Loading...
HomeMy WebLinkAbout3/27/2002 bfp20evansIOWA OTY - PUBLIC DRINKING WATER PROGRAM BACKFI~OW PREVENTION ASSEMBLY TEST DATA AND MAINTENANCE REPORT StJ pet. y ~ESSLJ~E StJPPLY . IN, G~P IN. SERIAL NUM~iER INITIAL TEST Passed Failed REDUCED PRESSURE PRINCIPAL ASSEMBLY: ~ [] I ST CHECK held in direc:ion of ,,ow (~.'7 PSID RELIEF VALVE opened at ,~-' PSID (2 PSID or more)'¢~,.~' [] DIFFERENCE (lst check - relief) f/.(~ P:-;ID (3 PSiD or more),./,-'Z~ [] 2NO CHECK held backpressure .,,B'/ [] NC.. 2 SHUTOFF VALVE leak tight '/J~ [] 2ND CHECK held in / direction of flow [_ov~' PSiD (1 PStD or more) /Z~- [] RELIEF VALVE exerci~-~d"-~o full open position __~__ [] NOTE: Failure of any of the above items, requires repair. FINAL TEST AFTER REPAIR Passed Failed REDUCED PRESSURE PRINCIPAL ASSEMBLY: [] 1 ST CHECK held in direction of flow PStO (5 PSID or more) [] [] RELIEF VALVE opened at PSID (2 PSID or more) [] [] DIFFERENCE (1st check - relief) PSID (3 PSID or more) t-i J [] 2ND CHECK held backpressure [] [] NO. 2 SHUTOFF VALVE Teak tight 2ND CHECK held in direction of flow PSID (1 PSID or more) [] [] RELIEF VALVE exercised to full open position [] [] INITIAL TEST Passed Failed [3OUBLE CHECX VALVE ASSEMBLY: [] [] i ST CHECK held in direction of flow PSiD (1 PS1D or more) 12 [] 2ND CHECK held backpressure [] [] NO. 2 SHUTOFF VALVE leak tight CT [] 2ND CHECK held in direction of flow PSID (~ PStD cr more) [] [] NOTE: Failure of any of the above items, requires repair. FINAL TEST AFTER REPAIR Passed Failec DOUBLE CHECK VALVE ASSEMBLY: D O 1ST CHECK held in direction of flow FSID (1 PSID cr more) [] [] 2NO CHECK held backpressure [] [] NO. 2 SHUTOFF VALVE leak tight [] [] 2ND CHECK held in direction of flow PSID (1 PSID or more) I:2 [] INITIAL TEST PRESSURE VACUUM BREAKER: Passed !nternai check held tight in direction of flow PSID (1 PSID or more) [] Inlet Poppet opened at PSiD I1 PS1[} or more) ID NOTE: Failure of any of the above items, requires repair. APPROVED APPUCA TIGNS ONLY Failed [] [] FINAL TEST AFTER REPAIR PRESSURE VACUUM BREAKER: Passed Internal check held tight in direction of flow PStD (1 PSID or more) E: Inlet Poppet opened at PSID (1 PSID or more) [] INITIAL TEST ANTI-SPILL VACUUM BREAKER: Passed Differential pressure across check w~s PSiD (1 PSiD or more) [] ~ir ~nlet start to open at PStD !i PSIO or mcre) D Air iniet fully open when supply pressure atmospheric [] NOTE: Failure of any of the above items, requires repair. ,z, PPNC VE~, A??L/CA 7'/C/VG ONLY Failed n [] FINAL TEST AFTER REPAIR ANTI-SPiLL VACUUM BREAKER: Passed Faile Differential pressure across check was PSID (1 PSi[3 or more) 0 [] Air inlet start to open at PSID (1 PSID or more) ID ¢2 Air inlet fully open when supply pressure atmospheric C 0 C O M M E hi T S FEPA, iR HISTORY THE ABOVE REPORT IS '~:ERTIFIED TO BE TRUE. ACCURATE AND FOM, PLETE/. ~X Bo~s Co., ~nc. 2865 Stoner Court,