Loading...
HomeMy WebLinkAboutNorth Liberty - Forevegreen Rd Extension - Phase 2 Page 4 The following information must be provided for all Surface Transportation Block Grant project proposals and will be provided to the MPOJC Transportation Technical Advisory Committee (TTAC) and Urbanized Area Policy Board for evaluation. MPOJC staff may contact you if additional information is required. You will have the opportunity to explain the project at a meeting of the MPOJC TTAC. MPOJC staff will score the projects; the TTAC may modify scores. Project Sponsor:_____________________________________________________________________ Contact Person (Name and Title):_______________________________________________________ Street Address:______________________________________________________________________ City:_____________________________________State:_______ ZIP Code:_____________________ Phone Number:________________________ Email Address: _______________________________ Unique Entity Identifier (UEI):__________________________________________________________ (To verify existing UEI or to register, go to System for Award Management at https://SAM.gov. The entity name associated with the UEI must match the entity listed on this application as the project sponsor.) Metropolitan Planning Organization (MPO):_______________________________________________ If more than one Agency or Organization is involved in this project, please state the agency or organization, contact person, mailing address, and telephone number of the second agency. (Attach an additional page if more than two agencies are involved.) Agency or Organization:_______________________________________________________________ Contact Person (Name and Title):_______________________________________________________ Street Address:______________________________________________________________________ City:________________________________ State:___________ ZIP Code:______________________ Phone Number:___________________________ Email Address:____________________________ Unique Entity Identifier (UEI):___________________________________________________________ Project Title:________________________________________________________________________ Project Description:(Provide summary details of only the project scope that is the subject of the funding request. i.e. number of proposed through lanes, turn lanes, and other critical features.) If this project includes land acquisition, how many acres?______________ PROJECT SPONSOR INFORMATION PROJECT INFORMATION Cities of North Liberty and Coralville Ryan Rusnak, Planning Director 360 North Main Street North Liberty Iowa 52317 319-626-5747 rrusnak@northlibertyiowa.org North Liberty: EQNKTW1PCN66 Metropolitan Organization of Johnson County City of Coralville Scott Larson, City Engineer 1512 7th Street Coralville Iowa 52241 319-248-1720 slarson@coralville.org QNVXMHKSJNN8 Forevergreen Road Extension - Phase 2 .25 This joint project between the Cities of North Liberty and Coralville would construct Forevergreen Road Extension - Phase 2 from the western limits of the eastern section of future Forevergreen Road extension - Phase 1 to Naples Avenue. The intersection of Forevergreen Road/Naples Avenue is planned as a roundabout. The newly constructed urban section would include tow vehicle travels lanes, a 10-foot-wide off-street multi-use trail on the north side, and a storm system. Page 5 Check all boxes that apply to indicate the categories that best describe your project. Trails and Bicycles Roadways and Bridges Facilities for pedestrians and bicycles including safe routes for non-drivers Construction, rehabilitation, preservation, or operational improvements of street facilities Conversion and use of abandoned railway corridors Bridge improvements including construction, rehabilitation, or preservation Scenic Historic Environmental Construction of turnouts, overlooks, and viewing areas Vegetation management practices in transportation rights-of-way Inventory, control, or removal of outdoor advertising Highway related stormwater management Historic preservation and rehabilitation of historic transportation facilities Reduction of vehicle-caused wildlife mortality or restoration of habitat connectivity Archaeological activities relating to impacts from another eligible activity Other Does the project comply with the adopted MPOJC Complete Streets Policy? Yes No Which of the following facilities are included in the proposal? Turn Lanes Separated trail or wide sidewalk (8’ or wider) ITS/Signalization Improvements Marked on-street bike facility Geometric Improvements Facilities to reduce modal conflict Is the focus of the project to address a safety concern at an intersection or midblock location, or improve safety at a location with a collision history involving bicyclists or pedestrians (refer to pages 22-25)? Yes No Upon completion, will the project be open to the public? Yes No Do you intend to charge a fee to users? Yes No If yes, how much will the fee be and how will the revenue be used?___________ PROJECT CATEGORY Not Applicable ✔✔ ✔ ✔ ✔ ✔ ✔ Page 6 Project Costs: Complete the table below by identifying the estimated project costs. Costs should reflect estimated costs in the execution year when funds are anticipated to be programmed and the project is ready to proceed. COLUMN 1 is the total project cost to the project sponsor and will include all costs whether STBG reimbursement is intended or the costs will be paid entirely with local or other funds. Most project sponsors do not intend to request reimbursement toward all project costs. The amount listed in COLUMN 1 for each type of cost should also be placed in either COLUMN 2 or COLUMN 3. The costs listed in COLUMN 2 are those that are not intended to be claimed for STBG reimbursement. Costs listed in COLUMN 3 are costs the project sponsor does intend to claim for reimbursement. No row should have costs in all three columns and the total of COLUMN 2 plus the total of COLUMN 3 should equal the total of COLUMN 1. COLUMN 1 Total Estimated Project Cost to Project Sponsor COLUMN 2 No STBG Reimbursement Planned COLUMN 3 Intend to Claim STBG Reimbursement Right-of-way Acquisition: $$$ Preliminary Design/Engineering: $$$ Construction: $$$ Construction Engineering: $$$ Other (please identify) :$$$ Other (please identify) :$$$ Total: $$$ LINE A: Total to be Claimed for Reimbursement (Total COLUMN 3)Ψ LINE B:Surface Transportation Block Grant Funding Request (Maximum 80% of Total COLUMN 3)Ψ LINE C:Required Local Match (Difference LINE A –LINE B; Minimum 20% of Total COLUMN 3)Ψ LINE D:Total Cost to Project Sponsor*(LINE C + Total COLUMN 2)Ψ * The Project Sponsor is also responsible for all cost overruns Funding Gap: After completing the Matching Funds section below, return to this section to show your calculation of the existing funding gap that exists on your project. LINE E:Total SECURED matching funds (Sum of all match sources listed as secured below)Ψ LINE F:Existing funding gap (Difference LINE D –LINE E)Ψ Matching Funds: Please list each funding source separately (including your own local funds secured for the project) and provide all of the following information: x Amount: List the funding amount secured or anticipated from each funding source. x Source: Identify the funding source. x Funds are secured or anticipated: A grant amount that has been confirmed by a funder in writing is a secured funding source. In identifying the applicant’s own contribution, the amount must be identified as a line item in an internal budget document or some other documentation must be able to be provided for the funding to be considered secured versus anticipated. Identifying funds under the presumption that a board or council will commit a certain amount through a future action would be considered an anticipated funding source. If you intend to apply for or have not yet received written confirmation of an award, these are considered anticipated.Only funding sources marked as secured should be included when calculating the total matching funds identified in LINE E above.All funding sources listed as secured will be required to provide proof that the award has been made or funds have otherwise been secured for your project. If you check secured and do not provide documentation, adjustments will be made to accurately reflect only secured and ESTIMATED PROEJCT COSTS, FUNDING GAP, AND MATCHING FUNDS 10,000 10,000 605,000 605,000 5,675,000 495,000 495,000 5,675,000 10,000 10,000 6,795,000 1,120,000 5,675,000 5,675,000 Utility Relocate 2,264,000 3,411,000 4,531,000 0 4,531000 Page 7 documented funding sources in scoring your application. x Funding type: Identify if funds are from a federal, state, local, or private source. x Intended use of these funds: In many cases, the intended use will be the same as this application; however, if the funds are for a particular item then indicate the funder’s intent. x Conditions on the use of funds: If the funder has any conditions on the funding, please list these. A common condition may be a date funds need to be spent by or a date the project must be completed by. Amount:Source: Funds are: Secured܆Anticipated:܆Funds are: Federal:܆State:܆ Local:܆Private:܆ Intended use of these funds: Conditions on the use of funds: Amount:Source: Funds are: Secured܆Anticipated:܆Funds are: Federal:܆State:܆ Local:܆Private:܆ Intended use of these funds: Conditions on the use of funds: Amount:Source: Funds are: Secured܆Anticipated:܆Funds are: Federal:܆State:܆Local:܆ Private:܆ Intended use of these funds: Conditions on the use of funds: Amount:Source: Funds are: Secured܆Anticipated:܆Funds are: Federal:܆State:܆ Local:܆Private:܆ Intended use of these funds: Conditions on the use of funds: Amount:Source: Funds are: Secured܆Anticipated:܆Funds are: Federal:܆State:܆ Local:܆Private:܆ Intended use of these funds: Conditions on the use of funds: Amount:Source: Funds are: Secured܆Anticipated:܆Funds are: Federal:܆State:܆ Local:܆Private:܆ Intended use of these funds: Conditions on the use of funds: Amount:Source: Funds are: Secured܆Anticipated:܆Funds are: Federal:܆State:܆Local:܆Private:܆ Intended use of these funds: Conditions on the use of funds: Amount:Source: Funds are: Secured܆Anticipated: ܆Funds are: Federal:܆State:܆ Local:܆Private:܆ Intended use of these funds: Conditions on the use of funds: $2,265,000 GO Bonds (City of North Liberty) For costs related to the City's portion for construction of the roadway section. $2,625,000 GO Bonds (City of Coralville) For costs related to the City's portion for construction of the roadway section. ✔ ✔ Anticipated NEPA Clearance (already in progress) Concept Statement Submittal Preliminary Plans Submittal Check Plans Submittal Buffer Period (Ease, Acq., Bridge and Floodplain Reviews) - START Buffer Period (Ease, Acq., Bridge and Floodplain Reviews) - END Final Plans Bid Letting (DOT) Award Construction Contract Construction - START Construction - END Audit Complete / Project Closed 2025 - June 2028 - April 2028 - October 2028 - December 2029 - January 2029 - June 2029 - July 2029 - October 2029 - November 2030 - March 2031 - June 2031 - December X A Concept Statement for the overall Forevergreen Road Extension project (12th Avenue to 1st Avenue) was submitted to the Iowa DOT in January 2025. This project has been discussed and coordinated through several meetings with the Iowa DOT and FHWA team, and the Concept Statement was submitted to cover the entire 1.3 mile project corridor to allow development of a major project path for a Phase 1 project utilizing a February 17, 2026 letting date. The DOT Office of Location and Environment required that an evaluation of the entire project corridor is required to achieve NEPA clearance before developing individual project phases. The City of North Liberty and the City of Coralville jointly submitted a funding application that was allocated $2.5M in Community Project Funding (aka Earmark) in 2023 through the Highway Infrastructure Program (HIP) with the City of Coralville as the lead sponsor (Demo ID IA259). These funds remain available for obligation through September 30, 2026, and will be utilized for construction costs of the Phase 1 portion of the overall project. This application applies to the Phase 2 portion of the overall project. Page 9 The following documents and narratives must be submitted with this application. In the upper right corner of each document or narrative write the corresponding letter shown below. A. A NARRATIVE assessing existing conditions, outlining the concept of the proposed project, and providing adequate project justification. Assess your project in regard to the transportation system relative to its functional relationship, proximity, or impact to an existing or planned transportation facility. If a regional project, assess the value of this project from a regional perspective and how it will be a functional addition to the transportation system and the region as a whole if no additional development funds are received. If a statewide or multi -regional project, assess the value of this project from a statewide or multi-regional perspective. B. A DETAILED MAP identifying the location of the project and any known environmentally sensitive areas/features. C. A SKETCH-PLAN of the project; including a typical cross-section of transportation facilities. D. An ITEMIZED BREAKDOWN of the total project costs. This documentation does not need to be a detailed, line-item type of estimate. However, it must accomplish two objectives: first, it must show the method by which the cost estimate was prepared; and second, it must enable a reviewer to determine if the cost estimate is reasonable. The manner in which these objectives are achieved may vary widely depending on the type, scope and complexity of the project. Absent a fully itemized list of costs, some general guidelines for possible methods of estimating each type of project cost are provided in Attachment A (page 13). E. An anticipated TIME SCHEDULE for the total project development. Funding for projects which fail to make satisfactory progress may be rescheduled or removed from the program by the Iowa Department of Transportation. F. An OFFICIAL ENDORSEMENT of the project from the authority to be responsible for its maintenance and operation. The authority must provide written assurance that it will adequately maintain the completed project for its intended public use for a minimum of 20 years following project completion. G. If applicable, a LETTER OF SUPPORT for the project from the scenic or historic byway board. The board’s letter should also address the project’s relationship to the byway’s intrinsic qualities, how the project will have a statewide or multi -regional impact, and whether the project is included in the byway’s current corridor management plan. H. A NARRATIVE discussing the public input process that was followed and the extent to which adjacent property owners and others have been informed of the proposed project and an assessment of their acceptance. I. A MINORITY IMPACT STATEMENT for the project. The undersigned is an official authorized to represent the applying organization. The person signing this document must have the authority to contractually bind the organization. Certification I certify that all proposed activities will be carried out; that all grant money received will be utilized solely for the purposes for which it is intended; that records documenting the planning process and implementation will be maintained and submitted when requested, and the Iowa DOT is hereby granted access to inspect project sites and/or records. To the best of my knowledge and belief, all information included in this application is true and accurate, including the commitment of all physical and financial resources. This application has been duly authorized by the applying organization. I understand that the attached official endorsement(s) binds the participating authority to assume responsibility for adequate maintenance of any new or improved facilities. DOCUMENTATION AND NARRATIVE INFORAMTION Page 10 The award of STBG funds and/or any subsequent funding or letting of contracts for design, construction, reconstruction, improvement, or maintenance; or the furnishing of materials shall not involve direct or indirect interest, prohibited by Iowa Code Sections 314.2, 362.5, or 331.342, of any state, county, or city official, elective or appointive. Any award of funding or any letting of a contract in violation of the foregoing provisions shall invalidate the award of funding and authorize a complete recovery of any funds previously disbursed. If funding assistance is approved for the project described in this application, I understand that an executed agreement between the applicant and the Iowa DOT is required before the project can be started, costs incurred, or such funding assistance authorized for use in implementing the project. Representing: _______________________________________________________________________ Printed Name____________________________________ Title________________________________ Signature________________________________________________ Date_______________________ City of North Liberty Ryan Rusnak Planning Director 2/24/2025 , IOWA CITY COMMUNITY SCHOOL DISTRICT CITY OF NORTH LIBERTY BEAUMONT, BARBARA G FOUR D'S ACRES, LLC KARL JOSEPH KREDER JR GAY D KEDER CITY OF CORALVILLE KERKHOFF, SCOTT M KERKHOFF, TERI J DAVIDSON, JAY R DAVIDSON, BEVERLY J CITY OFCORALVILLE SPENCER-JONES, ILIANA SPENCER-ORTEGA, HECTORWEINMAN, GARY KEMPF, JAMES KEMPF, MICHELLE NA P L E S A V E N E N L I B E R T Y R D N E KE L S E Y L N KELSEY CT FOREVERGREEN RD 12TH AVE FUTUR E CONTR O L B L DG PHASE I V FUT U R E STO R A G E B L D G SW O P T I O N FUTURESTORAGE BLDGEAST OPTION CITY OFCORALVILLE R=150. 0 0' R=765.00' 54' x 13' CONSPAN O-900 (543 sf) 9+0010+00 15+00 20+00 25+00 30+ 0 0 35+0 0 40+00 45+00 50+00 55+00 60+00 65+00 70+0 0 75+00 80+00 680 690 700 710 720 730 740 750 760 770 780 790 800 810 820 680 690 700 710 720 730 740 750 760 770 780 790 800 810 820 9+00 75 9 . 4 10+00 75 9 . 0 74 3 . 5 15+00 72 9 . 1 71 3 . 4 20+00 71 2 . 4 71 3 . 9 25+00 71 8 . 7 73 0 . 5 30+00 75 4 . 7 77 5 . 5 35+00 75 8 . 5 76 2 . 0 40+00 76 7 . 7 76 8 . 8 45+00 76 9 . 1 75 6 . 4 50+00 74 6 . 9 74 6 . 9 55+00 74 1 . 3 71 9 . 4 60+00 73 1 . 6 76 7 . 2 65+00 79 2 . 2 75 9 . 8 70+00 77 4 . 2 77 6 . 2 75+00 77 3 . 6 77 0 . 2 80+00 77 2 . 2 80+00 77 2 . 2 75 8 . 9 7 75 2 . 2 4 73 8 . 5 6 72 4 . 8 6 71 6 . 4 0 71 6 . 7 7 72 5 . 9 6 74 1 . 8 1 75 7 . 9 0 76 4 . 9 5 76 1 . 4 8 76 3 . 8 1 76 8 . 8 1 77 2 . 1 3 76 6 . 8 1 75 6 . 8 1 74 7 . 7 3 74 9 . 4 8 74 3 . 6 9 74 0 . 8 8 75 2 . 4 4 77 0 . 9 1 77 6 . 0 0 76 8 . 6 1 77 2 . 9 4 77 8 . 0 9 77 5 . 1 4 77 1 . 3 8 PVI STA: 11+77.29 PVI ELEV: 756.31 AD: -4.00% K: 50.00 200' VC BV C S : 1 0 + 7 7 . 2 9 BV C E : 7 5 7 . 8 1 EV C S : 1 2 + 7 7 . 2 9 EV C E : 7 5 0 . 8 1 HP STA: 10+77.29 HP ELEV: 757.81 PVI STA: 31+50.00 PVI ELEV: 767.81 AD: -8.50% K: 44.12 375' VC BV C S : 2 9 + 6 2 . 5 0 BV C E : 7 5 5 . 6 3 EV C S : 3 3 + 3 7 . 5 0 EV C E : 7 6 4 . 0 6 HP STA: 32+49.26 HP ELEV: 764.95 PVI STA: 72+40.00 PVI ELEV: 779.06 AD: -4.06% K: 49.32 200' VC BV C S : 7 1 + 4 0 . 0 0 BV C E : 7 7 6 . 5 1 EV C S : 7 3 + 4 0 . 0 0 EV C E : 7 7 7 . 5 5 HP STA: 72+65.76 HP ELEV: 778.11PVI STA: 43+00.00 PVI ELEV: 774.81 AD: -6.00% K: 66.67 400' VC BV C S : 4 1 + 0 0 . 0 0 BV C E : 7 7 0 . 8 1 EV C S : 4 5 + 0 0 . 0 0 EV C E : 7 6 6 . 8 1 HP STA: 42+33.33 HP ELEV: 772.15 PVI STA: 53+25.00 PVI ELEV: 750.69 AD: -5.50% K: 36.36 200' VC BV C S : 5 2 + 2 5 . 0 0 BV C E : 7 4 9 . 1 9 EV C S : 5 4 + 2 5 . 0 0 EV C E : 7 4 6 . 6 9 HP STA: 52+79.55 HP ELEV: 749.60 PVI STA: 63+83.70 PVI ELEV: 781.22 AD: -11.50% K: 30.43 350' VC BV C S : 6 2 + 0 8 . 7 0 BV C E : 7 6 8 . 0 9 EV C S : 6 5 + 5 8 . 7 0 EV C E : 7 7 4 . 2 2 HP STA: 64+36.96 HP ELEV: 776.65PVI STA: 21+50.00 PVI ELEV: 702.81 AD: 12.00% K: 70.83 850' VC BV C S : 1 7 + 2 5 . 0 0 BV C E : 7 2 6 . 1 9 EV C S : 2 5 + 7 5 . 0 0 EV C E : 7 3 0 . 4 4 LP STA: 21+14.58 LP ELEV: 715.47 PVI STA: 35+50.00 PVI ELEV: 759.81 AD: 4.00% K: 75.00 300' VC BV C S : 3 4 + 0 0 . 0 0 BV C E : 7 6 2 . 8 1 EV C S : 3 7 + 0 0 . 0 0 EV C E : 7 6 2 . 8 1 LP STA: 35+50.00 LP ELEV: 761.31 PVI STA: 67+50.00 PVI ELEV: 766.56 AD: 6.55% K: 38.17 250' VC BV C S : 6 6 + 2 5 . 0 0 BV C E : 7 7 1 . 5 6 EV C S : 6 8 + 7 5 . 0 0 EV C E : 7 6 9 . 7 5 LP STA: 67+77.67 LP ELEV: 768.51 PVI STA: 50+18.18 PVI ELEV: 746.09 AD: 5.50% K: 36.36 200' VC BV C S : 4 9 + 1 8 . 1 8 BV C E : 7 5 0 . 0 9 EV C S : 5 1 + 1 8 . 1 8 EV C E : 7 4 7 . 5 9 LP STA: 50+63.64 LP ELEV: 747.18 PVI STA: 57+50.00 PVI ELEV: 733.69 AD: 11.50% K: 43.48 500' VC BV C S : 5 5 + 0 0 . 0 0 BV C E : 7 4 3 . 6 9 EV C S : 6 0 + 0 0 . 0 0 EV C E : 7 5 2 . 4 4 LP STA: 56+73.91 LP ELEV: 740.21 -1.50% -5.50%6.50% -1.51% -2.00%2.00%2.55% -4.00% 1.50% -4.00% -4.00% 7.50% NORTH PROJECT NUMBER:SHEET NUMBER SHIVE-HATTERY 2112304220 D.01S-H PROJECT NO. 2112304220 JOHNSON S- H P R O J E C T N O . 2 1 1 2 3 0 4 2 2 0 FOREVERGREEN ROAD EXTENSION - PLAN VIEW FOREVERGREEN ROAD EXTENSION - PROFILE VIEW CITY OF CORALVILLE CITY OF CORALVILLE FOREVERGREEN ROAD EXTENSION 000000000 55+00+05+555 000000+00+00+05+05+5+0555+5+555555555555+ 1E 888888888888888888888888888888888888 ========11111111111111155555555555555555000000000000000.. 000000000000000000000000000 00000000000000000'' +0++++++00+0+0+00 0000+0 2 54' x 13' CONSPANN O-900 (543 sf) 2 3 RRRRRRRRRRRRRRRRR=======77777777777777777666666666666666666666666555555555555...00000000000000000'''' 5555555 4 PHASE 1 - EAST 1ST AVENUE CONNECTION PHASE 2 NAPLES AVENUE EAST CONNECTION PHASE 3 NAPLES AVENUE WEST CONNECTION PHASE 4 NAPLES AVENUE ROUNDABOUT 1 S T A V E N U E N O R T H L I B E R T Y R O A D NA P L E S A V E N U E FOREVERGREEN RD 12 T H A V E PHASE 1 - WEST 12TH AVENUE CONNECTION 1W $1,235,000$5,675,000$8,575,000$2,315,000 $2,000,000 Varies FOREVERGREEN ROAD EXTENSION PHASE 2 - TYPICAL SECTION FOREVERGREEN ROAD EXTENSION PHASE 2 - TYPICAL SECTION Varies FOREVERGREEN ROAD EXTENSION - PHASE 2 OPINION OF ANTICIPATED CONSTRUCTION COSTS Concept Phase - February 2025 2030 ITEM DESCRIPTION UNIT QUANTITY UNIT COST EXTENDED COST 1 EARTHWORK, CLASS 10 CY 90,000 9.00$ 810,000$ 2 CLEARING AND GRUBBING ACRE 6.00 10,500$ 63,000$ 3 CROSSROAD - PIPE CULVERTS LF 400 205$ 82,000$ 4 CROSSROAD - BOX CULVERTS LF 300 525$ 157,500$ 5 DRAINAGE CHANNEL REALIGNMENT LF 400 1,050$ 420,000$ 6 MODIFIED SUBBASE CY 2,400 40$ 96,000$ 7 LONGITUDINAL SUBDRAIN AND OUTLETS, 6-INCH LF 5,100 25$ 127,500$ 8 PCC PAVEMENT, 9-INCH (ROAD WIDTH 31' B-B)SY 6,070 67$ 406,690$ 9 PCC TRAIL, 10-FOOT WIDTH SY 2,800 52$ 145,600$ 10 STORM SEWER - ROADWAY PIPE LF 2,300 105$ 241,500$ 11 STORM SEWER - ROADWAY STRUCTURES EACH 36 5,200$ 187,200$ 12 WATER MAIN AND HYDRANTS, 12-INCH LF 1,750 236$ 413,000$ 13 RETAINING WALLS SF 7,500 100$ 750,000$ 14 WETLAND MITIGATION LS 1 410,000$ 410,000$ 15 SIDE ROAD CONNECTIONS LS 1 40,000$ 40,000$ 16 TRAFFIC CONTROL LS 1 15,000$ 15,000$ 17 STREET LIGHTING LS 1 55,000$ 55,000$ 18 MOBILIZATION LS 1 310,000$ 310,000$ OPINION OF CONSTRUCTION COST - SUBTOTAL 4,730,000$ CONTINGENCY (20%)945,000$ OPINION OF CONSTRUCTION COST - TOTAL 5,675,000$ PROPERTY ACQUISITIONS AND EASEMENTS 10,000$ PRIVATE UTILITY RELOCATIONS 10,000$ OPINION OF PROJECT COSTS - SUBTOTAL 5,695,000$ ENGINEERING FEDERAL-AID (DESIGN | BID | CONSTRUCTION)1,100,000$ * OPINION OF PROJECT COSTS - TOTAL 6,795,000$ * Costs for easements, acquisitions, and utility relocations are estimates based on conceptual stage project information DESCRIPTION: Construct new 31' B-B PCC urban roadway from Naples Avenue to 1st Avenue, connecting to the Phase 1 East roadway project limit. Work includes 10-foot PCC trail, retaining walls, 12-inch water main, box culverts, stream realingment, tree clearing and grading. Page 11 Minority Impact Statement Form 105101 (02-20) Pursuant to 2008 Iowa Acts, HF 2393, Iowa Code 8.11, all grant applications submitted to the State of Iowa that are due beginning Jan. 1, 2009, shall include a Minority Impact Statement. This is the state's mechanism for requiring grant applications to consider the potential impact of the grant project's proposed programs or policies on minority groups. Please choose the statement(s) that pertains to this grant application. Complete all the information requested for the chosen statement(s). Submit additional pages as necessary. The proposed grant project programs or policies could have a disproportionate or unique positive impact on minority persons. Describe the positive impact expected from this project: Indicate which groups are impacted: Women Persons with a disability Blacks Latinos Asians Pacific Islanders American Indians Alaskan Native Americans Other__________ The proposed grant project programs or policies could have a disproportionate or unique negative impact on minority persons. Describe the negative impact expected from this project: Present the rationale for the existence of the proposed program or policy : Page 12 Provide evidence of consultation with representatives of the minority groups impacted : Indicate which groups are impacted: Women Persons with a disability Blacks Latinos Asians Pacific Islanders American Indians Alaskan Native Americans Other__________ The proposed grant project programs or policies are not expected to have a disproportionate or unique impact on minority persons. Present the rationale for determining no impact: I hereby certify that the information on this form is complete and accurate, to the best of my knowledge. Name Title Definitions "Minority Persons,” as defined in Iowa Code 8.11, means individuals who are women, persons with a disability, Blacks, Latinos, Asians or Pacific Islanders, American Indians, and Alaskan Native Americans. “Disability,” as defined in Iowa Code 15.102, subsection 7, paragraph “b,” subparagraph (1): b.As used in this subsection: (1)"Disability" means, with respect to an individual, a physical or mental impairment that substantially limits one or more of the major life activities of the individual, a record of physical or mental impairment that substantially limits one or more of the major life activities of the individual, or being regarded as an individual with a physical or mental impairment that substantially limits one or more of the major life activities of the individual. "Disability" does not include any of the following: (a)Homosexuality or bisexuality. (b)Transvestism, transsexualism, pedophilia, exhibitionism, voyeurism, gender identity disorders not resulting from physical impairments or other sexual behavior disorders. (c)Compulsive gambling, kleptomania, or pyromania. (d)Psychoactive substance abuse disorders resulting from current illegal use of drugs. “State Agency,” as defined in Iowa Code 8.11, means a department, board, bureau, commission, or other agency or authority of the State of Iowa.