HomeMy WebLinkAboutWS5 - Burlington Street Bridge Project Update PresentationCONSULTANT PRESENTATION TO FOLLOW:
By: Michael Kurek, Project Manager, HDR Engineering
1 r I
WS5
'"r' LA
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240- 1 826
(319) 356-5000
(319) 356-5009 FAX
www.icgov.org
BURLINGTON STREET BRIDGE
BUILDINP BETTER CONNECTIONS
City Council
Update Meeting
May 20, 2025
FAAMTKIC4 NL1D-.
�WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW� WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW�
�im Introductions
■ Project Background and Overview
■ Stakeholder Engagement Summary
aim StakeholderWorking Group Feedback
aim Stakeholder Feedback
aim Public Feedback
■ TAC Needs/Wants
�im Advancing Concept Alternatives
�im Next Steps
PROJECT BACKGROUND
Ral""m
!!T•
TRAFFIC
VOLUMES
Vehicular (Daily)
ii 23K-25K on Riverside
ii 16K-22K on Burlington
�ii 44K Intersection Total
Entering Volume
Pedestrian Bridge (Daily)
11 1,500 — 2,500
Buses (Daily)
11 —350 East/West
11 —50 East/South
STAKEHOLDER
ENGAGEMENT
t PIS
6 'h
• LIST GROUPS REPRESENTED:
gum Student Government
um Bike Iowa City
um University of Iowa Facilities + Utilities
um Iowa City Downtown District
gum U of I - Recreation Services — Student Life
um City of Iowa City
N Streets,Water,Wastewater,
gum U of I Athletics
um Iowa DOT Maintenance and Operations
gum U of I Hospitals and Clinics
gum U of I Housing — Student Life
um College Hill Neighborhood Association
um Think Iowa City
um U of I— Power Plant, Water Plant, I I H R
gum Greater Iowa City Inc.
um Friends of Historic Preservation Iowa City
um Iowa City —Transit um MPOJC — Bike Coordinator
l--low easy is It for you to in* a e Burinin, ton Street Bridge for each
of
l�llll�lll`��1\0\0 v,l,,, Imodeood and e easy, 3 = difficult needs improvement)
�9tWrll•r,� 1' KW
.! �l i, sl i��l Fd, w � ,R Y "i murv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�nurv�n
o-;mir v,,A
GaAs
im City of Iowa City im University of Iowa im Bike & Pedestrian
IN Public Works Director IN Campus Planning IN Iowa City ADA Coordinator
IN Engineering IN Parking and Transportation IN Students for Disability Advocacy
IN Streets &Traffic IN Hospitals and Clinics IN Bike Iowa City
N Water,Wastewater IN Student Life — Cultural Centers
IN Parks IN Student Life —Housing
IN University of Iowa Cycling Club
IN Public Involvement ���� Student Life — Rec Services ��' University of Iowa —Bike Master
Planning Team
�im J ���� Facilities —Landscape ��M POC Facilities — Utilities MPOJC —Bike Coordinator
W Executive Director Athletics IN Iowa Bike Coalition
W Associate Transportation Planner College of Law IN University of Iowa Student Life
aim Iowa DOT im E M S
IN Planning
INBridge Design Office IN Iowa City Fire
IN Maintenance and Operations IN Iowa City Police
IN Traffic IN Johnson County Ambulance
IN Local District Engineers IN
Johnson County Sheriffs Office
IN University of Iowa Hospitals & Clinics
Private Utilities IN Football Event Coordination
Uofl Dam & Facilities
�im Iowa D N R
im Transit
�• Iowa City Transit
�• Coralville Transit
�N CAMBUS
N Parking &Transportation
GOVERNING BODIES & ELECTEIVF
OFFICIALS
�WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW� WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW�
■ City of Iowa City
■ Board of Regents —Via University of Iowa
�WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW� WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW�
'Nift
-
■ Public Information Meeting#
im In -Person and Virtual
ou 29 Attendees (not including project team or staff)
im Meetings Recorded and Posted to Project Website
■ Flyers and Project Post Cards
im ProjectWebsite & Email
im Press Releases
im Social Meida
0
Virtual Surveys
im 282 Responses
180
160
140
120
100
80
60
40
20
0
102
47 44 47
12
Replace east ard
west1bOUnd bridges
Wth a srgpe bridge.
Age Groups
65 o� 'I 8-24
aLmve
24% 25-34
r1���rlii��I���II��lllllll������
�5%
35-44
21 '/b
Goal Priorrfizafion
166
29.), 225
200
150
100
50
0
More efficiient
nnovennent
95
4 80
46 5 66 66 39 50 36 50 30 50
45 55 32
14 9 15
11111 .. . — 1, 1 HHHHHH11 IN
Roadway ancl �irnpirove, the brAge Evakiate pedestiri,,an Assess the Vowa Riiveir
georrietric and adpacerit corinecfions dami.
improvernents. roadways for rniulfiple
moides of
franspor�afian,
m1 (most mportraw) N2 iiiiia3 1111111114 5 (~I�east
Most Important Project Needs
ME
Des,mated blike
and pedestrbn
facififies
105
913
70
48
PuUlc [rarigit kvirmoved Hghbng AD A acces,sible Reduction of
and signage facHitles vehli�,Ie speeds
EXISTING STUDIESTRAFFIC, FUTUR
PLANS I
�WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW� WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW�
Campus Planning and Development
Campus Planning ,,, Committees ,,,, Real Estate Business Manager
ONA OTY BICYCLE. MASTER PLAN
■ Feedback was collected and analyzed for recurring comments, trends
in responses, impactful comments, polls, and stakeholder input.
■ Reviewed existing plans and studies
■ The needs and wants were developed from all of the public input,
stakeholder input during the visioning phase.All of the surveys,
feedback, meetings, comments from stakeholders were all compiled,
and common items were presented to the Technical Advisory
DETERMINING GUIDING
PRINCIPLES FROM
STAKEHOLDER
NEEDSANDWANTS
(2) Need
r °r Want
�WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW� WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW�
Iowa DOT
University of Iowa
MPOJC
�WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW� WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW�
TAC Workshop # 1 - Initial Vision Planning and Determination of Project Priorities
40 Unified direction to advance Concept alternatives
TAC Workshop #2 — Concept Alternatives Discussion and Advancement of Preliminary
Alternatives
40 Unified direction to advanced Preliminary Alternatives
TAC Workshop #3 — Preliminary Alternatives Discussion & Selection of Preferred
Alternative/Next Steps
40 Unified direction to advanced Preferred Alternative (singular)
TAC UNIFIED DECISION OP<.w-
NEEDS AND WANTS I
(1''I10Ik;YIIIGY)
Safety
(II'"'110I�IIV�u
J „III SU4, ,, U Y Area)
TRANSIT
BIKE/PED
ROADWAYS/INTERSECTIONS
Create and Enable safe, reliable,
Create lower stress ADA compliant areas to walk and
Design safer roads and intersections
y
and convenient transit service and
o
bike
that function for all modes
stops
W
Z
Lower
Improved
Safe and
Create a
Accommodate
Dedicated Bike/Ped
Design is ADA
Lower Bike
Pedestrian
Design Vehicle
intersection
Bypass for
Efficient
CAMBUS Transit
boarding zones
Space
Compliant
Stress
Stress
Works
Geometry
through traffic
Transit Service
Hub
and deliveries
;°� ehmil'
EMERGENCY RESPONSE
CAMPUS CONSIDERATION
y
Prioritize emergency vehicle access to the medical center during
Develop a sense of place that is safe and
W
design and construction
attractive
W
Z
Improve EMS Access and LIMIT
Unimpeded access for EMS vehicles
Communicate
Improved Lighting
Matching
Coordinate traffic
Emergency Room Impact
during peak and heavy drop-off/Pick-
updates through
and Safety
Aesthetic
impacts/stages through
up
Construction
Construction
(IL. Fm ()111(.) U"z.ljy )
�� �.U.,"If"l(JIfY'1�`�a r'VoYfU�G;`� `i� `��`�✓U,, ��rU'VII"Ui
ACCESS DURING CONSTRUCTION
y
Minimize construction impacts and disruption to traffic and
BURLINGTON ST DAM
W
adjacent land uses
Safety
W
Z
Maintain or
Maintain or
Coordinate traffic impacts/stages through Construction and Consider current
Decrease
Improve Flood
Improve River
operations to keep businesses open
Drowning Risk
Risk
Recovery
TAC UNIFIED DECISION OP<.w-
NEEDS AND WANTS I
Strate& Area)
ROADWAY
OWNERSHIP/MAINTENANCE
Cn
Grand Avenue
Z
Bridges transfer ownership and maintenance
Bridges transfer ownership and maintenance
Thew new bridge should
Remove the city from ownership and
responsibilities of the Burlington St Bridge to Iowa
responsibilities of any new or modified
accommodate inspection and
maintenance responsibilities of
DOT
pedestrian structure
maintenance via snooper
Grand/S. Grand surrounded by
university buildings
ACCESS DURINGCONSTRUCTION
EMERGENCY RESPONSE
CAMPUS CONSIDERATIONS
Q
The Riverside/Burlington Intersection should include signal pre-
Alternatives should be reviewed by
for
The Existing Bridge to remain in
emption
game -day operations staff negative
service as much as possible
impacts and accommodated
BURLINGTON ST DAM
cn
Recreation
Z
Whitewater
Q
Improve Downstream
Access
Fish /Boat Passage
Recreation / River
Access / Other
Recreation
PROJ ECT
CONSTRAINTS
Z,
COST AN D'SCH EDULEI M PACTS
Z,
Staged or Environmental Utility
0 ,
Cost Closed
Impacts Impacts
L)
Construction
J III Strate& Area)
ADVANCEMENT OF
CONCEPT ALTERNATIVES
me
MA,
If va,
A 'M
CEYAREA
I ot I
l ,'�//
gm,
Burlington Street
Ilemmm,
A/11
�WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW� WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW�
■ There are 4 primary areas which will drive design and options
Burlington St Dam Alternatives
Dam Alternative #2a: Modify - Safety
Dam Alternative #3: Dam Removal
Burlington St Bridge Alternatives
Bridge Alternative #2: Traditional Bridge w/ Separate Multi -
Modal Bride
Bridge Alternative #4: Signature Bridge w/ Separate Multi -
Modal Bridge
Roadway & Bike/Ped Crossing Alternatives
Crossing Alternative #2: Grade Separated - Under, Along
Riverside
Inia
ZIONSINMZ61
im What's next?
o May 22"d I Technical Advisory
Committee Workshop #2
o July I Stakeholder Meetings
o August I Public Meeting #2
o August I Electronic, public survey
■ Revisit with Council Late
Summer 2025
im Project contact
Justin Harland
Iowa City Public Works
jharland@iowa-city.org
3 19-356-5 154
Project Email:
it i it i
i �r
Thank you!
PRESENTATION CONCLUDED