~ACKFLOW PREVENTION ASSEMBLY TEST DATA AND MAINTENANCE REPORT
TYPE OF A~$EMgLY
· ~EIGHT OF;
TrME
6:30
MANUFACTUI~R
PROTG~TION FROM:
INITIAL TEST Passed Faired
REDUCED PRESSURE pRINCIPAL ASSEMBLY: n m
13193510?4?
SUPPLY ~:~/,t..~ IN. GAP '~ IN. I~ FA,L
T ST CHECK held in
direction of flow <~j~, ~. PSID .(S PSID or more) [] 1:3
RELIEF VALVE
opened at C4.~. PSID (2 PSID or more) [] 13
DIFFERENCE
(1st ~heck - relief) C4';_~_ PSID (3 PSID or more) [] []
2ND CHECK held backpressure [] []
NO. 2 SHUTOFF VALVE leak tight [] []
2ND CHECK held in
d;rectlon of flow ~..__~ PSID (1 PSID or more) [] []
RELIEF VALVE exercised to full open position [] []
NOTE: Failure of any of the above items, requires repair.
COMMENTS: I NEW' ~ISTALL~TION
I
~ YES [] NO
INITIAL TEST Passed Failed
DOUBLE CHECK VALVE ASSEMBLY: []
1 ST CHECK held in
direction of flow PSID (1 PSID or more) [3 []
2ND CHECK held hat'pressure
NO. 2 SHUTOFF VALVE leak tight
2ND CHECK held. in
direction of tlow. PSID (1 PSID or more) ¢3 []
NOTE: Failure of any of the above itenl$, requires repa'.'r.
FINAL TEST AFTER REPAIR Passed Failed
REDUCED PRESSURE PRINCIPAL ASSEMBLY: [] O
INITIAL TEST
PRESSURE VACUUM BREAKER; Passed
internal check held tight in direction of flow
PSID {1 PSID or more) []
Inlet Poppet opened at~ PSID
(1 PS[D or more) []
NOTE: Failure of any of the above items, requires repair.
INITIAL TEST
APPROVED APPLICA'/'IONS ONLY
Failed
[]
APPROVED APPECA T/ON$ OIVL Y
1ST CHECK held in
direction of flow PSID {5 PSID or more)
RELIEF VALVE
opened at ~ PSID (2 PSID or more)
DIFFERENCE
(1st check - relief) PSID {3 PSID or more)
2ND CHECK held bac~pressure
NO. 2 SHUTOFF VALVE le~k tight
2ND CHECK held in
direction of flow · PSID (1 PSID or more)
RELIEF VALVE exercised to full open position
FINAL TEST Al- IER REPAIR Passed Failed
DOUBLE CHECK VALVE ASSEMBLY: [] []
1ST CHECK held in
direction of flow PSID (1 PSID or more) O D
2ND CHECK held backpressure I~ 0
NO. 2 SHUTOFF VALVE leak right ~ []
2ND CHECK held in
direction of flow PSID {1 PSID or more) L3 []
ANTI-SPILL VACUUM BREAKER; Passed Failed
Oii~ferential pressure across check was
PSID (1 PSID or more) [] D
Air inlet star: tO open at . PSID
l1 PSlD or more) [] O
Air inlet [ully open when supply pressure
atmospheric [] []
NOTE: Failure of any of the above items, requires repai~.
FINAL TEST AFTER REPAIR
PRESSURE VACUUM BREAKER: Passed Failed
internal check held tight in direction of flow
PSID {1 PSID or more) ~'.1 []
Inlet Poppet opened at~ PSID
{1 PSID or morel [] O
FINAL TEST AFTER REPAIR
ANTI,SPILL VACUUM BREAKER: Passed Failed
Differentinl pressure across check was
PSID (1 PS1D or more) [] []
Air inle~ start to open at PSID
(1 PSID of morel 1:3 El
Air inlet fully open when supply pressure
atmospheric O O
COMMENTS
REPAIR HISTORY
,' THE ASOVE .E.ORT IS RTIPIE TO ^CCU T'E ^.O COMPUETE.
~ompanv & Ad,ross:
AAA Mechanical Contractors,_ . Inc._. P.O. ~x ~05, _Iowa. City
0296
Pho..
MAR-O?-2002 10:48 AAA MECHAN I CAL CONTRACTOR
IACKFLOW PREVENTION ASSEMBLY TEST DATA AND MAINTENANCE REPORT
... I
13193510?4?
METER NUMeER
P.03/04
TIM; "~'A,M,
HEr~HT It:]FI= ItLOOPl ~ I~0T~:TION FROM,'
INITIAL TEST Passed Failed
REDUCED PRESSURE PRINCIPAL ASSEMBLY: m []
1ST CHECK held in ,,_~
direction of flow ~ ,PSIO '(5 PSID or more) r't []
RELIEF VALVE
opened et ~,1~ PSID (2 PSID or more) D 13
DIFFERENCE
Ilst check - reliefi ~ PSID (3 PS;D or more) []
[]
2ND CHECK held backpressure [] []
NO. 2 SHUTOFF VALVE leek tight [] []
2ND CHECK held in
direction of flow ]~c~ PSlD (1 PSID or morel El
RELIEF VALVE exercised to full open position [] El
FINAL TEST AFTER REPAIR Passed Failed
REDUCED PRESSURE PRINCIPAL ASSEMBLY: [] []
1ST CHECK held in
direction of flow PSID (5 PSID or more) CI []
RELIEF VALVE
opened at PSID (2 PSID or more) [] []
DIFFERENCE
(1st check - relief) ~ PSID {3 PSID or more) [] J []
2ND CHECK held backpressure ~ []
NO. 2 SHUTOFF VALVE leek tight [] []
2ND CHECK held in
direction of flow PSID (1 PSID or more) [] []
RELIEF VALVE exercised to fuji open position [] []
NOTE: Failure of a~ly of the above items, requires repair.
INITIAL TEST Passed Failed
DOUBLE CHECK VALVE ASSEMBLY: ~ E]
1ST CHECK held in
direction of flow PSID (1 PSID or more) [] []
2ND CHECK held backpressure [] []
NO. 2 SHUTOFF VALVE leak tight [] []
2ND CHECK held in
directk)n of flow PSID [1 PSID or more) 0 []
NOTE: Failure of any of' ti3; above items, requires repair.
FINAL TEST AFTER REPAIR Passed Failed
DOUBLE CHECK VALVE ASSEMBLY:
1ST CHECK held in
direction of flow PSID (1 PSID or more) [] []
2ND CHECK held bac~cpressure [] []
NO. :2 SHUTOFF VALVE leak tight [] []
2ND CHECK held in
direction of flow PSID (~ P$ID or more) i~ []
INITIAL TEST
PRESSURE VACUUM BREAKER: Passed
Internal check held tight in direction of flow
PSID (1 PSID or more} 13
In(et Poppet o~ened at~ PSID
(1 PSIO or mote) 0
NOTE: Failure of any of the above items, requires repair.
INITIAL TEST
~ PPRO VEO A ~PI. IC.4 7'iONS ONLY
Failed
[]
APPROVED AP?L/CA T/ON$ ONLY
FINAL TEST AFTER REPAIR
PRESSURE VACUUM BREAKER: Passed Failed
Interna~ check held tight in direction of flow
PSIO (1 PSID or more) [] []
Inlet Poppet opened al: ~ PSID
(1 PSiD or more) [] r-i
FINAL TEST AFTER REPAIR
ANTI-SPILL VACUUM BREAKER: Passed Failed
Differential pressure across check was
'PSID [1 PSID or more] [] []
Air inlet start to open at PSID
{1 PSID or more) ED []
),ir in[at fully open when supply pressure
atmospheric 1~ []
NOTE; Fa[lute of any of the above items, requites reps}to
ANTI-SPILL VACUUM BREAKER: Passed Failed
Differentia] pre, sure across check was
PSID (1 PSID or morel In O
Air inlet start [o open at ..-- PSID
{1 PSIO or morel [] 13
Air inlet fully open when supply pressure
atmospheric [] []
COMMENTS
REPAIR M~STORY
THE ~,~OVE REPORT I$ cERTIFIED TO BE TRUE, A~TE AND COMPLETE.
7~sTed ~V: [Pcmnt]
Comoany & Address:
AAA Mechanical
' Cu~TO~f of
Contractors, Ing. P.O. Box 805, .~owa Cit~ J 319/351-1843
ARA MECHRNICAL CONTRRCTOR
MAR-O?-2002 10:49
BACKFLOW PREVENTION ASSEMBLY TEST DATA AND MAINTENANCE REPORT
13193S10747 P.04×04
IN,
INBV [NS'rAJJ.k?IQN
INITIAL TEST Pas~ed Failed
REDUCED PRESSURE PRINCIPAL ASSEMBLY: 1:3 El
I ST CHECK held in
direction of flow [] [3
RELIEF VALVE
opened at 13 []
DIFFERENCE.
(1 st check - relief) /"{'-.__~ PSID {3 PSIO o¢ more) 13 13
2ND CHECK held backpressure [] []
NO, 2 SHUTOFF VALVE leak tight [3 [3
2ND CHECK held in
direction of flow '?..,~ PSID (1 PSID or more) 13 13
RELIEF VALVE exercised to full open position [] 1:3
~,1~ PSID (5 PSID or more)
~ PSID (2 PSID or more)
FINAL TEST AFTER REPAIR Passed Failed
REDUCED PRESSURE PRINCIPAL ASSEMBLY: [] 13
1 ST CHECK held in
direction of flow ~ PSID {5 PSID or more) [] []
RELIEF VALVE
opened at ~. PSIO (2 PSID or more) [] 13
DIFFERENCE
(1st check, relief) __ PSID (3 PSID or more)
2ND CHECK held backpressure 13 13
NO. 2 SHUTOFF VALVE leak tight 13 []
2NO CHECK held in
direction of flow ~-- pSID (1 PSIO or more) 13
RELIEF VALVE exercised to full open position 13 []
NOTE: Failure of any of the above items, requires repair.
INITIAL TEST Passed Failed
DOUBLE CHECK VALVE ASSEMBLY: [] O
1 ST CHECK held in
direction of flow PSID I1 PSID or more) [3 []
2ND CHECK held bac~l~ressure [] []
NO, 2 SHUTOFF VALVE leak tight [] O
2ND CHECK held in
direction of lIow PSID (1 PSID or morel r3 []
FINAL TEST AFTER REPAIR
NOTE: Failure of any ~-f-the above kerns, requires repa?r.
INITIAL TEST
PRESSURE VACUUM BREAKER: Passed
Internal check held rich! in direction of flow
PS1D (1 PSID or morel O
In~et P~ppet ol3ened et__ PSID
(1 PSID or more) []
NOTE: Failure of any of the above items, requires repair.
.4PPROVEO APPI. IC4 T/ONE ONLY
Failed
[]
INITIAL TEST
APPROVED APPf./CA TION$ ONLY
DOUBLE CHECK VALVE ASSEMBLY:
1ST CHECK held in
direction of flow PSID (1 PSID or more) [] []
2ND CHECK held backpressure ID []
NO, 2 SHUTOFF VALVE leak tight I;3 []
?_ND CHECK hzld in
direction or flow __. PSID (1 PSID or more) []
Passed Failed
ANTI.SPILL VACUUM BREAKER: Passed Failed
Differential pressure across check was
PSID (1 PSID or more) [] []
Air inlet star~ I:o open at PSID
(l PSID or more) [] O
Air )nlet ~ull,/ ogen when supply pressure
atmospheric [] []
NOTE: Failure of any of the above items, requires repair,
FINAL TEST AFTER REPAIR
PRESSURE VACUUM BREAKER; Passed Failed
Internal check held tight in direction of flow
PSID (1 PSID or more) L:I [3
Inlet Poppet opened at~ PSID
(1 PSID or more) [3 []
FINAL TEST AFTER REPAIR
ANTI,SPILL VACUUM BREAKER: Passed Failec
Differen[ial pressure across check was
PSID (1 PSID or more) [] D
Air inlet start Co open at PSID
(1 PSID or more) [] O
Air inlet fully open when supply pressure
atmospheric ~
COMMENTS
REPAIR HISTORY
THE ABOVE REPORT IS CERTIFIED T~ !~E TRUe;, ACCURATE--- AND COMPLETE.
-tF ~ Signature Oa~e
Te~ce~ ey: [PrlnU
AAA Mechanical Contractors, Inc. ~_. gm-- ~gX 8 0 ] , .Iowa City
o~96_ _
319/351-1843_
· Date
TnTQI 13 DIA
MAR-O?-2002 10:47 AAA MECHANICAL CONTRACTOR 13193510?4?
)ACKFLOW PREVENTION ASSEMBLY TEST DATA AND MAINTENANCE REPORT
CUSTOME~ [ ClJ:~TQM~.,q NUMe~ i II1~. NUIm~;.q
P.01704
(IN./F'T.J
TmM~ I~A.M.
;, 5;50
MANUFACTURER,
SUPI~.Y PRESSURE
MODEL
IMETER NMMSER
P~OTECYtON FROM;
FR;I~71NG ~ YES [] NO RLOOOiNO ~ Y~S [] NO
SUPPLY ~,~..~ IN. GAP "~ iN.
INITIAL TEST
REDUCED PRESSURE PRINCIPAL ASSEMBLY:
1ST CHECK held in
direction of flow
RELIEF VALVE
opened et
OIFFERENCE
(1 st check - relief)
_~__ PSID (5 PSID or more)
~. ~.. PSID (2 PSID or more)
. PSID {3 PSID or mere)
2ND CHECK held backpressure
NO. 2 SHUTOFF VALVE leak tight
2ND CHECK held in
direction of flow ~ PSID (1 PSID or more)
RELIEF VALVE exercised to full open position
Passed Failed
FINAL TEST AFTER REPAIR Passed Failed
REDUCED PRESSURE PRINCIPAL ASSEMBLY: [] 1:3
1ST CHECK held [n
direction of flow ~ PSID (5 PSID or more) [] 1:3
RELIEF VALVE
opened at __. PSID (2 PSID or more) El O
DIFFERENCE
{1st check - relief) PSiD (3 PSID or more) [] j El
2ND CHECK held bach, pres'sure E! []
NO. 2 SHUTOFF VALVE le~k tight []
2ND CHECK held in
direction of flow ~ PSID [1 PSID or more) [] 13
RELIEF VALVE exercised to full open position [] []
[] 0
C] []
NOTE: Failure of any of the above items, requires repair.
FINAL TEST AFTER REPAIR Passed Failed
DOUBLE CHECK VALVE ASSEMBLY: Q E~
1 ST CHECK held in
direction of flow PSID (1 PSID or more) [3 []
2ND CHECK held backpressure [] []
NO, 2 SHUTOFF VALVE leak tight [] []
2ND CHECK held in
direction of flow PSID (1 PSID or more) [3 []
INITIAL TEST Passed Failed
DOUBLE CHECK VALVE ASSEMBLY:
1 ST CHECK held in
direction of flow PSID (1 PSIO or more) c3 []
2ND CHECK held backpressure [] []
NO. 2 SHUTOFF VALVE leek tight El []
2ND CHECK h-Id in
direction of flow PSID (1 PSID or more) Cl n
NOTE: Failure of any of the above items, requires repair.
INITIAL TEST
PRESSURE VACUUM BREAKER: Passed
Internal check held tight in direction of flow
PSID {1 PSID or more) []
Inlet Poppet ooened at~ PSID
[1 PSIO or more) ~
NOTE: Failure of any of the above ]terns, requires repair.
APPROVED APPUCA T/ON5 0NL Y
Failed
APPROVED APP?.../CA 770NS ONLY
FINAL TEST AFTER REPAIR
PRESSURE VACUUM BREAKER: passed Failed
Internat check held tight in direction of flow
PSID l1 PSID or more) [] []
Inlet Poppet opened at __ Pale
{1 PSID or more) I~ Et
FINAL TEST AFTER REPAIR
iNITIAL TEST
ANTI-SPILL VACUUM BREAKER: passed Failed
Differential pressure acre55 check was
PSID (1 PSID er morel [] []
Air inlet start to open at PSID
(1 P$ID or more) D []
Air inlet fully open when supply pressure
atmospheric [] []
ANTI-SPILL VACU'UM BREAKER; Passed Failed
Differential pressure across check was
PS[D (1 PSID or more) ~] []
.a,i~' inlet start to open at . PSID
~1 PSID or more) [] O
Air inlet fully open when supply pressure
atmospheric [] []
NOTE: Failure of any of the above items, requires repair.
COMMENTS
MEPA,n HISTORY
- THE ABOVE REPORT IS CERTIFIED TO BE'~UE, ACCU~T'E AND COMPLETE.
, Mike Jones /~~ ~~- ,~
AAA Mechanical
Contractors, In.c.P.O. Box 8051 Iowa Ci.t¥
0296_
Phone