HomeMy WebLinkAbout03/10/2005 Historic Preservation Commission
IOWA CITY HISTORIC PRESERVATION COMMISSION
THURSDAY, MARCH 10,2005
City Hall, 410 E. Washington Street
Emma J. Harvat Hall
7:00 p.m.
A. Call to Order
B. Public discussion of anything not on the agenda
C. Items for Consideration (vote required)
1. Certificate of Appropriateness:
a. 618-622 Iowa Avenue
b. 1227 Sheridan Avenue
c. 308 S Governor Street
d. 528 E College Street
e. 529 Brown Street
2. Meeting Minutes - February 10, 2005 and February 15, 2005 Special Meeting
D. Other
1. Discussion with Kerry McGrath, SHSI Local Government Coordinator
2. Memo from Tim Hennes, Iowa City Senior Building Inspector
3. Preservation Week
E. Adjourn
Application for Historic Review
Application for alterations to the exterior of historic landmarks or properties
located in a historic district or conservation district pursuant to Iowa City
Code Section 14-4C.
Meeting schedule: The HPC meets the second Thursday of each month.
During the summer months, the HPC may also meet on the fourth Thursday.
Applications are due by Wednesday the week prior to the meeting.
For 'Staff Use: .
Date submitted .......l..-::..:2:.l.12..........................
1:1 Certificate of No Material Effect
1:1 Certificate of Appropriateness
1:1 Major review
1:1 Intermediate review
1:1 Minor review
Applicant Information
(Please check primary contact person)
1:1 Owner .....LZ.l?..X.~.k-?..N......P.eQ.Ç?.~lf,;,I.J..~.s
Ph 0 ne ........'þ. 5:..(.. .'::'".... -:::1.. {,¡r, -:1..IR..........................................
Address ...3i.~.....~........ß..Qg.U.b1..fD..:rD.N:.....
....J:Q..~..~......~..L~..~...t.......:s:.Q..w.A...............
email.................................................................................................
1:1 Contractor ........JAY.:\Á.t5:.S.......A......Cb~~\~
Address ...................J..~..eG...........ç:.b~.gJ,?..........
.....3..1..z.......E..:......~Uj~...b..t.N.~..T.Q..t::~l........
Phone .....3..5....1. ..::::.....'::J..~..']..4?.......... ....................... .........
email.................................................................................................
1:1 Consultant .......J.b'v.!d.E.:$........é..J::....~..'e..t.?.......
Address ......... ................... .................................. ... ...................... ....
..................................~A.~.E"...............................................
Phone ...............................................................................................
...........................................................................................................
email.................................................................................................
Application Requirements
Attached are the following items:
'sI Site plan
1:1 Floor plans
I:ia' Building elevations
~ Photographs
1:1 Product information
1:1 Other ... ................. .............................. .............. ........ ......
If the proposed project entails an addition, a new structure or
a significant alteration to an existing structure, please submit a
site plan, floor plans. building elevations and photographs.
If the proposed project is a minor alteration to a structure,
please provide drawings and photographs to sufficiently
describe the scope of the project.
Provide a written description of the proposed project on the
second page of this application.
Property Information
Address of property ......(g,J..a....::..~.Æ:.~........~g~~...hU G
......J;.9.~..~.........~..~.~.~...~........!:.º..w..A:....................
Use of property ..........M..~..~~...~.....~...E.~..m.L~.y..........
Date constructed (if known) .........b..9..f?...Þ............................
Historic Designation
1:1 This property is a local historic landmark
OR
;a: This property is located in the:
1:1 Brown Street Historic District
1:1 College Green Historic District
. East College Street Historic District
1:1 Longfellow Historic District
1:1 Summit Street Historic District
1:1 Woodlawn Historic District
1:1 Clark Street Conservation District
IS College Hill Conservation District
1:1 Dearborn Street Conservation District
1:1 Lucas-Governor Street Conservation District
Within the district. this property is classified as:
1:1 Contributing
)( Noncontributing
1:1 Nonhistoric
Project Type
;ø Alteration of an existing building (ie. siding and window
replacement, skylights, window opening alterations, new
decks, porch reconstruction, baluster repair or similar)
~ Addition to an existing building (includes decks and ~)
1:1 Demolition of a building or portion of a building (ie. porch,
chimneys, decorative trim, baluster or similar)
1:1 Construction of new building
1:1 Repair or restoration of an existing structure that will not
change its appearance
1:1 Other
Project description
.........................6.P..þ...............~..~.A.b~..........f;?..S..Ç.9..ª.A..}...~..~.S?...........tì..A.~.:;P!::::!...~.~..?................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
..........................................................................................................................................................................................................
..........................................................................................................................................................................................................
..........................................................................................................................................................................................................
Materials to be used
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
..........................................................................................................................................................................................................
..........................................................................................................................................................................................................
Exterior appearance changes
................M..º..I~.~..........:I..~.~.Þ....~3..~..º..~.t~..~.........h.Q.f.?!~.L.r.4..~........................................................................................
.......................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................
..........................................................................................................................................................................................................
..........................................................................................................................................................................................................
..........................................................................................................................................................................................................
..........................................................................................................................................................................................................
..........................................................................................................................................................................................................
..........................................................................................................................................................................................................
..........................................................................................................................................................................................................
..........................................................................................................................................................................................................
7
/
<"-J
'::i~
«
,
,\
\
~ I II
1-
~IKX)I ==
J IIX. x.n ===
:~ ~===
===
.J ---
III
/ Tr'I"r
/
J
~
\\
.\ .l
z
o
1-
<W
»
w<:
-1
W<:
I~
¡-o
=>c()
0_
(f).<.Q
I I
I I
I I
I I
I 1
>-'
W ill I
> I
-< 0 I
l:)<JW :
Z3:< > I
601'0..
...J-([)O:::W
_(I)<::tCLf-
:J.-.LDa..<
m<DN<O
o
O::.-J
«
0-
"ZU
a::<w
Ol-a..
O(J)(f)
o .
I-"":N
Z
o
a::
IJ..
z
o
0::
-
3:
0......
..I- ~5:
(J)I >-
dGoou
<~ooz
0:::0:::00<
3:3:3:LL
>-
~"":N(y)~
U I I I 1
...J I I I I
< I I
m I I I 1
(f)
~
1-1.0
"WOQ)
(1)1-< X
...JW 0 (I)
~o:::o:::o:.::
3: U ;:::!f- u
Z<o::O
~80:::1-0:::
Z",,:N(y).q:
:< II I
I- I I I I
W I I I I
0::: I I I I
o
w
(f)1J"J
....0
>.
WI-...
O:::~
I
I
I
(f) :
W I
a.. I
>- I
I- I
I
;iô 0:::
....Z:cW
a::......_I
WOO:::l-
I-(ñl-O
< ..
:t:"":N(y)
(f)
Gô
t;ZO:::
.-J-O
-00
~<:ño
"":N(Y)
0::
o
...J
o
U
(f)(f)
(J)ZO:::
Z:CW
_.:c::::JG
(f)::::J.-JZ
I-.-JO<
O::OUI
o
o.U.-J.-J
o.OWW
:JOWW
(f)01-1-
3:(f)(f)
>-
Z "NM
0......
U I I I
...J I I I
< I I I
£D I f I
í ~:~.~.~
I
~.
()
.....
\-
.~
. >
\1/
;.J ,
. M.¡........
II
,.~'
~._~
\0-
~ \1J
V) 'J
<t
-<41- .u
~V)
t)
<
L
<
. I
'-
'.~'..'<
..::.~
:?'?£
1/ ./
~
,,0,9
II o;~
", , '".
1I1C"9
oy/n
b I I
Ii
-II 11
.... ~
·1
"
~~ i
. , Ò .'"
,~~ i
"C), '........, 'J " ¡
'~ ~ I¥ . 'j
Q
I\;
'I ! ¡!) I
I
i
\ I
(J
()
-....9
I
i
I
I
I
......" I
-O-
j
L.. ___
.... ;. ..... .' [ -.---
~n~
\
" ,I
-0-
I
I
1
,
..<:0
........
II
~
-~
IIJ
.J ~
~ v)
if)
CI)
-I
l.(¡
).
lU
..J
~
<t
.J -..!
!l. .,.J
~ '1
"
'-'
o
J
k.
~
«
.,.J
-
¡
Ii
)1
:.
;1
'I
¡
!I
,
I
i
~
¡
1
,I
:1
:¡
!¡
. '1
1 :
i
i
/' DNe.. AL.LÆ.Y -- /
I
~,
, I I
I
I I , I I
I I ! , L I
, I 1--- L ~.. ··-·1 I
~ I I i I t I
, I I I I
c\J I I I I
I I
I , I I ,
I I I I
I I I
I I
,
~
'\{)
"
"I
L
I ,.
I
- -- - --
~. .,
¡ - --
"'
! \J
!
- - ."'-c - - --
I
"') ,
/",....-' t
. ___ J
---- I
I
~~ . I ~é~
-. . J
-------- I
I
I
I
..-------¡
I
I
..1
I
-------¡
I
I
I
, ,
~
~i t---i---
~-~
- - -
- - -..
"' , - - - - 1
-'~-
61ð - t;" 2è. .I OW A Ave
PL. 0" -Pi.. A ¡J
3 c. A l.. Ë ¡II - ! 6 - /-
, .
[ REVISIONS
I
~
¡---
I
I
I :::::..
./.....
I
- --
I
I
,
I
I
I
I
.- --
I
I
I
I
I
!
I
^~~, "" , "",~~~,", -",
,~,~ 'il.~" ""'_~_~"~_~==~'~~_
-, p,,,,,{"==~~~,=,=)'-,,,,",,,,,,,
,~~",
Staff Report
February 4, 2005
Historic Review for 618-622 Iowa Ave.
District College Hill Conservation District
Classification: N on-Contributio.g
The applicants, Uptown Properties, are requesting Certificate of Appropriateness for additions and alterations thc above-
mentioned propetties. The structutes are three-story multi-family tesidential apartments. They are non-contributio.g
sttuctu.res in the neighborhoods. The additions and alterations include adding and/ot teplacing openings and adding
decotative balconies.
Applicable Standards and Guidelines
Iowa City Guidcli.tlcS fOt alt~ratiom¡
Guidelines do not address the issue at hand, howevet the pmperties are non-contributio.g in a conservation district and the
changes do not detract from the chatactet of the conservation district. Please refet to Section 10.0 of the Iowa City
Histotic Preservation Guidelines for further details on multifamily buildings.
Staff Comments
New addition and alterations do not detract from the charactet of the conservation district. The changes are in compliance
with the Guidelines.
Recommendations
The staff recommends d1e approval of Certificate of Appropriateness.
Application for Historic Review
Application for alterations to the exterior of historic landmarks or properties
located in a historic district or conservation district pursuant to Iowa City
Code Section 14-4C.
Meeting schedule: The HPC meets the second Thursday of each month.
During the summer months, the HPC may also meet on the fourth Thursday.
Applications are due by Wednesday the week prior to the meeting.
For Staff Use: .. :£
Date submitted ......!.:...:!.:.J.::J!..........................
I:] Certificate of No Material Effect
.it:: Certificate of Appropriateness
I:] Major review
I:] Intermediate review
I:] Minor review
Applicant Information
Property Information
(Please check primary contact person)
I:] Owner .:D.it.~.....:r....t\~~.1........~..&Q!.?.I4.!1~.t-.....
Phone ......3..S':...t.........:::?..~.J..9...............................................
Address .....!...l:.:~.:J........ .....s..h.!;..$.I.~.1.a?........!.t~.f:.......
...............~..f?..~..\4,...Ät.l....I.....:t..4.................2..f.:~.¡.e.
email .......ah\hþ.~.!'!f!.~!-:\.~!.:..e.......k-:!f.i..~.:1:.;.~...:.J.f:?~....
I:] Contractor ................................... ... ............................. ..............
Address ............................ ................ ..............................................
..........................................................................................................
Phone ........... ....................... ................ ...........................................
email...............................................................................................
I:] Consultant ..L(~~:;K~)~.-:-::1.:.....fl.1.!t..G.l~f:\?!.u..............
Add ress . ....... ....................... ................ ............. ..............................
....................~.'?..:':':.~.......::t.&.~!f.'.................................................
~I'i ~?I - .4 )70
Phone ..................................................................................... ........
.........................................................................................................
email...............................................................................................
Application Requirements
Attached are the following items:
I:] Site plan
I:] Floor plans
I:] Building elevations
I:] Photographs
I:] Product information
I:] Other ..................... .......... .......... ...................................
If the proposed project entails an addidon, a new structure or
a significant alteration to an existing structure, please submit a
site plan, floor plans. building elevations and photographs.
If the proposed project is a minor alteration to a structure,'
please provide drawings and photographs to sufficiently
describe the scope of the project.
Provide a written description of the proposed project on the
second page of this application.
Address of property .....!...>::..?:..J...........?..~.~.~.~..~.'!:.~......~.~
......................................:::r.~.':Y..d.....ç;,..!~....l..::L.~..........)-:-::};.~.1..~
Use of property ............~.~..:.~~.~.~.~~.........................................
;
Date constructed (if known) .....(,1.?f?..=..~.':".~..............................
Historic Designation
I:] This property is a local historic landmark
OR
d This property is located in the:
I:] Brown Street Historic District
I:] College Green Historic District
I:] East College Street Historic District
\/)í Longfellow Historic District
~ Summit Street Historic District
I:] Woodlawn Historic District
I:] Clark Street Conservation District
I:] College Hill Conservation District
I:] Dearborn Street Conservation District
I:] Lucas-Governor Street Conservation District
Within the district, this property is classified as:
I:] Contributing
I:] Noncontributing
I:] Nonhistoric
Project Type
,.....á Alteration of an exisdng building (ie. siding and window
replacement, skylights, window opening alterations, new
decks, porch reconstruction, baluster repair or similar)
/1:] Addition to an existing building (includes decks and ramps)
vQ Demolition of a building or portion of a building (ie. porch,
chimneys, decorative trim, baluster or similar)
I:] Construction of new building
I:] Repair or restoration of an existing structure that will not
change its appearance
1:1 Other
Project description
...................,..............................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
.........................................................................................................................................................................................................
.........................................................................................................................................................................................................
..........................................................................................................................................................................................................
Materials to be used
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
....................................................................................................................................................................06.................................................06.........................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
.........................................................................................................................................................................................................
.........................................................................................................................................................................................................
Exterior appearance changes
..................................................................................................................................................................................................................................................
...........Q.~.~.........1..r.rf..~.f?:t..........{..s............T~.........f?~.!..1a..~~.......:J::.s..~........h!?..I:\-;~.ç;......;:.........!rð..?~........(.v::?.......~6.f.~ (.y.l
..e.!.:..........:r.~..~.............S..tt··~..~..···.....l..1·¡.>.·~·.......r¿,.£...........~..!-?<?..~.........e.&...........~.:e..~.~..y..1:....Þ...~..1.-:~~........~..Q:.~.L¡;;
..b..~;. ......... ..þ...~.~.. ......~..t..~..~..... ......:....... ................. ....... ... ..... ............... ...... ........ ..... ...... ..... ..... ........ ........ ... ....... ..... ..............
...........................................................................................................................................................................................................
.........................................................................................................................................................................................................
.........................................................................................................................................................................................................
.........................................................................................................................................................................................................
..........................................................................................................................................................................................................
............ ~.............................................................................................. .................... ..........................................................................
.........................................................................................................................................................................................................
",,)""''O'Åe"l''ilT~VNlçrnv
"P\7"IIPO ,~~ bT<71Id
·
r<<I? ,)..0 =?~?
·
.:?'Vr 'ACd/'l¡\\'If'2Ið
·
!70OZ¡ld/0l '~l 'Vð
·
.0-) - .911 '"n'V,?Ç'
!
O¿«Po:õ9,6Iç
o:;sas' VA"70 ·~~1~
.e...
~1~ T'lD"l!"Wo:J l1~ 'TvL1tf:!Ql;~
.ç IN:WJ-n. N.?IÇ'"]d.
13aO...3~ l~V'H)QO~e
NOII:Jnè!19NO:J è!O::i ION - J..1NO NV'1d J..è!V'NIWI13è!d
~
~ß~
>d
n~
~!
g~
H
DODD
Dl1TID
DODD
z
~
¡:::
'<t
>
ill
at
~
z
o
æ
1L
I~
~§
~
i
~ ~ ~ ~
n~i ¡~ ªffi
~~, o~ ~s
¡
,
~ ¡
~~
'"
~"
u
ãl
" .
'"
~ ¡
8.
@
z
o
¡:::
'<t
>
ill
-l
ill
æ
'<t
ill
æ
~;rQorrvA.1~mVd<õl1l1::'>
!
O¿<;¡ç>tÇ9°bo;;
S5Ü:so V/I'Wo . "':'RI1 "%Wl
.....
!:fù1v'bol'1l.nf"W\Q:>lfT;'¡''1Vl1tI~~
. c; 1N~:Iì:¡ °tl:Jic;:¡Q °
'wr"ro '''~l.:>''-''''''
°
~Q;) 'Ag aJ¡Dcn7
°
:>vr 'Ag MIV'"ðQ
°
þ'OQZ/g/Ol '-:11 \fQ
o
.0-) .. .'tV' '-:¡ì\1:JÇ
13C0143è1 .LèlV'H'>IOOèla
NOI1:Jn<S19NO:J <SO::i lON - J..1NO NV'ld J..<SV'NIWI13<Sd
~
is
ßm .
m! L~
~~ ~~~
æ
i@.m
>m~
~,~
~~.
. .
o!,.,
~.
"ia.-
.'
.'
z
() z
¡:: ()
« ¡::
> «
ill >
-! ill
ill -!
I- ill
1L I-
ill :t
-! ~
æ
1
,
,
~ ~
Æ~
~!
~ i
~I
ß ~
!¡,
",
~I
@
NEW ADDITION EXI&T)NG: t40LlóE
~
-i
iO
-<
:1 'f ~~
~ ¡¡ g~
;¡ () ~I
..
< e
ª
()
()
<
~
19
11
()
iO
()
r
4'~2-
12'-4-
NEW ADDITION EXI&TING I-IOUe.E
@
10
~ ~
i'
i~
" ~
¡~
10
! ~
ï;
\ ~
Lr1
~;...-
, r
~()
!~¡mÎ!HíÎ 6CAU..· VB" - r o·
. ·
i'!!¡ii,lhi DA T~' ~1!3/200¿j ·
î¡¡l¡l!!~¡¡ I> ·
;!!h\II'" UJ Dl2.A\VN e.y, .JAC ·
¡¡¡'If!,!I! · ·
. Cu:.~De.y, CD'1
~!~!.. !;¡, ·
AW-<'CT ~i:J>.. 0.10..1.18
EXlõ TING I-IOU5E NEW ADDITION
28'-4'
..
~
CRAWL 50PÁCE i., II
¡ ª~
__FlOOR ..I016ta. /" i is..
2~' ¡I ".
¡ ¡¡¡ IF
m><"j!I " .. rlJ,
I ~ ~---'...J~
~~~ CmC.
U ~Øo I .......FlðQR .k')!.!!oTl!!l
ie¡ j
I
I
I
J;
Œ
~~~
h&
"!
~"
'.
"
()
c:
z
\J
Þ.
-i
Q
z
11
r
Þ.
Z
m
~r
~~
~~
W~
~~~
N
¡
O~&.~"~
i:~~~~~~
~~~~~::¡~()
'!Uh~~
h~Wiª
~~~~ .
10'-0"
1'-0"
1<:1'-4"
ExI&TING I-IOUSE NEW ADDITION
."
~~ ã~8§H"~~ 2
:~ i:~';:~18' ð
~ 11!!!6~ ~!f:Þ
~ ~~S!dR~~~:1
gg:~~~R&F ~
~ij~~~~~ç;1I z
"!'l~~~ p! ~
2Q~~;\ (I:I~\ m
~<~õ ~~8J <P
~(I~ ~m~m
~~'- ~~~I
~~ ~ih
~ r~~~
·
·
.D~.jIQJ.~L¡;;JJ;;J.JT .j.
RL-~~LI:;I1TC~DIUf~
. . . . .
6ROOKI-IART REMODEL
l.Pfot- T~ß.II('\Ij4. .5;,755
·
~.c,,.1IIJ370
CI..l2ß~II'(Aik'OC~
tJ
~
t[
Ò.
·
·
·
t
~
i
EXlðTING I-IOU5E NEW ADDITION
1&2'-0" OI.IT&IDE OF &T1ID
31\o'-e"
28'-4'
..
<>:
oJ¡
5'-4'
5'-0'
~ '"
I> ~
~;!
~~
1- l "'"
I ~ I ,()
()
I ~ I :I ..
~ I _ ~ 0>;
0;
"'. 21'-eJ!;¡' ,- J:!
.. 6:
"'.:
1- - - I
I ðl<:.T I.I6~r I @I
1'-e~"
'"
¡;
"'.:
t:
~
19'-50'
.
<>:
a'-o"
t:
<>:
:!
Þ.
Z
w
~: 10'-0"
J 5'-0"
~ ~ :.!'! ¡;;
<>: <>: ~~ ... I; ~ Ii ..
'" ~
2 ~ ¡;; '"
~i ..-
w 1t'-e~" '"
;-:
IUPJ.AÇEWIIÐOII.I
WI !>'..o"r...u.WINDOII.I
~~~rgoBE
CIoIANGEt>r" y
:;'-6' 5'-:;~' 3'-2~"
2'-0' 12'-0"
2'-6"
62'-0"
ml~
f~~i1
~~~
eEAM ASo<;;IYE A& REo:iOIRED
16-'..0" ~ ,'..o",,~ DOOR
o:!I'-4~'
10'-0"
:;'-5~" 3'-?~"
~
¡n
j!!
o
o
~
1)
r
Þ.
Z
21'-e~" ,"'-u"
19'-4~'
EXISoTING ~OU5E NEW ADDITION
.
'"
mr ö~~~m5 F~~ z
() 0
,() ~ -i
()
01> un~ º~~ m
()" ~ (>
zo @ ~a",
¡Z ~~¡¡¡
~'i1 ~~î~ ~ ~£~
'I> me!'!1> I>
~~ 2ÞUlð z I>ml>
0 1j"[;;-<œ m "',¡::
I> z m()
0 oþ'~m Ii' 1jm~
0 Z(I1)Þ 2'
m ~i1I;!!il ª I>a"
¡¡: :~~
ö õI~~~ r
~~ ~ õ ~n
m ~!'! ~ 'J1
m "
" ¡.' ~ !'! ~t9hi
"I 2' m .
'J () m
, '"
I>
Z' z
!'! "
@
H
~ ~
¡!i
I ~
If
B
~
~;
¡" PRELIMINARY PLAN ONLY - NOT FOR CONôTRUCTION
!
6CAL~...' v.4· - 1-0·
·
DA Tt-' 101B/200.4
·
DI2.A\\lt-J ~y, JAC
·
cLt.ctiD ~y, COM
·
6ROOK1-4ART REMODEL
.D~6ie1N.~U.~T 6·
· RJ;;..';:ÐÇ.~lJ';lJTC~LllUfT~ ·
· . . . . . ·
I...OI'L.l"'-'-c.. 'i'Wð. .5275">
· :o<ì.630.:l370 ·
c1JW¡ TN.~I.;ð.<iR.w¡;Jl..Y /lJ..lt>OCO\,\
·
·
·
J:!
<>:
~
~
Staff Report
March 03, 2005
Historic Review for 1227 Sheridan Avenue
District: Longfellow Historic District
Classification: Contributing
The applicants, Dan and Mary Brookhart, are requesting approval of Certificate of Appropriateness for proposed
demolition, addition and alteration. This is a non-contributing structure in the Longfellow Historic District. It is a single
faITÚly house built around 1950-60 with some influences of ranch house style. It was evaluated as non-historic structure as
it was built after 1946. The applicant has proposed to demolish the garage and enlarge it to accommodate two cars. The
proposed addition also includes addition of a family room behind the proposed garage, a small porch on the west façade.
The applicants also intend to add some more room on the north-west corner.
Applicable Regulations and Guidelines:
5.0 Iowa City Guidelines for Additions
An addition to a historic house is often required to accommodate an expanding family, home office or modem lifestyle.
These guidelines are for additions that expand the interior living space or building footprint, as well as for other attached
structures such as new porches, decks and ramps.
5.1 Expansion of Building Footprint
When planning an addition that expands the building footprint, consider first how a new exterior form and roof can be
added to the existing house in a manner that is compatible with the design of the historic building. Often, the desired
interior space dictates the location and size of the addition, and the resulting roofline and form appear awkward and
inconsistent with the historic structure. The Historic Preservation ComITÚssion strongly recommends using a design
professional to help evaluate space needs and plan a compatible addition. Additions to structures in districts must also
comply with the guidelines in section 8.0 Neighborhood District Guidelines.
Recommended:
Design
· Preserving significant historic materials and features of the original structure such as decorative windows, brackets,
porches, and trim.
· Designing an addition so that it does not diminish the character of the historic structure.
· Distinguishing between the historic structure and the new addition. This may be accomplished easily by offsetting the
walls of the addition from the walls of the original structure.
· Matching key horizontal "lines" on the existing building, such as water table, eave height, window head height and
band boards, in order to provide continuity between the addition and the historic structure.
· Using a palette of materials that is similar to that used on the historic structure.
· Placing building additions at the rear of a property, if possible. Additions at or near the front of an existing building
must be set back at least 18 inches from the front plane of the historic building, and must be differentiated by a
change in the roofline or other means.
Foundations
· Constructing an addition foundation that appears similar to the historic foundation in color, texture, unit size, and
joint profile.
Mass and RooJline
· Constructing additions that are consistent with the massing and roofline of the historic building. This requires that the
wall areas and corners, as well as the roof pitches and spans are all consistent with the existing building and have a
proportion that is similar to that of the existing building.
· Constructing the roof overhang, soffits and eaves of the addition so that they match the roof overhang, soffits and
eaves of the existing building. When the eaves of an addition intersect the eaves of the existing building, care should
be taken to assure that the two eaves align properly. The trim details of a new eave should match the eave details of
the existing building.
Siding
· Applying siding to a new addition that appears similar in size, shape, texture, and material to the existing siding on the
historic building.
Masonry
· When using masonry on an addition, using new masonry that appears similar in color, texture, unit size, and joint
profile to the historic masonry.
Wood
· Constructing additions with materials that appear similar to the historic siding, trim, moldings, and other details of the
original building.
Paint and Color
· Painting additions to match the existing historic building.
Windows
· Using windows that are of a similar type, proportion and divided-light pattern as those in the original structure.
· Following the guidelines for new windows in section 4.7 Windows.
Doors
· Installing doors in additions that match the material of historic doors, and have a similar style and appearance as the
historic doors in the existing building.
· Installing French doors, or doors of a similar type, in additions where a large opening is desired.
· Following the guidelines for new doors in section 4.8 Doors.
Gutters and downspouts
· Constructing built-in gutters in additions to historic buildings that have built-in gutters.
New porches
· Constructing new porches that are consistent with the historic building or similar to porches of the same architectural
style.
· Constructing new porches that are more than 18 inches above grade using traditional porch construction with wood
joists and wood flooring.
· Adding skirting to fill the space between the porch floor and grade if this space is 24 inches or greater. The skirt
should be constructed between the porch piers.
Disallowed:
· Constructing an addition between the historic building and the street.
· Leaving large expanses of wall surface uninterrupted by windows or doors.
· Constructing an addition that is not distinguishable from the historic building.
· Using synthetic siding on an addition instead of the historic siding type or a substitute material approved by the
Historic Preservation Commission.
· Adding space to a structure by enclosing a historic front or side porch.
Not Recommended:
· Constructing an addition that expands a historic house vertically and increases its overall height. Remodeling an attic
space and adding dormers is acceptable.
Exceptions:
Applies to: Historic Districts, Setback additions, Conservation Districts, All additions
Nèw foundations
· For additions to foundations, concrete or textured concrete block may be used in place of masonry units that appear
similar to the original masonry.
· For additions to foundations, it is acceptable to match the color of the original foundation by using paint or masonry
stain rather than matching the material and appearance of the original foundation material.
New masonry
· Additions to masonry structures may be sided with wood. The siding type must be consistent with the age and
architectural style of the historic building. The trim must be consistent with both the siding type and the architectural
style of the building. Any substitute materials must be durable, accept paint, and be approved by the Historic
Preservation Commission.
Exceptions:
Applies to: Historic Districts, Setback additions, Conservation Districts, All additions
Wood
· Window trim, door trim, fascia and frieze boards, and corner and band boards on additions must be similar to those
on the historic building. However, other details of the historic building may be omitted, simplified, or enhanced on
additions as long as they are compatible with the existing structure.
Windows
· Modern window types, such as casement windows, may be used in additions provided they have overall proportions
comparable to those found on the historic building, and a similar divided-light pattern. The windows must be
trimmed to match the historic windows in the building. The windows may be installed side-by-side, but they must
have a mullion between them if mullions were used between windows on the historic building. Transom-like or half-
round fixed glass units may be used if they create a traditional-looking window arrangement consistent with the
historic building style.
Porches
· Porch floors may be concrete if the floor is no more than 18 inches above grade. Porches with floors that are more
than 18 inches above grade must be built using traditional porch construction with wood joists and wood flooring.
· Dimensional lumber may be used for decking provided the gaps between the floorboards do not exceed 1/8 inch.
· Porches on rear elevations need not reproduce historic
details.
Gutters and downspouts
· Additions need not have built-in gutters unless the new gutters align with the built-in gutters of the existing building.
For instance, a one-story addition need not have built-in gutters if it is attached to a two-story wall.
5.2 Decks and Ramps
Decks and ramps are features that are not typical to historic structures. They are modern inventions designed to meet the
needs of our modern lifestyle and building codes. As such, it is not necessary that they duplicate the details of the building
to which they are attached. However, they should be as unobtrusive as possible.
Ramps may be approved that accommodate reasonable access and use by disabled occupants provided they do not
significandy alter or detract from the historic character of the building. The Historic Preservation Commission will work
with applicants to find designs that will accommodate their needs and that are compatible with the historic character of
the building.
Recommended:
Decks
· Locating a new deck on the back of a primary building, opposite the street-facing facade and set in from the side walls
at least 8 inches.
· Designing decks so that the size, scale and location do not detract from the character of the district's rear yards, if
significant to the district.
· Attaching decks to the building in a manner that will not damage a historic exterior wall or, other historic materials, or
cause wood siding to deteriorate.
· Following the guidelines in section 4.10 Balustrades and Handrails.
· If creating a screened porch structure, following the guidelines for porches in section 5.1 Expansion of Building
Footprint.
Ramps
· Designing ramps so they do not detract from the historic character of the house. To the extent possible, the yard
should be graded to create a portion of the incline of the ramp.
· Locating a new ramp, or as much of the new ramp as possible, on the side of the building.
· Incorporating a ramp into a porch.
· Landscaping around a ramp to soften the visual impact of the structure from the street.
· Following the guidelines in section 4.10 Balustrades and Handrails.
Disallowed:
Decks
· Constructing a deck between the street and the street-facing facade if it detracts from the neighborhood or is not
compatible with the architectural style of the existing building.
· Leaving balusters and railings unpainted if they are highly visible from the street.
Not Recommended:
Ramps
· Constructing a ramp that extends more than 8 feet in front of the primary, street-facing facade.
Staff Comments
Proposed additions will be a major increment in the building footprint. Care should be taken to not dominate the existing
structure by the large two-car garage. The size of the new structure should compatible to other surrounding houses in the
neighborhood in size and proportions. Though it is a non-historic structure it blends nicely in the neighborhood due to its
simple style of architecture. The applicants have been meeting with staff over the past few weeks to come to a design
solution that is consistent with the guidelines. The applicant intends to match the material on the existing structure for
new siding, roof, windows and doors. Final drawings will be submitted before the commission meets on Thursday March
10,2005. Staff can not provide a complete evaluation until a revised set of drawings is submitted.
Application for Historic Review
Application for alterations to the exterior of historic landmarks or properties
located in a historic district or conservation district pursuant to Iowa City
Code Section 14-4C.
Meeting schedule: The HPC meets the second Thursday of each month.
During the summer months, the HPC may also meet on the fourth Thursday.
Applications are due by Wednesday the week prior to the meeting.
For Staff Use:
Date submitted ....';:.;..............................................
[:J Certificate of No Material Effect
[:J Certificate of Appropriateness
:;:.'Q Major review
/0 Intermediate review
~ Minor review
Applicant Information
(Please check primary contact person)
~ Owner ....\Sf.\.~...........k.:.k..;.G.................................
Phone ..5.\S..-:..2::2:$:.1-:..Q.ro.....................................
Address ..3.y:\...?:M.~....S\...............................................
.~D.m.~....l¥.1........<:;().~.............................................
email .ç\\.~.OO~@..rJ..,~..'i...:..~..............
[:J Contractor ...\~.r1.~......L:kÇ.:.....................................
Address ....:.t.\4...3.k~..&..............................................
~.þ~~....\.)\....5Dkl<2.$.........................................
Phone ..SlS.::-.k:1.:§?.:...l..v.o-o.....................................
email.GhS~..cA~J.:~:..CWV\............
[:J Cons ultant ......................... ................................ ........................
Address ....................... ........................................................ ...........
.........................................................................................................
Phone ..... ... ........... ..... ............. ................................ ................... .....
.........................................................................................................
email...............................................................................................
Application Requirements
Attached are the following items:
[:J Site plan
[:J Floor plans
[:J Building elevations
vr;:f' Photographs
[:J Product information
[:J Other ........ ................ ...................... ............. .................
If the proposed project entails an addition, a new structure or
a significant alteration to an existing structure, please submit a
site plan, floor plans. building elevations and photographs.
If the proposed project is a minor alteration to a structure,
please provide drawings and photographs to sufficiently
describe the scope of the project.
Provide a written description of the proposed project on the
second page of this application.
Property Information
Address of property :~O~........S.:...(aQ\{~..~·.
\cw.~..Ú114··1·..tf.\:···;l.Z.2~O....................................
Use of property ....................................................................................
Date constructed (if known) .............................................................
Historic Designation
[:J This property is a local historic landmark
OR
~hiS property is located in the:
o Brown Street Historic District
[:J College Green Historic District
[:J East College Street Historic District
[:J Longfellow Historic District
[:J Summit Street Historic District
[:J Woodlawn Historic District
o Clark Street Conservation District
o College Hill Conservation District
o Dearborn Street Conservation District
vet Lucas-Governor ,Street Conservation District
Within the district, this property is classified as:
veí Contributing
[:J Noncontributing
[:J Nonhistoric
Project Type
\,2" Alteration of an existing building (ie. siding and window
replacement, skylights, window opening alterations, new
decks, porch reconstruction, baluster repair or similar)
1:1 Addition to an existing building (includes decks and ramps)
[:J Demolition of a building or portion of a building (ie. porch,
chimneys, decorative trim. baluster or similar)
[:J Construction of new building
vQ Repair or restoration of an existing structure thatwill not
change its appearance
1:1 Other
Project description
...~... .. ~Cl(Jy'\~.... ......~.....\1J)~...Jsa.s..h.a..~..~..................................................................................................
.... .... . X.~ .... ......~..b~......YCAA\t.... ......~.KK!......~cK\......sh:1X>...:.......................................................................
...(1£; . .. :c¡ ... .....'N(':¡;x:t..[(\..~r......ìú\'.ÇN.)........................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
.........................................................................................................................................................................................................
.........................................................................................................................................................................................................
.........................................................................................................................................................................................................
Materials to be used
...~œ&l...........................................................................................................................................................................................................................
......~n~...........................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
..................................................................................................................................................................................................................................................
.........................................................................................................................................................................................................
.........................................................................................................................................................................................................
Exterior appearance changes
~,e....~I\....W......I'íì....W~.....\X\....~.~..,~f...\Ç....WXY1M1ì~
..å>.....Ý.QA~'í\<\....\'(\........y..ULf....\.:oui.........I},.....~dta.....ya.Ù\úÇ.....\1J\Ü.....Y,Q,.1J..la.Lt..J ~
~. ... ""~.' .......~ç. .. ..t..)A}{\!lJ0.......~t.......cM(}{..;dt....f1)¡é!.......cx.IAXY.l1illn\...QJ.(). ...
m.~l\\..nmmknnm..y. . !'úuð...m..n.'N\'tb.mn.WO'~.....~.,.....~~.m.Rv.£.::::à.d.cLt \'lj
..~~~.......~.... ..... . ex.~cctY\.....:tv.u.....~0h.:!:w.....~.\Y.).ß~....Q0£........
.~~.........~~Q~.......Yv.t\Y\.....~......Mn.~.~...........................................................
.........................................................................................................................................................................................................
.........................................................................................................................................................................................................
.........................................................................................................................................................................................................
.........................................................................................................................................................................................................
.........................................................................................................................................................................................................
Application for permit from City of Iowa City
(and Historic Preservation Commission)
for 308 S. Governor. Iowa City. Iowa
* 1. Stair Rails. Hand rails will be constructed on each side of the wood porch
stairway. The handrails will be constructed of wood to match existing porch (in
shape and painted to match).
Concerning the color of porch and house, see photos attached. These
pictures are of a home in Bloomington, Illinois in a historic area near
Illinois Wesleyan University.
* 2. Windows. The five (5) basement windows will be replaced with windows with
insulated glass specially ordered to fit existing window openings. Sills replaced
as needed with wood by an Iowa City contractor and repainted white. See
invoice dated December 28, 2001 for description of windows purchased at that
time but not installed.
* 3. Siding. The home will either be resided with Hardi plank Cement Board
(permit required) or exterior repainted (no permit required). (see photos for
color)
** 4. Shutters to home. Color - see photos.
** 5. Tuckpoint; Basement Foundation; Front Porch; Columns; Footing. This will be
completed per the proposal of Mt. Vernon Construction, Inc. Attached is the
original proposal dated July 29, 2000 and reaffirmed on March 2,2005.
** 6. Gutter System. To be completed per the proposal of Tomlinson-Cannon
Spouting of Coralville, Iowa per proposal dated August 22,2001 and reaffirmed
on March 2,2005.
** 7. Front Cement Stairs by sidewalk. To be completed to match existing by
Randy's Construction of Coralville, Iowa per proposal dated February 25,2005.
( except no railing)
** 8. Repair fascia and soffit on east and southeast of house. Proposal dated March 1,
2005 from Randy Wessling Construction, LLC.
Also enclosed for information and reference, is a before and after photograph from
the Warren County Iowa Assessor's page of a home locally known as 800 North
Buxton, Indianola, Iowa of a similar age that we have remodeled in the last couple of
years, that continues to be owned and occupied by a family member.
* Permit required
** Not known if permit required or permit not required and information provided for
possible suggestions/guidance.
ISAK, LLC (owner)
Sunil Terdalkar
From:
Sent:
To:
Subject:
CMl10@aol.com
Thursday, February 24, 2005 11 :07 AM
sunil-terdalkar@iowa-city.org
308 S. Govenor
February 24, 2005
Sunil,
I have contacted you a couple times in reference to the house at 308 S. Governor St, Iowa
City, IA. I have the kinds and dimensions of the windows, which are listed below.
Secondly, we have decided that as opposed to building new steps, we are just going to fix
the concrete steps that are there right now. Do we need the permission of the Historic
Preservation Commission to go ahead with this? Also, I was wondering what type of railing
you would suggest putting in that would match the house.
The dimensions and material of the windows are:
The five windows are 8700 Sliders, Silver Line (white vinyl with insulated glass) and the
dimensions are as follows:
1) 38~" x 21 ~ "
2) 38" x 21 ~ "
3) 38W'x22
4) 38~" x 21 ~"
5) 38" x 18"
Please let me know if I need to get you any more information or if this is sufficient
enough to go ahead and get the permit required to do the work on the house.
Thank you for your time,
Cassie Isaacson
ISAK L.L.C
Phone: 515-249-1867
Email: cassie-isaacson@uiowa.edu
cmi10@aol.com
1
03/02/2005 15:07
5152238571
Iowa City Assessor - General Parcel Info
;I
ISAACSON LAW FIRM
PAGE 04/09
J o?t S'. 6- ¿:>V&- ~')V'p..( Page 2 of 2
BI'1.1'EMSNT ~Kdt:JUd
I)
ŒJ
ISFROP ~
[72
27 1;1
13 ",If
~
rv
I .~
'5Sr
2 10 2 JQUAA
t304 ..
.'W. .IWI
27 [I9S)
12
II!
Related Information Links
Iª.~J nfQIIJJ.~ti.o n
UilJ:>';::::"
I . ..~" ...
I.:. ::.,'
Prop~rjy.ß~çºrc;tCard R!,!p'QQ.
Map;;
Assessor Reports
m
P.r.9'p'.,ªr1Y,J~eco.r.º.J;'ªgL Repolt.(~º9..Þ§! P DF fil,ª)
Pri nter.F..r.l~.n.dly v~r~Jºn
hpme I par:.~'-s_e_a~c/:II resid~r.J~i~Ls.aresearch I ¡;.9mm~~ciaI5al~
~,!iJ_aIC;I:1.
~PJ...+æ S' 6;x;.rT/,y... MN'¡;t)w 1/1 ðll4Jlh'/lWí ÞuNIJA:n¿),¡V
-. W/Nt'Ow.J /'t1.11,o. -;; OA(JÆP 7Þ F..7" b-J.rTI.rvð- DP6NI.IIfJ¡/
¡Z, .p FItt~¡N1€
1-
- S"ll)fi WI-?-J.,"fG
I~ OP ~4"'"
- r;.~
ŸÝ/N/;)D/Juj fFy .t- 5 ~¡eC)(//.lP JLD¡?EJ ;;, 5òurrll
httpJ/iowacity.iowaassessors,cornlparce1.php?parceJ-l 010487007 &CFID= 1471 &CFTOKEN...
FevN ,()4-:'7Jt,;J!.),,'f" /l4Gl1f vlZlS~,t.J1"J
i
W,N/)¿)wll ~ '2.
/IV,,.y(ìoW ;f/." J
I__J
13--
3/1/05
03/02/2005 15:07
5152238571
ISAACSON LAW FIRM
PAGE 05/09
FHONE ND. 515 883 3038
Mar. 01·2Øøs 10:13AM Pl
INVOICE ,,:
. ;. '~'", .. ¡.: ',,,"
. :'. :~:,;. ~:~~ ~. "
PAGEt 1
',. '.
" 'S'" To'
. IV" . .....:':1 .
WilL CALL ~ ClTATfON.
':"::~~~~:I'. \
t~~\.;~>
/'~L ·:~:~~;I.· ~ :¡'
.;.... ~"" ,.:I~~'~~
1
a 114 X 21 1/2 SIL VERI.lNE 8700
"UPER. WHITE. CLEAI~ to
!3 ~ 21 'lJ2 SIl..VHoU.INf: tHOU
1.1DtiR WHnE, GI.EAR IG, MAPt~
'ANfl
8 11'.? )( :l:! Sll.VEHt..lNë tHUO
··l.lOf,:R, WHIT£:::, Ct.&Af< Ib
'8 1/4 X '?'I t/-;: t:;,l. Vri:I·'<I.INE a'l~U
"'UDf.R, WHIT!::, CL.EAH IG
U)t ,a SIL VEI'~INl: 8 'f\Ju SULI~H,
HI'IL-:. Cl.EAH Ie:;
I (¡~ uo 109.80
Yl.toU 97.50
91.60 97.50
9/.bO 9'1,50
1
1
1
, "
'/' .
.," :.
.' .
,.
.(b .~
~ . I '1.4'" 1
.. "
'~....
'~ ~ow AC,CEPT ~ rEf< GPRu ANI ) 'jl~.~
"".' ",,1. ,. ,"', . ",,' .
Suh'u{¡,d
:;:aleð T é)';'¡
) otdt rn\'()..~e AmolJl\
'!,
~;h~cl. Nu'
I \ ¡'J At utA:.
499,80
29.99
$ti29 19
O.QO
$~29./~
t~tI'VII\!)n1 Hf2oe=lVeci
. .
,', .
, ", "',
,-'
" >'"
~I:: ' "" ,
~st· DUE ACCOUN ~ S :"f~t: blJijJ~G r TO 1.5'" S'E!RviCE CHAR~ê, PER MONTH
.."V\''-''~.'" ".
/I,··~'r~·;:·:', !:.~':T
",~I~"q¡,$, .....iiœ . .
~ '\' ,,~.., , . ~ ,'" I " : '
d,
:~~::',,:': .~.. \ . ."~,,: " '" "
. .
03/02/2005 15:07 5152238571
~H~. ~,~~~~ 12:19PM TOMLIN50N-C~NNON
. .-. - ---, -
f&'
3=
if¡¡
ì8
~t
3-
() ~
tJJØ)
='0
fi~
ül"2.
>'"
~l
SJ. .CI
etc::
....·0
g~
o
:s
.-
. .
1--" "'...-
I
I
I
~
I
1-.
...._.~
"'~
~...
~.c
ISAACSON LAW FIRM
,,-""'.... -.-.
. - ~ ~------. -..:.... .....
~d
iF~o~
5''J1"'t1m3
~_ ~ ~ F 5"
::¡m"-:::S-
CI.I..~CA)::I
O ---en
.......... CO 0
=J.œCC-::s
g 0- ~-
~í'~9~
8~~~:1
?8 ï ~ ...., (Q()ø,'
NlJ\)~
3m()l -,
OJ
1m
011»
~!1~
ëiJ - CD
-~=
CDl-æ.
::D-f.0
cp 0 r; 0
""'=t@
CDmii
¡cër a
-. :::r c
~e!'"-h
CO!s-
_. r.a
=
to
oi"o
=;E. g i
:r""6'
o~ 3
~!.!
a!(
S!iS
CÞ g. '<
:::1''1:1 0
RQ~
er~::r
0<80
::13
œ.CÞ
9~
iQ:)
~~
1ña
-N
~5.
0»
C1'ë6
~ê
-I.(þ
-- --
t"'"'\~ ~
.'§~[~ :
~~ 1'\ C)
~ 0 0
~= 8 ~
g
'\
I
1
~..J
\~
"
-
~
'Í
o
......~t
CI\ ~
"":-I III
o
ð
PAGE 05/09
NO. 172 P, 2/2
li'!'ii:r5"5" "
~i~5.I!~ c
G.)C)Iþ:r1boo 0
§§:¡¡otlr~iê~ S'
~~::J:g.~N(J) ....
.".¡ ø ê &' ~ ox CD -.
.g~-"'.þo~~ Q
16 m 9i Ö~W~ :::5
"~~{)ii 5~
If fIIen
ä¡. ,
- ...
!
~
~~~~~ ~
G))Þ
eC'n
i~
cno
~c:
tIÞ~
S"c
3 ~
C)E:
car
1»,..
m --
::s 3
,..(1)
m
-'" .~-~- - . .~. ..- ~~---- -'
..-.....~:--
...... .... ..... ~
f i" §; ~ 9 ~ § Œ [iil' 51 ~ ~cc t: c r:: I: ~ Š c:.::
Iiª,'< -is Q.;~ t:rGl5 áã:'TI"nrtlrRc- 0 ::r
t:) "~iii'õ~~ g-ic !'gâJi~ gJgJ::!:!~. ~ m
~ w!;;¡;;!fI ~øØ1a.::iIi'2S:-!:i:¡¡::$:::7 C:¡'"
c a 52. ! '< 0 ~ šI Q. ~ g ::r fß ~'I m m m m m m (þ
.... ~cð i~~ Al8~ ~m §!. 5·g>i~i Ell. C" U;
".. ~ :::r a _.CI 0" =;: 91 iii' 6 ~ i ~ ß 5" ~ Q CD
.c:::: ...¡::9!.jšõJ::7.?:J_ O......,3;::¡(õCD,..
_. ß)::rör~' C1:I CD-I» =f(Þaí:: ...
2..J~ (S'a.a.e. .?ªtTgfi. ~.g~~ltIëd....cn
11 ~ ~ 3' 5' ~. i. fa. ~ n g g¡ "C ~ ; £ ~ s: ::T
Cot ~ 8!:l§tn ~§.fjfi3~'" ~ªæ.=<, ~A 0
A'Q cn§.m (þCT~ t!I COR)l'Dm VI C
~ CD :i' c.. ... a Q !e. ~ c::: ::J 'ª ( ~,,_
() g, cc~ !C1~(!j~§¡ ~g.o(C c.
~ ;:,3þ:::J =oS,f:
t.II -. ,- (:s~ -~ ::ïi ......
() a :::J!I'Ø3ø. mcg(Q'" .-.,
') ~ cc~¡¡:r 6'~I@~ 0
ã!F.fj'! œ.!æ~ s::
! CS' _·....lr/ØJ
. (1)... 3C)::s::J
II> -. (II !!!" !if
=r ~ CÐ()
... ()
CD
... _.__._-~
C)
-=(/)
im
;3
m-::C
:JCDZ
a.=~
~~C
=ec=
~ ª.~
tn:s
"'Dc
g3
üt
o~
~§ ~
~. ~ en
~O 0
~þ =
"'"-'-.. --
133/132/213135 15:137 5152238571
~~ 2,201215 12: 19PM" TOMLINSON-CAI'II'ION
ISAACSON LAW FIRM
PAGE 137/13'3
1'10.172
P.l/2
RANDY WESSL.ING CONSTRUCTION (..1.c
1822 CAL.IFORNIA AV~
IOWA CITY, IOWA 52240
Tel.: 319-351-74.23
Fax: 319~65-2S81
I Est; fIl.ªte'··'··
l;~:;;!- :mm
_J
To
308 IS. qav@tnorst
Iowa ='f}I ,lmII:¡
ItJmlllòtm can no
Page
Cnem
..._~..._---
.........--.. .. ........,
QuanLity
Unit
DescrIption
TX Unit PI1Cé
..~~~
$450.QD
1.00
~I'laœ soffit and fascia eln 5Cutheast comc~
of hO\lse 450.00
. '4!5O.oo
1.00
IBp/¡¡ce fascia on eJl."wlde of house 380,00
$3.5C.ao
$350.00
1.00
if there 15 damagé to ths framing and we
have to install new rafter tliII thll Wi\lln~
time and mflterlal,fI'om wP1at I OOuld see tile
reftE~ loc:nce" Of(
1.00
MQUI all \Or.Igl1!l to landfill
S50.00
, :&50.00
-.....-.----...-.
[
SUBiOTAL
TAX
[Date I TIJ~u",
L!~~~~tl1ie
--"-..
COTr1mE!nt¡;
$850,00
$0.00
.11650,00
..-----
~
03/02/2005 16:07
5152238671
ISAACSON LAW FIRM
PAGE 08/0g
Mar,j,20059:48AM
City or Coralvílle
No.9261 p,
RANDY~S CONSTRUCTION
P.O. BOX 5316
CORALVILLE, IA. 52241
319.400-1988 or 319~631..o116
FIN 32..00459'9
To: L$'Lk- LL C
(Oe;...v<. ~~Ci1,t1..C $,h.;)
Address: .3 D 8 S. ("YtJ"U'LV' r.qr .y-:
City: ~ ~
Tenns: é.~f J rY'I f7/Z-; Date:
S/') .l'2.3· ~r:.. ïJ ./~
Phone; 5 I 'S. '7 Ii 8 ~ t.)C) ~ 1 uil...
Zip Code: C;z.'tt.¡ S-
z-'Z.S'·()S"
Datc Descriptîon Total
¡/) JU?¡;."., ,~ - ¡,. ~1. .5.k.{21J . ð"~ J:Jd~ It..{«. ~lJ
..vr"I
~'Å I j "'-, 11/\ n::..~... .~ '(",0 oð
1/')(4 J.d..' ..I . . ,... lAD n;r ~ o-f ~n ~ æ~f,S'O
(} u .
í) t:· ð . "'(.... .. ':".+.J..) 4().ðO
v " u u
-r~ ~L~~..h ~"7ì.([)
.~ _l~A ,,~~ ~ "'JI\ I"i AA tv1..lA 1 ft~?~ rJ.4 ~....
f) (}~;L" i.r ~·Ð. I...J m -Q .U .1.' + Ál. ().t3f¡~O()
ð,.¡' . .,<1-. . ',.... ~'M ' . JJ () '.,5- J-~'" 'W-i-ð c~ ~
,~ ~ """'. f..~ - ~ #v,.vv>.
V () ì)
.. ...-
_w
-.-
Estimates 9;~ 30 days from date. ,
S% Fjnance fee added after 30 days from invoice date.
...-
"--~ ..
03/02/2005 16:07
5152238671
ISAACSON LAW FIRM
PAGE 09/09
e7/28/~~~ 10:13 3193519349
F1Q1, ~,!,. ~.t.:::., ~~_~!.~
FF ,rOPOI.1
MT. VERNON CONSTRuCTION. INC.
'10 ht ....... ". . P.O.... IS
MT. VERNON. IOWA &2314
OfFICI (Ill) .....141'
,~ (lit) ....m
,.. I~ST MCKEE~I REAL'ty
J..... æ 20Iæ 0!
.... ~
PoCIGE 02
.:rI PI
,..
~:'~_,_R;;"~.~~·.~d~.;.6:~~:'_
._._._..--C~.t~_._f~..._... ,
~---&."~L~ ~~ ~.J:'ðð_
~¡.. .A~ '~r- ~ --..-___~_.._.~_.____~___..._..
~-:ï2~~.s..k..! ~ :l=£"'--,~ 1-~ 7""0_.:
~ L ,~ c .!:Þ.t" ~'.. ¿¿ "
.IIoi!A.... _~fI!IJ~_....~.ðJooC __, .J.:'Ò!. ~. ~"tt._____.__.__.
·----·--------.--Lø!:.. "f":",,~ ~N"/'_ ~v~ ..
--. .__..._..._.._._..__.....".,_."........~_..._1... '2 ~ st) ~ __
~._-_..--._-,_._--......._--...._---.....---
,(~4iiI1-
.-' ., .''¡¡'
). ,
Acn....aœ of ,ro..... -,........ 11-' 111 1
........ .. .........., ... .. ..... ......... ., .. ~ ........
....--. -~IIIII"~.""""",
.. -. --.......... ",... -......... .-
---.........-.-..................__ 11 Jj.
-.... --.. -...... --....~.......
- - - ... .. ..... .......... ........... -- --
.... ...--,........-.........-,.-
............ - --,....."..... CIIl ~ ...... ~.
=:=!
DIIIÞ.," I J _
......
c e./ )
~~- ~f7.3
Staff Report
March 03, 2005
Historic Review for 308 S Governor Street
District: Lucas-Governor Street Conservation District
Classification: Contributing
The applicants, ISAK LLC, are requesting approval of proposed alterations to their property at 308 Governor Street. The
two story single-family house is a contributing structure in the Lucas-Governor Street Conservation District. A 'Stop
Work Order' was issued after some basement window replacements were carried out without a prior permit. The
applicants are requesting approval for prior work and also have proposed new alterations. They are:
1. Replace the front concrete stairs with new concrete stairs;
2. Replace wooden porch stairs with wood and replace the metal rail with wooden railing that matches the existing
balustrade on the porch.
3. The applicants have replaced a few of the five (5) basement windows with 'Silverline 8700 Slider Windows' and
propose to replace the remaining with the same. A storm door on the north elevation was replaced with an aluminum
screen door.
4. Applicants propose to repaint the existing siding. As an alternative they are requesting approval for replacement of the
siding with HardyPlank cement board.
5. Shutters
6. Replace fascia and soffit on East and South-East side
Following items may not require permit but applicant has included them in the application to seek some suggestions.
7. Tuck pointing to the foundation. Gutter system - Replace with Aluminum Seamless Gutters
Applicable Guidelines:
Iowa City Guidelines for alterations
4.7 Windows
Disallowed:
New and replacement windows
· Installing modern types of windows including sliding, awning, casement, and bay windows when they were not
original to the building, consistent with the architectural style, or required for egress.
Not Recommended:
Shutters
· Installing shutters on windows that did not historically have shutters.
Exceptions:
Applies to: Historic District, Noncontributing Conservation Districts, All properties
· Vinyl or vinyl clad wood windows may be used for replacement of basement windows provided the foundation
wall is no more than 18 inches above grade.
4.8 Doors
Recommended:
Historic doors
· Repairing historic doors rather than replacing them.
· Replacing badly deteriorated doors with new or salvaged doors that are similar in size, material, style, and
appearance.
Disallowed:
New doors
· Installing natural aluminum storm doors.
4.10 Balustrade and Handrails
Recommended:
New balustrades and handrails
· On buildings where a spindled balustrade would be most consistent with the architectural style, spacing spindles
so that the balustrade is at least 40% solid. Spindles must be spaced so that no gap between the spindles exceeds 4
inches as required by the building code. This is for child safety.
· Providing handrails on porch steps as required by the building code. Handrails should match the historic
balustrade height on the porch unless otherwise specified by the building code. The handrail must have a
continuous member that can be easily gripped. The handrail should either match the porch balustrade or be made
of round steel pipe.
· Providing balustrades on the porch as required by the building code. When the porch floor is more than 30
inches above grade, the balustrade must be 42 inches high except for single-family and duplex structures where it
may be as low as 36 inches.
Disallowed:
New balustrades and handrails
· Using unpainted treated wood for elements that would have been painted in the historic application.
· Using wrought iron elements unless they were part of the historic design.
Please refer to Section 4.5: Siding, 4.11 Gutters and Downsprouts.
Staff Coments:
Proposed replacements of stairs appear to meet the guidelines. Exception can be made for the basement windows if the
foundation wall is no more than 18" above grade. The original basement windows appeár to be top-hung casement type.
Replacement windows are vinyl sliding windows. Adding shutters where they are not original is not recommended as per
the Guidelines.
The Site Inventory Evaluation Sheet suggests that there original siding was covered with asbestos slate siding. Restoring
the original wood siding or replacing it with cement board siding would be appropriate according to the guidelines.
Staff recommends the use of like material for the replacement of fascia and soffit. Existing material appears to be wood.
Painting and tuck-pointing: Staff recommends following the general guidelines and that care be taken so that the structure
does not detract from the historic architectural style. For guidance on tuck-pointing foundations sections 4.1, 4.2 and for
painting section 4.6 can be referred to.
Application for Historic Review
Application for alterations to the exterior of historic landmarks or properties
located in a historic district or conservation district pursuant to Iowa City
Code Section I4-4C.
Meeting schedule: The HPC meets the second Thursday of each month.
During the summer months, the HPC may also meet on the fourth Thursday.
Applications are due by Wednesday the week prior to the meeting.
For Staff Use:
~, {" ,.....
Date submitted .........~:...........................................
'0' Certificate of No Material Effect
[J Certificate of Appropriateness
va Major review
1:1 Intermediate review
[J Minor review
Applicant Information
(Please check primary contact person)
~ Owner Çbfèd6...Qr?\.n;.~f.....t...\1.t?A~.(....\N.\å'1\oyev
Phone ..âl~:::.3.3Q.::~':iQ;?..................................................
Address ..£~~.....~r.:c.a~.~.....~.:.........................................
................~.~......Cr.b,r....J..~...:?.~.~..$.................
email...Ç,b.Q::c1~.~..::~hY.\.\g,c~.~Ù:;!~~\~~.....
[J 2';::~;r ........~mp.t......~.,t.r.~tÚ?~................
Address ....j?.:t.1i/i.....k:\.~¥....?.'f..:.r:.Q..B.QÄ..~.~~
..................f~.i::~.J.:~.~~.~......J.~.....~?:.~.~:r.......
Phone ......~..L~::::.~.~~.::..~!é.º..?::............................
email ...............................................................................................
[J c;:;~;;..:........IQ.Q~~'t......c.'?.~:\-.f..~.~·h:Q.~
Address ......5.~.....~.:......biY.)..v:\.....~.\..........................
.....................I~~.Q.....Glf·..·ß.....~.~~~.....
Phone ...........1?.~~:';;:..'3.~1:=::z.,~.~~........................
.........................................................................................................
email...............................................................................................
Application Requirements
Attached are the following items:
J3
[J
~
[J
[J
Site plan
Floor plans
Building elevations
Photographs
Product .information
Other ............................................................................
If the proposed project entails an addition, a new structure or
a significant alteration to an exI$ting structure, please submit a
site plan, floor plans. building elevations and photographs.
If the proposed project Is a minor alteration to a structure,
please provide drawings and photographs to sufficiently
describe the scope of the project.
Provide a written description of the proposed project on the
second page of this application.
Property Information
Address of property ...~..~~......ß.r.:º.~.~.......S!..:.........
.....................................................................................................................
Use of property ......~.~~.~.lQ............................................
Date constructed (if known) ....::=...L~.~.Q..............................
Historic Designation
[J This property is a local historic landmark
OR
~ This property is located in the:
}i Brown Street Historic District
[J College Green Historic District
[J East College Street Historic District
1:1 Longfellow Historic District
[J Summit Street Historic District
[J Woodlawn Historic District
[J Clark Street Conservation District
[J Collège Hill Conservation District
[J Dearborn Street Conservation District
[J Lucas-Governor Street Conservation District
Within the district, this property is classified as:
'i?J Contributing
[J Noncontributing
[J Nonhistoric
Project Type
~ Alteration of an existing building (ie. siding and window
replacement, skylights, window opening alterations, new
decks, porch reconstruction, baluster repair or similar)
[J Addition to an existing building (includes decks and ramps)
[J Demolition of a building or portion of a building (ie. porch.
chimneys, decorative trim, baluster or similar)
[J Construction of new building
[J Repair or restoration of an existing structure that will not
change its appearance
[J Other
Project Description
Background. Kitchen added to house in approx 1920 (house dates to 1890). Brick
kitchen foundation is failing in SE and SW comers due to foundation that is too shallow
(IS" below grade - Iowa City code is 42"). Kitchen interior is outdated and in need of
replacement. Back steps are in need of replacement due to unsafe steepness (8.5" rise, 9"
tread depth; very steep and slippery in winter). These projects can be combined because
they all affect the same area of the house. This is an ideal time to replace the drafty dirt
crawlspace with a clean full basement room - providing needed space in the basement
and making the house more appealing to families in the future.
1. Jack and hold I6'x9' single story room. Excavate and demo out failing brick
foundation walls. Excavate out crawlspace dirt. Pour concrete footings, install 8"
concrete block basement walls, and pour concrete basement floor. Install 2 wood
basement windows in new foundation (24" x 32").
2. Lower sills of south kitchen windows need to be raised above countertops. This
can be achieved by raising the lower sills 4" (one siding board). The new
windows will be 27 x 49" rather than 27 x 53".
3. There is a smaller window on the east side. The size of the window will remain
unchanged (24 x 45") but it will be raised by 4" so that the sill height is consistent
with the other two windows on the exterior.
4. The existing back steps must be removed for the foundation work. They will be
replaced by more aesthetic and safer steps. 8 steps will be used instead of 6, and a
landing will be included 2/3 of the way from the top. The new rise will be 7" per
step (existing is 8.5") and the tread depth will be lO-lOVz" (existing is 9").
Materials to be used
· Foundation: concrete block foundation with 2 wood windows (24 x 32", matching
existing basement windows) / will be covered with stucco to match existing
stucco
· Windows: Marvin wood windows; double glaze; Marvin wood storm window.
· Back steps: Pressure treated lumber (see photo ofneighbor's)
Exterior Appearance Changes
· Foundation: will no longer have wooden access door. Instead, there will be one
window on the south wall and one window on the east wall.
· Windows: South side windows will be 4" shorter. East side window will be
repositioned 4" higher. Existing aluminum storms will be replaced by wood.
House is currently about 2/3 wood storms and 1/3 aluminum storms - all black in
color.
· Back steps: Will look generally similar but more elaborate and substantial.
~
~
~
'7
N
SIT£
1=> LA 1'4
Ð( ;\J(...vJo-ý
~
------
1
K;+~~
~
J'Z
& o..'reuy-
_ _ _'fI¡~
\
l
l
t
I
I
\
PoRc..14 I
¡
;_ _ _ _ _ _ _ _ _ _ _ _..J.
BR.O ~ ~
75-r-~
LoI
0>
c:
.
()
co
LL
-
(I)
-C
.
..c
t:
o
..
(I)
en
~
o
..c
'+-
o
.........
c:
o
s......
LL
.
.........
s::
o
s......
.'
I
!
".,~..~.
c:
Q)
..c:
u
.......,
.
~
'+-
o
Q)
.,.....:<"'W
02/25/2005 15:41
3196482<:111\2
STUMPF CONST
PAGE 03
\, '-
~,¡&",_0'
Jrnpøøa1
",,"" No
..ap .
of
Pal'"
?' --.-.........
..
..
~ ~~ GENEAALCONTAACTOR
t iii 2975 HIGHWAY 22 E · P,O. BOX 130
~ \. RIVERSIDE, IOWA 52327
CONSTRUCTION Fax 319 648 90
631-2553
PROfO&Þ.\. $I,/IIMITI'~Q TO
Charley Stanier
STREU
529 Brown St
, CI'V. ST~1't ANO ZiP com.
IQwa City Ia
UC",ITECT
I'HOIIE
330-2403
JOa NAME
DAn;
2-25-05
JOII lOCAflOl'l
tlAt( 01 f'l.J\Nl
r;:'tH. ~~;. /1.1-' f
JOII PHOIfE
Wt he..by '\lbmit $ptCÍIICltiQnS and ostimllt.. IQr:
.
I
,
I
,
I
Jack and shore the 16' x 9' single story room on the south side
of t'he home.. E'xö'ä'va't·e·"""ând....:Cïëïñci)'..·..'ôii£'·'Ü'tbe· 'f·ãI"ìI'ñs:i'~..tfr1'ek' '¡¡'i";rs':"'"''''EJiêã'Ÿãië'''''''''~'''''''''~'''''''~''~
,
,
~? t ë~~6i~{:'" t~~¡~¡'ñ~'!'i~iI'~:~fh~~ë~T~~'="'''~2~~;:i~':''"''~'Þ'~-~}~~·~'I~~~··-i*:~,~·~·~····..··,·_",·,,·
~~:~=~~t tï~e t~~(19.~'~iiÞ""Þ~~Þ~"~Y~~'~ïii~~ñ~?Þ~u~,P'ñl~!"c~ij~·fi~~·~·fi~~~:iñ"""""""·"'''·'''''·''''''''-''·
the new basement area. Install a window in new foundation.
All debt- i s'c lêâñei<f'ïip"'äñèf"fíaüfë . w(iý'~"Reset"""e·xrlji't"ì·ñg·"wõõQ"s'Eeps··"·"'''''·'''''·'."................,
and touch up drive way gravel.
. .. . ,. ..,. . ,." n..m' ""..~"...."" '" ·"N,"·, '''"'..,,, no. "'''''''''''M''.~m'''''' ." "'W","','. ""'" ..,,,.,. ...... '..n'µ' "."... """......~""""'''' ''',''''''''''''''''''''~'''''''''''''_'M~'''~''n'M''''''_U'~~''''''"m..."....._...'..m..".m....'.,.,..."_,~......,"~".,...,....,...."~.,,
I
,
,
I
2 Y\e..v whJ+e. woo! \N1'~Df,AJ:$
, .. -, '''''''' ''''~.....,..._...,...".". .,,,.,.....,,",.,...,.,,"~..~...,. ",n,. ,.~. .~...._u,"...".",",,"",.,~..,,<.. ............"., ,..m...,. _.", '" ..' '·""-"·'·~'·~'''··''w...."w,...".,.,.~~"",....,~"...~~"__~..,,.........'~..,........~",..~.,,,,,.~"...._..........,...~..w,.,..........
.'..n.·""..."..
,.,......". ........~,. ~".....'.._"'. ....--...............-..,-..........".,.. ".".,,' .......".." ...." ........... ...~,,,..,,. .,. ..,,, ,.....,...,,,~...., ..".".........,............ ........ . ..__···..······.....~.·~.~·,·.."'w...,.........,......_..".".....~~"....._",..,......,"..'".·......"'~__.n_.....M~
. . ......., ..." .... ........""''''''.,~..m..~....·,,....'..,....................._~...........M.._.'''.._...,."......,..'........""."...."". ..... '" ....m""_.~..."M................"...,..'"~.....~......'M__m."..._...,,_.._'''''_'~''''M_'''''''''''''''''''_~''........"...........m..,._.,,''''''''_W'''''_'~
. .,..."......"
. . ..".......'..,...... .. ~~........."........,_.....~"..".....".,".'.......,......~~..._..__......._..."...".......,....,.,.,..,..........._.~."..~...,.,........,""">o,,.."....ff"..,...,....,..........__..""..._.""_._."__M"...""_".."'.....""...''''.._''"..''...M"...M.......~_"_..~.....~,~~...._,,
....."..
". ......,-.... . ..... ... .-.. ·,·'"'··",·.......,............~~_.."__......_._",."_".."~...._..,."u........~.~..,."..._......"_".""."."..,,,,,..,,,,."......,......,,.,,"....,,.,,,,,..".....,"~."..""......"'"......,..........14>"......_"_~~..."....._"'.,,....,,,.....,....,,'~,...._.."...._,,___....,,_.......~..
,.., .................
... . ...........,......,..."""..........",.,..,...,....".,_.........."...,...........,.........,..,_..."...._..". ··,·v"...·····., ",..".....,.......".,.,"'.....,..............M....".",.,.",,'............."..."""...~....".._...'.._...~",,.............,...._.....""M.......__".......",...".....,..,.....___"_...._.,,....._..w"'.
. ,..n.
...... .... ...... '"'' ...-.........,..,..,..,...,.,........,'..............,......."....................,.........',..",.,."..........,.."..".....,...".".."....",,,.....>0,,..,,......'"...........",'....."................_.....M_......¡"u"............................,...._,...._..................."'....,,,.,,...""......._..,,_._........
I
.... ... .......... .... ...".... ............ ...".m·..'·.·.~...."....."........_"..,......~,.."..."___""......."".·,,.·.'.'...........N'_""'""~...",....._"."'''"'''''',.~................,,.......'......M........."_......._."'.......".'''''................... 'r' , ,......__._....."....."./I...........n__".".._...."......"........"
I
l tb.U.tlj!IJ:D tJ~oul1>!nd
~&ym.nl 10 be mode .. 10110""
Upon completion.
II, 'rø.pøø, hereby 10 furnish material and labor - complete In accordance with above specifications. for Ihe sum of:
tb.r~,!!! Q"uq~r~d siJ:Ct...:f. .-1 . . ! . .. . . . .. . dollars ($ 13360.00
.) .
.. m"..-IOI ¡¡. ¡""r._..... .. _II.... M _... "" _.- ,.. ~ko
....... _In. to ""III!IfQ )fOftI.... M'i __... ~...... _ ......IIIco·
'}Oft, ¡nWl,,'n. ~ ëOiti wi-JI H ,ut:UiW ...., up Mlttftorcl." ami Will ~ .n
........... _......boYt tllo .!tlmalt. AI__IIII.COIIII.,ø.pIIO> ~~
Ot ....,. ~ -OWr tOnt""" ownw kî eat" II.... tømr]~"IM"'" fln"'.'Y IMufll'lQ.
OUt W'Uthn iln. filII)': ÇlMtm bY WQ~f, C9rri..,.Htiln 'MY"""
Autltqri¡td
Slpunt
"
NoI.: rhll pI'OJIOUIl m"f "
withdrawn II)' III If not ~td wllhln
30
I
...
-
.. dtyI.
Atttptlmr' .øf 'røpøa1.- ThtI abcIvti prIcfl, 1I*1I1"",1tw
.nd condition. .... $Ali.IIIC:IO!)' Ind Ill'll 1tIIrtII¡r~. YOII... lulhorIztd 511111\111'.
10 cIo t". worll as ."""mod. Parment will be mil. H IIIIIIlmId II!HM.
... .- -----
-..'Wt...·
.,,-~
. .
Oalt 0/ A«./llanco:
n
.
-- ,
~ -
$llIIItúrt .
""'~....._... ~
¡',"'.-
r-"1!j1' . .
c:
o
·
+-'
CO
c:
:::J
c:
·
+J
en
· ,.-
X
(J)
I
en
o
+-'
o
.r:.
~ .
I' .Q I.-
C a. 1i) G)
G> :J «1 E
~"C.B8
¡.æ .5E S
U}"",oooo
::;CJ) I ..
C\I - . «1
C «1
.G)~G)
G)ü:>E
"C '+- «1
«1 _. 0 s...
~..... ...~ ..... '+-
tn..c 0 G)
~ .~.~ ~
o .......~ 0
~ (¡) .5 .r:.
~ E P P
I.t) 0 s... G)
-- 0.2 >
~ u.J s... ;-:
COO~«1
°CG)~
P ~ E ~~
ø co....'
"CG)J::"C
¡E~~
X G) 0·-
III _ .¡:; .r:.
L.I.I(j).QU}
. U} ..c U}
§ to g> ~
:J ,,' e C
1Soð~~
G) ~~ U} ~
.'" ~ '-'
G>G)oc
t;....4«1 :J
C(¡)US
B E .«1
~.o.E ~
.....-.a>oQ)
·~"S·ø .~
U(,/) 'õ ~g
.~. ..~.........~..... .':JI .....
œoo~
·,_,.c'
...."''''''''y
':R-o ?ð6~
-Fa v..n.clo.. +-10 Y"'-
W " t\ d \.Ù..5
S ov.t"'- E \~""" C<" \-í 0.....
NtW
Z!. 4 ~ 32-'1 WooJ.. w\'o{\.J..ov-J
::::c... \0,-",+(0'" ~ o\ð.
,
c.I'"/I;W\ "'i'ø.a.- "f''it-Y''''''5
N.c.""
n......"'d-Q....\-\o'^
~6t-
E te.."oJ''''-~\"OY\
2'l'd~ ~ woe&.
w......tl.ow
',,,
..
"'C"
~.-
-~
CO
en
.
o
o
c:
Cl)
en
.
CO
.
"'C
Q)
..r:::.
'0
E -,"
s... œ
R E
CIJ Q)
"'C.c
o
o .-
~ ~
..r:::.~
",I" I"
"- c:
~ Q)
~e-
o ~
~Q)
.- E
~ œ
"'C-=
o ~
~ 0
c:~
.~~
:E ,.-,.~
Q) E
.c:::J
c:
.-
.- E
~ :::J
CIJ œ
~ Q)
"'Cs...
c: œ
..... UJ
~ E
-s...
æ!J.
E CIJ
Q)t:D
o c::
tV -,,,
c..æ
Q)à!i
0:::.........
·
(/)
c:
·
c:
(/)
co
s-
s-
o
'+-
·
-,,-----~
c::
.
+-'
en
.
x
en
(1)
+-'
en
~
u
co
c:»CD
C .~
. Iii. CD
>..J::
......
en c
.J::
;+-øO
..c
en
"C ~ ..
(]) en
() s...
coO
S- C»
.
(]) CD
.cC
o 0
............
~ ~
() CO
CD·
- ._~
.
~ ~
.
en
~ ~ w 1~
I ~u.~~l-a
I \Ç. 0 \I) Ql -.
r ~ ~
~\O
'"
/. .~
~ a.
/ c. .:
(f V
'"
- ~
"' oJ
f' ~
>' ,
~ (~ 3 ¡
J)
1 "
ç ..f '" "'U'~
.. .... >-
II) 'VIOlS~ «
- --.J) = p:. Q.
¡¿ -~~ ~
W \)Otr I lu
I .> ::.
...... Q
/ ~ ~
.) 0
~¡J I
~
/
/
/
>-
~
J(
~
.t»
~
(
~
~
~
\.1
~
--
1 ~
.; 0
JD
I
.~
j)
"1
Ó
%
4:
,J
Staff Report
March 04, 2005
Historic Review for 529 Brown Street
District: Brown Street District
Classification: Key-Contributing
Applicant, Charles Stanier, is requesting approval of Certificate of Appropriateness for proposed alterations to his
property on 529 Brown Street. The structure is a key-contributing property in the Brown Street Historic district. Proposed
alterations include repairing the foundation under the kitchen, replacement of three windows on the south side and
installations of two new basement windows. The applicant also proposes to reconfigure the stairs for back entry and
change the orientation ot the stairs.
Applicable Regulations and Guidelines:
4.0 Iowa City Historic Preservation Guidelines for Alterations
4.1 Foundations
Recommended:
Historic foundations
· Correcting all sources of moisture and other circumstances that may cause damage to the foundation wall and
footings.
· Repairing historic foundations rather than replacing them.
· Repairing or replacing, if necessary, foundations with materials that appear similar to the existing materials in size,
color, texture, composition, and joint profile.
· Repairing stucco with a mixture that matches the existing in texture, color, and composition.
· Retaining the size and shape of historic door openings, window openings, and storm cellar entrances in the
foundation. If new window wells are required, the materials used must appear similar to the existing foundation
material.
· Removing all nonhistoric materials.
· Maintaining a slope away from the foundation to prevent standing water or drainage toward the foundation.
Not Recommended:
Historic foundations
· Raising the adjacent grade at the foundation to cover what was historically exposed.
· Painting masonry or concrete foundations that were originally unpainted.
Exception:
Applies to: Historic Districts, Noncontn"butingproperties, Conservation Districts, All properties
New foundations
· For replacement foundation walls and piers, concrete or rock-face concrete block may be used in place of masonry
units that appear similar to the existing.
4.7 Windows
Recommended:
Replacement windows
· Replacing badly deteriorated windows with new ones that match the type, size, sash width, trim, use of divided-lights,
and overall appearance of the ~storic windows.
· Using new wood windows and sashes, if necessary, to replace historic wood windows and sashes. The use of metal-
clad, solid-wood windows is acceptable. Replacement windows and trim must accept paint. Divided-lights may be
created with muntin bars that are adhered to both sides of the glass, but not with snap-in muntin bars.
New windows
· Adding windows that match the type, proportions, trim, and appearance of the historic windows. The sash width
must be similar to that of the original windows.
· Adding new windows in a location that is consistent with the window pattern of the historic building or buildings of
similar architectural style.
Exceptions:
Applies to: Historic District, Noncontributing, Conseroation Districts, All properties
· Vinyl or vinyl clad wood windows may be used for replacement of basement windows provided the foundation wall is
no more than 18 inches above grade.
4.10 Balustrades and Handrails
Recommended:
New balustrades and handrails
· Installing turned balusters in balustrades that have an actual diameter of 2 inches or greater, or square spindles that are
1-1/2 inches or greater in width.
· Installing top and foot rails that are at least 2 inches in thickness. These can be made with 3/ 4-inch and 5/ 4-inch
lumber glued together.
· On buildings where a spindled balustrade would be most consistent with the architectural style, spacing spindles so
that the balustrade is at least 40% solid. Spindles must be spaced so that no gap between the spindles exceeds 4 inches
as required by the building code. This is for child safety.
· Providing handrails on porch steps as required by the building code. Handrails should match the historic balustrade
height on the porch unless otherwise specified by the building code. The handrail must have a continuous member
that can be easily gripped. The handrail should either match the porch balustrade or be made of round steel pipe.
· Providing balustrades on the porch as required by the building code. When the porch floor is more than 30 inches
above grade, the balustrade must be 42 inches high except for single-family and duplex structures where it may be as
low as 36 inches.
· Sloping the top and foot rails slightly to allow water to be shed from these surfaces and help prevent deterioration of
these members.
Disallowed:
New balustrades and handrails
· Using unpainted treated wood for elements that would have been painted in the historic application.
· Using wrought iron elements unless they were part of the historic design.
Exceptions:
Applies to: Historic District, Noncontributing, Conseroation Districts, All properties
New balustrades and handrails
· On buildings where a spindled balustrade would be most consistent with the architectural style, spacing spindles so
that the balustrade is at least 30% solid.
· On buildings where turned spindles would be most consistent with the architectural style, installing square spindles.
Staff Comments
Proposed alterations and use of material as stated in the application are consistent with the guidelines. Staff recommends
use of matching trim on all of the windows and a matching style of windows for basement. Foundation should be
repaired, or replaced as per existing conditions and if necessary, using the same stucco finish as the existing foundation.
Although the replacement windows for the kitchen are proposed to shorter in height, the change will facilitate a necessary
functionality. The structure, where the kitchen exists, appears to be a later addition. Proposed alterations are in general
consistent with the guidelines.
·-
Application for Historic Review
Application for alterations to the exterior of historic landmarks or properties
located in a historic district or conservation district pursuant to Iowa City
Code Section 14-4C.
Meeting schedule: The HPC meets the second Thursday of each month.
During the summer months, the HPC may also meet on the fourth Thursday.
Applications are due by Wednesday the week prior to the meeting.
For '"Staff Use: J)
Date submitted ..........~!!2.£...........................
\JP !XI Certificate of No Material Effect
ve( Certificate of Appropriateness
1:1 Major review
1:1 Intermediate review
1:1 Minor review
Applicant Information
(Please check primary contact person)
!XI Owner ...........H~.~~~.~.~~Y.!g.ª~9.r.~...............................
Phone ...............~:!1:-.9..~.~2...........................................................
Address ..........:?~~..~:.çº.u.~g~.§!r.~~L................................
..........................!!?~~.ç~.D.:<.!A..?~~:~g....................................
email .................................................................................................
1:1 Contractor ..................................................................................
Address ...........................................................................................
...........................................................................................................
Phone ...............................................................................................
email .................................................................................................
1:1 Consultant ..~º~.~~.Y..MçÇ~~.........................................
Address ..........7..f~.s.:.s.Mmm.lt.~Þ.::~~.t#.R1..........................
........................J.º~ª.ÇitY.,JA..~.*~:!º....................................
Phone ................?4J.::1Q.4.?...........................................................
...........................................................................................................
. shellmac@att.net
emall .................................................................................................
Application Requirements
Attached are the following items:
1:1 Site plan
W Floor plans
!XI Building elevations
!XI Photographs
1:1 Product information
!:J Other ..............................................................................
If the proposed project entails an addition, a new structure or
a significant alteration to an existing structure, please submit a
site plan, floor plans. building elevations and photographs.
If the proposed project is a minor alteration to a structure,
please provide drawings and photographs to sufficiently
describe the scope of the project.
Provide a written description of the proposed project on the
li;prnnn n:l17P nf thili; :lnnlir:ltinn
Property Information
Address of prope1t~~5~l¿.Ǻ.n~g~.§g.~~L.............................
....................................................................................................................
Use of property ..........ê.~~~.Y..ß~~~g~..........................
Date constructed (if known) ..............................................................
Historic Designation
1:1 This property is a local historic landmark
OR
~ This property is located in the:
1:1 Brown Street Historic District
!]¡I College Green Historic District
1:1 East College Street Historic District
1:1 Longfellow Historic District
1:1 Summit Street Historic District
1:1 Woodlawn Historic District
1:1 Clark Street Conservation District
1:1 College Hill Conservation District
1:1 Dearborn Street Conservation District
1:1 Lucas-Governor Street Conservation District
Within the district, this property is classified as:
!XI Contributing
1:1 Noncontributing
1:1 Nonhistoric
Project Type
a Alteration of an existing building (ie. siding and window
replacement, skylights, window opening alterations, new
decks, porch reconstruction, baluster repair or similar)
1:1 Addition to an existing building (includes decks and ramps)
veí Demolition of a building or portion of a building (ie. porch,
chimneys, decorative trim, baluster or similar)
1:1 Construction of new building
/13 Repair or restoration of an existing structure that will not
, change its appearance
\/'0 Othpr
¡,", , .1
¡.
(fi ,f
;:;/:'~-0
Project description
Th~.P'!g.P..9.1?~g.P'!gj!?Ç.t~§.!Q.!~£Q~Y:!!£!!hÇ..þ.~.~~P.Q!£h.~~.?~£h~.~º~~.?!.?~~..9~n~g~..~~~L.ThÇ..Q~g!m~!.~~!~Ç.~
~~~..g~Ql!~h~.~~l~..~Ç..Q~Ç.~.l'Y.Ç.!~.9.~tQn9.~.þ.y'.~.£QÐ.y'"~!Q!.l'Y.hQ.~~.~~£.~~.g.!Q.!~.P.~.!h~.P.Q!£h:.f.Q!lli:-........
~!Ç.~y.~.!h~P.Q!£h.9.9.~~;.m~~~.t.~~A.~r.?y'y'Ç..!rtm.l'Y.~~..~.~ty'~~g:...Th~.§h~.£t~.P.Þ.9.~Q.~~.g9.QL~~!Ç..~~..~'y'~~.
~.~.~!QY~.9.f..~~.~.p.p.E£!!~.9.!b.fu~.P.9.!£h.l'Y.!H.~.£Q~!!y'ç!~.~,!!.Qri~.Q~~!.&1:.~~£.~~.!h~..P.9.!£h.~g.~.g.~~~....
ç.QÐ.~ç~.QÐ..~~..µ'9.rthJ9.tUÐ.~.!!!!g.9.!~h:.~.f.Ç.~.f.~gr9.m.fu~.l'Y.Ç.§!IQn!!!~;.!hÇ..9.9.p':g~~.9.!.f.Q!.~~.?k.£QÐ.~y.Q~~!'~.!Q....
1?,Ç..~l~.~h~!hÇ..§h~.~..9.ri~~~.Y.J.Q£?~:..Th~~~JÜ~.µ,~.~~.!g..!~9.9.~£!!hÇ..§h~Q.~.:::~t.£lQ§~!.!Q.fu~.þ'.~ç~
4Q.9.!.~Q.§.::~:':.~~!h~.H:.:-.Q::'.~p.:J~gtÞ.:..H.9.~~.Y.~!;.!hÇ..§h~.!.~.Ð.9.!!!,£~~.Q~þ'ÿ'!!g.~~!~~~.f.~~~:.MQ!Ç.:-.
<J.y'Ç.;..~.~9.?..Q[~~..~~.!!!!g.J?'Q!£h~n.p':Q!.£~Ç..l'Y.hÇ.p.:.Yi~~~g.!!Q.~.ç9.n~g~..9.!.!.9.~.9.P.:.~t!~t§:...ThÇ..~hÇ.Q....
~Itþ'~QÇ~.~~.£QÐ.g~!.~m.p.~Þ.E£.Yi~~:................................................................................................................................................................
Th~..~!!~tp.!P.P.Q~~.~t!Q.~~£t~~.P.9.!£h.~~~.~~£h.~~Ç..!!Q!.Qri~.!Q.!hÇ.J?Q!f.h:...ThÇ.!Ç.J~..Q!g.p.~t
~t~~JQ£~!9.P.:.~~.~~.~~.~I~.~~..?~h~.!Q.!hÇ..ÇQ~~:..Þ.!.ÇQ!!~.~.!Þ.~J~Q!!!h?!!hÇ..~.P.~l~.~~.
':Y~.~~.!9.~£9.!!~!h.~i~J~m.Y..Y!!PJ!i.n~.~~:..f.~Q~~.~~,g.!2.Mf!fg~tK~y.~§~..lli!§.~.gf.....
~.Œþ.{y.~ili!.:-.JQ.~.ç!9.~!9.!Þ.Ç..!ID?!m~>.!Y.P.!~x.g.i4..'!9.th!y~.~~:.Th~f9.~.\!~YÞ.Æ.!hç.~~9.gª~~:...
:QQ!.£þ..!!~~~.~~~.~.~~9.n.9.f.!hç.~~....................................................................
Materials to be used
~;..~~~~~~~~H.~~.~~~.~~.9.!~~...............................................
~m~Ð.!p.~.l'Y.!M.~.m~~:.~.P.9.~hg~!.~º.~.~.~.~!~l~~~.~~!£!1...._.....................................
º9.2!.~.~Y..~~.~.!!!:..{~.r.9.!£Þ..~.9.P.:l.................................................................................................................................................
~h~;..~.9.Q~.g~~~.f.~~.~.~.~..~..~~~aI~.{~..~_~~~_~...................................
etc. will be wood or fiber-cement board.
............--..................---.....................................................................................................................................................................................................................................
Th~.!~f.f.<?!.Þ.9.!Þ..!hÇ..~h~.~P.9.!£Þ..l'Y.!M.~.~.£~ºM2!.~!!!!!:!!':..m.............................m.........................................................................
.............................................................................................................................................................................................................
..................................................................................................................................................................................................................
Exterior appearance changes
Qy~:L~.N?~.ºf.tÞ.~.p.~.m~þ..ªº4.~º~IDJ!.!!º!.~.ª"!~º.~...............................................................................................................
...........................................................................................................................................................................................................................................................................................................................................................
.........................................................................................................................................................................................................................................................................................
..........................................................................................................................................................................................................
.................................................................................................................................................................................................................
............................................................................................................................................................................................................
..........................................................................................................................................................................................................
..........................................................................................................................................................................................................
..........................................................................................................................................................................................................
...................................................................................................................................................................................................................
...............................................................................................................................................................................................................
» »
1- Î ::;. ~8:
8'-0" 8
:;;, 0 œ CD
Co :;;,. r- 8 Co I\)
œ <e. 0 õ....
:;;, :;;, £ :;;, Co
Q Q!..~ ~ß8
en 0 :;;, ....
c: =r :;;, Qg/f
:;;, ~g,
;::+
en ï1
(') -
m 0
(i) 0
~ ....,
~ -c
~
II OJ
~ :::s
, -
g
m
><
(i)"
-
S·
(Q
::J:
o
c:
UJ
CD
~
~
-..
,11\ --+
, ' I
===::1
0>
,-
00
=
c.=-.=-.=-_
en
=r
CD
0.
'ì--t
--
.....
,-
g
<
CD
~
s:\)
::J
0.
s:\)
"-'-+
I I
\__ I
.....
,-
g
"-'-+
' I
\...._ J
.....
,-
g
,,-,-+
I I
__,1
L 6'-11" -16'-11" -16'_11' J
"..'-'\
, I
,-,
, ,
, I
2x wolmanized ledger bds.
2x roof joists @ 24" O.c.
Crown moulding to
match original
2x8 cont. header
Extg. soft brick wall
2x8 wolmanized ledger bd.
Porch Section
Scale: 1/2" = 1'-0"
Bead bd. ceiling
I
~
I
I
I
I
I
I
I
I
I I
L___.J
EPDM roof or similar - red
1x6 fascia bd.
Half-round gutter
Half-round gutter
Fiber cement frieze bd.
Salvaged decorative frieze or
new to match original
Salvaged columns or new to
match original
2x8 wolmanized floor joists @
16" O.c.
Veritcalgrænfirflooring
(2) 2x8 wolmanized beam
Fiber-cement skirt bd.
6x6 post
12" d round concrete footing
flush to grade
(J) :z r---------
I
£ I
0 L_________
~ ;:¡..
~ =::r
......
Ol m
II CD
...... <
I
0 Q)
:I ~
r----------
0 I
I
::::J L_________
r----------
I
I
L.__________
¡-----------
I
L__________
ï---------
I
I
L._
c=J I
c=J I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
______________________________J I I
L_L_____J
en m
£
~ 0)
en
~ ......
~ m -
0)
= CD
II
~ <
,- 0)
0
= ......
o· r----
I
::J I
L_
í---------
I
'----
r---------
I
L____
...-
ß",'J¡
~~ "'"
~ 1:,
o
',,^,
'\
tf~:*'
j2"-','""""
"",":~,
0]1'7"
"'+
Staff Report
March 4, 2005
Historic Review for 528 E College Street
District: College Green Historic District
Classification: Contributing
Applicants, Helen and Kevin Burford, are requesting approval of Certificate of Appropriateness for the demolition and
proposed restoration of the back porch and shed at their property, 528 E. College Street. A Certificate of No Material
Effect was approved earlier last year for the restoration, but as described in the application it was demolished by the
contractor without the knowledge of the applicants. The porch and shed will be modified in design to accommodate a
condenser for the air conditioner, but will be very similar to the previous porch. Applicants are also proposing to not to
replace the railing.
Applicable Regulations and Guidelines:
4.0 Iowa City Historic Preservation Guidelines for Alterations
4.9 Porches
Recommended:
Historic porches
· Repairing historic porches and conserving as much of the historic material as possible.
· Replacing badly deteriorated components with hew ones that match the historic components in design and material.
Custom fabrication of columns, brackets, pedestals, and moldings may be necessary, but many porch components can
be ordered through lumber yards.
· Using vertical-grained fir porch flooring for its resistance to weathering.
· Using wood steps for a wood porch and tile, brick, or concrete steps for a masonry porch.
· Leaving exposed the support piers below the porch columns. Skirting must be added to fill the space below the porch
floor and grade if this space is 24 inches or greater. The skirt must be located between the porch piers.
· Constructing porch skirting using a 3-6 inch wood frame with slats fastened to the back of the frame in a vertical or
lattice pattern.
Disallowed:
Historic porches
· Removing a historic front porch.
· Changing the original roof pitch. Newer materials including EPDM rubber sheeting and heat-sealed asphalt products
make the maintenance of low-pitched roofs easier than in years past.
Exceptions:
Applies to: Historic District, Noncontributing, Conservation Districts, All properties
· Porches on rear elevations need not reproduce historic details.
4.10 Balustrades and Handrails
Recommended:
Historic balustrades and handrails
· Repairing historic balustrades and railings.
· Replacing badly deteriorated components with ones that match the historic components in design and material.
New balustrades and handrails
· Providing balustrades on the porch as required by the building code. When the porch floor is more than 30 inches
above grade, the balustrade must be 42 inches high except for single-family and duplex structures where it may be as
low as 36 inches.
Disallowed:
Historic balustrades and handrails
· Removing historic balustrades or railings.
Staff Comments
The porch appears not be original when the house was built in 1867 It was redesigned several times to accommodate
desired functions. The proposed redesign will not change the appearance of the structure or the porch. Similarly the
balustrade may also be a later addition to the porch in the most recent redesign.
Recommendations
The Certificate of Appropriateness be approved, provided the proposed alterations are consistent with the guidelines.
,~ 1
-~= -.....!t
----....
£~~!S
~ ~gg.~
~:
CITY OF IOWA CITY
MEMORANDUM
Date:
February 17, 2005
Bob Miklo, Sr. Planner
Tim Hennes, Sr. Building Inspector¡ft
13 Linn St. & 503 Melrose Ave
To:
From:
Re:
In response to discussions that the building division is at fault for the construction work
performed without a permit at the above addresses I offer the following:
13 Linn St.: Inspectors noticed work being performed to the outside of the building and informed
Frantz Construction's employees a permit was required prior to any such work being
done. The exterior building wall was already cut and interior work completed prior to
the building inspection division investigating. I did not have a conversation with the
contractor regarding this project prior to the work being done. I'm confident in stating
this because I'm aware that this building is a historic structure since its historic nature
was used as an argument by the owner to not require an accessible entrance into
the building for the new restaurant use that went in the lower level in 2000.
503 Melrose Ave: This project was again brought to our attention after the work was completed.
The issue was brought to the city's attention by a neighbor calling Shelly McCafferty
who investigated and discovered the work was not permitted. The building
inspection division sent a notice of violation for construction without a permit to the
owner shortly after this discovery. It is alleged the contractor had called and asked if
he needed a permit for the work and was told he didn't. I'm confident that all staff in
the division is aware a permit is required for the removal and replacement of
structural columns regardless of the historic nature of the building.
More often than not the first defense when someone is confronted with an inspector citing work
without a permit is to reference an undocumented conversation saying we called and
they told me a permit wasn't required. Staff is very cautious with these
conversations and recommends plans showing proposed work to make a final
determination if a permit is required or not.
MINUTES
HISTORIC PRESERVATION COMMISSION
FEBRUARY 10, 2005 -7:00 P.M.
EMMA J. HARVAT HALL
DRAFT
MEMBERS PRESENT: Richard Carlson, James Enloe, Michael Maharry, Mark McCallum, Justin
Pardekooper, Jim Ponto, Amy Smothers, Tim Weitzel
MEMBERS ABSENT: Michael Gunn
STAFF PRESENT: Bob Miklo, Sunil Terdalkar
OTHERS PRESENT: Michael Brennan, Helen Burford, Shelley McCafferty, Zoe Eckstein, Barbara
Eckstein, Jim Throgmorton, Joyce Hofmann, Ben Hofmann, Bob Orend, Bill
Frantz, Michael Wright, Dan Lammers, Rita Sandhagen
CALL TO ORDER: Chairperson Michael Maharry called the meeting to order at 7:05 p.m.
Maharry stated that the order of proceedings for each application will be an oral report by staff
summarizing the issues of the application, an opportunity for the applicant to speak, the
Commission will then discuss the application in relationship to applicable standards and
guidelines contained in the Preservation Handbook. After deliberation, the Commission will state
its findings and vote on a motion. Motions are always made in the affirmative. Approved
certificates authorize the building official to issue permits for the approved work. Decisions of the
Commission will be filed with the City Clerk within five days of the meeting at which the decision
is made. An applicant desiring to appeal a decision of the Commission must do so by letter
delivered to the Commission staff no later than ten business days after the decision is filed with
the City Clerk's Office.
PUBLIC DISCUSSION OF ANY ITEM NOT ON THE AGENDA:
There was none.
INTRODUCTION OF STAFF - SUNIL TERDALKAR :
Maharry introduced Sunil Terdalkar as the new City staff person. Terdalkar stated that his
undergraduate degree is in architecture, and he worked as an architect for a year and half. He said
he then received his degree in planning from The University of Cincinnati.
Maharry welcomed Richard Carlson as a returning Commission member.
ITEMS FOR CONSIDERATION:
604 Grant Street.
Terdalkar said that this is a reapplication after an earlier denial of a certificate of appropriateness.
He said the owners have proposed to replace the windows as per specifications attached with the
application. Maharry said these windows were suggested by Knebel Windows as windows that
meet the guidelines.
Joyce Hofmann said that these windows had been approved by the Commission for previous
applications. She said the lawyer for the company that installed the first windows is now saying
that a portion of the installation has been completed but that the Hofmanns had refused to
complete the installation and had not paid for the work. Joyce Hofmann said they would not pay
the company for something the company did not get a permit for. She said they have consulted
their own lawyer. Maharry said the Commission would support the Hofmanns in this matter. Justin
Historic Preservation Commission Minutes
February 10, 2005
Page 2
Pardekooper said that he would be willing to work with Knebel on a voluntary basis regarding the
installation of the windows.
Tim Weitzel asked if the windows are six over six. Terdalkar confirmed this.
"MOTION: Mark McCallum moved to approve the certificate of appropriateness for the replacement
of windows at 604 Grant Street. Weitzel seconded the motion. The motion carried on a vote of 8-0.
Joyce Hofmann said she probably won't pursue going forward with this until the matter is
resolved with the company that replaced windows recently. Maharry said the Commission's
decision had no time limit.
814 Ronalds Street.
Jim Throgmorton, one of the owners of the property, said the contractors were also available to
answer questions about this project. He said he and Barbara Eckstein bought the house several
months ago, intending to renovate it, to contribute to the neighborhood, and to contribute to the
City by investing in it. Throgmorton said he has hired some really good people to work on the
house, with Lammers Constructions and Rita Sandhagen doing most of the work.
Dan Lammers provided photographs of the existing 3076 wood door, with transom above, that
would be moved to a new location as indicated on the drawings. Terdalkar said this is a single-
family house, and the applicant is making a request for an alteration. He said the applicants
propose to remove two awning windows, install a new bay window and relocate the rear entrance
door.
Lammers said the existing door to be reused was originally an exterior door that now leads out
into a porch. He said the porch will be incorporated into a new kitchen. Lammers said the door in
place will have the transom over it.
Lammers said he would try to duplicate the bay window on the front of the house as closely as
possible. He said the new window will be an Andersen thermalpane window with wide trim.
Lammers said the drawings show steps coming directly off the door, but City Code will not allow
that. He stated that he will have a three-foot landing there to conform to the Code. Lammers added
that there will not be brackets under the bay window as indica.ted in the original drawings.
Richard Carlson asked about the north window that is eliminated on sheet three of the drawings.
Sandhagen said there is currently a window there, but it will be removed because that is where the
kitchen cabinets will be located.
Maharry asked about the material for the soffit and the fascia on the bay window. Lammers replied
that everything else in the house is just the standard dimensional wood, so that is what he will
use there. Maharry asked if there are updated plans for the baluster design on the exterior stairs.
Sandhagen said that the stairway is an existing stairway that will just be moved around.
MOTION: James Enloe moved to approve a certificate of appropriateness for the revised drawings
for the project at 814 Ronalds Street with the provision that the trim for new and replaced
openings and everything be done in wood as explained at the meeting. McCallum seconded the
motion.
Jim Ponto asked if having the wider landing would push the stairs in front of the basement
window. Lammers confirmed this and said he will therefore probably have to discontinue the
window and block it in. He said he would use cast block. Ponto asked about the existing window
air conditioner, and Lammers responded that it would be removed.
Historic Preservation Commission Minutes
February 10, 2005
Page 3
Eckstein said the future plan is to have a screened porch off of the door. She said they will do all
these th ings that make it up to Code, but they planned to add a screened-in porch in that area.
AMENDMENT TO THE MAIN MOTION: Enloe amended the main motion to approve the removal of
the basement window on the north. McCallum seconded the amendment.
Maharry said this project is a good example of rehabilitating historic space. He said this involves
removing and adding a few windows that are modern yet match the historic design of the house
allowing update the kitchen and provide more reasonable space; this is a good design. Maharry
said he appreciates the recycling of the historic door.
The motion carried on a vote of 8-0.
815 Roosevelt.
Terdalkar stated that this property is a contributing structure in the Longfellow Historic District.
He said this is a two-story, single-family residence in the craftsman style. Terdalkar said the
applicants propose an addition to the rear of the property and have submitted revised drawings.
He said the addition would now be offset by twelve inches from the existing south wall of the
house to differentiate between the new and existing structure as per the guidelines. Terdalkar said
the plan showed an eight-inch offset from an existing wall on the north side of the addition.
Terdalkar said that he would suggest not offsetting the wall by eight inches and making the
addition a size of nine feet six inches by ten feet two inches.
Wright said he had no problem with losing the offset. Lammers said he would be duplicating
everything that is on the house with the addition. He said the soffits will be the exposed beaded
soffit, and stonework around the bottom will be cast stone.
Enloe asked if this is basically increasing the offset from the side to comply with the twelve-inch
guideline. Terdalkar said the guideline requires only the offset from the existing plain of the
building.
Michael Wright asked if the recommendation is to eliminate the little popout on the one side.
Terdalkar confirmed this. He said the applicant could either go for an addition of nine feet six
inches by nine feet six inches or increase it to ten feet six inches by nine feet six inches. Wright
said he would prefer to keep it as nine feet six inches by nine feet six inches. Terdalkar said it
would not make any difference on compliance with the guidelines.
Carlson said it is more an aesthetic thing than anything else. He said there is no reason to have
the jog, but if the owner wants to have the jog, the Commission has no objection to it.
MOTION: Ponto moved to approve a certificate of appropriateness for an addition to the house at
815 Roosevelt. Weitzel seconded the motion. The motion carried on a vote of 8-0.
13 South Linn Street.
Terdalkar stated that this building is one of the Iowa City historic landmarks, built in 1917 with
great influence of the Georgian Revival style. He said the exterior was altered in the form of an
installation of an ATM. Terdalkar said the Georgian revival style is characterized by its symmetry,
the geometric proportions, hipped roofs and sashed windows. Terdalkar said the ATM and the
opening created to fit it breaks the symmetry.
Bill Frantz said he represents Frantz Construction. He said that Frantz Construction was hired by
Liberty Bank to install the ATM machine. Frantz said the bank had contacted the owner of the
building, after which a representative of Frantz Construction asked a Building Department official
what would have to be done to relocate a forced water main. Frantz said that through that, there
Historic Preservation Commission Minutes
February 10, 2005
Page 4
was a misunderstanding on the part of the Frantz Construction representative as to what was
required, as he believed no permit was needed.
Frantz said he found out after completion of the work that the building was designated as a
historic building. He said he then talked to Tim Hennes at the Building Department, who informed
him as to what the procedure is. Frantz said he had contacted the City Engineer to find out the use
of the public right-of-way, and the City Engineer informed him that. agreement was not required.
Frantz said that the brick that was removed has been salvaged and could be reused at some later
date if the ATM is removed.
Weitzel asked if the removal of the sprinkler system main would require a building permit. Frantz
said it did not; he said he was told that it is governed by the State and was directed to the Fire
Department to get information regarding that, although they did not say that a permit was required
for that.
Maharry asked if the changes in the electricity for the ATM would require a permit and inspection.
Frantz said he was unsure what was required there for that. Miklo said that generally, any
electrical work requires a permit, although he was not 100% certain that it would have been
required in this case.
Frantz said that his company is in the construction business, and they know what permits are
required. He said that they get permits for all of their new construction and remodeling. Frantz
said the first thing they did was to approach the Building Department. He said the
misunderstanding is unfortunate, but Gene Nisly from his office did speak directly with Tim
Hennes, the Chief Building Inspector, before any work was done.
Weitzel asked if landmarks have historic overlay zoning. Miklo said that they do and are
designated on the zoning map. Maharry said that would be triggered by the City process if the
address of any landmark in the City came up, whether in a historic district or not. Miklo said it
would then bring it to the attention of the building official that an additional step is required before
a permit could be issued.
Maharry asked if other ATMs have been installed recently and if building permits were required in
those cases. McCallum said that a lot of them are interior to buildings. Maharry said he assumed
that a permit would be required to install an ATM to the exterior of a brand new building,
particularly with the electrical consequences and the right-of-way issues.
Pardekooper said the æa+-.apparent problem is that, as per the applicant, there was a failure in
communication. He said the Fire Department is usually the entity that should be consulted with
regard to fire sprinkler concerns. Pardekooper said the issue is in where the fault lies and thought
it would be helpful to talk to Hennes regarding this application.
Maharry proposed that the Commission's scope is to decide whether or not this is an appropriate
alteration of a historic building, regardless of whether it is already in place or whether it is
planned for the future. He said that is the Commission's only purview. Maharry said the
unfortunate situation doesn't change what the Commission is supposed to do, which is to decide
whether or not this is an appropriate thing for this particular building. Enloe said it would,
however, be useful to follow up on this situation to make certain it does not happen again.
MOTION: Enloe moved to approve a certificate of appropriateness for the installation of an ATM at
13 South Linn Street. McCallum seconded the motion.
Enloe said the ATM is inappropriate in this location and ruins the symmetry of the facility's
design. Ponto said if this had come to the Commission before installation, he would have asked
about other options and other potential locations. Weitzel pointed out that this is a landmark
structure and this does not comply with the Secretary of Interior's guidelines for treatment of a
historic building.
Historic Preservation Commission Minutes
February 10, 2005
Page 5
McCallum said he has been in a similar situation where he has had to really ferret out from the
Building Department what was approved and what was not approved. He said he does not think
this is the fault of the construction company, although he does not like the location of the ATM.
Maharry said the Commission has been put in this position all too frequently. Weitzel said the
Commission cannot be the judge of what went wrong or why it went wrong. He said the
Commission needs to be the arbiter of what is appropriate in terms of architecture and history and
apply the guidelines and the Secretary of the Interior's standards.
The motion failed on a vote of 1-7. with McCallum votina in favor.
Maharry said the decision may be appealed within ten business days after it is filed with the City
Clerk's Office, which is done within five days.
503 Melrose Avenue.
Bob Orend stated that he is the Facilities Manager for the Latter Day Saints Church.
Terdalkar said this is an Iowa City historic landmark. He stated that the architecture of the
structure is influenced by Victorian and Italianate and a little bit of colonial revival style. Terdalkar
said that the columns of the porch were removed and so were the balustrades. He said the reason
given for this was the cost of maintenance.
Orend said there was no intent to circumvent the Commission. He said he instructed the
contractor, Stephens Concrete, that a permit was required for this project. Orend said he
questioned Stephens at length, and Stephens said he had contacted the Building Department and
was told that a permit was not required. Orend said that when Stephens inquired about a permit
he did not volunteer the address nor did the clerk he spoke to ask for the address.
Orend said the columns are installed and the intent was to match what was existing there. He said
that matching materials were not used; these are aluminum columns. Orend said one of the
reasons for that was maintenance. He said there are other exterior things planned for the building
for 2006, and this meeting was very educational for him.
Maharry said that it is of concern that this is the second time this property is before the
Commission with a project that did not comply with the guidelines. He said there was an issue
with vinyl replacement windows a year or two ago.
Orend said the pillars do not match the existing color of the house, but the intent is to eventually
have them match. Orend said that recently a bay window was replaced, but was approved by the
Commission. Maharry said that approval came after the expensive windows were already
purchased. The applicant came to the Commission and said that they had purchased custom
made replacement windows before seeking Historic Preservation approval because the building
owner did not realize a permit was required.
McCallum said the pillars that were replaced were not necessarily original. Maharry asked if there
was thought to returning the building to its original and more simple structure as shown in the
1910 photograph. Orend said no, that the thought was to match what was replaced as nearly as
possible. He said the porch is considerably different, because the floor is all concrete now. Orend
said that a few years ago wood epoxy was used on the balusters, but that only lasted a couple of
years.
McCallum asked if a center rail is required by Code. Weitzel said that if the deck is 30 inches or
below, a center rail is not needed.
Historic Preservation Commission Minutes
February 10,2005
Page 6
Miklo said this was not the original porch design and said the pillars were installed sometime
between 1912 and 1966. He said there is a Secretary of the Interior standard that says that
changes to a property that have acquired historic significance in their own right will be retained
and preserved. Miklo said the Commission may want to discuss whether that would apply in this
case. He said this is an issue because what was replaced was architecturally significant.
Weitzel asked Carlson what he thought about the significance of the porch. Carlson responded
that the porch was clearly an early 20th century replacement because of the style and building
materials.
Carlson asked if any of the replaced materials were salvageable or salvaged. Orend replied that
the only things remaining are some of the wood columns, which may not be in good enough
condition for load bearing capacity. He said the balusters were destroyed when they were
demolished. Orend said there are only a couple of the capitals left.
MOTION: Ponto moved to approve an application for a certificate of appropriateness for the
installation of aluminum columns and balusters at 503 Melrose Avenue. Enloe seconded the
motion.
Weitzel questioned whether the Commission could require the owners to put back what was taken
out because it has been destroyed now. He said, however, that it was significant historically and
architecturally. Carlson asked if the items that were replaced would have been salvageable.
Smothers said she would need to see the materials. She said, however, that there are people and
companies in the State who can replicate what was removed. Smothers said it would cost more,
but the replacements would follow the Secretary of the Interior's standards and guidelines.
McCallum asked if the aluminum columns can be painted, and Smothers confirmed this, but
mentioned difficulties.
Weitzel stated that if the Commission looks at the guidelines, this cannot be approved. He said
that based on the guidelines, the original feature was significant, and the guidelines prohibit the
removal of the feature.
Maharry summarized that this clearly did not meet the requirements and that it would not likely
have been approved if the applicant had requested it before doing the work. If an application had
been submitted the Commission would have explored solutions to repairing the existing materials
rather than compete replacement with inappropriate new materials. He said that the Commission
did approve the window replacement in the previous application for this property because the
windows being replaced were not historic but were from a recent remodeling. Although the porch
design was not the original it was installed early in the 20th Century and was historic in its own
right.
MuCallum asked if the Commission would approve restoring the porch to it original design shown
in the 1912 photograph. Enloe said that if the Commission votes no on this, the applicant will need
to come back with a different proposal. Orend stated that the owners have spent $20,000 on this
already.
The motion failed on a vote of 0-8.
Maharry said the decision may be appealed within ten business days after it is filed with the City
Clerk's Office, which is done within five days.
618-622 Iowa Avenue.
Terdalkar said the applicant has asked for a deferral of this item.
Historic Preservation Commission Minutes
February 10, 2005
Page 7
MOTION: Weitzel moved to defer consideration of a certificate of appropriateness for a project at
618-622 Iowa Avenue. Enloe seconded the motion. The motion carried on a vote of 8-0.
416 South Summit Street.
Terdalkar stated that this is a contributing property in the Summit Street Historic District. He said
this is a single-family house built between 1910 and 1920. Terdalkar said the house has some
influence of prairie style and is a good example of foursquare design. He said the application is
for a certificate of appropriateness for additions and alterations.
Pardekooper said that because he is the general contractor for this project, he would recuse
himself from participation in the discussion. He said that McCafferty would answer any questions
about the project.
McCafferty said that this house was a rental property that was purchased by the neighbors with
the intent to rehabilitate it and put it back on the market as a single-family house. She said there
are a few minor alterations plus the deck that they would like to add. McCafferty said the railing
for the proposed addition is decorative, but she would also like to get approval of a standard
railing with 2 Y:z inch spacing as an alternative.
Maharry asked about the height of the skirting below the deck. McCafferty responded that it is
pretty tall, close to six feet high. She said there is no way to modify the grade there to raise that,
because of the driveway and garage right next to it. McCafferty said there is a cistern there also,
and she did not want to do anything with the cistern because it is so close to the house and
foundation and she was afraid that the added soil pressure from filling it might damage the
foundation of the house. She said she expected the skirting to be vertical slats of about 2 Y:z
inches.
Weitzel asked if that would historically have a skirting. Smothers said that the skirting is a 19th
century style for a lot of recreational homes along water bodies, and to be that high is actually
quite natural.
Smothers asked about the proposal to replace the existing awning windows on the north elevation
with a glass block. McCafferty said that was done at the owners' request, although they were
informed that it might not be approved by the Commission. She said her request would be that if
the Commission does not approve the glass block, to either leave the frame in place and use
obscure glass or to get rid of the awning windows altogether. McCafferty said the window is
above the shower wall so that a conventional window could not be installed there.
Smothers asked if the owners would object to putting more substantial trim around the glass
block. McCafferty said that right now there is just a two-inch standard trim as drawn. Smothers
said that giving the window some depth might make it recede a little bit.
Carlson said it does not look like there is any kind of recess, and there should be an eight-inch
recess from the side wall for the deck. Weitzel said he did not know if the setback requirements
would apply to a deck.
McCallum said the deck makes sense the way it is lined up now. He said because the window is
there, an offset would move the deck over to go against the existing window. McCafferty said she
ended up needing a fairly wide deck to get the width of the stairs so that the stairs would not
interfere with the driveway. She pointed out that this is fairly far back from the street.
Ponto said the reason for an offset is to distinguish a new addition from an existing building, and
if it is a deck, it is already distinguished. Weitzel agreed and said the Commission did not want to
force the change of an existing window in order to get an offset.
Historic Preservation Commission Minutes
February 10,2005
Page 8
Carlson read from the guidelines under recommended, "Decks: Locating a new deck on the back
of the primary building, opposite the street-facing façade and set in from the side walls at least
eight inches." Maharry said it is recommended but not required. Carlson said the Commission
then needs to make very clear why no offset is required, if the certificate is approved.
MOTION: Weitzel moved to approve a certificate of appropriateness for a project at 416 South
Summit Street with the options of either 1) leaving the existing windows, 2) using opaque glass in
the existing, or 3) removal of both the awning and window entirely on both sides of the bathroom
and with the option of using the alternate, simple rail design for the deck. Enloe seconded the
motion.
Weitzel pointed out that the rationale for not requiring the deck to be set back is that the setback
is a recommendation and not a requirement in the guidelines and because a setback would
interfere with the existing window.
The motion carried on a vote of 7-1. with Carlson votina no.
MINUTES:
Januarv 8. 2005.
MOTION: Weitzel moved to approve the minutes of the January 8, 2005 meeting of the Historic
Preservation Commission, as written. Enloe seconded the motion. The motion carried on a vote of
8-0.
Januarv 13. 2005.
Carlson said there was a typographical error on page two, the misspelling of the word
"application."
MOTION: Enloe moved to approve the minutes of the January 13, 2005 meeting of the Historic
Preservation Commission, subject to one typographical correction. Weitzel seconded the motion.
The motion carried on a vote of 8-0.
DISCUSSION AND INFORMATION:
Historic Preservation Week Activities.
Miklo said that because the staff position supporting the Commission is half time and because of
the number of applications in recent months, staff cannot put in as much time in preparing for
preservation awards as in the past. He said staff therefore wanted to start discussions early to get
volunteers for various tasks and possibly have more input from Friends of Historic Preservation.
Miklo said the other possibility is to do a different activity for Preservation Week in May and hold
the awards program at a different time of year.
Maharry stated that there was discussion at the annual Friends of Historic Preservation meeting
regarding changing the awards program to Irving Weber Week in August. He said that would give
more time in the spring and summer to arrange the program and also allow for more projects to
be completed during the year of presentation. Maharry said the tasks to be assigned include
advertising and soliciting nominations, which could be started at any time and possibly have a
closing date.
McCafferty said that as the past staff person for the Commission, she would offer some
suggestions for consideration. She said often projects are begun in the summer with the intention
of finishing them the next spring. She said that if the project is not completed before the awards
ceremony and the nominations are closed too early, there will be a wait of two seasons in order
for it to be recognized. McCafferty said she would support presenting the awards in August so
Historic Preservation Commission Minutes
February 10, 2005
Page 9
that projects can be recognized as soon as they are finished, and doing something else to
recognize Preservation Week, such as walking tours, editorials, and/or educational exhibits.
Burford said she has made some inquiries with the Johnson County Historical Society to see if it
would be open to greater participation. She said she is waiting to hear back to see what the scope
and expectations could be for additional volunteers. Maharry suggested the Englert Theatre as a
potential location for the awards presentation.
Miklo suggested appointing a subcommittee to meet with a similar subcommittee of the Friends of
Historic Preservation to discuss these issues. Maharry, McCallum, and Weitzel volunteered to
serve on such a subcommittee. Maharry said that Friends of Historic Preservation meets on
February 16th, and between that time and the March Historic Preservation Commission meeting,
the two subcommittees can get together to discuss Preservation Week.
MOTION: Weitzel moved to create a subcommittee to talk to other organizations regarding moving
the Awards Ceremony to Irving Weber Week in August. Enloe seconded the motion. The motion
carried on a vote of 8-0.
Historic Review Subcommittee:
Maharry said that the subcommittee framework is in place if the Commission chooses to enact it.
He said this might be a good time to do that, especially since it would help Terdalkar learn the
process.
Terdalkar read from Section 10 of the By-laws of the Handbook describing the purview of the
subcommittee: ''The Commission shall have the authority to establish a Historic Preservation
Design Review Subcommittee to review and make recommendations to the Commission regarding
the applications of certificates of appropriateness. Said subcommittee shall consist of three
members of the Commission appointed annually by the Commission to serve one-year terms."
Maharry said the subcommittee would hold discussions and question and answer sessions and
formulate an opinion to forward to the Commission as a whole. He stated that the subcommittee
meetings would also be open public meetings that would need to be advertised. Enloe said he felt
the subcommittee would expedite the work of the Commission as a whole. Maharry said the
Commission could discuss this further at its next meeting.
OTHER:
McCollister Farmstead:
Terdalkar said that drawings depicting conceptual ideas for the land on the McCollister Farmstead
were submitted, and the developer is looking for guidance from the Commission. He said the
designs are for the replacement of the barn with a mixed-use commercial and apartment structure.
Weitzel said he likes the board and batten and the stone elements proposed for the barnlike
structure. Terdalkar pointed out the elevation that would be seen from the street.
Smothers said this structure is a classic Iowa barn. She said that in terms of shape, size, scale,
and use of space, that is what comes to her mind. Smothers said that she did like some of the
elements used here in terms of the rhythm and fenestration.
Terdalkar said there is a kind of dilemma to having so many openings on the side, and you would
not find that on a barn. Maharry said he did not believe that people would want to live in a building
so stereotypically like a barn.
Historic Preservation Commission Minutes
February 10, 2005
Page 1 0
Miklo said this will be new construction and the developer is asking for feedback. Enloe said the
consensus of the Commission is to have something in between the two designs. Maharry said
that because there will be five other structures on the site, it will not appear like a farmstead.
McCallum said that one is used to seeing the barn from the road, and he would like to see
something with a similar size and footprint to the old barn and perhaps something not so
commercial looking. Maharry said he would like to see the design have less of an arts and crafts
feature. Miklo said he would inform the developer that of the two designs, the Commission would
prefer the second one but would like to see something that is a little more barn-like and simple,
without the obvious arts and crafts style. He said he would inform the developer that the
Commission would like to see this on its agenda again.
Maharry said that the Commission would hold a meeting on Tuesday, February 15th at 5: 30 p.m. to
consider a certificate of appropriateness.
Miklo stated that Kerry McGrath from the State Historical Society would be in Iowa City in March
and would like time on the agenda of the Commission's March meeting.
Terdalkar said the City is sending out over 1,100 informational letters, including maps, to every
property owner of landmark properties and of properties in the City's conservation and historic
districts.
ADJOURNMENT:
The meeting was adjourned at 9:12 p.m.
Minutes submitted by Anne Schulte
s:/pcd/minutes/hpcl2005/hpc02-10-05.doc
MINUTES
HISTORIC PRESERVATION COMMISSION
FEBRUARY 15, 2005 - 5:30 P.M.
PLANNING DEPARTMENT CONFERENCE ROOM
DRAFT
MEMBERS PRESENT: Richard Carlson, Michael Maharry, Mark McCallum, Jim Ponto, Amy Smothers,
Tim Weitzel
MEMBERS ABSENT: James Enloe, Michael Gunn, Justin Pardekooper, Jann Weissmiller
STAFF PRESENT: Bob Miklo, Sunil Terdalkar
OTHER PRESENT: Michael Brennan, Jill Crouse, Randy Wessling
CALL TO ORDER: Chairperson Maharry called the meeting to order at 5:36 p.m.
PUBLIC DISCUSSION OF ANY ITEM NOT ON THE AGENDA:
There was none.
ITEMS FOR CONSIDERATION:
629 Oakland Avenue.
Terdalkar stated that this is a contributing structure in the Longfellow District. He said this application is
for alterations to the building, including removal of the chimney. Terdalkar said that the chimney is
proposed to be removed for interior alterations and that it is not a fireplace chimney. He said that the
applicant also proposes to replace a window on the second floor and remove a window on the first floor.
Jill Crouse, 629 Oakland Avenue, said that she likes the way her house looks and doesn't want to change
it but given the smallness of the bathrooms and the amount of space the chimney takes up, especially
upstairs, she would like to remove it.
Regarding removal of the first floor window, Crouse said she did not really want to alter the exterior of the
house much. She said the other options include removing the built-in linen closet, which gives a lot of
character to the interior of the house, or removing all of the closet space. Crouse said she saw the
window removal as the lesser of the evils. She said her neighbor's side door is right outside the window,
so there is a privacy issue with the window.
Descriptions of the two options for replacement windows were distributed. Crouse said the Andersen
window had vinyl trim so that it does not meet the guidelines. She said the Shelter window is aluminum-
wrapped wood.
Crouse said she would like to make the bathroom into a walk-in shower. She said that besides the
privacy issue, it is very difficult to keep the woodwork dry. McCallum suggested using a circular shower
curtain that circles all the way around.
Maharry asked about the second floor window replacement - if two windows would be replaced with two
windows. Crouse said she planned to use a twin unit with windows of the same size. She stated that one
of the current windows is warped and won't open, and the ropes on the other window are broken so that it
only opens slightly.
MOTION: Ponto moved to approve a certificate of appropriateness for alterations to 629 Oakland
Avenue, with the stipulation that the Shelter window be used to replace the second floor window.
Weitzel seconded the motion.
Ponto said he is concerned about losing the bottom window. He said it looks very nice and to have that
expansive space without a window there will give it a very different look.
Smothers said she agreed and said there are other alternatives, such as the use of textured glass in the
bathroom window. She said that she did not have a problem with removing the chimney from below to
Historic Preservation Commission Minutes
February 15, 2005
Page 2
add space. Smothers said that it would be very difficult to stabilize the chimney on top of the roof. She
said the first floor window and the chimney are identifiable features to this house.
McCallum said there could be a tiled shower wall all the way around the window with perhaps an insert
covering the window with a moisture-proof surface on the inside to serve as the shower wall.
Maharry stated that the guidelines disallow the removal of windows and doors that contribute to the
overall character of the house. Carlson said that both the chimney and the window are fairly minimal in
terms of their overall contribution, but the house itself is so minimal in detail that percentage-wise, these
things are more important.
Ponto agreed to withdraw his motion so that the project could be considered in three separate parts.
MOTION: Weitzel moved to approve a certificate of appropriateness for the replacement of the
upper floor window with windows that meets the guidelines, for the project at 629 Oakland
Avenue. McCallum seconded the motion. The motion carried on a vote of 6-0.
MOTION: McCallum moved to approve a certificate of appropriateness for the removal of the
chimney of the house at 629 Oakland Avenue. Ponto seconded the motion.
Weitzel said the Commission needs to come to a consensus as to whether the chimney is a contributing
feature of the house. Carlson stated that the chimney is a contributing feature but questioned whether it
is a key feature. He said the guidelines disallow "Removing prominent chimneys that are important to the
historic architectural character of the building." Carlson said it is not a prominent chimney, and it may be
only marginally important to the character of the building, in his opinion. He said that even if removal of
the chimney is not expressly disallowed, the Commission needs to consider whether it contributes
enough to the building to warrant its preservation.
Smothers said she considers the chimney part of the silhouette in terms of the neighborhood. She said
one of the ways to tell an older home from a new one is the presence of a chimney like this.
Carlson said that if it were even a plain brick chimney, it would be different, but the exterior has the same
decorative brick as the foundation and the porch. He said this is really all of a piece.
Weitzel said he hates to keep such a small feature of a building from making an adaptive reuse that will
keep the building usable and modern. He said, however, that the chimney matches the 'columns on the
porch, and that was an intentional design feature when the house was built.
Ponto said he could see how taking out the chimney would really allow a decent bathroom on the second
floor. Maharry said he is of the opinion that this is not a prominent chimney and that the adaptive reuse
outweighs the need to have a chimney here. Weitzel said he did not feel that keeping the chimney is
important enough to prevent the house from being used by someone who wants to stay in the
neighborhood.
The motion carried on a vote of 4-2. with Carlson and Smothers votina no.
MOTION: Weitzel moved to approve a certificate of appropriateness for the removal of the first
floor window as part of the project at 629 Oakland Avenue. Ponto seconded the motion.
Weitzel said it is a tougher sell to say the window is not part of a prominent elevation of the house. He
said he was somewhat ambivalent because he can see that it could be a maintenance issue, but he has
heard suggestions that might address that.
McCallum said that if the exterior appearance is retained, then modifications could be done on the inside.
Maharry said that if the window could be removed and saved so that the opening is still there for a future
use, that would be acceptable to him. McCallum said that frosted glass could be used, and the exterior
wood silhouette could be kept with a solid piece of glass in the middle to function as the shower wall.
Historic Preservation Commission Minutes
February 15, 2005
Page 3
Ponto said he feels that the fenestration is an important aspect of the house. Carlson said it would be a
broad expanse without the window, and he thought it would look kind of odd.
The motion failed on a vote of 0-6.
Crouse said she did not want to lose the window but saw it as a last resort. She said she would talk to
her contractor about some of the suggestions.
The Commission discussed some alternatives that might be acceptable. McCallum suggested tiling all
around the shower butting up to the window with no trim. Smothers discussed using a solid piece of
marine glass that comes in a frame and is one finished piece.
Weitzel pointed out that the Commission has no control over what is done to the interior of the building.
He also said he was concerned that the Commission members might get into something they are not
experts in and could recommend something that might not work. Miklo added that removal of the window
is planned for 2006 so that there is time for Crouse to speak with her contractor about this and come back
to the Commission with an alternative.
409 South Summit Street.
Terdalkar said that this house is a contributing structure in the Summit Street Historic District. He said
this is a two-story, gabled house of a simple design. Terdalkar said the porch steps have been removed
and are to be replaced, and the owner would also like to add handrails to the steps.
Maharry asked about the condition of the original stairs.
Randv WesslinQ, 1822 California Avenue, said that the original stairs were probably wood. Over the years
the stairs were replaced with concrete. More recently wood stairs were built over the concrete. He said
the concrete was in worse shape than the wood built over it. Wessling said the owner would like~to add
handrails to the stairs.
Weitzel asked about the age of the house. Terdalkar responded that it would have been built around
1900.
Carlson said that whether or not the porch is original, it is in keeping with the house. Wessling said the
handrails would duplicate exactly what is already there, including the balusters, the style, and the
spacing. Ponto asked if the width would be the full width of the opening, and Wessling confirmed this.
MOTION: Weitzel moved to approve a certificate of appropriateness for the project at 409 South
Summit Street. McCallum seconded the motion. The Motion carried by a vote of 6-0.
OTHER:
Weitzel said that the Longfellow Neighborhood Association is looking for things to do for its PIN grant this
year. He said one possibility is the restoration and conservation of the obelisk. Weitzel said the obelisk
has deteriorated a lot in the last ten years.
Weitzel said neighbors have talked about conserving the obelisk where it is or putting it in a museum and
replacing it with a replica. He said the obelisk is apparently located on a City right-of-way. Weitzel said
he did not know what the procedure would be in that case.
Weitzel said the obelisk is the marker at the location of the southeast corner of the original town plat. He
said the entire commemorative text is preserved in one of Shambaugh's books so that it could be redone.
Weitzel said he has spoken with various technical people, and the recommendations are to either let the
obelisk go or put it in a museum.
Miklo suggested having it displayed in the Old Capitol Museum. Weitzel said he would speak to the
museum officials. He said that if the obelisk goes to a museum, there will need to be funding for removal
costs and for the replica. Miklo said that a PIN grant is all local money. He added that since this is such
Historic Preservation Commission Minutes
February 15, 2005
Page 4
a significant piece, rather than waiting for a PIN grant, perhaps Public Works could be approached with
the case that this is just a good public project to do.
Terdalkar said it would be a good idea to inventory these kinds of objects located in the City and give
them some kind of designation. Weitzel said he thinks that is a great idea and said he would be willing to
help document these objects.
ADJOURNMENT:
The meeting was adjourned at 6:27 p.m.
Minutes submitted by Anne Schulte
s:/pcd/minutes/H PC/2005/hpc02-15-05.doc