HomeMy WebLinkAboutICCSD.pptFacilities Master
Plan (Status Quo)
DESCRIPTION OF WdRK
(See Pnss+cal Neeas assessment Repartfa comaiete aescnpUon of MENreravanonsl
STATUS CAPACITY PROJECT FUNDING
-. 0 COST SOURCE
CCMPLETION
DATE
ELEMERMITY SCHOOLS
2024,2025 Projected Elem (III EnroNnwift = 8,880
8,656
ALEXANDER ELEM.
New 500 student elen muton,.
:. :•:r,cc°,
500
$14, L
SAVE
Fall 2015
BOR.AUG ELEM
Minor repairs,
451
58K
GO BOND
Fall 2023
CORALVILLE CENTRAL ELEM.
Accessibility renovation; masonry tuckpointing, rooftop HVAC replacement,
a r.c esss
362
1 $4,7
SAVE
Fall 2016
GARNER ELEM.
Playgroul>d sod replaccr:ei¢t, minor repairs
445
S9&',
CO BOND
Fall 2023
GRANT ELEM.
New 500 student elementary.
500
$14.1
GO BOND
Fall 2019
HILLS ELEM,
HOOVER ELEM.
Building code repairs,
Building code repairs and air conditioning Discontinued use as a school no earlier than the 2017-18 school year DemoCitron casts included.
a
189
S780K
$1.5
PPE
PPEL
Fall 2015
Fall 2014
HOOVER ('EAST) ELEM.
New 500 student elementary.=ruF•a<s
500
514, L
SAVE
Fall 2017
HORN ELEM.
Accessibility renovations. interior iighimg upgrade, classroom door replacement
410
$1,0
GO BOND
Fall 2021
KIRKWOOD ELEM.
Rooftop AHU VAV System and roofing replacement
356
54.5
GO BOND
Fall 2022
LEMME ELEM.
Gymnasium addition. Window replacement and IT upgrades.
401
1 $3.1
GO BOND
Fall 2023
LINCOLN ELEM
Classroom (+50) & gymnasium addition pending property acquisition. Accessibility renovations, roof replacement fan coil unit HVAC system.
window replacement.
237
54.6
GO BOND
Fall 2019
LONGFELLOW ELEM.
Historical renovation of building and classroom (+150)/gymnasium addition.
408
512.3
SAVE
Fall 2018
LUCAS ELEM,
MANN ELEM.
Interior lighting upgrades. water source heat pump HVAC system, ceiling repL,r 7 ri:
Historical renovation of building and classroom (+180)/gymnasium addition
381
417
54.0
512.6
SAVE
GO BOND
Fall 2017
Fall 2019
PENN ELEM.
Addition includes 8 classrooms (+200) and multipurpose room. Renovations include HVAC system upgradecarpet replacement, and IT updates,
587
$9,4
SAVE
Fall 2015
SHIMEK ELEM.
Classroom (+100) & gymnasium addition. Renovations include roof replacement and water source heat pump HVAC system.
339
$5.2
GO BOND
Fall 2020
7A'AIN ELEM.
Addition includes 1 additional classroom (+25) and gymnasium. Renovations include accessibility renovations, water source heat pump HVAC
system, and wmdow wall replacement
277
56.3
SAVE
Fall 2015
VAN ALLEN ELEM.
Addition includes 4 classrooms (+100). Renovations include minor repairs.
N radia s
564
51,6
PPEL
Fall 2015
WEBER ELEM
IT upgrades and interior lighting upgrades-
496
S2 0
PPEL
Fall 2017
WICKHAM ELEM.
IT upgrades.. gym floor repairs.
428
51.2
GO BOND
Fall 2021
WOOD ELEM_
Fan cool unit HVAC system and root replacement
408
$33
GO BOND
Fall 2022
r
.. 5 n.
r r� „a ,E , „ri ,E , rri ,E , rri ,E , rri ,-E , ^„ri � n, s "'irpn rro rpft 16f V`iM iy,
.;
�4uuuuuuu uuuuuuuuu'� drr i rJIV�J4 p� �liii n�nfi'nsn`uuriri �n nrhn hr,T”
NORTH CENTRAL JH
Addition includes 8 classrooms (+180). library and cafeteria expand
816
S6. L
GO BOND
Fall 2021
NORTHWEST JH
Addition includes 1 classroom it Renovations include roof replacement. IT upgrades interior lighting upgrades and VAV air handling unit
HVAC system
836
$10.4
GO BOND
Fall 2021
SOUTH EAST JH
Additia, includes 2 classrooms («60)- Renovations include acces.blr,y renowations, HVAG system renovations interior hl upgrades, 'ocker
replacement and roof replacement_
824
510,6
GO BOND
Fall 2019
HIGH SCHOOLS
202 High so:,,wW,
�...� ��IjIIIVV, Ifjllllllllllllr,''
puiiliiitiipnl
'
CITY HS
includes 12 classrooms (+300) over 2 phases of construction. cafeteria and library expansion. Renovations include accessibility renova-
eras. IT upgradesgeothermal heat pump systemand roof replacement
PI r-:Stt�'_S
1.593
$21. 3
SAVE / ,O
BOND
Fa':I 2016 /Fall 2021
LIBERTY HS
New 1.500 student high school constructed in 3 phases,
N Pav;aEss
1,500
563, 7
SAVE / GO
Summer 2017 / Fall
2019 / Fall 2022
TATE HS
Minor repairs
119
S78K
GO BOND
Fall 2023
TREC
Masonry repair, VAV rooftop HVAC system and water source heat pump, plaster repair.
125
$3.1
GO BOND
Fall 2023
WEST HS
Accessibility renovations. roof replacement. IT upgrades. HVAC system revisions & upgrades. electrical upgrades. wmdmv wall system replace-
ment over 2 chases of construction.
AVE / GO
Fall 2018 / Spring 2020
ONE VISION TRAL I"I: >.
SCHOOLHOUSE
i : i I transportation of ten-plex unit to sites utilized during renovations_
Ongoing
2024-25 Projected K-12 Enrollment = 16,317
Total
16,1541
$258.4
DESCRIPTION OF WORK
(S" Physes NezdsAszessr-tkep_rttc.,F-pltedes•apuonotrenavabom)
5
`J G�
g�Q PP
G
PRESENT
COST
INLATION
ADJUSTED
COST'
, di
O� G
ELEMENTARY SCHOOLS
ALEXANDER ELEM.
2024.20 ,Projected Elentetif8,926
New 500 student elementary.
N h `---
500
$14.1
3.a� a v nfl
S14A
SAVE
F;
FORLAU", ELEM_
Classroom addition (+100) and minor repairs
55;
S1 '
S1 7
GO BON::
lab �G�d
COR<''r'LLE CENTRAL ELEM.
Accessibility renovations, masonry tuckpointing, rooftop HVAC replacement.
mr vaa;PEss
3621
S4.7
54.7
SAVE
Fab 2016
",1
Classroom addition (+175), playground sod replacement, minor repairs.
[:
53 3
$40
GO BON.:
Fall 2019
New 600 student elementary.
600
517.0
520.2 GO BONG
Fab 2019
HP_LS ELEN.
Building code repairs
189
S780K
S780K
PFEL
Fall 2015
HOOVER ELEM.
Building code repairs and air conditioning. Discontinued use as a school no earlier than the 2017-18 school year Demolition costs included.
Rs"triE €;
S1.5
S1,5
PPEL
Fall 2014
HOOVER {EAST) ELEM.
New 500 student elementary.
500
$14.1
515.7
SAVE
Fall 2017
HORN ELEM.
Accessibility renovations, interior lighting upgrade, classroom door replacement,
410
5975K
SL3 GO BOND
Fab 2022
KIRKWOOD ELEM.
Classroom addition (+150). rooftop AHU VAV System and roofing replacement
456
1 S8.2
$109
GO BOND
Fall 2022
LEMME ELEM.
Classroom (+125) & gymnasium addition. Window replacement and IT upgrades.
476
S6.1
$8.3 GO BOND
Fall 2023
LINCOLN ELEM
Gymnasium addition. pending property acquisition Accessib hry renovations, roof replacement, fan cod unit HVAC system. window replacement
187
$40
$48
GO BOND
Fall 2019
LONGFELLOW ELEM.
LUCAS ELEM,
Historical renovation of building and gymnasium addition.
Interior lighting upgrades. water source heat pump HVAC system. ceding replacement. window wall replacement.
258
381
SIO.2
S4.0
Sl L7
S4.4
SAVE
SAVE
Fal 2018
Fall 2017
MANN ELEM.
Historical renovation of building and gymnasium addition.
237
$99
$11,71 GO BOND
Fall 2019
PENN I
Addticn includes 8 classrooms (+200) and multipurpose room. Renovations include HVAC system upgrade. carpet replacement. and IT updates,
1FEs
587
S99
59,9
SAVE
Fall 2015
SHIMEK ELEM.
Gymnasium addition. Renovations include roof replacement and water source heat pump MVAC system.
2391
S4.0
S4.9 GO BOND
Fab 2020
TWAIN ELEM.
Addition includes 1 additional classroom (+25) and gymnasium, Renovations include accessibility renovations, water source heat pump HVAC
system, and window wall replacement_
s, c)rf,ss
277
S5 I
S6 l
SAVE
Fall 2015
VAN ALLEN ELEM.
Addition includes 4 classrooms (+100). Renovations include minor repairs.
r pPOGPESs
564
S16
SL6
PPEL
Fab 2015
WEBER ELEM
Classroom (+200) and gymnasium addition_ Renovations include IT upgrades and interior lighting upgrades.
596
54
$52
Pi
Fall 2017
WICKHAM ELEM,
IT upgrades, gym floor repairs.
428
S1.2
S1.5 GO BOND
Fab 2021
WOOD ELEM-
Classroom addition (+100). Renovations include fan cod unit HVAC system and roof replacement
508
S6 2
$7 7
GO BOND
Fall 2020
NORTH CENTRAL JH
Addition includes 11 classrooms 1+2401. library and cafeteria expansions Athletic master plan add tions/renovations included
876
S10.4
S132
GO BOND
Fall 2021
NORTHWEST JH
Addition includes 2 classrooms (+60). Renovations include roof replacement, IT upgrades, interior lighting upgrades and VAVair handling unit
HVAC system. Athletic master plan additions/renovations included.
866
512.4
515.7 GO BOND
Fall 2021
SOUTH EAST 1H
CITY HS
Addition includes 3 classrooms (+90). Renovations include accessibility renovations. HVAC system renovations interior lighting upgrades, locker
replacement, and roof replacement. Athletic master plan additions/renovations included.
Addition includes 12 classrooms (+300) over 2 phases of construction, cafeteria and library expansion. Renovations include accessibility renovaa
tions. IT upgrades. geothermal heat pump system and roof replacement. Athletic master plan additions/renovations included,
PRC RE s
854
1.593
$12 1
S26.8
$142
S33 I
GO BOND
SAVE /
GO BOND
Fall 2019
Fall 2016/
Fall 2021
LIBERTY HIS
New 1.500 student high school constructed in 3 phases.
w oG Ess
1,500
$67.1
575.3
SAVE /
GO BOND
Sum. 2017 /
Fab 2019
TATE HS
Minor repairs
119
S78K
S108K GO BOND
Fall 2023
TREC
Masonry repair. VAV rooftop HVAC system and water source heat pump, plaster repair.
126
S3.1
S4.2 GO BOND
Fab 2023
WEST HS
Accessibility renovations. roof replacement. IT upgrades. HVAC system revisions & upgrades electrical upgrades window wall system replace-
ment over 2 phases of construction. Athletic master plan additions/renovations included.
1684
$217
S255
SAVE /
GO BUND
Fall 2018 /
Spring 2020
ONE VISION TRANSITIONAL
SCHOOLHOUSE
Purchase, installation, and transportation of ten-plex unit to sites utilized during renovations.
S7.3
56.3
Ongoing
WWII f{1(IIIIIIII1If1If1II1II1II1II1II1II1If1It
9k4kNNNRNRNRNRNNNNRNRNRNRNNNNRNRNRNRNNNNRNRNRNRNNNNRNRNRNRNNNNRNRNRNRNNNNRNRNRNNNa
pIIIIIIIIIIIII1PIIlII,ll,lll° p....;
Illi'
ljlll
III111111
;uu"s
Inflation
Planned
Adjusted
Expected
School
Capacity
Cost*
Funding Source
Completion
Hoover
$1.50
PPEL
2014
Alexander
500
$14.10
SAVE
2015
Hills
189
$0.78
PPEL
2015
Penn
587
$9.90
SAVE
2015
Twain
277
$6.10
SAVE
2015
Van Allen
564
$1.60
PPEL
2015
Coralville Central
362
$4.70
SAVE
2016
Hoover East
500
$15.70
SAVE
2017
Lucas
381
$4.40
SAVE
2017
Weber
596
$5.20
PPEL
2017
Longfellow
258
$11.70
SAVE
2018
Garner
620
$4.00
GO Bond
2019
Grant
600
$20.20
GO Bond
2019
Lincoln
187
$4.80
GO Bond
2019
Mann
237
$11.70
GO Bond
2019
Shimek
239
$4.90
GO Bond
2020
Wood
508
$7.70
GO Bond
2020
Wickham
428
$1.50
GO Bond
2021
Horn
410
$1.30
GO Bond
2022
Kirkwood
456
$10.90
GO Bond
2022
Bourlaug
551
$1.70
GO Bond
2023
Lemme
476
$8.30
GO Bond
2023
*Dollars in millions; 3.5%
annual inflation
*In millions; current dollars
12/10/13
04/14/15
12/10/13
04/14/15
Plan
Plan
Capacity
Plan
Plan
Change in
Capacity
Capacity
Change
Dollars*
Dollars*
Dollars*
Alexander
500
500
0
14.100
14.100
0.000
Bourlaug
451
551
100
0.008
1.200
1.192
Coralville Central
362
362
0
4.700
4.700
0.000
Garner
445
620
175
0.098
3.300
3.202
Grant
500
600
100
14.100
17.000
2.900
Hills
189
189
0
0.780
0.780
0.000
Hoover
1.500
1.500
0.000
Hoover East
500
500
0
14.100
14.100
0.000
Horn
410
410
0
1.000
0.975
-0.025
Kirkwood
356
456
100
4.500
8.200
3.700
Lemme
401
476
75
3.100
6.100
3.000
Lincoln
237
187
-50
4.600
4.000
-0.600
Longfellow
408
258
-150
12.300
10.200
-2.100
Lucas
381
381
0
4.000
4.000
0.000
Mann
417
237
-180
12.600
9.900
-2.700
Penn
587
587
0
9.400
9.900
0.500
Shimek
339
239
-100
5.200
4.000
-1.200
Twain
277
277
0
6.300
6.100
-0.200
Van Allen
564
564
0
1.600
1.600
0.000
Weber
496
596
100
2.000
4.700
2.700
Wickham
428
428
0
1.200
1.200
0.000
Wood
408
508
100
3.300
6.200
2.900
*In millions; current dollars
12/10/13 Plan
4/14/15 Plan
Capacity
12/10/13 Plan
4/14/15 Plan
Change in
Capacity
Capacity
Change
Dollars*
Dollars*
Dollars
Iowa City Locations
Alexander
500
500
0
14.100
14.100
0.000
Hoover
1.500
1.500
0.000
Hoover East
500
500
0
14.100
14.100
0.000
Horn
410
410
0
1.000
0.975
-0.025
Lemme
401
476
75
3.100
6.100
3.000
Lincoln
237
187
-50
4.600
4.000
-0.600
Longfellow
408
258
-150
12.300
10.200
-2.100
Lucas
381
381
0
4.000
4.000
0.000
Mann
417
237
-180
12.600
9.900
-2.700
Shimek
339
239
-100
5.200
4.000
-1.200
Twa i n
277
277
0
6.300
6.100
-0.200
Weber
496
596
100
2.000
4.700
2.700
Wood
408
508
100
3.300
6.200
2.900
4774
4569
-205
84.100
85.875
1.775
Coralville Locations
Bourlaug
451
551
100
0.008
1.200
1.192
Coralville Central
362
362
0
4.700
4.700
0.000
Kirkwood
356
456
100
4.500
8.200
3.700
Wickham
428
428
0
1.200
1.200
0.000
1597
1797
200
10.408
15.300
4.892
North Liberty Locations
Garner
445
620
175
0.098
3.300
3.202
Grant
500
600
100
14.100
17.000
2.900
Penn
587
587
0
9.400
9.900
0.500
Van Allen
564
564
0
1.600
1.600
0.000
2096
2371
275
25.198
31.800
6.602
*In millions; present dollars
12/10/13
4/14/15
12/10/13
4/14/15
Plan
Plan
Capacity Plan
Plan Change in
Capacity
Capacity
Change Dollars*
Dollars* Dollars*
Junior High Schools
North Central
Northwest
Southeast
High Schools
City
Liberty
West
Tate
TREC
One Vision Trasitional
*In millions; present dollars
816
876
60
6.100
10.400
4.300
836
866
30
10.400
12.400
2.000
824
854
30
10.600
12.100
1.500
2476
2596
120
27.100
34.900
7.800
1593
1593
0
21.300
26.800
5.500
1500
1500
0
63.700
67.100
3.400
1684
1684
0
16.100
21.700
5.600
119
119
0
0.078
0.108
0.030
126
126
0
3.100
3.100
0.000
6.500
7.300
0.800
5022
5022
0
110.778
126.108
15.330