Loading...
HomeMy WebLinkAbout2002-01-29 Council minutes City of Iowa City MEMORANDUM To: Mayor and City Council From: Marian K. Karr, City Clerk Date: January 29, 2002 Re: Council Work Session, January 29, 2002, 8:10 a.m. in Emma J. Harvat Hall Council: Champion, Kanner (8:15), Lehman, O'Donnell, Pfab, Vanderhoef, Wilburn (8:25) Staff: AtkJns, Helling, Karr, O'Malley, Mansfield, Herting, Davidson, Franklin, Schmadeke, Trueblood, Fosse Tapes: 02-10, Side Two; 02-12, Both Sides; 02-13, Side One (A complete transcription and materials distributed are available in the City Clerks office) Council continued utilizing the following flip chart developed from the previous budget session of 1/24 to indicate projects the Council wanted to consider separately starting with Waterworks Park (first podion of the chart discussed 1/24): Proiect Direction Budqet Public Art $50,000 a year -$250,000 X Mormon Trek Ext 1-921 Fire Truck out 2 years -$800,000 X Station #4 - Staff '05 JCCOG Traffic Calming $10,000 a year -$ 75,000 (road use tax) X Civic Center X Open Space/Parkland Waterworks Park (*See chad #2 below) X Camp Cardinal Rd/Clear Creek X Foster Road-Dubuque $1,000,000+900,000 X Economic Development City Park Pool '04 X Nodh Side Market Place Library FTE's ? Move out '04/eliminate Council Work Session 1-29-02 Page 2 (After further discussion the direction was added to the flip chart along with budget ramifications. "X" indicates agreement to leave as presented.) (*Chart #2) Butler House 50,000 + 50,000=$100,000 Roads/Parking Waterworks $76,000 Water Revenue Miller Orchard Park $200,000 '05? 276,000 $376,000 Majority of Council referred the matter to Parks & Recreation Commission for a decision on distribution of $200,000 originally planned for Miller-Orchard. Staff provided information on: · Power Dam project, a presentation on the proposed bridge design will be scheduled · North Side Market Place · Fire Station #4 · Library FTE's After discussion changes were noted on the flip charts. Meeting later in the day (6:30 PM) to hear from Boards & Commissions and community organizations. The Mayor noted that another budget meeting would be needed and asked Members to bring their calendars to tonight's meeting to discuss scheduling; and encouraged Members to make a list of items to help focus the next meeting on any changes. Council reaffirmed their desire to set up a joint meeting with the Airport Commission. Staff provided information on: · Airport Subsidy Plan, schedule joint meeting · Public Power Study, schedule separate work session · Deer Kill, questioned change to skip 03 and do in 04, staff will furnish information Human Services Council Member Vanderhoef questioned if the City would help fund Human Services agencies through assistance with their utility needs rather than with cash dollars from the general fund. She suggested retaining the City amount committed last year (thus reducing the hit on the general fund), and the CDBG funds of $105,000, and capping the total at $360,000. Vanderhoef will prepare additional information and allocation report for further discussion. Meeting adjourned 11:45 A.M. clerkJmem/worksess 1-29~2 doc BUTLER HOUSE TRAIL HEAD PARK PROJECT BUDGET = $100,000 1) Parking Lot (1/2 construction cost) $ 50,000 2) Trail from Parking Lot to Butler House $ 25,000 3) Trail Connector to Dubuque Street $ 25,000 WATER WORKS PARK PROJECT BUDGET = $250,000 COMPONENT WATER SHARE PARKS SHARE TOTAL COST 1) Parking Lot 50,000 0 $ 50,000 (1/2 construction cost) 2) Well & Pond Access Roads 30,000 0 $ 30,000 3) Ampitheater Access Walks 14,500 14,500 $ 29,000 4) Ampitheater Stage 3,500 3,500 $ 7,000 5) Wetland Access Walk 33,000 0 $ 33,000 6) South Trail Extension 19,000 19,000 $ 38,000 7) Shelters (2) 0 37,000 $ 37,000 8) Storm Sewer, Silt Fence, 26,000 0 $ 26,000 Earthwork, Erosion Control TOTAL 176, 000 74, 000 $ 250, 000 MILLER / ORCHARD PARK PROJECT FY02 FUNDING = $ 200,000 (G.O. Bonds) PROPOSAL: 1) Transfer this $200,000 to the FY02 "Waterworks Park" project, which will enable us to do the prairie grass & wild flower plantings, and some of the park components such as shelters, limited trail segments and part of the "amphitheater" costs. 2) Transfer $10,000 from the FY02 "Parkland Development" account to the "Miller / Orchard Park" account. This will provide for cleaning up the 2 acre parcel of parkland and minimal park development, as per the neighborhood's wishes (i.e. removing poison ivy, dead trees and undesirable brush; possibly some grass seeding and other small plantings; installation of park benches, picnic tables and other small amenities as may be desired by neighborhood residents). 3) Budget $200,000 in FY05 for development of a larger Miller / Orchard Park in the event two more acres of parkland can be obtained as desired by the neighborhood. Input from the neighborhood will be required for the development, but it is anticipated that it would include a number of items typically associated with a neighborhood park such as: park shelter(s), playground equipment, basketball court, sand volleyball court, park benches, picnic tables, barbecue grills, security lighting, sidewalks, landscaping, and signage.