HomeMy WebLinkAboutGateway ppt•
a
Council Work Session #4
Council Work Session 4
Tonight's Objectives
• Review activities since the January work session
• Discuss the design elements of the project
• Develop the design elements as they will be presented on the
Project Concept Statement for submittal to Iowa DOT
Council Work Session 4
Agenda:
• Recent public involvement activities
• Design concept and elements
• Design concept construction impacts and FAQ
� Public Involvement
Recent stakeholder engagement with:
■ Bella Vista
• Individual property owners
• Civic organizations
• Hancher /Mayflower teams
• Technical Advisory Committee
� Public Involvement
Pre - Design Open House:
• Held February 25th at Public Library
• More than 100 attendees
• Displayed the Design Concept with Council parameters
• Formal presentation and informal discussions
� Public Involvement
Pre - Design Open House — Key Takeaways:
• Aesthetics — maintain views of the river, park and trees
• Sidewalks along entire east side of Dubuque
• Pedestrian crossings are important to provide
• Speed limit — evenly split between current and all 25 mph
• Dubuque and Park turn lanes important
• Keep construction as short as possible
Transportation Modes and
� Enhancements
■ Pedestrian
• Sidewalk on east side to facilitate movement between locations on east side and to
provide routes to signalized crossings
• All sidewalks will be brought up to ADA standards
• Grade separated crossing of Park Road
• Protected sidewalks on Park Road Bridge
■ Bicycle
• Bike trail built to full ASHTO standards along west side of Dubuque Street
• Grade separated crossing of Park Road for River Corridor Trail
■ Transit — Improved geometry for bus movements
■ Vehicular —Reduce delay at the Dubuque Street Park Road intersection
■ All Modes
• Improved flood protection
• Everything brought up to new condition
Design Concept Discussion
• Design parameters and elements
• Cross section primer
• Design concept discussion
• Features
• Renderings
• Cross sections
�- No
8 GUTTER
3mim_.
MULT143M PATH
I
EXISTING GROUND
` /
Wp
MEDIAN
MEDIAN �
� Functions of Curb and Gutter
Stormwater conveyance
C TOLGA AKMEN'LNP
Snow storage intrusion
t
r
Park Road Looking East
IOWA
CITY
4TEWAY
uesian concent FOCUS Arev
Dubuque at Foster Road
■ Urban section, no median
■ 35 mph speed limit
■ Path /sidewalk both sides
■ Reduced footprint
IOWA
CITY
4TEWAY
Dubuque Street 2-50 IF, —
Recommendation
Dubuque near Foster
• Maintain multi -use path /sidewalk on both sides 10- foot /6 -foot
• Maintain current 35 mph speed limit
• 12 -foot lanes / 1.5 -foot curb and gutter
• Transitions from using no median to having a median
Dubuque near Taft Speedway
■ Median transition
■ 35 mph speed limit
■ Realigned Taft intersection
■ Path /sidewalk both sides of
Dubuque
• Reduced footprint
• Reduced wall heights
• Changes to park impacts
IOWA
CITY
4TEWAY
t.
1310
llt*
w TI
MSECTION EXHIBIT I XS•l
DR. HH & SYLVILLA JACOBSEN HOUSE
52-05067 - 1016 N OUBUOUE STREET
CROSS SECTION 6 PLAN VIEW
Recommendation
Dubuque near Taft Speedway
• Maintain multi -use path and sidewalk on both sides 10'/6'
• Maintain current 35 mph speed limit
• 12 -foot lanes / 1.5 -foot curb and gutter
• Keep urban section transition with and without median
Dubuque near Ridge Road
■ Urban with median used
• 35 mph speed limit
• Relocated Ridge intersection
• Reduction in footprint
• Changes to park impacts
• Still allows Cambus turnaround
.,
W
I�
.s
,1c
700
AM
670 _ NEPA Preferred Concept
Current Concept
660 � k'
640
700
680
640
Dubuque Street 6 +oo 0 15 30 so'
Recommendation
Dubuque near Ridge Road
• Keep Cambus turnaround
• Maintain multi -use path /sidewalk on both sides 10- foot /6 -foot
• Maintain current 35 mph speed limit
• 12 -foot lanes and 1.5 -foot curb and gutter
Dubuque near Mayflower
■ Transition zone
• Urban sections include varied median
• Speed limit 35 mph
■ Multi -use path and sidewalks
i
IFf Ar
,.,z;
I ,
I
a i
714411
I .
ri
05 0
Dubuque Street is +oo 0 15 so so,
Sidewalk /Trail Continuity
Y ;
- r
t •�M1
Ems'
,PL
'43 1"
r .�
Recommendations
Dubuque Mayflower to north of Kimball
• Maintain current Cambus operations
• Maintain multi -use paths on both sides
• Southbound side use 10 foot path throughout corridor
• Northbound side use 8 -foot paths transition to 6 -foot north of Mayflower
• Un- signalized crosswalk at Mayflower
• Maintain current 35 mph speed limit
• 51 -foot curb to curb without median / median varies
Kimball to Park
■ Lower elevation based on design
parameters
• Retaining wall along southbound
• Urban section
• Speed limit 25 south of Kimball
■ Multi -use path and sidewalks
■ Reduced footprint along
northbound lanes
Kimball to Park
WO
F ? A �•1
r-i
I
IL. 1 MM
CROSS SECTION
i1
D
Y. •D
A
ti. •n I
M
I
Preliminary - SL
to Cha
N. X.SECTION EXHIBIT I XS-3
w 12 SEL" VISTA
BROWN STREET HISTORIC DISTRICT
CROSS SECTION a PLAN VIEW
710 710
690
r NEPA Preferred Concept
670 ---.„ Current Concept
660
640
690
640
Dubuque Street 37 +50 0 15 30 60'
Recommendation
Dubuque from Kimball to Park
■ 12 -foot lanes
• 1.5 -foot curb and gutter both sides
• 51 -foot from back of curb to back of curb
• Use 8 -foot parkway both sides
• Southbound side use 10 foot multi -use path
• Northbound side use 8 -foot sidewalks
Park /Dubuque Intersection
• Urban section applied
• Includes Dubuque right turn lane
• Park Road Bridge 5 lanes
• Speed limit 25 mph south of Kimball
• Lower elevation — now 100 +1'
■ Retaining wall along southbound
■ Multi -use path and sidewalks
■ Smaller footprint along northbound
lanes
Ike
IOWA
CITY
4TEWAY
C
Ti 71 min IMre
•
IOWA
CITY
4TEWAY
Dubuque Ric
s f"rr-
iM�.
710 710
690
r NEPA Preferred Concept
670 ---.„ Current Concept
660
640
690
640
Dubuque Street 37 +50 0 15 30 60'
710
700
690
660
670
660
650
640
710
700
6 -Zl1
F r NEPA Preferred Concept 680
Current Concept Y —Ai 670
660
640
Dubuque Street 41 +50 0 15 30 60'
Traffic Operations
Dubuque /Park Intersection
Is the Southbound right turn lane needed?
• Southbound causes delays in the morning peak hour
• LOS F today and in 2040 for southbound and intersection
• Without right turn lane
• Southbound LOS F today and in 2040 — Four minute delays
• Intersection LOS F today and in 2040 —Two and a half minute delays
■ With 275 -foot right turn lane
• Southbound LOS C today and in 2040 — Delays less than 25 seconds
• Intersection LOS B today and in 2040— Delays less than 20 seconds
Traffic Operations
Dubuque /Park Intersection
How many lanes does eastbound Park Road need?
• Two lanes eastbound today
• Eastbound movement causes delay
• Current intersection LOS E today / LOS F in 2040
• Two eastbound lane scenario:
• Intersection improves— LOS C today/ LOSE in 2040
• Eastbound movement poor— LOSE today/ LOS Fin 2040
■ Three eastbound lane scenario
• Intersection improves— LOS B today/ LOS C in 2040
• Eastbound improves— LOS C today/ LOS Din 2040
Traffic Operations
Dubuque /Park Intersection
How many westbound lanes should Park Road have?
• Two lanes there today
• Considered scenario with one westbound lane and two
• No capacity issues for westbound lanes
• Cambus stop on bridge
• Driver safety consideration
• Two lanes provides capacity for events and incident
management
Iow1 CITY
Recommendation
GATEWAY
Dubuque Street at Park Road:
• 12 -foot lanes
• 1.5 -foot curb and gutter both sides
• 51 -foot from back of curb to back of curb
• Use 8 -foot parkway / 10 foot multi -use path / 8 -foot sidewalks
• Add right turn lane to southbound
• Improve level of service
• Turn lane does not shift roadway to the east
• Considerable expense to add at a later date
■ Maintain the existing lane configuration northbound
Iow1 CITY
Park • • i • •
GATEWAY
Partial Through Arch bridge
Five lane bridge
3 lanes eastbound 2 west
Multiple bike /ped crossings
Trail underpass on west side
25 mph
IOWA
CITY
4TEWAY
1110
• T
- m �WW ip I,
ELEVATION
9i' -0
Recommendation
Park Road Bridge
■ Five 12 -foot lanes on bridge
• Eastbound — dual left turn lanes and one right turn lane
• Westbound— two lanes
• Warranted by existing traffic
• Arch bridge cannot be widened at a later date
• Allows Cambus to operate as it does today
• Provides capacity for events and incident management
IOWA CITY
- GATEWAY
700
u:.
660
640
Park Road 6 +00
C
w
• . • K►IV[M Nei is
NEPA Preferred C
I r
Current Concept
•[I
0 15 30 60'
Park Road 16 +00
0 15 30 60'
Iow1 CITY
Recommendation
GATEWAY
■ On Park Road from bridge to Lower City Park
• Sidewalks transition for 10 -foot at bridge to 8 or 6 -foot
• Five 12 -foot lanes drop outside lanes at Lower City Park
■ From Lower City Park to Riverside
• Three lane section —12 -foot center turn lane / 11 -foot travel lanes
• Use 1.5 -foot curb and gutter
• Sidewalks — 8 -foot along eastbound lanes / 6 -foot along westbound
• Benefits event traffic at Hancher and City Park
• Benefits daily traffic including new Hancher loading docks
Iow1 CITY
Next Steps
GATEWAY
• Complete conceptual design phase
• Submit Concept Statement to DOT
• Subject to DOT approval
• Develop aesthetics and landscape concepts
• Begin preliminary and final design
• Continued stakeholder coordination