Loading...
HomeMy WebLinkAboutPublic Works Master PlanIOWA CITY PUBLIC WORKS - MASTER PLAN Master Planning Process Step 1 Data Collection • Data Collection • Survey Questionnaire • Detailed Interviews • Space Needs Program • Tailored operational needs • Comparative Analysis • Existing Conditions • Industry standards • Assessment and Analysis • Existing site functions • Facility conditions • Operational growth Public ntrksA min Public works Administration Master Planning Process I Data Development 2035 Needs Bnng to current standards Proposed MP(MDG /NM Proposed MP(MDG/NM Ewisting Eclips Report Program Program Future Needs reccomendatlon) reccomendatlon) Department Area Hays Area Bays Area Bays Area Bays Area Bays Area Bays Shared NA SEE TOTAL NA 17,152 NA 17,152 NA 17,152 NA 17,152 NA Refuse 12,450 NA SEETOTAL SEETOTAL 20,900 16 25,354 22 20,9D0 16 25,354 22 Streets and Traffic 43,005 NA SEETOTAL SEETOTAL 57,936 71 66,167 85 57,936 71 66,167 85 a = Water 73,400 NA SEE TOTAL SEETOTAL 11,]97 17 11,]9] 17 11,797 17 11,797 17 12 'o 3 IO WARM 235V 37SV 455V 37SV 45 SV = Building Total 68,855 STORAGE 68,664 44LV 107,785 67 LV 120,470 79 LV 107,785 67LV 120,470 79LV n PARTYEAR 67 Total 104 TOTAL 124 TOTAL 104 TOTAL 124TOTAL 8HD/SP 9HD/SP 8HD/SP 9HD/SP _ 211D 611D 4 L 5LD 4 L 5 L Equipment 12,210 4 LD 28,017 3 LO 46,296 5 HDB 50,581 6 HDB 45,325 2 HDB 50,565 3 HDB 6 Total 9Total 3 LDB 4 LDB 2LDB 3LDB rc 20 Total 24 Total 16 Total 20 Total ,s 0/NA 0/NA 0HUB OHDB OHDB OHDB Transit 36,332 STotal FUNCTION FUNCTION 35,425 OLDB 51,826 OLDB 35,425 OLDB58,149 OLDB WASN'T WASN'T SEE EQUIP SEE EQUIP SEE EQUIP SEE EQUIP r STUDIED STUDIED Fire 1,560 NA NA NA 3,771 NA 3,771 NA 3,771 NA 3,771 NA Puke 1,560 NA NA NA 4,422 NA 4,422 NA 4,422 NA 4,422 NA m 0/NA 0/NA E FUNCTION FUNCTION BuildlnSTotal 3,120 NA 8,193 NA 8,193 NA 8,193 NA 8,193 NA 3 WASN'T WASN'T sruolED STUDIED m - 0/NA 0/14A FUNCTION FUNCTION Landfill 16,460 NA 26,565 NA 26,565 NA 26,555 NA 26,565 NA = WASN'T WASN'T STUDIED STUDIED Master Planning Process I Charrette Process 90 Nib, Owner — Brainstorm Sessions Architect Users Facilities Designer I Step Charrette • Review of Maintenance Methods N • Establish Affinities • Staffing Projections O • Space Programs E Fleet Design Data o Sustainable Design a • Design Criteria a • Site Selection o • Site Investigation U • Existing Facility Evaluation • Preliminary Equipment Estimate I Project Site Study I Iowa City IOWA CITY PUBLIC WORKS MASTER PLAN 12/b/2n16 Ff Maintenance Design rte— Group NEUMANN MONSON A—.HITECTS Project Site Study I Growth 1959-1966 1990- 9 600•-0• 2400'- 0' 0' 12001-01, 1969-- ml 1980 2015 -future 1839-1952: 3542 acres 1959-1966: 6752 acres 1969-1979: 3795 acres 1980-1989: 150 acres 1990-1999: 1515 acres 2000-2014 1113 acres Project Site Study I Existing Facilities WATER WORKS 1-80 F iD a s� MELROSE AVE- M 0 FIRE/POLICE DEPT GILBERT COURT' r - I �6 IOWA CITY PUBLIC WORKS MASTER PLAN 12/b/2n16 Ff Maintenance Design rte— Group NEUMANN MONSON A.CNITECTS Project Site Study I Winter Domicile Location Travel Path Miles Landfill to Riverside 5.7 Landfill to Napoi—i Fairgrounds to Riverside 1.8 Napoleon to Riverside 1.7 Fire/police to Big Ten 6.4 Gilbert Ct to Napoleon 1.6 4PK k Time 14min 5min 5min 12min WATER WORKS {'< OPON,r -. ,.. -2 r Len 5min- '� zy- t .�`F; s K i -e 1 t� 4 i v FIRT//POLICE DEPT � •• ' ' ' �fVTELTidSE'AVE ' � � � a / // G LBERT COURT LANDFILL \ RIVERSM _ Al \ I 1 R BIG TEN -_-_'I' ; +`OLEON Sao. -a^ 3200'- 0' o Soa-o `J FAIRGROUNDS U-191 • EQUIPMENT/REPAIR • LANDFILL s� „• SOLID WASTE � 4Tv STREETS/TRAFFIC E� • TRANSIT • WATER • FIRE/POLICE Project Site Study I Summer Domicile Location Travel Path Miles Time Landfill to Riverside 5.7 14min ;Landfill to Napo -_. 6.8 16min Napoleon to Riverside 1.7 5min Fire/police to Big Ten 6.4 12min - Gilbert Ct to Napoleon 1.6 5min , WATER WORKS s - FfRF7POLI D 4 — — — — — —fNnM SE'AVT ti — >�� IP �: ` — — — — — —I GLBERT*1€ LANDFILL � � — — — 7ft k !! RIVERSR7E II ' BIG TEN— — NAPOLEON SOU -0, 3200 -0' i o' 800.-0.. FAIRGROUNDS U-191 • EQUIPMENT/REPAIR �k LANDFILL KNo : • SOLID WASTE STREETS/TRAFFIC • TRANSIT • WATER x,• FIRE/POLICE IOWA CITY PUBLIC WORKS MASTER PLAN - 12/6/2n16 �� r—Maintenance .i— GrauDesipgn NEUMANN MONSON A.CNITECTS Project Site Study I Proposed Travel Path Landfill to Napoleon Fire/police to Napoleon Miles LS3 2.1 Time `_ = ` 8min � �"Jz � s T - M ELR�f A. - IPA LANDFILL a �-RIVERSIDE - - .IP BIG TEN �x FAIRGROUNDS ;1 WATER WORKS U-191 NAPOLEON • EQUIPMENT/REPAIR • LANDFILL SOLID WASTE STREETS/TRAFFIC • TRANSIT • WATER FIRE/POLICE IOWA CITY PUBLIC WORKS MASTER PLAN - 121612n16 Ff Maintenance Design r-- Graup NEUMANN MONSON A.CNITECTS Project Site Study I Napoleon Lane ISI' d WATERBODY /v ♦ ti I PUBLIC PARKS 01 � -i G 9i ► \, i y� � • ��� t � � �� HOUSING —ROADS FUTURE HOUSING BIKE �FTHESIT\���`�» ---- VIEWS i 3 R C S A f � IOWA CIN PUBLICWORKS MASTER PLAN 1216/20 f ' Maintenance 250' -0- i000�-o10001-01, Group 1 A - n soo�-a" c� _, \ �,� NEUMANN MONSON _. Project Site Study I Zoning 0 aso - ullT 0 `_ o^ WATERBODY NEIGHBORHOOD PUBLIC SINGLE FAMILY • MULTI FAMILY • COMMUNITY COMMERCIAL IOWA CITY PUBLIC WORKS MASTER PLAN 12/b/2n16 Ff Maintenance Design r-- Graup NEUMANN MONSON A—.HITECTS Project Site Study I Utilities SANITARY GAS STORM WATER ELECTRIC TELEPHONE 'A CITY PUBLIC WORKS TER PLAN 5/2816 ,fM#Maintenance i Design Group MANN MONSON A—.HITECTS Master Plans I Precedent Studies - Maintenance Building Concepts Drive-in/Back Master Plans I Precedent Studies - Maintenance Facilities Des Moines Master Plans I Precedent Studies - Maintenance Facilities Cedar Rapids - LJ �w IF a { v e e y R I J r oe III�� N`z Master Plans I Precedent Studies - Maintenance Facilities St. Charles, MO Master Plans I Precedent Studies - Maintenance Facilities Naperville, IL Master Plans I Precedent Studies - Transit Facilities Kenosha, WI RTYPE Bls RakiNR _ rvNu M1FviXS I2 I I I I I AteOSf F_.. / i r.n J 1 [YHN{Ipl � YXTI. w' lJuc ^IQ'P1bC sP Ma 915e i Master Planning Process I Charrette Process Concepts Review 2 -" 5 3 - Review Charrettel Schemes j . a I � e x f1� 0 a 561EHE °f" t A �a e Groulo NEUMANN MONSON ARCHITECTS Master Planning Process I C harrette Process Concepts 6 7 8 Synthesis Selected Concept Concept Plansl Selected Master Plan to Develop a SHED I i d FIR[ '� nnosroavE r�or� ��� �00 r nucrw n.IoT gra i Y vim` ♦."♦� rues rvruae � l7 �� rnua�muno�a %-� __� .i� 1, I �, � _ ♦ .. IOWA CITY PUBLIC WORKS MASTER PLAN 12/b/2n16 Maintigenance i Desn Group NEUMANN MONSON A—.HITECTS Concept Design) Diagrams IOWA CITY PUBLIC WORKS MASTER PLAN 12/6/2,116 �� Maintenance .i Design r.. Group NEUMANN MONSON a.CNITECTS oilIl South District Destination IOWA CITY PUBLIC WORKS MASTER PLAN 12/6/2,116 �� Maintenance .i Design r.. Group NEUMANN MONSON a.CNITECTS Concept Plansl Selected Master Plan to Develop a SHED I i d FIR[ '� nnosroavE r�or� ��� �00 r nucrw n.IoT gra i Y vim` ♦."♦� rues rvruae � l7 �� rnua�muno�a %-� __� .i� 1, I �, � _ ♦ .. IOWA CITY PUBLIC WORKS MASTER PLAN 12/b/2n16 Maintigenance i Desn Group NEUMANN MONSON A—.HITECTS Concept Plansl Selected Master Plan to Develop off IOWA CITY PUBLIC WORKS MASTER PLAN 12/6/2n16 A4F Maintenance GrouDesipgn NEUMANN MONSON A—.HITECTS • Concept Design] Diagrams q IOWA CITY PUBLIC WORKS MASTER PLAN 12/6/2016 .Maintenance r,j Design 11 Group NEUMANN MONSON A-.HITECTS IOWA CITY PUBLIC WORKS MASTER PLAN 12/b/2n16 �# Maintenance .i Design rLm— Group NEUMANN MONSON A—.HITECTS F_N.tual and Local materials Va riety of resil lent trees and Stormwater retention, a in ga rdens Promenade esta bl ished th mug h a rch itectu re a nd lighting Concept Plansl Selected Master ANIMAL SHELTER " STAFF. PARKING SALTS MIXBINS •\ =a. RINE <2. TOWER YARD STORAGE 3� li I �L,I���JJ IJII I I IJ I BULK WATER SHOPS/ \ STORAGE \ FUTURE DEVELOPMENT SOLID WASTE ✓ i B BAY � s #FPA EP�BPYIIRI eus Office / Shared Water Streets / Traffic Solid Waste Maintenance Transit MAI TENANDE TRANSIT I IOWA CIN PUBLIC WORKS PARCEL MASTER PLAN 1022x52019 '� 1216/2n16 /a Maintenance n I�4F i NEUMANN MONSON A.CHITECTS McCOLLISTER BOULEVARD Concept Plansl Phasing Diagram STAFF • '• �` QN / PA - SALT MDIBINS •'\ T AL - SHOPS ER \jwNE STORAGE :• ` FUTURE DEVELOPMENT Y �POLICk _.SOLIOWASTE\ r `� \ FIREST�\ {^J WASH V VFIREYYY w ��✓"� ,�, TOWER BAY � N YARD STORAGE / ••�, ILII OA EQUIPMENT Ell RE US �AU�ON_ _ h�' / BUB / MAI TENANCE� LO �. i. r / TRANBIC. /-- (�4 1 '` UTURE R- FUEL ` PARCEL 1S2T 018 , ITER � McCOLLISTER BOULEVARD Existing Phase 1 IOWA CITY PUBLIC WORKS MASTER PLAN 121612n16 Ff Maintenance Design r-- Graup NEUMANN MONSON A.CNITECTS Concept Plansl Phasing Diagram ,,�r. • • «NE /-/ STAFF ��•, SON / . PARKING SALT MIXBINS `• ,` SHOPS STORAGE w AT i� auuc WATER FUTURE DEVELOPMENT TEN \` MAI TENANGE / N i TRANSIT 1111 YYY PARCEL r~ 1 1022452019 McCOLLISTER BOULEVARD Phase 1 _; Phase 2 _; Phase 3 _; Phase 4 _; Future 17 IOWA CITY PUBLIC WORKS MASTER PLAN 12/b/2n16 �. i�4F Maintenance Design r.. Group NEUMANN MONSON A.CNITECTS Concept Design] Sustainable Options Site Features PhatONcl[alq shade structure Building Design and Materials Parking bloswale Translucent clerestory windows natural light Insulated translucent sectional door Bicycle rack CNG fuellnq for buses and nor -revenue vehicles Solar tube day lightlnq strategy Light reflective fkor IOWA CITY PUBLIC WORKS MASTER PLAN 12/6/2,16 PFMaintenance .i Design rLm— Group NEUMANN MONSON a.CNITECTS Concept Design] Sustainable Options Mechancial Systems Heat recovery piping Llectrical Systems Destratilicatlon fan Radiant floor system Under floor air distribution LED Nghting Photovoltaic panels on roof Photovoltaic panel on parking canopy Task lighting Plumbing Systems Dual volumeflush toilet West water reclaim System Low -How and automatic fixtures Rainwater harvesting IOWA CITY PUBLIC WORKS MASTER PLAN 12/b/2n16 AAFf Maintenance Design rGroup NEUMANN MONSON A—.HITECTS Concept Plansl Selected Master ANIMAL SHELTER " STAFF. PARKING SALTS MIXBINS •\ =a. RINE <2. TOWER YARD STORAGE 3� li I �L,I���JJ IJII I I IJ I BULK WATER SHOPS/ \ STORAGE \ FUTURE DEVELOPMENT SOLID WASTE ✓ i B BAY � s #FPA EP�BPYIIRI eus Office / Shared Water Streets / Traffic Solid Waste Maintenance Transit MAI TENANDE TRANSIT I IOWA CIN PUBLIC WORKS PARCEL MASTER PLAN 1022x52019 '� 1216/2n16 /a Maintenance n I�4F i NEUMANN MONSON A.CHITECTS McCOLLISTER BOULEVARD Master Planning Process I C harrette Process Concepts Concepts caner Users' Brainstorm1, 4 % Review Sessions 1 2 1, itect ,- 5 Faciliti 3 ` Designer Synthesis Selected Concept