HomeMy WebLinkAbout2ndQuarterhandoutConstruction Site Erosion and
Sediment Control Resources:
I. Standards and Specifications for Erosion and
Sediment Control Practices and Stormwater Quality:
Statewide Urban Design Standards and Specifications
www.iowasudas.org
II. General Permit # 2 for Construction Sites:
http://www.iowadnr.com/water/stormwater/index.html
http://www.iowadnr.com/water/stormwater/forms.html
Questions Regarding General Permit Number 2: Joe Griffin
IDNR Central Office Stormwater Coordinator 515-281-7017
IDNR Field Offices Contact Information:
District 1 Manchester 563-927-2640 District 4 Atlantic 712-243-1934
District 2 Mason City 641-424-4073 District 5 Des Moines 515-725-0268
District 3 Spencer 712-262-4177 District 6 Washington 319-653-2135
III. Statewide General Stormwater Information:
www.iowastormwater.org
IV. Construction Site Erosion and Sediment Control
Training Events:
www.iowastormwater.org
www.iamu.org
Look under the Stormwater Button