HomeMy WebLinkAboutAgenda 10-09-25*The times listed in the agenda are the anticipated duration of that particular agenda item. The actual
discussion may take more or less time than anticipated.
If you will need disability-related accommodations in order to participate in this program/event, please
contact Michael Tharp, Airport Manager, at 319-356-5045 or at michael-tharp@iowa-city.org. Early
requests are strongly encouraged to allow sufficient time to meet your access needs.
IOWA CITY AIRPORT COMMISSION
MEETING AGENDA
AIRPORT TERMINAL BUILDING
1801 S. RIVERSIDE DRIVE
IOWA CITY, IOWA
THURSDAY, OCTOBER 9, 2025 – 6:00 P.M.
1. Determine Quorum 1 min*
2. Approval of Minutes from the following meetings: 2 min
September 11, 2025
3. Public Comment - Items not on the agenda 5 min
4. Items for Discussion / Action:
a. Airport Construction Projects: 15 min
i. FAA grant projects
1. Runway 12/30 Displaced Threshold/Relocation
2. Runway 7/25 & 12/30 Pavement Maintenance
a. Consider a resolution authorizing chair to sign agreement with McClure
Engineering for design/bid/construction related services
ii. Iowa DOT grant projects
1. T-Hangar Building
2. Wildlife Mitigation Study
b. Airport "Operations" 45 min
i. IPIB Open Meetings Training Follow-Up
ii. Budget
1. FY27 Budget Submittal
a. Motion to submit FY27 budget
iii. Management
1. Temporary Access Agreement with Hills Bank
a. Consider a resolution approving agreement with Hills Bank
iv. Events
1. Autocross (Oct 19)
2. Climate Fest (Sept 22)
c. FBO / Flight Training Reports 10 min
i. Jet Air
1. Hangar Door Replacement
a. Consider a resolution setting a public hearing for an agreement to replace
the Hangar M Door and Extend Hangar N Ground Lease
d. Commission Members' Reports 2 min
e. Staff Report 2 min
5. Set next regular meeting for November 13, 2025
6. Adjourn
MINUTES DRAFT
IOWA CITY AIRPORT COMMISSION
September 11, 2025 – 6:00 P.M.
AIRPORT TERMINAL BUILDING
Members Present: Hellecktra Orozco, Judy Pfohl, Chris Lawrence, Warren Bishop
Members Absent: Ryan Story
Staff Present: Michael Tharp, Jennifer Schwickerath, Sarah Gardner
Others Present: Adam Thompson, Matt Wolford, Marty Boller, Robert Miklo, David
Woodruff, Meg George
RECOMMENDATIONS TO COUNCIL:
None
DETERMINE QUORUM
A quorum was determined at 6:03 pm and Bishop called the meeting to order.
Lawrence nominated Pfohl to serve as Acting Secretary, seconded by Bishop. Motion carried 4-0
APPROVAL OF MINUTES
Pfohl stated she reviewed the minutes and had a couple of minor changes she gave Tharp.
Lawrence moved to accept the minutes as amended, seconded by Pfohl. Motion carried (4-0
Story Absent)
PUBLIC COMMENT - None
ITEMS FOR DISCUSSION / ACTION
a.Terminal Building Historic Preservation and Modernization – Tharp stated give
everyone background information, 5 years ago, Congress passed the Bipartisan
Infrastructure Law which was signed and within that program there were dollars that
could be applied for by airports to construct terminal buildings. Tharp stated that
they were unsuccessful in getting grant funds and that those programs were ending.
Due to those conversations there was a group that took interest in placing the
terminal building on the National Register and they were attending the meeting
tonight to talk with the Commission about the process and if that designation was
made, how that would affect the airport. Tharp introduced Marty Boller who
introduced the rest of the attendees from the Friends of Historic Preservation. Boller
introduced the rest of the members and then Robert Miklo spoke about the group’s
history and previous work. Boller described the building and the architect of the
building Henry Fisk and the background of Fisk as an architect in Iowa City. Boller
stated that they believed Fisk to be the first registered architect in Iowa City and
Johnson County. Boller continued to describe the buildings that Fisk designed.
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 2 of 98
Airport Commission
September 11, 2025
Page 2 of 6
Boller stated that the building was one of the pieces most similar to the original
building and recent projects to maintain the building helped to maintain the historic
look. Woodruff stated that they wanted to be partners with the airport in helping to
find architects and companies that would continue to help preserve the building in
future projects. Boller noted that there are programs that help to provide funding for
projects that can help the airport to manage the building. Bishop talked about the
airport challenges with the building where the footprint for a terminal building is
constrained. Bishop stated that he worked as a part time flight instructor and noted
the HVAC systems were outdated and the building had other space issues. Pfohl
stated that they had multiple flight instructors sharing office space which impacted
training. Lawrence stated that the issues the airport has are economic and that this
is a gateway to the city. Lawrence stated that grants are difficult to find and that
when they did their space needs study and reviewed options for rehabilitating the
building versus building new they chose to pursue the build new option due to the
costs. Lawrence referenced the Ottumwa terminal building as a building that felt
welcoming and was “wowed” when he saw it. Lawrence stated he wasn’t opposed
to having the building on the register and that if it opened the door to other options
for funding he’d like to know about that. Miklo stated that if the building was on the
register and the Commission wanted to demolish it or do something that would harm
the historic nature, there would need to be some coordination with the State Historic
Preservation Office. Tharp stated the FAA considers the building a historically
significant building and any effort so any use of federal money would already be
required to go through a process that Miklo described. Tharp stated that this is going
to be an ongoing process and that right now the Airport Commission didn’t need to
take a position on the process if they didn’t want to. Tharp stated that the state
general aviation vertical infrastructure program had a $300,000 cap on new
construction and $150,000 on rehabilitation projects. Tharp stated that the FAA
priority scoring for terminal buildings is so low that without a program like they just
saw, the chances of getting federal money to do something is nearly zero. Tharp
also stated that the FAA also has rules on what portions of terminal buildings are
eligible for funding and that many portions of the existing building wouldn’t be eligible
for grant funds. Miklo described some of those ways historic preservation projects
is through tax credits. Tharp stated that since they are a government body, using
tax credits requires more work to be able to utilize. Lawrence noted that anything
they do to the building would be detrimental to airport business as they have no other
locations to put people while work was ongoing. Tharp noted that the preservation
work would continue and they would keep in communication. When the information
was ready to be submitted they could bring that awareness back to the Commission
and the Commission could then make a choice whether to support the placement
request or not. Tharp stated that he and Thompson had been having conversations
under the assumption that the terminal building was going to be around for a while
and what improvements could be done to make the building better suited for airport
operations. Thompson stated that he put together a plan with some a la carte type
options and described those options like looking at the HVAC system or going bigger
and doing a full rehabilitation and master plan for an expansion. Thompson
mentioned that going to an electrical based system could be utilized to capture some
of the energy supported by the solar array. Members discussed what the next steps
should be and what the focus would take. Bishop asked if they need a motion and
Tharp responded that at this point he just need a consensus and he believed that
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 3 of 98
Airport Commission
September 11, 2025
Page 3 of 6
the Commission was saying they would move forward with the HVAC system
improvement options. Thompson stated that they would expect this to be a state
grant application project as early as next year.
b. Airport Construction Projects:
i. FAA grant projects –
1. Runway 12/30 Displaced Threshold – Tharp stated they are still
waiting for the manufacturer to get information on the permanent
fixtures for the temporary lights that have been installed. Tharp
noted that while they were doing the inspection for this project they
noticed a couple of panels that had cracked in the newly paved
areas. Tharp stated that the contractor was notified so they can plan
the replacement. Lawrence asked about the repairs and Tharp
stated they would be a replacement and that they would have a
runway closure at some point for it.
2. Runway 7/25 & 12/30 Pavement Maintenance – Tharp stated that
Thompson had prepared a draft work order for the project and that
they were still waiting for the project go-letter from the FAA.
Lawrence asked about the lifespan of concrete. Tharp stated the
design life is 20 years but the practical life is near 40 years.
ii. Iowa DOT grant projects
1. T-hangar Building – Tharp stated that this was on hold until next
spring and they would re-apply for the project next spring. Tharp
stated they would know what the last FAA allocation from BIL was
so that would help finalize numbers
2. Wildlife Mitigation Study – Tharp stated the USDA guys were
collecting their data.
c. Airport “Operations
i. Budget – Tharp noted that the budget committee was Chair, Secretary, and
himself. Tharp stated that he had done a preliminary budget writeup and he
was already showing a surplus. Tharp noted there were a couple of hangars
that would be undergoing a CPI inflator. Tharp noted for the last budget
year, they had a budget that was submitted with a surplus of about $4000
dollars and the last report showed a surplus of $10,000. Tharp stated he
believed the city was going to release the budget system on October 1st.
ii. Management –
1. Ground lease with McGrath Holdings LLC –
a. Public Hearing – Bishop opened the hearing at 7:12pm.
Tharp stated that this lot was originally part of the Dreusicke
Toyota dealership agreement and that before Dreusicke sold
the dealership this agreement expired. Tharp noted that
McGrath wanted to update the sign and he offered the same
agreement they had with Dreusicke and McGrath responded
they didn’t want the sign that badly. Tharp stated they then
settled on the trade of being able to use the sign for the cost
of the ground maintenance. Bishop closed the public
hearing at 7:14pm
b. Consider a resolution #A25-14 approving a ground lease with
McGrath – Orozco moved the resolution, seconded by
Lawrence. Motion carried 4-0 (Story Absent)
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 4 of 98
Airport Commission
September 11, 2025
Page 4 of 6
iii. Events –
1. Young Eagles (Aug 16th) - Tharp stated they had about 45 kids get
rides and that they did have a way for kids to be on a wait list for
rides for no-shows. Tharp noted that the event ended a little early
due to the heat, but that all the kids who were there got a ride.
2. Pancake Breakfast (Aug 24) - Tharp stated that the breakfast was
absolutely phenomenal and that the weather was some of the best
it’s ever been. Tharp stated that they’re looking at doing something
a little different with the car locations because people will still show
up as late as after 10am and getting them through the crowd is
problematic. Tharp noted the typical partners were there. Lawrence
said he flew out that morning and there was a lot of people that were
on the ramp looking at aircraft. Tharp noted they used to have Civil
Air Patrol helping but then they stopped participating. Wolford noted
he believed it was due to a lack of volunteers overall in the local
group.
3. Autocross (Sept 14, Oct 19) – Tharp stated that this weekend was
a weekend for the group to be active. Tharp stated he was out on
the pavement recently and said it was getting to be pretty bad and
didn’t know how many more years the group would be using the
airport.
4. Climate Fest (Sept 22) – Tharp stated they were also planning for
Climate Fest and that Sarah Gardner, Climate Action Coordinator
for the city was there to also tell them a bit more about the plans.
Gardner shared plans for the day stated they would have some
activities in the viewing area and they were working with Public
Space One. Gardner stated that in the conference room they would
have an art exhibit and tours of the solar array. There was also
going to be some activities in the viewing area.
d. FBO / Flight Training Reports
i. Jet Air – Wolford stated that he didn’t have a lot to update but they’ve been
extremely busy. Wolford noted they’ve been active with survey aircraft
staying here. Pfohl asked about the door proposal and Wolford responded
that he was still working with some manufacturers to choose an option.
e. Commission Members' Reports – Orozco asked for clarification on plans for phase
2 of the solar array. Tharp stated they ended the planning of that project to use the
money for the hangar construction. Orozco also asked about the display jet and
Tharp stated that he was still reaching out to veterans groups to let folks know the
Airport had plans for the jet.
f. Staff Report – Tharp stated that the City Managers Office had offered to have a
representative come to city boards and commission meetings to discuss the
upcoming vote on the local option sales tax if members were interested. Tharp
described the proposed use of the funds and members discussed if they needed to
have a conversation. Members declined the offer. Tharp reminded folks about the
open meetings training scheduled for Terry Trueblood and that they would have
food.
SET NEXT REGULAR MEETING – Set the next meeting for October 9, 2025.
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 5 of 98
Airport Commission
September 11, 2025
Page 5 of 6
ADJOURN – Pfohl moved to adjourn the meeting at 7:40pm. Seconded by Orozco. Motion
carried (4-0 Story Absent)
______________________________________________ ___________________
CHAIRPERSON DATE
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 6 of 98
Airport Commission
September 11, 2025
Page 6 of 6
Airport Commission
ATTENDANCE RECORD
2024-2025
NAME
TERM
EXP.
Bishop 06/30/26 X X X X X X X X O/E X/E X X X
Lawrence 06/30/29 X O/E X X X O/E X X X X X X X
Orozco 06/30/28 X O/E X X O/E O/E X O/E X X X/E X X
Key:
X = Present
X/E = Present for Part of Meeting
O = Absent
O/E = Absent/Excused
NM = Not a member at this time
X/S = Present for subcommittee meeting
O/S = Absent, not a member of the subcommittee
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 7 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 8 of 98
Project No.: 2023001080-001
Project Name: Airfield Pavement Maintenance - Runway 7-25 (West End) and 12-30
Iowa City Municipal Airport
Project Manager: Adam Thompson
PROJECT DESCRIPTION:
1.
2.
Part I: Design and Bidding Services
Included Not Included
100.05 Airport Master Planning and Reports
1. Preliminary Planning and Reports X
2. Project Concepts X
3. Capital Improvements Plan X
4. Evaluation of Alternatives for Improvement X
5. Master Planning Design/Concepts X
200.05 Existing Conditions
1. Data Gathering/Inventory X
2. Existing Condition Drawings X
3. Geographical Information Systems X
4. Environmental Assessment X
5. Airspace Obstruction Survey X
300.05 Airport Improvement Program (AIP) Grant Administration
1. Prepare AIP Grant Application X
2.Prepare AIP Sponsor Certifications X
3.Prepare AIP Invoice Summary & assist Owner w/ monthly reimbursements (assume 12 months)X
4.Prepare AIP Sponsor Quarterly Performance Reports (assume 12 months)X
5.Prepare AIP Financial Reports (SF-271 and SF-425 Forms)X
6.Update 3-year DBE Program (FY25-FY27)X
7.Prepare Pavement Maintenance Program in accordance with FAA AC 150/5380-7B
●Inventory of existing pavement conditions X
●X
●X
400.05 Preliminary Design
1. Conduct Remote Project Kickoff Meeting. Prepare agenda and distribute minutes.X
2.Confirm Scope, Extent and Character of the Project:
●Final Design Criteria X
●Field Survey to Determine Existing Conditions (1-8 hour visit by RPR/Project Engineer)X
●Pre-trip preparation X
●Post trip processing X
●X
●X
●X
●X
●X
●X
435.05 Soil Boring Coordination
1. Prepare Geotechnical Scope of Work and submit to Geotechnical Firm X
2. Review Geotechnical Scope/Fee Proposal and coordinate contract approval with Owner X
3. Coordinate field exploration with Owner X
4.X
Preparation of Program Report (sections include General Information, Inspection Schedule, Pavement Inventory, Inspection Reports, Distress Identification
Index, Economic Analysis/Network Priority Ranking, and Program Funding and Programming
TASK ORDER NO. 1
AGREEMENT FOR ENGINEERING SERVICES
IOWA CITY MUNICIPAL AIRPORT
IOWA CITY, IOWA
Item
DESIGN AND BIDDING SERVICES
AIRFIELD PAVEMENT MAINTENANCE - RUNWAY 7-25 (WEST END) AND 12-30
FAA AIP 3-19-0047-03X-2026
This TASK ORDER NO. 1, made on the day of , 2025, under the terms and conditions established in the MASTER AGREEMENT, dated the 13th
day of February , 2025, by and between McClure, of Clive , Iowa (herein referred to as "Consultant") and the Iowa City Airport Commission, Iowa (hereinafter referred to as
"Owner"). Services shall be performed per the fees, terms and conditions outlined in this Task Order. The Consultant shall provide engineering services at the request of the Owner
which consists of the items listed below, located at the Iowa City Municipal Airport (KIOW).
The Owner shall provide information, which shall set forth the Owner’s objectives, schedule, constraints, budget with reasonable contingencies and other applicable criteria. (See
Exhibit ‘E’ for Owner’s responsibilities).
The Consultant shall provide the following services, including:
P:\2023001080-001 - IOW-Airfield Pave Main-RWY 7-25-W End - RWY 12-30\01-Project Management\Agreements\01-Task Order 1 - Design_Bidding\01A-TASK ORDER NO. 1
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 9 of 98
500.05 Final Design
A05.30% Design Phase
1. Perform 30% Airfield Electrical Layout X
2. Prepare 30% Project Drawings X
3. Prepare 30% Engineer’s Report X
4. Prepare 30% “Opinion of Probable Construction Cost” / Budget Validation. X
5. Perform 30% QA/QC by Senior Airport Engineer X
6. Furnish 30% Documents in accordance with Table 3 in Exhibit ‘B’.X
7. Conduct 30% Review Meeting via teleconference. Prepare agenda and distribute minutes.X
8. Prepare Draft CSPP X
B05.90% Design Phase
1. Formally Address Owner 30% Comments X
2. Perform 90% Airfield Electrical Design X
3. Prepare 90% Project Drawings in accordance with Table 1 in Exhibit ‘B’X
4. Prepare 90% Specifications in accordance with Table 2 in Exhibit ‘B’X
5. Prepare 90% Engineer’s Report X
6. Prepare 90% “Opinion of Probable Construction Cost” / Budget Validation X
7. Perform 90% QA/QC by Senior Airport Engineer X
8. Furnish 90% Documents in accordance with Table 3 in Exhibit ‘B’.X
9. Conduct 90% Review Meeting at Owner's Location. Prepare agenda and distribute minutes.X
10.
●X
●X
●X
C05.Issued for Bid (IFB) Package (100% Phase)
1. Formally Address FAA and Owner 90% Comments X
2. Prepare IFB (100%) Drawings, Specifications, and Bid Documents X
3. Furnish IFB (100%) Documents in accordance with Table 3 in Exhibit ‘B’X
504.05 Construction Permits
1.1. Erosion Control Plan/Permit
●X
Prepare Storm Water Pollution Prevention Plan (SWPPP)X
2. Iowa DOT Right-of-Way Permit X
3. City Permits X
4. County Permits X
5. Other Permits, including Army Corps of Engineers Section 404 Permit X
6. File and submit FAA OE/AAA Case Study along with runway offset exhibits
● FAA Obstruction Evaluation/Airport Airspace Analysis (OE/AAA) Form X
602.05 Advertising, Bidding, Contract Award
1. Assist Owner in advertising for and obtaining bids X
2. Conduct Prebid Conference at Owner’s location with a virtual option (1 meeting). Prepare agenda and minutes X
3. Provide Drawings, Specifications, and Bid Documents X
4. Issue Addenda to interpret or clarify bid documents.X
5. Respond to Bidders questions at discretion of Owner.X
6. Coordinate bid opening online via QuestCDN (1 virtual meeting)X
7. Prepare Bid Tabulation X
8. Review Bidders quals, bids, and other documents. Make recommendation for award of contract.X
9. Distribute Executed Construction Contracts
●X
●X
●X
1 Copy to Engineer X
700.05 Topographic Survey
1. Research existing survey control network system X
2. Locate standard topographic features within project limits as show on Figure 1 X
3. Process survey work into AutoCAD topographic base files X
Included Not Included
850.05 Project Management and Coordination
1. Develop internal project management (PM) plan. Identify key personnel and designate responsibilities for PM plan implementation and execution.X
2. Continual track of task completion and coordination of staff scheduling. X
3. Continual Coordination with Owner and FAA (assume 9 months).X
4. Provide updates on project schedule (assume 9 months)X
5. Provide monthly progress reports to Owner (assume 9 months)X
6. Maintain documentation of pertinent correspondence (email, letters, telephone logs)X
7. Prepare independent fee analysis package X
8. Perform business and contract administration (assume 9 months)X
9. Conduct internal design review meetings (3-people prior to 30% and 90% submittals)X
10. Coordination between sub-consultants X
11 Other Meetings
●Special meetings with Council/Staff X
●Public Informational Meetings X
●Regulatory Agencies X
960. Subconsultants
N/A
Apply for NPDES Permit from DNR (Owner will be operator listed on permit). Consultant will not be liable for fines arising from noncompliance with SWPPP. The
Owner shall be the Permit holder and shall pay for all costs associated with permit.
Item
P:\2023001080-001 - IOW-Airfield Pave Main-RWY 7-25-W End - RWY 12-30\01-Project Management\Agreements\01-Task Order 1 - Design_Bidding\01A-TASK ORDER NO. 1
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 10 of 98
3. Payment to the Consultant shall be made on the following basis:
Part I: Design and Bidding Services
3.1.1 For performing the Services identified within Part I, the Owner shall pay the Consultant a lump sum amount in accordance with the following:
Item Description
100.05 Airport Master Planning and Reports $
X 200.05 Existing Conditions Lump Sum $
X 300.05 Airport Improvement Program (AIP) Grant Administration Lump Sum $
X 400.05 Preliminary Design Lump Sum $
435.05 Soil Boring Coordination Lump Sum $
X 500.05 Final Design Lump Sum $
A05. 30% Design Lump Sum $
B05. 90% Design Lump Sum $
C05. Issued for Bid (100%) Lump Sum $
X 504.05 Construction Permits Lump Sum $
600.05 Construction Administration Lump Sum $
X 602.05 Advertise, Bidding, Contract Award Lump Sum $
603.05 Quality Assurance Testing Coordination Lump Sum $
650.05 Resident Project Representative Cost + Fixed Fee (NTE)$
X 700.05 Topographic Survey Lump Sum $
760.07 Construction Staking Lump Sum $
800.05 Project Closeout Lump Sum $
X 850.05 Project Management and Coordination Lump Sum $
960.05 Subconsultants Lump Sum $
Part I Subtotal:
3.1.2
3.1.3
(a) scope, complexity or character of the Services or the Project;
(b) conditions under which the Services are required to be performed; or
(c) duration of the Services, if a change in the Schedule warrants such adjustment in accordance with the terms of this Agreement.
3.2.1
3.2.2
3.3.1
3.3.2
4.
a.
b.
c.
d.
e.
f.
g.
Sponsor Certifications for Consultant Selection, Project Plans and Specifications, and Construction/Equipment Contracts shall be submitted to the Owner
within ten (10) calendar days of the submittal of the Issued for Bid plans and specifications.
Bid tabulation shall be submitted to the Owner within three (3) business days of the bid opening.
The bid opening shall be conducted within thirty (30) calendar days of Owner and FAA authorization to bid.
The lump sum includes compensation for the Services, Subconsultant costs, if any, and appropriate factors for labor, overhead, profit, and Reimbursable
Expenses.
The Project Kickoff Meeting shall be conducted within thirty (30) calendar days of receipt of Notice to Proceed or executed Agreement from the Owner
whichever date comes later.
Issued for Bid plans and specifications shall be submitted to the Owner within thirty (30) calendar days of conducting the final review meeting and receipt
of final review comments from the Owner and FAA.
The Consultant shall perform the Services and deliver the related Documents (if any) according to the schedule outlined as follows:
Within ninety (90) calendar days from receipt of 30% review comments from Owner and FAA, the Consultant shall submit 90% level plans sheets,
specifications, and design report narrative whichever date comes later.
Section 3.2: Additional Services
Section 3.3: Other Payment Provisions
Reimbursable Expense Definition: Reimbursable expenses include, but are not limited to, transportation, subsistence, reproduction of reports, drawings,
specifications, and other Project documents, courier services, materials, supplies, equipment rental and other costs specific to the Project.
$58,550.00
$490.00
$7,610.00
6,680.00
$3,520.00
$1,940.00
$7,960.00
$6,430.00
$17,830.00
$5,150.00
$940.00
Although the Consultant recognizes and accepts the ordinary risks and/or benefits of a lump sum fee structure, the parties agree to negotiate an
adjustment of the lump sum amount if there has been, or is to be, a material change in the:
Any services rendered by the Consultant beyond those described in the Scope of Services shall be compensated on a lump sum basis as set forth in
Section 3.1.
The Consultant’s estimate of the amount that will become payable for Additional Services is only an estimate. If it becomes apparent that this estimated
compensation amount will be exceeded, the Consultant and Owner shall mutually negotiate in writing to additional compensation exceeding said
estimated amount.
Section 3.1: Basis of Compensation
Progress Payments: Payment to the Consultant shall be made on a monthly basis, within 30 days of invoice for work completed to date. Amounts unpaid
30 days after invoice date shall bear interest from the date payment is due at a rate of 1.5% per month compounded and shall include costs for attorney
Within one-hundred fifty (150) calendar days from Notice to Proceed or executed Agreement from Owner, the Consultant shall submit 30% drawings,
Engineer’s design report narrative, and preliminary CSPP whichever date comes later.
P:\2023001080-001 - IOW-Airfield Pave Main-RWY 7-25-W End - RWY 12-30\01-Project Management\Agreements\01-Task Order 1 - Design_Bidding\01A-TASK ORDER NO. 1
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 11 of 98
5.
Included Not Included
Exhibit 'A'X
Exhibit 'B'X
Exhibit 'C'X
Exhibit 'D'X
Exhibit 'E'X
Exhibit 'F'X
Exhibit 'G'X
Exhibit 'H'X
Exhibit 'I'X
SPECIAL INSTRUCTIONS:
Iowa City Airport Commission McClure
Iowa City, Iowa Coralville, Iowa
By:By:
Name:Name: Adam Thompson
Title:Title: Project Manager
Date:Date:
OWNER:
Hourly Rate Schedule
Detailed Scope of Services
Subconsultant(s) Contract
Owner’s Responsibilities to Consultant
Duties and Responsibilities of Resident Project Representative (RPR)
Opinion of Probable Construction Cost
This Agreement represents the entire and integrated Agreement between the OWNER and the CONSULTANT.
Consultant Terms and Conditions Standard Agreement
Federal Provisions
Estimated Cost of Consultant Services
P:\2023001080-001 - IOW-Airfield Pave Main-RWY 7-25-W End - RWY 12-30\01-Project Management\Agreements\01-Task Order 1 - Design_Bidding\01A-TASK ORDER NO. 1
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 12 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 13 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 14 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 15 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 16 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 17 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 18 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 19 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 20 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 21 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 22 of 98
Exhibit C Detailed Scope of Work P a g e | C1
EXHIBIT C
McCLURE ENGINEERING COMPANY
DETAILED SCOPE OF SERVICES
AIRFIELD PAVEMENT MAINTENANCE - RUNWAY 7-25 (WEST END) AND 12-30
BACKGROUND:
Part I: The existing western end of Runway 7-25 and all of Runway 12-30 were reconstructed in 2009/2010. These runways have pavement
joints in need of re-sealing as well as spalling, corner breaks, and cracked panels in need of rehabilitation. This pavement mainte nance will
preserve pavement life and decrease potential FOD issues.
In addition, Runway 7 has an outdated Runway End Identifier Light System (REILs) that is proposed to be replaced as part of t his project.
By replacing this system, the new REIL will be within 2 -years of the new Runway 7-25 lighting system and will age at a similar lifespan.
PROJECT ASSUMPTIONS:
The following assumptions have been established for the design and bidding phase services:
1. The project scope includes the following:
a. Pavement maintenance/rehabilitation for the West end of Runway 7 -25, including the Runway Intersection
b. Pavement maintenance/rehabilitation for all of Runway 12-30
c. Pavement markings are generally in good condition and this project is only planned to incorporate marking where
patching or other rehabilitation work is necessary.
d. Re-marking of taxiway lead-in lines from the RSA onto the runway pavement, as necessary.
e. Removal of the existing Runway 07 REIL and associated cable
f. Installation of new energy-efficient Runway 07 REIL (LED) in a continuous conduit system with associated bare
counterpoise system
2. The proposed project limits, including survey limits, are illustrated in Figure 1.
3. The construction shall be funded in part by grants received from the FAA as follows:
a. FAA Airport Improvement Program (AIP) – Entitlement Funds
4. The total preliminary opinion of probable construction cost for the proposed project is estimated at $520,000.00, as illustrated in
Exhibit G.
5. Design phase services will be separated into the following major components:
a. Preliminary Design (Project Kickoff, Confirm Scope)
b. 30% CSPP
c. Final Design (90% completion)
d. Issued for Bid (IFB) Package (100% completion)
6. The construction of the proposed improvements is assumed to commence in Fall 2026 with a multi-phase construction sequence
to provide adequate safety by reducing back-taxiing operations and minimizing airport and runway closure durations.
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 23 of 98
Exhibit C Detailed Scope of Work P a g e | C2
Part I: Engineering Design Bidding Services (Taxiway A & D)
Task 100. Airport Master Planning and Reports
(Not Included)
Task 200. Existing Conditions
1. Data Gathering and Inventory
a. Research records of ownership, utility service providers, authorities having jurisdiction, and others
2. Existing Condition Drawings
a. Obtain Record Drawings for projects within the immediate vicinity or those having potential impacts on the proposed
project
Task 300. FAA Airport Improvement Program (AIP) Grant Administration
1. Prepare AIP Grant Application
2. Prepare AIP Sponsor Certifications
3. Update 3-year DBE Program (FY25-FY27) Not Included
Task 400. Preliminary Design
1. Conduct Project Kickoff Meeting with the Owner and FAA virtually. Conduct Project Kickoff (attended by PM and Project
Engineer).
a. Prepare Project Kickoff Meeting Agenda and distribute to participants.
b. Conduct a design kickoff meeting virtually to finalize the project scope, design criteria, schedule and goals with the Owner,
FAA, and Consultant. The Consultant will provide written minutes of the meeting and distribute to all attendees within seven
(7) working days of the meeting. Assume 2 - people shall participate in meeting (Project Manager & Project Engineer).
2. Confirm Scope, Extent, and Character of the Project:
a. Final Design Criteria. Establish design criteria in accordance with FAA standard Advisory Circulars and/or supplemental
specifications, as required.
b. Field Survey to Determine Existing Conditions. Assume 2 - people (RPR and Project Engineer) to visit site to assess existing
conditions. If inspection within the AOA is necessary, the inspection team will use handheld radios to monitor the common
traffic advisory frequency while the apron is active. As aircraft taxi on the apron, the inspecti on team will exit the safety area
immediately.
i. Pre-trip preparation
ii. Post-trip processing will be completed downloading photographs and filing documentation
c. Develop Construction Item List which is a list used to determine which construction specifications will be required for the
project.
d. Review Project Questions and Issues
e. Coordinate Building Layouts with the FAA, Owner, and the Subconsultant(s) Not included
f. Operations and Maintenance Concepts including landside building access points, airside building access points,
pedestrian/pilot building traffic flow patterns, etc. Not included
g. Utility Requirements. Establish requirements and determine if any adjustments are deemed necessary, suitable/safe locations
for utility facilities.
h. Project Limits Exhibits. Develop and finalize proposed project limits.
3. Prepare Preliminary "Opinion of Probable Costs" and Project Budget based on preliminary design. Not included
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 24 of 98
Exhibit C Detailed Scope of Work P a g e | C3
Task 435: Soil Boring Coordination
(Not Included)
Task 500: Final Design
A. 30% Design Phase
For this phase, the Consultant will prepare 30% plan sheets, which will be submitted for review to the Owner and FAA for the purpose
of verifying the construction sequencing and project budget.
1. 30% Airfield Electrical Design – Not Included
2. 30% OPCC and Project Budget
3. Perform 30% QAQC by Senior Airport Engineer
4. Furnish 30% Project Documents in accordance with Table 1.
5. Conduct 30% Review Meeting via teleconference
6. Prepare Draft Construction Safety and Phasing Plan (CSPP) – Not Included
B. 90% Design Phase
This phase will consist of the development of 90% bid documents. The bid package will include an advanced level of design th at builds
from the confirmed scope and design completed in preliminary design. 90% design documents routinely entail the completion of
construction details, final quantities, quality control checking for all construction work items less final review comments f rom the Owner.
1. Formerly address FAA and Owner 30% Comments
2. Perform 90% Airfield Electrical Design as follows:
a. Finalize the Runway 07 REIL layout. All lighting systems shall be designed in accordance with FAA AC 150/5340-30, Design
and Installation Details for Airport Visual Aids, current edition at time of design.
b. Determine wiring and circuit layout plans to power proposed REIL system in accordance with FAA AC 150/5340-30, Design
and Installation Details for Airport Visual Aids.
3. Prepare 90% Project Drawings
a. The Consultant shall prepare 90% plans in accordance with Table 1.
4. Prepare 90% Specifications
a. The Consultant shall prepare 90% specifications in accordance with Table 2.
5. Prepare 90% Engineering Design Report
a. The Consultant shall prepare 90% EDR in accordance with the approved FAA format . Due to the scope of project, some
sections of the EDR as required by the FAA’s AIP Sponsor Guide Section 920 will be significantly cut back or not applicable.
A summary of the sections contained in the EDR follows:
i. General Scope of Project
ii. Existing Conditions
iii. Utility Lines in Work Area
iv. Fleet Mix Not Included
v. Design Standards
vi. Geometric Improvements Not Included
vii. Geotechnical Investigation Not Included
viii. Pavement Design Not Included
ix. Pavement Marking Not Included
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 25 of 98
Exhibit C Detailed Scope of Work P a g e | C4
x. Drainage Design Not Included
xi. Environmental Considerations
xii. Airfield Lighting and Signage Not Included
xiii. NAVAIDs
xiv. Miscellaneous Work Items
xv. Life Cycle Cost Analysis Not Included
xvi. Sponsor Requested Modifications to FAA Standards
xvii. Delineation of AIP Non-Participating Work
xviii. Construction Safety and Phasing
xix. Project Schedule
xx. Engineers Estimate of Probable Construction Cost
xxi. Project Budget Summary
xxii. DBE Participation
xxiii. Appendices
6. Prepare 90% Consultant’s Opinion of Probable Construction Cost and Project Budget
a. A 90% Consultant’s Opinion of Probable Construction Cost will be prepared which accompanies the submittal. The estimate
will be based on final quantities. The estimate will be used to compare and validate the current project budget.
7. Perform 90% Quality Control by Senior Airport Engineer
b. An internal quality control review by a Senior Airport Engineer will be conducted on the 90% design plans, specifications, an d
Consultant’s Opinion of Probable Construction Cost, and Engineering Design Report prior to submittal to the Owner. It is
assumed this effort will require sixteen (16) hours by a Senior Airport Engineer.
c. Address Quality Control comments revising the 90% plans, specifications, Opinion of Probable Construction Cost, and
Project Budget.
8. Furnish 90% Documents
d. Consultant shall submit and distribute 90% plans, specifications, Consultant’s Opinion of Probable Construction Cost, and
Project Budget to the Owner for review, comment, and approval. Copies will be distributed as detailed in Table 3.
9. Conduct 90% Final Review Meeting
e. The Consultant shall coordinate and conduct one (1) meeting with the Owner to review the 90% plans, Consultant’s
Opinion of Probable Construction Cost, and Project Budget. (assume 1-person (Project Manager) shall attend meeting).
10. Prepare Final CSPP Document
f. Prepare Preliminary CSPP in accordance with AC 150/5370-2, Operational Safety on Airports During Construction
g. Include 90% Construction Safety and Phasing Plans
h. Submit Final CSPP to FAA and Owner
i. Address FAA comments on Final CSPP submitted and re-submit for approval
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 26 of 98
Exhibit C Detailed Scope of Work P a g e | C5
C. Issued for Bid (IFB) Package (completed to 100%)
This phase will consist of the development of final bidding documents for the proposed project. It will be the final level o f design from the
submittal made as part of the 90% Design Phase incorporating all Owner comments.
1. Formally Address FAA and Owner 90% Comments
a. The Consultant shall review all comments received from the FAA and the Owner from the 90% design submittal review and
incorporate applicable comments into plans, specifications, Consultant’s Opinion of Probable Construction Cost, and Project
Budget.
2. Prepare Issued for Bid (IFB) Drawings, Specifications, and Bid Documents
a. The Consultant shall prepare IFB plans and specifications in accordance with Table 1 and Table 2.
3. Furnish Issued for Bid (100%) Submittal
a. This task consists of the assembly of the documents for the final Issued for Bid submittal to the Owner. Deliverables will also
be submitted electronically. Copies will be distributed as detailed in Table 3.
Task 504: Construction Permits
6. File and submit FAA OE/AAA Case Study with Runway Offset Exhibits
a. For temporary construction items (such as the contractor’s staging area, access road, and equipment) and permanent facilities ,
the Consultant shall prepare and submit FAA 7460-1 forms electronically through the FAA’s OE/AAA website. The FAA shall
conduct an aeronautical study of the temporary and permanent points. The Consultant shall coordinate these points with
FAA prior to submission.
Task 602: Advertising, Bidding, Contract Award
1. Assist Owner in advertising for and obtaining bids from prospective Contractors.
a. Prepare Advertisement
b. Publish Notice of Letting and Public hearing in accordance with Iowa Code
c. Maintain Plan holder’s List
2. Conduct remote Pre-Bid Conference.
a. Prepare meeting agenda and distribute to participants
b. The Consultant shall coordinate and conduct a pre-bid conference from the Owner’s location which would allow virtual
participation. (1-person shall attend meeting; Project Manager).
c. Provide written minutes of the meeting and distribute to all attendees within seven (7) working days of the meeting.
3. Provide Drawings, Specifications, and Bid Documents
a. Prepare and provide Issued for Bid (IFB) contract documents for use by up to four (4) Plan Holding Houses (Plan Rooms) and
four (4) potential bidders. The Consultant shall distribute IFB documents in accordance with Table 3.
4. Prepare/Issue addenda to interpret or clarify bid documents
a. The Consultant shall prepare all required addenda to revise plans, specifications, and other contract documents in order to
(1) provide clarifications, (2) correct discrepancies, or (3) add necessary details or contract alterations.
5. Respond to bidders’ questions at the discretion of the Owner
a. Coordinate and review pre-bid submittals from Bidders with Owner
b. Respond to bidder questions and publish written answers to all plan holders at the discretion of the Owner.
6. Conduct bid opening online via QuestCDN (1 opening).
7. Prepare bid tabulation
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 27 of 98
Exhibit C Detailed Scope of Work P a g e | C6
a. The Consultant shall develop tabulation of all bids received within three (3) working days.
8. Review bidders’ qualifications.
a. Provide evaluation of checking for correctness, qualifications of apparent low bidder, DBE participation goals, etc.
b. Make recommendations of award of contract based on bids.
9. Present bids and make recommendation of award of contract in person at Owner's location (1-person shall attend meeting;
Project Manager)
Task 700. Topographic Survey
1. Research existing survey control network system Not Included
2. Locate standard topographic features within survey limits in Figure 1 (INCLUDED WITH EXISTING CONDITIONS SITE VISIT)
5. Process survey work into AutoCAD topographic base files
Task 850. Project Management and Coordination
1. Develop internal project management (PM) plan. Identify key personnel and designate responsibilities for PM plan implementation and
execution.
2. Continual track of task completion and coordination of staff scheduling.
3. Continual Coordination with Owner and FAA (assume 9 months).
a. This task consists of the continual coordination with Owner and FAA staff, as required, keeping team members fully
informed of developments and decisions that are made concerning the project.
b. The majority of this communication will be made by and through the Project Manager and Project Engineer.
4. Provide updates on project schedule (assume 9 months)
5. Provide Monthly Progress Reports to Owner and FAA (assume 9 months).
6. Maintain Documentation of Pertinent Correspondence made by Email, Memos, Letters, Telephone etc.
7. Prepare independent fee estimate. Not included
8. Perform Business and Contract Administration (assume 9 months).
9. Conduct internal design review meetings (3-people prior to 90% submittal).
a. Preliminary Design Kickoff (1 meeting).
b. Miscellaneous (1 meeting held virtually for construction phasing/scheduling review, airport coordination).
c. 90% review meeting (1 meeting held virtually to review project challenges)
10. Coordination between subconsultants.
a. N/A
11. Other Meetings Not included
Task 960: Subconsultants - Design/Bidding Services
Not included.
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 28 of 98
Exhibit C Detailed Scope of Work P a g e | C7
Table 1. Estimated Plan Sheets
Sheet Title # Sheets 30% 90% IFB
Cover Sheet 1 X X X
Index of Plan Sheets and Estimated Quantities 1 X X
General Legend and Abbreviations 1 X X
General Airport Notes 1 X X
Project Layout Plan 1 X X
Geometric Layout and Survey Control Plan 1 X X
Safety and Phasing Plans 3 X X X
Safety Details 1 X X X
Existing Conditions & Proposed Rehabilitation 7 X X
Existing Electrical Circuit Map 1 X X
Electrical Demolition Plan, Layout/Wiring Plan, & Details 1 X X
Existing Electrical Vault Building Keyed Notes 1 X X
Total 20 5 20 20
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 29 of 98
Exhibit C Detailed Scope of Work P a g e | C8
Table 2. Estimated Specifications
Front End Specifications
Cover
Engineering Seals
Table of Contents
Notice of Public Hearing and Letting
Instructions to Bidders
Schedule of Prices
DBE Commitment
Buy America Forms
Bid Bond
Contract/Performance Bond/Payment Bond/Identity of Subcontractors
Notice of Award/Notice to Proceed/Acceptance
Insurance Requirements
Release by Claimants
Wage Rate Determination
General Provisions
Technical Specifications
C-105: Mobilization
P-101: Preparation, Removal of Existing Pavements
P-501: Cement Concrete Pavement
P-605: Joint Sealants for Pavements
P-610: Concrete for Miscellaneous Structures
P-620: Runway and Taxiway Marking
L-108: Underground Power Cable for Airports
L-110: Airport Underground Electrical Duct Banks and Conduits
L-115: Electrical Manholes & Junction Structures
L-125: Installation of Airport Lighting Systems
T-901: Seeding
T-908: Mulching
Appendix
Appendix A: List of Advisory Circulars
Appendix B: Construction Safety and Phasing Plan (CSPP)
Table 3. Deliverables
30% Submittal 90% Submittal IFB (100%)
Submittal
Plans Plans (Half-sized) Spec Book Plans
(Half-sized)
Spec.
Book
Owner Digital Only Digital Only Digital Only 2 Digital
Only
Engineer 2 2 2 2 2
Subconsultant 1 1 1 1 1
FAA Digital Only Digital Only Digital Only Digital Only Digital
Only
Plan Houses* 4 4
Bidders 4 4
Total 3 3 3 9 9
* For submittals to plan houses, a PDF file will be provided for plans and specs
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 30 of 98
RUNWAY 7-25
AB
A
N
D
O
N
E
D
P
A
V
E
M
E
N
T
RU
N
W
A
Y
1
2
-
3
0
ESTABLISH
RUNWAY 7-25
CENTERLINE
ESTABLISH
RUNWAY 12-30
CENTERLINE
P:
\
2
0
2
3
0
0
1
0
8
0
-
0
0
1
-
I
O
W
-
A
i
r
f
i
e
l
d
P
a
v
e
M
a
i
n
-
R
W
Y
7
-
2
5
-
W
E
n
d
-
R
W
Y
1
2
-
3
0
\
0
4
-
D
r
a
w
i
n
g
s
\
C
i
v
i
l
\
E
x
h
i
b
i
t
s
\
P
r
o
j
e
c
t
L
i
m
i
t
s
.
d
w
g
8
/
2
7
/
2
0
2
5
8
:
0
5
A
M
DRAWING NO.
IO
W
A
C
I
T
Y
M
U
N
I
C
I
P
A
L
A
I
R
P
O
R
T
REVISIONS
---
---
---
---
---
---
---
---
Ankeny,IA | Carroll,IA | Clive,IA
Cedar Rapids,IA | Fort Dodge,IA
North Liberty,IA | Sioux City,IA
NOTICE:
McClure Engineering Co. is not
responsible or liable for any issues,
claims, damages, or losses
(collectively, “Losses”) which arise
from failure to follow these Plans,
Specifications, and the engineering
intent they convey, or for Losses
which arise from failure to obtain
and/or follow the engineers’ or
surveyors' guidance with respect to
any alleged errors, omissions,
inconsistences, ambiguities, or
conflicts contained within
the Plans and Specifications.
Macon,MO | Columbia,MO
North Kansas City,MO
Lenexa, KS
1360 NW 121st Street
Clive, Iowa 50325
PH. 515-964-1229
OF 18
---
Portsmouth, NH Boston, MA
ENGINEER
AJM
DRAWN BY
TMD
CHECKED BY
JAP
---
PR
O
J
E
C
T
L
I
M
I
T
S
A
N
D
RU
N
W
A
Y
C
E
N
T
E
R
L
I
N
E
S
RON
HT
125 2500
GRAPHIC SCALE
500
LEGEND
RUNWAY 7-25 REHABILITATION
RUNWAY 12-30 REHABILITATION
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 31 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 32 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 33 of 98
OPINION OF PROBABLE PROJECT COST
PROJECT:Runway 7-25 & 12-30 Rehabilitation
AIRPORT:Iowa City Municipal Airport
DATE:September 2025
ITEM NO. ITEM DESCRIPTION QUANTITY UNIT COST/UNIT COST
C-105-1 MOBILIZATION 1 LS $30,000.00 $30,000
C-105-2 TRAFFIC CONTROL 1 LS $10,000.00 $10,000
C-105-3 CONSTRUCTION STAKING 1 LS $5,000.00 $5,000
P-101-1 PCC JOINT CLEANING AND SEALING 37,500 LF $3.50 $131,250
P-101-2 PCC CRACK FILLING ROUTE AND SEAL 130 LF $10.00 $1,300
P-101-3 PCC PATCHING 15 SF $60.00 $900
P-620-1 PAVEMENT MARKING (WATERBORNE)2,000 SF $4.00 $8,000
L-108-1 (1) 2" SCHEDULE 40 PVC CONDUIT, IN TRENCH OR (1) 2" HDPE SDR-
13.5 CONDUIT, PLOWED 300 LF $8.00 $2,400
L-108-2 NO. 8 AWG, 5 KV, L-824, TYPE C CABLE, INSTALLED IN CONDUIT 310 LF $5.00 $1,550
L-108-3
NO. 6 AWG, SOLID, BARE COPPER COUNTERPOISE WIRE,
INSTALLED IN TRENCH WITH GROUND RODS, INCLUDING
CONNECTIONS/TERMINATIONS
310 LF $5.00 $1,550
L-108-4 SYSTEM TESTING 1 LS $2,000.00 $2,000
L-125-1 L-849 RUNWAY END IDENTIFIER LIGHT SYSTEM, LED 1 EA $16,000.00 $16,000
L-125-2 LOCATION AND PROTECTION OF EXISTING AND NEW CABLES AND
EQUIPMENT 1 LS $1,000.00 $1,000
TOTAL ESTIMATE OF PROBABLE CONSTRUCTION COST (RUNWAY 7-25)$210,950
P-101-5 PCC JOINT CLEANING AND SEALING 44,870 LF $3.50 $157,045
P-101-6 PCC CRACK FILLING ROUTE AND SEAL 70 LF $10.00 $700
P-101-7 PCC PATCHING 24 SF $60.00 $1,440
P-101-8 PCC PANEL REPLACEMENT 156 SF $50.00 $7,800
P-101-9 PCC GRINDING 140 SF $40.00 $5,600
P-620-2 PAVEMENT MARKING (WATERBORNE)2,000 SF $4.00 $8,000
TOTAL ESTIMATE OF PROBABLE CONSTRUCTION COST (RUNWAY 12-30)$180,585
TOTAL ESTIMATE OF PROBABLE CONSTRUCTION COST $391,535
GEOTECHNICAL INVESTIGATION N/A
TOPOGRAPHIC SURVEY N/A
DESIGN PHASE ENGINEERING $50,000
BIDDING PHASE $7,500
CONSTRUCTION ADMIN/OBSERVATION $40,000
SPONSOR ADMINISTRATION N/A
QA MATERIAL TESTING (EST.)N/A
FAA INSTRUMENT APPROACH PROCEDURE DEVELOPMENT N/A
FAA FLIGHT INSPECTION $12,500
TOTAL ESTIMATE OF PROBABLE PROJECT COST $501,535
RUNWAY 7-25 (7 End)
RUNWAY 12-30
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 34 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 35 of 98
Page 1 of 18 Updated May 24, 2023
F EDERAL C ONTRACT P ROVISIONS FOR A/E A GREEMENTS
A LL REFER E NCES MADE HEREIN TO “C ONTRACTOR ”, “P RIME C ONTRACTOR ”,
“B IDDER ”, “O FFEROR ”, AND “A PPLICANT ” SHALL PERTAIN TO THE
A RCHITECT /E NGINEER (A/E).
A LL REFER E NCES MADE HEREIN TO “S UBCONTRACTOR ”, “S UB ‐TIER C ONTRACTOR ”
OR “LOWE R T IER C ONT RACTOR ” S HALL PERTAIN TO ANY SUBCONSULTANT UNDER
CONTRACT WITH THE A/E.
A LL REFER E NCES MADE HEREIN TO “S PONSOR ” AND “O WNER ” SHALL PERTAIN TO
THE STATE , CITY , AIRPORT AUTHORI TY OR OT HE R PUBLIC ENTITY EXECUTING
CONTRACTS WITH THE A/E.
PROVISIONS APPLICABLE TO ALL CONTRACTS
ACCESS TO RECORDS AND REPORTS ............................................................................................................. 3
CIVIL RIGHTS – GENERAL ............................................................................................................................... 3
CIVIL RIGHTS – TITLE VI ASSURANCES ........................................................................................................... 3
PROHIBITION ON CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE
SERVICES OR EQUIPMENT ................................................................................................................ 6
FEDERAL FAIR LABOR STANDARDS ACT (FEDERAL MINIMUM WAGE) ......................................................... 6
OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 .................................................................................... 6
RIGHT TO INVENTIONS .................................................................................................................................. 6
SEISMIC SAFETY ............................................................................................................................................. 7
TAX DELINQUENCY AND FELONY CONVICTIONS .......................................................................................... 7
TRADE RESTRICTION CERTIFICATION ............................................................................................................ 7
VETERAN’S PREFERENCE ............................................................................................................................... 8
PROVISIONS APPLICABLE TO CONTRACTS EXCEEDING $10,000
DISTRACTED DRIVING ................................................................................................................................... 9
EQUAL EMPLOYMENT OPPORTUNITY (EEO) ................................................................................................. 9
PROHIBITION OF SEGREGATED FACILITIES ................................................................................................. 10
TERMINATION OF CONTRACT ..................................................................................................................... 11
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 36 of 98
Page 2 of 18 Updated May 24, 2023
PROVISIONS APPLICABLE TO CONTRACTS EXCEEDING $25,000
DEBARMENT AND SUSPENSION .................................................................................................................. 12
PROVISIONS APPLICABLE TO CONTRACTS EXCEEDING $100,000
CONTRACT WORKHOURS AND SAFETY STANDARDS ACT REQUIREMENTS ................................................ 13
LOBBYING AND INFLUENCING FEDERAL EMPLOYEES ................................................................................. 14
PROVISIONS APPLICABLE TO CONTRACTS EXCEEDING $150,000
CLEAN AIR AND WATER POLLUTION CONTROL .......................................................................................... 15
PROVISIONS APPLICABLE TO CONTRACTS EXCEEDING $250,000
BREACH OF CONTRACT TERMS ................................................................................................................... 15
DISADVANTAGED BUSINESS ENTERPRISE ................................................................................................... 15
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 37 of 98
Page 3 of 18 Updated May 24, 2023
PROVISIONS APPLICABLE TO ALL CONTRACTS
ACCESS TO RECORDS AND REPORTS
Reference: 2 CFR § 200.334
2 CFR § 200.337
FAA Order 5100.38
The Contractor must maintain an acceptable cost accounting system. The Contractor agrees to provide
the Owner, the Federal Aviation Administration and the Comptroller General of the United States or any
of their duly authorized representatives access to any books, documents, papers and records of the
Contractor which are directly pertinent to the specific contract for the purpose of making audit,
examination, excerpts and transcriptions. The Contractor agrees to maintain all books, records and
reports required under this contract for a period of not less than three years after final payment is made
and all pending matters are closed.
CIVIL RIGHTS – GENERAL
Reference: 49 USC § 47123
In all its activities within the scope of its airport program, the Contractor agrees to comply with
pertinent statutes, Executive Orders, and such rules as identified in Title VI List of Pertinent
Nondiscrimination Acts and Authorities to ensure that no person shall, on the grounds of race, color,
national origin (including limited English proficiency), creed, sex (including sexual orientation and gender
identity), age, or disability be excluded from participating in any activity conducted with or benefiting
from Federal assistance.
This provision is in addition to that required by Title VI of the Civil Rights Act of 1964.
CIVIL RIGHTS – TITLE VI ASSURANCES
Reference: 49 USC § 47123
FAA Order 1400.11
Title VI Solicitation Notice
The Sponsor, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat.
252, 42 USC §§ 2000d to 2000d‐4) and the Regulations, hereby notifies all bidders or offerors that it
will affirmatively ensure that for any contract entered into pursuant to this advertisement,
disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in
response to this invitation and no businesses will be discriminated against on the grounds of race,
color, national origin (including limited English proficiency), creed, sex (including sexual orientation
and gender identity), age, or disability in consideration for an award.
Title VI List of Pertinent Nondiscrimination Acts and Authorities
During the performance of this contract, the Contractor, for itself, its assignees, and successors in
interest (hereinafter referred to as the “Contractor”) agrees to comply with the following non‐
discrimination statutes and authorities; including but not limited to:
Title VI of the Civil Rights Act of 1964 (42 USC § 2000d et seq., 78 stat. 252) (prohibits
discrimination on the basis of race, color, national origin);
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 38 of 98
Page 4 of 18 Updated May 24, 2023
49 CFR part 21 (Non‐discrimination in Federally‐Assisted programs of the Department of
Transportation—Effectuation of Title VI of the Civil Rights Act of 1964);
The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 USC §
4601) (prohibits unfair treatment of persons displaced or whose property has been acquired
because of Federal or Federal‐aid programs and projects);
Section 504 of the Rehabilitation Act of 1973 (29 USC § 794 et seq.), as amended (prohibits
discrimination on the basis of disability); and 49 CFR part 27 (Nondiscrimination on the Basis of
Disability in Programs or Activities Receiving Federal Financial Assistance);
The Age Discrimination Act of 1975, as amended (42 USC § 6101 et seq.) (prohibits
discrimination on the basis of age);
Airport and Airway Improvement Act of 1982 (49 USC § 47123), as amended (prohibits
discrimination based on race, creed, color, national origin, or sex);
The Civil Rights Restoration Act of 1987 (PL 100‐259) (broadened the scope, coverage and
applicability of Title VI of the Civil Rights Act of 1964, the Age Discrimination Act of 1975 and
Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms
“programs or activities” to include all of the programs or activities of the Federal‐aid recipients,
sub‐recipients and contractors, whether such programs or activities are Federally funded or
not);
Titles II and III of the Americans with Disabilities Act of 1990 (42 USC § 12101, et seq) (prohibit
discrimination on the basis of disability in the operation of public entities, public and private
transportation systems, places of public accommodation, and certain testing entities) as
implemented by U.S. Department of Transportation regulations at 49 CFR parts 37 and 38;
The Federal Aviation Administration’s Nondiscrimination statute (49 USC § 47123) (prohibits
discrimination on the basis of race, color, national origin, and sex);
Executive Order 12898, Federal Actions to Address Environmental Justice in Minority
Populations and Low‐Income Populations (ensures nondiscrimination against minority
populations by discouraging programs, policies, and activities with disproportionately high and
adverse human health or environmental effects on minority and low‐income populations);
Executive Order 13166, Improving Access to Services for Persons with Limited English
Proficiency, and resulting agency guidance, national origin discrimination includes discrimination
because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take
reasonable steps to ensure that LEP persons have meaningful access to your programs [70 Fed.
Reg. 74087 (2005)];
Title IX of the Education Amendments of 1972, as amended, which prohibits you from
discriminating because of sex in education programs or activities (20 USC § 1681, et seq).
Nondiscrimination Requirements / Title VI Clauses for Compliance
Compliance with Nondiscrimination Requirements:
During the performance of this contract, the Contractor, for itself, its assignees, and successors in
interest (hereinafter referred to as the “Contractor”) agrees as follows:
1. Compliance with Regulations: The Contractor (hereinafter includes consultants) will comply
with the Title VI List of Pertinent Nondiscrimination Acts and Authorities, as they may be
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 39 of 98
Page 5 of 18 Updated May 24, 2023
amended from time to time, which are herein incorporated by reference and made a part of this
contract.
2. Nondiscrimination: The Contractor, with regard to the work performed by it during the
contract, will not discriminate on the grounds of race, color, national origin (including limited
English proficiency), creed, sex (including sexual orientation and gender identity), age, or
disability in the selection and retention of subcontractors, including procurements of materials
and leases of equipment. The Contractor will not participate directly or indirectly in the
discrimination prohibited by the Nondiscrimination Acts and Authorities, including employment
practices when the contract covers any activity, project, or program set forth in Appendix B of
49 CFR part 21.
3. Solicitations for Subcontracts, including Procurements of Materials and Equipment: In all
solicitations, either by competitive bidding or negotiation made by the Contractor for work to be
performed under a subcontract, including procurements of materials, or leases of equipment,
each potential subcontractor or supplier will be notified by the Contractor of the contractor’s
obligations under this contract and the Nondiscrimination Acts and Authorities on the grounds
of race, color, or national origin.
4. Information and Reports: The Contractor will provide all information and reports required by
the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its
books, records, accounts, other sources of information, and its facilities as may be determined
by the Sponsor or the Federal Aviation Administration to be pertinent to ascertain compliance
with such Nondiscrimination Acts and Authorities and instructions. Where any information
required of a contractor is in the exclusive possession of another who fails or refuses to furnish
the information, the Contractor will so certify to the Sponsor or the Federal Aviation
Administration, as appropriate, and will set forth what efforts it has made to obtain the
information.
5. Sanctions for Noncompliance: In the event of a Contractor’s noncompliance with the non‐
discrimination provisions of this contract, the Sponsor will impose such contract sanctions as it
or the Federal Aviation Administration may determine to be appropriate, including, but not
limited to:
a. Withholding payments to the Contractor under the contract until the Contractor
complies; and/or
b. Cancelling, terminating, or suspending a contract, in whole or in part.
6. Incorporation of Provisions: The Contractor will include the provisions of paragraphs one
through six in every subcontract, including procurements of materials and leases of equipment,
unless exempt by the Acts, the Regulations, and directives issued pursuant thereto. The
Contractor will take action with respect to any subcontract or procurement as the Sponsor or
the Federal Aviation Administration may direct as a means of enforcing such provisions including
sanctions for noncompliance. Provided, that if the Contractor becomes involved in, or is
threatened with litigation by a subcontractor, or supplier because of such direction, the
Contractor may request the Sponsor to enter into any litigation to protect the interests of the
Sponsor. In addition, the Contractor may request the United States to enter into the litigation to
protect the interests of the United States.
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 40 of 98
Page 6 of 18 Updated May 24, 2023
PROHIBITION ON CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR
EQUIPMENT
Reference: 2 CFR § 200, Appendix II(K)
2 CFR § 200.216
Contractor and Subcontractor agree to comply with mandatory standards and policies relating to use
and procurement of certain telecommunications and video surveillance services or equipment in
compliance with the National Defense Authorization Act [Public Law 115‐232 § 889(f)(1)].
FEDERAL FAIR LABOR STANDARDS ACT (FEDERAL MINIMUM WAGE)
Reference: 29 USC § 201, et seq
2 CFR § 200.430
All contracts and subcontracts that result from this solicitation incorporate by reference the provisions
of 29 CFR part 201, et seq, the Federal Fair Labor Standards Act (FLSA), with the same force and effect as
if given in full text. The FLSA sets minimum wage, overtime pay, recordkeeping, and child labor
standards for full and part‐time workers.
The Contractor has full responsibility to monitor compliance to the referenced statute or regulation.
The Contractor must address any claims or disputes that arise from this requirement directly with the
U.S. Department of Labor – Wage and Hour Division.
OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970
Reference: 20 CFR Part 1910
All contracts and subcontracts that result from this solicitation incorporate by reference the
requirements of 29 CFR Part 1910 with the same force and effect as if given in full text. The employer
must provide a work environment that is free from recognized hazards that may cause death or serious
physical harm to the employee. The employer retains full responsibility to monitor its compliance and
their subcontractor’s compliance with the applicable requirements of the Occupational Safety and
Health Act of 1970 (29 CFR Part 1910). The employer must address any claims or disputes that pertain
to a referenced requirement directly with the U.S. Department of Labor – Occupational Safety and
Health Administration.
RIGHT TO INVENTIONS
Reference: 2 CFR Part 200, Appendix II(F)
37 CFR Part 401
Contracts or agreements that include the performance of experimental, developmental, or research
work must provide for the rights of the Federal Government and the Owner in any resulting invention as
established by 37 CFR part 401, Rights to Inventions Made by Non‐profit Organizations and Small
Business Firms under Government Grants, Contracts, and Cooperative Agreements. This contract
incorporates by reference the patent and inventions rights as specified within 37 CFR § 401.14.
Contractor must include this requirement in all sub‐tier contracts involving experimental,
developmental, or research work.
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 41 of 98
Page 7 of 18 Updated May 24, 2023
SEISMIC SAFETY
Reference: 49 CFR Part 41
In the performance of design services, the Consultant agrees to furnish a building design and associated
construction specification that conform to a building code standard that provides a level of seismic
safety substantially equivalent to standards as established by the National Earthquake Hazards
Reduction Program (NEHRP). Local building codes that model their building code after the current
version of the International Building Code (IBC) meet the NEHRP equivalency level for seismic safety. At
the conclusion of the design services, the Consultant agrees to furnish the Owner a “certification of
compliance” that attests conformance of the building design and the construction specifications with
the seismic standards of NEHRP or an equivalent building code.
TAX DELINQUENCY AND FELONY CONVICTIONS
Reference: Section 8113 of the Consolidated Appropriations Act, 2022 (Public Law 117‐103) and
similar provisions in subsequent appropriations acts
DOT Order 4200.6 – Appropriations Act Requirements for Procurement and Non‐
Procurement Regarding Tax Delinquency and Felony Convictions
The Contractor certifies:
1) It is not a corporation that has any unpaid Federal tax liability that has been assessed, for which
all judicial and administrative remedies have been exhausted or have lapsed, and that is not
being paid in a timely manner pursuant to an agreement with the authority responsible for
collecting the tax liability. A tax delinquency is any unpaid Federal tax liability that has been
assessed, for which all judicial and administrative remedies have been exhausted, or have
lapsed, and that is not being paid in a timely manner pursuant to an agreement with the
authority responsible for collecting the tax liability.
2) It is not a corporation that was convicted of a criminal violation under any Federal law within
the preceding 24 months. A felony conviction is a conviction within the preceding twenty four
(24) months of a felony criminal violation under any Federal law and includes conviction of an
offense defined in a section of the U.S. code that specifically classifies the offense as a felony
and conviction of an offense that is classified as a felony under 18 USC § 3559.
The Contractor agrees to incorporate the above certification in all lower tier subcontracts.
TRADE RESTRICTION CERTIFICATION
Reference: 49 USC § 50104
49 CFR Part 30
By submission of an offer, the Offeror certifies that with respect to this solicitation and any resultant
contract, the Offeror:
1) is not owned or controlled by one or more citizens of a foreign country included in the list of
countries that discriminate against U.S. firms as published by the Office of the United States Trade
Representative (USTR);
2) has not knowingly entered into any contract or subcontract for this project with a person that is a
citizen or national of a foreign country included on the list of countries that discriminate against U.S.
firms as published by the USTR; and
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 42 of 98
Page 8 of 18 Updated May 24, 2023
3) has not entered into any subcontract for any product to be used on the Federal project that is
produced in a foreign country included on the list of countries that discriminate against U.S. firms
published by the USTR.
This certification concerns a matter within the jurisdiction of an agency of the United States of America
and the making of a false, fictitious, or fraudulent certification may render the maker subject to
prosecution under Title 18 USC § 1001.
The Offeror/Contractor must provide immediate written notice to the Owner if the Offeror/Contractor
learns that its certification or that of a subcontractor was erroneous when submitted or has become
erroneous by reason of changed circumstances. The Contractor must require subcontractors provide
immediate written notice to the Contractor if at any time it learns that its certification was erroneous by
reason of changed circumstances.
Unless the restrictions of this clause are waived by the Secretary of Transportation in accordance with
49 CFR § 30.17, no contract shall be awarded to an Offeror or subcontractor:
1) who is owned or controlled by one or more citizens or nationals of a foreign country included on the
list of countries that discriminate against U.S. firms published by the USTR; or
2) whose subcontractors are owned or controlled by one or more citizens or nationals of a foreign
country on such USTR list; or
3) who incorporates in the public works project any product of a foreign country on such USTR list.
Nothing contained in the foregoing shall be construed to require establishment of a system of records in
order to render, in good faith, the certification required by this provision. The knowledge and
information of a contractor is not required to exceed that which is normally possessed by a prudent
person in the ordinary course of business dealings.
The Offeror agrees that, if awarded a contract resulting from this solicitation, it will incorporate this
provision for certification without modification in all lower tier subcontracts. The Contractor may rely on
the certification of a prospective subcontractor that it is not a firm from a foreign country included on
the list of countries that discriminate against U.S. firms as published by USTR, unless the Offeror has
knowledge that the certification is erroneous.
This certification is a material representation of fact upon which reliance was placed when making an
award. If it is later determined that the Contractor or subcontractor knowingly rendered an erroneous
certification, the Federal Aviation Administration (FAA) may direct through the Owner cancellation of
the contract or subcontract for default at no cost to the Owner or the FAA.
VETERAN’S PREFERENCE
Reference: 49 USC § 47112(c)
In the employment of labor (excluding executive, administrative, and supervisory positions), the
Contractor and all sub‐tier contractors must give preference to covered veterans as defined within Title
49 United States Code Section 47112. Covered veterans include Vietnam‐era veterans, Persian Gulf
veterans, Afghanistan‐Iraq war veterans, disabled veterans, and small business concerns (as defined by
15 USC § 632) owned and controlled by disabled veterans. This preference only applies when there are
covered veterans readily available and qualified to perform the work to which the employment relates.
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 43 of 98
Page 9 of 18 Updated May 24, 2023
PROVISIONS APPLICABLE TO CONTRACTS EXCEEDING $10,000
DISTRACTED DRIVING
Reference: Executive Order 13513
DOT Order 3902.10
In accordance with Executive Order 13513, “Federal Leadership on Reducing Text Messaging While
Driving”, (10/1/2009) and DOT Order 3902.10, “Text Messaging While Driving”, (12/30/2009), the
Federal Aviation Administration encourages recipients of Federal grant funds to adopt and enforce
safety policies that decrease crashes by distracted drivers, including policies to ban text messaging while
driving when performing work related to a grant or subgrant.
In support of this initiative, the Owner encourages the Contractor to promote policies and initiatives for
its employees and other work personnel that decrease crashes by distracted drivers, including policies
that ban text messaging while driving motor vehicles while performing work activities associated with
the project. The Contractor must include the substance of this clause in all sub‐tier contracts exceeding
$10,000 that involve driving a motor vehicle in performance of work activities associated with the
project.
EQUAL EMPLOYMENT OPPORTUNITY (EEO)
Reference: 2 CFR Part 200, Appendix II(C)
41 CFR § 60‐1.4
41 CFR § 60‐4.3
Executive Order 11246
Equal Opportunity Clause
During the performance of this contract, the Contractor agrees as follows:
(1) The Contractor will not discriminate against any employee or applicant for employment because
of race, color, religion, sex, sexual orientation, gender identity, or national origin. The Contractor
will take affirmative action to ensure that applicants are employed, and that employees are
treated during employment, without regard to their race, color, religion, sex, sexual orientation,
gender identify, or national origin. Such action shall include, but not be limited to, the following:
employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff,
or termination; rates of pay or other forms of compensation; and selection for training,
including apprenticeship. The Contractor agrees to post in conspicuous places, available to
employees and applicants for employment, notices to be provided setting forth the provisions of
this nondiscrimination clause.
(2) The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of
the Contractor, state that all qualified applicants will receive consideration for employment
without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.
(3) The contractor will not discharge or in any other manner discriminate against any employee or
applicant for employment because such employee or applicant has inquired about, discussed, or
disclosed the compensation of the employee or applicant or another employee or applicant.
This provision shall not apply to instances in which an employee who has access to the
compensation information of other employees or applicants as a part of such employee's
essential job functions discloses the compensation of such other employees or applicants to
individuals who do not otherwise have access to such information, unless such disclosure is in
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 44 of 98
Page 10 of 18 Updated May 24, 2023
response to a formal complaint or charge, in furtherance of an investigation, proceeding,
hearing, or action, including an investigation conducted by the employer, or is consistent with
the contractor's legal duty to furnish information.
(4) The Contractor will send to each labor union or representative of workers with which it has a
collective bargaining agreement or other contract or understanding, a notice to be provided by
the agency contracting officer, advising the labor union or workers’ representative of the
Contractor’s commitments under this section 202 of Executive Order 11246 of September 24,
1965, and shall post copies of the notice in conspicuous places available to employees and
applicants for employment.
(5) The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965,
and of the rules, regulations, and relevant orders of the Secretary of Labor.
(6) The Contractor will furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or
pursuant thereto, and will permit access to his books, records, and accounts by the contracting
agency and the Secretary of Labor for purposes of investigation to ascertain compliance with
such rules, regulations, and orders.
(7) In the event of the Contractor’s noncompliance with the nondiscrimination clauses of this
contract or with any such rules, regulations, or orders, this contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible for
further Government contracts in accordance with procedures authorized in Executive Order
11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked
as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of
the Secretary of Labor, or as otherwise provided by law.
(8) The Contractor will include the provisions of paragraphs (1) through (8) in every subcontract or
purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued
pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such
provisions will be binding upon each subcontractor or vendor. The Contractor will take such
action with respect to any subcontract or purchase order as may be directed by the Secretary of
Labor as a means of enforcing such provisions, including sanctions for noncompliance: Provided,
however, that in the event the contractor becomes involved in, or is threatened with, litigation
with a subcontractor or vendor as a result of such direction, the Contractor may request the
United States to enter into such litigation to protect the interests of the United States.
PROHIBITION OF SEGREGATED FACILITIES
Reference: 2 CFR Part 200, Appendix II(C)
41 CFR Part 60‐1
(a) The Contractor agrees that it does not and will not maintain or provide for its employees any
segregated facilities at any of its establishments, and that it does not and will not permit its
employees to perform their services at any location under its control where segregated facilities are
maintained. The Contractor agrees that a breach of this clause is a violation of the Equal
Employment Opportunity clause in this contract.
(b) “Segregated facilities,” as used in this clause, means any waiting rooms, work areas, rest rooms and
wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or
dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation,
and housing facilities provided for employees that are segregated by explicit directive or are in fact
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 45 of 98
Page 11 of 18 Updated May 24, 2023
segregated on the basis of race, color, religion, sex, sexual orientation, gender identity, or national
origin because of written or oral policies or employee custom. The term does not include separate
or single‐user rest rooms or necessary dressing or sleeping areas provided to assure privacy
between the sexes.
(c) The Contractor shall include this clause in every subcontract and purchase order that is subject to
the Equal Employment Opportunity clause of this contract.
TERMINATION OF CONTRACT
Reference: 2 CFR Part 200, Appendix II(B)
FAA Advisory Circular 150/5370‐10, Section 80‐09
Termination for Convenience (Professional Services)
The Owner may, by written notice to the Consultant, terminate this Agreement for its convenience
and without cause or default on the part of Consultant. Upon receipt of the notice of termination,
except as explicitly directed by the Owner, the Contractor must immediately discontinue all services
affected.
Upon termination of the Agreement, the Consultant must deliver to the Owner all data, surveys,
models, drawings, specifications, reports, maps, photographs, estimates, summaries, and other
documents and materials prepared by the Engineer under this contract, whether complete or
partially complete.
Owner agrees to make just and equitable compensation to the Consultant for satisfactory work
completed up through the date the Consultant receives the termination notice. Compensation will
not include anticipated profit on non‐performed services.
Owner further agrees to hold Consultant harmless for errors or omissions in documents that are
incomplete as a result of the termination action under this clause.
Termination for Cause (Professional Services)
Either party may terminate this Agreement for cause if the other party fails to fulfill its obligations
that are essential to the completion of the work per the terms and conditions of the Agreement. The
party initiating the termination action must allow the breaching party an opportunity to dispute or
cure the breach.
The terminating party must provide the breaching party seven (7) days advance written notice of its
intent to terminate the Agreement. The notice must specify the nature and extent of the breach, the
conditions necessary to cure the breach, and the effective date of the termination action. The rights
and remedies in this clause are in addition to any other rights and remedies provided by law or
under this agreement.
a) Termination by Owner: The Owner may terminate this Agreement for cause in whole or in part,
for the failure of the Consultant to:
1. Perform the services within the time specified in this contract or by Owner approved
extension;
2. Make adequate progress so as to endanger satisfactory performance of the Project; or
3. Fulfill the obligations of the Agreement that are essential to the completion of the Project.
Upon receipt of the notice of termination, the Consultant must immediately discontinue all services
affected unless the notice directs otherwise. Upon termination of the Agreement, the Consultant
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 46 of 98
Page 12 of 18 Updated May 24, 2023
must deliver to the Owner all data, surveys, models, drawings, specifications, reports, maps,
photographs, estimates, summaries, and other documents and materials prepared by the Engineer
under this contract, whether complete or partially complete.
Owner agrees to make just and equitable compensation to the Consultant for satisfactory work
completed up through the date the Consultant receives the termination notice. Compensation will
not include anticipated profit on non‐performed services.
Owner further agrees to hold Consultant harmless for errors or omissions in documents that are
incomplete as a result of the termination action under this clause.
If, after finalization of the termination action, the Owner determines the Consultant was not in
default of the Agreement, the rights and obligations of the parties shall be the same as if the Owner
issued the termination for the convenience of the Owner.
b) Termination by Consultant: The Consultant may terminate this Agreement for cause in whole or
in part, if the Owner:
1. Defaults on its obligations under this Agreement;
2. Fails to make payment to the Consultant in accordance with the terms of this Agreement;
3. Suspends the project for more than one hundred eighty (180) days due to reasons beyond
the control of the Consultant.
Upon receipt of a notice of termination from the Consultant, Owner agrees to cooperate with
Consultant for the purpose of terminating the agreement or portion thereof, by mutual consent. If
Owner and Consultant cannot reach mutual agreement on the termination settlement, the
Consultant may, without prejudice to any rights and remedies it may have, proceed with
terminating all or parts of this Agreement based upon the Owner’s breach of the contract.
In the event of termination due to Owner breach, the Consultant is entitled to invoice Owner and to
receive full payment for all services performed or furnished in accordance with this Agreement and
all justified reimbursable expenses incurred by the Consultant through the effective date of
termination action. Owner agrees to hold Consultant harmless for errors or omissions in documents
that are incomplete as a result of the termination action under this clause.
PROVISIONS APPLICABLE TO CONTRACTS EXCEEDING $25,000
DEBARMENT AND SUSPENSION
Reference: 2 CFR Part 180 (Subpart B)
2 CFR Part 200, Appendix II(H)
2 CFR Part 1200
DOT Order 4200.5
Executive Orders 12549 and 12689
Certification of Offeror/Bidder Regarding Debarment
By submitting a bid/proposal under this solicitation, the bidder or offeror certifies that neither it nor
its principals are presently debarred or suspended by any Federal department or agency from
participation in this transaction.
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 47 of 98
Page 13 of 18 Updated May 24, 2023
Certification of Lower Tier Contractors Regarding Debarment
The successful bidder, by administering each lower tier subcontract that exceeds $25,000 as a
“covered transaction”, must confirm each lower tier participant of a “covered transaction” under
the project is not presently debarred or otherwise disqualified from participation in this federally‐
assisted project. The successful bidder will accomplish this by:
1. Checking the System for Award Management at website: http://www.sam.gov.
2. Collecting a certification statement similar to the Certification of Offeror /Bidder Regarding
Debarment, above.
3. Inserting a clause or condition in the covered transaction with the lower tier contract.
If the Federal Aviation Administration later determines that a lower tier participant failed to disclose
to a higher tier participant that it was excluded or disqualified at the time it entered the covered
transaction, the FAA may pursue any available remedies, including suspension and debarment of the
non‐compliant participant.
PROVISIONS APPLICABLE TO CONTRACTS EXCEEDING $100,000
CONTRACT WORKHOURS AND SAFETY STANDARDS ACT REQUIREMENTS
Reference: 2 CFR Part 200, Appendix II(E)
2 CFR § 5.5(b)
40 USC § 3702
40 USC § 3704
1. Overtime Requirements.
No contractor or subcontractor contracting for any part of the contract work which may require or
involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic,
including watchmen and guards, in any workweek in which he or she is employed on such work to work
in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a
rate not less than one and one‐half times the basic rate of pay for all hours worked in excess of forty
hours in such workweek.
2. Violation; Liability for Unpaid Wages; Liquidated Damages.
In the event of any violation of the clause set forth in paragraph (1) of this clause, the Contractor and
any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor
and subcontractor shall be liable to the United States (in the case of work done under contract for the
District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such
liquidated damages shall be computed with respect to each individual laborer or mechanic, including
watchmen and guards, employed in violation of the clause set forth in paragraph (1) of this clause, in the
sum of $29 for each calendar day on which such individual was required or permitted to work in excess
of the standard workweek of forty hours without payment of the overtime wages required by the clause
set forth in paragraph (1) of this clause.
3. Withholding for Unpaid Wages and Liquidated Damages.
The Federal Aviation Administration (FAA) or the Owner shall upon its own action or upon written
request of an authorized representative of the Department of Labor withhold or cause to be withheld,
from any moneys payable on account of work performed by the contractor or subcontractor under any
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 48 of 98
Page 14 of 18 Updated May 24, 2023
such contract or any other Federal contract with the same prime contractor, or any other federally‐
assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the
same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such
contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth
in paragraph (2) of this clause.
4. Subcontractors.
The Contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraphs (1)
through (4) and also a clause requiring the subcontractor to include these clauses in any lower tier
subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower
tier subcontractor with the clauses set forth in paragraphs (1) through (4) of this clause.
LOBBYING AND INFLUENCING FEDERAL EMPLOYEES
Reference: 31 USC § 1352 – Byrd Anti‐Lobbying Amendment
2 CFR Part 200, Appendix II(I)
49 CFR Part 20, Appendix A
Certification Regarding Lobbying
The Bidder or Offeror certifies by signing and submitting this bid or proposal, to the best of his or
her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the Bidder or
Offeror, to any person for influencing or attempting to influence an officer or employee of an
agency, a Member of Congress, an officer or employee of Congress, or an employee of a
Member of Congress in connection with the awarding of any Federal contract, the making of any
Federal grant, the making of any Federal loan, the entering into of any cooperative agreement,
and the extension, continuation, renewal, amendment, or modification of any Federal contract,
grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person
for influencing or attempting to influence an officer or employee of any agency, a Member of
Congress, an officer or employee of Congress, or an employee of a Member of Congress in
connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned
shall complete and submit Standard Form‐LLL, “Disclosure Form to Report Lobbying,” in
accordance with its instructions.
(3) The undersigned shall require that the language of this certification be included in the award
documents for all sub‐awards at all tiers (including subcontracts, subgrants, and contracts under
grants, loans, and cooperative agreements) and that all sub‐recipients shall certify and disclose
accordingly.
This certification is a material representation of fact upon which reliance was placed when this
transaction was made or entered into. Submission of this certification is a prerequisite for making or
entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to
file the required certification shall be subject to a civil penalty of not less than $10,000 and not more
than $100,000 for each such failure.
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 49 of 98
Page 15 of 18 Updated May 24, 2023
PROVISIONS APPLICABLE TO CONTRACTS EXCEEDING $150,000
CLEAN AIR AND WATER POLLUTION CONTROL
References: 2 CFR Part 200, Appendix II(G)
42 USC § 7401, et seq
33 USC § 1251, et seq
Contractor agrees to comply with all applicable standards, orders, and regulations issued pursuant to
the Clean Air Act (42 USC §§ 7401‐7671q) and the Federal Water Pollution Control Act as amended
(33 USC §§ 1251‐1387). The Contractor agrees to report any violation to the Owner immediately upon
discovery. The Owner assumes responsibility for notifying the Environmental Protection Agency (EPA)
and the Federal Aviation Administration.
The Contractor must include this requirement in all subcontracts that exceed $150,000.
PROVISIONS APPLICABLE TO CONTRACTS EXCEEDING $250,000
BREACH OF CONTRACT TERMS
Reference: 2 CFR § 200 Appendix II(A)
Any violation or breach of terms of this contract on the part of the Contractor or its subcontractors may
result in the suspension or termination of this contract or such other action that may be necessary to
enforce the rights of the parties of this agreement.
Owner will provide Contractor written notice that describes the nature of the breach and corrective
actions the Contractor must undertake in order to avoid termination of the contract. Owner reserves
the right to withhold payments to Contractor until such time the Contractor corrects the breach or the
Owner elects to terminate the contract. The Owner’s notice will identify a specific date by which the
Contractor must correct the breach. Owner may proceed with termination of the contract if the
Contractor fails to correct the breach by the deadline indicated in the Owner’s notice.
The duties and obligations imposed by the Contract Documents and the rights and remedies available
thereunder are in addition to, and not a limitation of, any duties, obligations, rights and remedies
otherwise imposed or available by law.
DISADVANTAGED BUSINESS ENTERPRISE
Reference: 49 CFR Part 26
Solicitation Language (Solicitations that include a Contract Goal)
Bid Information Submitted as a matter of responsiveness:
The Owner’s award of this contract is conditioned upon Bidder or Offeror satisfying the good
faith effort requirements of 49 CFR § 26.53.
As a condition of responsiveness, the Bidder or Offeror must submit the following information
with its proposal on the forms provided herein:
1) The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will
participate in the contract;
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 50 of 98
Page 16 of 18 Updated May 24, 2023
2) A description of the work that each DBE firm will perform;
3) The dollar amount of the participation of each DBE firm listed under (1);
4) Written statement from Bidder or Offeror that attests their commitment to use the DBE
firm(s) listed under (1) to meet the Owner’s project goal;
5) Written confirmation from each listed DBE firm that it is participating in the contract in the
kind and amount of work provided in the prime contractor's commitment; and
6) If Bidder or Offeror cannot meet the advertised project DBE goal, evidence of good faith
efforts undertaken by the Bidder or Offeror as described in appendix A to 49 CFR part 26. The
documentation of good faith efforts must include copies of each DBE and non‐DBE
subcontractor quote submitted to the bidder when a non‐DBE subcontractor was selected
over a DBE for work on the contract.
Bid Information submitted as a matter of bidder responsibility:
The Owner’s award of this contract is conditioned upon Bidder or Offeror satisfying the good
faith effort requirements of 49 CFR § 26.53.
As a condition of responsibility, every Bidder or Offeror must submit the following information
on the forms provided herein within five days after bid opening.
1) The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will
participate in the contract;
2) A description of the work that each DBE firm will perform;
3) The dollar amount of the participation of each DBE firm listed under (1);
4) Written statement from Bidder or Offeror that attests their commitment to use the DBE
firm(s) listed under (1) to meet the Owner’s project goal;
5) Written confirmation from each listed DBE firm that it is participating in the contract in the
kind and amount of work provided in the prime contractor's commitment; and
6) If Bidder or Offeror cannot meet the advertised project DBE goal, evidence of good faith
efforts undertaken by the Bidder or Offeror as described in appendix A to 49 CFR part 26. The
documentation of good faith efforts must include copies of each DBE and non‐DBE
subcontractor quote submitted to the bidder when a non‐DBE subcontractor was selected
over a DBE for work on the contract.
Solicitation Language (Race/Gender Neutral Means)
The requirements of 49 CFR part 26 apply to this contract. It is the policy of the Owner to
practice nondiscrimination based on race, color, sex, or national origin in the award or
performance of this contract. The Owner encourages participation by all firms qualifying under
this solicitation regardless of business size or ownership.
Prime Contracts (Contracts Covered by a DBE Program)
Contract Assurance (49 CFR § 26.13)
The Contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color,
national origin, or sex in the performance of this contract. The Contractor shall carry out applicable
requirements of 49 CFR part 26 in the award and administration of DOT‐assisted contracts. Failure
by the Contractor to carry out these requirements is a material breach of this contract, which may
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 51 of 98
Page 17 of 18 Updated May 24, 2023
result in the termination of this contract or such other remedy as the recipient deems appropriate,
which may include, but is not limited to:
1) Withholding monthly progress payments;
2) Assessing sanctions;
3) Liquidated damages; and/or
4) Disqualifying the Contractor from future bidding as non‐responsible.
Prompt Payment (49 CFR § 26.29)
The prime contractor agrees to pay each subcontractor under this prime contract for satisfactory
performance of its contract no later than thirty (30) calendar days from the receipt of each payment
the prime contractor receives from Owner. The prime contractor agrees further to return retainage
payments to each subcontractor within thirty (30) calendar days after the subcontractor’s work is
satisfactorily completed. Any delay or postponement of payment from the above referenced time
frame may occur only for good cause following written approval of the Owner. This clause applies to
both DBE and non‐DBE subcontractors.
Termination of DBE Subcontracts (49 CFR § 26.53(f))
The prime contractor must not terminate a DBE subcontractor listed in response to the above
Solicitation Language (Solicitations that include a Contract Goal) section (or an approved substitute
DBE firm) without prior written consent of Owner. This includes, but is not limited to, instances in
which the prime contractor seeks to perform work originally designated for a DBE subcontractor
with its own forces or those of an affiliate, a non‐DBE firm, or with another DBE firm.
The prime contractor shall utilize the specific DBEs listed to perform the work and supply the
materials for which each is listed unless the contractor obtains written consent from the Owner.
Unless the Owner’s consent is provided, the prime contractor shall not be entitled to any payment
for work or material unless it is performed or supplied by the listed DBE.
The Owner may provide such written consent only if the Owner agrees, for reasons stated in the
concurrence document, that the prime contractor has good cause to terminate the DBE firm. For
purposes of this paragraph, good cause includes the circumstances listed in 49 CFR §26.53.
Before transmitting to the Owner its request to terminate and/or substitute a DBE subcontractor,
the prime contractor must give notice in writing to the DBE subcontractor, with a copy to the
Owner, of its intent to request to terminate and/or substitute, and the reason for the request.
The prime contractor must give the DBE five days to respond to the prime contractor's notice and
advise the Owner and the contractor of the reasons, if any, why it objects to the proposed
termination of its subcontract and why the Owner should not approve the prime contractor's action.
If required in a particular case as a matter of public necessity (e.g., safety), the Owner may provide a
response period shorter than five days.
In addition to post‐award terminations, the provisions of this section apply to preaward deletions of
or substitutions for DBE firms put forward by offerors in negotiated procurements.
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 52 of 98
Page 18 of 18 Updated May 24, 2023
This Page Intentionally Left Blank
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 53 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 54 of 98
1. Direct Salary Costs
Title Hours % Total Hourly Rate* Cost
Principal in Charge 0 0.0% 77.90$ -$
Project Manager 95 24.9%57.81$ 5,491$
Senior Engineer 28 7.3%60.63$ 1,697$
Engineer II 21 5.5%44.75$ 939$
Engineer I 106 27.8%36.62$ 3,881$
Engineering Technician II 85 22.3%34.71$ 2,950$
Project Coordinator 46 12.1%39.00$ 1,794$
*Hourly, not Loaded Rate Weighted Average Rate = 43.97$
Total Hours 381 Direct Salary Cost 16,752$
Total Number of Sheets Anticiapted 20
Average Hours per Plan Sheet 19.1
Percentage of Direct Salary Costs 201.41%In-Direct Salary Cost 33,740$
Effective Multiplier 3.47 Total Salary & OH Cost 50,492$
Percent of Salary Cost 15.00%Profit 7,574$
2. Total Labor, Overhead, and Fixed Payment Total Labor Cost 58,066$
3. Direct Expenses
Printing 8.5 x 11 3,645 pages 0.10$ 365$
Printing 11 x 17 270 pages 0.20$ 54$
Reports 0 reports 75.00$ -$
Postage/Shipping 0 mailings 20.00$ -$
Vehicle Mileage 92 miles 0.700$ 65$
Rental Car 0 days 100.00$ -$
Lodging 0 nights 109.00$ -$
Meals 0 meals 10.00$ -$
Total Expenses 484$
4. Subconsultant Costs
Total Subconsultant Costs -$
Items 4, 5, plus 6 58,550$
AIRFIELD PAVEMENT MAINTENANCE - RUNWAY 7-25 (WEST END) AND 12-30
ROUNDED
Exhibit I
Part I: Design and Bidding Services
DESIGN AND BIDDING SERVICES
IOWA CITY MUNICIPAL AIRPORT, IOWA CITY, IOWA
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 55 of 98
CITY OF IOWA CITY
NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS
Report generated: 10/02/2025 12:55
User: mtharp
Program ID: bgnyrpts
Page 1
PROJECTION: 27100 FY27 Operating Budget FOR PERIOD 99
ACCOUNTS FOR:
2025 2026 2026 2026 2026 2027 PCT
Airport ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION DIVISION CHANGE
850110 Airport Operations
76850110 331100 Fed Grants .00 .00 .00 .00 .00 .00 .0%
76850110 363910 Misc Merch .00 .00 .00 .00 .00 .00 .0%
Sales of Airport T-shirts during events and throughout the year.
2022 - sold remaining inventory and not replenishing.
76850110 369100 Reimb Exp .00 .00 .00 .00 .00 .00 .0%
Don't plan for these annually
76850110 381100 Int Invest 10,578.62 .00 .00 -705.10 .00 .00 .0%
Don't annually plan for these
76850110 382100 Land Rent -45,418.89 -55,000.00 -55,000.00 -19,962.14 -47,600.00 -56,000.00 1.8%
Active leases:
Farm - FNC Managed (~$32,000/year)
Toyota Iowa City Expires 2033 ~$10,000/year
Jet Air Hangar N Expires 2046 ~$2250/year (5-Year CPI 9/1/26)
Edmonds - Expires 2046 ~$600/year (5-Year CPI 6/1/26)
IA Army National Guard ($9500/year) (7/1/27 CPI adjust, then every 5-years)
76850110 382200 BdngRmRent -313,150.66 -325,000.00 -325,000.00 -79,052.39 -306,200.00 -340,000.00 4.6%
Oct 25 - Increased T-Hangars 2.5%
CPI Adjustment Schedule
Hangar M - $500/mth - Base Rent $1200/month beginning 10/1/26
Hangar M - 1/1/27 5-Year CPI (base rent $1200)
FBO Agreement - 1/1/27 5-year CPI ($5502.92/mth)
OPL - 1/1/26 5-Year CPI ($4824/mth)
Hangar L - 2/1/28 5-Year CPI ($764.73/mth x2)
Revenues - FY2027
T-Hangars - $166,000
Jet Air - $66,035.04
Hangar M - $12,300
OPL - $57,888
Hangar L - $18,353.52
Corporates - $23,352
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 56 of 98
CITY OF IOWA CITY
NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS
Report generated: 10/02/2025 12:55
User: mtharp
Program ID: bgnyrpts
Page 2
PROJECTION: 27100 FY27 Operating Budget FOR PERIOD 99
ACCOUNTS FOR:
2025 2026 2026 2026 2026 2027 PCT
Airport ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION DIVISION CHANGE
76850110 382300 Equip Rent -887.50 -1,300.00 -1,300.00 -425.00 -1,300.00 -900.00 -30.8%
Flight simulator use - 2020 contained pre-purchase sales of flight time to gauge
interest and build up cash to purchase.
Annual sales estimate to roughly 150 hours (@ $45/hour after fees)
FY22 Most free hours expire from initial fundraising purchase (FY20)
FY23 Airport Commission reduced rate on sim to encourage continued use.
76850110 384900 Oth Comm -86,187.95 -75,000.00 -75,000.00 -23,864.25 -61,500.00 -82,000.00 9.3%
Oct 2023 Increased Fuel Flowage from $.10/gallon to $.15/gallon. Avg Annual
sales 500,000 gallons/year
OPL also pays $.10/gal for use of separate fuel system than retail - $2000/year
revenue
76850110 393910 MiscXferIn .00 .00 .00 .00 .00 .00 .0%
76850110 411000 Perm FT 86,511.77 92,600.00 92,600.00 21,246.63 92,600.00 94,200.00 1.7%
76850110 413000 Temp Empl .00 .00 .00 .00 1,000.00 .00 .0%
76850110 414500 Longevity 650.00 .00 .00 .00 650.00 .00 .0%
76850110 421100 Health Ins 8,799.60 9,700.00 9,700.00 2,600.15 9,700.00 11,100.00 14.4%
76850110 421200 Dental Ins 402.48 400.00 400.00 117.46 400.00 400.00 .0%
76850110 421300 Life Ins 190.80 200.00 200.00 49.38 200.00 200.00 .0%
76850110 421400 DisbltyIns 296.52 300.00 300.00 76.17 300.00 300.00 .0%
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 57 of 98
CITY OF IOWA CITY
NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS
Report generated: 10/02/2025 12:55
User: mtharp
Program ID: bgnyrpts
Page 3
PROJECTION: 27100 FY27 Operating Budget FOR PERIOD 99
ACCOUNTS FOR:
2025 2026 2026 2026 2026 2027 PCT
Airport ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION DIVISION CHANGE
76850110 422100 FICA 6,573.74 7,000.00 7,000.00 1,600.41 7,000.00 7,200.00 2.9%
76850110 423100 IPERS 8,074.38 8,700.00 8,700.00 2,005.71 8,700.00 8,900.00 2.3%
76850110 431020 CourtCosts .00 .00 .00 .00 .00 .00 .0%
76850110 432020 Audit 562.98 900.00 900.00 .00 900.00 900.00 .0%
Average Annual Costs
76850110 432030 Finan Srvc .00 .00 .00 .00 .00 .00 .0%
76850110 432080 OthProSrvc .00 .00 .00 .00 .00 .00 .0%
76850110 435055 Mail&Deliv .00 .00 .00 .00 .00 .00 .0%
76850110 435060 Legal Pubs 155.20 .00 .00 26.92 .00 .00 .0%
76850110 436030 Transportn 842.75 600.00 600.00 439.60 800.00 600.00 .0%
Travel to Iowa Aviation Conference (site random in Iowa) and 4 States Regional
(Formerly FAA) Aviation Conference in Kansas City
26 - Dubuque
27 - Des Moines
76850110 436050 Registratn 525.00 1,000.00 1,000.00 350.00 500.00 1,000.00 .0%
Travel to Iowa Aviation Conference and 4 States Regional (Formerly FAA) Aviation
Conference
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 58 of 98
CITY OF IOWA CITY
NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS
Report generated: 10/02/2025 12:55
User: mtharp
Program ID: bgnyrpts
Page 4
PROJECTION: 27100 FY27 Operating Budget FOR PERIOD 99
ACCOUNTS FOR:
2025 2026 2026 2026 2026 2027 PCT
Airport ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION DIVISION CHANGE
76850110 436060 Lodging 630.28 500.00 500.00 582.88 500.00 500.00 .0%
Travel to Iowa Aviation Conference and 4 States Regional (Formerly FAA) Aviation
Conference
76850110 436080 Meals 125.00 100.00 100.00 62.50 100.00 100.00 .0%
Travel to Iowa Aviation Conference and 4 States Regional (Formerly FAA) Aviation
Conference
76850110 437010 CompLiabty 11,027.32 9,000.00 9,000.00 .00 9,000.00 15,000.00 66.7%
10/2025 Update $ per email with Melissa for insurance related accounts
Loss Reserve - $4000
Liability Policy ~$6000/year, without pollution policy
Pollution policy, add ~$7,000 (est), every 3 years, FY2024/2027/2030
UST Insurance (Building H - Underground Fuel Tank) ~ $2500/year
Bonding - $1000
76850110 437020 Fir&CasIns 25,104.00 28,000.00 28,000.00 .00 24,400.00 31,000.00 10.7%
$31,000 for FY27, then 10% increase per year from Melissa M 10/2/25
76850110 437030 WrkCompIns 1,000.00 2,100.00 2,100.00 .00 2,100.00 1,000.00 -52.4%
76850110 437041 Bnd&OthIns 2,328.00 900.00 900.00 2,372.00 4,000.00 1,000.00 11.1%
Bond for Airport Commission Members $875
76850110 437200 LossRsvPay 4,000.00 4,000.00 4,000.00 .00 3,000.00 4,000.00 .0%
Annual Loss Reserve Payment
76850110 438010 Stormwater 18,944.64 19,800.00 19,800.00 4,736.16 19,800.00 19,000.00 -4.0%
76850110 438030 Electricty 10,986.08 10,000.00 10,000.00 1,027.84 10,000.00 10,000.00 .0%
Installation of phase 1 should be complete during FY25. Meter charges were
$12,300 for last 12 months (10/22-10/23) which would be covered by solar.
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 59 of 98
CITY OF IOWA CITY
NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS
Report generated: 10/02/2025 12:55
User: mtharp
Program ID: bgnyrpts
Page 5
PROJECTION: 27100 FY27 Operating Budget FOR PERIOD 99
ACCOUNTS FOR:
2025 2026 2026 2026 2026 2027 PCT
Airport ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION DIVISION CHANGE
76850110 438050 Landfill .00 200.00 200.00 39.50 200.00 200.00 .0%
Avg Landfill Use
76850110 438070 HeatngFuel 2,993.93 5,000.00 5,000.00 74.36 5,000.00 5,000.00 .0%
76850110 438080 Sewer 2,221.99 1,800.00 1,800.00 424.63 1,800.00 1,800.00 .0%
76850110 438090 Water 2,450.07 2,800.00 2,800.00 502.77 4,300.00 2,800.00 .0%
FY23/24 Water Issues resolved
Avg Water bills $230/month
76850110 438100 Refuse 2,421.50 2,800.00 2,800.00 649.50 2,800.00 2,800.00 .0%
76850110 438110 Loc Phone .00 200.00 200.00 .00 200.00 200.00 .0%
76850110 442010 OthBldgR&M 27,352.04 15,000.00 15,000.00 10,892.98 13,600.00 20,000.00 33.3%
JA Janitorial - $8136
Increased spending on maintenance of hangar door motors
FY25 replaced emergency door drop stops on several hangars $6000
76850110 442020 Struct R&M 1,232.35 1,500.00 1,500.00 .00 800.00 1,500.00 .0%
FY 24 had $6500 for roof leaks. Increasing budget for additional maintenance
76850110 442030 HeatingR&M 3,918.00 5,000.00 5,000.00 1,561.30 2,000.00 5,000.00 .0%
Increased maintenance for HVAC systems.
FY22/24 spikes are Radiant Heater Replacements
76850110 442060 ElecPlmR&M 4,412.37 5,000.00 5,000.00 2,281.77 5,000.00 5,000.00 .0%
Avg Expenses
FY24 contained replacement of several exterior lighting fixtures that had failed
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 60 of 98
CITY OF IOWA CITY
NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS
Report generated: 10/02/2025 12:55
User: mtharp
Program ID: bgnyrpts
Page 6
PROJECTION: 27100 FY27 Operating Budget FOR PERIOD 99
ACCOUNTS FOR:
2025 2026 2026 2026 2026 2027 PCT
Airport ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION DIVISION CHANGE
76850110 443080 Oth Eq R&M 22,749.59 10,000.00 10,000.00 2,000.80 10,000.00 15,000.00 50.0%
FY25 - Several Fencing/Gate repairs that had been deferred
76850110 444080 SoftwarR&M 161.15 .00 .00 .00 .00 .00 .0%
76850110 445030 Nursery 51,036.18 50,000.00 50,000.00 19,873.41 50,000.00 50,000.00 .0%
JA Contract (groundskeeping) $6215/month x 8 months
Parks & Rec mowing Gilbert Street area (previously paid to be maintained)
76850110 445080 SnowIceRem 24,860.00 26,700.00 26,700.00 .00 26,700.00 26,700.00 .0%
Snow removal portion of maintenance contract and deicing supplies
JA Contract, DeIcer material
$6215x4 (remaining groundskeeping contract months)
$8000 ~3 tons of deicer material (FY25 onward unfunded)
76850110 445110 Testing 5,603.50 1,500.00 1,500.00 824.00 1,500.00 1,500.00 .0%
FY2025/FY2028/FY2031- 3 year UST Cathodic Protection testing due (add $2500), UST
Monitoring and Spill Bucket
Annual Line/Leak testing for UST (~$600)
Annual Backflow Testing Services (~$800)
76850110 445230 OthOptgSvc 1,741.02 1,000.00 1,000.00 722.41 1,000.00 1,000.00 .0%
76850110 446100 Atty Chgbk 8,100.00 8,200.00 8,200.00 1,366.70 8,200.00 8,300.00 1.2%
Adjusted by annual pay inc - 2.25% for FY25.
76850110 446120 ITS SrvChg 456.23 400.00 400.00 82.20 400.00 500.00 25.0%
76850110 446130 ITS PC Chg 12,348.72 15,200.00 15,200.00 1,902.22 15,200.00 12,300.00 -19.1%
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 61 of 98
CITY OF IOWA CITY
NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS
Report generated: 10/02/2025 12:55
User: mtharp
Program ID: bgnyrpts
Page 7
PROJECTION: 27100 FY27 Operating Budget FOR PERIOD 99
ACCOUNTS FOR:
2025 2026 2026 2026 2026 2027 PCT
Airport ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION DIVISION CHANGE
76850110 446160 ITSNetwChg 9,000.00 9,900.00 9,900.00 .00 9,900.00 11,900.00 20.2%
76850110 446190 ITSSAASChg 234.60 300.00 300.00 46.05 300.00 400.00 33.3%
76850110 446200 Copy Chgbk 600.00 1,400.00 1,400.00 233.30 1,400.00 1,400.00 .0%
76850110 446300 PhoneEqChg 1,439.35 1,600.00 1,600.00 250.55 1,600.00 1,700.00 6.3%
76850110 446320 Mail Chgbk 215.43 200.00 200.00 312.36 200.00 200.00 .0%
76850110 446350 VehReplChg 39,950.85 42,000.00 42,000.00 6,959.16 42,000.00 41,100.00 -2.1%
Increased for Tractor purchase
76850110 446370 Fuel Chgbk 3,221.20 4,900.00 4,900.00 1,477.57 4,900.00 3,400.00 -30.6%
76850110 446380 VehR&MChg 11,864.16 10,700.00 10,700.00 3,157.61 10,700.00 12,300.00 15.0%
76850110 449055 PermitFees 443.16 400.00 400.00 .00 400.00 500.00 25.0%
FY2019/FY2024/FY2029 5-year Stormwater Permit Due (add 750)
Boiler Permits ($200)
Elevator (175)
UST (75)
76850110 449060 Dues&Memb 1,375.00 1,000.00 1,000.00 500.00 1,000.00 1,500.00 50.0%
Iowa Public Airports Association
Think Iowa City
AAAE
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 62 of 98
CITY OF IOWA CITY
NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS
Report generated: 10/02/2025 12:55
User: mtharp
Program ID: bgnyrpts
Page 8
PROJECTION: 27100 FY27 Operating Budget FOR PERIOD 99
ACCOUNTS FOR:
2025 2026 2026 2026 2026 2027 PCT
Airport ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION DIVISION CHANGE
76850110 449120 Equip Rent 620.00 .00 .00 420.00 .00 500.00 .0%
Avg equipment rental
76850110 452010 Off Supply 58.00 100.00 100.00 80.95 100.00 100.00 .0%
Paper/Pens etc.
76850110 454020 Subscript 457.60 1,000.00 1,000.00 .00 1,000.00 1,000.00 .0%
Corridor Business Journal
CR Gazette
Flight Sim data subscription
76850110 455110 Software 349.88 400.00 400.00 43.98 400.00 400.00 .0%
76850110 455120 MiscHrdwr 169.65 .00 .00 .00 1,000.00 .00 .0%
76850110 461050 OthAg Mat .00 .00 .00 .00 .00 .00 .0%
76850110 466070 Oth Maint 718.84 500.00 500.00 8,154.38 700.00 3,000.00 500.0%
Replacement parts for runway lights - new systems have no spare parts
- Previous systems had spare parts from relighting projects
76850110 467020 Equip R&M 445.92 1,000.00 1,000.00 .00 1,000.00 1,000.00 .0%
76850110 467160 OthVehR&M .00 100.00 100.00 .00 100.00 100.00 .0%
Misc Costs
76850110 468030 Asphalt .00 200.00 200.00 .00 100.00 200.00 .0%
Maintenance potholes
76850110 468050 Sand 83.82 100.00 100.00 .00 100.00 100.00 .0%
Avg Sand Expense
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 63 of 98
CITY OF IOWA CITY
NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS
Report generated: 10/02/2025 12:55
User: mtharp
Program ID: bgnyrpts
Page 9
PROJECTION: 27100 FY27 Operating Budget FOR PERIOD 99
ACCOUNTS FOR:
2025 2026 2026 2026 2026 2027 PCT
Airport ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION DIVISION CHANGE
76850110 469040 TrafficCnt 16.38 .00 .00 .00 400.00 .00 .0%
76850110 469190 MinorEquip 31.19 500.00 500.00 .00 500.00 500.00 .0%
FY22 - Funds for as needed equipment purchases during year (weedeater, chainsaw,
vacuum etc)
76850110 469200 Tools 141.44 500.00 500.00 .00 500.00 500.00 .0%
Minor tools purchases
76850110 469210 First Aid 1,080.21 1,200.00 1,200.00 .00 300.00 1,200.00 .0%
76850110 469320 MiscSuppl .00 .00 .00 .00 .00 .00 .0%
76850110 469360 Food&Bever .00 .00 .00 .00 .00 .00 .0%
76850110 473010 Cont Impr .00 .00 .00 .00 .00 .00 .0%
76850110 474240 Tractors .00 .00 .00 .00 .00 .00 .0%
76850110 475010 Furn&OffEq .00 .00 .00 .00 .00 .00 .0%
76850110 490040 CIPFunding .00 .00 .00 .00 .00 .00 .0%
TOTAL UNDEFINED PROJECT -760.52 -30,200.00 -30,200.00 -21,880.61 6,350.00 -29,900.00 -1.0%
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 64 of 98
CITY OF IOWA CITY
NEXT YEAR / CURRENT YEAR BUDGET ANALYSIS
Report generated: 10/02/2025 12:55
User: mtharp
Program ID: bgnyrpts
Page 10
PROJECTION: 27100 FY27 Operating Budget FOR PERIOD 99
ACCOUNTS FOR:
2025 2026 2026 2026 2026 2027 PCT
Airport ACTUAL ORIG BUD REVISED BUD ACTUAL PROJECTION DIVISION CHANGE
120 Airport Mural
76850110 362100 120 Contr&Dona .00 .00 .00 .00 .00 .00 .0%
76850110 473010 120 Cont Impr .00 .00 .00 .00 .00 .00 .0%
TOTAL Airport Mural .00 .00 .00 .00 .00 .00 .0%
TOTAL Airport Operations -760.52 -30,200.00 -30,200.00 -21,880.61 6,350.00 -29,900.00 -1.0%
TOTAL Airport -760.52 -30,200.00 -30,200.00 -21,880.61 6,350.00 -29,900.00 -1.0%
TOTAL REVENUE -435,066.38 -456,300.00 -456,300.00 -124,008.88 -416,600.00 -478,900.00 5.0%
TOTAL EXPENSE 434,305.86 426,100.00 426,100.00 102,128.27 422,950.00 449,000.00 5.4%
GRAND TOTAL -760.52 -30,200.00 -30,200.00 -21,880.61 6,350.00 -29,900.00 -1.0%
** END OF REPORT - Generated by Michael Tharp **
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 65 of 98
2024 through 2030
Capital Improvement Plan
Iowa City, IAProjects By Department
Department Project #2024 2025 2026 2027 2028 2029 2030 Total
Airport Apron Expansion A3473 800,000 650,000 1,450,000
Airport Solar A3481 622,732 622,732
Fuel Storage Tank Fill Cabinet
Replacement A3484 470,000 470,000
Hangar Building A3487 1,300,000 1,300,000
HVAC Update A3483 325,000 325,000
Runway 12/30 Pavement Repairs A3475 250,000 250,000
Runway 12/30 Threshold
Displacement/Relocation A3471 875,000 875,000
Runway 7/25 Pavement Repairs A3474 250,000 250,000
Taxiway Maintenance - Seal/Crack
Repairs A3482 300,000 300,000
Terminal Building Space Needs Study A3480 200,000 200,000
Terminal Lobby Furniture/Flooring
Replacement A3488 50,000 50,000
Tractor Broom A3486 30,000 30,000
Wildlife Assessment A3485 40,000 40,000
Airport Total 1,697,732 395,000 550,000 1,300,000 1,100,000 470,000 650,000 6,162,732
GRAND TOTAL 1,697,732 395,000 550,000 1,300,000 1,100,000 470,000 650,000 6,162,732
Airport
Produced Using Plan-It CIP Software
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 66 of 98
Projection: 27100 - FY27 Operating Budget
Period: Memo
Revised Budget includes Carry Forward
Revenue & Expense Accounts
Next Year Budget Historical Comparison
Accounts Description 2023 Actuals 2024 Actuals 2025 Actuals 2026 Actuals CY Revised
Budget
Projection
Level 1
Percent
Change
70 Business Type Activities 39,967.69 37,594.26 (760.52)(20,990.61)(30,200.00)(29,900.00)-1.0%
HA FED INTERGOVNT REV 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
331100-
Federal Grants 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
Total 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
KA CONTRIB & DONATIONS 0.00 (36,325.00)0.00 0.00 0.00 0.00 0.0%
120 0.00 (36,325.00)0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
362100-120
Contrib & Donations 0.00 (36,325.00)0.00 0.00 0.00 0.00 0.0%
Total 0.00 (36,325.00)0.00 0.00 0.00 0.00 0.0%
KE MISC MERCHANDISE 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
363910-
Misc Sale of Merchandise 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
Total 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
KG OTHER MISC REVENUE 0.00 (1,400.00)0.00 0.00 0.00 0.00 0.0%
0.00 (1,400.00)0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
369100
Reimb of Expenses 0.00 (1,400.00)0.00 0.00 0.00 0.00 0.0%
Total 0.00 (1,400.00)0.00 0.00 0.00 0.00 0.0%
LA INTEREST REVENUES (784.01)4,286.61 10,578.62 (705.10)0.00 0.00 0.0%
(784.01)4,286.61 10,578.62 (705.10)0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
381100
Interest on Investments (784.01)4,286.61 10,578.62 (705.10)0.00 0.00 0.0%
Total (784.01)4,286.61 10,578.62 (705.10)0.00 0.00 0.0%
LB RENTS (361,310.16)(355,118.21)(359,457.05)(99,439.53)(381,300.00)(396,900.00)4.1%
(361,310.16)(355,118.21)(359,457.05)(99,439.53)(381,300.00)(396,900.00)4.1%
10/6/2025 1:35:03 PM Page 1 of 10
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 67 of 98
Projection: 27100 - FY27 Operating Budget
Period: Memo
Revised Budget includes Carry Forward
Revenue & Expense Accounts
Next Year Budget Historical Comparison
Accounts Description 2023 Actuals 2024 Actuals 2025 Actuals 2026 Actuals CY Revised
Budget
Projection
Level 1
Percent
Change
7600-70-70-850-850100-850110-000-0000-
382100
Land Rental (53,062.36)(47,609.28)(45,418.89)(19,962.14)(55,000.00)(56,000.00)1.8%
7600-70-70-850-850100-850110-000-0000-
382200
Building/Room Rental (307,377.80)(306,203.93)(313,150.66)(79,052.39)(325,000.00)(340,000.00)4.6%
7600-70-70-850-850100-850110-000-0000-
382300-
Equipment Rental (870.00)(1,305.00)(887.50)(425.00)(1,300.00)(900.00)-30.8%
Total (361,310.16)(355,118.21)(359,457.05)(99,439.53)(381,300.00)(396,900.00)4.1%
LG ROYALTIES & COMMISS (48,567.40)(61,483.60)(86,187.95)(23,864.25)(75,000.00)(82,000.00)9.3%
(48,567.40)(61,483.60)(86,187.95)(23,864.25)(75,000.00)(82,000.00)9.3%
7600-70-70-850-850100-850110-000-0000-
384900
Other Commissions (48,567.40)(61,483.60)(86,187.95)(23,864.25)(75,000.00)(82,000.00)9.3%
Total (48,567.40)(61,483.60)(86,187.95)(23,864.25)(75,000.00)(82,000.00)9.3%
NG MISC TRANSFERS IN 0.00 (2,315.55)0.00 0.00 0.00 0.00 0.0%
0.00 (2,315.55)0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
393910
Misc Transfers In 0.00 (2,315.55)0.00 0.00 0.00 0.00 0.0%
Total 0.00 (2,315.55)0.00 0.00 0.00 0.00 0.0%
PA REGULAR SALARIES 75,077.09 84,225.97 86,511.77 21,246.63 92,600.00 94,200.00 1.7%
75,077.09 84,225.97 86,511.77 21,246.63 92,600.00 94,200.00 1.7%
7600-70-70-850-850100-850110-000-0000-
411000
Perm Full Time 75,077.09 84,225.97 86,511.77 21,246.63 92,600.00 94,200.00 1.7%
7600-70-70-850-850100-850110-000-0000-
413000
Temporary Employees 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
Total 75,077.09 84,225.97 86,511.77 21,246.63 92,600.00 94,200.00 1.7%
PB OTHER SALARIES 650.00 650.00 650.00 0.00 0.00 0.00 0.0%
650.00 650.00 650.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
414500
Longevity Pay 650.00 650.00 650.00 0.00 0.00 0.00 0.0%
Total 650.00 650.00 650.00 0.00 0.00 0.00 0.0%
PC GROUP INSURANCE 8,663.41 9,350.74 9,689.40 2,843.16 10,600.00 12,000.00 13.2%
10/6/2025 1:35:03 PM Page 2 of 10
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 68 of 98
Projection: 27100 - FY27 Operating Budget
Period: Memo
Revised Budget includes Carry Forward
Revenue & Expense Accounts
Next Year Budget Historical Comparison
Accounts Description 2023 Actuals 2024 Actuals 2025 Actuals 2026 Actuals CY Revised
Budget
Projection
Level 1
Percent
Change
8,663.41 9,350.74 9,689.40 2,843.16 10,600.00 12,000.00 13.2%
7600-70-70-850-850100-850110-000-0000-
421100
Health Insurance 7,838.64 8,478.48 8,799.60 2,600.15 9,700.00 11,100.00 14.4%
7600-70-70-850-850100-850110-000-0000-
421200
Dental Insurance 399.36 401.52 402.48 117.46 400.00 400.00 0.0%
7600-70-70-850-850100-850110-000-0000-
421300
Life Insurance 162.54 180.26 190.80 49.38 200.00 200.00 0.0%
7600-70-70-850-850100-850110-000-0000-
421400
Disability Insurance 262.87 290.48 296.52 76.17 300.00 300.00 0.0%
Total 8,663.41 9,350.74 9,689.40 2,843.16 10,600.00 12,000.00 13.2%
PD SOCIAL SEC CONTRIB 5,718.20 6,408.93 6,573.74 1,600.41 7,000.00 7,200.00 2.9%
5,718.20 6,408.93 6,573.74 1,600.41 7,000.00 7,200.00 2.9%
7600-70-70-850-850100-850110-000-0000-
422100
FICA 5,718.20 6,408.93 6,573.74 1,600.41 7,000.00 7,200.00 2.9%
Total 5,718.20 6,408.93 6,573.74 1,600.41 7,000.00 7,200.00 2.9%
PE RETIREMENT CONTRIB 7,012.81 7,665.66 8,074.38 2,005.71 8,700.00 8,900.00 2.3%
7,012.81 7,665.66 8,074.38 2,005.71 8,700.00 8,900.00 2.3%
7600-70-70-850-850100-850110-000-0000-
423100
IPERS 7,012.81 7,665.66 8,074.38 2,005.71 8,700.00 8,900.00 2.3%
Total 7,012.81 7,665.66 8,074.38 2,005.71 8,700.00 8,900.00 2.3%
QA OFFICIAL/ADMIN SVCS 0.00 296.37 0.00 0.00 0.00 0.00 0.0%
0.00 296.37 0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
431020
Court Costs & Services 0.00 296.37 0.00 0.00 0.00 0.00 0.0%
Total 0.00 296.37 0.00 0.00 0.00 0.00 0.0%
QB PROFESSIONAL SVCS 17,079.14 5,036.50 562.98 0.00 900.00 900.00 -
90000.0
%
17,079.14 5,036.50 562.98 0.00 900.00 900.00 -
90000.0
%
10/6/2025 1:35:03 PM Page 3 of 10
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 69 of 98
Projection: 27100 - FY27 Operating Budget
Period: Memo
Revised Budget includes Carry Forward
Revenue & Expense Accounts
Next Year Budget Historical Comparison
Accounts Description 2023 Actuals 2024 Actuals 2025 Actuals 2026 Actuals CY Revised
Budget
Projection
Level 1
Percent
Change
7600-70-70-850-850100-850110-000-0000-
432020
Annual Audit 549.00 490.50 562.98 0.00 900.00 900.00 0.0%
7600-70-70-850-850100-850110-000-0000-
432030-
Financial Services & Charges 35.00 0.00 0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
432080
Other Professional Services 16,495.14 4,546.00 0.00 0.00 0.00 0.00 0.0%
Total 17,079.14 5,036.50 562.98 0.00 900.00 900.00 -
90000.0
%
QD DATA AND COMM SVCS 329.32 26.20 155.20 26.92 0.00 0.00 0.0%
329.32 26.20 155.20 26.92 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
435055-
Mail & Delivery 12.68 0.00 0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
435060
Legal Publications 316.64 26.20 155.20 26.92 0.00 0.00 0.0%
Total 329.32 26.20 155.20 26.92 0.00 0.00 0.0%
QE TRAVEL & TRAINING 1,982.46 2,090.60 2,123.03 1,434.98 2,200.00 2,200.00 0.0%
1,982.46 2,090.60 2,123.03 1,434.98 2,200.00 2,200.00 0.0%
7600-70-70-850-850100-850110-000-0000-
436030
Transportation 483.06 568.66 842.75 439.60 600.00 600.00 0.0%
7600-70-70-850-850100-850110-000-0000-
436050
Registration 1,019.00 925.00 525.00 350.00 1,000.00 1,000.00 0.0%
7600-70-70-850-850100-850110-000-0000-
436060
Lodging 415.40 531.94 630.28 582.88 500.00 500.00 0.0%
7600-70-70-850-850100-850110-000-0000-
436080
Meals 65.00 65.00 125.00 62.50 100.00 100.00 0.0%
Total 1,982.46 2,090.60 2,123.03 1,434.98 2,200.00 2,200.00 0.0%
QF INSURANCE 32,082.00 42,665.04 43,459.32 2,372.00 44,000.00 52,000.00 18.2%
32,082.00 42,665.04 43,459.32 2,372.00 44,000.00 52,000.00 18.2%
7600-70-70-850-850100-850110-000-0000-
437010
Comp Liability Insurance 6,155.00 16,246.04 11,027.32 0.00 9,000.00 15,000.00 66.7%
7600-70-70-850-850100-850110-000-0000-
437020
Fire & Casualty Insurance 16,917.00 21,419.00 25,104.00 0.00 28,000.00 31,000.00 10.7%
10/6/2025 1:35:03 PM Page 4 of 10
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 70 of 98
Projection: 27100 - FY27 Operating Budget
Period: Memo
Revised Budget includes Carry Forward
Revenue & Expense Accounts
Next Year Budget Historical Comparison
Accounts Description 2023 Actuals 2024 Actuals 2025 Actuals 2026 Actuals CY Revised
Budget
Projection
Level 1
Percent
Change
7600-70-70-850-850100-850110-000-0000-
437030
Worker's Comp Insurance 2,000.00 2,000.00 1,000.00 0.00 2,100.00 1,000.00 -52.4%
7600-70-70-850-850100-850110-000-0000-
437041
Bonding & Other Insurance 4,010.00 0.00 2,328.00 2,372.00 900.00 1,000.00 11.1%
7600-70-70-850-850100-850110-000-0000-
437200
Loss Reserve Payment 3,000.00 3,000.00 4,000.00 0.00 4,000.00 4,000.00 0.0%
Total 32,082.00 42,665.04 43,459.32 2,372.00 44,000.00 52,000.00 18.2%
QG UTILITY SERVICES 55,243.16 50,655.90 40,018.21 7,454.76 42,600.00 41,800.00 -1.9%
55,243.16 50,655.90 40,018.21 7,454.76 42,600.00 41,800.00 -1.9%
7600-70-70-850-850100-850110-000-0000-
438010
Stormwater Utility Charges 18,938.64 18,944.64 18,944.64 4,736.16 19,800.00 19,000.00 -4.0%
7600-70-70-850-850100-850110-000-0000-
438030
Electricity 20,162.83 20,212.10 10,986.08 1,027.84 10,000.00 10,000.00 0.0%
7600-70-70-850-850100-850110-000-0000-
438050
Landfill Use 190.30 343.40 0.00 39.50 200.00 200.00 0.0%
7600-70-70-850-850100-850110-000-0000-
438070
Heating Fuel/Gas 3,885.18 2,569.76 2,993.93 74.36 5,000.00 5,000.00 0.0%
7600-70-70-850-850100-850110-000-0000-
438080
Sewer Utility Charge 4,827.74 2,868.08 2,221.99 424.63 1,800.00 1,800.00 0.0%
7600-70-70-850-850100-850110-000-0000-
438090
Water Utility Charge 4,640.47 2,943.42 2,450.07 502.77 2,800.00 2,800.00 0.0%
7600-70-70-850-850100-850110-000-0000-
438100
Refuse Collection Charges 2,598.00 2,774.50 2,421.50 649.50 2,800.00 2,800.00 0.0%
7600-70-70-850-850100-850110-000-0000-
438110-
Local Phone Service 0.00 0.00 0.00 0.00 200.00 200.00 0.0%
Total 55,243.16 50,655.90 40,018.21 7,454.76 42,600.00 41,800.00 -1.9%
QI BUILDING R&M SVCS 34,896.87 56,120.76 36,914.76 14,826.05 26,500.00 31,500.00 18.9%
34,896.87 56,120.76 36,914.76 14,826.05 26,500.00 31,500.00 18.9%
7600-70-70-850-850100-850110-000-0000-
442010
Other Building R&M Services 21,101.44 24,521.24 27,352.04 10,982.98 15,000.00 20,000.00 33.3%
7600-70-70-850-850100-850110-000-0000-
442020
Structure R&M Services 4,170.89 7,957.05 1,232.35 0.00 1,500.00 1,500.00 0.0%
7600-70-70-850-850100-850110-000-0000-
442030
Heating & Cooling R&M
Services
4,382.81 12,733.87 3,918.00 1,561.30 5,000.00 5,000.00 0.0%
10/6/2025 1:35:03 PM Page 5 of 10
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 71 of 98
Projection: 27100 - FY27 Operating Budget
Period: Memo
Revised Budget includes Carry Forward
Revenue & Expense Accounts
Next Year Budget Historical Comparison
Accounts Description 2023 Actuals 2024 Actuals 2025 Actuals 2026 Actuals CY Revised
Budget
Projection
Level 1
Percent
Change
7600-70-70-850-850100-850110-000-0000-
442060
Electrical & Plumbing R&M
Srvc
5,241.73 10,908.60 4,412.37 2,281.77 5,000.00 5,000.00 0.0%
Total 34,896.87 56,120.76 36,914.76 14,826.05 26,500.00 31,500.00 18.9%
QJ EQUIPMENT R&M SVCS 10,372.65 13,893.99 22,749.59 2,000.80 10,000.00 15,000.00 50.0%
10,372.65 13,893.99 22,749.59 2,000.80 10,000.00 15,000.00 50.0%
7600-70-70-850-850100-850110-000-0000-
443080
Other Equipment R&M
Services
10,372.65 13,893.99 22,749.59 2,000.80 10,000.00 15,000.00 50.0%
Total 10,372.65 13,893.99 22,749.59 2,000.80 10,000.00 15,000.00 50.0%
QK IT EQUIP R&M SVCS 0.00 0.00 161.15 0.00 0.00 0.00 0.0%
0.00 0.00 161.15 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
444080-
Software R&M Services 0.00 0.00 161.15 0.00 0.00 0.00 0.0%
Total 0.00 0.00 161.15 0.00 0.00 0.00 0.0%
QL OPERATING SERVICES 90,512.88 85,432.79 83,240.70 21,419.82 79,200.00 79,200.00 0.0%
90,512.88 85,432.79 83,240.70 21,419.82 79,200.00 79,200.00 0.0%
7600-70-70-850-850100-850110-000-0000-
445030
Nursery Srvc-Lawn & Plant
Care
46,602.06 57,839.15 51,036.18 19,873.41 50,000.00 50,000.00 0.0%
7600-70-70-850-850100-850110-000-0000-
445080
Snow and Ice Removal 35,317.33 25,692.62 24,860.00 0.00 26,700.00 26,700.00 0.0%
7600-70-70-850-850100-850110-000-0000-
445110
Testing Services 3,709.00 1,323.00 5,603.50 824.00 1,500.00 1,500.00 0.0%
7600-70-70-850-850100-850110-000-0000-
445230
Other Operating Services 4,884.49 578.02 1,741.02 722.41 1,000.00 1,000.00 0.0%
Total 90,512.88 85,432.79 83,240.70 21,419.82 79,200.00 79,200.00 0.0%
QM INTRA-CITY SERVICES 89,558.68 90,924.59 87,430.54 16,587.72 94,800.00 93,500.00 -1.4%
89,558.68 90,924.59 87,430.54 16,587.72 94,800.00 93,500.00 -1.4%
7600-70-70-850-850100-850110-000-0000-
446100
City Attorney Chargeback 7,814.00 7,970.00 8,100.00 2,050.03 8,200.00 8,300.00 1.2%
7600-70-70-850-850100-850110-000-0000-
446120-
ITS-Server/Storage Chgbk 316.57 376.95 456.23 82.20 400.00 500.00 25.0%
10/6/2025 1:35:03 PM Page 6 of 10
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 72 of 98
Projection: 27100 - FY27 Operating Budget
Period: Memo
Revised Budget includes Carry Forward
Revenue & Expense Accounts
Next Year Budget Historical Comparison
Accounts Description 2023 Actuals 2024 Actuals 2025 Actuals 2026 Actuals CY Revised
Budget
Projection
Level 1
Percent
Change
7600-70-70-850-850100-850110-000-0000-
446130
ITS-PC/Peripheral/Tablet S/R 15,842.00 14,868.00 12,348.72 1,902.22 15,200.00 12,300.00 -19.1%
7600-70-70-850-850100-850110-000-0000-
446160
ITS-Infrastucture Fee 8,958.00 8,958.00 9,000.00 0.00 9,900.00 11,900.00 20.2%
7600-70-70-850-850100-850110-000-0000-
446190-
ITS-Software SAAS Chgbk 233.85 234.60 234.60 46.05 300.00 400.00 33.3%
7600-70-70-850-850100-850110-000-0000-
446200
Photocopying Chargeback 689.29 1,200.00 600.00 349.97 1,400.00 1,400.00 0.0%
7600-70-70-850-850100-850110-000-0000-
446300
Phone Equipment/Line Chgbk
1,391.60 1,430.80 1,439.35 250.55 1,600.00 1,700.00 6.3%
7600-70-70-850-850100-850110-000-0000-
446320
Mail Chargeback 151.76 153.42 215.43 312.36 200.00 200.00 0.0%
7600-70-70-850-850100-850110-000-0000-
446350
City Vehicle Replacement
Chgbk
36,516.36 40,751.89 39,950.85 6,959.16 42,000.00 41,100.00 -2.1%
7600-70-70-850-850100-850110-000-0000-
446370
Fuel Chargeback 4,858.57 4,702.52 3,221.20 1,477.57 4,900.00 3,400.00 -30.6%
7600-70-70-850-850100-850110-000-0000-
446380
Vehicle R&M Chargeback 12,786.68 10,278.41 11,864.16 3,157.61 10,700.00 12,300.00 15.0%
Total 89,558.68 90,924.59 87,430.54 16,587.72 94,800.00 93,500.00 -1.4%
QO MISC SVCS & CHARGES 1,320.00 2,485.16 2,438.16 920.00 1,400.00 2,500.00 -
140000.
0%
1,320.00 2,485.16 2,438.16 920.00 1,400.00 2,500.00 -
140000.
0%
7600-70-70-850-850100-850110-000-0000-
449055
Permitting Fees 440.00 968.16 443.16 0.00 400.00 500.00 25.0%
7600-70-70-850-850100-850110-000-0000-
449060
Dues & Memberships 880.00 1,317.00 1,375.00 500.00 1,000.00 1,500.00 50.0%
7600-70-70-850-850100-850110-000-0000-
449120
Equipment Rental 0.00 200.00 620.00 420.00 0.00 500.00 0.0%
Total 1,320.00 2,485.16 2,438.16 920.00 1,400.00 2,500.00 -
140000.
0%
RA GENERAL SUPPLIES 201.55 41.26 58.00 80.95 100.00 100.00 0.0%
201.55 41.26 58.00 80.95 100.00 100.00 0.0%
10/6/2025 1:35:03 PM Page 7 of 10
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 73 of 98
Projection: 27100 - FY27 Operating Budget
Period: Memo
Revised Budget includes Carry Forward
Revenue & Expense Accounts
Next Year Budget Historical Comparison
Accounts Description 2023 Actuals 2024 Actuals 2025 Actuals 2026 Actuals CY Revised
Budget
Projection
Level 1
Percent
Change
7600-70-70-850-850100-850110-000-0000-
452010
Office Supplies 201.55 41.26 58.00 80.95 100.00 100.00 0.0%
Total 201.55 41.26 58.00 80.95 100.00 100.00 0.0%
RC BOOKS & PERIODICALS 541.60 952.60 457.60 0.00 1,000.00 1,000.00 0.0%
541.60 952.60 457.60 0.00 1,000.00 1,000.00 0.0%
7600-70-70-850-850100-850110-000-0000-
454020
Subscriptions 541.60 952.60 457.60 0.00 1,000.00 1,000.00 0.0%
Total 541.60 952.60 457.60 0.00 1,000.00 1,000.00 0.0%
RD COMP & PRINT SUPP 635.46 2,711.20 519.53 43.98 400.00 400.00 0.0%
635.46 2,711.20 519.53 43.98 400.00 400.00 0.0%
7600-70-70-850-850100-850110-000-0000-
455110-
Software 609.98 122.72 349.88 43.98 400.00 400.00 0.0%
7600-70-70-850-850100-850110-000-0000-
455120
Misc Computer Hardware 25.48 2,588.48 169.65 0.00 0.00 0.00 0.0%
Total 635.46 2,711.20 519.53 43.98 400.00 400.00 0.0%
RE AGRICULTURE SUPPLIES 42.39 0.00 0.00 0.00 0.00 0.00 0.0%
42.39 0.00 0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
461050-
Other Agriculture Materials 42.39 0.00 0.00 0.00 0.00 0.00 0.0%
Total 42.39 0.00 0.00 0.00 0.00 0.00 0.0%
RI R&M SUPPLIES 1,049.86 298.70 718.84 8,154.38 500.00 3,000.00 500.0%
1,049.86 298.70 718.84 8,154.38 500.00 3,000.00 500.0%
7600-70-70-850-850100-850110-000-0000-
466070
Other Maintenance Supplies 1,049.86 298.70 718.84 8,154.38 500.00 3,000.00 500.0%
Total 1,049.86 298.70 718.84 8,154.38 500.00 3,000.00 500.0%
RJ EQUIP R&M SUPPLIES 2,121.00 50.93 445.92 0.00 1,100.00 1,100.00 0.0%
2,121.00 50.93 445.92 0.00 1,100.00 1,100.00 0.0%
10/6/2025 1:35:03 PM Page 8 of 10
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 74 of 98
Projection: 27100 - FY27 Operating Budget
Period: Memo
Revised Budget includes Carry Forward
Revenue & Expense Accounts
Next Year Budget Historical Comparison
Accounts Description 2023 Actuals 2024 Actuals 2025 Actuals 2026 Actuals CY Revised
Budget
Projection
Level 1
Percent
Change
7600-70-70-850-850100-850110-000-0000-
467020
Equipment R&M Supplies 2,121.00 50.93 445.92 0.00 1,000.00 1,000.00 0.0%
7600-70-70-850-850100-850110-000-0000-
467160
Other Vehicle R&M Supplies 0.00 0.00 0.00 0.00 100.00 100.00 0.0%
Total 2,121.00 50.93 445.92 0.00 1,100.00 1,100.00 0.0%
RK SURFACING MATERIALS 192.70 171.17 83.82 0.00 300.00 300.00 0.0%
192.70 171.17 83.82 0.00 300.00 300.00 0.0%
7600-70-70-850-850100-850110-000-0000-
468030
Asphalt 192.70 141.04 0.00 0.00 200.00 200.00 0.0%
7600-70-70-850-850100-850110-000-0000-
468050
Sand 0.00 30.13 83.82 0.00 100.00 100.00 0.0%
Total 192.70 171.17 83.82 0.00 300.00 300.00 0.0%
RL OTHER SUPPL & EQUIP 1,169.13 2,194.95 1,269.22 0.00 2,200.00 2,200.00 0.0%
1,169.13 2,194.95 1,269.22 0.00 2,200.00 2,200.00 0.0%
7600-70-70-850-850100-850110-000-0000-
469040-
Traffic Cntrl Imprvmt Supplies 0.00 0.00 16.38 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
469190
Minor Equipment 229.00 761.18 31.19 0.00 500.00 500.00 0.0%
7600-70-70-850-850100-850110-000-0000-
469200
Tools 374.43 53.39 141.44 0.00 500.00 500.00 0.0%
7600-70-70-850-850100-850110-000-0000-
469210-
First Aid/Safety Supplies 445.70 1,296.52 1,080.21 0.00 1,200.00 1,200.00 0.0%
7600-70-70-850-850100-850110-000-0000-
469320
Miscellaneous Supplies 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
469360
Food and Beverages 120.00 83.86 0.00 0.00 0.00 0.00 0.0%
Total 1,169.13 2,194.95 1,269.22 0.00 2,200.00 2,200.00 0.0%
SC IMPRMTS OT BUILDINGS 12,800.00 25,600.00 0.00 0.00 0.00 0.00 0.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
473010
Contracted Improvements 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
Total 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
10/6/2025 1:35:03 PM Page 9 of 10
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 75 of 98
Projection: 27100 - FY27 Operating Budget
Period: Memo
Revised Budget includes Carry Forward
Revenue & Expense Accounts
Next Year Budget Historical Comparison
Accounts Description 2023 Actuals 2024 Actuals 2025 Actuals 2026 Actuals CY Revised
Budget
Projection
Level 1
Percent
Change
120 12,800.00 25,600.00 0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
473010-120
Contracted Improvements 12,800.00 25,600.00 0.00 0.00 0.00 0.00 0.0%
Total 12,800.00 25,600.00 0.00 0.00 0.00 0.00 0.0%
SD VEHICULAR EQUIPMENT 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
474240
Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
Total 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
SF FURNITURE & FIXTURES 1,376.90 0.00 0.00 0.00 0.00 0.00 0.0%
1,376.90 0.00 0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
475010
Furniture & Office Equipment 1,376.90 0.00 0.00 0.00 0.00 0.00 0.0%
Total 1,376.90 0.00 0.00 0.00 0.00 0.00 0.0%
TB OTHER FINANCING USES 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
0.00 0.00 0.00 0.00 0.00 0.00 0.0%
7600-70-70-850-850100-850110-000-0000-
490040
Capital Project Funding 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
Total 0.00 0.00 0.00 0.00 0.00 0.00 0.0%
Grand Total 39,967.69 37,594.26 (760.52)(20,990.61)(30,200.00)(29,900.00)-1.0%
10/6/2025 1:35:03 PM Page 10 of 10
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 76 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 77 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 78 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 79 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 80 of 98
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 81 of 98
CITY OF IOWA CITY
INVOICE LIST BY GL ACCOUNT
Report generated: 10/06/2025 11:44
User: mtharp
Program ID: apinvgla
Page 1
YEAR/PERIOD: 2026/3 TO 2026/3
ACCOUNT/VENDOR INVOICE PO YEAR/PR TYP S WARRANT CHECK DESCRIPTION
76000000 Airport
76000000 220107 Deposits
000119 SWANSON, NAOMI INV104275_Deposit 0 2026 3 INV P 121.00 091925 319605 Hangar #8 Deposit R
ACCOUNT TOTAL 121.00
ORG 76000000 TOTAL 121.00
76850110 Airport Operations
76850110 435060 Legal Publications
010238 IOWA CITY PRESS CITI 0007290880 0 2026 3 INV P 26.92 091925 319580 AUGUST 2025 PRESS C
ACCOUNT TOTAL 26.92
76850110 438030 Electricity
010319 MIDAMERICAN ENERGY 571114302 0 2026 3 INV P 12.32 091225 59081 1801 S RIVERSIDE DR
010319 MIDAMERICAN ENERGY 571148842 0 2026 3 INV P 21.69 091225 59081 1801 S RIVERSIDE DR
010319 MIDAMERICAN ENERGY 571148928 0 2026 3 INV P 286.17 091225 59081 1801 S RIVERSIDE DR
010319 MIDAMERICAN ENERGY 571159524 0 2026 3 INV P 120.92 091225 319427 Bldg D, North T's E
010319 MIDAMERICAN ENERGY 571187656 0 2026 3 INV P 10.10 091225 319427 Runway Lights
451.20
ACCOUNT TOTAL 451.20
76850110 438070 Heating Fuel/Gas
010319 MIDAMERICAN ENERGY 571148654 0 2026 3 INV P 19.02 091225 59081 1801 S RIVERSIDE DR
010319 MIDAMERICAN ENERGY 571148842 0 2026 3 INV P 14.58 091225 59081 1801 S RIVERSIDE DR
33.60
ACCOUNT TOTAL 33.60
76850110 438100 Refuse Collection Charges
011001 ABC DISPOSAL SYSTEMS 1105813 0 2026 3 INV P 176.50 091925 59124 Refuse & Recycling
011001 ABC DISPOSAL SYSTEMS 1105814 0 2026 3 INV P 40.00 091925 59124 Refuse & Recycling
216.50
ACCOUNT TOTAL 216.50
76850110 442010 Other Building R&M Services
010014 ADVANCED ELECTRICAL 68818 0 2026 3 INV P 153.44 091225 59028 Install new Hand Dr
010358 OVERHEAD DOOR COMPAN 059473 0 2026 3 INV P 524.25 091925 319614 Hangar H Door Repai
010358 OVERHEAD DOOR COMPAN 059951 0 2026 3 INV P 253.50 092625 320035 Hangar 22 Cable Rep
777.75
010856 JET AIR INC IOW IVI-25-006587 0 2026 3 INV P 678.00 091225 319406 Groundskeeping and
014647 DAN'S OVERHEAD DOORS 591389 0 2026 3 INV P 232.00 091225 59045 Hangar H Repairs
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 82 of 98
CITY OF IOWA CITY
INVOICE LIST BY GL ACCOUNT
Report generated: 10/06/2025 11:44
User: mtharp
Program ID: apinvgla
Page 2
YEAR/PERIOD: 2026/3 TO 2026/3
ACCOUNT/VENDOR INVOICE PO YEAR/PR TYP S WARRANT CHECK DESCRIPTION
014647 DAN'S OVERHEAD DOORS 591552 0 2026 3 INV P 2,003.00 091225 59045 Hangar H Door Repai
2,235.00
ACCOUNT TOTAL 3,844.19
76850110 442030 Heating & Cooling R&M Services
013430 ALL TEMP REFRIGERATI 12924 0 2026 3 INV P 606.00 091925 319519 Terminal AC repair
013430 ALL TEMP REFRIGERATI 13034 0 2026 3 INV P 955.30 092625 319917 AC Terminal south e
1,561.30
ACCOUNT TOTAL 1,561.30
76850110 443080 Other Equipment R&M Services
010014 ADVANCED ELECTRICAL 68940 0 2026 3 INV P 199.02 092625 59578 South Vehicle Gate
010384 PYRAMID SERVICES INC 233384 0 2026 3 INV P 85.22 091925 319618 Equipment Repairs -
010647 CENTRAL PETROLEUM EQ 51509 0 2026 3 INV P 228.00 100325 320125 Fuel Storage Tank R
010856 JET AIR INC IOW IVI-25-006600 0 2026 3 INV P 368.40 091225 319406 Maintenance Reimbur
ACCOUNT TOTAL 880.64
76850110 445030 Nursery Srvc-Lawn & Plant Care
010856 JET AIR INC IOW IVI-25-006587 0 2026 3 INV P 6,215.00 091225 319406 Groundskeeping and
010856 JET AIR INC IOW IVI-25-006600 0 2026 3 INV P 437.09 091225 319406 Maintenance Reimbur
6,652.09
ACCOUNT TOTAL 6,652.09
76850110 466070 Other Maintenance Supplies
010856 JET AIR INC IOW IVI-25-006600 0 2026 3 INV P 14.83 091225 319406 Maintenance Reimbur
011180 BLUEGLOBES LLC IOW-64993 0 2026 3 INV P 8,139.55 092625 319929 Runway and Taxiway
ACCOUNT TOTAL 8,154.38
ORG 76850110 TOTAL 21,820.82
FUND 7600 Airport TOTAL: 21,941.82
** END OF REPORT - Generated by Michael Tharp **
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 83 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 1
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 Airport Operations
76850110 321910 Misc Permits & Licenses
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 331100 Federal Grants
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 362100 120 Contrib & Donations
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 363910 Misc Sale of Merchandise
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 369100 Reimb of Expenses
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 369900 Miscellaneous Other Income
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 381100 Interest on Investments
0.00 0.00 0.00 -705.10 0.00 705.10 100.0%
76850110 382100 Land Rental
-55,000.00 0.00 -55,000.00 -19,962.14 0.00 -35,037.86 36.3%
76850110 382200 Building/Room Rental
-325,000.00 0.00 -325,000.00 -79,052.39 0.00 -245,947.61 24.3%
2026/03/090209 09/08/2025 GBI -176.00 REF HANGAR RENT - September 2025
2026/03/090492 09/17/2025 GBM 172.00 REF
2026/03/090915 09/22/2025 GBI -26,395.13 REF
76850110 382300 Equipment Rental
-1,300.00 0.00 -1,300.00 -425.00 0.00 -875.00 32.7%
2026/03/090988 09/18/2025 CRP -122.50 REF 5229664 OTHER
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 84 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 2
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 384100 Telephone Commission
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 384200 Vending Machine Commission
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 384900 Other Commissions
-75,000.00 0.00 -75,000.00 -23,864.25 0.00 -51,135.75 31.8%
2026/03/090493 09/17/2025 GBI -699.90 REF Fuel Flowage - 6999 gal
2026/03/090988 09/18/2025 CRP -5,744.85 REF 5229698 OTHER
2026/03/090988 09/18/2025 CRP -8,395.20 REF 5229699 OTHER
2026/03/091650 09/23/2025 CRP -8,284.20 REF 5232943 OTHER
76850110 392100 Sale of Land
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 392300 Sale of Equipment
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 392400 Gain/Loss on Sale
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 393120 General Levy
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 393910 Misc Transfers In
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 411000 Perm Full Time
92,600.00 0.00 92,600.00 17,899.43 0.00 74,700.57 19.3%
2026/03/090097 09/05/2025 PRJ 3,347.20 REF 083025 WARRANT=083025 RUN=1 BIWEEKLY
2026/03/090506 09/19/2025 PRJ 3,347.20 REF 091325 WARRANT=091325 RUN=1 BIWEEKLY
76850110 412000 Perm Part Time
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 413000 Temporary Employees
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 414500 Longevity Pay
0.00 0.00 0.00 0.00 0.00 0.00 .0%
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 85 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 3
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 421100 Health Insurance
9,700.00 0.00 9,700.00 2,228.70 0.00 7,471.30 23.0%
2026/03/090097 09/05/2025 PRJ 371.45 REF 083025 WARRANT=083025 RUN=1 BIWEEKLY
2026/03/090506 09/19/2025 PRJ 371.45 REF 091325 WARRANT=091325 RUN=1 BIWEEKLY
76850110 421200 Dental Insurance
400.00 0.00 400.00 100.68 0.00 299.32 25.2%
2026/03/090097 09/05/2025 PRJ 16.78 REF 083025 WARRANT=083025 RUN=1 BIWEEKLY
2026/03/090506 09/19/2025 PRJ 16.78 REF 091325 WARRANT=091325 RUN=1 BIWEEKLY
76850110 421300 Life Insurance
200.00 0.00 200.00 49.38 0.00 150.62 24.7%
2026/03/090506 09/19/2025 PRJ 16.46 REF 091325 WARRANT=091325 RUN=1 BIWEEKLY
76850110 421350 Group Life - Imputed
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 421400 Disability Insurance
300.00 0.00 300.00 76.17 0.00 223.83 25.4%
2026/03/090506 09/19/2025 PRJ 25.39 REF 091325 WARRANT=091325 RUN=1 BIWEEKLY
76850110 422100 FICA
7,000.00 0.00 7,000.00 1,348.48 0.00 5,651.52 19.3%
2026/03/090097 09/05/2025 PRJ 251.94 REF 083025 WARRANT=083025 RUN=1 BIWEEKLY
2026/03/090506 09/19/2025 PRJ 252.36 REF 091325 WARRANT=091325 RUN=1 BIWEEKLY
76850110 423100 IPERS
8,700.00 0.00 8,700.00 1,689.73 0.00 7,010.27 19.4%
2026/03/090097 09/05/2025 PRJ 315.98 REF 083025 WARRANT=083025 RUN=1 BIWEEKLY
2026/03/090506 09/19/2025 PRJ 315.98 REF 091325 WARRANT=091325 RUN=1 BIWEEKLY
76850110 424900 Other Post Employment Benefits
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 431020 Court Costs & Services
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 432020 Annual Audit
900.00 0.00 900.00 0.00 0.00 900.00 .0%
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 86 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 4
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 432030 Financial Services & Charges
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 432050 Appraisal Services
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 432080 Other Professional Services
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 432080 651 Other Professional Services
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 435055 Mail & Delivery
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 435056 Delivery Services
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 435057 Couriers
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 435060 Legal Publications
0.00 0.00 0.00 26.92 0.00 -26.92 100.0%
2026/03/090328 09/09/2025 API 26.92 VND 010238 VCH IOWA CITY PRESS AUGUST 2025 PRESS CITIZEN PUBL 319580
76850110 436030 Transportation
600.00 0.00 600.00 439.60 0.00 160.40 73.3%
2026/03/090097 09/05/2025 PRJ 439.60 REF 083025 WARRANT=083025 RUN=1 BIWEEKLY
76850110 436030 651 Transportation
0.00 0.00 0.00 0.00 0.00 0.00 .0%
2026/03/090097 09/05/2025 PRJ 439.60 REF 083025 WARRANT=083025 RUN=1 BIWEEKLY
76850110 436050 Registration
1,000.00 0.00 1,000.00 350.00 0.00 650.00 35.0%
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 87 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 5
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 436060 Lodging
500.00 0.00 500.00 0.00 0.00 500.00 .0%
76850110 436060 651 Lodging
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 436070 Miscellaneous Travel Expense
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 436080 Meals
100.00 0.00 100.00 62.50 0.00 37.50 62.5%
2026/03/090097 09/05/2025 PRJ 62.50 REF 083025 WARRANT=083025 RUN=1 BIWEEKLY
76850110 437010 Comp Liability Insurance
9,000.00 0.00 9,000.00 0.00 0.00 9,000.00 .0%
76850110 437010 651 Comp Liability Insurance
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 437020 Fire & Casualty Insurance
28,000.00 0.00 28,000.00 0.00 0.00 28,000.00 .0%
76850110 437030 Worker's Comp Insurance
2,100.00 0.00 2,100.00 0.00 0.00 2,100.00 .0%
76850110 437041 Bonding & Other Insurance
900.00 0.00 900.00 2,372.00 0.00 -1,472.00 263.6%
76850110 437200 Loss Reserve Payment
4,000.00 0.00 4,000.00 0.00 0.00 4,000.00 .0%
76850110 438010 Stormwater Utility Charges
19,800.00 0.00 19,800.00 4,736.16 0.00 15,063.84 23.9%
2026/03/090430 09/17/2025 CRP 1,578.72 REF C -250917 2026 UB UB
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 88 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 6
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 438030 Electricity
10,000.00 0.00 10,000.00 1,027.84 0.00 8,972.16 10.3%
2026/03/090227 09/05/2025 API 286.17 VND 010319 VCH MIDAMERICAN ENE 1801 S RIVERSIDE DR, 59081
2026/03/090227 09/05/2025 API 21.69 VND 010319 VCH MIDAMERICAN ENE 1801 S RIVERSIDE DR 59081
2026/03/090227 09/05/2025 API 12.32 VND 010319 VCH MIDAMERICAN ENE 1801 S RIVERSIDE DR, 59081
2026/03/090274 09/08/2025 API 120.92 VND 010319 VCH MIDAMERICAN ENE Bldg D, North T's Electricity 319427
2026/03/090274 09/08/2025 API 10.10 VND 010319 VCH MIDAMERICAN ENE Runway Lights 319427
76850110 438050 Landfill Use
200.00 0.00 200.00 39.50 0.00 160.50 19.8%
76850110 438070 Heating Fuel/Gas
5,000.00 0.00 5,000.00 74.36 0.00 4,925.64 1.5%
2026/03/090227 09/05/2025 API 14.58 VND 010319 VCH MIDAMERICAN ENE 1801 S RIVERSIDE DR 59081
2026/03/090227 09/05/2025 API 19.02 VND 010319 VCH MIDAMERICAN ENE 1801 S RIVERSIDE DR, 59081
76850110 438080 Sewer Utility Charge
1,800.00 0.00 1,800.00 424.63 0.00 1,375.37 23.6%
2026/03/090430 09/17/2025 CRP 158.62 REF C -250917 2026 UB UB
76850110 438090 Water Utility Charge
2,800.00 0.00 2,800.00 502.77 0.00 2,297.23 18.0%
2026/03/090430 09/17/2025 CRP 184.77 REF C -250917 2026 UB UB
76850110 438100 Refuse Collection Charges
2,800.00 0.00 2,800.00 649.50 0.00 2,150.50 23.2%
2026/03/090329 09/10/2025 API 176.50 VND 011001 VCH ABC DISPOSAL SY Refuse & Recycling Pickup & Di 59124
2026/03/090329 09/10/2025 API 40.00 VND 011001 VCH ABC DISPOSAL SY Refuse & Recycling Pickup & Di 59124
76850110 438100 651 Refuse Collection Charges
0.00 0.00 0.00 0.00 0.00 0.00 .0%
2026/03/090329 09/10/2025 API 176.50 VND 011001 VCH ABC DISPOSAL SY Refuse & Recycling Pickup & Di 59124
2026/03/090329 09/10/2025 API 40.00 VND 011001 VCH ABC DISPOSAL SY Refuse & Recycling Pickup & Di 59124
76850110 438110 Local Phone Service
200.00 0.00 200.00 0.00 0.00 200.00 .0%
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 89 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 7
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 438120 Long Distance Service
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 442010 Other Building R&M Services
15,000.00 0.00 15,000.00 10,892.98 0.00 4,107.02 72.6%
2026/03/090219 09/02/2025 API 153.44 VND 010014 VCH ADVANCED ELECTR Install new Hand Dryer - Hanga 59028
2026/03/090219 09/02/2025 API 232.00 VND 014647 VCH DAN'S OVERHEAD Hangar H Repairs 59045
2026/03/090219 09/02/2025 API 2,003.00 VND 014647 VCH DAN'S OVERHEAD Hangar H Door Repairs 59045
2026/03/090274 09/08/2025 API 678.00 VND 010856 VCH JET AIR INC IOW Groundskeeping and Janitorial 319406
2026/03/090466 09/10/2025 API 524.25 VND 010358 VCH OVERHEAD DOOR C Hangar H Door Repairs 319614
2026/03/090932 09/19/2025 API 253.50 VND 010358 VCH OVERHEAD DOOR C Hangar 22 Cable Replacement 320035
76850110 442020 Structure R&M Services
1,500.00 0.00 1,500.00 0.00 0.00 1,500.00 .0%
76850110 442030 Heating & Cooling R&M Services
5,000.00 0.00 5,000.00 1,561.30 0.00 3,438.70 31.2%
2026/03/090466 09/10/2025 API 606.00 VND 013430 VCH ALL TEMP REFRIG Terminal AC repair 319519
2026/03/090932 09/19/2025 API 955.30 VND 013430 VCH ALL TEMP REFRIG AC Terminal south end 319917
76850110 442040 Cooling Equipment R&M Services
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 442060 Electrical & Plumbing R&M Srvc
5,000.00 0.00 5,000.00 2,281.77 0.00 2,718.23 45.6%
76850110 442070 Bldg Pest Control Services
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 443050 Radio Equipment R&M Services
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 443080 Other Equipment R&M Services
10,000.00 0.00 10,000.00 2,000.80 0.00 7,999.20 20.0%
2026/03/090274 09/08/2025 API 326.01 VND 010856 VCH JET AIR INC IOW Maintenance Reimbursement 319406
2026/03/090274 09/08/2025 API 42.39 VND 010856 VCH JET AIR INC IOW Maintenance Reimbursement 319406
2026/03/090466 09/10/2025 API 85.22 VND 010384 VCH PYRAMID SERVICE Equipment Repairs - Grass blow 319618
2026/03/091061 09/19/2025 API 199.02 VND 010014 VCH ADVANCED ELECTR South Vehicle Gate Repairs 59578
2026/03/091683 09/30/2025 API 228.00 VND 010647 VCH CENTRAL PETROLE Fuel Storage Tank Repairs 320125
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 90 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 8
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 444060 Cable & Electrical R&M Srvcs
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 444080 Software R&M Services
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 445030 Nursery Srvc-Lawn & Plant Care
50,000.00 0.00 50,000.00 19,873.41 0.00 30,126.59 39.7%
2026/03/090274 09/08/2025 API 6,215.00 VND 010856 VCH JET AIR INC IOW Groundskeeping and Janitorial 319406
2026/03/090274 09/08/2025 API 437.09 VND 010856 VCH JET AIR INC IOW Maintenance Reimbursement 319406
76850110 445080 Snow and Ice Removal
26,700.00 0.00 26,700.00 0.00 0.00 26,700.00 .0%
76850110 445100 Towing
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 445110 Testing Services
1,500.00 0.00 1,500.00 824.00 0.00 676.00 54.9%
76850110 445140 Outside Printing
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 445140 651 Outside Printing
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 445230 Other Operating Services
1,000.00 0.00 1,000.00 722.41 0.00 277.59 72.2%
76850110 446010 Administrative Services
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 446100 City Attorney Chargeback
8,200.00 0.00 8,200.00 2,050.03 0.00 6,149.97 25.0%
2026/03/091723 09/30/2025 GEN 683.33 REF REJE#2 Airport to Attorney
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 91 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 9
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 446120 ITS-Server/Storage Chgbk
400.00 0.00 400.00 82.20 0.00 317.80 20.6%
76850110 446130 ITS-PC/Peripheral/Tablet S/R
15,200.00 0.00 15,200.00 1,902.22 0.00 13,297.78 12.5%
76850110 446140 ITS-Capital Replacement Chgbk
0.00 0.00 0.00 388.16 0.00 -388.16 100.0%
76850110 446150 ITS-Application Dvlp Fee Chgbk
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 446160 ITS-Infrastucture Fee
9,900.00 0.00 9,900.00 0.00 0.00 9,900.00 .0%
76850110 446190 ITS-Software SAAS Chgbk
300.00 0.00 300.00 46.05 0.00 253.95 15.4%
76850110 446200 Photocopying Chargeback
1,400.00 0.00 1,400.00 349.97 0.00 1,050.03 25.0%
2026/03/091726 09/30/2025 GEN 116.67 REF CopChb Copier Chargebacks
76850110 446220 Phone Service Chargeback
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 446300 Phone Equipment/Line Chgbk
1,600.00 0.00 1,600.00 250.55 0.00 1,349.45 15.7%
76850110 446320 Mail Chargeback
200.00 0.00 200.00 312.36 0.00 -112.36 156.2%
76850110 446350 City Vehicle Replacement Chgbk
42,000.00 0.00 42,000.00 6,959.16 0.00 35,040.84 16.6%
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 92 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 10
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 446360 City Vehicle Rental Chargeback
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 446370 Fuel Chargeback
4,900.00 0.00 4,900.00 1,477.57 0.00 3,422.43 30.2%
76850110 446380 Vehicle R&M Chargeback
10,700.00 0.00 10,700.00 3,157.61 0.00 7,542.39 29.5%
76850110 448040 City Sponsored Event
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 449055 Permitting Fees
400.00 0.00 400.00 0.00 0.00 400.00 .0%
76850110 449060 Dues & Memberships
1,000.00 0.00 1,000.00 500.00 0.00 500.00 50.0%
76850110 449100 651 Vehicle Rental
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 449120 Equipment Rental
0.00 0.00 0.00 420.00 0.00 -420.00 100.0%
76850110 449120 651 Equipment Rental
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 449280 Misc Services & Charges
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 449350 Meals (non-travel)
0.00 0.00 0.00 0.00 0.00 0.00 .0%
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 93 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 11
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 449360 Interest Expense
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 449370 Depreciation Expense
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 452010 Office Supplies
100.00 0.00 100.00 0.00 0.00 100.00 .0%
76850110 452030 Minor Office Equip/Furniture
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 452040 Sanitation & Indust Supplies
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 454020 Subscriptions
1,000.00 0.00 1,000.00 0.00 0.00 1,000.00 .0%
76850110 455110 Software
400.00 0.00 400.00 21.99 0.00 378.01 5.5%
76850110 455120 Misc Computer Hardware
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 461040 Other Agriculture Chemicals
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 461050 Other Agriculture Materials
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 465010 651 Other Fluids & Gases
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 466040 Plumbing Supplies
0.00 0.00 0.00 0.00 0.00 0.00 .0%
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 94 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 12
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 466050 Electrical Supplies
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 466070 Other Maintenance Supplies
500.00 0.00 500.00 8,154.38 0.00 -7,654.38 1630.9%
2026/03/090274 09/08/2025 API 14.83 VND 010856 VCH JET AIR INC IOW Maintenance Reimbursement 319406
2026/03/090932 09/19/2025 API 8,139.55 VND 011180 VCH BLUEGLOBES LLC Runway and Taxiway Lights 319929
76850110 466070 652 Other Maintenance Supplies
0.00 0.00 0.00 0.00 0.00 0.00 .0%
2026/03/090274 09/08/2025 API 14.83 VND 010856 VCH JET AIR INC IOW Maintenance Reimbursement 319406
2026/03/090932 09/19/2025 API 8,139.55 VND 011180 VCH BLUEGLOBES LLC Runway and Taxiway Lights 319929
76850110 467020 Equipment R&M Supplies
1,000.00 0.00 1,000.00 0.00 0.00 1,000.00 .0%
76850110 467160 Other Vehicle R&M Supplies
100.00 0.00 100.00 0.00 0.00 100.00 .0%
76850110 468030 Asphalt
200.00 0.00 200.00 0.00 0.00 200.00 .0%
76850110 468050 Sand
100.00 0.00 100.00 0.00 0.00 100.00 .0%
76850110 469040 Traffic Cntrl Imprvmt Supplies
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 469190 Minor Equipment
500.00 0.00 500.00 0.00 0.00 500.00 .0%
76850110 469200 Tools
500.00 0.00 500.00 0.00 0.00 500.00 .0%
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 95 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 13
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 469210 First Aid/Safety Supplies
1,200.00 0.00 1,200.00 0.00 0.00 1,200.00 .0%
76850110 469260 Fire Ext & Refills
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 469290 Purchases For Resale
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 469290 652 Purchases For Resale
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 469320 Miscellaneous Supplies
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 469320 651 Miscellaneous Supplies
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 469360 Food and Beverages
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 469999 PCard Reconciliation
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 473010 Contracted Improvements
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 473020 Non-Contracted Improvements
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 474240 Tractors
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 475010 Furniture & Office Equipment
0.00 0.00 0.00 0.00 0.00 0.00 .0%
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 96 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 14
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ACCOUNTS FOR: 7600 Airport
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
76850110 476070 PC Hardware
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 490040 Capital Project Funding
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 490150 Operating Subsidy
0.00 0.00 0.00 0.00 0.00 0.00 .0%
76850110 490190 Interfund Loan
0.00 0.00 0.00 0.00 0.00 0.00 .0%
TOTAL Airport Operations
-30,200.00 0.00 -30,200.00 -25,681.61 0.00 -4,518.39 85.0%
TOTAL Airport
-30,200.00 0.00 -30,200.00 -25,681.61 0.00 -4,518.39 85.0%
TOTAL REVENUES
-456,300.00 0.00 -456,300.00 -124,008.88 0.00 -332,291.12
TOTAL EXPENSES
426,100.00 0.00 426,100.00 98,327.27 0.00 327,772.73
PRIOR FUND BALANCE 11,949.52
CHANGE IN FUND BALANCE - NET OF REVENUES/EXPENSES 25,681.61
REVISED FUND BALANCE 37,631.13
Airport Commission Agenda & Info Packet
Meeting Date: Oct 9, 2025 Page 97 of 98
CITY OF IOWA CITY
YEAR-TO-DATE BUDGET REPORT
Report generated: 10/06/2025 11:43
User: mtharp
Program ID: glytdbud
Page 15
FY2026 BUDGET - SEPTEMBER DETAIL
FOR 2026 03 JOURNAL DETAIL 2026 3 TO 2026 3
ORIGINAL APPROP TRANS/ADJSMTS REVISED BUDGET YTD ACTUAL ENCUMBRANCES AVAILABLE BUDGET % USED
GRAND TOTAL
-30,200.00 0.00 -30,200.00 -25,681.61 0.00 -4,518.39 85.0%
** END OF REPORT - Generated by Michael Tharp **