HomeMy WebLinkAboutPublic Works Master PlanIOWA CITY PUBLIC WORKS - MASTER PLAN
Master Planning Process
Step 1
Data Collection
• Data Collection
• Survey Questionnaire
• Detailed Interviews
• Space Needs Program
• Tailored operational needs
• Comparative Analysis
• Existing Conditions
• Industry standards
• Assessment and Analysis
• Existing site functions
• Facility conditions
• Operational growth
Public ntrksA min
Public works Administration
Master Planning Process I Data Development
2035 Needs
Bnng to current standards
Proposed MP(MDG /NM
Proposed MP(MDG/NM
Ewisting Eclips Report
Program
Program Future Needs
reccomendatlon)
reccomendatlon)
Department Area Hays Area Bays
Area Bays
Area Bays
Area Bays
Area Bays
Shared
NA
SEE TOTAL
NA
17,152
NA
17,152
NA
17,152
NA
17,152
NA
Refuse
12,450
NA
SEETOTAL
SEETOTAL
20,900
16
25,354
22
20,9D0
16
25,354
22
Streets and Traffic
43,005
NA
SEETOTAL
SEETOTAL
57,936
71
66,167
85
57,936
71
66,167
85
a
=
Water
73,400
NA
SEE TOTAL
SEETOTAL
11,]97
17
11,]9]
17
11,797
17
11,797
17
12
'o
3
IO WARM
235V
37SV
455V
37SV
45 SV
=
Building Total
68,855
STORAGE
68,664
44LV
107,785
67 LV
120,470
79 LV
107,785
67LV
120,470
79LV
n
PARTYEAR
67 Total
104 TOTAL
124 TOTAL
104 TOTAL
124TOTAL
8HD/SP
9HD/SP
8HD/SP
9HD/SP
_
211D
611D
4 L
5LD
4 L
5 L
Equipment
12,210
4 LD
28,017
3 LO
46,296
5 HDB
50,581
6 HDB
45,325
2 HDB
50,565
3 HDB
6 Total
9Total
3 LDB
4 LDB
2LDB
3LDB
rc
20 Total
24 Total
16 Total
20 Total
,s
0/NA
0/NA
0HUB
OHDB
OHDB
OHDB
Transit
36,332
STotal
FUNCTION
FUNCTION
35,425
OLDB
51,826
OLDB
35,425
OLDB58,149
OLDB
WASN'T
WASN'T
SEE EQUIP
SEE EQUIP
SEE EQUIP
SEE EQUIP
r
STUDIED
STUDIED
Fire
1,560
NA
NA
NA
3,771
NA
3,771
NA
3,771
NA
3,771
NA
Puke
1,560
NA
NA
NA
4,422
NA
4,422
NA
4,422
NA
4,422
NA
m
0/NA
0/NA
E
FUNCTION
FUNCTION
BuildlnSTotal
3,120
NA
8,193
NA
8,193
NA
8,193
NA
8,193
NA
3
WASN'T
WASN'T
sruolED
STUDIED
m
-
0/NA
0/14A
FUNCTION
FUNCTION
Landfill
16,460
NA
26,565
NA
26,565
NA
26,555
NA
26,565
NA
=
WASN'T
WASN'T
STUDIED
STUDIED
Master Planning Process I Charrette Process
90 Nib,
Owner —
Brainstorm
Sessions
Architect
Users
Facilities
Designer
I
Step
Charrette
• Review of Maintenance Methods
N
• Establish Affinities
• Staffing Projections
O
• Space Programs
E
Fleet Design Data
o
Sustainable Design
a
• Design Criteria
a
• Site Selection
o
• Site Investigation
U
• Existing Facility Evaluation
• Preliminary Equipment Estimate
I
Project Site Study I Iowa City
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/b/2n16
Ff Maintenance
Design
rte— Group
NEUMANN MONSON A—.HITECTS
Project Site Study I Growth
1959-1966
1990-
9
600•-0• 2400'- 0'
0' 12001-01,
1969--
ml
1980
2015 -future
1839-1952: 3542 acres
1959-1966: 6752 acres
1969-1979: 3795 acres
1980-1989: 150 acres
1990-1999: 1515 acres
2000-2014 1113 acres
Project Site Study I Existing Facilities
WATER WORKS 1-80
F iD
a
s� MELROSE AVE-
M
0
FIRE/POLICE DEPT
GILBERT COURT'
r -
I
�6
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/b/2n16
Ff Maintenance
Design
rte— Group
NEUMANN MONSON A.CNITECTS
Project Site Study I Winter Domicile Location
Travel Path
Miles
Landfill to Riverside
5.7
Landfill to Napoi—i
Fairgrounds to Riverside
1.8
Napoleon to Riverside
1.7
Fire/police to Big Ten
6.4
Gilbert Ct to Napoleon
1.6
4PK
k
Time
14min
5min
5min
12min
WATER WORKS
{'< OPON,r -. ,..
-2 r
Len
5min- '�
zy- t .�`F; s
K
i -e 1
t�
4 i v
FIRT//POLICE DEPT
� •• ' ' ' �fVTELTidSE'AVE ' � � � a /
//
G LBERT COURT
LANDFILL
\ RIVERSM _ Al
\ I 1
R
BIG TEN -_-_'I' ; +`OLEON
Sao. -a^ 3200'- 0'
o Soa-o `J FAIRGROUNDS
U-191
• EQUIPMENT/REPAIR
• LANDFILL
s�
„• SOLID WASTE
� 4Tv
STREETS/TRAFFIC
E�
• TRANSIT
• WATER
• FIRE/POLICE
Project Site Study I Summer Domicile Location
Travel Path
Miles
Time
Landfill to Riverside
5.7
14min
;Landfill to Napo -_.
6.8
16min
Napoleon to Riverside
1.7
5min
Fire/police to Big Ten
6.4
12min -
Gilbert Ct to Napoleon
1.6
5min ,
WATER WORKS
s
-
FfRF7POLI D
4
— — — — — —fNnM SE'AVT
ti — >�� IP
�:
` — — — — — —I GLBERT*1€
LANDFILL � � — — — 7ft
k
!! RIVERSR7E II '
BIG TEN— — NAPOLEON
SOU -0, 3200 -0'
i
o' 800.-0.. FAIRGROUNDS
U-191
• EQUIPMENT/REPAIR
�k LANDFILL
KNo
: • SOLID WASTE
STREETS/TRAFFIC
• TRANSIT
• WATER
x,• FIRE/POLICE
IOWA CITY PUBLIC WORKS
MASTER PLAN
- 12/6/2n16
��
r—Maintenance
.i— GrauDesipgn
NEUMANN MONSON A.CNITECTS
Project Site Study I Proposed
Travel Path
Landfill to Napoleon
Fire/police to Napoleon
Miles
LS3
2.1
Time `_ = `
8min
� �"Jz
� s T
-
M ELR�f
A. -
IPA
LANDFILL a
�-RIVERSIDE
-
- .IP
BIG TEN
�x
FAIRGROUNDS
;1
WATER WORKS
U-191
NAPOLEON
• EQUIPMENT/REPAIR
• LANDFILL
SOLID WASTE
STREETS/TRAFFIC
• TRANSIT
• WATER
FIRE/POLICE
IOWA CITY PUBLIC WORKS
MASTER PLAN
- 121612n16
Ff Maintenance
Design
r-- Graup
NEUMANN MONSON A.CNITECTS
Project Site Study I Napoleon Lane
ISI' d
WATERBODY
/v ♦ ti I
PUBLIC PARKS
01 � -i G 9i ► \,
i
y�
� • ��� t � � �� HOUSING
—ROADS
FUTURE HOUSING
BIKE
�FTHESIT\���`�» ----
VIEWS
i
3
R C
S
A
f �
IOWA CIN PUBLICWORKS
MASTER PLAN
1216/20 f '
Maintenance
250' -0- i000�-o10001-01,
Group 1 A
- n soo�-a" c�
_, \ �,� NEUMANN MONSON _.
Project Site Study I Zoning
0
aso - ullT
0 `_
o^
WATERBODY
NEIGHBORHOOD
PUBLIC
SINGLE FAMILY
• MULTI FAMILY
• COMMUNITY
COMMERCIAL
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/b/2n16
Ff Maintenance
Design
r-- Graup
NEUMANN MONSON A—.HITECTS
Project Site Study I Utilities
SANITARY
GAS
STORM
WATER
ELECTRIC
TELEPHONE
'A CITY PUBLIC WORKS
TER PLAN
5/2816
,fM#Maintenance
i Design
Group
MANN MONSON A—.HITECTS
Master Plans I Precedent Studies - Maintenance Building Concepts
Drive-in/Back
Master Plans I Precedent Studies - Maintenance Facilities
Des Moines
Master Plans I Precedent Studies - Maintenance Facilities
Cedar Rapids
- LJ
�w
IF
a { v
e e
y
R I J
r
oe
III��
N`z
Master Plans I Precedent Studies - Maintenance Facilities
St. Charles, MO
Master Plans I Precedent Studies - Maintenance Facilities
Naperville, IL
Master Plans I Precedent Studies - Transit Facilities
Kenosha, WI
RTYPE Bls RakiNR _
rvNu
M1FviXS
I2
I
I
I
I I
AteOSf F_.. /
i r.n
J 1
[YHN{Ipl � YXTI. w' lJuc
^IQ'P1bC sP
Ma
915e i
Master Planning Process I Charrette Process
Concepts
Review
2
-"
5
3
-
Review
Charrettel Schemes
j .
a
I
�
e
x
f1�
0
a 561EHE °f"
t
A
�a e
Groulo
NEUMANN MONSON ARCHITECTS
Master Planning Process I C harrette Process
Concepts
6
7
8
Synthesis
Selected
Concept
Concept Plansl Selected Master Plan to Develop
a
SHED
I i d
FIR[
'� nnosroavE r�or� ��� �00
r
nucrw n.IoT
gra i
Y
vim` ♦."♦� rues rvruae � l7 �� rnua�muno�a
%-� __� .i� 1, I �, � _ ♦
..
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/b/2n16
Maintigenance i Desn
Group
NEUMANN MONSON A—.HITECTS
Concept Design) Diagrams
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/6/2,116
�� Maintenance
.i Design
r.. Group
NEUMANN MONSON a.CNITECTS
oilIl
South District Destination
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/6/2,116
�� Maintenance
.i Design
r.. Group
NEUMANN MONSON a.CNITECTS
Concept Plansl Selected Master Plan to Develop
a
SHED
I i d
FIR[
'� nnosroavE r�or� ��� �00
r
nucrw n.IoT
gra i
Y
vim` ♦."♦� rues rvruae � l7 �� rnua�muno�a
%-� __� .i� 1, I �, � _ ♦
..
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/b/2n16
Maintigenance i Desn
Group
NEUMANN MONSON A—.HITECTS
Concept Plansl Selected Master Plan to Develop
off
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/6/2n16
A4F Maintenance
GrouDesipgn
NEUMANN MONSON A—.HITECTS
•
Concept Design] Diagrams
q
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/6/2016
.Maintenance
r,j Design
11 Group
NEUMANN MONSON A-.HITECTS
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/b/2n16
�# Maintenance
.i Design
rLm— Group
NEUMANN MONSON A—.HITECTS
F_N.tual and Local materials
Va riety of resil lent trees and
Stormwater retention, a in ga rdens
Promenade esta bl ished th mug h a rch itectu re a nd lighting
Concept Plansl Selected Master
ANIMAL
SHELTER
"
STAFF.
PARKING
SALTS MIXBINS •\
=a.
RINE
<2.
TOWER
YARD STORAGE 3�
li I �L,I���JJ IJII I I IJ I
BULK
WATER
SHOPS/ \
STORAGE
\ FUTURE
DEVELOPMENT
SOLID WASTE
✓ i
B
BAY �
s
#FPA
EP�BPYIIRI
eus
Office / Shared
Water
Streets / Traffic
Solid Waste
Maintenance
Transit
MAI TENANDE
TRANSIT
I
IOWA CIN PUBLIC WORKS
PARCEL
MASTER PLAN
1022x52019
'�
1216/2n16
/a
Maintenance
n
I�4F
i
NEUMANN MONSON A.CHITECTS
McCOLLISTER
BOULEVARD
Concept Plansl Phasing Diagram
STAFF • '• �`
QN / PA
-
SALT MDIBINS •'\
T
AL - SHOPS
ER \jwNE STORAGE
:• ` FUTURE
DEVELOPMENT
Y �POLICk _.SOLIOWASTE\ r `�
\ FIREST�\
{^J WASH V
VFIREYYY w ��✓"� ,�,
TOWER BAY
� N
YARD STORAGE / ••�,
ILII OA
EQUIPMENT
Ell RE US
�AU�ON_ _ h�' / BUB
/ MAI TENANCE�
LO
�. i. r /
TRANBIC. /--
(�4 1
'` UTURE
R- FUEL ` PARCEL
1S2T 018
,
ITER �
McCOLLISTER
BOULEVARD
Existing
Phase 1
IOWA CITY PUBLIC WORKS
MASTER PLAN
121612n16
Ff Maintenance
Design
r-- Graup
NEUMANN MONSON A.CNITECTS
Concept Plansl Phasing Diagram
,,�r. • • «NE /-/ STAFF ��•,
SON / . PARKING
SALT MIXBINS `• ,`
SHOPS
STORAGE
w
AT i�
auuc
WATER
FUTURE
DEVELOPMENT
TEN
\` MAI TENANGE /
N i
TRANSIT
1111
YYY PARCEL
r~ 1 1022452019
McCOLLISTER
BOULEVARD
Phase 1
_; Phase 2
_; Phase 3
_; Phase 4
_; Future
17
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/b/2n16
�. i�4F Maintenance Design
r.. Group
NEUMANN MONSON A.CNITECTS
Concept Design] Sustainable Options
Site Features
PhatONcl[alq shade structure
Building Design and Materials
Parking bloswale
Translucent clerestory windows natural light
Insulated translucent sectional door
Bicycle rack
CNG fuellnq for buses and nor -revenue vehicles
Solar tube day lightlnq strategy
Light reflective fkor
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/6/2,16
PFMaintenance
.i Design
rLm— Group
NEUMANN MONSON a.CNITECTS
Concept Design] Sustainable Options
Mechancial Systems
Heat recovery piping
Llectrical Systems
Destratilicatlon fan
Radiant floor system Under floor air distribution
LED Nghting Photovoltaic panels on roof Photovoltaic panel on parking canopy Task lighting
Plumbing Systems
Dual volumeflush toilet
West water reclaim System
Low -How and automatic fixtures
Rainwater harvesting
IOWA CITY PUBLIC WORKS
MASTER PLAN
12/b/2n16
AAFf Maintenance
Design
rGroup
NEUMANN MONSON A—.HITECTS
Concept Plansl Selected Master
ANIMAL
SHELTER
"
STAFF.
PARKING
SALTS MIXBINS •\
=a.
RINE
<2.
TOWER
YARD STORAGE 3�
li I �L,I���JJ IJII I I IJ I
BULK
WATER
SHOPS/ \
STORAGE
\ FUTURE
DEVELOPMENT
SOLID WASTE
✓ i
B
BAY �
s
#FPA
EP�BPYIIRI
eus
Office / Shared
Water
Streets / Traffic
Solid Waste
Maintenance
Transit
MAI TENANDE
TRANSIT
I
IOWA CIN PUBLIC WORKS
PARCEL
MASTER PLAN
1022x52019
'�
1216/2n16
/a
Maintenance
n
I�4F
i
NEUMANN MONSON A.CHITECTS
McCOLLISTER
BOULEVARD
Master Planning Process I C harrette Process
Concepts Concepts
caner
Users'
Brainstorm1, 4 % Review
Sessions 1 2 1,
itect ,- 5
Faciliti 3
`
Designer
Synthesis Selected
Concept