement 1 and 2
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
O
ev Aeration Equipment Improvements
V3174 - Public Works
Replace the remaining mixers in the aeration trains 1 - 4 with high efficiency mixers matching
those placed in Cell 9 of trains 1-4 and replace mixers in the high strength tank. This would be
total of 30 mixers.
The total budget is $3,328,000.
2026
$350,000
2028
$100,000
2029
$2,878,000
Details
All Projects (List)
Capital Improvements 2025 - 2029
- Aeration Equipment Improvements
V3174 - Public Works
Total Budget: $3,328,000
Wastewater Treatment Facility Improvements
V3175 - Public Works
Total Budget: $162,000
HVAC Replacement
V3177 - Public Works
Total Budget: $200,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
4
Wastewater Treatment Facility Improvements
V3175 - Public Works
This project includes improvements to the influent flow monitoring and replacement of the gri
classifiers and the biosolids conveyor.
The total budget is $162,000.
2025 $162,000
Rotating Drum Thickener Replacement 1 and 2 Details All Projects (List) is
Capital Improvements 2025 - 2029
A4M Aeration Equipment Improvements
V3174 - Public Works
Total Budget: $3,328,000
Wastewater Treatment Facility Improvements
4' V3175 -Public Works
Total Budget: $162,000
HVAC Replacement
V3171- Public Works
Total Budget: $200,000
Rotating Drum Thickener Replacement 1 and 2
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
HVAC Replacement
V3177 - Public Works
Replace the heating/ventilation/air conditioning (HVAC) for the Influent Pump Station (IPS),
Sludge Processing Building (SSPRS), Motor Vehicle Storage Building (MVSB), Administration
Building (ADMIN), and Grit Building (GRIT)
The total budget is $200,000.
2025 $200,000
Details All Projects (List)
Capital Improvements 2025 - 2029
—� Total Budget: $200,000
Rotating Drum Thickener Replacement 1 and 2
V3179 - Public Works
Total Budget: $1,662,000
Equalization Basin Resurfacing
V3182 - Public Works
Total Budget: $250,000
Effluent Water Pump Station Improvements
V3183 - Public Works
Total Budget: $76,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
Powered by Esri
Rotating Drum Thickener Replacement 1 and 2
V3179 - Public Works
Replace RDT 1 and 2 with in -kind process equipment or a more efficient process equipment.
This will include all ancillary equipment required to make this an operational and a direct
replacement for the existing RDTs 1 and 2 and all of their ancillary equipment.
The total budget is $1,662,000.
2027 $195,000
2028 $1,467,000
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Transportation On the Radar
r
—� Total Budget: $200,000
� yr
Rotating Drum Thickener Replacement 1 and 2
V3179 - Public Works
Total Budget: $1,662,000
Equalization Basin Resurfacing
V3182 - Public Works
Total Budget: $250,000
Effluent Water Pump Station Improvements
V3183 - Public Works
Total Budget: $76,000
Equalization Basin Resurfacing
V3182 - Public Works
The Equalization Basin (EQB) is critical for extreme high flow received at the Wastewater
Treatment Plant(Plant). The EQB was expanded in 2012 as partof the last major Plant upgrade
The asphalt bottom and sides are showing excessive oxidation and cracking. The intent of the
project is to repair the cracking and to renew the asphalt surface.
The total budget is $250,000
2025 $250,000
Details All Projects (List)
Capital Improvements 2025 - 2029
—� Total Budget: $200,000
Rotating Drum Thickener Replacement 1 and 2
V3179 - Public Works
Total Budget: $1,662,000
Equalization Basin Resurfacing
V3182 - Public Works
Total Budget: $250,000
Effluent Water Pump Station Improvements
V3183 - Public Works
Total Budget: $76,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
Powered by Esri
v Effluent Water Pump Station Improvements
V3183 - Public Works
Install a fourth Effluent Water Pump to serve the in plant distribution system and soccer park
irrigation system. Work includes rebuilding of the Amiad filtration system.
The total budget is $76,000.
2025 $76,000
Details All Projects (List)
Capital Improvements 2025 - 2029
r � I
r A
�altlr
E�
m
m
Wastewater Digester Gas Improvements
® V Public Works
Totatall Budget:
Budget: $3,000,000
Wastewater Treatment Plant Secondary Clarifier Repairs
V3185 - Public Works
Total Budget: $871,000
Bradford Drive Water Main Replacement
ON W3300 - Public Works
- Total Budget: $920,000
High Service Pump VFD Replacement
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
1
Wastewater Digester Gas Improvements
V3184 - Public Works
This project includes a new process to treat the digester gas to pipeline quality and
infrastructure necessary to transport conditioned gas to the pipeline network. Additionally, a
High Strength Receiving Station will be installed for additional biogas feedstock.
The total budget is $3,000,000.
2025 $3,000,000
Details All Projects (List)
Capital Improvements 2025 - 2029
fr,?
Wastewater Digester Gas Improvements
V Public Works
t
Totatall Budget:
Budget: $3,000,000
Wastewater Treatment Plant Secondary Clarifier Repairs
V3185 - Public Works
Total Budget: $871,000
Bradford Drive Water Main Replacement
W3300 - Public Works
Total Budget: $920,000
MHigh Service Pump VFD Replacement
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
n
f'
i
Powered by Esri
Wastewater Treatment Plant Secondary Clarifier Repairs
V3185 - Public Works
This project will replace the rake mechanisms and drives for Clarifiers C5300 and 5400 that
were new in 2002 and part of WWTP upgrades.
The total budget is $871,000.
1
2027 $871,000
Details All Projects (List)
Capital Improvements 2025 - 2029
W
• r r]
Wastewater Digester Gas Improvements
V Public Works
t
Totatall Budget:
Budget: $3,000,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
'JJ t'l: 'ROOR WWINW31
FWOW _1i
_ y
—_ai-8ratlrord Di - - —
Wastewater Treatment Plant Secondary Clarifier Repairs
V3185 - Public Works
Total Budget: $871,000
Bradford Drive Water Main Replacement
NE W3300 - Public Works
Total Budget: $920,000
High Service Pump VFD Replacement
9
y
r '
Bradford Drive Water Main Replacement
W3300 - Public Works
This is a water main replacement project on Bradford Dr, Louise St, and Wayne Ave.
Approximately 1950 feet of 6-inch cast-iron pipe (vintage 1956) will be replaced with 2,500
feet of 8-inch PVC. The scope of the project will replace or install water main on Bradford Dr
from Arthur St to 1 stAve, on Louise St from Bradford Dr to Wayne Ave, and on Wayne Ave fror
Wade St to Arthur St.
The total budget is $920,000.
2025 $920,000
Details All Projects (List) 40
Capital Improvements 2025 - 2029
total budget: IVZU,UVU
High Service Pump VFD Replacement
W3314 - Public Works
Total Budget: $350,000
- Collector Well #1 Reconstruction
W3322 - Public Works
Total Budget: $3,100,000
Water Plant Roof Replacements
W3325 - Public Works
TIJ
Total Budget: $650,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
11!
h pbw. •. LA�
*fA-
I'll
p' +
L —
ev High Service Pump VFD Replacement
W3314 - Public Works
Replace the (4) four variable frequency drives (VFDs) on our high service pumps. These pump:
used to move all of the drinking water in the City from the treatment facility to services and
tanks.
The total budget is $350,000.
2025 $350,000
Details All Projects (List)
Capital Improvements 2025 - 2029
E iota3 budget: IYZU,VUU
High Service Pump VFD Replacement
W3314 - Public Works
isTotal Budget: $350,000
Collector Well #1 Reconstruction
W3322 - Public Works
Total Budget: $3,100,000
Water Plant Roof Replacements
W3325 - Public Works
TIJ
Total Budget: $650,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
Collector Well CW-2
y.
Lateral #,'. 187' Lateral #1'. W
v Collector Well #1 Reconstruction
W3322 - Public Works
Collector Well #1 is currently out -of -commission due to the laterals becoming plugged or
ruptured allowing unsatisfactory raw water to enter the caisson. This project will reconstruct th
well by installing (2) new 12-inch laterals, abandoning the existing laterals, redirecting the
settling lagoon effluent to CW#1 to allow process water reuse, and perform pumping tests to
inform future well field projects. The project has the potential to increase the yield of CW#1
from zero gallons per day to 1 to 2 million gallons of alluvial aquifer source water per day.
The total budget is $3,100,000.
2025 $100,000
2026 $3,000,000
Details All Projects (List)
Capital Improvements 2025 - 2029
F
High Service Pump VFD Replacement
W3314 - Public Works
Total Budget: $350,000
Collector Well #1 Reconstruction
W3322 - Public Works
Total Budget: $3,100,000
Water Plant Roof Replacements
W3325 - Public Works
' Total Budget: $650,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
Water Plant Roof Replacements
W3325 - Public Works
Replace the roof membranes on the Water Plant garage, shop, and chemical storage rooms,
generator building, well houses, and ground storage reservoir pump houses.
The total budget is $650,000.
2026 $50,000
2027 $600,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Treatment Process Update
W3326 - Public Works
Total Budget: $1,600,000
Melrose Avenue Water Main - Camp Cardinal to Highway 218
W3327 - Public Works
Total Budget: $650,000
Powerhouse Dam Rehabilitation
W3328 - Public Works
Total Budget: $100,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
Treatment Process Update
W3326 - Public Works
Complete the construction of Filter #6 at the Water Plant. The project will also overhaul the
lime softening and ferric sulfate equipment, and remove the obsolete soda ash feed
equipment.
The total budget is $1,600,000.
2027 $100,000
2028 $1,500,000
GSR Upgrade and Repairs Details All Projects (List)
W 1'3? Q_ P. , k I i, Mf( rbc 0
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Transportation On the RadarOF
^� v
'y - .ne
%, 184� 1 - R A
4 �
Lt<_
Melrose Avej�y.�
Treatment Process Update
W3326- Public Works
Total Budget: $1,600,000
Melrose Avenue Water Main - Camp Cardinal to Highway 218
W3327 - Public Works
Total Budget: $650,000
Powerhouse Dam Rehabilitation
W3328 - Public Works
Total Budget: $100,000
GSR Upgrade and Repairs
W 1'3?Q-P. ,k I i, Mf( rbc
rig . ,..... ._•� ... _ ,
C Melrose Avenue Water Main -Camp Cardinal to Highway 218
W3327 - Public Works
Replace approximately 1,900 feet of 12-inch, 1984 ductile iron water main with 16-inch PVC
water main.
The total budget is $650,000.
2026 $50,000
2027 $600,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Treatment Process Update
W3326- Public Works
Total Budget: $1,600,000
Melrose Avenue Water Main - Camp Cardinal to Highway 218
W3327 - Public Works
Total Budget: $650,000
Powerhouse Dam Rehabilitation
W3328 - Public Works
Total Budget: $100,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
ev Powerhouse Dam Rehabilitation
W3328 - Public Works
Repair defects found during an underwater inspection of the Iowa River powerhouse dam
located below the pedestrian bridge connecting the Iowa River Power Restaurant to the
Peninsula Well Field area.
The total budget is $100,000.
2025 $100,000
GSR Upgrade and Repairs Details All Projects (List)
1A1lq?Q- P,.kh, W—L, 0
Capital Improvements 2025 - 2029
r�
F � .
I t �d•
A
GSR Upgrade and Repairs
i
W3329 - Public Works
Total Budget: $1 600,000
Water Plant Flowmeter Replacement
W3330 - Public Works
Total Budget: $550,000
American Legion PRV Integration & Peninsula Antenna
W3332 - Public Works
F-i Total Budget: $200,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
v GSR Upgrade and Repairs
W3329 - Public Works
Replace and elevate rotting electrical panels in the Rochester (ROC), Emerald (EME), and
Sycamore (SYC) ground storage reservoirs (GSR). Make repairs to the pump house structures,
roofs, and replace doors. Evaluate the addition of a third pump to ROC or EME.
The total budget is $1,600,000.
2026 $100,000
2027 $1,500,000
Details All Projects (List)
Capital Improvements 2025 - 2029
GSR Upgrade and Repairs
W3329 - Public Works
Total Budget: $1,660,000
v
Water Plant Flowmeter Replacement
W3330- Public Works
Total Budget: $550,000
-14 American Legion PRV Integration & Peninsula Antenna
W3332 - Public Works
Total Budget: $200,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
Water Plant Flowmeter Replacement
W3330 - Public Works
Replacement of (1) 12-inch, (2) 20-inch, (3) 30-inch, and (2) 36-inch magnetic flow meters at th
Water Treatment Plant.
The total budget is $550,000.
2027 $50,000
2028 $500,000
Details All Projects (List)
Capital Improvements 2025 - 2029
1''
GSR Upgrade and Repairs
W3329 - Public Works
Total Budget: $1,600,000
1
Water Plant Flowmeter Replacement
W3330 - Public Works
Total Budget: $550,000
American Legion PRV Integration & Peninsula Antenna
W3332 - Public Works
Total Budget: $200,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
r
ev American Legion PRV Integration & Peninsula Antenna
W3332 - Public Works
Complete the American Legion Rd pressure reducing valve (PRV) vault electrical,
instrumentation, and controls integration to the water system SCADA system. Involves the
installation of electrical distribution circuits, a PLC, pressure transducers, and network
interconnectivity. Install a radio frequency antenna at the Peninsula Well Field and
decommission the antenna on the N. Dodge HyVee City -owned tower. City fiber was run to th,
Peninsula via Foster Rd in 2024 to allow for this antenna installation.
The total budget is $200,000.
2025 $200,000
Details All Projects (List)
Capital Improvements 2025 - 2029
06 W3332 - Public Works
Total Budget: $200,000
Relocate Bulk Water Station
W3333 - Public Works
Total Budget: $150,000
Water Rate Study
W3334 -Public Works
Total Budget: $100,000
East Elevated Storage
WLW3335- Public Works
r—i S7 Inn nnn
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
by Es . i ri --
ev Relocate Bulk Water Station
W3333 - Public Works
The relocation of the bulk water fill station from the Equipment & Transit Division site to the
Public Works campus coincident with the build out of the Equipment &Transit Division
expansion to the Public Works campus. The new bulk water fill station is intended to be
designed with better access for large vehicles and with more climate control to allow the use
of the station into the colder months.
The total budget is $150,000.
2026 $150,000
' Details All Projects (List)
Capital Improvements 2025 - 2029
W3332 - Public Works
Total Budget: $200,000
Relocate Bulk Water Station
W3333 - Public Works
Total Budget: $150,000
Water Rate Study
W3334 -Public Works
Total Budget: $100,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
Iowa City Residential Cost per Gallon of Water 1966-2024
$o.Ola I I I
soma
C a i WNIFkM R I I
°% I •I I I
$0.0a0 I I•• I I
� E I • I I I
I • I I I
£ $o.00s I • I •• I I
Ps I I 1 I
3m I • I •q• I
� $0.006 I • I •••1••••1••••
s e JI• TI
cE • • • l I I I
- £ • I I I I
8 ^� 5aooz I I I I
I I I I
19fi0 19]D 1980
Water Rate Study
W3334 - Public Works
Perform a study of the Iowa City water utility rates to determine the funding method needed tc
accomplish roughly $40-60M worth of source water, distribution, and treatment projects
beginning in 2029 through 2033. These projects include new source waterwells, new storage
tanks, and treatment unit process rehabilitation.
The total budget is $100,000.
2025 $100,000
East Elevated Storage
W3335 - Public Works ' Details All Projects (List)
T—i P-4.. - S7 Inn nnn 40
Capital Improvements 2025 - 2029
did
iutai ouuyut. .� i uu,vvu
Water Rate Study
W3334 -Public Works
Y Total Budget: $100,000
East Elevated Storage
iLW3335- Public Works
Total Budget: $7,700,000
Rochester GSR & Water Main Improvements
W3336- Public Works
Total Budget: $1,100,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police ® Transportation On the Radar
QYIA C17v
YFTER009
The wafer "aver on No h Dodge Street was a 8[eal chal-
Menge for the Loge of 'Taair Town' w the early years of the
k. cetLLuty.
Poweredby Esri
ev East Elevated Storage
W3335 - Public Works
Installation of a one million gallon elevated storage tank on the east side of Iowa City near
Interstate 80.
The total budget is $7,700,000.
2028 $200,000
2029 $7,500,000
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Transportation On the Radar
wiai ouuy— .P uu,vvu
Water Rate Study
W3334 - Public Works
�r
Total Budget: $100,000
East Elevated Storage
W3335 - Public Works
Total Budget: $7,700,000
Rochester GSR & Water Main Improvements
W3336- Public Works
Total Budget: $1,100,000
ti1K
Powered by Esri
ev Rochester GSR & Water Main Improvements
W3336 - Public Works
Additional pumps and valves at the Rochester GSR to support an east side elevated storage
tank along with any improvements to water main along Rochester to reduce velocity headloss
during filling operations.
The total budget is $1,100,000.
2028 $100,000
2029 $1,000,000
' Details All Projects (List)
Capital Improvements 2025 - 2029
.1st T,J.,
$�•'• � �.
` - 'F lULM
u
our
c
•� �n 1� r
Tower Place Drainage Modifications
T3026 -Transportation
Total Budget: $1,000,000
Transit Maintenance Facility Relocation
T3055-Trans portation
Total Budget: $21,400,000
Replace Door -Door Closures in Parking Facilities
T3070 -Transportation
Total Budget: $200,000
Wayfinding Sign Refresh in Parking Facilities
J
I
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works ® On the Radar
`.m e
�ni. e.� _ u`r
' IN., - Aw
Tower Place Drainage Modifications
T3026 - Transportation
This project will modify the existing drainage pipe network and divert storm water from the
upper decks to the exterior of the structure rather than routing it through the lower level.
The total budget is $1,000,000.
2028 $185,000
2029 $815,000
Details All Projects (List)
Capital Improvements 2025 - 2029
Tower Place Drainage Modifications
i N26 -Transportation
iota) Budget: $1,000,000
Transit Maintenance Facility Relocation
73055-Transportation
., Total Budget: $21,400,000
Replace Door -Door Closures in Parking Facilities
T3070 -Transportation
Total Budget: $200,000
Wayfinding Sign Refresh in Parking Facilities
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works ® On the Radar
ev Transit Maintenance Facility Relocation
T3055 - Transportation
This project involves the construction of a new transit facility for maintenance operations and
storage. As part of this project, the storage area will be expanded allowing for an increase in
fleet size and the maintenance facility will be upgraded. The relocation will address the
environmental issues that exist at the current facility and allow for the redevelopment of a
major commercial site at the corner of Highway 6 and Riverside Drive.
The total budget is $21,400,000.
2025 $535,000
2026 $20,865,000
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works On the Radar
�r lmlo
`G LolEege 51 -
uai sr : ii+gh'uay T1 6urfington 5l1 Highway 1jA
-
9 7k +
- -- ►��_:i_ —
.ECourE1;r
Powered by Esri
ev Replace Door -Door Closures in Parking Facilities
'r Tower Place Drainage Modifications T3070 - Transportation
r3026 - Transportation
' Project to replace several damaged doors, door closures, and window frames in the Capitol
Total Budget: $1,000,000 Street ramp, Dubuque Street ramp, Tower Place ramp, Chauncey Swan ramp, and doors in
other facilities as they fail.
- Transit Maintenance Facility Relocation
The total budget is $200,000.
T3055-Transportation
2025 $100,000
Total Budget: $21,400,000 2026 $100,000
Replace Door -Door Closures in Parking Facilities
T3070 -Transportation
Total Budget: $200,000
Wayfinding Sign Refresh in Parking Facilities
Details All Projects (List)
Capital Improvements 2025 - 2029
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works ® On the Radar
�r -
t Z _ . ., r
hE College St
1 lit
4L"
4Y 9urliugwn Si 1 Highway
_ [ 6rli[ig Euri St 1, Higtiway 1 '
y courtst
dMlotal budget: ILUU,VUU
Wayfinding Sign Refresh in Parking Facilities
73071 -Transportation
Total Budget: $200,000
On -Street Meter Replacement
T3072 -Transportation
Total Budget: $800,000
Tower Place Hl Replacement
T3073-Transportation
74� Total Budget:$925,000
Wayfincling Sign Refresh in Parking Facilities
T3071 -Transportation
Design and implement a universal way -finding system for the City -owned parking facilities.
This project will replace worn and chipped paint on concrete columns throughout the facility,
as well as 40 year old outdated signage.
The total budget is $200,000.
2027 $200,000
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works On the Radar
I t I_ lr:'s(�....
_ 'W Jeffeison Si W kFferson
q _ w �� • _ u, c JL•liP.f SUII
■ f Al
W low a Avedt _ � ,...,u ...... .M. •
` • E la_wtt Avep41
y�
C 14 JI
77iiia
.
.Yv
�t ...i� +
W wsshington S�t`-W_ E Washington St. T- - W,
wLi y � ,
Powered by Esri
dMlotai t3uaget: i[uu,uuu
Wayfinding Sign Refresh in Parking Facilities
T3071 -Transportation
Total Budget: $200,000
On -Street Meter Replacement
T3072 - Transportation
Total Budget: $800,000
Tower Place HVAC Replacement
T3073-Transportation
94t Total Budget:$925,000
On -Street Meter Replacement
T3072 - Transportation
This project involves the replacement of our current on -street smart meter system with new
meters or a new multi -space system.
The total budget is $800,000.
2029 $800,000
Details All Projects (List)
Capital Improvements 2025 - 2029
irs on.51 �rlll■'^'� w1i xe
_ _ N f: •Jolt ftiop S[
Any,
^E iowa Ave
1 i, 3yy
'4''T N F vIr0811IIIdtOn SI-
�Ll
iota] budget: I2UU,VUU
Wayfinding Sign Refresh in Parking Facilities
T3071 -Transportation
Total Budget: $200,000
On -Street Meter Replacement
T3072 -Transportation
Total Budget: $800,000
Tower Place HVAC Replacement
T3073-Transportation
A�it1
Total Budget: $925,000
Department All Ongoing Annual Airport Fire"WTLibrary Senior Center Parks Police Public Works ® On the Radar
--1
�r .., rl .ice � rr.��: � r•K+, ,VEIN",
ere
Lyl
v Tower Place HVAC Replacement
T3073 - Transportation
The Tower Place Parking Facility has a shared HVAC system used by all the condo owners. The
heating component includes a gas boiler system in the lower level of the facility and the A/C
component includes a cooling tower system on the rooftop of each stairwell. This project is to
replace both of these systems due to age and maintenance challenges.
The total budget is $925,000.
2025 $925,000
Details All Projects (List)
l�
Department All Ongoing Annual Airport Fire"WTLibrary Senior Center Parks Police Public Works ® On the Radar
--1
�r .., rl .ice � rr.��: � r•K+, ,VEIN",
ere
Lyl
v Tower Place HVAC Replacement
T3073 - Transportation
The Tower Place Parking Facility has a shared HVAC system used by all the condo owners. The
heating component includes a gas boiler system in the lower level of the facility and the A/C
component includes a cooling tower system on the rooftop of each stairwell. This project is to
replace both of these systems due to age and maintenance challenges.
The total budget is $925,000.
2025 $925,000
Details All Projects (List)
l�
Capital Improvements 2025 - 2029
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works ® On the Radar
ta-
h ail
i 1
Irw
Powered by Esri
wiai ouuye�. .�ow,vvu
® Tower Place HVAC Replacement
- T3073- Transportation
�5 Total Budget: $925,000
ON -4Capitol Street Ramp N Stairwell Lobby Remodel
T3074-7rans ortation
P
Total Budget: $100,000
Transit Automatic Passenger Counters
T3075 - Transportation
Total Budget: $150,000
Capitol Street Ramp N Stairwell Lobby Remodel
T3074 - Transportation
Create a more inviting area on all levels of the north elevator lobby area. This project will
include replacing tile and lighting systems as well as repainting walls, window trim, and ceilinc
surfaces.
The total budget is $100,000.
2027 $100,000
Details
All Projects (List)
17 U
Capital Improvements 2025 - 2029
wiai ouuyu�. .�ovu,vvu
Tower Place HVAC Replacement
T3073 - Transportation
Total Budget: $925,000
r -
Capitol Street Ramp N Stairwell Lobby Remodel
.3074-Tr nsportatbn
Total Budget: $100,000
klav
Transit Automatic Passenger Counters
T3075 - Transportation
Total Budget: $150,000
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works ® On the Radar
m C
LO
x .....:.,�...w - - -
E lawn Rve ~ x
E Washing toif Si. -
c �
FI tea'
vie — I I ^�N ��� _ a•
+
:��• '� -
ECni lope
r I Powered by Esri
ev Transit Automatic Passenger Counters
T3075 - Transportation
Installing Automatic Passenger Counters on every 40' transit bus in the fleet. This system will
count passengers boarding and alighting per day, route, and stop.
The total budget is $150,000.
2025 $150,000
Details All Projects (List) is
Capital Improvements 2025 - 2029
InMcCollister Boulevard Extension
Future - Public Works
East Side Sports Complex
Future - Parks
Highway b Bridge over the Iowa River
Future - Public Works
Carson Lake Park
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works Transportation
c
ai
ar
McCollister Boulevard Extension
Future - Public Works
Extension of McCollister Boulevard from Sycamore Street to Scott Boulevard.
The total budget is $0.
Details All Projects (List)
Capital Improvements 2025 - 2029 Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works Transportation
ev East Side Sports Complex
McCollister Boulevard Extension Future- Parks
Future - Public Works
j� Build out a new 73-acre park on the City's east side. Includes various field sports as well as
_ serving as a neighborhood amenity.
East Side Sports Complex
Future - Parks
Highway b Bridge over the Iowa River
Future - Public Works
Carson Lake Park
The total budget is $0.
Details All Projects (List)
Capital Improvements 2025 - 2029
.. �.+.�► sit �; �,;, '
Ir Or
j���Djg
_ - Highways W�1�,
. �; 1�
1 I.
^ - yam:
F
a.r
3,
tp
r� r.nw �rR u•� ■
McCollister Boulevard Extension
Future -Public Works
1 I�
East Side Sports Complex
Future - Parks
Highway 6 Bridge over the Iowa River
Future - Public Works
I Ill
ram, Carson Lake Park
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works Transportation
L'�� ■k � ��al f
lig hland Avc
if 4
{
v Highway 6 Bridge over the Iowa River
Future - Public Works
This is an IDOT project that will reconstruct the bridge over the Iowa River on Highway 6, soutl
of Riverfront Crossings Park.
The total budget is $0.
Details All Projects (List)
Capital Improvements 2025 - 2029
Carson Lake Park
Future - Parks
Kitty Lee Road SW
Future - Public Works
Gateway Trail Segment
Future - Parks
I
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works Transportation
4f, ,
218
� rF_
yin---- ----- "�-- -'
�._f `:Q_„.,.' [ARSONS LAKE -MASTER PLAN GRAPHIC
_ -- veexwmzoz< SHIVC-I-IATTC-
Powered by Esri
C Carson Lake Park
Future- Parks
Design and construction of a new regional recreation area around Carson Lake, similar to Tern
Trueblood Recreation Area.
The total budget is $0.
Details All Projects (List)
Capital Improvements 2025 - 2029
t
Carson Lake Park
Future- Parks
Kitty Lee Road SW
Future - Public Works
Gateway Trail Segment
Future - Parks
I
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works Transportation
Powered by Esri
tv Kitty Lee Road SW
Future - Public Works
This project will reconstruct Kitty Lee Road between Highway 1 and its northern terminus -
including the Highway 1 intersection.
The total budget is $0.
Details All Projects (List)
Capital Improvements 2025 - 2029
I .I
7
Carson Lake Park
Future - Parks
Kitty Lee Road SW
Future - Public Works
Gateway Trail Segment
I M- Future - Parks
Department All Ongoing Annual Airport Fire Library Senior Center Parks Police Public Works Transportation
I
Gateway Trail Segment
Future- Parks
This section, from the Hancher footbridge to Park Road, is the final piece to complete the trail
on the east side of the Iowa River from Iowa Avenue to the north.
The total budget is $0.
Details All Projects (List) is