Loading...
HomeMy WebLinkAbout2ndQuarterhandoutConstruction Site Erosion and Sediment Control Resources: I. Standards and Specifications for Erosion and Sediment Control Practices and Stormwater Quality: Statewide Urban Design Standards and Specifications www.iowasudas.org II. General Permit # 2 for Construction Sites: http://www.iowadnr.com/water/stormwater/index.html http://www.iowadnr.com/water/stormwater/forms.html Questions Regarding General Permit Number 2: Joe Griffin IDNR Central Office Stormwater Coordinator 515-281-7017 IDNR Field Offices Contact Information: District 1 Manchester 563-927-2640 District 4 Atlantic 712-243-1934 District 2 Mason City 641-424-4073 District 5 Des Moines 515-725-0268 District 3 Spencer 712-262-4177 District 6 Washington 319-653-2135 III. Statewide General Stormwater Information: www.iowastormwater.org IV. Construction Site Erosion and Sediment Control Training Events: www.iowastormwater.org www.iamu.org Look under the Stormwater Button