HomeMy WebLinkAboutCIP HandoutA,0 O!C
2
Cm a1 w cRY
%3011 -f .'.
Capllal Mpmva * ft,m
Bunnvy
L \T/'w
NAM
Cly., —aft
FY1012 -F 19
Capllal Immo�amama proyam
Bunmary
♦n+
f.
vwamF
��
�AO�+
rw�am
�..Rers
Mwa
we,®
tlon
aoi¢
a �.N
L \T/'w
NAM
MIYw Oti
1
Cly., —aft
FY1012 -F 19
Capllal Immo�amama proyam
Bunmary
m
MIYw Oti
1
z
#4850 Rock Island Railroad
Depot Acquisition
,Y
�5.
LANDFILL and
PUBLIC UTILITIES
hut
#3137 North River Corridor y.'=
Trunk Sewer Reconstruction 7„
4
CIP Funding Sources ' 't
Federal Aviation Administration
Pays 95% of the project cost
Large scale projects
Iowa Dept. of Transportation –
Office of Aviation
Pays 70 -85% of the project
cost
Smaller scale projects
FY2015 - t
#3430 Apron Reconstruction &
Connecting Taxiway
FY2014
#3442 — Update Master Plan _ ---�
Runway 12 -30, Part 77 Obstruction "
Mitigation
r
IT'Y
FY2014
#3442 — Update Master Plan _ ---�
Runway 12 -30, Part 77 Obstruction "
Mitigation
r
Ll
#3812 American Legion /Scott !Z
Blvd Intersection Improvements
r =� a
#3814 Traffic Signal Projects .,="
Highway 218 and Me vase Ave Old Highway 218 and McCollister Blvd
Las ..... ....._
..call Blvd and Muscatine Ave
#3829 US 6 East
Rehabilitation
y
•a
u
#3849 Brick Street
Reconstruction
1 s�
#3854 American Legion
Road Scott /Taft Avenue ~.
II
A
FLOOD R)ECOVERY
and MITIGATION T,
a
Flood Mitigation Strategies "-'z
1. Buyout flood impacted residential properties within the
100 year and 500 year floodplams and convert them to
open space
2 For remaining homes, implement realistic protection
measures such as elevation of structures, elevation of
mechanical systems, back0ow prevention valves and
protection of access
3 Protect cnbcal infrastructure. First priority. Dubuque
Street and Park Road Bridge. Second priority .
relocate the North Wastewater Facility
a If funding becomes available for levees and Floodwalls,
consider such strategies in flood prone
neighborhoods.
#3135 South Wastewater t =��
Plant Expansion
12
13
14
401, ICI* 0
we 10
no
15
16
#3971
Central Business District ' !
_ Maintenance Proect
#4130
�A Parks Annual
Improvements &
AN, Maintenance
#4137 A96FW—
Frauenholtz- Miller
Park Development
IN
I1LVJ
Pedestrian Bridge
Rocky Shore Dr. to Peninsula
#4222 Hwy 1 SidewalklTrail
Riverside Dr. to Sunset St.
#4321y °.T,
Waterworks Park
Hospice Memorial
UBLIC SAFETY
#4406 Fire Apparatus
"717 -
L E \ S51
#4411 Fire SCBAIAir 4 +,�
System Replacement
% 0, �.
Y
EC4IOMIt
FNVEh_QFVOI T
l
#4513
Riverfront
Crossings
Itlecenl MUOIng
rethinking use of the
nvedront
Reintroduction of
Passenger Rail as a
catalyst
Redevelopment of
Gilbert Street
Encourage mixed -use
development in a
mixed -use
neighborhood
;IL
# 4514 Towncrest Redevelopment Plan
• Create a Towncrest Theme Li
reestablish Towncrest as a destination
• Revitalize existing commerc
buildings
• Encourage new mixed -use
buildings
IWIF
22
ON THE RADAR
Burlington Street Median
i' r-
Burlington Street Traffic { - ".i,
Signal Pre - Emption
24
Mormon Trek Left Turn
+=qt
Lanes
t
W�Y'+
�..
Riverside Drive Streetscape { - =T
au. a �l>Cr
k
a l
a ,,
Economic Development
• Riverfront Crossings Multi
Use Facility
• College St / Gilbert St NE
Corner (Old Greyhound
and Wilson Building site)
• Moss -Green Office Park
• Fire - damaged downtown
properties
• HWY 1 /HWY 6 Public
Works site
91
Iowa Riverbank Stabilizationy1Yy
Project
Police Firing Range ` =Ti
u
f
QUESTIONS
and
DISCUSSION