HomeMy WebLinkAboutMORMON TREK PCC PATCHING PROJECT 2024MORMON TREK PCC PATCHING PROJECT 2024
2024-Mar-19 Plans, specs, project manual
2024-Mar-19 Engineer's estimate of cost
2024-Mar-19 Res No. 24-68: Setting public hearing
2024-Apr-02 Res No. 24-84: Approving project manual & estimate of cost
2024-Mar-25 Notice of public hearing
2024-Apr-04 Notice to bidders
2024-May-07 Res No. 24-116: Awarding contract for construction
2024-May-16 Performance, payment, & maintenance bond
2025-Jun-09 Engineer's report
2025-Jun-17 Res No. 25-151: Accepting the work
CITY OF lOVVA CITY
UNESCO CITY OF LITERATURE
PUBLIC WORKS DEPARTMENT
ENGINEERING DIVISION
PROJECT MANUAL
FOR THE
FORMAL
MORMON TREK PCC PATCHING PROJECT
IOWA CITY, IOWA
March 19, 2024
E :
+„1
CO
z41
w:
v�
0005
CERTIFICATIONS PAGE
I hereby certify that this engineering document was
prepared by me or under my direct personal supervision
and that I am a duly licensed Professional Engineer
''�o, under the laws of the State of Iowa.
••.
SCOTT K. Z6) : Scott K. Sovers Date
SOVERS
17141 :� ` License Number: P17141
� My license renewal date is December 31, 2024
Pages or sheets covered by this seal:
�'1OW11110%��o�Entire Bound Document
-nu t
r�
v
Mormon Trek Pcc Patching Project 0005 — Page 1 of 1
0010
TABLE OF CONTENTS
PROJECT MANUAL
0005 CERTIFICATIONS PAGE
0010 TABLE OF CONTENTS
0100 NOTICE TO BIDDERS
0110 NOTICE OF PUBLIC HEARING
0200 INSTRUCTIONS TO BIDDERS
0400 PROPOSAL
0405 BIDDER STATUS FORM
0500 CONTRACT
0510 PERFORMANCE, PAYMENT, AND MAINTENANCE BOND
0520 CONTRACT COMPLIANCE
0530 WAGE THEFT POLICY
SUDAS STANDARD SPECIFICATIONS
GENERAL SUPPLEMENTAL SPECIFICATIONS
SUPPLEMENTAL SPECIFICATIONS
PLANS (UNDER SEPARATE COVER)
�a
}
yJ
• • yw.�ir. )
y�
Mormon Trek Pcc Patching Project 0010 — Page 1 of 1
0100
NOTICE TO BIDDERS
MORMON TREK PCC PATCHING PROJECT
Sealed proposals will be received by the City Clerk of the City of Iowa City, Iowa, until 3:00 P.M.
on the 23Id day of April 2024. Sealed proposals will be opened immediately thereafter. Bids
submitted by fax machine shall not be deemed a "sealed bid" for purposes of this Project.
Proposals received after this deadline will be returned to the bidder unopened.
Proposals will be acted upon by the City Council at a meeting to be held in the Emma J. Harvat
Hall at 6:00 P.M. on the 7th day of May, 2024, or at special meeting called for that purpose.
The Project will involve the following
Approximately 4,000 square yards of PCC patching on Mormon Trek Boulevard north of Melrose
Avenue, as well as intake throat replacements, pavement markings, and seeding/site restoration.
All work is to be done in strict compliance with the Project Manual prepared by The City of Iowa
City, Iowa, which has heretofore been approved by the City Council, and are on file for public
examination in the Office of the City Clerk.
Each proposal shall be completed on a form furnished by the City and must be submitted in a
sealed envelope. In addition, a separate sealed envelope shall be submitted containing a
completed Bidder Status Form and a bid security executed by a corporation authorized to contract
as a surety in the State of Iowa, in the sum of 10% of the bid. The bid security shall be made
payable to the TREASURER OF THE CITY OF IOWA CITY, IOWA, and shall be forfeited to the
City of Iowa City in the event the successful bidder fails to enter into a contract within ten (10)
calendar days of the City Council's award of the contract and post bond satisfactory to the City
(in the form shown in Section 0510) ensuring the faithful performance of the contract and
maintenance of said Project, if required, pursuant to the provisions of this notice and the other
contract documents. The City shall retain the bid security furnished by the successful bidder until
the approved contract has been executed, the required Performance, Payment, and Maintenance
Bond (as shown in Section 0510) has been filed by the bidder guaranteeing the performance of
the contract, and the contract and security have been approved by the City. The City shall
promptly return the checks or bidder's bonds of unsuccessful bidders to the bidders as soon as
the successful bidder is determined or within thirty days, whichever is sooner.
The successful bidder will be required to furnish a Performance, Payment, and Maintenance Bond
in an amount equal to one hundred percent (100%) of the contract price and in the form shown in
Section 0510, said bond to be issued by a responsible surety approved by the City, and shall
guarantee the prompt payment of all materials and labor, and also protect and save harmless the
City from all claims and damages of any kind caused directly or indirectly by the operat+pn of the
contract, and shall also guarantee the maintenance of the improvement for a period 4 five (5)
years from and after its completion and formal acceptance by the City Council
17
r
Mormon Trek Pcc Patching Project 0100 — Page 1 of 2
The following limitations shall apply to this Project:
Specified Start Date:
May 27, 2024
Substantial Completion Date:
August 23, 2024
Final Completion Date:
September 13, 2024
Liquidated Damages:
$500 per day
All of the bid items listed in Section 0400 — Proposal shall be completed by the Substantial
Completion Date except item 13 Hydraulic Seeding, Fertilizing, and Mulching.
The Project Manual may be examined at the office of the City Clerk. Copies thereof and blank
forms may be secured at the office of Technigraphics, a division of Rapids Reproductions located
at 415 Highland Ave, Suite 100, Iowa City, Iowa 52240. Phone: (319) 354-5950, Fax: (319) 354-
8973, Toll -Free: (800) 779-0093.
Prospective bidders are advised that the City of Iowa City desires to employ minority contractors
and subcontractors on City projects. A listing of minority contractors can be obtained from the
Iowa Department of Inspections and Appeals at (515) 281-5796 and the Iowa Department of
Transportation Contracts Office at (515) 239-1422.
Bidders shall list on the Proposal the names of persons, firms, companies or other parties with
whom the bidder intends to subcontract. This list shall include the type of work and approximate
subcontract amount(s).
The Contractor awarded the contract shall list on the Contract its subcontractors, together with
quantities, unit prices and extended dollar amounts.
By virtue of statutory authority, preference must be given to products and provisions grown and
coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required
under Iowa Statutes. The Iowa reciprocal resident bidder preference law applies to this Project.
The City reserves the right to reject any or all proposals, and also reserves the right to waive
technicalities and irregularities.
Posted upon order of the City Council of Iowa City, Iowa.
KELLIE GRACE, CITY CLERK
Fri
�d3
Mormon Trek Pcc Patching Project 0100 — Page 2 of 2
0110
NOTICE OF PUBLIC HEARING
NOTICE OF PUBLIC HEARING ON PROJECT MANUAL
AND ESTIMATED COST FOR THE MORMON TREK PCC
PATCHING PROJECT IN THE CITY OF IOWA CITY, IOWA
TO ALL TAXPAYERS OF THE CITY OF IOWA CITY,
IOWA, AND TO OTHER INTERESTED PERSONS:
Public notice is hereby given that the City Council of the
City of Iowa City, Iowa, will conduct a public hearing on the
Project Manual, including the plans, specifications, contract,
and estimated cost for the construction of the Mormon Trek
PCC Patching in said city at 6:00 p.m. on the 2nd day of April,
2024, said meeting to be held in the Emma J. Harvat Hall in
the City Hall, 410 East Washington Street in said city, or if
said meeting is cancelled, at the next meeting of the City
Council thereafter as posted by the City Clerk.
This project includes approximately 4,000 square yards
of portland cement concrete patching on Mormon Trek
Boulevard north of Melrose Avenue, as well as intake throat
replacements, pavement markings, and seeding/site
restoration.
Said Project Manual and estimated cost are now on file
in the office of the City Clerk in the City Hall in Iowa City,
Iowa, and may be inspected by any interested persons.
Any interested persons may appear at said meeting of
the City Council for the purpose of making objections to and
comments concerning said Project Manual or the cost of
making said improvement.
This notice is given by order of the City Council of
t"
s
the City of Iowa City, Iowa and as provided by law.
Kellie K. Grace, City Clerk
C
--}
w f
co
Mormon Trek Pcc Patching Project 0110 — Page 1 of 1
0200
INSTRUCTIONS TO BIDDERS
MORMON TREK PCC PATCHING PROJECT
Bid Submittals:
a. Time, Date and Location:
April 23, 2024 at 3:00 p.m.
City Clerk's Office
410 East Washington Street
Iowa City, Iowa 52240
b. Submittals include two separate sealed envelopes:
Envelope 1: Bid Security and Bidder Status Form
Envelope 2: Proposal
C. See Section 1020, as may be supplemented, for complete descriptions of proposal
requirements and conditions.
2. Bidder Status:
a. Use the Bidder Status Form included in Section 0405.
b. Submit in accordance with 0200.2.b above.
C. See Section 0405 for the Worksheet: Authorized to Transact Business and 875
Iowa Administrative Code Chapter 156 (73A), found at the following website:
https://www.legis.iowa.gov/docs/iac/chapter/08-15-2018.875.156.pdf, for
assistance in completing the form.
3. Bid Security:
a. Use the Bid Bond Form included in Section 0410.
b. Submit in accordance with 0200.2.b above.
C. Bid security is 10% of the total bid, including all added alternates (do not deduct
the amount of deducted alternates).
pll
d. See Section 1020, as may be supplemented, for a complete descriptiowof the bid
security requirements."
4. Progress and Schedule:
a. Contract Times:'
Specified Start Date: May 27, 2024=�-
Substantial Completion Date: August 23, 2024
Final Completion Date: September 13, 2024
:-
00
Liquidated Damages: $500 per day
All of the bid items listed in Section 0400 - Proposal shall be completed by
the Substantial Completion Date except item 13 Hydraulic Seeding,
Fertilizing, and Mulching.
b. Work Restrictions:
i. No work shall be done between 10:00 pm and 7:00 am without the approval
of the Engineer, with the exception of saw cutting freshly poured concrete.
ii. Notify the Engineer four days in advance of street closings so that a press
release can be issued. No street may be closed without the Engineer's
approval and said notification.
Mormon Trek Pcc Patching Project 0200 - Page 1 of 3
C. Community Events:
i. The Contractor should look at community calendars to determine potential
conflicts with planned construction activities and schedule.
ii. The Contractor should make sure their activities are not impacting
community events.
iii. No work shall occur on University of Iowa home football gamy; days. All
lanes should be open to traffic over home football game day leekends.
The home football game days are scheduled to be:
• August 31, 2024
• September 7, 2024
\---{,
• September 14, 2024
.-<.
• October 12, 2024
• October 26, 2024
,.
• November 2, 2024
'" W
• November 29, 2024
5. Performance, Payment and Maintenance Bond:
a. The successful bidder will be required to furnish a bond in an amount equal to one
hundred percent (100%) of the contract price for a period of five (5) years after its
completion and formal acceptance by the City Council.
b. Use the Performance, Payment, and Maintenance Bond Form included in Section
0510.
C. See Section 1070, Part 3, as may be supplemented, for a complete description of
the bonding requirements.
6. Insurance Requirements:
a. The City of Iowa City is to be listed on the required insurance certificate, as an
additional insured on a primary and non-contributory basis. Review this
requirement with your insurance broker prior to bidding.
b. See Section 1070, Part 3, as may be supplemented, for a complete description of
the insurance requirements.
7. Taxes:
a. Sales Tax Exemption Certificates will be issued according to Section 1020, 1.08
of the Supplemental Specifications.
8. Contract Compliance:
a. For all contracts of $25,000 or more, the successful bidder shall abide by the
requirements of the City's Contract Compliance Program, as described in the
Section 0520.
9. Wage Theft Policy:
a. For all contracts of $25,000 or more, the successful bidder shall abide by the
requirements of the City's Wage Theft Policy, as described in Section 0530.
10. References:
a. The successful bidder and all of its subcontractors are required to submit at least
four (4) days prior to award three (3) references involving similar projects, including
at least one municipal reference. Award of the bid or use of specific subcontractors
may be denied if sufficient favorable references are not verified or based on past
experience on projects with the City of Iowa City.
Mormon Trek Pcc Patching Project 0200 — Page 2 of 3
b. References shall be addressed to the City Engineer and include the name, address
and phone number of the contact person, for City verification.
11. Contract Documentation:
a. The Contractor must demonstrate an active subscription to Doc Express (program
by Info Tech, Inc.) is maintained. Doc Express will be used to process
documentation, including, but not limited to, contract documents, change orders,
shop drawings, certificates, equipment lists, progress payments, and other
electronic submittals.
b. Record documentation is required on all projects in accordance with Section 1090,
1.08.E of the Supplemental Specifications. Liquidated damages will be considered
if adequate record documentation is not submitted by the Final Completion Date.
4 J
i%JO
ZE
CO
Mormon Trek Pcc Patching Project 0200 — Page 3 of 3
INSERT IN ENVELOPE 2
0400
PROPOSAL
MORMON TREK PCC PATCHING PROJECT
CITY OF IOWA CITY
Please DO NOT USE the proposal included in the bound volume of the specifications. Separate
copies of this form are contained with this document.
The following documents must be submitted as printed. No alterations, additions, or deletions
are allowed. If the Bidder notes a requirement in the contract documents that the Bidder believes
will require a conditioned or unsolicited alternate bid, the Bidder must immediately notify the
Engineer in writing. The Engineer will issue any necessary interpretation by an addendum.
Name of Bidder:
Address of Bidder:
TO: City Clerk
City of Iowa City
City Hall
410 East Washington Street
Iowa City, Iowa 52240
The undersigned bidder submits herewith bid security in the amount of
$ , in accordance with the terms set forth in the Project Manual.
The undersigned bidder, having examined and determined the scope of the Contract,
hereby proposes to provide the required labor, services, materials and equipment and to perform
the Project as described in the Project Manual, including Addenda and
, and to do all work at the prices set forth herein.
The undersigned bidder further proposes to do all "Extra Work" which may be required to
complete the work contemplated, at unit prices or lump sums to be agreed upon in writing prior to
starting such work.
The undersigned bidder certifies that this proposal is made in good faith, and without
collusion or connection with any other person or persons bidding on the work.
The undersigned bidder states that this proposal is made in conformity with the Contract
and agrees that, in the event of any discrepancies or differences between the vous items
included in the Contract, Supplemental Specification Section 1040, 1.03 shall govert�g
r=,
Mormon Trek Pcc Patching Project 0400 — Page 1 of 4
INSERT IN ENVELOPE 2
BID
ITEM DESCRIPTION
ESTIMATED
UNITS QUANTITY
UNIT EXTENDED
PRICE AMOUNT
1
Below Grade Excavation
SY
100
(Core Out) *contingency
2
Intake Adjustment,
EA
15
SW-508, Throat Only
3
Intake Adjustment,
EA
22
SW-509, Throat Only
4
Intake Adjustment,
EA
1
SW-541 Top and Throat
5
Full Depth Patch, PCC,
SY
2985
10", CSUD
Full Depth Patch, PCC,
6
10", CSUD, Reinforced
SY
1015
with #5 bars 18" O.C.
7
Subbase Over
TON
50
Excavation *contingency
Crack and Joint
8
Cleaning and Filling,
MI
1.6
Hot Pour
9
Painted Pavement
STA
100
Markings, High -Build
10
Painted Symbols and
EA
10
Legends, High -Build
11
Temporary Traffic
LS
1
Control
Temporary Traffic
12
Control, Dynamic
LS
1
Message Boards
13
Hydraulic Seeding,
LS
1
Fertilizing, and Mulching
14
Mobilization
LS
1
TOTAL EXTENDED AMOUNT =
*This is a contingency bid item to only be used with permission of the Engineer.
The Bidder may submit computer -generated unit price table in accordance with the Special
Provisions.
�a
C
p
Mormon Trek Pcc Patching Project 0400 — Page 2 of 4
INSERT IN ENVELOPE 2
The names of those persons, firms, companies or other parties with whom we intend to enter into
a subcontract, together with the type of subcontracted work and approximate dollar amount of the
subcontract, are as follows:
NOTE: All subcontractors are subject to approval by City of Iowa City.
co
Mormon Trek Pcc Patching Project 0400 — Page 3 of 4
INSERT IN ENVELOPE 2
The undersigned Bidder is a/an:
❑ Individual, Sole Proprietorship
❑ Partnership
❑ Corporation
❑ Limited Liability Company
❑ Joint venture
❑ Other
Its Public Registration Number issued by the Iowa Commissioner of Labor, pursuant to Section
91 C.5 of the Iowa Code is:
Failure to provide said Registration Number shall result in the bid being read under advisement.
A contract will not be executed until the Contractor is registered to do business in the State of
Iowa.
Bidder's Name
Signature
Printed Name
Title
Street Address
City, State, Zip Code
Telephone Number
CD
^
c-)
U
CD
cry
NOTE: The signature on this proposal must be an original signature in ink; copies, facsimiles, or
electronic signatures will not be accepted.
Mormon Trek Pcc Patching Project 0400 — Page 4 of 4
INSERT IN ENVELOPE 1
0405
BIDDER STATUS FORM
All bidders must submit the following completed form to the governmental body requesting bids per 875 Iowa Administrative Code Chapter 156
To be completed by all bidders Part A
❑ Yes ❑ No My company is authorized to transact business in Iowa.
(To help you determine ifyour company is authorized, please review the Worksheet: Authorization to Transact Business).
❑ Yes ❑ No My company has an office to transact business in Iowa.
❑ Yes ❑ No My company's office in Iowa is suitable for more than receiving mail, telephone calls, and e-mail.
❑ Yes ❑ No My company has been conducting business in Iowa for at least 3 years prior to the first request for bids on this
proj ect.
❑ Yes ❑ No My company is not a subsidiary of another business entity or my company is a subsidiary of another business
entity that would qualify as a resident bidder in Iowa.
If you answered "Yes" for each question above, your company qualifies as a resident bidder. Please complete
Parts B and D of this form.
If you answered "No" to one or more questions above, your company is a non-resident bidder. Please
complete Parts C and D of this form.
To be completed by resident bidders Part B
Dates: to Address:
(mm/dd/yyyy) City, State, Zip Code:
Dates: to Address: __
(mm/dd/yyyy) City, State, Zip Code:
Dates: to Address:
(mm/dd/yyyy) City, State, Zip Code: - rr;
You may attach additional sheet(s) if needed. E
To be completed by non-resident bidders" Part C
1. Name of home state or foreign country reported to the Iowa Secretary of State:
2. Does your company's home state or foreign country offer preference to bidders who are residents? ❑ Yes ❑ No
3. If you answered "Yes" to question 2, identify each preference offered by your company's home state or foreign country and the
appropriate legal citation.
You may attach additional sheet(s) if needed.
To be completed by all bidders Part D
I certify that the statements made on this document are true and complete to the best of my knowledge and I know that my failure to
provide accurate and truthful information may be a reason to reject my bid.
Firm Name:
Signature:
Date:
Mormon Trek Pcc Patching Project 0405 — Page 1 of 2
INSERT IN ENVELOPE 1
WORKSHEET: AUTHORIZATION TO TRANSACT BUSINESS
This worksheet may be used to help complete Part A of the Resident Bidder Status form. If at least one of the
following describes your business, you are authorized to transact business in Iowa.
❑ Yes ❑ No My business is currently registered as a contractor with the Iowa Division of Labor.
❑ Yes ❑ No My business is a sole proprietorship and I am an Iowa resident for Iowa income tax purposes.
❑ Yes ❑ No My business is a general partnership or joint venture. More than 50 percent of the general
partners or joint venture parties are residents of Iowa for Iowa income tax purposes.
❑ Yes ❑ No My business is an active corporation with the Iowa Secretary of State and has paid all fees
required by the Secretary of State, has filed its most recent biennial report, and has not filed articles of dissolution.
❑ Yes ❑ No My business is a corporation whose articles of incorporation are filed in a state other than Iowa,
the corporation has received a certificate of authority from the Iowa Secretary of State, has filed its most recent
biennial report with the Secretary of State, and has neither received a certificate of withdrawal from the Secretary
of state nor had its authority revoked.
❑ Yes ❑ No My business is a limited liability partnership which has filed a statement of qualification in this
state and the statement has not been canceled.
❑ Yes ❑ No My business is a limited liability partnership which has filed a statement of qualification in a state
other than Iowa, has filed a statement of foreign qualification in Iowa and a statement of cancellation has not
been filed.
❑ Yes ❑ No My business is a limited partnership or limited liability limited partnership which has filed a
certificate of limited partnership in this state, and has not filed a statement of termination.
❑ Yes ❑ No My business is a limited partnership or a limited liability limited partnership whose certificate of
limited partnership is filed in a state other than Iowa, the limited partnership or limited liability limited partnership
has received notification from the Iowa Secretary of state that the application for certificate of authority has been
approved and no notice of cancellation has been filed by the limited partnership or the limited liability limited
partnership.
❑ Yes ❑ No My business is a limited liability company whose certificate of organization is filed in Iowa and
has not filed a statement of termination.
❑ Yes ❑ No My business is a limited liability company whose certificate
other than Iowa, has received a certificate of authority to transact business i
been revoked or canceled.
n
of organization is filed in a state
Iowa and the certificate has not
�-o
fir"
7,J
Mormon Trek Pcc Patching Project
0405 — Page 2 of 2
INSERT IN ENVELOPE 1
0410
BID BOND FORM
MORMON TREK PCC PATCHING PROJECT
CITY OF IOWA CITY
, as Principal, and ,
as Surety declare that we are held and are firmly bound unto the City of Iowa City, Iowa,
hereinafter called "OWNER," in the amount of to
pay said sum as herein provided. We as Principal and Surety further promise and declare that
these obligations shall bind our heirs, executors, administrators, and successors jointly and
severally. This obligation is conditioned on the Principal submission of the accompanying bid,
dated for Mormon Trek Pcc Patching Project.
NOW, THEREFORE,
(a) If said Bid shall be rejected, or in the alternate,
(b) If said Bid shall be accepted and the Principal shall execute and deliver a contract
in the form specified, and the Principal shall then furnish a security for the
Principal's faithful performance of said Project, and for the payment of all persons
performing labor or furnishing materials in connection therewith, and shall in all
other respects perform the Project, as agreed to by the City's acceptance of said
Bid,
then this obligation shall be void. Otherwise this obligation shall remain in full force and effect,
provided that the liability of the Surety for any and all claims hereunder shall, in no event, exceed
the amount of the obligation stated herein.
By virtue of statutory authority, the full amount of this bid security shall be forfeited to the
Owner in the event that the Principal fails to execute the contract and provide the security, as
provided in the Project Manual or as required by law.
The Surety, for value received, hereby stipulates and agrees that the obligations of said
Surety and its security shall in no way be impaired or affected by any extension of the time within
which the Owner may accept such Bid or may execute such contract documents, and said Surety
does hereby waive notice of any such time extension.
The Principal and the Surety hereto execute this bid security this
of , A.D., 20_.
Witness
Witness
day
(Seal)
Principal
By: s (Title)
(Seal)
Surety
�.
By:
(Attorney -in- act) -,
Attach Power -of -Attorney, if applicable
Mormon Trek Pcc Patching Project 0410 — Page 1 of 1
and
0500
CONTRACT
MORMON TREK PCC PATCHING PROJECT
CITY OF IOWA CITY
This Contract is made and entered into by and between the City of Iowa City, Iowa ("City"),
("Contractor").
Whereas, the City has prepared certain Plans, Specifications, Proposal and Contract
dated the 191h day of March, 2024, for the Mormon Trek PCC Patching ("Project"), and
Whereas, the City publicly solicited bids for construction of said Project; and
Whereas, Contractor submitted a bid on the Project described in said Project Manual; and
Whereas, the parties hereto now wish to enter into this Contract for the construction of
said Project.
Now, therefore, it is agreed:
1. The Contractor hereby agrees to perform the Project for the sums listed in its
Proposal including the total extended amount of $
which sums are incorporated herein by this reference.
2. This Contract consists of the Contract Documents, as defined in the Section 1010,
1.03, and the following additional component parts which are incorporated herein
by reference:
a. Contractor's Completed Bidder Status Form; attached hereto; and
b. Contractor's Completed Contract Compliance Program (Anti -
Discrimination Requirements) Assurance, if applicable, pursuant to Section
0200, attached hereto; and
C. Contractor's Completed Wage Theft Affidavit, if applicable, pursuant to
Section 0200, attached hereto.
The above components are deemed complementary and what is called for by one shall
be as binding as if called for by all.
r
=-� c-3
"o
Mormon Trek Pcc Patching Project 0500 — Page 1 of 2
3
The names of those persons, firms, companies or other parties, acknowledged by
the City, with whom we intend to enter into a subcontract, together with the type of
subcontracted work and approximate dollar amount of the subcontract, are as
follows (or shown on an attachment):
DATED this day of 120
(The City of Iowa City will date this Contract after all signatures are obtained)
City Contractor
Signature of City Official Signature of Contractor Officer
Printed Name of City Official Printed Name of Contractor Officer
ATTEST:
By:
City Clerk (for Formal Projects only)
APPROVED BY:
City Attorney's Office
Title of Contractor Officer
ATTEST:
B:
(Company Offici
r -v
co
Mormon Trek Pcc Patching Project 0500 — Page 2 of 2
0510
PERFORMANCE, PAYMENT, AND MAINTENANCE BOND
MORMON TREK PCC PATCHING PROJECTr ; y
CITY OF IOWA CITY =m�
irn
Know All by These Presents: -
That we, as Principal
(hereinafter the "Contractor" or "Principal") and
as Surety are held and firmly bound unto City of Iowa City, Iowa, as Obligee (hereinafter referred
to as "the Jurisdiction"), and to all persons who may be injured by any breach of any of the
conditions of this Bond in the penal sum of
dollars ($ ), lawful money of the United States, for the payment of which
sum, well and truly to be made, we bind ourselves, our heirs, legal representatives and assigns,
jointly or severally, firmly by these presents.
The conditions of the above obligations are such that whereas said Contractor entered into a
contract with the Jurisdiction, bearing date the day of
(hereinafter the "Contract") wherein said Contractor undertakes and agrees to
construct the following described improvements:
This project includes approximately 4,000 square yards of PCC patching on Mormon Trek
Boulevard north of Melrose Avenue, as well as intake throat replacements, pavement markings,
and seeding/site restoration.
To faithfully perform all the terms and requirements of said Contract within the time therein
specified, in a good and workmanlike manner, and in accordance with the Contract Documents.
It is expressly understood and agreed by the Contractor and Surety in this bond that the following
provisions are a part of this Bond and are binding upon said Contractor and Surety, to -wit:
Performance: The Contractor shall well and faithfully observe, perform, fulfill, and abide
by each and every covenant, condition, and part of said Contract, by reference made a
part hereof, for the above referenced improvements, and shall indemnify and save
harmless the Jurisdiction from all outlay and expense incurred by the Jurisdiction by
reason of the Contractor's default of failure to perform as required. The Contractor shall
also be responsible for the default or failure to perform as required under the Contract and
Contract Documents by all its subcontractors, suppliers, agents, or employees furnishing
materials or providing labor in the performance of the Contract.
2. Payment: The Contractor and the Surety on this Bond hereby agreed to pay all just claims
submitted by persons, firms, subcontractors, and corporations furnishing materials for or
performing labor in the performance of the Contract on account of which this Bond is given,
including but not limited to claims for all amounts due for labor, materials, lubricants, oil,
gasoline, repairs on machinery, equipment, and tools, consumed or used by the Contractor
or any subcontractor, wherein the same are not satisfied out of the portion of the contract
price the Jurisdiction is required to retain until completion of the improvement, but the
Contractor and Surety shall not be liable to said persons, firms, or corporations unless the
Mormon Trek Pcc Patching Project 0510 — Page 1 of 4
claims of said claimants against said portion of the contract price shall have been
established as provided by law. The Contractor and Surety hereby bind themselves to the
obligations and conditions set forth in Chapter 573 of the Iowa Code, which by this
reference is made a part hereof as though fully set out herein.
3. Maintenance: The Contractor and the Surety on this Bond hereby agree, at their own
expense:
A. To remedy any and all defects that may develop in or result from work to be
performed under the Contract within the period of five years (5) from the date of
acceptance of the work under the Contract, by reason of defects in workmanship
or materials used in construction of said work;
B. To keep all work in continuous good repair; and
C. To pay the Jurisdiction's reasonable costs of monitoring and inspection to assure
that any defects are remedied, and to repay the Jurisdiction all outlay and expense
incurred as a result of Contractor's and Surety's failure to remedy any defect as
required by this section.
4. General: Every Surety on this Bond shall be deemed and held bound, any contract to the
contrary notwithstanding, to the following provisions:
A. To consent without notice to any extension of time to the Contractor in which to
perform the Contract;
B. To consent without notice to any change in the Contract or Contract Documents,
which thereby increases the total contract price and the penal sum of this bond,
provided that all such changes do not, in the aggregate, involve an increase of
more than 20% of the total contract price, and that this bond shall then be released
as to such excess increase; and
C. To consent without notice that this Bond shall remain in full force and effect until
the Contract is completed, whether completed within the specified contract period,
within an extension thereof, or within a period of time after the contract period has
elapsed and the liquidated damage penalty is being charged against the
Contractor.
D. That no provision of this Bond or of any other contract shall be valid that limits to
less than five year(s) (5) after the acceptance of the work under the Contract the
right to sue on this Bond.
E. That as used herein, the phrase "all outlay and expense" is not to be limited in any
way, but shall include the actual and reasonable costs and expenses incurred by
the Jurisdiction including interest, benefits, and overhead where applicable.
Accordingly, all outlay and expense would include but not be limited to all contract
or employee expense, all equipment usage or rental, materials, testing, outside
experts, attorneys fees (including overhead expenses of the Jurisdiction's staff
attorneys), and all costs and expenses of litigation as they are incurred by the
Jurisdiction. It is intended the Contractor and Surety will defend and indemnify the
Jurisdiction on all claims made against the Jurisdiction on account of Contractor's
failure to perform as required in the Contract and Contract Documents, that all
agreements and promises set forth in the Contract and Contract Documents, in
VM01 'A113 AV' :approved change orders, and in this Bond will be fulfilled, and that the Jurisdiction
1\4I0 Ali? will be fully indemnified so that it will be put into the position it would have been in
had the Contract been performed in the first instance as required.
9.1 :1 Rd 61 8VW bZU
-
Mormon Trek Pcc Patching Project 0510 — Page 2 of 4
In the event the Jurisdiction incurs any "outlay and expense" in defending itself against
any claim as to which the Contractor or Surety should have provided the defense, or in the
enforcement of the promises given by the Contractor in the Contract, Contract Documents,
or approved change orders, or in the enforcement of the promises given by the Contractor
and Surety in this Bond, the Contractor and Surety agree that they will make the
Jurisdiction whole for all such outlay and expense, provided that the Surety's obligation
under this bond shall not exceed 125% of the penal sum of this bond.
In the event that any actions or proceedings are initiated regarding this Bond, the parties
agree that the venue thereof shall be Johnson County, State of Iowa. If legal action is
required by the Jurisdiction to enforce the provisions of this Bond or to collect the monetary
obligation incurring to the benefit of the Jurisdiction, the Contractor and the Surety agree,
jointly, and severally, to pay the Jurisdiction all outlay and expense incurred therefor by
the Jurisdiction. All rights, powers, and remedies of the Jurisdiction hereunder shall be
cumulative and not alternative and shall be in addition to all rights, powers, and remedies
given to the Jurisdiction, by law. The Jurisdiction may proceed against surety for any
amount guaranteed hereunder whether action is brought against the Contractor or whether
Contractor is joined in any such action(s) or not.
Now therefore, the condition of this obligation is such that if said Principal shall faithfully
perform all the promises of the Principal, as set forth and provided in the Contract and in
this Bond, then this obligation shall be null and void, otherwise it shall remain in full force
and effect.
When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first
as defined in this Bond and the Contract; second, if not defined in the Bond or Contract, it
shall be interpreted or construed as defined in applicable provisions of the Iowa Code;
third, if not defined in the Iowa Code, it shall be interpreted or construed according to its
generally accepted meaning in the construction industry; and fourth, if it has no generally
accepted meaning in the construction industry, it shall be interpreted or construed
according to its common or customary usage.
Failure to specify or particularize shall not exclude terms or provisions not mentioned and
shall not limit liability hereunder. The Contract is hereby made a part of this Bond.
y�3 10
Mormon Trek Pcc Patching Project 0510 — Page 3 of 4
PRINCIPAL:
SURETY:
Printed Name of Contractor Officer Surety Company Name
By By
Signature of Contractor Officer Signature of Attorney -in -Fact Officer
Title of Contractor Officer Printed Name of Attorney -in -Fact Officer
Company Name of Attorney -in -Fact
Company Address of Attorney -in -Fact
City, State, Zip Code of Attorney -in -Fact
Telephone Number of Attorney -in -Fact
NOTE:
1. All signatures on this performance, payment, and maintenance bond must be
original signatures in ink; copies, facsimile, or electronic signatures will not be
accepted.
2. This bond must be sealed with the Surety's raised, embossing seal.
3. The Certificate or Power of Attorney accompanying this bond must be valid on its
face and sealed with the Surety's raised, embossing seal.
4. The name and signature of the Surety's Attorney-in-Fact/Officer entered on this
bond must be exactly as listed on the Certificate or Power of Attorney
accompanying this bond.
G it :1 q8 61 VVt%' tcZ
Mormon Trek Pcc Patching Project 0510 — Page 4 of 4
0520
CONTRACT COMPLIANCE
SECTION I - GENERAL POLICY STATEMENT
It is the policy of the City of Iowa City to require equal employment opportunity in all City contract
work. This policy prohibits discrimination by the City's contractors, consultants and vendors and
requires them to ensure that applicants seeking employment with them and their employees are
treated equally without regard to age, color, creed, disability, gender identity, marital status,
national origin, race, religion, sex, or sexual orientation.
It is the City's intention to assist employers, who are City contractors, vendors or consultants, in
designing and implementing equal employment opportunity so that all citizens will be afforded
equal accessibility and opportunity to gain and maintain employment.
Provisions:
1. All contractors, vendors, and consultants requesting to do business with the City must
submit an Equal Opportunity Policy Statement before the execution of the contract.
2. All City contractors, vendors, and consultants with contracts of $25,000 or more (or less if
required by another governmental agency) must abide by the requirements of the City's
Contract Compliance Program. Emergency contracts may be exempt from this provision
at the discretion of the City. Regardless of the value of the contract, all contractors,
vendors, and consultants are subject to the City's Human Rights Ordinance, which is
codified at Article 2 of the City Code.
3. Contracting departments are responsible for assuring that City contractors, vendors, and
consultants are made aware of the City's Contract Compliance Program reporting
responsibilities and receive the appropriate reporting forms. A notification of requirements
will be included in any request for proposal and notice of bids.
4. Prior to execution of the contract, the completed and signed Assurance of Compliance
(located on 0520 — Pages 2 and 3) or other required material must be received and
approved by the City.
5. Contracting departments are responsible for answering questions about contractor,
consultant and vendor compliance during the course of the contract with the City.
6. All contractors, vendors, and consultants must refrain from the use of any signs or
designations which are sexist in nature, such as those which state "Men Working" or
"Flagman Ahead," and instead use gender neutral signs.
7. All contractors, vendors, and consultants must assure that their subcontractors abide by
the Caty's Human Rights Ordinance. The City's protected classes are listed at Iowa City
di 66de Section 2-3-1.
v
Mormon Trek Pcc Patching Project 0520 — Page 1 of 6
SECTION II - ASSURANCE OF COMPLIANCE
The following sets forth the minimum requirements of a satisfactory Equal Employment
Opportunity Program which will be reviewed for acceptability. PLEASE RETURN PAGES 2
THROUGH 3 OF THIS SECTION TO THE CONTRACTING DEPARTMENT PRIOR TO THE
EXECUTION OF THE CONTRACT.
With respect to the performance of this contract, the contractor, consultant or vendor agrees as
follows: (For the purposes of these minimum requirements, "contractor" shall include consultants
and vendors.)
The contractor will not discriminate against any employee or applicant for employment and
will take affirmative efforts to ensure applicants and employees are treated during
employment without regard to their age, color, creed, disability, gender identity, marital
status, national origin, race, religion, sex, or sexual orientation. Such efforts shall include,
but not be limited to the following: employment, promotion, demotion, or transfer;
recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of
compensation; and selection for training, including apprenticeship.
2. The contractor will, in all solicitations or advertisements for employees placed by or on
behalf of the contractor, state that it is an equal opportunity employer.
Note: Contracts that are federally funded are subject to Executive Order No. 11246, as
amended, and the regulations (see generally 29 U.S.C. § 1608 et seq.) and relevant orders
of the U.S. Secretary of Labor. The Secretary of Labor, and not the City, enforces said
regulations and orders.
3. Provide a copy of your written Equal Employment Opportunity policy statement.
Where is this statement posted?
4. What is the name, telephone number and address of your business' Equal Employment
Opportunity Officer?
(Please print)
Phone Number
6 181 WrPtiv
Street Address
City, State, Zip Code
Mormon Trek Pcc Patching Project 0520 — Page 2 of b
5. The undersigned agrees to display, in conspicuous places at the work site, all posters
required by federal and state law for the duration of the contract. NOTE: The City can
provide assistance in obtaining the necessary posters.
6. How does your business currently inform applicants, employees, and recruitment sources
(including unions) that you are an Equal Employment Opportunity employer?
The above responses are true and correctly reflect our Equal Employment Opportunity policies.
Business Name
Signature
Print Name
vlmol `x 113 VIIA01
6TI :1 148 6 18VW W
Phone Number
Title
Date
Mormon Trek Pcc Patching Project 0520 — Page 3 of 6
SECTION III - SUGGESTED STEPS TO ASSURE EQUAL EMPLOYMENT
OPPORTUNITIES
COMPANY POLICY
Determine your company's policy regarding equal employment opportunities. Document
the policy and post it in a conspicuous place so that it is known to all your employees.
Furthermore, disseminate the policy to all potential sources of employees and to your
subcontractors asking their cooperation. The policy statement should recognize and
accept your responsibility to provide equal employment opportunity in all your employment
practices. In regard to dissemination of this policy, this can be done, for example, through
the use of letters to all recruitment sources and subcontractors, personal contacts,
employee meetings, web page postings, employee handbooks, and advertising.
2. EQUAL EMPLOYMENT OPPORTUNITY OFFICER
Designate an equal employment opportunity officer or, at minimum, assign someone the
responsibility of administering and promoting your company's Equal Employment
Opportunity program. This person should have a position in your organization which
emphasizes the importance of the program.
INSTRUCT STAFF
Your staff should be aware of and be required to abide by your Equal Employment
Opportunity program. All employees authorized to hire, supervise, promote, or discharge
employees or are involved in such actions should be trained and required to comply with
your policy and the current equal employment opportunity laws.
4. RECRUITMENT
(a) Let potential employees know you are an equal opportunity employer. This can be
done by identifying yourself on all recruitment advertising as "an equal opportunity
employer".
(b) Use recruitment sources that are likely to yield diverse applicant pools.
Word-of-mouth recruitment will only perpetuate the current composition of your
workforce. Send recruitment sources a letter annually which reaffirms your
commitment to equal employment opportunity and requests their assistance in
helping you reach diverse applicant pools.
(c) Analyze and review your company's recruitment procedures to identify and
eliminate discriminatory barriers.
(d) Select and train persons involved in the employment process to use objective
standards and to support equal employment opportunity goals.
(e) Review periodically job descriptions to make sure they accurately reflect major job
functions. Review education and experience requirements to make sure they
accurately reflect the requirements for successful job performance.
Review the job application to ensure that only job related questions are asked. Ask
yourself "Is this information necessary to judge an applicant's ability to perform the
jd �' job applied for?" Only use job -related tests which do not adversely affect any
particular group of people.
(g) Monitor interviews carefully. Prepare interview questions in advance to assure that
j they are only job related. Train your interviewers on discrimination laws. Biased
Mormon Trek Pcc Patching Project 0520 — Page 4 of 6
and subjective judgments in personal interviews can be a major source of
discrimination.
(h) Improve hiring and selection procedures and use non -biased promotion, transfer
and training policies to increase and/or improve the diversity of your workforce
representation. Companies must make sure procedures for selecting candidates
for promotion, transfer and training are based upon a fair assessment of an
employee's ability and work record. Furthermore, all companies should post and
otherwise publicize all job promotional opportunities and encourage all qualified
employees to bid on them.
For your information is a copy of Section 2-3-1 of the City Code which prohibits certain
discriminatory practices in employment can be found at:
https://codelibrary amlegal com/codes/iowacityia/latest/iowacity ia/0-0-0-631#JD 2-3-1.
Please note that the protected characteristics include some not mandated for protection
by Federal or State law. As a contractor, consultant or vendor doing business with the City
of Iowa City you are required to abide by the provisions of the local ordinance in
conjunction with your performance under a contract with the City.
61 21N
Mormon Trek Pcc Patching Project 0520 — Page 5 of 6
SAMPLE: EQUAL EMPLOYMENT OPPORTUNITY POLICY
To all employees of
This Company and its employees shall not discriminate against any employee or applicant for
employment based on his or her age, color, creed, disability, gender identity, marital status,
national origin, race, religion, sex, or sexual orientation. The anti -discrimination policy extends to
decisions involving hiring, promotion, demotion, or transfer; recruitment or recruitment advertising;
layoff or termination; rates of pay or other forms of compensation; and selection for training,
including apprenticeship. Further, this Company and its employees will provide a working
environment free from such discrimination.
All employees are encouraged to refer minority and women applicants and applicants with
disabilities for employment.
The Equal Employment Opportunity Officer for the
is:
Name:
Address:
Telephone:
NOTE: This is a SAMPLE ONLY. You may wish to confer with your Equal Employment
Opportunity (EEO) officer or legal counsel to formulate a policy which specifically meets the needs
of your company.
,'AGJ-X113 V Q1
61 hZE1Z
MGM
0520 —Page 6 of 6
Mormon Trek Pcc Patching Project
0530
WAGE THEFT POLICY
It is the policy of the City of Iowa City, as expressed by City Council Resolution No. 15-364
adopted on November 10, 2015, not to enter into certain contracts with, or provide discretionary
economic development assistance to, any person or entity (including an owner of more than 25%
of the entity) who has admitted guilt or liability or been adjudicated guilty or liable in any judicial
or administrative proceeding of committing a repeated or willful violation of the Iowa Wage
Payment Collection law, the Iowa Minimum Wage Act, the Federal Fair Labor Standards Act or
any comparable state statute or local ordinance, which governs the payment of wages, for a period
of five (5) years from the date of the last conviction, entry of plea, administrative finding or
admission of guilt. (hereinafter "Wage Theft Policy")
Application. The Wage Theft Policy applies to the following:
a. Contracts in excess of $25,000 for goods, services or public improvements.
b. Contracts for discretionary economic development assistance. "Discretionary"
economic development assistance shall mean any economic development
assistance provided by the City of Iowa City that is not required by law.
Exceptions. The Wage Theft Policy does not apply to emergency purchases of goods
and services, emergency construction or public improvement work, sole source contracts
excepted by the City's purchasing manual, cooperative/piggyback purchasing or contracts
with other governmental entities.
III. Affidavit. The contracting entity must complete the attached affidavit showing
compliance with the Wage Theft Policy and provide it to the Contracting Department
prior to the execution of the contract.
Contract provision: Any contract to which this policy is applicable will include the following contract
provision: If the City becomes aware that a person or entity (including an owner of more than
25% of the entity) has admitted guilt or liability or been adjudicated guilty or liable in any judicial
or administrative proceeding of committing a repeated or willful violation of the Iowa Wage
Payment Collection law, the Iowa Minimum Wage Act, the Federal Fair Labor Standards Act or
any comparable state statute or local ordinance, which governs the payment of wages, within the
five (5) year period prior to the award or at any time after the award, such violation shall constitute
a default under the contract.
IV. Waivers. If a person or entity is ineligible to contract with the City as a result of the Wage
Theft Policy it may submit a request in writing indicating that one or more of the following
eft«1 �1�lljmtjcip , have been taken:
a. There has been a bona fide change in ownership or control of the ineligible person
j RJ G i S W u entity;
.... b. Disciplinary action has been taken against the individual(s) responsible for the acts
giving rise to the violation(s);
Mormon Trek Pcc Patching Project 0bW — Fage i or s
Remedial action has been taken to prevent a recurrence of the acts giving rise to
the disqualification or default; or
d. Other factors that the person or entity believes are relevant.
The City Manager or Designee shall review the documentation submitted, make any inquiries
deemed necessary, request additional documentation if warranted and determine whether a
reduction in the ineligibility period or waiver is warranted. Should the City Manager or Designee
determine that a reduction or waiver of the ineligibility period is warranted the City Manager or
Designee shall make such recommendation to the City Council. The City Council will make a final
decision as to whether to grant a reduction or waiver.
Mormon Trek Pcc Patching Project 0530 — Page 2 of 3
WAGE THEFT AFFIDAVIT
I, , certify under penalty of perjury and pursuant to
the laws of the State of Iowa that the following is true and correct:
1. I am the [position] of
["contracting entity"] and have the authority to execute this affidavit on behalf of said
contracting entity and any person or entity with an ownership interest in said contracting
entity of more than 25%.
2. Neither ["contracting entity"] nor any person or entity
with an ownership interest of more than 25% of said contracting entity has been
adjudicated guilty or liable in any judicial or administrative proceeding of committing a
repeated or willful violation of the Iowa Wage Payment Collection law, the Iowa Minimum
Wage Act, the Federal Fair Labor Standards Act or any comparable state statute or local
ordinance, which governs the payment of wages in the last 5 years.
Signature
� tkioj,�Ito V{f Qi
61:1 Wa 61 HVW It U
Mormon Trek Pcc Patching Project 0530 — Page 3 of 3
SUDAS STANDARD SPECIFICATIONS
The City of Iowa City has adopted the SUDAS Standard Specifications for use on all public
improvement projects and construction within the public right-of-way. The SUDAS Standard
Specifications are incorporated herein by reference. Copies of the current version of the SUDAS
Standard Specifications Manual can be obtained from the SUDAS website at:
https://iowasudas.org/manuals/specifications-manual/. These specifications are kept on file in the
City Engineer's Office and will be made available for viewing by City staff and the public.
Previous editions of the SUDAS Standard
https://iowasudas.org/archived-specifications/.
61: t Wd 61 8VW b*
Specifications can be found here:
Mormon Trek Pcc Patching Project Page 1 of 1
GENERAL SUPPLEMENTAL SPECIFICATIONS
The City of Iowa City has adopted the General Supplemental Specifications for use on all public
improvement projects and construction within the public right-of-way. The General Supplemental
Specifications are incorporated by reference. Copies of the General Supplemental Specifications
can be obtained from the website at: https://iowasudas.org/supplemental-specifications/. These
specifications are kept on file in the City Engineer's Office and will be made available for viewing
by City staff and the public.
t#tt�83�Ito d �tQi
61: t tad 61 8VW hU
Mormon Trek Pcc Patching Project Page 1 of 1
SUPPLEMENTAL SPECIFICATIONS
The City of Iowa City has adopted the Supplemental Specifications to the 2024 Edition of the
SUDAS Standard Specifications Manual for use on all public improvement projects and
construction within the public right-of-way. The Supplemental Specifications are incorporated
herein by reference. Copies of the current version can be obtained at: https://www.iowa-
city orq/weblink/0/edoc/1845668/CIC%20Supplemental%2OSpecs.pdf or are available in the City
Engineering Division Office.
�i ADO
O
61 au
Mormon Trek Pcc Patching Project Page 1 of 1
PLANS (UNDER SEPARATE COVER)
M313 All')
Mormon Trek Pcc Patching Project Page 1 of 1
Johnson County, Iowa
7141 K11, 19 Pik 1: t, 5
CITY OF ION CITY ENGINEERING DIVISION {� tt
O VE- F IT Y I ae k
LOCATION MAP
INTERSTATE 80
y�
�P
2 �G�
tia sT ss �
�h%c 000ae
Hp,
9y w
6 C
MELROSE AVE
m
yc T
PROJECT LOCATION
F
MORMON TREK PCC PATCHING
ON
Not to Scale
I NDEX
I TITLE SHEET
2 GENERAL NOTES, QUANTITIES, LEGEND
3 DETAILS
4 ESTIMATED REFERENCE NOTES
5 PATCHING PLAN
6 PATCHING PLAN
7 PATCHING PLAN
8 PATCHING PLAN
IOWA ONE CALL
.11
TOLL FREE
CALL BEFORE YOU DIG
mImF--
10WA CITY
ENGINEERING
■��������immom iMEN!
ECT• • • • '
CITY OF IOWA CITY ENGINEERING DIVISION
APPROVED
CITY ENGINEER DATE
I hereby certify that this engineering document was prepared by me
SS�o,;;��,
underdirect personal slthe alaws toftd
the Stateof Iowa.
icensedPofessonalEngneersunder
,',
Signed: Date:
SCOTT K.
W SOVERS1714
'
StOTT K. SOVERS, P.E.
Iowa License No. 17141
/OWA ,
4•Ni•••est"
My licensed renewal date is December 31, 2024
Pages or sheets covered by this seal: ALL
CONTACTS
GENERAL NOTES
UTILITY NOTES
GENERAL LEGEND
THE FOLLOWING UTILITY COMPANIES MAY HAVE FACILITIES IN
PROXIMITY TO THE PROJECT:
GAS & ELECTRIC MID AMERICAN ENERGY CO.
1630 LOWER MUSCATINE RD.
IOWA CITY, IOWA 52240
JOE RETEK - GAS
PHONE: 319-341-4457
LINDSAY HOUSTON - ELECTRIC
PHONE: 319-341-4419
FIBER OPTIC
UTILITY LOCATING
CITY OF IOWA CITY
CENTURY LINK/LUMEN
615 3RD AVENUE SE
CEDAR RAPIDS, IA 54201
JAKE ORNSBY
PHONE: 319-383-1270
MEDIACOM
546 SOUTHGATE AVENUE
IOWA CITY, IOWA 52240
DARWIN DRISCOLL
PHONE: 319-351-0408 x3702
MOBILE: 845-204-5742
A.T. &T.
1425 OAK STREET
KANSAS CITY, MO 64106
LENNY VOHS
PHONE: 816-275-4014
MOBILE: 770-335-8244
AUREON
JEFF KLOCKO
PHONE: 515-240-2544
MOBILE: 515-830-0445
CITY OF IOWA CITY
WATER DIVISION
PHONE: 319-356-5160
UNIVERSITY OF IOWA
GEORGE STUMPF
PHONE: 319-335-2814
IMON
MATT KEARNEY
PHONE: 319-450-0653
ONE CALL
PHONE: 1-800-292-8989
WATER DIVISION
JON DURST
PHONE: 319-356-5160
SEWER DIVISION
JESSE EISTER
PHONE: 319-631-1144
TRAFFIC ENGINEERING
BROCK HOLUB
PHONE: 319-356-5482
PARKS AND FORESTRY
TYLER BAIRD
PHONE: 319-356-2069
I. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH
STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS)
AND THE CITY OF IOWA CITY STANDARD SPECIFICATIONS
AND DETAILS, UNLESS OTHERWISE SPECIFIED BY DETAILS
AND NOTES SHOWN IN THE PLANS.
2. CONSTRUCTION ADMINISTRATION AND SURVEY WILL BE
PERFORMED BY THE CITY OF IOWA CITY. THE
CONTRACTOR SHALL NOTIFY THE CITY SURVEY PARTY
CHIEF 48 HOURS IN ADVANCE OF NECESSARY STAKING.
3. LIMITS OF CONSTRUCTION SHALL BE AS SHOWN ON THE
PROJECT PLANS. THE CONTRACTOR SHALL GET
AUTHORIZATION FROM THE ENGINEER PRIOR TO
PERFORMING ANY WORK ON PRIVATE PROPERTY. THE
CONTRACTOR SHALL CONFINE ALL ACTIVITIES TO WITHIN
THE LIMITS OF CONSTRUCTION, UNLESS AUTHORIZED BY
THE ENGINEER AND/OR PRIVATE PARTIES IN WRITING.
4. THE CONTRACTOR SHALL MAINTAIN ACCESS TO
INDIVIDUAL PROPERTIES THROUGHOUT THE CONSTRUCTION
OF THE PROJECT. THE CONTRACTOR SHALL NOTIFY
PROPERTY OWNERS 48 HOURS IN ADVANCE OF DRIVEWAY
MODIFICATION THAT WILL TEMPORARILY LIMIT OWNER
ACCESS TO THEIR PROPERTY.
5. EROSION CONTROL MEASURES NECESSARY TO PROTECT
PROJECT SITE AGAINST SILTATION, EROSION, AND DUST
POLLUTION. PROJECT SITE SHALL COMPLY WITH SOIL
EROSION CONTROL REQUIREMENTS OF IOWA CODE AND
LOCAL ORDINANCES.
6. ALL HORIZONTAL AND VERTICAL REFERENCES ARE US
STATE PLANE IOWA SOUTH ZONE; US SURVEY FOOT
NAD83 (1996 HARN) AND NAVD 88 RESPECTIVELY.
7. ALL TREES WITHIN THE LIMITS OF CONSTRUCTION SHALL
REMAIN IN PLACE. THE CONTRACTOR SHALL PROCEED
WITH CONSTRUCTION ACTIVITIES IN SUCH A MANNER TO
PROTECT ALL TREES AND SITE FEATURES WHICH WILL
REMAIN IN PLACE.
8. THE CONTRACTOR IS TO NOTIFY AND COORDINATE ALL
WATER MAIN AND VALVE ADJUSTMENT WORK WITH THE
IOWA CITY WATER DIVISION.
9. THE CONTRACTOR SHALL USE ALL MEANS NECESSARY TO
CONTROL DUST SPREADING FROM ALL WORK AND STAGING
AREAS. DUST CONTROL MEASURES SHALL BE IN
ACCORDANCE WITH APPLICABLE SPECIFICATIONS,
APPROVED BY THE ENGINEER AND SHALL BE INCIDENTAL.
10. PAVEMENT REMOVAL AND REPLACEMENT LIMITS TO BE
FIELD VERIFIED AND APPROVED BY ENGINEER PRIOR TO
REMOVAL.
IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION,
REQUIRES VERBAL NOTICE TO IOWA ONE CALL,
I-800-292-8989, NOT LESS THAN 48 HOURS BEFORE
EXCAVATING, EXCLUDING WEEKENDS AND LEGAL
HOLIDAYS.
2. WHERE EXISTING POWER POLES ARE IN CLOSE PROXIMITY
TO OPEN AREAS, UTILITY COMPANIES SHOULD BE
CONTACTED TO HOLD THE POLES DURING CONSTRUCTION.
SCHEDULE ACCORDINGLY.
3. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES
HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND
RECORDS, AND THEREFORE THEIR LOCATIONS MUST BE
CONSIDERED APPROXIMATE ONLY.
4. IT IS POSSIBLE THERE MAY BE OTHER UNDERGROUND
FACILITIES, THE EXISTENCE OF WHICH IS PRESENTLY NOT
KNOWN OR SHOWN. NO CLAIMS FOR ADDITIONAL
COMPENSATION WILL BE ALLOWED TO THE CONTRACTOR
FOR ANY INTERFERENCE OR DELAY CAUSED BY SUCH
WORK.
5. WHERE PUBLIC AND PRIVATE UTILITY FIXTURES ARE
SHOWN AS EXISTING ON THE PLANS OR ENCOUNTERED
WITHIN THE CONSTRUCTION AREA, IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO:
• NOTIFY THE OWNERS OF THOSE UTILITIES PRIOR TO THE
BEGINNING OF ANY CONSTRUCTION;
• COORDINATE OPERATIONS WITH UTILITIES;
• AFFORD ACCESS TO THESE FACILITIES FOR NECESSARY
MODIFICATION OF SERVICES;
• DETERMINE EXISTENCE AND EXACT LOCATION OF
UNDERGROUND UTILITIES AND AVOID DAMAGE THERETO;
• PRIOR TO BEGINNING CONSTRUCTION, PROVIDE LABOR
AND EQUIPMENT NECESSARY TO DETERMINE THE EXACT
LOCATION AND ELEVATION OF ALL UTILITY CROSSINGS
WHICH MAY RESULT IN CONFLICTS TO PROPOSED
IMPROVEMENTS.
EDGE OF PAVEMENT
RIGHT OF WAY (ROW)
CENTERLINE
TREE, DECIDUOUS
TREE, CONIFEROUS
HEDGE/TREE COVER
FENCE
RETAINING WALL
BUILDING
BACK OF CURB TO BACK OF CURB
PORTLAND CEMENT CONCRETE
HOT MIX ASPHALT
MAILBOX
SIDEWALK
WATER METER
DUCTILE IRON PIPE
REINFORCED CONCRETE PIPE
SIGNS
POWER POLE
10' CSUD, REINFORCED
10' CSUD
MANHOLE
O M H
CATCH BASIN
❑ CB
—
CLEANOUT
CO
0 0
#
GU` WIRE # .�
a .,.
FIRE HYDRANT
DRAINAGE LINE
®
A6. F9!}INYt�i..l
Ghj� } f'-[ kl/`
—us—w—us
t RiE6TELEI�H
—*----T----
I:
B-B
BURIED TELEVISION CABLE
—'"----rv----
PCC
BURIED ELECTRIC
—` ----` ----
HMA
OVERHEAD ELECTRIC
—(E)-----�`�---
MB
WATER MAIN
—"----"----
SW
FIBER OPTIC CABLE
—f0----fD----
WM
SANITARY SEWER
—
DIP
STORM SEWER
RCP
LIGHT POLE
o Q
UTILITY BOXES
8 O
4�r PP
WATER VALVE
. WV
GAS VALVE
- GV
WATER SHUT OFF
4&
ESTIMATED PROJECT QUANTITIES
ITEM NO.
ITEM CODE
ITEM
ESTIMATED
QUANTITY
UNIT
I
2010-F
BELOW GRADE EXCAVATION (CORE OUT)
100
Sv
2
6010-E
INTAKE ADJUSTMENT, SW-508 THROAT ONLY
15
EA
3
6010-E
INTAKE ADJUSTMENT, SW-509 THROAT ONLY
22
EA
4
6010-E
INTAKE ADJUSTMENT, SW-541 TOP AND THROAT
I
EA
5
7040-A
FULL DEPTH PATCH, PCC, 10', CSUD
2985
SY
6
7040-A
FULL DEPTH PATCH, PCC, 10' CSUD, REINFORCED WITH #5
BARS 18" O.C.
1015
SY
7
7040-B
SUBBASE OVER EXCAVATION
50
TON
8
7040-D
CRACK AND JOINT CLEANING AND FILLING, HOT POUR
1.6000
MI
9
8020-B
PAINTED PAVEMENT MARKINGS, HIGH -BUILD
100
STA
10
8020-G
PAINTED SYMBOLS AND LEGENDS
EA
II
8030-A
TEMPORARY TRAFFIC CONTROL
I
LS
12
8030-A
TEMPORARY TRAFFIC CONTROL, DYNAMIC MESSAGE BOARDS
I
LS
13
9010-B
HYDRAULIC SEEDING, FERTILIZING, AND MULCHING
I
LS
14
11,020-A
MOBILIZATION
I
LS
CITY OF IOWA CITY ENGINEERING DESIGN: MLV PROJECT: SHEET TITLE: SHEET:
DIVISION DRAWN: KKL MORMON TREK PCC PATCHING GENERAL NOTES, QUANTITIES, LEGEND Z
DATE: 05/19/2024
Joint Sealant Material
,. +
48
Saw Cut`'
Crack or
Joint Line
See Detail A or B
W18" Long Dowel
at 12" Centers
.CD- O®®
DOWELED CONTRACTION JOINT
.1 4" ± 16' Saw Cut
DETAIL A
(Saw cut formed by conventional concrete sawing equipment.)
1-2„ to 4„
Top of Pavement
Sealant
SECTION A -A
(Detail at Edge of Pavement)
BAR SIZE TABLE FOR
CONTRACTION JOINTS
O
Solid Dowel
Diameter
Tubular Dowel
Diameter
Tie Bar
Size
< 8"
3/4"
7/8-
#6
>_ 8" but < 10"
1 1/4"
1 3/8"
#10
>_ 10"
1 1/2"
1 5/8"
#11
Tubular Dowel Bars will not be allowed for
RD joints.
1� See dowel assemblies for fabrication details.
02 See Bar Size Table for Contraction Joints on Sheet 2,
6 Place bars within the limits shown under dowel
assemblies.
® Unless specified otherwise, use 'CD' transverse
contraction joints in mainline pavement wher(I is
greater or equal to 8 inches. Use 'C' joints when (1) is
less than 8 inches.
6 Saw'CD' joint to a depth of T/3 ± 1/4"; saw'C' joint to a
depth of TA ± 1/4".
Joint Sealant Material
1,l + ill
4 -8
14,. +4.,
Crack or -
Joint Line
illto 16" Saw Cut
DETAIL B
(Saw cut formed by approved early concrete sawing equipment.)
Joint Sealant Material—
i" ±
4
Crack or -
Joint Line
DETAIL C
4 ± 16 Saw Cut
1 1 4" ± 4" Saw Cut
LEGEND
Existing Pavement
Proposed Pavement
RIM 7o,a,m STAM OADM PV-101
JOINTS
fr
CITY
OF
I O" /� CIW
ENGINEERING
DESIGN: MLV PROJECT:
�/v /r-�'� DIVISION DRAWN: KKL
s DATE: 03/19/2024
#5 EDoxv Coated Transverse
#5 Epoxy Coated
Bars at 18" O_C.
I-ongituornai tsars
at 18" O.C.
REINFORCED PCC OVER STORM PIPE
NOTES:
Section A -A
ated
ears
I. REINFORCEMENT BARS SHALL BE PLACED AT ALL PATCH LOCATIONS WHERE STORM SEWER IS UNDER PAVEMENT.
2. BARS SHALL BE EACH DIRECTION AT 18-INCH ON CENTERS.
3. ALL TIES, CHAIRS, AND ANCHORS ARE INCIDENTAL TO THE PATCH.
MORMON TREK PCC PATCHING
HEET TITLE:
DETAILS
SHEET:
3
ESTIMATED REFERENCE NOTES
ITEM NO.
ITEM CODE
DESCRIPTION
BELOW GRADE EXCAVATION (CORE OUT) - THIS IS A CONTINGENCY BID ITEM TO BE USED WITH PERMISSION OF THE ENGINEER. IF UNSUITABLE MATERIAL IS FOUND BELOW TOP 12, $ GRADE,
I
2010-F
REPLACE WITH 3" MACADAM. THE USE OF 3" MACADAM IS INCIDENTAL. JR1tt 1 9 pil{' 1!
INTAKE ADJUSTMENT, SW-508, THROAT ONLY - SEE SHEETS 5-8.
2
6010-E
INTAKE ADJUSTMENT, SW-509, THROAT ONLY - SEE SHEETS 5-8.
3
6010-E
INTAKE ADJUSTMENT, SW-541 TOP AND THROAT - SEE SHEETS 5-8.
4
6010-E
FULL DEPTH PATCH, PCC, 10", CSUD - INCLUDES CD JOINTS AS INDICATED ON SHEETS 5-8. THE CITY STREETS DIVISION IS WILLING TO ACCEPT CLEAN PAVEMENT REMOVALS AT 101 MCCOLLISTER
5
7040-A
BOULEVARD.
FULL DEPTH PATCH, PCC, 10", CSUD, REINFORCED WITH #5 BARS 18" O.C. - SEE DETAIL ON SHEET 3. THE CITY STREETS DIVISION IS WILLING TO ACCEPT CLEAN PAVEMENT REMOVALS AT 101
6
7040-A
MCCOLLISTER BOULEVARD.
SUBBASE OVER EXCAVATION - THIS IS A CONTINGENCY BID ITEM TO BE USED WITH PERMISSION OF THE ENGINEER. IF UNSUITABLE MATERIAL IS FOUND WITHIN TOP 12" OF SUBGRADE, REPLACE WITH
7
7040-B
SUBBASE MATERIAL.
CRACK AND JOINT CLEANING AND FILLING, HOT POUR - INCLUDES FURNISHING CRACK AND JOINT FILLER MATERIAL AND ROUTING, SAWING, CLEANING, AND FILING JOINTS AND CRACKS. LENGTH IS
8
7040-D
DOWN THE CENTERLINE OF TWO LANES. TURNING LANES ARE INCIDENTAL.
PAINTED PAVEMENT MARKINGS, HIGH -BUILD - INCLUDES ALL PAVEMENT MARKINGS ON MORMON TREK BOULEVARD FROM MELROSE AVENUE NORTH TO IOWA CITY LIMITS. CONTRACTOR SHALL ATTEND A
9
8020-B
PAVEMENT MARKING REVIEW MEETING WITH IOWA CITY STREETS DIVISION PRIOR TO INSTALLING PAVEMENT MARKINGS.
PAINTED SYMBOLS AND LEGENDS, HIGH -BUILD - INCLUDES ALL PAVEMENT SYMBOLS ON MORMON TREK BOULEVARD FROM MELROSE AVENUE NORTH TO IOWA CITY LIMITS. CONTRACTOR SHALL ATTEND A
10
8020-G
PAVEMENT MARKING REVIEW MEETING WITH IOWA CITY STREETS DIVISION PRIOR TO INSTALLING PAVEMENT MARKINGS.
TEMPORARY TRAFFIC CONTROL - CONTRACTOR SHALL MAINTAIN AT LEAST ONE LANE OF TRAFFIC IN EACH DIRECTION AT ALL TIMES. THE USE OF ARROW BOARDS WILL BE REQUIRED. ANY FLAGGERS
II
8030-A
USED SHALL BE INCIDENTAL. SEE SUDAS STANDARD SPECIFICATIONS FIGURES 8030.101, 8030.110, 8030.111, AND 8030.113.
TEMPORARY TRAFFIC CONTROL, DYNAMIC MESSAGE BOARDS - CONTRACTOR SHALL SUPPLY DYNAMIC MESSAGE BOARDS TO ADVERTISE LANE CLOSURES AT LEAST ONE WEEK IN ADVANCE OF WORK
12
8030-A
BEGINNING.
HYDRAULIC SEEDING, FERTILIZING, AND MULCHING - FALL SEED WINDOW IS BETWEEN AUGUST 10 AND SEPTEMBER 30.
13
9010-B
MOBILIZATION - INCLUDES THE MOVEMENT OF PERSONNEL, EQUIPMENT, AND SUPPLIES TO THE PROJECT SITE; THE ESTABLISHMENT OF OFFICES, BUILDINGS, AND OTHER FACILITIES NECESSARY FOR THE
14
11,020-A
PROJECT; AND BONDING, PERMITS, AND OTHER EXPENSES INCURRED PRIOR TO CONSTRUCTION.
ENGINEERING DESIGN: MLV PROJECT: SHEET TITLE: SHEET:
CITY0IOWA C T Y DIVISION DRAWN: KKL MORMON TREK PCC PATCHING ESTIMATED REFERENCE NOTES 4
DATE: 03/19/2024
L
MORMON TREK BLVD ,uTIM 0V
1-,-,- -1- - - - ------------------ - - - - - --
15+50 16+00 16+50 17+00 1 18+00 18+51
THROAT
THROAT
- --------------
509
------- ---
. , I 17R
---- ---- -----
----------- - ---- -
---------------
--- ---------
ENGINEERING DESIGN: MLV PROJECT: SHEET TITLE:
PATCHING PLAN
CITY O F I OWA CITY DIVISION DRAWN: KKL MORMON TREK PCC PATCHING M A T 17 'In ln/inl
20i
-o y
� SW-509
40
THROAT
? {` { 0 40's
�---__
27+-00 28+00-Inc,
29+00
-'/ SW-541 TOP MORMON TREK B_LVD +Sp �-
-
00 AND THROAT _- 08 30
THR
S=5
THR- AT `
10" CSUD, REINFORCED
10" CSUD
` a SW-509 TH SSA �6kgo
THROAT .. _
30+
31+0p
31+50
32+00 -
2+50 - _-- - _
_ 34+50 S
33+00 33+50 34+00 THROAT
THRO T
;... .
Y
MORMON N
_TREK BLVD."�
4
1
a
y
S
CITY F OWA C ENGINEERING DESIGN: MLV PROJECT: SHEET TITLE: SHEET:
DRAWN: KKL MORMON TREK PCC PATCHING PATCHING PLAN ]
DIVISION DATE: 03/19/2024
,
w
n
N
a
a ..
R -
r
x
g
4&�
Wa509,
--- -
ffi - .... .
THROAT •
�p
_ ? '
_ Mug
SW 508
4 .0
SW-508 ; - SW
37+00 37+50 0 38+ 39+00, 39+50 40+00 40+50 41+00 x _ i
4 ,:
41+50 42+00; ,: 424-054
. . . . 7. . . . . . 7
i�i/
'" MORMON TREK BLVD
-
-,
, s
10" CSUD, REINFORCED i�OZ.;%i
10" CSUD
u m
u m
CITY OF IOWA CITY ENGINEERING DESIGN: MLV PROJECT: SHEET TITLE: SHEET:
DRAWN: KKL MORMON TREK PCC PATCHING PATCHING PLAN $
DIVISION DATE: 03/19/2024
19 March 2024
City Clerk's Office
410 East Washington Street
Iowa City, Iowa, 52240
� r l
:rulU�pI h
�
CITY OF IOWA CITY
UNESCO CITY OF LITERATURE
410 East Washington Street
Iowa City, Iowa 52240- 1826
(319) 356-5000
(319) 356-5009 FAX
www.icgov.org
Subject: Opinion of Estimated Construction Cost for the Mormon Trek PCC Patching Project
Dear City Clerk,
The engineer's opinion of estimated construction costs for the upcoming Mormon Trek PCC
Patching Project is $670,000.
Sincerely,
Marri VanDyke
Civil Engineer
�y
Prepared by: Marri VanDyke, Engineering Division, 410 E. Washington St., Iowa City, IA 52240, (319)356-5044
Resolution No. 24-68
Resolution setting a public hearing on April 2, 2024 on project
manual and estimate of cost for the construction of the Mormon
Trek PCC Patching Project, directing City Clerk to publish notice
of said hearing, and directing the City Engineer to place said
project manual on file for public inspection.
Whereas, funds for this project are available in the Annual Pavement Rehabilitation Account
#S3824.
Now, therefore, be it resolved by the Council of the City of Iowa City, Iowa, that:
1. A public hearing on the project manual and estimate of cost for the construction of the
above -mentioned project is to be held on the 2"d day of April, 2024, at 6:00 p.m. in the
Emma J. Harvat Hall, City Hall, Iowa City, Iowa, or if said meeting is cancelled, at the next
meeting of the City Council thereafter as posted by the City Clerk.
2. The City Clerk is hereby authorized and directed to publish notice of the public hearing for
the above -named project in a newspaper published at least once weekly and having a
general circulation in the City, not less than four (4) nor more than twenty (20) days before
said hearing.
3. A copy of the project manual and estimate of cost for the construction of the above -named
project is hereby ordered placed on file by the City Engineer in the office of the City Clerk
for public inspection.
Passed and approved this 19th day of March , 20 24
M aoo
Approved by
Attest:
City Clerk City Attor ey's Office
(Liz Craig - 03/13/2024)
It was moved by Harmsen and seconded by Alter
adopted, and upon roll call there were:
Ayes:
x
x
x
Nays:
Absent:
Alter
Bergus
Dunn
Harmsen
Moe
Salih
Teague
the Resolution be
Prepared by: Mani VanDyke, Engineering Division, 410 E. Washington St., Iowa City, IA 52240, (319) 356-5044
Resolution No. 24-84
Resolution approving project manual and estimate of cost for the
construction of the Mormon Trek PCC Patching Project,
establishing amount of bid security to accompany each bid,
directing City Clerk to post notice to bidders, and fixing time and
place for receipt of bids.
Whereas, notice of public hearing on the project manual and estimate of cost for the above -
named project was published as required by law, and the hearing thereon held; and
Whereas, the City Engineer or designee intends to post notice of the project on the website
owned and maintained by the City of Iowa City; and
Whereas, funds for this project are available in the Annual Pavement Management Account
#S3824.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa that:
1. The project manual and estimate of cost for the above -named project are hereby
approved.
2. The amount of bid security to accompany each bid for the construction of the above -
named project shall be in the amount of 10% (ten percent) of bid payable to City of Iowa
City, Iowa.
3. The City Clerk is hereby authorized and directed to post notice as required in Section 26.3,
not less than 13 days and not more than 45 days before the date of the bid letting, which
may be satisfied by timely posting notice on the Construction Update Network, operated
by the Master Builder of Iowa, and the Iowa League of Cities website.
4. Sealed bids for the above -named project are to be received by the City of Iowa City, Iowa,
at the Office of the City Clerk, at the City Hall, before 3:00 p.m. on the 23rd day of April,
2024. At that time, the bids will be opened by the City Engineer or his designee, and
thereupon referred to the City Council of the City of Iowa City, Iowa, for action upon said
bids at its next regular meeting, to be held at the Emma J. Harvat Hall, City Hall, Iowa City,
Iowa, at 6:00 p.m. on the 7t' day of May, 2024, or at a special meeting called for that
purpose.
Passed and approved this end day of April , 2024.
I
May r
Approved by
Attest: .
City dlerk City Attor ey's Office
(Liz Craig - 03/28/2024)
Resolution No. 24-84
Page 2
It was moved by Alter and seconded by
adopted, and upon roll call there were:
Ayes: , Nays:
Absent:
Alter
x Bergus
x Dunn
Harmsen
Moe
Salih
Teague
the Resolution be
LocaliQ
Iowa PO Box 631851 Cincinnati, OH 45263-1851
GANNETT
PROOF OF PUBLICATION
0110
NOTICE OF PUBLIC HEARING
NOTICE OF PUBLIC HEARING ON
PROJECT MANUAL AND ESTI-
City Clerk's Office
MATED COST FOR THE MORMON
E C
NIOWA PROJECT
City Of Iowa City
IN THE C I TYT OF CITY,
410 E Washington ST
IOWA
Iowa City IA 52240-1825
TO ALL TAXPAYERS OF THE
CITY OF IOWA CITY, IOWA, AND
TO OTHER INTERESTED
PERSONS:
STATE OF WISCONSIN, COUNTY OF BROWN
Public notice is hereby given that
the City Council of the City of Iowa
The Iowa City Press Citizen, a newspaper printed and published in
City, Iowa, will conduct a public
hearing On the Manual,
the cityof Iowa, Johnson County, State of Iowa, and personal
y p
s, specifications,
including the plans, specifications,
knowledge of the facts herein state and that the notice hereto
contract, and estimated cost for the
annexed was Published in said newspapers in the issue:
construction Of the Mormon Trek
PCC' Patching in said city at 6:00
03/25/2024
p.m. on the 2nd day of April, 2024,
said meeting to be held in the
Emma J. Harvat Hall in the City
and that the fees charged are legal.
Hall, 410 East Washington Street in
Sworn to and subscribed before on 03/25/2024
said city, or if said meeting is
cancelled, at the next meeting of the
City Council thereafter as posted by
the City Clerk.
This project includes approximately
4,000 square yards of portland
cement concrete patching on
Mormon Trek Boulevard north of
Melrose Avenue, as well as intake
throat replacements, pavement
markings, and seeding/site restora-
tion.
Said Proiect Manual and estimated
cost are now on file in the office of
the City Clerk in the City Hall in
Legal Clerk
Iowa City, Iowa, and may be
inspected by any interested persons.
Any interested persons may appear
at said meeting of the City Council
Notary, of County of Brown
otai y ty
for the purpose of making obiections
to and comments concerning said
r i '
Project Manual or the cost of
My commission expires
making said improvement.
This notice is given by order of the
Publication Cost: $40.60
City. Council of the City of Iowa City,
Order No: 9984879 # of Copies:
Iowaded by
K. asCity Clerk
Customer No: 1249729 0
PO #:
THIS IS NOT AN INVOICE!
Please do not use this form for payment remittance.
KATHLEEN ALEN
Notary Public
State of Wisconsin
Page 1 of 1
A'J-8�; I I
IOWA
LEAGUE
gfCITIES
CERTIFICATE
The Iowa League of Cities an entity organized under the laws of Iowa as an instrumentality of its
member cities, with its principal place of business in Des Moines, Polk County, Iowa, does hereby
certify that I am now and was at the time hereinafter mentioned, the duly qualified and acting
Executive Director of the Iowa League of Cities, and that as such Executive Director of the League
and by full authority from the Executive Board, I have caused a
NOTICE TO BIDDERS
Mormon Trek Blvd PCC Paving Project
Classified ID: 111712166734
A printed copy of which is attached and made part of this certificate, provided on 04/04/2024 to be
posted on the Iowa League of Cities internet site on the following date:
2024-04-04
I certify under penalty of perjury and pursuant to the laws of the State of Iowa that the preceding is
true and correct.
04/04/2024
Alan Kemp, Executive Director
0100
NOTICE TO BIDDERS
MORMON TREK PCC PATCHING PROJECT
Sealed proposals will be received by the City Clerk of the City of Iowa City, Iowa, until 3:00 P.M.
on the 231d day of April 2024. Sealed proposals will be opened immediately thereafter. Bids
submitted by fax machine shall not be deemed a "sealed bid" for purposes of this Project.
Proposals received after this deadline will be returned to the bidder unopened.
Proposals will be acted upon by the City Council at a meeting to be held in the Emma J. Harvat
Hall at 6:00 P.M. on the 71h day of May, 2024, or at special meeting called for that purpose.
The Project will involve the following
Approximately 4,000 square yards of PCC patching on Mormon Trek Boulevard north of Melrose
Avenue, as well as intake throat replacements, pavement markings, and seeding/site restoration.
All work is to be done in strict compliance with the Project Manual prepared by The City of Iowa
City, Iowa, which has heretofore been approved by the City Council, and are on file for public
examination in the Office of the City Clerk.
Each proposal shall be completed on a form furnished by the City and must be submitted in a
sealed envelope. In addition, a separate sealed envelope shall be submitted containing a
completed Bidder Status Form and a bid security executed by a corporation authorized to contract
as a surety in the State of Iowa, in the sum of 10% of the bid. The bid security shall be made
payable to the TREASURER OF THE CITY OF IOWA CITY, IOWA, and shall be forfeited to the
City of Iowa City in the event the successful bidder fails to enter into a contract within ten (10)
calendar days of the City Council's award of the contract and post bond satisfactory to the City (in
the form shown in Section 0510) ensuring the faithful performance of the contract and
maintenance of said Project, if required, pursuant to the provisions of this notice and the other
contract documents. The City shall retain the bid security furnished by the successful bidder until
the approved contract has been executed, the required Performance, Payment, and Maintenance
Bond (as shown in Section 0510) has been filed by the bidder guaranteeing the performance of
the contract, and the contract and security have been approved by the City. The City shall
promptly return the checks or bidder's bonds of unsuccessful bidders to the bidders as soon as
the successful bidder is determined or within thirty days, whichever is sooner.
The successful bidder will be required to furnish a Performance, Payment, and Maintenance Bond
in an amount equal to one hundred percent (100%) of the contract price and in the form shown in
Section 0510, said bond to be issued by a responsible surety approved by the City, and shall
guarantee the prompt payment of all materials and labor, and also protect and save harmless the
City from all claims and damages of any kind caused directly or indirectly by the operation of the
contract, and shall also guarantee the maintenance of the improvement for a period of five (5)
years from and after its completion and formal acceptance by the City Council.
Mormon Trek Pcc Patching Project Page 1 of 2
The following limitations shall apply to this Project:
Specified Start Date:
May 27, 2024
Substantial Completion Date:
August 23, 2024
Final Completion Date:
September 13, 2024
Liquidated Damages:
$500 per day
All of the bid items listed in Section 0400 — Proposal shall be completed by the Substantial
Completion Date except item 13 Hydraulic Seeding, Fertilizing, and Mulching.
The Project Manual may be examined at the office of the City Clerk. Copies thereof and blank
forms may be secured at the office of Technigraphics, a division of Rapids Reproductions located
at 415 Highland Ave, Suite 100, Iowa City, Iowa 52240. Phone: (319) 354-5950, Fax: (319) 354-
8973, Toll -Free: (800) 779-0093.
Prospective bidders are advised that the City of Iowa City desires to employ minority contractors
and subcontractors on City projects. A listing of minority contractors can be obtained from the
Iowa Department of Inspections and Appeals at (515) 281-5796 and the Iowa Department of
Transportation Contracts Office at (515) 239-1422.
Bidders shall list on the Proposal the names of persons, firms, companies or other parties with
whom the bidder intends to subcontract. This list shall include the type of work and approximate
subcontract amount(s).
The Contractor awarded the contract shall list on the Contract its subcontractors, together with
quantities, unit prices and extended dollar amounts.
By virtue of statutory authority, preference must be given to products and provisions grown and
coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required
under Iowa Statutes. The Iowa reciprocal resident bidder preference law applies to this Project.
The City reserves the right to reject any or all proposals, and also reserves the right to waive
technicalities and irregularities.
Posted upon order of the City Council of Iowa City, Iowa.
KELLIE GRACE, CITY CLERK
Mormon Trek Pcc Patching Project Page 2 of 2
Ashley Platz
From: Cindy Adams <CAdams@mbi.build>
Sent: Thursday, April 4, 2024 8:05 AM
To: Ashley Platz
Subject: Certificate for Notice to Bidders
Attachments: We sent you safe versions of your files; 04.04.24 Notice to Bidders.pdf
A
RISK
** This email originated outside of the City of Iowa City email system. Please take extra care opening any links or
attachments. **
Mimecast Attachment Protection has deemed this file to be safe, but always exercise caution when opening files.
Certificate
The undersigned, being first duly sworn on oath, states that The Construction Update Plan Room Network ("CU
Network") is a corporation duly organized and existing under the laws of the State of Iowa, with its principal place of
business in Des Moines, Polk County, Iowa. The undersigned also states that he is now and was at the time hereinafter
mentioned, the duly qualified and acting President / CEO of the CU Network, and that as such President / CEO of the CU
Network and by full authority from the Executive Board, he caused a
NOTICE TO BIDDERS
Iowa City — Iowa Avenue Bridge Trail Underpass Bridges Project
Iowa City — Mormon Trek PCC Patching Project
A printed copy of which is attached and made part of this certificate, to be posted in the Construction Update Network
Plan Room, a relevant contractor plan room service with statewide circulation and a relevant contractor lead generating
service with statewide circulation, on the following date(s):
April 04, 2024
I certify under penalty of perjury and pursuant to the laws of the State of Iowa that the preceding is true and correct.
April 04, 2024
Date President/CEO of The Construction Update Plan Room Network
CindyrAdams
Project ion l,st
^► Master Builders of Iowa
P (515) 402-9858
E CAdams@MBI.Build I W www.MBI.Build
Daily Notice
to Bidders
Master Builders of Iowa
The Project Source
This report is brought to you through an exclusive partnership
between Cons tructConnect and the Master Builders of Iowa.
0100
NOTICE TO BIDDERS
MORMON TREK PCC PATCHING PROJECT
Sealed proposals will be received by the City Clerk of the City of Iowa City, Iowa, until 3:00 P.M.
on the 23rd day of April 2024. Sealed proposals will be opened immediately thereafter. Bids
submitted by fax machine shall not be deemed a "sealed bid" for purposes of this Project.
Proposals received after this deadline will be returned to the bidder unopened.
Proposals will be acted upon by the City Council at a meeting to be held in the Emma J. Harvat
Hall at 6:00 P.M. on the 7'h day of May, 2024, or at special meeting called for that purpose.
The Project will involve the following
Approximately 4,000 square yards of PCC patching on Mormon Trek Boulevard north of Melrose
Avenue, as well as intake throat replacements, pavement markings, and seeding/site restoration.
All work is to be done in strict compliance with the Project Manual prepared by The City of Iowa
City, Iowa, which has heretofore been approved by the City Council, and are on file for public
examination in the Office of the City Clerk.
Each proposal shall be completed on a form furnished by the City and must be submitted in a
sealed envelope. In addition, a separate sealed envelope shall be submitted containing a
completed Bidder Status Form and a bid security executed by a corporation authorized to contract
as a surety in the State of Iowa, in the sum of 10% of the bid. The bid security shall be made
payable to the TREASURER OF THE CITY OF IOWA CITY, IOWA, and shall be forfeited to the
City of Iowa City in the event the successful bidder fails to enter into a contract within ten (10)
calendar days of the City Council's award of the contract and post bond satisfactory to the City (in
the form shown in Section 0510) ensuring the faithful performance of the contract and
maintenance of said Project, if required, pursuant to the provisions of this notice and the other
contract documents. The City shall retain the bid security furnished by the successful bidder until
the approved contract has been executed, the required Performance, Payment, and Maintenance
Bond (as shown in Section 0510) has been filed by the bidder guaranteeing the performance of
the contract, and the contract and security have been approved by the City. The City shall
promptly return the checks or bidder's bonds of unsuccessful bidders to the bidders as soon as
the successful bidder is determined or within thirty days, whichever is sooner.
The successful bidder will be required to furnish a Performance, Payment, and Maintenance Bond
in an amount equal to one hundred percent (100%) of the contract price and in the form shown in
Section 0510, said bond to be issued by a responsible surety approved by the City, and shall
guarantee the prompt payment of all materials and labor, and also protect and save harmless the
City from all claims and damages of any kind caused directly or indirectly by the operation of the
contract, and shall also guarantee the maintenance of the improvement for a period of five (5)
years from and after its completion and formal acceptance by the City Council.
Mormon Trek Pcc Patching Project Page 1 of 2
The following limitations shall apply to this Project:
Specified Start Date: May 27, 2024
Substantial Completion Date: August 23, 2024
Final Completion Date: September 13, 2024
Liquidated Damages: $500 per day
All of the bid items listed in Section 0400 — Proposal shall be completed by the Substantial
Completion Date except item 13 Hydraulic Seeding, Fertilizing, and Mulching.
The Project Manual may be examined at the office of the City Clerk. Copies thereof and blank
forms may be secured at the office of Technigraphics, a division of Rapids Reproductions located
at 415 Highland Ave, Suite 100, Iowa City, Iowa 52240. Phone: (319) 354-5950, Fax: (319) 354-
8973, Toll -Free: (800) 779-0093.
Prospective bidders are advised that the City of Iowa City desires to employ minority contractors
and subcontractors on City projects. A listing of minority contractors can be obtained from the
Iowa Department of Inspections and Appeals at (515) 281-5796 and the Iowa Department of
Transportation Contracts Office at (515) 239-1422.
Bidders shall list on the Proposal the names of persons, firms, companies or other parties with
whom the bidder intends to subcontract. This list shall include the type of work and approximate
subcontract amount(s).
The Contractor awarded the contract shall list on the Contract its subcontractors, together with
quantities, unit prices and extended dollar amounts.
By virtue of statutory authority, preference must be given to products and provisions grown and
coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required
under Iowa Statutes. The Iowa reciprocal resident bidder preference law applies to this Project.
The City reserves the right to reject any or all proposals, and also reserves the right to waive
technicalities and irregularities.
Posted upon order of the City Council of Iowa City, Iowa.
KELLIE GRACE, CITY CLERK
Mormon Trek Pcc Patching Project Page 2 of 2
Prepared by: Marri VanDyke, Engineering Division, 410 E. Washington St., Iowa City, IA 52240 (319)356-5044
Resolution No. 24-116
Resolution awarding contract and authorizing the Mayor to sign
and the City Clerk to attest a contract for construction of the
Mormon Trek PCC Patching Project.
Whereas, Feldman Concrete of Dyersville, Iowa has submitted the lowest responsive, responsible
bid of $542,070.00 for construction of the above -named project; and
Whereas, funds for this project are available in the Annual Pavement Management Account
#S3824.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that:
1. The contract for the construction of the above -named project is hereby awarded to
Feldman Concrete of Dyersville, Iowa, subject to the condition that awardee secure
adequate performance and payment bond, insurance certificates, and contract compliance
program statements.
2. The Mayor is hereby authorized to sign and the City Clerk to attest the contract for
construction of the above -named project, subject to the condition that awardee secure
adequate performance and payment bond, insurance certificates, and contract compliance
program statements.
3. The City Engineer and City Manager are authorized to execute change orders according
to the City's Purchasing Policy as they may become necessary in the construction of the
above -named project.
Passed and approved this 7th day of
Attest : �P_
City Clerk
May 2024
May
Approved b
City A rney's Office
(Liz Craig - 05/01/2024)
It was moved by Moe and seconded by Dunn the Resolution be
adopted, and upon roll call there were:
Ayes:
N
Nays:
Absent:
Alter
Bergus
Dunn
Harmsen
Moe
Salih
Teague
0510 � � -�-c
PERFORMANCE, PAYMENT, AND MAINTENANCE BONf? ---"
MORMON TREK PCC PATCHING PROJECTA�
E573 CITY OF IOWA CITY"
C
Know All by These Presents: ^'
That we, Feldman Concrete , as Principal
(hereinafter the "Contractor" or "Principal") and Merchants Bonding Company (Mutual) ,
as Surety are held and firmly bound unto City of Iowa City, Iowa, as Obligee (hereinafter referred
to as "the Jurisdiction"), and to all persons who may be injured by any breach of any of the
conditions of this Bond in the penal sum of Five Hundred forty-two thousand, seventy dolla[s
dollars ($ 542,070.00 ), lawful money of the United States, for the payment of which
sum, well and truly to be made, we bind ourselves, our heirs, legal representatives and assigns,
jointly or severally, firmly by these presents.
The conditions of the above obligations are such that whereas said Contractor entered into a
contract with the Jurisdiction, bearing date the day of mer&r M aItt-
2024 (hereinafter the "Contract") wherein said Contractor undertakes and agrees to
construct the following described improvements:
This project includes approximately 4,000 square yards of PCC patching on Mormon Trek
Boulevard north of Melrose Avenue, as well as intake throat replacements, pavement markings,
and seeding/site restoration.
To faithfully perform all the terms and requirements of said Contract within the time therein
specified, in a good and workmanlike manner, and in accordance with the Contract Documents.
It is expressly understood and agreed by the Contractor and Surety in this bond that the following
provisions are a part of this Bond and are binding upon said Contractor and Surety, to -wit:
Performance: The Contractor shall well and faithfully observe, perform, fulfill, and abide
by each and every covenant, condition, and part of said Contract, by reference made a
part hereof, for the above referenced improvements, and shall indemnify and save
harmless the Jurisdiction from all outlay and expense incurred by the Jurisdiction by
reason of the Contractor's default of failure to perform as required. The Contractor shall
also be responsible for the default or failure to perform as required under the Contract and
Contract Documents by all its subcontractors, suppliers, agents, or employees furnishing
materials or providing labor in the performance of the Contract.
2. Payment: The Contractor and the Surety on this Bond hereby agreed to pay all just claims
submitted by persons, firms, subcontractors, and corporations furnishing materials for or
performing labor in the performance of the Contract on account of which this Bond is given,
including but not limited to claims for all amounts due for labor, materials, lubricants, oil,
gasoline, repairs on machinery, equipment, and tools, consumed or used by the Contractor
or any subcontractor, wherein the same are not satisfied out of the portion of the contract
price the Jurisdiction is required to retain until completion of the improvement, but the
Contractor and Surety shall not be liable to said persons, firms, or corporations unless the
Mormon Trek Pcc Patching Project 0510 — Page 1 of 4
claims of said claimants against said portion of the contract price shall have been
established as provided by law. The Contractor and Surety hereby bind themselves to the
obligations and conditions set forth in Chapter 573 of the Iowa Code, which by this
reference is made a part hereof as though fully set out herein.
3. Maintenance: The Contractor and the Surety on this Bond hereby agree, at their own
expense:
A. To remedy any and all defects that may develop in or result from work to be
performed under the Contract within the period of five years (5) from the date of
acceptance of the work under the Contract, by reason of defects in workmanship
or materials used in construction of said work;
B. To keep all work in continuous good repair; and
C. To pay the Jurisdiction's reasonable costs of monitoring and inspection to assure
that any defects are remedied, and to repay the Jurisdiction all outlay and expense
incurred as a result of Contractor's and Surety's failure to remedy any defect as
required by this section.
4. General: Every Surety on this Bond shall be deemed and held bound, any contract to the
contrary notwithstanding, to the following provisions:
A. To consent without notice to any extension of time to the Contractor in which to
perform the Contract;
B. To consent without notice to any change in the Contract or Contract Documents,
which thereby increases the total contract price and the penal sum of this bond,
provided that all such changes do not, in the aggregate, involve an .increase of
more than 20% of the total contract price, and that this bond shall then be released
as to such excess increase; and
C. To consent without notice that this Bond shall remain in full force and effect until
the Contract is completed, whether completed within the specified contract period,
within an extension thereof, or within a period of time after the contract period has
elapsed and the liquidated damage penalty is being charged against the
Contractor.
D. That no provision of this Bond or of any other contract shall be valid that limits to
less than five year(s) (5) after the acceptance of the work under the Contract the
right to sue on this Bond.
E. That as used herein, the phrase "all outlay and expense" is not to be limited in any
way, but shall include the actual and reasonable costs and expenses incurred by
the Jurisdiction including interest, benefits, and overhead where applicable.
Accordingly, "all outlay and expense" would include but not be limited to all contract
or employee expense, all equipment usage or rental, materials, testing, outside
experts, attorneys fees (including overhead expenses of the Jurisdiction's staff
attorneys), and all costs and expenses of litigation as they are incurred by the
Jurisdiction. It is intended the Contractor and Surety will defend and indemnify the
Jurisdiction on all claims made against the Jurisdiction on account of Contractor's
failure to perform as required in the Contract and Contract Documentsr that all
agreements and promises set forth in the Contract and Contract-Docum*nts, in
approved change orders, and in this Bond will be fulfilled, and that the Jufsdiction
will be fully indemnified so that it will be put into the position it wobtd-have�een in.;
had the Contract been performed in the first instance as required.2' T
--� r-
•V
CD
e V
Mormon Trek Pcc Patching Project 0510 - Page 2 of 4
In the event the Jurisdiction incurs any "outlay and expense" in defending itself against
any claim as to which the Contractor or Surety should have provided the defense, or in the
enforcement of the promises given by the Contractor in the Contract, Contract Documents,
or approved change orders, or in the enforcement of the promises given by the Contractor
and Surety in this Bond, the Contractor and Surety agree that they will make the
Jurisdiction whole for all such outlay and expense, provided that the Surety's obligation
under this bond shall not exceed 125% of the penal sum of this bond.
In the event that any actions or proceedings are initiated regarding this Bond, the parties
agree that the venue thereof shall be Johnson County, State of Iowa. If legal action is
required by the Jurisdiction to enforce the provisions of this Bond or to collect the monetary
obligation incurring to the benefit of the Jurisdiction, the Contractor and the Surety agree,
jointly, and severally, to pay the Jurisdiction all outlay and expense incurred therefor by
the Jurisdiction. All rights, powers, and remedies of the Jurisdiction hereunder shall be
cumulative and not alternative and shall be in addition to all rights, powers, and remedies
given to the Jurisdiction, by law. The Jurisdiction may proceed against surety for any
amount guaranteed hereunder whether action is brought against the Contractor or whether
Contractor is joined in any such action(s) or not.
Now therefore, the condition of this obligation is such that if said Principal shall faithfully
perform all the promises of the Principal, as set forth and provided in the Contract and in
this Bond, then this obligation shall be null and void, otherwise it shall remain in full force
and effect.
When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first
as defined in this Bond and the Contract; second, if not defined in the Bond or Contract, it
shall be interpreted or construed as defined in applicable provisions of the Iowa Code;
third, if not defined in the Iowa Code, it shall be interpreted or construed according to its
generally accepted meaning in the construction industry; and fourth, if it has no generally
accepted meaning in the construction industry, it shall be interpreted or construed
according to its common or customary usage.
Failure to specify or particularize shall not exclude terms or provisions not mentioned and
shall not limit liability hereunder. The Contract is hereby made a part of this Bond.
Mormon Trek Pcc Patching Project
r""
jM
0510 — Page 3 of 4
PRINCIPAL:
Feldman Concrete
Printed Name of Contractor Officer
By ny✓1 G+.V
Signature of/Contractor Officer
Title of Contractor Officer
SURETY:
Merchants Bonding Company (Mutual)
Surety Company Name
Signature of Attorney -in -Fact Officer
Hannah Cecelia Kuhse
Printed Name of Attorney -in -Fact Officer
TRICOR
Company Name of Attorney -in -Fact
600 Star Brewery Dr Suite 110
Company Address of Attorney -in -Fact
Dubuque IA 52001
City, State, Zip Code of Attorney -in -Fact
(563) 556-5441
Telephone Number of Attorney -in -Fact
sA
C)
Mormon Trek Pcc Patching Project 0510 — Page 4 of 4
M.ERCHANT�
BONDING COMPANY,.
POWER OF ATTORNEY
Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the
"Companies") do hereby make, constitute and appoint, individually,
Hannah Cecelia Kuhse
their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of
persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions
or proceedings allowed by law.
This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board
of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors of
Merchants National Bonding, Inc., on October 16, 2015.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and
authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto,
bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the
Company, and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the
Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction
contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department
of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of
its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 13th day of May 2024
.• P ��ON • •, • �A,• MERCHANTS BONDING COMPANY (MUTUAL)
.•• .� q '•. � LNG Cp ' •
'•� 'RPO/Q' e0 ; •O.''�PQ,q' 9 • MERCHANTS NATIONAL BONDING, INC.
by G� 4� d/b/a MERCHANTS NATIONAL INDEMNITY COMPANY
z 2003 ?�� : �1933 c;
�. rCb. By
%,dui'•• ,• .,..;��`;� '•,b�;�.. � ..-`1•st•:
•.�Y''
President
STATE OF IOWA ••�''""'���� •' • • • • ` •
COUNTY OF DALLAS ss.
On this 13th day of May 2024 before me appeared Larry Taylor, to me personally known, who being by me duly sworn
did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the
seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf
of the Companies by authority of their respective Boards of Directors.
",VgLl4 %Penni Miller
z Commission Number 787952 -
• • My Commission Expires
iOwA January 20, 2027 otary Pu c
(Expiration of notary's commission
does not invalidate this instrument)"
ems,
I, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING74NC., do hereby
certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies,.WWch is still in full
force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 13th day of�� M$y_� 2024 .
• y' _ • /i�
2003 : u7 :'� 1933 Secretary
POA 0018 (1124)
ENGINEER'S REPORT
June 9, 2025
CITY OF 1011VA CITY
410 East �Vfkshiugtou Strut
Iowa City, Iowa 52240 - 1826
(319) 356 - 5000
(319) 356 - 5009 V..AX
ww%' iogoN%0r&'
City Clerk
Iowa City, Iowa
Re: Mormon Trek PCC Patching Project
Dear City Clerk:
I hereby certify that the construction of the Mormon Trek PCC Patching Project has been
completed by Feldman Concrete of Dyersville, Iowa in substantial accordance with the plans and
specifications prepared by the City of Iowa City.
The project was bid as a unit price contract and the final contract price is $ 598,807.84.
There were three (3) change orders on this project as follows:
1) Water blasting for pavement marking symbols and legends $1,595.00
2) Modified subbase for large pavement patches $7,729.99
3) Bid item quantity adjustments
Total
$ 47,412.85
$ 56,737.84
recommend that the above -referenced improvements be accepted by the City of Iowa City.
Sincerely,
Jason Havel, P.E.
City Engineer
Prepared by: Justin Harland, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5154
Resolution No. 25-151 ,
Resolution accepting the work for the Mormon Trek PCC
Patching Project
Whereas, the Engineering Division has recommended that the work for construction of the
Mormon Trek PCC Patching Project, as included in a contract between the City of Iowa City and
Feldman Concrete of Dyersville, Iowa, dated May 16, 2024, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Clerk's office; and
Whereas, funds for this project are available in the Annual Pavement Management account #
S3824; and
Whereas, the final contract price is $598,807.84.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 17th day of June 12025
Mayo
Attest: J �, , , '" �), a-, , -,
City Clerk
It was moved by Bergus and seconded by
adopted, and upon roll call there were:
Ayes:
x
x
Nays:
Approved by
zx__�
City Attorne s Office
(Liz Craig - 06/11/2025)
weilein the Resolution be
Absent:
Alter
Bergus
Harmsen
Moe
Salih
Teague
Weilein