HomeMy WebLinkAbout12-27-2012 Airport CommissionIOWA CITY AIRPORT COMMISSION
MEETING AGENDA
AIRPORT TERMINAL BUILDING
1801 S. RIVERSIDE DRIVE
IOWA CITY, IOWA
THURSDAY, DECEMBER 27, 2012 -12:00 P.M.
1. Determine Quorum
2. Items for Discussion / Action:
a. 7/25 Parallel Taxiway Grading & Drainage
i. Consider a resolution accepting project as complete
b. Hangar M Taxiway Extension
i. Consider a resolution accepting project as complete
c. Budget
i. Flooring Project
3. Adjourn
'The times listed in the agenda are the anticipated duration of that particular agenda item. The actual discussion
may take more or less time than anticipated
Prepared by: Michael Tharp, Operations Specialist, 1801 S. Riverside Or, Iowa City IA 52246 319-350-5045
RESOLUTION N
RESOLUTION ACCEPTING THE WORK FOR THE RUNWAY 7/25 PARALLEL
TAXIWAY GRADING & DRAINAGE
WHEREAS, the Commission's consultant for the above referenced project, AECOM Inc., has
recommended that the work associated with the project, by Carter and Associates Inc., be
accepted as complete.
WHEREAS, the final contract price is $1,231,645.80 which is established from the original
contract cost of $1,278,474.5 minus $46,828.7 from Change Orders #1-5.
NOW, THEREFORE, BE IT RESOLVED BY THE IOWA CITY AIRPORT COMMISSION THAT:
Said improvements are hereby accepted by the Iowa City Airport Commission.
Passed and approved this day of
UM W
ATTEST:
SECRETARY
It was moved by and seconded by
adopted, and upon roll call there were:
Ayes
Nays
Approved by
City Attorney's Office
Absent
Assouline
Gardinier
Horan
Mascari
Ogren
2012.
the Resolution be
A.r`l
December 5, 2012
Mr. Jose Assouline
Iowa City Airport Commission
1801 S. Riverside Drive
Iowa City, IA 52246
AECOM 5153237910 tel
500 SW 7th Street 515 2444803 fax
Suite 301
Des Moines, Iowa 50309
www.aecom.com
SUBJECT: Construct Runway 7125 Parallel Taxiway
Grading and Drainage
Iowa City Municipal Airport
City of Iowa City, Iowa
FAA AIP Project No. 3-19-0047-20
AECOM ID No. 60223530
Dear Mr. Assouline:
By this letter, we hereby state:
We have made a final review of the project on July 10, 2012, and subsequent review of the project
on July 19, 2012.
2. To the best of our knowledge and belief, based on observations of AECOM staff during
construction, the contractor, Carter and Associates, Inc. have performed the work in accordance
with the proposal requirements in effect for the above -referenced project.
3. The total cost of the completed work is $1 231 645.80.
I hereby certify that this engineering document was prepared by me or
° pESS10'"'°•.
under my direct personal supervision and that I am a duly licensed
•••'••••i `'-.,
Professional Engineer under the laws of the state of Iowa.
O � F i
S�'
Jr oavlo e,
a HUGH ES �Z
David B. Hughes Date
°f
f„°;,,,,0,
License No.13037
My license renewal date is December 31, 2013,
Pages or sheets covered by this seal:
Llwork\projact160223530 IOW Parallel Taxiway ORS\200_Correspondence\201-202 Incoming-OulgoingWA120512 TO doo
Prepared by: Michael Tharp, Operations Specialist, 1801 S. Riverside Or, Iowa City IA 52246 319-356-5045
RESOLUTION
RESOLUTION ACCEPTING THE WORK FOR THE "HANGAR M TAXIWAY
IMPROVEMENTS"
WHEREAS, the Commission's consultant for the above named project, Foth Environment &
Infrastructure, has recommended that the work associated with the project, by Bud Maas
Concrete Inc., be accepted as complete.
WHEREAS, the final contract price is $ 38,922.50 which is established from the original contract
cost of $ 39,822.50 minus $900.00 from Change Orders #1 reflecting actual quantities installed.
NOW, THEREFORE, BE IT RESOLVED BY THE IOWA CITY AIRPORT COMMISSION THAT:
Said improvements are hereby accepted by the Iowa City Airport Commission.
Passed and approved this day of 12012.
CHAIRPERSON
ATTEST:
SECRETARY
It was moved by and seconded by
adopted, and upon roll call there were:
Ayes
Nays
Approved by
)uo la -ti,,g
City Attorney's Office
Absent
Assouline
Gardinier
Horan
Mascari
Ogren
the Resolution be
ENGINEER'S STATEMENT OF COMPLETION
HANGAR `M' TAXIWAY EXTENSION
IOWA CITY MUNICIPAL AIRPORT
IOWA CITY, IOWA
IOWA DOT FY2013
PROJECT No. 911301OW100
CONTRACT No. 14168
I hereby certify that to the best of my knowledge, belief and professional judgment,
based on observations of the work under the terms of the Agreement, that the Hangar
'M' Taxiway Extension project is complete and in conformity with the contract
documents. 1, therefore, recommend that subject to performance and payment bonds
posted by the Contractor and Surety, the project be considered completed.
Foth Infrastructure and Environment, LLC
By:
Eric M. Scott, P.E.
Date: December 10, 2012
X:\CR\IE\2012\121005-00\5000 Client\Statement of Completion -Hangar M Taxiway Extension. doc