Loading...
HomeMy WebLinkAboutPamphletExisting Sites 1 ' � * WATER WORKS +-._-----rr_-YIPOYIR__- V ♦ _.1 LANDFILL RIVERSIDE , BIG TEN • _ P.—Di• �i"�1� FAIRGROUNDS; ' FIRE/POLICE DEPT GILBERT COURT 112. NAPOLEON r Consolidated Sites 1 1 � *WATERWORKS .eo ' FIRE/POLICE DEPT 'I — \ _ Kuoz.K 1 I I I LANDFILL �' 1 1 12.1 mllss, 8 minutes 1 as mu..,161L1111111M 1 h 1 NAPOLEON «"• BIG JEN, FAIRGROUND`,' ' Benefits of site consolidation • 24,528 miles and 1,663 FTE hours saved, annually • $295k in annual operational efficiencies City Growth 1959.1966: 6752 acres 1980-1989: 150 acres 2000-2014 1113 acres NEUMANN MONSON ARCHITECTS 1969-1979: 3795 acres 1990-1999: 1515 acres 2015 - future JAff.Maintenance W Design � — Group MASTER PLAN .... `\ �a souownsYe �y MY$ r Departments to be consolidated onsite • Solid Waste/Refuse • Equipment Maintenance • Streets • Water Distribution • Traffic • Fire • Public Works • Police • Transit Information • 256,000 SF of conditioned space • 14 acres of useable site area EXISTING FACILITIES Water Distribution Former Transit building on Gilbert Street, occupied by the Water Distribution In 1973. Refuse and Traffic Engineering Former Landfill buildings on Riverside Drive, occupied by the Public Works Department In 1971. Equipment and Repair Building built in 1978 on Riverside Drive. Transit Building built in 1984 on Riverside Drive. Vehicle Overflow Johnson County Fairgrounds buildings have been rented for 40+ years. Streets, Traffic, and Administration Structures at the Napoleon Site built between 1940.2015.