Loading...
HomeMy WebLinkAbout08-25-2011 Airport CommissionAIRPORT TERMINAL BUILDING 1801 S. RIVERSIDE DRIVE IOWA CITY, IOWA THURSDAY, AUGUST 25,2011 — 5:OOP.M. 1, Determine Quorum 2. Approval of Minutes from the following meetings: July 21, 2011; August 4, 2011 3. Public Discussion - Items not on the agenda 4. Items for Discussion/Action: a. Corporate Hangar L i. Consider a resolution accepting bids and awarding contract ii. Consider a resolution approving contract with of Infrastructure and Environment LLC for engineering construction administration and observation services iii. Hangars 1. Consider a resolution setting a public hearing on Hangar L leases b. Terminal Building Brick Repair i. Consider a resolution approving contract with VJ Engineering for design and construction engineering services. c. Ruppert Land d. Airport Commerce Park e. Airport Farming / Farmer's National Agreement f. FAAIIDOT Projects ® AEC OM David Hughes I. Runway 7/25 & 12/30 ii. Obstruction Mitigation iii. 7-25 Parallel Taxiway 1. Consider a resolution approving agreement with AEC OM for construction related services for the construction of the Runway 7- 25 Parallel Taxiway Grading and Drainage g. Airport "Operations": Strategic Plan -implementation; Budget; Management i. Airport Operations Specialist Position h. FBO / Iowa Flight Training / Whirly.bird Reports I. Subcommittees' Reports j. Commission Members'Reports k. Staff Report 5. Set next regular meeting for September 15, 2011 at 6.00 p.m. 6. Adjourn Airport Commission July 21, 2011 Page 1 MINUTES IOWA CITYAIRPORT COMMISSION JULY 21, 2011 — 6:00 P.M. AIRPORT TERMINAL BUILDING Members Present: Jose Assouline, Steve Crane, Minnetta Gardinier, Howard Horan, Rick Mascari Staff Present: Sue Dulek, Michael Tharp RECOMMENDATIONS TO COU® s touncil actionl- None CALL TO ORDER: Chairperson Gardinier called the meeting to order at 6:08 P.M. APPROVAL OF MEETING MINUTES: The minutes of the June 16, 2011, meeting were briefly discussed. Mascari moved to approve the June 16, 2011, minutes as submitted; seconded by Crane. Motion carried 5- 0. None. a. Aviation Commerce Park — Jeff Edberg — Edberg addressed the Members, noting that they have a new reporting system. He noted that since the last meeting he has not received any additional calls on the lots, but that another broker thought he had a possibility. Edberg continued, noting that he does have a very interested party and plans are being developed for a 7,000 -square foot facility for a commissary (kitchen) type business. He also noted that the dog business who is interested in a lot is still struggling with financing at this point. i. Public Hearing — Gardinier opened the public hearing. Eric Scott joined the Members at the table, noting that he has plans and specs to share with them. Tharp noted that what the Members are seeing is a modification of the previous plans. He noted that the pricing of the 62 ft. x 65 ft. hangars is just too high for their budget. Tharp continued to respond to questions and concerns about this change in the hangar plans and specs. Members voiced their concerns about the sizing of this hangar, with Mascari noting that he believes they are not ready yet to move forward with this. He believes they need to Kook at this a bit more. Tharp stated that with the Airport Commission July 21, 2011 Page 2 budget they have to work with, they do have some limitations. Scott responded to Members' questions, as well. Mascari asked for some clarification on the funding thal they do have and how much they would need to come up with. He asked if the State still offers 70% money on infrastructure projects. Tharpdo respond,o questions,a.ning what led them to offer the alternative plans. discussion centered on a hangar with various sized doors'and spaces, with Members noting that they need to think about future needs and being flexible. Members continued to discuss various configurations for a hangar. Jet Air weighed in as well on what size hangars needs.4' agreed theirlike to have Eric Scott 'return with a cost estimate for the alternative configuration for f Gardinier went around the table to get everyone's opinion. Dulek then informed the Members +' they need to -o in this situation. ' 1 acceptplan as discussed, addendum alternate opt Members decided to hold a special meeting on Thursday, P.M. Mascari '� , August4 111 meeting. Horan seconded the motion. Motion carried -0.. Constructionii. Consider a Resolution Approving Plans, Specifications, and Form of Contract for the ao defer this to the 814111 Horan seconded motion. MotionM I,.. fflascari asked if the Commissiond; jump to Item g.i, as he has another commitment and meeting: 1. Runway 7125 & 12130 — Tharp noted that there isn't much to update. They are still awaiting the FAA to get throughdocumentation before this project closedcompletely Obstruction Mitigation — Nothing new to report 7-25 Parallel >,` p noted that Public-' is currentlydoing g meansindependent review on this. That next meeting. 1. Consider a Resolution Approving Agreement With AECOM for Construction Related Services for the Construction of the Runway 7-25 Parallel Taxiway Grading and Drainage — Horan}': l defer the resolution August special4, 2011 seconded the motion.4-0; LEDs,Mascari absent. d. FY2012 Iowa Department of Transportation Grants — Tharp noted that the paperwork has been received on one of the grants. This is for the exterior lighting, switching over to f more electrical work on the hangars, along with security upgrades.";- that the entire programapproved; g for about $750,000 wor pending signature „ i«, Airport Commission July 21, 2011 Page 3 L Consider a Resolution Accepting Grant Agreement 911201OW100 —Horan moved to recommend Resolution #A11-18 Accepting Grant Agreement 911201OW100 as discussed. Assouline seconded the motion. Motion carried 4-0; Mascari absent. e. 2011 Air Race Classic — Tharp noted that he put this on the agenda, as he wanted to thank the Jet Air staff for all they did during the Air Race Classic. He added that it was a good event even though they did not get the final send-off due to the weather. Gardinier noted that she received good feedback from the racers. One of the comments made at the end of the race, according to Gardinier, was that the Air Race Classic should consider places like Iowa City in the future. f. 2011 — 2012 T -Hangar Rates and Charges — Gardinier recused herself from this discussion, as she has a conflict of interest in the matter. Tharp noted that it is that time of the year again to start looking at rates and fees at the Airport. He noted that Members received a memo from him laying out the background on this matter. His recom- mendation is to raise rates based on the inflationary factor. Tharp responded to Members' questions concerning hangar rates. Members also discussed the waiting list numbers with the commission. Gardinier commented from the public that she felt renters at the airport were paying a premium to have their aircraft here. Gardinier then asked about the status of the waiting list to which Tharp responded. Wolford commented that the construction of the new hangars would also impact the list. Tharp noted that leases expire in September. Members looked at several different scenarios and came to the agreement that a 2.5% increase is what they would like to go with. Tharp stated that they will be using the same lease agreement, as this has not changed. Horan moved to increase all rents by 2.5%. Crane seconded the motion. Motion carried 3-0; Gardinier recused herself and Mascari absent. g. Airport "Operations": Strategic Plan Implementation; Budget; Management — Airport Operations Specialist Position [This item was discussed earlier, following Item b.ii., as noted above.]— Mascari noted that he would like to review the Operations Specialist position. He continued, stating that he believes they should change this position from part-time status to full-time. He explained his reasoning for this, adding that if they were to lose Tharp to another airport it would be a huge loss for the Commission. He would like to see this change made in order to protect their interests of having a full-time Airport manager. Gardinier noted that she would support such a change. Gardinier asked Tharp to draft a rationale with specific goals for how the additional time would benefit the Airport and the Commission. A discussion ensued, with Members agreeing that this position should be full time. The history of how this position developed was also discussed. Gardinier noted that she would like to speak with the City Manager regarding the amount the Airport puts toward the Economic Development Coordinator position. This amount would help them in bringing the Airport position up to full time. (Mascari left the meeting at this point.) ii. Gardinier asked if anyone had anything regarding Airport operations. Tharp noted that they are now in the new fiscal year. He stated that they ended with about $70,000, but the parking lot overlay is still needed and that is around $40,000. This leaves around $30,000 from last fiscal year. Tharp noted that he was notified of a July 21, 2011 Page 4 "homeless" encampment on some Airport property recently. Me added that it will take some time to clean up this area and that everything needs to be removed. This will take some tractors that are able to knock down large brush. Tharp stated that he is working with Carol Sweeting from City Hall on this issue. The discussion continued, with Tharp noting that there were two areas with about 5 or 6 tents. Gardinier stated that she believes the police should be watching this area more closely if there are that many camps being kept. Tharp will let Members know what he finds out from City staff. Gardinier stated that she believes they should get som;�� estimates on cost for removing this brush. Tharp added that he wants to see what Carol Sweeting can come up with as she is suggesting volunteer help. Tharp noted that he and Gardinier have been working on the accelerated hangar debt repayment agreement. He noted that the current agreement distributed to them is from the City Manager's office. He briefly explained the idea behind this 70/30 split, with 70% of sales proceeds paid directly to the City and with 30% of sales proceeds retained by the Commission if needed for airport expenditures. This will maintain the current status quo policy of the City matching funds. Tharp added that if the Members are in agreement, they can move forward with this. Horan moved to approve the agreement regarding hangar debt repayment and lot sales, per the City Manager's agreement. Crane seconded the motion. Motion carried 4-0; Mascari absent. Iowa Flight Training I Whirlybird Reports — Matt Wolford of Jet Air addressed the Members, stating that they were really happy with the Air Race Classic turnout. He noted that they have still been mowing a lot and keeping bushes trimmed. Philip Wolford spoke next, stating that they will be switching fuel vendors in the near future, sometime between August 15 and September 15. They will be going with Shell once the change is made. He added that this brings his three locations under one fuel vendor and ordering system. Philip also noted that Pat Sheridan's last day was the last day of the Air Race (June 21) and that he has moved to Colorado for a job. A 0 W1, wff -, M-3 !� }, 4 i " j. Commission Members' Reports — Horan asked that Members check the Facebook page for the Airport, adding that he put some photos up. Staff Report — Tharp reminded Members that the FAA Airports Conference is coming u;t in Kansas City, September 27-28, 2011. He added that if anyone would like to join him to please let him know. SET INEXT REGULAR MEETING: A special meeting will be held on Thursday, August 4, 2011, at 6:00 P.M., and the next regular meeting will be Thursday, August 18, 2011, at 6:00 P.M. at the Airport Terminal building. ADJOURN: Gardinier made the motion to adjourn the meeting at 8:40 P.M.; seconded by Horan. Motion carried 4-0; Mascari absent. Airport Commission July 21, 2011 Page 5 Kim M KIEWN10=1 NM = Not a Member at this time TERM NAME EXP. 04 CD CA (D CO I C-4 C—f) LO CO r— Rick 03/01/13 X x x x x x i x x X/E Mascan Howard 03101/14 x x x x x x X x x Horan Minnetta i 03/01115 X X X X X X X O/E x Gardinier jI— Jose 03102112 j X X X j X O/E O/E X X X Assouline Steve 03102/14 O/E I X X i X X I O/E X x X Crane M KIEWN10=1 NM = Not a Member at this time Airport Commission August 4, 2011 Page 1 MINUTES' IOWA CITYAIRPORT COMMISSION AUGUST 4, 2011— m AIRPORT TERMINAL BUILDING Members Present- Jose Assouline,Horan, Mascari .firCOMMENDATIONS TO UNCII1L„w (to becomeffeetive onl Uki��u�lUw I��u� Au b. FY2012 Iowa Department of Transportation Grant i. Tharp noted this is the other grant that had been expected from the state. Tharp noted this grant Airport Commission August 4, 2011 Page 2 value of the grant was, and if there were matching funds required. Tharp noted the • value was $100,300 and that there was a 15% local match. Mascari moved resolution #A1 1-20, seconded by • Motion carried 5-0. Airport Commission August 4, 2011 Page 3 Airport Commission ATTENDANCE RECORD KM TERM NAME C14 C14 LO 0 r-- 00 Rick 03/01/13 X x x x x x x X X/E Mascari Howard 03101/14 X x x x x x x x x Horan Minnetta' 03101115 X x x x x x X O/E X Gardinier Jose 03102112 X x x X O/E O/E X x x Assoullne Steve 03102114 O/E X x x X OIE X x x Crane onml�� X/E = Present for Part of Meeting NM = Not a Member at this time Prepared by: Michael Tharp, Operations Specialist, 1801 S. Riverside Dr, Iowa City IA 52246 319-350-5045 •• -� • •_ CHAIRPERSON SIGN AND � • • FOR THE CONSTRUCTIONOF WHEREAS, of has submitted the lowest responsible bid of for construction of the above named project. NOW, THEREFORE, BE IT RESOLVED BY THE IOWA CITY AIRPORT COMMISSION, THAT: 1. The bids for the above named projected are accepted. 2. The contract for the construction of the above named project is hereby awarded to subject to the conditions: a. That awardee secures adequate performance and payment bond, insurance certificates, and contract compliance program statements. 3. The Chairperson is hereby authorized to sign and the Secretary to attest the contract for construction of the above-named project, subject to the condition that awardee secure adequate performance and payment bond, insurance certificates, and contract compliance program statements upon instruction from legal counsel. Passed and approved this ___ day of It was moved by and seconded by adopted, and upon roll call there were: Ayes Nays Approved b City Attorney's Office Absent 2011,. the Resolution be Assouline Crane Gardinier Horan Mascari WHEREAS, the Commission desires to secure the services of Foth Infrastructure and Environment, LLC to provide engineering construction administration and observation services relM ted to the proposed Iowa City Municipal Airport Hangar'L' Construction. NOW, THEREFORE, BE IT RESOLVED BY THE AIRPORT Cn1,4hMSXM-O-14!-T�C1TY-O-F IOWA CITY: MA"1140MIN M11111 Al, I Passedand approved this day of ................................................. ..... . ... .. ........ . . ........................ ................................................... ___, 2011. CHAIRPERSON Approveby A 7EST: ......... ......................... . .............. . ............ . .. . ...... SECRETARY City Attorney's Office It was moved by and seconded by adopted, and upon roll call there were: MM THIS AGREEMENT, made and entered into this day of 2011 , by and between the Iowa City Airport Commission, Iowa City, Iowa, hereinafter referred to as the Commission and Foth Infrastructure and Environment, LLC. , of Cedar Rapids , hereinafter referred to as the Consultant. WHEREAS, the Commission desires to secure the services of the Consultant to provide engineering construction administration and observation services related to the proposed Iowa City Municipal Airport Hangar 'L' Construction. NOW THEREFORE, it is agreed by and between the parties hereto that the Commission does now contract with the Consultant to provide services as set forth herein. Consultant agrees to perform the engineering services for the Commission, and to do so in a timely and satisfactory manner. Services provided under this agreement shall be as further described in Attachment A, attached and incorporated herein. ���1111#7►1 The Consultant shall complete construction phase services for the Project on or before February 24th, 2012. A. The Consultant shall not commit any of the following employment practices and agrees to prohibit the following practices in any subcontracts. To discharge or refuse to hire any individual because of their race, color, religion, sex, national origin, disability, age, marital status, gender identity, or sexual orientation. 2. To discriminate against any individual in terms, conditions, or privileges of employment because of their race, color, religion, sex, national origin, disability, age, marital status, gender identity, or sexual orientation. B. Should the Commission terminate this Agreement, the Consultant shall be paid for all work and services performed up to the time of termination. However, such sums shall not be greater than the "Not -to -exceed" amount listed in Section IV. The Commission may terminate this Agreement upon seven (7) calendar days' written notice to the Consultant. C. This Agreement shall be binding upon the successors and assigns of the parties hereto, provided that no assignment shall be without the written consent of all Parties to said Agreement. D. It is understood and agreed that the retention of the Consultant by the Commission for the purpose of the Project shall be as an independent contractor and shall be exclusive, but the Consultant shall have the right to employ such assistance as may be required for the performance of the Project. Foth Infrastructure and Environment, LLC. Project No. 111010.00 F-114 a r-1101 0 1 JA 1:4 ki Ill Iowa City Municipal Airport Hangar'L' Construction Iowa City, Iowa Construction Phase Services Iowa City, Iowa work, services, materials, equipment and supplies necessary to complete the proposed Iowa City Municipal Airport Hangar'L' Construction administration and observation phase services. The proposed project involves construction administration and observation phase services for the construction of Hangar'Lsite-work and pre-engineered aircraft hangars. The scope of services to be performed by the Consultant shall be completed in accordance with generally accepted standards of practice and shall include the services to complete the following phases/tasks: I I Previously completed # 1.0 General Administration of Construction Contract. 2.0 Coordinate and attend preconstruction meeting and distribute minutes to the Contractor and Owner. 3.0 Attend bi-weekly construction meetings. 4.0 Respond to Requests for Information (I's) during construction. 5.0 Shop Drawing Review 6.0 Issue clarification and change documents. 7.0 Process Applications for Payment. 8.0 Process reimbursement requests from Iowa DOT. 9.0 Review O&M manuals for completeness and coordinate submission to Owner. 10.0 Perform review and develop punchlist at the completion of project. 11,0 Develop as -built drawings based upon Contractor "redlines" and deliver one (1) hard copy of as -built drawings to owner along with electronic copy (CAD and pdf). Half-time onsite construction observation is anticipated for the duration of the project. Estimate is bas's on approximately twenty (20) hours a week and a construction schedule of September 2011 through January 2012. Additional observation and site visits by Engineer at intervals appropriate to the variou stages of construction as the Engineer deems necessary. ADDITIONAL SERVICES Additional Services not incWded in this Agreement. If authorized under a Supplemental Agreement, the Consultant shall furnish or obtain from others the following services: 1.) Construction Staking. 2.) Construction Testing. 3.) Construction Observation/Resident Project Services beyond schedule noted in Task C. 4.) ALP Update. 5.) Airport Tenant Coordination. 6.) Pavement Management Program Update. X:\CR\[E\2011X1110I0-00\1000BudgetXCACO\Final- Revised Construction length-0822111sos--08222011-ICIOA-CACO.doc Foth Infrastructure and Environment, LLC. Iowa City Municipal Airport Hangar Construction Project No. 111010.00 Iowa City, Iowa ATTACHMENT "B" Iowa City Municipal Airport Hangar Construction Iowa City, Iowa X:\CR\IE'•2011\111D10-00\1000 Budget\CACO\Final - Revised Construction length-082211\sos-08222011-ICIOA-CAIO.doc 2 - C O r7 ---------- .... . 2-M ..... RS 3. -3 2 Et 0 a m on 1.4 -0 m = A U3 m CD rg 0 to 0 13 cm, CD W > mg m 0 tl rA Project Manager III Lead Engineer Project Engineer 11 A m AmA AA Nm Nm Am Project Engineer I Engineering Tech 11 jj. Field Technician 11 Administrati— Assistarrt R. Z. Z Ca MITI m 3 Iowa City Municipal Airport Hangar Construction FOTH 1.Direct Salary Costs Hours Ratehlour Cost ..'Title — Z 7-60 Lead Engineer 16 $ 40.59 $ 649..44 Project Engrn Total Direct Salary Costs $ 14,732.40 o. Labor & General Administrative Overhead Percentage ofDirect Salary Costs 162.50% Total In -Direct Salary Costs * 3. Out -of -Pocket Expenses a. Transportation Personal Vehicle Miles @$u.555/mile $ u.Per Diem c. Materials and Supplies (Survey) $ u.Other (Phnmng.Reproduction, and Mailing ufContract Documents) $ Total Expenses $ 4.Subtotal uritems 1.u.and o v = =i..ap...~~-, 1500m $ �. ~~.. -,.__ 6. Subcontract costs Miller ounwid iemoitemue KJvvVxEngineering Consultants � � Total Subcontracted Costs $ 23,940.15 7.Total Project Costs Item 4,s.plus O Rounded $ 61,300.00 miller dunwiddie A, RCH� {"EC FU RE I Direct Sallary Costs TUB Houm Rate/Hour Cost -r-i ger 40 5 14 0 2, 1 36 00 Sr, Ar(,,1h1tecA - Specs 0 5 30 II 1ojed Archkx,1 l6 29.90---- .... ...... ArdhrtedwW Desligncii 0 21 DO 'i AdiiiiiiIiinII,strafive AsslsPanl 4 Total Direct Salary Costs $ 2,674.40 2. Labor & General Administrative Overhead Percentage of Direct Salary Costs 3.O -of®Pocket Expenses a. Transportation Personal Vehicle Miles Airfare b. Printing and Reproduction c. Courier / Postage / Shipping d. Lodging 4. Subtotal of Items 1, 2, and 3 S.. Fixed Payment .15.00% of Items 1 and 2 6. Subcontract Costs 14&92% Total In -Direct Salary Costs 1,800 0 $0.51 / mile 0 0 $900 roundtrip 3 @ $100 Total Expenses HgERM $918.00 $0.00 $150.00 $150.00 8 $...?5.00 . . ... .......... .......... - $1,503.00 F"M 7. Total Project Costs (items 4, 5, and 6) $9 �066 42 9 000M .)uncI ed 44140 .. ........ . .. .......... I .................... .......... ......... .................. . . ... .... . .... . ............................ . ........................ ........................................ . ...... . ........................... Iowa City Municipal Airport Hangar Construction KJWW Engineering Consultants, PC 1. Direct Salary Costs 1� Wile Hours Rate"Hoi.ir ....... . ..... .............................................. Cost . .............. — .. .. .......................... . . . ..... ir, Engiineer ................. 8 11 .1--l- ................................... $ 53.17 . .................................. I - —1-1.1 .-1 ..................... $ 1. .......... —1 425.36 1 1 . ... . . . ........ ....... ....... ".. -_1 - _1 ........................ . .... . ......................... . - gineer 16 441.72 $ 567.52 $ 24.06 . ... . .......................... $ ... — 1102.48: _ . ............................................. Admik-iistrative A­ssl�stan_t 10 $ 17.96 . .. . . .. .. . . ................ . ... . ....... $ 179-60 . ......................... ................ ...... ... ........................... . .............................. Construcfion AdirNirdstn,-ition ........... .......................... . ..... .......... . ... . - . ..................... .................. . . ... 32 .. . ....................................... ....... $ 33.44 . ...... . .......... . . ............................ . . .1 ..................... $ 1,070.08 ................ 11.1 Total Direct Salary Costs $ 2,535.04 2. Labor & General Administrative Overhead Percentage of Direct Salary Costs 161.19% Total In -Direct Salary Costs $ 4,086.23 3. Out-of-pocket Expenses a. Transportation Personal Vehicle Miles 0 @ $0.51 1 mile $ b. Per Diem c. Materials and Supplies $ d. Other $ Total Expenses $ - 4. Subtotal of Items 1, 2, and 3 $ 6,621.27 S. Fixed Payment 12.00% of Items I and 2 $ 794.55 6. Subcontract Costs Total Subcontracted Costs $ 7, Total Project Costs Item 4, 5, plus 6 $ 7,416.82 Rounded $ 7,500.00 Foth Infrastructure and Environment, LLC. Iowa City Municipal Airport Hangar Construction Project No. 111010.00 Iowa City, Iowa A r"II! AGHMEim r,,,c,'. INSURANCEG11:..:.-R F111:::`1CA ........................... Iowa City Municipal Airport Hangar Construction Iowa City, Iowa The pertinent insurance certificates to be submitted upon acceptance of Engineering Proposal. X:\CR\IE\2011\111010-00\100OBudget\CACO\FiriaI Revised Constnict.lonlength-OB2211\sos-08222011-ICIOA-GAGO.doe 3 -2- E It is agreed by the Commission that all records and files pertaining to information needed by the Consultant for the project shall be available by said Commission upon reasonable request to the Consultant. The Commission agrees to furnish all reasonable assistance in the use of these records and files. F. It is further agreed that no Party to this Agreement shall perform contrary to any state, federal, or local law or any of the ordinances of the City of Iowa City, Iowa. G. At the request of the Commission, the Consultant shall attend meetings of the Commission relative to the work set forth in this Agreement. Any requests made by the Commission shall be given with reasonable notice to the Consultant to assure attendance. H. The Consultant agrees to furnish, upon termination of this Agreement and upon demand by the Commission, copies of all basic notes and sketches, charts, computations, and any other data prepared or obtained by the Consultant pursuant to this Agreement without cost, and without restrictions or limitation as to the use relative to specific projects covered under this Agreement. In such event, the Consultant shall not be Liable for the Commission's use of such documents on other projects. The Consultant agrees to furnish all reports, specifications, and drawings, with the seal of a professional engineer affixed thereto or such seal as required by Iowa law. The Commission agrees to tender the Consultant all fees in a timely manner, excepting, however, that failure of the Consultant to satisfactorily perform in accordance with this Agreement shall constitute grounds for the Commission to withhold payment of the amount sufficient to properly complete the Project in accordance with this Agreement. K. Should any section of this Agreement be found invalid, it is agreed that the remaining portion shall be deemed severable from the invalid portion and continue in full force and effect. L. Original contract drawings shall become the property of the Commission. The Consultant shall be allowed to keep mylar reproducible copies for the Consultant's own filing use. M. Fees paid for securing approval of authorities having jurisdiction over the Project will be paid by the Commission. N. Upon signing this agreement, Consultant acknowledged that Section 362.5 of the Iowa Code prohibits a City officer or employee from having an interest in a contract with the City, and certifies that no employee or officer of the City, which includes members of the City Council and City boards and commissions, has an interest, either direct or indirect, in this agreement, that does not fall within the exceptions to said statutory provision enumerated in Section 362.5. O. The Consultant agrees at all times material to this Agreement to have and maintain professional liability insurance covering the Consultant's liability for the Consultant's negligent acts, errors and omissions to the Commission in the sum of $1,000,000. M In consideration of the Construction Phase services, work, equipment, supplies, or materials provided herein, the Commission agrees to pay the Consultant $61,300-00 NOT -TO -EXCEED FEE (Unit Cost/Time Charges), including any authorized reimbursable expenses, pursuant to the Schedule of Fees set forth in Attachment B, attached and incorporated herein. Construction Phase Services $ 61,300.00 Total $ 61,300.00 V. MISCELLANEOUS A. All provisions of the Agreement shall be reconciled in accordance with the generally accepted standards of the Engineering Profession. B. It is further agreed that there are no other considerations or monies contingent upon or resulting from the execution of this Agreement, that it is the entire Agreement, and that no other monies or considerations have been solicited. wffsflml��l Im= "Title-, FOR THE CONSULTANT Foth Infrastructure and Environment, LLC Signature,.,. ------------ Name" David D. K Pler I ........................ . ......... I., . ..... ............ _ ................. I . ....... . ............... . ......... . . . ......... . . ............. .. I . .............. . .. . ........... I..., . . ............. I., Title. So Iro'ect IMan Senior P�-cL 11 �,a �er Date: Date: Prepared by: Michael Tharp, Operations Specialist, 1801 S. Riverside Dr. Iowa City, IA 52246 (319) 350 5045 RESOLUTION NO. HEARINGSRESOLUTION SETTING PUBLIC SEPTEMBER 15, 2011, REGARDINGTO ENTER INTO GROUND LEASES WHEREAS, the Commission has awarded a contract to construct Hangar L which will contain hangars; and WHEREAS, the Airport Operations Manager has negotiated leases for said hangars. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA CITY, IOWA, THAT: 1. The Iowa City Airport Commission does hereby declare its intent to enter into lease agreements for Hangar L. 2. Public hearings on said proposed lease agreements should be and are hereby set for September 15, 2011 at 6:00 p.m. in the Terminal Building, Iowa City Airport, 1801 S. Riverside Drive, Iowa City, Iowa, or if said meeting is cancelled, at the next meeting of the Airport Commission thereafter as posted by the City Clerk. The City Clerk is hereby directed to cause Notice of Public Hearing for each hangar lease to be published as provided by law. Passed and approved this day of 2011. Approved By: CI to tR.PERSO.N ATTEST: SECRETARY City Atto ey's Office It was moved by and seconded by the Resolution be adopted, and upon roll call there were: Ayes Nays Absent Assouline Crane Gardinier _Horan Mascari Prepared by: Michael Tharp, Operations Specialist, 1801 S. Riverside Dr. Iowa City, IA 52246 (319) 350 5045 RESOLUTIONNO. RESOLUTION APPROVING TASK ORDER NO. 7 WITA AECO01 FOR CONSTRUCTION RELATED SERVICES RELATING TO THE RUNWAY 7-25 PARALLEL TAXIWAY GRADING AND DRAINAGE WHEREAS, the Iowa City Airport Commission entered into a contract entitled "Professional Services Agreement" with Earth Tech (n/k/a AECOM) on December 11, 2008 to provide engineering services for Federal Airport Improvement Program Projects; WHEREAS, Part I(A) of said agreement provides that the parties will enter into supplemental task orders for each project; WHEREAS, the Commission and AECOM have previously entered into Task Orders Nos, 1, 2, 3, 4, 5 and No. 6; WHERAS, the Commission and AECOM now desire to enter into Task Order No. 7, a copy of which is attached. 1. The Chairperson is authorized and the Secretary to attest to Task Order No. 7 following advice of counsel® Passed and approved this . ....................... . ..................... — day of CHAIRPERSON It was imoved by and seconded by adopted, and upon iroIl call there were: 2011. ... ......... . . City Attorney's Office F.Al 6=2 I the ResoLtion be Crane Gardinier Horan Mascari AECOM A 501 Sycamore Street Suite 222 Waterloo, Iowa 50703 www.aecom.com k: GRADING AND DRAINAGE IOWA CITY, IOWA 319 232 6531 tel 319 232 0271 fax Project Description - See attachment and incorporated herein. Scope of Services - See attachment and incorporated herein. Compensation A. Compensation for services for the Construction Phase shall be a cost plus fixed fee not -to -exceed One Hundred Twenty -Eight Thousand Seven Hundred Dollars ($128,700.00). See attachment and incorporated herein. General Conditions Except as specifically amended by this agreement, services shall be provided in accordance with the Consultant Services Agreement for the Iowa City Municipal Airport between AECOM Technical Services, Inc., and the Iowa City Airport Commission dated December 22, 2008. APPROVED kom 1; 1. k, r�-t I V.: .%• 111111 1 1 1• By L Joe A. Becker Date Date Auaust22 2011 SCOPE OF SERVICES FOR RUNWAY 7/25 PARALLEL TAXIWAY GRADING AND DRAINAGE IOWA MUNICIPAL ,lRy . , IOWA CITY, IOWA FAA AIP 3-19-0047-20 X t 4, A 070 IN 11,116 NOW W, phaseThe work to be performed by the Consultant shall encompass and include detailed work, services, materials, equipment and supplies necessary to provide construction -phase services. The design oid The c . divided r i ti Assianment of #., x;.w This task consists of assigning engineer oproject r will be the principal liaison assemblingbetween the Sponsor, Consultant and regulatory agencies. Z Assemble Construction Documents, This task consists of assisting the Sponsor in o . the Contractor and the ; Sponsor. 3. Conference. This task consists of attending and conducting a Pre -Construction Contractor,pre-construction conference with representatives of the Sponsor, Consultant,^ and affected utilities. 4. Construction SurveylgS. This task consists o; establishing horizontal vertical control for the project. do " task it ^ Contractor «" will be checked on a weekly basis prior to beginning work in the area staked, and periodically for grade and alignment. The survey notes received from the Contractor will be organized, checked and filed for reference during the project. 5. Shop Drawings and Submittals. This task consists of reviewing shop drawings and other submittals as required of the Contractor by the contract documents for conformance with the design concept of the project and compliance with the information given in the contract documents. 6. Construction Observation Program. This task consists of preparation of Construction Observation Program which will detail the measures and procedures that are required to assure conformance with the approved plans and specifications. This program will be developed in accordance with the FAA Central Region AIP Sponsor Guide. 7. Construction Assistance. This task consists of answering design interpretation questions from the Sponsor, Contractor, review staff and appropriate agencies. 8. Pay Applications and Reimbursement Forms. This task consists of preparing and processing monthly applications for payment to the Contractor and forwarding to the Sponsor for execution with recommendations for approval and payment. This task also includes preparation of federal reimbursement forms for the Sponsor. 9. Labor and Payroll Reports. This task consists of reviewing weekly labor and payroll reports for compliance with Davis-Bacon Act, conducting on-site employee interviews, and conducting E.E.O. site inspections. Original documents will be submitted to the Sponsor at completion of project for storage. 10. Testing of Materials. This task consists of providing field testing and materials testing in accordance with the Construction Inspection Program. A subconsultant will provide quality assurance testing for establishing proctor values for the pipe backfill and embankment materials. 11. Site Visits. This task consists of providing periodic site visits to the construction site by design personnel at appropriate stages of construction to review the quality of the work and to determine, in general, whether the work conforms with the contract documents. 12. Change Orders. This task consists of coordinating with the Sponsor and Contractor in preparing and processing contract change orders. 13. Construction Observation. This task consists of providing field observation during construction to review the work of the Contractor to determine if the work is proceeding in general accordance with the contract documents and that completed work appears to conform to the contract documents. Also included in this task will be the monitoring of DBE participation in the project. Staffing requirements may be adjusted during the project in relation to the level of construction activity. 14. Weeklv Construction Meeliqqs. This task consists of meeting with the airport staff, tenants, and the Contractor for weekly progress meetings throughout the construction phase of the project. The meetings are 1discuss roj ti operations, construction lY n upcoming construction 15. Non-[;omg)liance geporting. This task consists of reporting to the Sponsor any work , r or does contractand advising the Sponsor of any work thate correctedor i; 1R Contractor Modifications. This task co of reviewing, evaluating and making i;' io o the Sponsor on suggestions for modifications have been made by the Contractor. 17. Projectfiles, This task consists of maintaining files for correspondence, „"f of the job conferences,4 drawings and samplesubmissions,� do original contract documents including addenda, change orders, field modifications, additional drawingsissued subsequentexecutionof the contract, clarifications and interpretations of the contract documents, progress reports and other project -related documents. 18. Daily Elports. This task consists of the resident field representative keeping a diary, log book or those times on d the job site; weather conditions; data relative to questions of extras or deductions; list of visiting officials and representatives of manufacturers, fabricators, suppliers and distributors;decisions, in general and specific observations detailin more of observing test procedures.As part of this task, weekly construction progress and inspection prepared *. Punch List. This task consists of conducting f. review of the project completion and preparing a list of items (punch list) to be completed or corrected. 20. Final Review. This task consists of performing a field observation of the completed project before a final application for payment is processed for the Contractor. 21. - ,y assisting the -.. «. ct Closeout. This task consists of ct completion and final closeout documentation from the Contractor for the FAA by providing the r', If, 'K documentation as identified in the Central,aI Airports Divisiony " Sponsor Guide dated Octobe a. Sponsor Certification for Final Acceptance b. Final Outlay Report — Standard Form SF -271 0. Final Project Cost Summary d. Summary of DBE Utilization e. Final o -Report Brief Narrative Accomplished 3) Contract Time, including Explanation of Liquidated Damages (if Required) 4) Statement of Compliance with Contract Labor Provisions 5) Administrative Costs 6) Engineering Costs 7) Force Account (If Any) 8) Construction Costs 9) Buy American Provisions 10) Construction Material Testing and Acceptance 11) Final Inspection Report/Record of Completion 12) Contractor's Final Statement of Completion 13) Project Photographs f. As -Built Record Drawings g. Sponsor Cover Letter 1) Sponsor Amendment Request 2) Statement of Compliance with Approved Plans and Specifications 3) Eligibility of Claimed Costs h. Record Drawings i. SF -425 Financial Report j. OMB Audit A-133 22. Record Drawings. This task consists of providing the Sponsor with a copy of "record drawings" of the construction plans for the project based on the construction observation records of the review staff and Contractor showing those changes made during construction considered significant. Two copies of the "record drawings" in electronic and reproducible format will be provided to the Sponsor. One electronic copy would be for the FAA. Electronic drawings shall be in MicroStation V8 format. Task does not include updating of the Airport Layout Plans. 23. Construction Administration. This task consists of construction administration and coordination of the project. Interoffice meetings, general day-to-day administrative responsibilities, and typing of interoffice memoranda and minutes of meetings are included in this task. L:\workMDMI NWGREE\PROF\ICTaskOrder7Runway7-25.doc Attachment B Iowa City Municipal Airport Ruuiru ay '7-26 Par heli "iraali ay Grading & Drainage FAA AIRS lPr sect INN. 3-19-0047.20 Construction IRelated Services onsuuk int. Cost Summary Project Professional 130 Staff Professional 2.22 CADD Operator 48 Senior Technician 700 Technician 40 Project Support 110 Direct Labor Total 1250 li. Payroll Burden and Overhead costs Ill. Direct Project Expenses category Bruits Mileage 3600 Per Diem 0 Lodging Copier 2600 Plan Copier 400 CAPS 10 eodirneter 20 Nuclear [tensity Gua e 30 Miscellaneous IV. AE d, IM Estimate Costs V. Subcontract Expense Terracon VI. Estimated Costs VII. Fixed Pee. VIII, Maximum Amount Payable Rate/Unit $®510 32.00 $03.00 0.0 $0.50 26.00 12.50 0,00 1; f i $38,939.00 160.00% $62.302.40 $8,000.00 $113,500.00 $15,200.00 $126,700.00 5* 0 0 ,:3 CD �3 0 '7 > w3 r 3 C5 C:� Ca 0, ID C, 0 0 55 > > K yc) �z ^x7 Ll C7 6 Ll T. H 0 X vii Ea - 15, -n O C, C222 0 C:l Ci 41 can O O Cl b r3 hJ C, CL C, rr Id o cgs Id ciS.roCJen 0 0 ,:3 CD �3 0 '7 REVE: 08.22.11 10:37:36 Method: 3 Page 1 of 21 Page: I Iowa City General Ledger System FY 2012 Revenue Reporting For the period 07.01.1:, to 07.31.11 Estimated YTD Period Account Revenue Revenue Revenue Remainder $ ------------------------------------------------------------------- ...®R...a--- ------------ ------------ ---- ------- _----- 7600 Airport INTEREST REVENUES 381100 Interest on Investments 600.00 23.47 23.47 576.53 33.91 Total INTEREST REVENUES RENTS 382100 Land Rental 38220C Building/Room Rental Total RENTS ROYALTIES & COMMISS?ONS 384200 Vending Machine Comm 384900 Other Commissions Tota! ROYALTIES & COMMISSIONS TRANSFERS TRANSFERS FROM GOVERNMENTAL ACTIVITIES 393120 General Levy Total TRANSFERS FROM GOVERNMENTAL ACTIVITIES Total TRANSFERS Total Airport *** GRAND TOTAL *** 600.00 23.47 23.47 576.53 3.91 41968.00 1000.00 1006.00 40968.00 2.38 231842.00 1-7404.00 11404.00 214438,00 7.51 ---------- ------------ 273810.00 ------ 18404.00 ----- ------------ 18404.00 ------ 255406.00 6.72 83.00 83.00 20000.01 1580.10 1580.10 18419.90 7.90 20083.00 1580.10 1580.10 18502.90 7.87 100000.00 8333.33 8333.33 91666.67 8.33 ----------- ------------ 100000.00 ------------ 8333.33 ----- 8333.33 ------ 91666,67 ---__- 8.33 100000.00 8333.33 8333.33 91666.67 8.33 3944933.00 28340.90 28340.90 366152.10 7.18 394493.01 28340.90 28340.90 366152.10 7,18 SRPE: 08.22.11 10:37:11 Method: 1 Iowa City Generral. Ledger System FY 2012 Expense Reporting For the period 07.01.11 to 07.31.11 Page 2 of 21 Total REGULAR SALARIES & WAGES OTHER WAGES 414500 Longevity Pay Total OTHER WAGES Total SALARIES & WAGES EMPLOYER BENEFITS GROUP INSURANCE 421100 Bealth Insurance 421200 Dental Insurance 421300 Life Insurance 421400 Disability Insurance Total GROUP INSURANCE SOCIAL SECURITY CONTRIBUTIONS 422100 FICA Total SOCIAL SECURITY CONTRIBUTIONS RETIREMENT CONTRIBUTIONS 423100 IPRRS Total RETIREMENT CONTRIBUTIONS Total EMPLOYER BENEFITS 36891.00 YTD Period 32938.90 Account Appropriated Expenditures Expenditures Encumbrance Balance 6 Used 7600 Airport 244.00 AIRPORT 244.00 37135.00 560100 Airport Operations 3952.10 33182.90 10.64 SALARIES & WAGES 329.82 329,82 3268.18 REGULAR SALARIES & WAGES 232.00 19.32 19.32 411000 Perm Full Time 1.00 79.00 1.00 412000 Perm Part Time 36370.00 3927.60 3927.60 32442,4C 10.80 413000 Temporary Employees 520.00 24.50 24.50 495.50 4.71 Total REGULAR SALARIES & WAGES OTHER WAGES 414500 Longevity Pay Total OTHER WAGES Total SALARIES & WAGES EMPLOYER BENEFITS GROUP INSURANCE 421100 Bealth Insurance 421200 Dental Insurance 421300 Life Insurance 421400 Disability Insurance Total GROUP INSURANCE SOCIAL SECURITY CONTRIBUTIONS 422100 FICA Total SOCIAL SECURITY CONTRIBUTIONS RETIREMENT CONTRIBUTIONS 423100 IPRRS Total RETIREMENT CONTRIBUTIONS Total EMPLOYER BENEFITS 36891.00 3952,10 3952.10 32938.90 10.71 244.00 244.00 244.00 244.00 37135.00 3952.10 3952.10 33182.90 10.64 3598.00 329.82 329,82 3268.18 9.17 232.00 19.32 19.32 212,68 8.33 79.00 7.31 7.31 71.69 9.25 176.00 13,50 13.50 162.50 7.67 4085.00 369.95 369.95 3715.05 9.06 2841.00 293.45 293.45 2547.55 10.33 2841.00 293.45 293,45 2547.55 10,33 2997.00 318.93 318.93 2678.07 10.64 2997,00 318.93 318,93 2678.07 10.64 9923.00 982.33 98233 8940,67 9.90 Page 3 of 21 EXPE: 08.22.11 10:37:12 Method: 1 Page: 2 Icaa City General Ledger System F`1 2012 Expense Reporting For the period 07.01.11 to 07.31.11 YTD Period Account Appropriated Expenditures Expenditures Encumbrance Balance p Used 7600 Airport ICON3I115ED) AIRPORT (CONTINUED} 560100 Airport Operations (CONTINUED) PROFESSIONAL & TECHNICAL SERVICES OFFICIAW ADMINSTRATIVE SERVICES 431020 Court Costs & Services 78.00 78.00 Total OFFICIA11ADMINSTRATIVE SERVICES PROFESSIONAL SERVICES 432020 Annual Audit Total PROFESSIONAL SERVICES DATA AND COMMUNICATION SERVICES 435056 Delivery Services 435057 Couriers 435060 Legal Publications Total DATA AND CONNUNICATION SERVICES TRAINING & EDUCATION 436030 Transportation 436050 Registration 436060 Lodging 436080 Meals Total TRAINING i EDUCATION INSURANCE 437+010 Comp Liability Insurance 437020 Fire & Casualty Insurapce 437030 Worker`s Come Insurance 437041 3ondinu & Other Insurance 437200 Loss Reserve Payment Total INSURANCE UTILITY SERVICES 438011.0 Stormwater Utility Charges 438030 Electricity 78.00 78,00 1202.00 1202.00 1262.00 1202.00 52.00 52.00 85.00 85.00 98.00 98.00 235.00 235.00 700.00 700.00 400.00 400.00 5003,00 5803.00 200.00 200.00 6303,00 6303.00 4148.00 3950.00 3950.00 198.00 95.23 12745.00 750.00 750.00 11995.010 5.88 36,00 36.00 90.00 901.00 5150.00 5150.00 ------------------ 22980.00 ------------ 4700.00 ------------ 4700.00 ------------ 18280,00 ------ 20,45 7104.00 789.11 789._1 6314.89 11.11 12903.00 1337.23 1337.23 11565.77 10.36 EXPE: 08.22.11 10:37:12 Method: 1 Pagee 3 Iowa City General Ledger System FY 2012 Expense'Reporting For the period 47.01.11 to 07.31.11 Total PROFESSIONAL & TECHNICAL SERVICES REPAIR & MAINTENANCE BUILDING REPAIR & MAINTENANCE SERVICES 442010 Other Building Repair & Maintena 442020 Structure Repair &Maintenance S 442030 Heating Equipment Repair & Maint 442040 Cooling Equipment Repair & Maint 442060 Electrical & Plumbing Repair & M 442070 Bldg Pest Control Services Total BUILDING REPAIR & MAINTENANCE SERVICE EQUIPMENT REPAIR & MAINTENANCE SERVICES 443050 Radio Equipment Repair & Mainten 443060 Telecom Equipment Repair & Maint 443080 Other Equipment Repair & Mainten Total EQUIPMENT REPAIR & MAINTENANCE SERVIC TECHNICAL SERVICES 445030 Nursery Service -Lawn and Plant C 445080 Snow and Ice Removal 445110 Testing Services 445140 Outside Printing 62627.00 7235.52 YTD Period 11.55 12085.00 Account Appropriated Expenditures Expenditures Encumbrance Balance t Used 7600 Airport (CONTINUED) 4625.01 7.50 1500.00 AIRPORT (CONTINUED) 1000.00 1000,00 560100 Airport Operations (CONTINUED) 1000.00 750.08 750,08 249.92 75.01 PROFESSIONAL & TECHNICAL SERVICES (CONTINUED) 419.00 21004.00 UTILITY SERVICES (CONTINUED) 1851.07 19152,93 8.81 283.00 1127.42 438070 Heating Fuel/Gas 6489.00 40.36 40.36 6448.64 .62 438080 Sewer Utility Charge 1654.00 119.18 119.18 1534.82 7.21 438090 Nater Utility Charge 1454,00 109.23 109.23 1344,77 7.51 438100 Refuse Collection Charges 1253,00 131.00 131.00 1122.00 10.45 438110 Local Phone Service 967.00 18540,00 907.00 438120 Long Distance Service 65.00 9.41 9.41 55.59 14.48 Total UTILITY SERVICES 31829.00 2535.52 2535.52 29293.48 7.97 Total PROFESSIONAL & TECHNICAL SERVICES REPAIR & MAINTENANCE BUILDING REPAIR & MAINTENANCE SERVICES 442010 Other Building Repair & Maintena 442020 Structure Repair &Maintenance S 442030 Heating Equipment Repair & Maint 442040 Cooling Equipment Repair & Maint 442060 Electrical & Plumbing Repair & M 442070 Bldg Pest Control Services Total BUILDING REPAIR & MAINTENANCE SERVICE EQUIPMENT REPAIR & MAINTENANCE SERVICES 443050 Radio Equipment Repair & Mainten 443060 Telecom Equipment Repair & Maint 443080 Other Equipment Repair & Mainten Total EQUIPMENT REPAIR & MAINTENANCE SERVIC TECHNICAL SERVICES 445030 Nursery Service -Lawn and Plant C 445080 Snow and Ice Removal 445110 Testing Services 445140 Outside Printing 62627.00 7235.52 7235.52 55391.48 11.55 12085.00 726.00 726.00 11359.00 6.01 5000.00 374.99 374.99 4625.01 7.50 1500.00 1500.00 1000.00 1000,00 1000.00 750.08 750,08 249.92 75.01 419.00 419.00 21004.00 1851.07 1851.07 19152,93 8.81 283.00 1127.42 1127.42 -844.42 398,38 454.00 454.00 5898.00 5898.00 6635.00 1127e42 1127.42 5507,58 16.99 37080,00 4500.00 4500.00 32580.00 12.14 18540.00 18540,00 850.00 850.00 127,00 127.00 EXPE: 08.22,11 10:37,12 Method: 1 Page 5 of 21 Page: 4 Iowa City General Ledger System FY 2012 Expense Reporting For the period 07,01.11 to 07.31.11 YTD Period Account Appropriated Expenditures Expenditures Encumbrance Balance % Used ------_._-_@A_.___m---a_______------------------- ------------ __--- - __-- ------------ ___--__ __- 7600 Ain ort (CONTINUED) AIRPORT {CONTINUED) 560100 Airport Operations (CONTINUED; REPAIR & MAINTENANCE (CONTINUED) TECHNICAL SERVICES ,CONTINUED) Total TECHNICAL SRRVICES INTRA -DEPARTMENT SERVICES 446100 City Attorney Char-geback 446132 ITS-PC/Peripheral Support Charge 446140 ITS -Computer Replacement Chargeb 446160 ITS-Network/Internet Chargeback 446200 Photocopying Chargeback 446220 Phone Service Chargeback 446300 Phone Equipmenz Line Chargeback 446320 Mail Chargeback 446350 City Vehicle Replacement Chargeb 446360 City Vehicle Rental Chargeback 446370 Fuel Chargeback 446380 Vehicle Repair & Maintenance Cha 446390 Auto Body Repair Chargeback Total INTRA -DEPARTMENT SERVICES I4I810ELLAHROUS SERVICES & CHARGES 449055 Permitting Fees 449060 Dues & Memberships 449120 Equipment Rental 449350 Meals iron -travel) 449360 Interest Expense Total MISCELLANEOUS SERVICES & CHARGES Total REPAIR & MAINTENANCE - 56597.00 ®_.. 4500.00 4500.00 52097.00 7.95 5233,00 5233.00 400.00 4C0.00 400,00 100.00 517.00 43.08 43.08 473.92 8.33 360.00 30.00 30,00 330.00 8.33 231.00 1.08 1.08 229.92 .47 692.00 93.31 93.31 598,69 13.48 1020.00 92.50 97.50 927.50 9.07 529.00 3.85 3,85 525,15 .73 14397.00 1353.72 1363.72 13033.28 9.47 500.00 500.00 3669.00 418.48 418.48 3250.52 11,41 15132.00 287.48 W-48 14844.52 1.90 224.00 224.00 42904.00 2733,50 2733.50 40170,50 6.37 65.00 65.00 675.00 675.00 754.00 425.00 425.00 329.00 56.37 39.46 38.46 -38,46 60060.00 4823.10 49233.10 5:236.90 8.03 61554.00 5266,56 5286.56 56267.44 8.59 188694.00 15498.55 15498.55 173195,45 8.21. SIPE: x8.22.11 1x:37:17. Method: 1 on Iowa City General Ledger System FY 2012 Expense Reporting For the period 07.01.11 to 07.31.11 YTD Period Account Appropriated Expenditures Expenditures Encumbrance Balance Used 7600 Airport (CONTINUED) AIRPORT (CONTINUED) 560100 Airport Operations (CONTINUED) OTHER PURCHASED SERVICES (CHANGE TO OFFICE SU GENERAL SUPPLIES 452010 Office Supplies 577.00 78.56 78.56 498.44 13.62 Total GENERAL SUPPLIES BOOKS & PERIODICALS 454010 Reference Materials & Books 454020 Subscriptions Total BOOKS & PERIODICALS COMPUTER & PRINTING SUPPLIES 455120 disc Computer Hardware Total COMPUTER & PRINTING SUPPLIES Total OTHER PURCHASED SERVICES (CHANGE TO OFF OPERATING SUPPLIES AGRICULTURE SUPPLIES 461030 Plants & Trees 461040 Other Agriculture Chemicals Total AGRICULTURE SUPPLIES REPAIR & MAINTENANCE SUPPLIES 466030 Paint Supplies 466050 Electrical Supplies 466060 Other Construction Supplies 466070 Other Maintenance Supplies Total REPAIR & MAINTENANCE SUPPLIES SURFACING MATERIALS 468030 Asphalt Total SURFACING 6iATERIALS 577.00 78.56 78.56 498.44 13,62 16.00 2099.00 2115.00 16,00 2099.00 2115.00 2600.00 2600.00 2600.00 2604.00 5292.00 78.56 78,56 5213.44 1.48 3000.00 1500.00 4500.00 3000.00 1500.00 4500.00 23.00 23.00 1066.00 1066.00 119.00 119.00 200.00 200.00 140$.00 146b.Ca 103.00 103.00 103,00 103.00 Page 7of21 E%P&: 08,22,11 101:37:12 Method-, 1 Page; 6 Iowa City General Ledger System FY 2012 Expense Reporting For the period 07.01.11 to 07,31.11 YTD Period Account Appropriated Expenditures Expenditures Encumbrance Balance % Used ------------------------------------------------------ ------------ ------------ _- I --------- ------------ ------------ ------ N ) 7600 Airport (,CONTINUED) AIRPORT (CONTINUED) 560100 Airport Operations ,CONTINUED) OPERATING SUPPLIES (CONTINUED) OTHER SUPPLIES & EQUIPMENT 469040 Traffic Control Improvement Supp 138.00 138.00 469200 Tools 76,00 76.00 469260 Fire Ext & Refills 465.00 466.00 469320 Miscellaneous Supplies 552,00 552.00 Total OTHER SUPPLIES & EQUIPMENT Total OPERATING SUPPLIES IMPROVEMENTS OTHER THAN BUILDING IMPROVEMENTS OTHER THAN BUILDING 'GREATER 4730101 Contracted Improvements 473020 Non -Contracted Improvements Total IMPROVEMENTS OTHER THAN BUILDING OTHER FINANCIAL USES 490150 Operating Subsidy 490190 Interfund Loan ?otal OTHER FINANCIAL USES Total Airport Operations Total Airport 1232.00 1232.00 7243,00 7243.00 20000.00 9000.00 20000.00 9000.00 29000,00 29000.00 11517.00 959.75 959.75 10557.25 8,33 45236.00 3656,82 3656.82 41579.18 8.08 56753.00 4616.57 4616.57 52136.43 8.13 ------------ ------------ 396667,00 396667,00 ---- 32363,63 ------------------- 32363.63 ------------ ------ 354303.37 ---- 8.16 ------------ ------------ 396667,00 -- 32363,63 --------- --->-------- 32363.63 ------------ 364303.37 __---- 8.15 RIPE: 08.22.11 10:37:12 Method: I Page: 7 Iowa City General Ledger System FY 2012 Expense Reporting For the period 07,01,11 to 07.31.11 YTD Period Account Appropriated Expenditures Expenditures Encumbrance Balance % Used ----- 7600 Airport (CONTINUED) AIRPORT (CONTINUM) 560100 Airport Operations (CONTINUED) OTHER FINANCIAL USES (CONTINUED) GRAND TOTAL 396667.00 32363.63 32363,63 364303.37 0.16 TRID: 09,22.11 10:38:24 Method: 4 Iowa City General Ledger System Expenditures Detail FY 2012 Detail Reporting For the period 07.01.11 to 07,31.11 Page 9 of 21 Pace: 1 Trans Date Trans Type Report# Source Description Debit Credit ----------- --------- -- .___-___ -------------------------------- -- ------------ --w_®___---- 7600 Airport 560100 Airport Operations 412000 Perm Dart Time 07.01.11 Old Sys 110701010009 07.15.11 Old Sys 110713010005 07.29.1.1 Old Sys 110727010007 Total Perin Part Time 413000 Temporary Employees 07.01.11 Old Sys 110701010009 Total Temporary Employees 42:00 Health Insurance 07.22.11 Journal Total Health Insurance 421200 Dental Insurance 07.22.11 Journal 503221jCIC PAYROLL RECAPIPAYROLL 01 1297.20 a03383\CIC PAYROLL RECAP�PAYROLL 15 1297.20 503543\CIC PAYROLL RECAP�PAYROLL 29 1333.20 Check:691528`MADISON NATIONAL LIFE Total Disability Insurance 3927,60 503221�CIC PAYROLL RECAP�PAYROLL 01 24.50 24.50 110802172316 009456 NL HEALTH INSURANC&iCIC HEALTH INS 329,82 ------------ ------------ 329.82 110802172316 009455 JUL MAL INSURANCE\CIC DENTAL INS 19.32 Total Dental Insurance 19.32 421300 Life Insurance 07.18.11 New Vouch 110719030008 06769411 Check:691524\MADISON NATIONAL LIFE Total Life Insurance 421400 Disability Insurance 07,18.11 New Vouch 110719030008 06769512 Check:691528`MADISON NATIONAL LIFE Total Disability Insurance 422100 FICA 07.01,11 Old Sys 110701010009 70i0599\,FICA\CITY CONTRIBUTION 07.15.11 Old Sys 110713010005 7150599�FICA\CITY CONTRIBUTION 07,29.11 Old Sys 110727010007 7290599\FICA`CITY CONTRIBUTION Total FICA 7.31 7.31 13.50 13.50 96.67 94.79 101.99 293.43 TRID: 08.22.11 10:38:24 Method: 4 Iowa City General Ledger System Expenditures Detail FY 2012 Detail Reporting For the period 07.01.11 to 07.31.11 Trans Date Trans Type Report# Source Description 7600 Airport (CONTINUED) Check;692319\MIDAMERICAN ENERGY%f 1024.14 560100 Airport Operations (CONTINUED) ENERGY\ELR 37.96 423100 MRS Check:692319\MIDAMERICAN ENERGY\ELE 161.22 07.01.11 Old Sys 110701010009 7010599\1PERS�CITY CONTRIBUTION 07.15.11 Old Sys 110713010005 7150599`IPERS\CITY CONTRIBUTION 07.29.11 Old Sys 110727010007 7290599,IPERS\CITY CONTRIBUTION Total IPERS 437010 Comp Liability Insurance 07.14.11 New Vouch 110720030040 03304336 Check:691361\AW WELT AMBRISCO INSUR Total Camp Liability Insurance 437020 Fire & Casualty Insurance 07.13.11 Nev Vouch 110714030016 06769089 Check:691343\PBTROLRUM MARRRTRRS MA Total Fire & Casualty Insurance 438010 Stormwater Utility Charges 07.20.11 Journal 110802172316 009453 057-095-03�STORMWTRl7.20.11 Bill Da Total Stormwater Utility Charges 438030 Electricity 07.27,11 New Vouch 07.27.11 New Vouch 07.27.11 New Vouch 07.27.11 New Vouch Total Electricity 438070 Heating Fuel/Gas 07,27,11 New Vouch 07.27.11 New Vouch 07.29.11 New Vouch Total Heating Fuel/Gas Debit Credit 106.66 104.68 107.59 318.93 3950.00 3950.00 750.00 750.00 789.11 789.11 110728030137 06770181 Check;692316\MIDABERICAN ENERGY`ELR 113.91 110728030137 067702.80 Check;692319\MIDAMERICAN ENERGY%f 1024.14 110728030137 06770282 Check:692319\MIDAMERICAN ENERGY\ELR 37.96 110728030137 06770284 Check:692319\MIDAMERICAN ENERGY\ELE 161.22 1337,23 110728030137 06770281 Check:692319\MIDAMERICAN ENHRGY\GAS 12.59 110728030137 06770283 Check:692319`MIDAMERICAN ENERGY\GAS 11.30 110801030008 06770434 Check:692648`MIDAMERICAN ENERGY,GAS 16.47 40.36 TRID: 08.22.11 10:38:24 Method: 4 Iowa City General Ledger System Expenditures Detail FY 2012 Detail Reporting For the period 07.01.11 to 07.31.11 Page 11 of 21 Page: 3 Trans Date Trans Type Report# Source Description Debit Credit 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) 438080 Sewer Utility Charge 07.20.11 Journal 110802172316 OC9453 057-115-00\SEWER\7.20,11 Bill Date 8.15 07,20.11 Journal 110802172316 009453 057-ll7-00\SEWER\7.20.11 Bill Date 20.12 07.20.11 Journal 110802172316 009453 057-118-03\SEWER\7.20.11 Bill Date 20.12 07.20.11 Journal 110802172316 009453 057-120-00\S8WHR\7.20.11 Bill Date ____________ 70.79 ______®_....---. Total Sewer Utility Charge 119.18 438090 Water Utility Charge 07.20.11 Journal 110802172316 009453 057-095-G3\WATER\7,20,11 Bill Date 8.65 07.20.11 Journal 110802172316 009453 057-115-00`WATBRj7.20.11 Bill Date 16.47 07.20.11 Journal 110802172316 009453 057-117-00\WATER17.20,11 Bill Date 15.38 07.20.11 Journal 110802172316 009453 057-118-03\WATER\7.20.11 Bill Date 15.38 07.20.11 Journal 110802172316 009453 057-120-001WATRR`7.20,11 Bill Date 53.35 Total Water Utility Charge 109.23 438100 Refuse Collection. Charges 07.19.11 New Vouch 110720030040 06769735 Cheek:691427\ABC DISPOSAL SYSTEMS I 34,00 07.19.11 New Vouch 110720030040 06769736 Check:691427\ABC DISPOSAL SYSTEMS 1 28.00 07.19.11 New Vouch 110720030040 06769737 Check:691427\ABC DISPOSAL SYSTEMS 1 69.00 Total Refuse Collection Charges 131.00 436120 Long Distance Service 07.01.11 Ph Lar. Dst 110801101545 000670119 JUL LONG DIST CHGBR 9.41 Total Lang Distance service 9.41 442010 Other Building Repair & Maintenance Ser 07.2).11 New Vouch 110721030158 06769902 Check:691503\JET AIR INC IOW`CLEANI 500.00 07.26.11 New Vouch 110727030012 0677G011 Check:692313\MARV'S GLASS SPECIALTI 226.00 Total Other Building Repair & Maintenance Servi 726.00 442020 Structure Repair & Maintenance Services 07.18.11 New Vouch 110719030006 06769614 Check:691576\T & R ROOFING & SHRBT 325.00 07,21,11 P -Card 11CB04103810 17800367 03C*07IS ELEVATOR CO\JONE NASBY 49.99 TRID: 08,22.11 10:38:24 Method: 4 Iowa City General Ledger System Expenditures Detail FY 2012 Detail Reporting For the period 07.01.11 to 07.31.11 Trans Date Trans Type Report# Source Description Debit Credit 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) 442020 Structure Repair & Maintenance Services Total Structure Repair & Maintenance Services 442060 Electrical & Plumbing Repair & Maintena 07.13.11 New Vouch 110714030016 06900774 Check:691168`ADFANCED ELECTRICAL SH 07.13.11 New Vouch 110714030016 06900805 Cheek:6912401LYNCE'S PLUMBING INC\O Total Electrical & Plumbing Repair & Maintenanc 443050 Radio Equipment Repair & Maintenance Se 07.13.11 New Vouch 110714030016 06769077 Check,6912321JET AIR INC IOW\FUEL F Total Radio Equipment Repair & Maintenance Sery 445030 Nursery Service -Lawn and Plant Care 07.20.11 New Vouch 110721030158 06769903 Check:691503\JBT AIR INC IOW\MAINT Total Nursery Service -Lawn and Plant Care 446130 ITS-PC/Peripheral Support Chargeback 07.01.11 IT Support 110729162551 00007024 FY12 ITS ANNUAL CHGB Total ITS-PC/Peripheral Support Chargeback 446140 ITS -Computer Replacement Chargeback 47.01.11 IT Repl 110706170021 00007025 JUL ITS REPL CHGBCk Total ITS -Computer Replacement Chargeback 446160 ITS-Network/Internet Chargeback 07.01.11 IT Int/Nwk 110706153206 00007031 JUL ITS META/INTRNET Total ITS-Network/Internet Chargeback 446200 Photocopying Chargeback 07.01.11 Copier Chg 110726115702 00700048 JUN PHOTOCOPY CHARGR Total Photocopying Chargeback 374.99 200.58 549.50 750.08 1121.42 1127.42 4500.00 4500.00 400.00 400.00 43.08 43.08 30.00 34.00 l.oa 1.08 TRID: 08.22.11 10:38:24 Method: 4 Iowa City General Ledger System Expenditures Detail FY 2012 Detail Reporting For the period 07.01.11 to 07.31.11 Page 13 of 21 Page: 5 Trans Date Trans Type Report# Source Description Debit Credit 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) 446220 Phone Service Chargeback 07.31.11 Qwest Chrg 110805103236 00007032 Jul Telecom Charges Total Phone Service Chargeback 446300 Phone Equipment/Line Chargeback 07.01.11 Ph Egaipmt 110801101545 00007018 JUL PHON EQUIP CHGBk Total Phone EquipmentfLine Chargeback 446320 Mail Chargeback 07.01.11 Mail 110706114159 00700054 JUN POSTAL CHARGES Total Mail Chargeback 446350 City Vehicle Replacement Chargeback 07.31.11 EQ Repl 110803104915 00007006 JUL REPLACEMENT COST Total City Vehicle Replacement Chargeback 446370 Fuel Chargeback 07.31.11 EQ Div 110803104915 00007708 JUL DIVISION FUEL Total Fuel Chargeback 446380 Vehicle Repair & Maintenance Chargeback 07.31.11 EQ Dili 110803104915 00007008 JUL DIVISION SERVICE Total Vehicle Repair & Maintenance Chargeback 449120 Equipment trental 07.19,11 New Vouch 110720030040 06769666 Check:6915911YOTTY'S INC�GOLF CART Total Equipment Rental 449350 Meals (non -travel) 07.21.11 P -Card Total Meals (non -travel) 93.31 93.31 92.50 92.50 3.85 3.85 1363.72 ------------ ------- 1163.72 418,48 418.48 287.48 287.48 425.00 ------------ ____________ 425.00 110804103810 17800551 ZIO JOHNOS SPAGHETTI H\MICHAEL THAR 38.46 ... .......... 38.46 TRID: 08.22.11 10:38:24 Method: 4 Iowa City General Ledger System Expenditures Detail FY 2012 Detail Reporting For the period 07.01.11 to 07.31.11 on Trans Date Trans Type Report# Source Description Debit Credit 7600 Airport (CONTINUED) UI Hangar Loan Princ\Jul Interfund 1136.95 110802172316 009463 560100 Airport Operations (CONTINUED) 727.54 110802172316 009463 SW T-Hngr Loan Princ�Jul 449360 Interest Expense 562.36 07.31.11 Journal 110802172316 009463 Corp Hangar Loan IntjJul Interfund 1770.03 07.31.11 Journal 110802172316 009463 UI Hangar Loan Int�Jul Interfund Lo 1254.57 07.31.11 Journal 110802172316 009463 SE T-Hngr Loan Int�Jul Interfund Lo 930.86 07.31.11 Journal 110802172316 009463 SW T-Hngr Loan Int�Jul Interfund Lo 867.64 Total Interest Expense 452010 Office Supplies 07.21.11 P -Card Total Office Supplies 490150 Operating Subsidy 07.31.11 Journal Total Operating Subsidy 490190 Interfund Loan 07.31.11 Journal 07.31.11 Journal 07.31.11 Journal 07.31.11 Journal Total Interfund Loan 4823.10 110804103810 17800552 STAPLESCONTRACTCOMMBRC�MICHAEL THAR 78.56 78.56 110809133644 009488 Airport 101 BD Coord�Jul Budgeted 0 959.75 959.75 110802172316 009463 Corp Hangar Loan PrnjJul Interfund 1229.97 110802172316 009463 UI Hangar Loan Princ\Jul Interfund 1136.95 110802172316 009463 SE T-Hngr Loan Princ�Ju1 Interfupd 727.54 110802172316 009463 SW T-Hngr Loan Princ�Jul Interfund 562.36 3656.82 Total Airport Operations 32363.63 TRID: 08.22.11 10:38:24 Method: 4 Iowa City General Ledger System Expenditures Detail FY 2x12 Detail Reporting For the period 07.01.11 to 07.31.11 Page 15 of 21 Page: 7 Trans Date Trans Type Report# Source Descriptio: Debit Credit 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) 490190 Interfund Loan (CONT ___®_d_®____ ________u___ Total, Airport 32363.63 ID: D8'22.11 18:38/24 Method: 4 Iowa City General Ledger System ExD9uditmrgo Detail BY %V12 Detail Reporting For the period 07.01.11 to 07.31.11 Trans Date Trans Type Report—#' Source Description Debit Credit 7608 Airport (CONTINUED) 960100 &i%pD%± Operations (CONTINUED) 490190 IotVzIuDd Loan (CONTINUED) w* GRAND TOTAL *+' ]2]63.63 ============ TRID: OB,22.11 1,:38:31 Method: 4 Iowa City General Ledger System Revenues Detail FY 2012 Detail Reporting For the Deriod 07.01.11 to 07.31.11 Page 17 of 21 Page: 1 Trans Date Trans Type Report# Source Description Debit Credit 7600 Airport 560100 Airport Operations 381100 Interest on TnVeStment6 07.31.11 Allocation 11080914281. Jul interest allocation: 23.47 Total Interest on Investments ------------ -------- -- 23.47 —Total 382100 Land Rental 07.06.11 Misc Pymt 1107111635:.6 70-5\ARMRD FORCES RESERVE\AIRPORT L 350.00 07.14.11 Payment 110714091739 00019599 2-6%BELL LARRY & SANDRA\PAYMENT 300.00 07.29.11 Misc Pym"- 110802112416 70-11�ARMED FORCES RESERVEjAIRPORT 350.09 Total Land Rental 1000.00 382200.BuildirgjRoo:t Rental 07.01,11 Payment 110701091523 00019565 2-6'AWERS ROBERT\JUL 11`vHANGAR #9 141,0111 07.01.11 Payment 110701091523 00019573 2-31DOW11ES GREGIJUL 11y 1.:7 P. #51 168,00 07.05.11 Payment 110705094028 00419514 2-14\DEMARIA JOSEPE\JUL 11lHANGAR 148.00 07.05.11 Payment 110705094028 00019566 2-6�OPERATOR PERFORMANCE LAB\JUL 11 4038.00 07.05.11 Payment 114705094028 00019566 2-6\0PERATOR PERFORMANCE LABIJUL 11 615.00 07.06.11 Payment 110706093756 00019516 1-26\SCHNELL T0�1�JUL 111HANGAR #62 174,00 07.06.11 Payment 110706093756 00019544 1-22'�AEROHAWKS\JUL 11\HANGAR #19 148,00 07,06,11 Payment 110706093756 00019569 1-25\ST&ARMAN'\JUL 11lHANGAR 447 168,00 07.36.11 Payment 110706093750 00019584 1-21\11UST GARY\JUL 111HANGAR #4 141.00 07.06.11 Payment 110706093756 00019584 1-21�LUST GARY;JUL 11\EANGAR #21 148,00 47,3?.11 Payment 110707092304 30019562 2-4\RCOF KEITH`JUL 11\HANGAR #42 168.00 07.x$.11 Payment 1107,08092?57 0001951.5 2-7\RANEY CHARLES�JUL 11'tiFnNGAR #1 141,00 07.48.11 Pavment 1107080092757 00019517 3-21BULLERS JONATHAN�11, 11\HANGAR 141,00 07,08,11 Payment i10708P92757 00019524 3-1\B7LER 70HN\JUL 11;HANGAR #36 168.00 07.08,11 Payment 110708092757 00019524 3-1"BUTLER JOi?N�JL'L 11`,HANGAR #37 168.00 07,08.11 Payment 110708092757 00019614 2-61PCLASKI h'IGHAELAJUL 11'1EAIaGAR 148,00 0;.11,11 Payment 1'07110°5633 00019513 2-3�PITTON MIKE\JUL 11!HANGAR #26 148.00 07.11.11 Payment 110711495633 00019519 2-4�BULGARELLI DAVID\JUL I1\HANGAR 148.00 07.11.11 Payrent 110711095633 00019523 2-6\MASCARi RICK\'JUL 11\HANGAR #30 148.00 07,12.11 Payment 110712090715 00019533 1-26�NE lA PHYS THERPY ASSOC\JUL 11 396.00 07.12.11 Payment 110712090715 00019567 1-19�WIRCAERT RONALD\JUL 111,HANGAR 192.00 07,13.11 Paynent 110713090837 00019490 1-13\FIELD HOWARD\JUL 11\HANGAR 45 1n8,00 ZMEM TRID: 08.22.11 10:38:31 Method: 4 Page: 2 Iowa City General Ledger System Revenues Detail FY 2012 Detail Reporting For the period 07.01.11 to 07.31.11 Trans Date Trans Type Report# Source Description Debit Credit 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) 382200 Building/Room Rental (CONTINUED) 07.13.11 Payment 110713090837 00019538 2-7\ZUBROD ROY\JUL 11\HANGAR #20 148.00 07.13.11 Payment 110713090837 00019547 2-13\GERR FR8D\JUL 11\HANGAR #16 148.00 07.15.11 Payment 110715090742 00019531 2-4\LACINA DAVE\JUL 11\HANGAR #57 198,00 07.15,11 Payment 110715115029 00019487 99-1\MILLBR RICHARD\JUL 11\HANGAR. 168.00 07.15.11 Payment 110715115029 00019501 89-4\HIKCKLEY HARRY\JUL 11\HANGAR 404.00 07,15.11 Payment 110715115029 00019501 89-4\HINCKLEY HARRY\JUL 11\HANGAR 141.00 07-15,11 Payment 110715115029 00019504 89-5\VOS JEREMY\JUL 11\HARNGAR #41 168.00 07.15.11 Payment 110715115029 00019529 89-6\PISHBAUGH JUSTIN\JUL 11\RANGA 174.00 07.15.11 Payment 110715115029 00019532 89-7\PATTSCHRL RICHARD\JUL 11\HAN 229.00 07.15.11 Payment 110715115029 00019534 89-8\ALLENDZR PATRICK\JUL 11\HARGA 168.00 07.15.11 Payment 110715115029 00019550 89-10\EDRONDS TERRY\JUL 11\HANGAR 4113.00 07.15.11 Payment 110715115029 00019559 89-13%VADRONS UP\JUL 11\HANGAR #5 168.00 07.15.11 Payment 110715115029 00019561 89-14\GURNETT DON\JUL 11\HANGAR #3 310.00 07.15.11 Payment 110715115029 00019570 89-15\SINGLETARY ROBERT\JUL 11\HAN 141.00 07.15.11 Payment 110715115029 00019580 89-17\SWANSON NAOMI\JUL 11\HANGER 141.00 07.15.11 Payment 110715115029 00019603 89-22\COHN GARY\JUL 11\RANGAR #22 148.00 07.15.11 Payment 110715115029 00019604 89-23\DOUGLAS BRIAN\JUL 11\HANGAR 141.00 07.15.11 Payment 110715115029 00019607 89-25\MHADE JAMES N\JUL 11\HANGAR 168.00 07.18,11 Payment 110718092032 00019305 2-6\FULL JERRY\JUR 11\HANGAR #45 204.00 07,18.11 Payment 110718092032 00019489 2-11\ODGAARD JACOB\JUL 11\HANGAR # 141.00 07.18.11 Payment 110718092032 00019503 2-13\RUYLE JOHN\JUL 11\HANGAR #33 358.00 07.18,11 Payment 110718092032 00019520 2-7\IOWAAERO\JUL 11\HANGAR #43 168.00 07.18.11 Payment 110718092032 00019536 2-5\CHALKLEY BEN\JUL 11\HANGAR f14 148.00 07.18.11 Payment 110718092032 00019563 2-19\JET AIR INC\JUL 11\BUILDINGS D 3926.00 07.18.11 Payment 110718092032 00019575 3-3\PLANAGAN JAMES\JUL 11\HANGAR # 168.00 07.18.11 Payment 110718092032 00019578 2-19\JET AIR\JUL 11\HANGAR #60 174.00 07.18.11 Payment 110718092032 00019578 2-19\JET AIR\JUL 11\HANGAR #59 174.00 07.18.11 Payment 110718092032 00019611 1-11\YELDER ROY\JUL 11\HARGAR #18 148.00 07.26.11 Payment 110726093852 00019609 1-31\RORR BRIAN\JUL 11\HANGAR #27 148,00 07.29.11 Payment 110729091707 00019861 1-13\BRUMLEY JAXES\AUG !I\HkNGAR # 148.00 Total Building/Room Rental 17404.00 TRID: 08.22.11 10:38:31 Method: 4 Iowa City General Ledger System Revenues Detail FY 2012 Detail Reporting For the period 07.01.11 to 07.31.11 Page 19 of 21 Page: 3 Trans Date Trans Type Report# Source Description Debit Credit 7600 Airport (CONTINUED) 560103 Airport Operations ;CONTINUED) 354900 Other Commissions 07.14.11 Misc Pymt 110714491744 2-12\WESTERN PETROLEUM COMPANY\GAS 1580.10 Total Other Commissions 1580.10 393120 General Levy 07.31.11 Journal 110809133644 009488 Ptax to Airport�Jul Budgeted Operat 8333.33 Total General Levy 8333.33 ------_-.®- ------------ Total Airport Operations 28340.90 %RID: 08.22.11 10:0:31 Method/ 4 Iowa City General LedprDvDtem Revenues Detail FY 2012 Detail Reporting For the period 07.01.11 to 07.31.11 Trans Date Trans Tvoa DeDvc # 8nnree Description Debit Credit 7600 Airport (CU0TI0OQD) 560100 Airport Operations (CONTINUED) Total AirDort 3040.90 TRID: 08,22,11 10:38:31 Method: 4 Iowa City General hedger System Revenues Detail FY 2012 Detail Reporting For rhe period 07.01,11 to 07,31.11. Page 21 of 21 Page: 51 Trans Date Trans Type Report# Source Description Debit Credit 7600 Airport (CONTINUED) 560100 Airport Operations (CONTINUED) ttt GRAND TOTALS 29340.90