Loading...
HomeMy WebLinkAbout1995-05-30 Minutes numberedCity of Iowa City MEMORANDUM Date: To: From: Re: June 9, 1995 Mayor and City Council City Clerk Council Work Session - CIP, May 30, 1995 - 6:35 p.m. in the Council Chambers Mayor Susan Horowitz presiding. Council present: Horowitz, Baker, Kubby, Lehman, Novick, Throgmorton, Pigott (6:40 p.m.). Staff present: Atkins, Helling, Woito, Karr, Ogren, Franklin, Yucuis, Craig, Trueblood, Schmadeke, Davidson, Fosse, Elias. Tapes: 95-70, All; 95-71, All. WATER AND WASTEWATER PROJECTS: Reel 95-70, Side 1 City Manager Atkins, Public Works Director Schmadeke, and Finance Director Yucuis presented information. Council directed Finance Director Yucuis to prepare wastewater fee structures based on phase-in and accumulating cash totaling 20% and 25% of the project cost. CONTINUED - SEE ITEM AFTER STREET RECONSTRUCTION LIBRARY UPDATE: Reel 95-70, Side 1 Library Board of Trustees Chair Greenleaf presented a summary of the library building options and distributed a summary of revised options. (Separate list of CIP projects attached.) CIP - PARKS & RECREATION PROJECTS: Reel 95-70, Side 2 Parks and Recreation Department Director Trueblood presented parks and recreation capital improvement projects. Trueblood reported that Cemetery Staffmember Wonick is preparing a memo regarding cemetery options. CIP - STREET RECONSTRUCTION AND NEW STREETS: Reel 95-70, Side 2 Public Works Director Schmadeke, City Engineer Fosse, PCD Asst. Dir. Davidson, and Pollution Control Superintendent Elias presented capital improvement street reconstruction and new street projects. After discussion Council requested information from Eagle's regarding the Eagle's-Towncrest project timetable; consideration of transportation system management to manage traffic volumes; and a traffic calming infrastructure line item be added to the CIP budget. 2 WATER AND WASTEWATER PROJECTS CONTINUED: Reel 95-71, Side 1 City Manager Atkins and Finance Director Yucuis provided Council with a revised 5/30 wastewater projects - phase-in and accumulation of cash chart, page 3a. Atkins stated he will prepare a wastewater projects financing option memo that will accumulate 25% cash, leveling out rates with a 4-5 year project phase-in. CIP CONTINUED: Reel 95-71, Side 1 Public Works Director Schmadeke, City Engineer Fosse, PCD Asst. Dir. Davidson, and PCD Director Franklin presented the capital improvement bridge projects, pedestrian bike projects, stormwater, wastewater, landfill, and other projects. Council directed staff add streetscape improvements to the Iowa Avenue project. Meeting adjourned at 9:40 p.m. c~e,X~c~pS-30,min PARKS- RECREATION Hickory Hill Trail Hunters Run Park Kiwanis Park Benton Street Park Napoleon Park Renovation Parks Maintenance Building U of I Softball Complex Llghttng Cemetery Expand Recreation Center Expand Mercer Aquatic Center South Sycamore Soccer Complex Indoor Ice Rink Open Space- Land Acquisition Parkland Development Parks Maintenance Footbridge Shelter Improvements Sidewalk Replacement Accessibility Parking LOtS I 0,000 10,000 5,000 25,000 15,000 $ 50,000 $ 200,000 $ 75,000 $ 40,0O0 $ 460,000-700,000 $ 500,000 $ 150,000 '$ 7 $ 4,500,000 $ 1,400,000 $ 700,000 $ 2,000,000 $ 350,000 $ 350,000 $ 455,000 STREET RECONSTRUCTION Burlington and Gilbert Intersection First Avenue- D tO Muscafine Melrose- Byington to Hawkins Traffic Signal / Intersection- ACT / Hwy 1 Dodge Street- Governor to Dubuque · River Street- Riverside. to Wooff Willow Street- Muscafine to Brookside Highway 6- Left Turn at Fffst Highway 1 · Sunset Right Tum WooIf Avenue- Newton to River First Avenue. Muscatine to Bradford Gilbert- Hwy 6- Dual Left Turn Benton- Greenwood to Orchard Sycamore- Hwy 6 to Deforest Dubuque- Foster Intersection American Legion- Scott to Taft Annual Asphalt Resurfacing Traffic Signals- Miscellaneous $12,000 540,000 6O0,OOO 500,000 1,339,000 910,000 200,000 100,000 1 O0 000 510 000 540 000 39O 000 850 000 180 000 930 000 1,600,000 2,000,000 350,000 NEW STREETS Southgate Avenue Scott Boulevard Phase I Phase II Phase III East- West Arterial Phase 1 Phase II Phase III First Avenue Extended $ 2,015,000 $ 1,865,000 $ 1,765,000 $ 1,535,000 $ 870,000 $ 1,147,000 · Hickory to E-W Foster Road- Dubuque- Prairie du Chien Camp Cardinal / Highway 965 East- West Parkway Sand to Sycamore Sycamore to Detention Basin Basin to Saddlebrook Saddlebrook to East Properly Line East Line to Sioux Avenue Court Street Extended to Taft Sycamore- South through Langenberg $ 324,000 $ 525,000 '$ 1,700,000 $ 3,404,000 $ 3,300,000 $ 850,000 $ 850,000 $ 40O,OOO $ 600,000 $ 60O,OOO $ 1,850,000 $ 150,000 STORMWATER Shamrock- Peterson South Sycamore Detention Basin Kiwanis Park Sandusky Sunset Street Hafor Iowa Interstate Railroad - Seventh to First Sump Pump Discharge Revise FEMA Flood Maps $ 114,000 $ 800,000 $ 210,000 $ 81,700 $ 300,000' $ 500,000 $ 350,000 $ 75,000 $ ? WASTEWATER Scott Park Area Trunk Sewer Melrose Market' Sewer River Street Sewer Southwest Interceptor Sewer East Iowa City Trunk Peninsula Sewer and Lift Station B'jaysville Lane Sewer $ 1,600,000 $ 340,000 $ 20,500 $ 200,000 $.7,500,000 '3,000,000 $ 502,000 $ 110,000 LANDFILL Ceil Construction Hazard Waste / Recycling Building Landf~ Cover Additional Land $ 2,000,000 $ 450,000 $ 500,000 $ ~ STREET RECONSTRUCTION Whteffront · North of Southgate Sycamore- Bums to City limits Sycamore- City limits south to comer Foster- West of Dubuque Slothbower Road 420th Street near Industrial' Park Melrose - Hwy 2 18 to West High School (Unimproved) $ 350,000 $ 943,000 $ 769,000 $ 1,205,000 $ 2,$40,000 $ 800,000 $ 2,740,000 Melrose Woolf Burlington Summit Second Meadow Rochester Brookside Pedestrian Overpass- BRIDGES Hwy 6 $ 1,764.,000 $ 880,000 $ 595,000 $ 1,0 t 6,000 $ t 75,000 $ 275,000 $ 100,000 $ 175,000 $ 720,000 PEDESTRIAN / BICYCLE PROJECTS Iowa River Trail System willow Creek Trail Curb Ramps (ADA) Longfellow Area- Tunnel under railroad Mormon Trek Sidewalk- Hwy 6 to Melrose Intra-CtW Bike Trails $ $ $ $ $ $ 900,0O0 150,000 700,000 t 35,000 150,000 210,000 OTHER PROJECTS Multi-Use Parking Facility- Near Southside Streetscape - Near Southside Industrial Park Fire Station Fire Training Facility Cultural / Conference Center Public works Complex Civic Center- Third Fioor Police- Second Floor Land Acquisition - Ralston Creek Library Expansion Airport Land Acquisition- Ralston Creek Geographic Information System (GIS) City Plaza- Facelift Summit Street Historic Plan 4.,000,000 700.000 4,000,000 1.000,000 700,000 8,500,000 2.000,000 650,000 300,000 ? 2,000,000 0.000,000 750,000 200,000 200,000