Loading...
HomeMy WebLinkAbout2017-10-03 Resolution4d o) Prepared by: Scott Sovers, Sr. Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319)356-5142 Resolution No. 17-312 Resolution accepting the work for the First Ave (US Highway 6 to Mall Drive) Four Lane to Three Lane Conversion Project Whereas, the Engineering Division has recommended that the work for construction of the First Ave (US Highway 6 to Mall Drive) Four Lane to Three Lane Conversion Project, as included in a contract between the City of Iowa City and Quality Striping Inc. of Des Moines, IA, dated April 27, 2017, be accepted; and Whereas, the Engineer's Report and the performance and payment bond have been filed in the City Engineer's office; and Whereas, funds for this project are available in the First Avenue Three Lane Conversion account *S3937;and Whereas, the final contract price is $21,916.04. Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, That said improvements are hereby accepted by the City of Iowa City, Iowa. Passed and approved this 3rd day of October 2017. Ma or Approved by ATTE ee.e—t2� City Clerk 4ityl-Attorney's Office -1.7 It It was moved by Botchwav and seconded by Thomas the Resolution be adopted, and upon roll call there were: Ayes: Nays: Absent: x Botchway x Cole x Dickens x Mims x Taylor x x Thomas Throgmorton Pweng/masters/acptwork.doc 9117 i r CITY OF IOWA CIT 100317 A*1gVM r. -^� COUNCIL ACTION REPO R 4d(1) October 3, 2017 Resolution accepting the work for the First Ave (US Highway 6 to Mall Drive) Four Lane to Three Lane Conversion Project Prepared By: Scott Sovers - Sr. Civil Engineer Reviewed By: Jason Havel - City Engineer, Ron Knoche - Public Works Director $ Geoff Fruin - City Manager Fiscal Impact: None Recommendations: Staff: Approval Commission: N/A Attachments: Resolution, Engineer's Report Executive Summary: The project generally involved the replacement of pavement markings and signal modifications as necessary to convert First Avenue (US Highway 6 to Mall Drive) from 4 lanes to 3 lanes and add bicycle lanes. Work on the project was recently completed by Quality Striping Inc. of Des Moines, Iowa, in substantial accordance with the plans and specifications. The Engineer's Report and Performance and Payment bonds are on file with the City Engineer. •: Project Estimated Cost: $ 43,000.00 •: Project Bid Received: $ 22,356.59 ❖ Project Actual Cost: $ 21,916.04 ENGINEER'S REPORT September 20, 2017 � r Ott no +®p��� CITY OF IOWA CITY 410 East Washington Street Iowa City, Iowa 52240 - 1826 (319) 356 - 5000 (319) 356 - 5009 FAX www.icgov.org City Clerk Iowa City, Iowa Re: First Ave (US Highway 6 to Mall Drive) Four Lane to Three Lane Conversion Project Dear City Clerk: I hereby certify that the construction of the First Ave (US Highway 6 to Mall Drive) Four Lane to Three Lane Conversion Project has been completed by Quality Striping Inc. of Des Moines, Iowa in substantial accordance with the plans and specifications prepared by Snyder and Associates, Inc. of Cedar Rapids, Iowa. The project was bid as a unit price contract and the final contract price is $ 21,916.04. There was one change or extra work order for the project as describe below: 1. Credit for traffic signal programming that was part of the contractor's scope but completed by City Traffic Staff. $ (693.00) I recommend that the above -referenced improvements be accepted by the City of Iowa City. Sincerely, r Jason Havel, P.E. City Engineer 4d P-) Prepared by: Dave Panos, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145 Resolution No. 17-313 Resolution accepting the work for the HMA Crack Sealing Project 2017 WHEREAS, the Engineering Division has recommended that the work for construction of the HMA Crack Sealing Project 2017, as included in a contract between the City of Iowa City and Illowa Investment Inc. of Blue Grass, Iowa, dated July 28, 2017, be accepted; and Whereas, the Engineer's Report and the performance and payment bond have been filed in the City Clerk's office; and Whereas, funds for this project are available in the Pavement Rehabilitation Fund account # S3824; and Whereas, the final contract price is $58,077.00. Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said improvements are hereby accepted by the City of Iowa City, Iowa. Passed and approved this 3rd day of October 2017 ;9<7� Ma or Approved by Att ' ity Clerk City Attorney's Office,/, -,--//,, It was moved by Botchway and seconded by adopted, and upon roll call there were: Ayes: Nays: x x x x x x x Thomas the Resolution be Absent: Botchway Cole Dickens Mims Taylor Thomas Throgmorton r ICITY O F 1 O WA C 1 Tom- -^ All COUNCIL ACTION REPOR 4�== October 3, 2017 Resolution accepting the work for the HMA Crack Sealing Project 2017 Prepared By: Dave Panos - Sr. Civil Engineer Reviewed By: Jason Havel - City Engineer, Ron Knoche - Public Works Director Geoff Fruin - City Manager Fiscal Impact: None Recommendations: Staff: Approval Commission: N/A Attachments: Resolution, Engineer's Report Executive Summary: The project was let as a Competitive Quotation project and has been completed by Illowa Investments, Inc. of Blue Grass, Iowa, in substantial accordance with the plans and specifications. The Engineer's Report and Performance and Payment bond are on file with the City Engineer. Project Estimated Cost: $ 90,000.00 Project Bid Received: $ 82,214.37 Project Actual Cost: $ 58,077.00 Work for this project was completed in the following areas: Scott Boulevard — Rochester Avenue to Court Street California Avenue — Union Road to Miami Drive Nevada Avenue - Union Road to Miami Drive Miami Drive — Nevada Avenue to Hollywood Boulevard Ridge Road - Ridgewood Lane to Whiting Avenue 7th Avenue — Muscatine Avenue to F Street Jefferson Street — Dubuque Street to 7`h Avenue Prentiss Street — Capitol Street to Dubuque Street Capitol Street — Prentiss Street to Court Street Burlington Street - Summit Street to Muscatine Avenue CITY OF IOWA CITY 410 East Washington Street Iowa City, Iowa 52240 - 1826 (319) 356 - 5000 (319) 356 - 5009 FAX www.icgov.org ENGINEER'S REPORT September 22, 2017 City Clerk Iowa City, Iowa Re: HMA Crack Sealing Project 2017 Dear City Clerk: I hereby certify that the construction of the HMA Crack Sealing Project 2017 has been completed by Illowa Investment of Blue Grass, Iowa in substantial accordance with the plans and specifications prepared by the City of Iowa City, Iowa. This project was bid as a unit price contract and the final contract price is $58,077.00. There were no change orders for the project. I recommend that the above -referenced improvements be accepted by the City of Iowa City. Sincerely, Jason R. Havel, P.E. City Engineer pwenglmastemlengrpt.doc +rt (? ) Prepared by: Jason Reichart, Public Works, 410 E. Washington St., Iowa City, IA 52240; (319) 356-5416 Resolution No. 17-314 Resolution approving, authorizing and directing the Mayor to execute and the City Clerk to attest an Agreement by and between the City of Iowa City and Anderson -Bogert to provide engineering consultant services for the Burlington and Madison Intersection Improvements Project WHEREAS, the City of Iowa City desires to revisit the Burlington Street Median Project, evaluate the existing plans to determine what revisions may be needed, and complete the design of the Burlington and Madison Intersection Improvements Project; and Whereas, the Burlington and Madison Intersection Improvements Project includes traffic signal, pedestrian signal, ADA sidewalk, and public utility improvements and the restriping of Madison Street to include a 4 -lane to 3 -lane conversion and bike lanes.: and Whereas, the City of Iowa City desires the services of a consulting firm to prepare preliminary and final design for construction of the Burlington and Madison Intersection Improvements Project; and Whereas, the City of Iowa City has negotiated an Agreement for said consulting services with Anderson -Bogert to provide said services; and Whereas, it is in the public interest to enter into said Consultant Agreement with Anderson -Bogert; and Whereas, funds for this project are available in the Burlington & Madison Intersection Improvements account # S3834. Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that: 1. The Consultant Agreement attached hereto is in the public interest, and is approved as to form and content. 2. The Mayor and City Clerk are hereby authorized and directed to execute the attached Consultant Agreement. 3. The City Manager is authorized to execute amendments to the Consultant Agreement as they may become necessary. Passed and approved this 3rd day of October / 2017 G, May1dr Approved by 'City ClerkCity Attorney's Office Resolution No. 17-314 Page 2 It was moved by sotchway and seconded by Thomas adopted, and upon roll call there were: Nays: Absent: the Resolution be Botchway Cole Dickens Mims Taylor Thomas Throgmorton CONSULTANT AGREEMENT BURLINGTON AND MADISON INTERSECTION IMPROVEMENTS PROJECT THIS AGREEMENT, made and entered into this 3rd day of October, 2017, by and between the City of Iowa City, a municipal corporation, hereinafter referred to as the City and Anderson -Bogert Engineers & Surveyors, Inc., of Cedar Rapids, IA, hereinafter referred to as the Consultant. WHEREAS, in 2010 Anderson Bogert completed design of the Burlington Street Median Project which included the construction of a median on Burlington Street from the Iowa River to Capitol Street, traffic signal improvements, new water main at Madison Street, street lighting improvements, and landscaping; and WHEREAS, the Burlington Street Median Project was put on hold due to uncertainty regarding development in the area; and WHEREAS, the City applied for and was awarded a Traffic Safety Improvement Program (TSIP) and a Surface Transportation Program (STP) grant by the [DOT to improve this IDOT corridor; and WHEREAS, due to the planned construction of the University of Iowa Museum of Art and availability of funds, the City now wishes to proceed with certain improvements at the Burlington and Madison intersection, which may include changes to utilities, sidewalks, traffic control devices and channelization, and street lighting ("Burlington and Madison Intersection Improvement Project'); and WHEREAS, the City also wishes to restripe Madison Street to include a 4 -to -3 lane conversion from Market Street to Court Street and continuous bike lanes from Market Street to Prentiss Street because Madison Street has been designated as an important corridor for bike riders in the Iowa City Bike Master Plan; and WHEREAS, the Burlington and Madison Intersection Improvements Project will revisit the previous project design to evaluate the existing plans and determine what revisions and/or additions may be needed in coordination with the University of Iowa and current design standards; and WHEREAS, the City issued a Request for Proposals to provide professional engineering services for a number of projects, including the design of the Burlington and Madison Intersection Improvements Project; and WHEREAS, the City chose Anderson Bogert based on their previous experience with the previous project, their experience with similar projects, and their knowledge of the surrounding area; and WHEREAS, the City has negotiated an Agreement for said consulting services with Anderson Bogert. NOW THEREFORE, it is agreed by and between the parties hereto that the City does now contract with the Consultant to provide services as set forth herein. -2 - SCOPE OF SERVICES Consultant agrees to perform the following services for the City, and to do so in a timely and satisfactory manner. PRELIMINARY DESIGN a. Kickoff Meeting — The CONSULTANT will schedule a project kickoff meeting with City Staff and other affected stakeholders (e.g., [DOT, University of Iowa, etc.) to discuss the project, requirements, schedule and review frameworks by each entity. The meeting will be held at City Hall. b. Utility Research — The CONSULTANT will perform office research to gather information pertaining to existing utilities in the project area. In addition, inquiry will be made with the City, University, MidAmerican and other utility companies regarding the future needs and plans in the project area. c. Public Outreach - The CONSULTANT will conduct one-on-one public outreach meetings to gather input on desired public corridor improvements from the following property owners: i. Kum & Go ii. Apartment buildings east of Kum & Go iii. University of Iowa At this time, CONSULTANT anticipates up to two outreach meetings with Kum & Go and with the apartment buildings east of Kum & Go, and 8 meetings with University of Iowa staff, for a total of 12 meetings. CONSULTANT shall coordinate with the City to schedule a meeting with local bicycling advocates. . CONSULTANT shall prepare and host one open house meeting with the general public hosted at the City's facilities. d. Review Design Standards — The CONSULTANT will review all design standards applicable to the development of the project. Coordination with the appropriate utilities is required in order to accommodate all facilities impacted by the project. e. Design Surveys — The CONSULTANT will perform field surveys to establish vertical and horizontal control points tied to the CITY's datum. The CONSULTANT will research property records to establish the locations of existing property lines, right-of-way lines and property ownership for the properties affected by the project and incorporate this data into the base map. The CONSULTANT will also research underground utility locations with the various property owners and utility companies and plot their locations on the based map. Utilities to be researched include field tiles, sanitary sewer, storm sewer, electric, gas, water, telephone, cable television and fiber optic lines. This will include two joint meetings with the utility companies having facilities located in the project area prior to the initiation of field tasks. f. Base Map Preparation —The CONSULTANT will prepare base maps showing the information collected in the Utility Research and Design Survey tasks of the Preliminary Design. Existing ground contours and topographic information will be shown as required by the limits and detail of the preliminary design of the proposed -3 - facilities. The scale of the information will be suitable for the City's required detail. The plan sheets will be 22"x34" plans. Sheets plotted at half size must maintain legibility and utilize typical civil drawing scales. g. Concept Development — The CONSULTANT will prepare up to 3 strip maps with concepts for the Burlington Street and Madison Street intersection as well as lane modifications to Madison Street. These concepts will be reviewed by the appropriate stakeholders and a preferred concept selected for advancement to design. h. Preparation of Concept Statement — In accordance with the IDOT Federal -Aid Project Development Guide, the CONSULTANT shall complete the Concept Statement using the IDOT template. The Concept Statement shall be based on the preferred concept and shall include the cost estimate and associated information required in the form. This will be submitted to the CITY for review and subsequent submittal to the [DOT. Environmental Clearance — In accordance with the ]DOT Federal -Aid Project Development Guide, the CONSULTANT shall complete an environmental review. If further environmental investigations, studies or reports beyond a Categorical Exclusion are needed, this will be treated as extra work beyond this scope of services and will affect the project schedule. j. Planning Level Study For Modifications to the Burlington Street bridge over the Iowa River and possible reconfiguration of Grand Avenue/Byington Road/Melrose Avenue — The CONSULTANT shall prepare a planning level study and memorandum evaluating the effects of changes to the Burlington Street Bridge and related work west of the Iowa River on the Burlington Street Corridor from the bridge through Madison Street intersection. k. Water System — It is assumed the project design will include minor revisions to the water system designed in the Burlington Street Median Project plan set (e.g., profile adjustments, add valves around fire hydrants, review services, etc.), generally along Burlington Street, from Madison to Capitol. The CONSULTANT will provide information to the CITY as needed for the CITY to prepare any necessary DNR permits for new water main. The construction documents will include plan, profile, standard details, any special details as required by local project conditions, quantity estimates, specifications, bid items, bid item descriptions, and other miscellaneous details to provide documents suitable for bidding and constructing the water main improvements. CONSULTANT also anticipates meeting with CITY Water Department staff up to two times (at least once in the field) to discuss the design and project conditions. This service does not include preliminary design for any University of Iowa water main relocations or adjustments. Storm Sewer System — It is assumed the existing intake locations and spacing on Madison Street is sufficient. No hydrology or hydraulic calculation will be performed. A field review of intake conditions and suitability for conversion to a 3 - lane roadway with bicycle lanes will be completed on Madison Street from Market Street to Prentiss Street. On Burlington Street, a review of previous drainage calculations will be performed to update any assumptions to current standards. It is assumed either the existing system or the system previously designed during the Burlington Street Median Project will be sufficient for the preferred alternative developed in the Concept phase of this project. If it is determined that additional -4 - storm sewer improvements are necessary, design of the new storm sewer will be considered additional work. m. University -Owned Utilities — This project scope includes an examination any existing University -owned steam tunnels that may be impacted by the City's utility improvements. If this examination reveals the need to relocate any of the steam tunnels to accommodate the City's utilities, Consultant shall prepare preliminary designs and cost estimates for such work. n. Front Street Entrance — It is anticipated up to two meetings will be required with stakeholders to identify and develop improvement alternatives at the intersection of Front Street with Burlington Street. o. Coordination with CRANDIC Railroad — The CONSULTANT will work with representatives of CRANDIC Railroad to identify impacts this project may have on railroad crossings and railroad crossing signals. The CONSULTANT will also work to incorporate CRANDIC's specifications and permits necessary to allow the project improvements to be constructed (e.g. provisions for railroad protective insurance, flagman requirements, conditions for working within the railroad right-of- way, etc.). p. Coordination with University Representatives for the Proposed Museum Project — The CONSULTANT will attend up to two meetings with University representatives to coordinate construction activities on the proposed new Art Museum project with proposed Burlington Street and Madison Street improvements. q. Revisit Traffic Study and Geometric Analyses at Madison and Burlington Intersection — Review the previous studies and plans to date and identify intersection geometric improvements to include in the project design. This effort will include comparing the latest traffic counts with previous traffic counts, reviewing traffic projections from the MPO, using the Synchro Traffic model of the Burlington Street corridor previously developed by the CONSULTANT to evaluate signal timing impacts on the overall corridor coordination, prepare signalized intersection capacity analyses for the future conditions to determine necessary lane arrangements, turn bay storage lengths, and proposed traffic signal phasings and timings. Sanitary Sewer Improvements — CONSULTANT shall review previous sanitary sewer improvements developed in the course of performing on the Burlington Street Median Project to determine whether updates are needed to comply with current City and State design standards, and incorporate such updated plans into the plans for this project. It is assumed that sanitary sewer system improvements will be limited to replacing deteriorated manholes, adjusting manhole lids and covers as needed to fit the proposed improvements on Burlington Street. No sanitary sewer work is anticipated on Madison Street. Major sanitary sewer main upgrade, lining, realignment, point repairs, or replacement is not anticipated for this project. s. Preliminary Plan Preparation (30% Plans) — Once the Categorical Exclusion environmental clearance has been received, the CONSULTANT will utilize the base maps prepared in the Base Map Preparation task to prepare preliminary plans in compliance with the plan requirements of the IDOT. The plans will be in substantial compliance with the project concept. The plan sheets will be prepared -5 - in accordance with requirements to provide plans suitable for [DOT bid letting process. Sheets will be plotted at 11x17 and must maintain legibility and utilize typical civil drawing scales. Also included in this task will be the following: i. Preliminary plan and profiles for the proposed improvements. ii. Preliminary typical cross sections for the proposed improvements. iii. Plan view alignments for water, sanitary, and storm sewer improvements. iv. Preliminary structural details if needed. v. Traffic signal plan(s) vi. Lighting plan vii. Provisions which may be necessary to accommodate future construction of the corridor such as the relocation of existing utilities or modification of existing connections. viii. Identify constraints or conflicts that affect the anticipated cost of the proposed facilities as set forth in the concept plan. ix. Plan enlargements as required, showing the removals and proposed construction, including modifications to approach pavements and adjoining roadway pavements. x. Preliminary storm water pollution prevention plan. A. Preliminary striping and signage plan. xii. Update the construction cost opinion and evaluate compared to project budget. t. Submittal to City — The CONSULTANT will prepare plans and construction cost opinion for submittal to the CITY for review. The submittal will be complete such that the plans may be reviewed as "Preliminary Plans" by the CITY for ultimate submittal to the IDOT. When submitting preliminary plans to the CITY, the plans will be (11"x17"). This submittal will be made on or before the date established in the project plan. u. 60% Plan Preparation — While ]DOT is reviewing the Preliminary Pians, the CONSULTANT will continue with design efforts to develop 60% plans. These plans will include: i. Intersection details ii. Plan and profiles of water mains, sanitary, and storm sewer improvements. iii. Sidewalk plans along Burlington Street. iv. Preliminary traffic control plan. The plan will include provisions for temporary access to adjacent properties during construction as necessary. v. Sidewalk ramp layouts vi. Traffic signal wiring schematics vii. Street lighting wiring schematics viii. Basic landscape plans (Minor brick highlights at intersections, seeding, etc.) ix. Special Details x. Detailed cross sections 2. FINAL DESIGN a. Check Plan Preparation (90% Plans) — The CONSULTANT will prepare check plans which will include the comments from the University, IDOT, and City review of the preliminary and 60% plans. The plan sheets will generally include the following as applicable for this project: i. Title Sheet ii. Typical Sections iii. Quantity Estimate and References iv. General Notes v. Plan and Profile Sheets vi. Storm Sewer Plans vii. Sanitary Sewer Plans viii. Water Main Plans ix. Structural Detail Sheets (if needed) x. Structural Plan (If needed) A. Traffic Control Plan xii. Traffic Signal Plans xiii. Storm Water Pollution Prevention Plan xiv. Joint Detail Plan xv. Intersection Detail Plans xvi. Median Details xvii. Sidewalk Ramp and ADA Compliance Details (S Sheets) xviii. Basic Landscaping Plan xix. Permanent Striping and Signage Plan xx. Construction Details xxi. Detailed Cross Sections xxii. Special Provisions for IDOT bid letting format b. Construction Cost Opinion —The CONSULTANT will prepare a construction cost opinion and budget review based on the check plans as submitted. c. Submittal to City — The CONSULTANT will prepare plans, special provisions and construction cost opinion for submittal to the CITY for review. The submittal will be complete such that the plans may be reviewed as "Check Plans" by the CITY for ultimate submittal to the IDOT. This submittal will be made on or before the date established in the project plan. d. Quality Review by Design Team — The CONSULTANT will perform a field review regarding the quality of the design completed. Issues such as property owner concerns, coordination with utility companies and other agencies, and the maintenance aspects of the facilities will be considered while making the review. The input from a contractor will be included when appropriate. The accuracy and completeness of documents will also be scrutinized in order to minimize the need for modifications to the design. Any necessary modifications will be included in the documents following the quality review by the designer. e. Final Plan Preparation (100% Plans) — The CONSULTANT will incorporate the comments of the CITY and IDOT staff review of the plans in order to prepare "Final Plans". These will be completed and submitted on or before the date established in the project plan. f. Right-of-way and Easements — CONSULTANT shall prepare legal descriptions and plats necessary for the City to acquire any temporary construction easements, utility easements, or right-of-way required for construction of the Project. -7- 3. DESIGN SERVICES PROJECT MANAGEMENT a. Tracking and Project Schedule — The CONSULTANT will provide monthly updates of the project plan. The status of the plan will be presented at the monthly project review meetings. If the project is not on schedule, the CONSULTANT will present its approach for bringing the project back on schedule. b. Monthly Project Review Meetings — The CONSULTANT will present information pertaining to the project at monthly project review meetings with the CITY's Project Manager. The information will include both technical and project management issues. The CONSULTANT will be responsible for keeping, preparing, and distributing minutes of the meetings. It is estimated there will be 12 monthly project review meetings over the life of the project. 4. BIDDING AND CONTRACT AWARD The ]DOT will administer the construction bidding. The CITY and ]DOT will coordinate in awarding the project contract. The CONSULTANT will be available to address questions and prepare addenda during the bidding process. The CONSULTANT shall review the bids and make a recommendation to the CITY as to award of the contract. 5. CONSTRUCTION SERVICES a. Pre -construction Meeting — The CONSULTANT will attend and participate in the pre -construction meeting. b. Final Inspection — The CONSULTANT will conduct a final inspection with the CITY to determine if the project has been completed in substantial accordance with the contract documents and to determine if the contractor has fulfilled all the obligations of the contract as they relate to the design. c. Record Construction Drawings — The CONSULTANT will prepare a set of reproducible drawings on showing those significant changes made during construction based on observations, construction notes, inspection reports, or other data provided to the CONSULTANT by CITY. The drawings will be supplied in a pdf format as well as AutoCAD files compatible with AutoCAD version 2015 or higher. 6. ADDITIONAL SERVICES The following items are specifically excluded from the Scope of Services, but could be added at a future date by amendment to this agreement executed in writing prior to performance of such additional service, if it is determined during the course of the project that these services are required. a. New street lighting, electrical and photometric design for street lighting; b. Detailed structural analyses or design of any public or private utilities conduits or structures affected by the project (e.g., steam lines, electrical vaults, etc.); c. Geotechnical services; d. Detailed environmental services if a Categorical Exclusion determination is not made; e. Detailed streetscape design; f. Gateway monuments; g. Railroad signal relocations; M h. Railroad crossing panel extension; and L Virtual tour of corridor improvements. II. TIME OF COMPLETION The Consultant shall complete the following phases of the Project in accordance with the schedule shown. October 9, 2017 Project Start November 6, 2017 Concept Review and Data Collection Completed November 14, 2017 Submit Concept Statement May 15, 2018 Preliminary Plans — 30% Plans June 19, 2018 60% Plans July 24, 2018 Check Plans — 90% Plans August 21, 2018 Final Plans — 100% Plans November 20, 2018 Bid Letting Note the schedule follows the IDOT Instructional Memorandum I.M. 3.005, Project Development Submittal Dates and Information. The schedule is subject to reviews and approvals and or additional requirements that may be imposed by the [DOT as part of the Federal Aid process. III. GENERAL TERMS A. The Consultant shall not commit any of the following employment practices and agrees to prohibit the following practices in any subcontracts. To discharge or refuse to hire any individual because of their race, color, religion, sex, national origin, disability, age, marital status, gender identity, or sexual orientation. 2. To discriminate against any individual in terms, conditions, or privileges of employment because of their race, color, religion, sex, national origin, disability, age, marital status, gender identity, or sexual orientation. B. Should the City terminate this Agreement, the Consultant shall be paid for all work and services performed up to the time of termination. However, such sums shall not be greater than the "lump sum" amount listed in Section IV. The City may terminate this Agreement upon seven (7) calendar days' written notice to the Consultant. C. This Agreement shall be binding upon the successors and assigns of the parties hereto, provided that no assignment shall be without the written consent of all Parties to said Agreement. D. It is understood and agreed that the retention of the Consultant by the City for the purpose of the Project shall be as an independent contractor and shall be exclusive, but the Consultant shall have the right to employ such assistance as may be required for the performance of the Project. l� E. It is agreed by the City that all records and files pertaining to information needed by the Consultant for the project shall be available by said City upon reasonable request to the Consultant. The City agrees to furnish all reasonable assistance in the use of these records and files. F. It is further agreed that no Party to this Agreement shall perform contrary to any state, federal, or local law or any of the ordinances of the City of Iowa City, Iowa. G. At the request of the City, the Consultant shall attend meetings of the City Council relative to the work set forth in this Agreement. Any requests made by the City shall be given with reasonable notice to the Consultant to assure attendance. H. The Consultant agrees to furnish, upon termination of this Agreement and upon demand by the City, copies of all basic notes and sketches, charts, computations, and any other data prepared or obtained by the Consultant pursuant to this Agreement without cost, and without restrictions or limitation as to the use relative to specific projects covered under this Agreement. In such event, the Consultant shall not be liable for the City's use of such documents on other projects. I. The Consultant agrees to furnish all reports, specifications, and drawings, with the seal of a professional engineer affixed thereto or such seal as required by Iowa law. J. 24 The City agrees to tender the Consultant however, that failure of the Consultant to this Agreement shall constitute grounds amount sufficient to properly complete Agreement. all fees in a timely manner, excepting, satisfactorily perform in accordance with for the City to withhold payment of the the Project in accordance with this Should any section of this Agreement be found invalid, it is agreed that the remaining portion shall be deemed severable from the invalid portion and continue in full force and effect. L. Original contract drawings shall become the property of the City. The Consultant shall be allowed to keep reproducible copies for the Consultant's own filing use. M. Fees paid for securing approval of authorities having jurisdiction over the Project will be paid by the City. N. Upon signing this agreement, Consultant acknowledged that Section 362.5 of the Iowa Code prohibits a City officer or employee from having an interest in a contract with the City, and certifies that no employee or officer of the City, which includes members of the City Council and City boards and commissions, has an interest, either direct or indirect, in this agreement, that does not fall within the exceptions to said statutory provision enumerated in Section 362.5. O. The Consultant agrees at all times material to this Agreement to have and maintain professional liability insurance covering the Consultant's liability for the Consultant's negligent acts, errors and omissions to the City in the sum of $1,000,000. -10 - IV. COMPENSATION FOR SERVICES The City shall compensate the Consultant for services rendered under this agreement. Compensation shall be on a time and expense basis at rates set forth in the attached Exhibit A. The fee, including all time and expenses, shall not exceed $142,129.00. The CONSULTANT shall submit invoices monthly. A complete invoice shall, at a minimum, contain the following information: • Project name and contract number; • Contract value information including the following: Total contract value; Total value of previous invoices; Total value of current payment due; Total remaining contract value following the current payment; • A statement of the services rendered during the billing period; • A statement of the hourly rate at which the services are billed; and • A statement of the progress of the completion of the scope of services. V. MISCELLANEOUS A. All provisions of the Agreement shall be reconciled in accordance with the generally accepted standards of the Engineering Profession. B. It is further agreed that there are no other considerations or monies contingent upon or resulting from the execution of this Agreement, that it is the entire Agreement, and that no other monies or considerations have been solicited. C. This Agreement shall be interpreted and enforced in accordance with the laws of the State of Iowa. Any legal proceeding instituted with respect to this Agreement shall be brought in a court of competent jurisdiction in Johnson County, Iowa. The parties hereto hereby submit to personal jurisdiction therein and irrevocably waive any objection as to venue therein, including any argument that such proceeding has been brought in an inconvenient forum. FOR THE CITY By: Title: Mayor / Date: 10/03/2017 ATTEt� t Si - pwVo"skonsagmt.fnn FOR THE CONSULTANT By: (,-- —� Title: Principal Date: 9/26/2017 Approved by: City Attorney's Office Date -11 - EXHIBIT A - RATES FOR PROFESSIONAL SERVICES Effective July 1, 2017 EngineerI............................................................................................................................. $84.00 EngineerII............................................................................................................................ $92.00 EngineerIII......................................................................................................................... $110.00 EngineerIV........................................................................................................................ $132.00 EngineerV......................................................................................................................... $152.00 EngineerVI........................................................................................................................ $174.00 EngineerVII....................................................................................................................... $205.00 EngineerVIII...................................................................................................................... $215.00 SurveyorI............................................................................................................................ $68.00 SurveyorII............................................................................................................................ $88.00 SurveyorIII......................................................................................................................... $120.00 SurveyorIV........................................................................................................................ $132.00 Survey Field Work (1 man, truck & equipment)..........................................................$162.00 EngineerTechnician I........................................................................................................ $55.00 EngineerTechnician II....................................................................................................... $82.00 EngineerTechnician III.................................................................................................... $110.00 EngineerTechnician IV................................................................................................... $125.00 Construction Observation 1.............................................................................................. $75.00 Construction Observation 11........................................................................................... $110.00 UtilitiesSpecialist 11............................................................................................................ $110.00 DocumentSpecialist I....................................................................................................... $60.00 DocumentSpecialist II...................................................................................................... $72.00 DocumentSpecialist III..................................................................................................... $85.00 Document Specialist IV..................................................................................................... $92.00 Public Involvement Specialist I........................................................................................ $78.00 Public Involvement Specialist 11..................................................................................... $108.00 Item Per Each ATV $50.00/day Boat $150.00/day Roll of Flagging $3.00 Flats $0.60 Hubs $0.60 Lath $0.75 Spike 8. Washer $1.00 Paint $5.00 Pins, Rods $2.00 T -posts $4.00 Galvanized Posts $9.25 Mileage Current IRS mileage rate CITY OF IOWA CITY COUNCIL ACTION REPO" October 3, 2017 Resolution approving, authorizing and directing the Mayor to execute and the City Clerk to attest an Agreement by and between the City of Iowa City and Anderson -Bogert to provide engineering consultant services for the Burlington and Madison Intersection Improvements Project Prepared By: Jason Reichart - Civil Engineer Reviewed By: Jason Havel - City Engineer, Ron Knoche - Public Works Director Geoff Fruin - City Manager Fiscal Impact: $142,129 Recommendations: Staff: Approval Commission: N/A Attachments: Resolution, Consultant Agreement Executive Summary: This agreement authorizes Anderson -Bogert to prepare preliminary and final design, and provide bidding and construction phase services for the Burlington and Madison Intersection Improvements Project. The project includes the development of dedicated left -turn lanes on Madison Street at the Burlington Street intersection, traffic signal and pedestrian signal improvements, ADA sidewalk improvements, and public utility improvements. The project also includes the restriping of Madison Street to include a 4 -lane to 3 -lane conversion from Market Street to Court Street and the addition of continuous bike lanes from Market Street to Prentiss Street. Background / Analysis: In 2010, Anderson -Bogert completed design of the Burlington Street Median Project. This project included the construction of a median on Burlington Street from the Iowa River to Capitol Street, traffic signal improvements, new water main at the Madison Street intersection, street lighting improvements and landscaping. At that time, the project was put on hold due to uncertainty regarding development in the area and other factors. The Burlington and Madison Intersection Improvements Project will revisit the previous project to evaluate the existing plans and determine what revisions and/or additions may be needed. The City issued a Request for Proposals to provide professional engineering services for a number of projects, including the Burlington and Madison Intersection Improvements Project. The City chose Anderson -Bogert based on their experience with the previous project, their experience with similar projects, and their knowledge of the surrounding area. q cl (I-) j Prepared by: Jason Reichert, Public Works, 410 E. Washington St., Iowa City, IA 52240; (319) 356-5416 Resolution No. 17-315 Resolution approving, authorizing and directing the Mayor to execute and the City Clerk to attest Amendment No. 2 to the February 19, 2013, agreement by and between the City of Iowa City and Shive-Hattery, Inc. to provide engineering consultant services for the Burlington Clinton Intersection Improvements Project. Whereas, the City and Consultant entered in to a Consultant Agreement on or about February 19, 2013, for the Burlington and Clinton Intersection Improvements Project, which was to include traffic signal improvements, removal and replacement of water main along Clinton Street; and Whereas, said agreement was amended on or about May 3, 2016 to modify the design to accommodate the construction of the University of Iowa School of Music and the proposed art museum at this intersection and identify any property acquisition needs (Amendment No. 1); and Whereas, on June 2, 2017, the City bid the project, as amended in Amendment No. 1, but did not receive any bids; and Whereas, the City now desires to further broaden the scope of services to be performed by the Consultant to provide additional design development and plan revisions prior to rebidding the project; and Whereas, it is in the public interest to enter into said Consultant Agreement with Shive-Hattery, Inc.; and Whereas, funds for this project are available in the Burlington & Clinton Intersection Improvements account # S3840; and _ Now, therefore, be it resolved by the city council of the City of Iowa City, Iowa, that: 1. Amendment No. 2 to the Consultant's Agreement attached hereto is in the public interest, and is approved as to form and content. 2. The Mayor and City Clerk are hereby authorized and directed to execute the attached Amendment No. 2 to the Consultant's Agreement. Passed and approved this 3rd day of October / y�2017 Maykfr Approved by Attes 6 6-1r11L1r-L- ,C z/ Ci y Clerk Chy Attorney's Office 1 i� Resolution No. 17_11 5 Page 2 It was moved by Botchway and seconded by adopted, and upon roll call there were: Nays: Thomas Absent: the Resolution be Botchway Cole Dickens Mims Taylor Thomas Throgmorton CONSULTANT AGREEMENT BURLINGTON/CLINTON INTERSECTION IMPROVEMENTS PROJECT AMENDMENT NO. 2 THIS AMENDMENT No. 2 to the February 19, 2013, CONSULTANT AGREEMENT for the Burlington/Clinton Intersection Improvements Project, by and between the City of Iowa City, a municipal corporation, hereinafter referred to as the City and Shive-Hattery, Inc., hereinafter referred to as the Consultant, is made and entered into this 3rd day of October 2017. WHEREAS, the City and Consultant entered in to a Consultant Agreement on or about February 19, 2013, for the Burlington/Clinton Intersection Improvements Project, which was to include traffic signal improvements, removal and replacement of water main along Clinton Street; and WHEREAS, said agreement was amended on or about May 3, 2016 to modify the design to accommodate the construction of the University of Iowa School of Music and the proposed art museum at this intersection and identify any property acquisition needs (Amendment No. 1); and WHEREAS, on June 2, 2017, the City bid the project, as amended in Amendment No. 1, but did not receive any bids due to contractors limited availability; and WHEREAS, the City now desires to further broaden the scope of services to be performed by the Consultant to provide additional design development and plan revisions, as detailed below, prior to rebidding the project; and WHEREAS, the Project limits have been increased to include the restriping of Clinton Street to include a 4 -Lane to 3 -Lane conversion from Jefferson Street to Court Street and the addition of bike lanes from Church Street to Benton Street.; and WHEREAS, the design will include a fiber optic conduit connecting the existing network north to the intersection of Clinton Street to College Street; and WHEREAS, Consultant is willing to perform these additional services for additional fees and extension of the schedule for completion. NOW THEREFORE, it is agreed by and between the parties hereto that the parties do now agree to the following amendments to the February 19, 2013 Consultant Agreement, as amended: SCOPE OF ADDITIONAL SERVICES: Consultant agrees to perform the following additional services for the City, and to do so in a timely and satisfactory manner. Construction Document Phase A. Pavement Marking Design. • Between Benton Street and Court Street — two-lane section with on -street bike lanes • Between Court Street and Jefferson Street — three -lane section with on -street parking and bike lanes Between Jefferson Street and Church Street — two-lane section with on -street parking and bike lanes B. Fiber Optic Conduit Design • Design conduit for a future fiber optic line from the Burlington/Clinton Street intersection to the south side of the Clinton/College Street intersection C. Construction Document Revisions for Second Bidding • The construction documents will be revised to include addendum information from the first bid set and design modifications for the water main in front of the Hilton Garden Inn on the east side of Clinton Street • Attend two (2) meetings for construction coordination with Hilton Garden Inn Bidding Phase A. Prepare City Council Presentation Exhibits • Provide isometric proposed roadway typical sections, water main construction location, and turn lane construction exhibits for City Council presentation TIME OF COMPLETION: The Consultant shall complete the following phases of the Project in accordance with the revised schedule shown below. Construction Document Phase Bidding Construction Start September 2017 October 2017 April 2018 III. COMPENSATION FOR ADDITIONAL SERVICES Complete October 2017 December 2017 April 2019 In consideration for the above-described change to the Scope of Services, the Consultant's total hourly not -to -exceed fee is increased for the performance of the Scope of Services and increase in rates, as amended, by $11,500, including any authorized reimbursable expenses, pursuant to the Schedule of Fees attached to the original agreement. Compensation Breakdown Summary Construction Document Phase $10,400 Bidding Phase $1.100 Total $11,500 IV. All other provisions of the February 19, 2013 consultant agreement, as previously amended in Amendment No. 1, not specifically amended herein shall remain in full force and effect. .. i FOR THECITY By: Title: Mayor Date: 10/03/17 ATTEST. ice FORTHECONSULTANT By: Title: Project Manager Date: 9/28/17 Approved by: />II�iIIAi.���*�Y71/ City Attorney's Office Date f r 1 CITY O F IOWA CIT 10-03-17 %r� COUNCIL ACTION REPO 4d(4) October 3, 2017 Resolution approving, authorizing and directing the Mayor to execute and the City Clerk to attest Amendment No. 2 to the February 19, 2013, agreement by and between the City of Iowa City and Shive-Hattery, Inc. to provide engineering consultant services for the Burlington Clinton Intersection Improvements Project. Prepared By: Jason Reichart - Civil Engineer Reviewed By: Jason Havel - City Engineer, Ron Knoche - Public Works Director Geoff Fruin - City Manager Fiscal Impact: $5,600 available in the Burlington/Clinton Intersection Imp account #53840 Recommendations: Staff: Approval Commission: N/A Attachments: Resolution Executive Summary: Plans, specifications, form of contract and estimate of cost for the above-named project were approved at the May 2, 2017 Council Meeting setting a bid date of June 2, 2017 and an award date of June 20, 2017. However, no bids were received on June 2, 2017 for the Burlington Clinton Street Intersection Improvements Project. Staff contacted plan holders after no bids were received and determined that contractors were too busy and felt there was not enough flexibility in the contract time to complete this project with their current workloads. Staff then met with the Consultant to discuss re -bidding the project. It was determined the option offering the most flexibility and least inconvenience to pedestrian and vehicle traffic would be to revise the plans, specifications, and form of contract and re -bid the project in the fall of 2017 with a specified start date in the spring of 2018. Under Amendment No. 2, the Consultant will provide additional services necessary to revise the project documents for rebidding the project. Background / Analysis: The Burlington Clinton Street Improvement Project will replace old infrastructure and is expected to improve traffic and pedestrian safety at the Burlington Street and Clinton Street intersection, and throughout the Clinton Street corridor. This project includes the construction of new water main and ADA and sidewalk improvements along Clinton Street between Court Street and Burlington Street. This project will also include the construction of new turn lanes and signal improvements at the Burlington and Clinton intersection and the restriping of Clinton Street to include a 4 -Lane to 3 -Lane conversion from Jefferson Street to Court Street, and the addition of bike lanes from Church Street to Benton Street. Li 1. Prepared by: Eric R. Goers, Asst. City Attorney, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5030 Resolution Number: 17-316 Resolution authorizing the Mayor to sign and City Clerk to attest Storage and Indemnification Agreement for 821 South Clinton Street, in which Johnson County will allow the storage of the Fire Department water rescue boat. Whereas, the Iowa City Fire Department ("ICFD") provides certain technical rescue services for the public, including water and ice rescue, and is in need of practical and convenient storage space for watercraft and associated equipment during the term of this Storage and Indemnification Agreement for 821 South Clinton Street ("Agreement'); and Whereas, collaboration and cooperation between the City and the County is long-standing and mutual; and Whereas, the County has the capacity to assist the City by providing indoor parking and storage for the ICFD boats at the County's building at 821 South Clinton Street in Iowa City (the "Storage Facility"); and Whereas, the County does not seek compensation for the space in the Storage Facility used by the City in this way, and the City appreciates that all space and facilities are borrowed on an "as is" basis, and at its own risk; and Whereas, it is in the best interests of the City to approve this Agreement. Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that: 1. The attached Storage and Indemnification Agreement for 821 South Clinton Street is approved. 2. The Mayor and the City Clerk are authorized and directed to respectively execute and attest the Agreement attached hereto in duplicate. Passed and approved this 3rd day of October Major 2017 Ap ved by Attest:. ty Clerk City Attorney's Office Resolution No. 17-316 Page 2 It was moved by Botchway and seconded by Thomas the Resolution be adopted, and upon roll call there were: Ayes: Nays: Absent: x Botchway x Cole x Dickens x Mims x Taylor x Thomas x Throgmorton STORAGE AND INDEMNIFICATION AGREEMENT FOR 821 SOUTH CLINTON STREET This Sharing and Indemnification Agreement for 821 South Clinton Street (hereinafter, the "Agreement") is between the City of Iowa City (hereinafter, the "CITY") and Johnson County, Iowa (hereinafter, the "COUNTY"; together, the "PARTIES".) RECITALS WHEREAS, the Iowa City Fire Department ("ICFD"), a CITY entity, provides certain technical rescue services for the public, including water and ice rescue, and is in need of practical and convenient storage space for watercraft and associated equipment during the term of this Agreement; and WHEREAS, collaboration and cooperation between the CITY and the COUNTY is long- standing and mutual; and WHEREAS, the COUNTY has the capacity to assist the CITY by providing indoor parking and storage for the ICFD boats at the COUNTY's building at 821 South Clinton Street in Iowa City (the "Storage Facility"); and WHEREAS, the COUNTY does not seek compensation for the space in the Storage Facility used by the CITY in this way, and the CITY appreciates that all space and facilities are borrowed on an "as is" basis, and at its own risk; and WHEREAS, the PARTIES wish to enter into this Agreement to memorialize their mutual understanding. AGREEMENT 1. Term. This Agreement will become effective when all the PARTIES have signed it, and run through June 30, 2020. The date this Agreement is signed by the last party to sign it (as indicated by the date stated opposite that party's signature) will be deemed the date of this Agreement. 2. Facilities. The CITY shall have a license to use the garage area at the Storage Facility (the "ICFD Space"), along with vehicular access across paved areas of the property, all as designated by COUNTY and depicted on Exhibit A attached hereto. CITY is responsible for installing, operating, and maintaining any equipment and/or fixtures needed by the ICFD for their intended use of the ICFD Space, and removing such equipment and repairing any damage upon termination of this Agreement. The ICFD Space shall be returned in as good of condition as when received by the CITY, save normal wear and tear. 3. Premises Condition and Security. The ICFD Space within the Storage Facility is provided for the CITY's use in "as is" condition, with limited or no presence of COUNTY employees at in the ICFD Space or Storage Facility during the period this Agreement is in effect. CITY will take whatever precautions it deems necessary and prudent to secure the boats and other CITY property that the CITY locates in the ICFD Space. Boat Storage and Indemnification Agreement - 821 So. Clinton St. 1 4. Janitorial. COUNTY personnel will not be regularly present in the Storage Facility during the period this Agreement is in effect, and will not be routinely cleaning or maintaining the ICFD Space. It is expected that CITY employees using the facility will be reasonably diligent in cleaning and maintaining the ICFD Space as used by the CITY. If conditions necessitating substantial repairs arise during the period this Agreement is in effect, CITY will notify the appropriate COUNTY employees. COUNTY may address such repair needs in its sole discretion. 5. Use of Facilities. The CITY will use the Storage Facility and ICFD Space solely for boat parking and storage, and access to such boats by the ICFD. The facilities may not be used for any other purpose without prior written approval by the COUNTY. CITY shall cooperate with COUNTY personnel and provide access when needed by the COUNTY to the ICFD Space. 6. Prohibited Behavior. Smoking is not allowed anywhere on the grounds of the Storage Facility. 7, Waiver. The CITY hereby disclaims, and CITY hereby releases the COUNTY from any and all liability, whether in contract or tort (including strict liability and negligence) for any loss, damage, or injury of any nature whatsoever sustained by CITY, its employees, agents or invitees related in any way to CITY's use of the Storage Facility during the term of this Agreement, including, but not limited to, loss, damage or injury to the property of CITY, or the injury (up to and including death) of CITY's employees, contractors, subcontractors. agents, volunteers, or invitees. 8. Indemnification. CITY agrees to defend, indemnify, and hold harmless the COUNTY against any and all claims related in any way to CITY's use of the Storage Facility during the tenn of this Agreement. 9. Waiver of Subrogation. The CITY and COUNTY and all parties claiming under or through them hereby mutually release and discharge each other, and the officers, employees, agents, representatives, customers and business visitors of CITY and COUNTY fi-om all claims, losses and liabilities arising from or caused by any hazard covered by insurance on or in connection with the facilities or said building, even if caused by the fault or negligence of a released party. This release shall apply only to the extent that such claim, loss or liability is covered by insurance. 10. Termination. This Agreement may be terminated prior to its expiration by either party by providing written notice to the other party. Said termination will be effective fourteen (14) calendar days after service, by first class mail, on the other party. Written notice shall be provided to the following: CITY: Fire Chief, City of Iowa City, 410 E. Washington St., Iowa City, IA 52240; COUNTY: Chairperson, Johnson County Board of Supervisors, 913 S. Dubuque St., Iowa City, IA 52240. In the event this Agreement expires without earlier Boat Storage and Indemnification Agreement — 821 So. Clinton St. 2 termination, the terms will remain in effect on a month-to-month basis, subject to termination as provided in this section. IN WITNESS WHEREOF, the PARTIES hereto have executed this Agreement as of the date opposite their respective signatures. CITY OF IOWA CITY Jami6s A. Throgmorton, Mayor Attest: Ci Clerk CITY ACKNOWLEDGMENT STATE OF IOWA ) ss: JOHNSON COUNTY ) 10/03/17 DATE On this 3rd day of October , 2017, before me, the undersigned, a notary public in and for the State of Iowa, personally appeared James A. Thrognrorton and Kellie Fruehling, to me personally known, who being by me duly sworn, did say that they are the Mayor and City Clerk, respectively, of said municipal corporation executing the within and foregoing instrument; that the seal affixed thereto is the seal of said municipal corporation; that said instrument was signed and sealed on behalf of said municipal corporation by authority of its City Council; and that the said Mayor and City Clerk as such officers acknowledged that the execution of said instrument to be the voluntary act and deed of said corporation, by it and by them voluntarily executed. Approved: Notary Public in and for t1 State of Iowa CHRISTINE OLNEY Commission Number 606232 M 0mmission E*hs City Attorney Boat Storage and Indemnification Agreement - 821 So. Clinton St. a JOHNSON COUNTY, IOWA ry J elle' ettig, Chairperson Attest: County Auditor STATE OF IOWA ) ) ss: JOHNSON COUNTY ) COUNTY ACKNOWLEDGEMENT On this :— day of 6CII +%� 2017, before me, the undersigned, a Notary Public in and for the State of Iowa, personally appeared Janelle Rettig and Travis Weigert, to me personally ]mown, and, who, being by me duly sworn, did say that they are the Chairperson of the Board of Supervisors and County Auditor, respectively, of the County of Johnson, Iowa; that the seal affixed to the foregoing instrument is the corporate seal of the corporation, and that the instrument was signed and sealed on behalf of the corporation, by authority of its Board of Supervisors; and that the said Chairperson and Auditor, as such officers aelmowledged the execution of the instrument to be their voluntary act and deed and the voluntary act and deed of said corporation, by it and by them voluntarily executed. Notary Public in d for the Stat of Iowa My commission expires: Boat Storage and Indemnification Agreement - 821 So. Clinton St NOTE: ICFD Space may be nominally reconfigured to accommodate COUNTY staff access to second (westerly) restroom. Z Q W W W W S cr_ X W 2 OW W F-cr_ ¢ I - UV) [L -Z zQ ujz Z ol- do WW r Boat Storage and Indemni&cation Agreement — 821 So. Clinton St. F- m 0 l✓ u m i t 1 CITY O F IOWA C I 10-03-17 ^ � COUNCIL ACTION REP 4 (m5 October 3, 2017 Resolution approving a space sharing agreement with Johnson County for the fire department's use of a portion of Johnson County's building at 821 S. Clinton Street. Prepared By: John Grier, Fire Chief Eric Goers, Assistant City Attorney Reviewed By: Simon Andrew, Assistant to the City Manager Fiscal Impact: No impact Recommendations: Staff: Approval Commission: N/A Attachments: Agreement Executive Summary: The City and County have determined sharing storage space for watercraft and associated equipment to be of mutual benefit. No compensation is being required by the County and either parry may terminate the agreement with 14 days' notice. Background / Analysis: The Iowa City Fire Department (ICFD) and Johnson County Ambulance Service (JCAS) have a long history of collaboration and cooperation in providing emergency medical care to the community. This space sharing agreement furthers the existing alliance by providing ICFD access to sufficient, easily accessible, and secure storage space. Under the proposed agreement, ICFD has access to storage space located at 821 S. Clinton Street. The City is responsible for installing, operating, and maintaining any fixtures needed by ICFD. ICFD is also responsible for keeping the designated area reasonably clean and maintained. The City Attorney's Office has reviewed and approved the proposed agreement. ,�6 Prepared by: Sara Hektoen, Assistant City Attorney, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5030 RESOLUTION NO. 17-317 Resolution Authorizing Conveyance of a Portion of Vacated Right -of -Way Adjacent to 2222 Old Highway 218 South to the State of Iowa. Whereas, the City of Iowa City vacated a portion of the unimproved right-of-way north of McCollister Boulevard, west of South Riverside Drive adjacent to 2222 South Riverside Drive; and Whereas, the intent of the vacation is to allow it to be conveyed to the State of Iowa for the use and benefit of the University of Iowa; and Whereas, the City of Iowa City is the abutting property owner to the south, but the City has no interest in retaining this segment of vacated right-of-way, although sanitary sewer is located under the property and an easement for that purpose will be necessary; and Whereas, the Planning and Zoning commission considered and recommended approval of the vacation; and Whereas, City Council has approved the vacation; and Whereas, if approved, this conveyance would be done in exchange for the State of Iowa's conveyance of certain right-of-way to the City in Block 44, Original Town (the alley bisecting the City Hall parking lot) so that it may be incorporated into the redevelopment thereof; and WHEREAS, on September 19, 2017, the City Council adopted a Resolution proposing to convey its interest in the vacated right-of-way, authorizing public notice of the proposed conveyance, and setting the date and time for the public hearing; and WHEREAS, following the public hearing on the proposed conveyance, the City Council finds that the conveyance is in the public interest. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA CITY, IOWA, that: Upon the direction of the City Attorney, the Mayor and the City Clerk are authorized to execute a quit claim deed conveying the City's interest in a portion of the vacated right-of- way adjacent to 2222 Old Highway 218 South, to the State of Iowa for the use and benefit of the University of Iowa, subject to a sanitary sewer easement and in consideration for the State's conveyance to the City of the alley right-of-way in Block 44, Original Town, Iowa City, Iowa. 2. The City Attorney is hereby authorized to deliver said quit claim deed and to carry out any actions necessary to consummate the conveyance required by law. Resolution No. 17-317 Page 2 It was moved by sotchway and seconded by Dickens the Resolution be adopted, and upon roll call there were: AYES: NAYS: ABSENT: Passed and approved this 3rd day of Approved by ity Attorney's Office October MA R Botchway Cole Dickens Mims Taylor Thomas Throgmorton 2017. ATTEST: Al CITV CLERK W. Prepared by: Kristopher Ackerson, Neighborhood Services, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5230 Resolution No. 17-318 Resolution committing $330,000 in FY2017 and FY2018 General Funds to the Del Ray Ridge LP application for 2018 Low Income Housing Tax Credit funds. Whereas, the City Council seeks to fulfill its goal to increase the availability of affordable housing in Iowa City; and Whereas, the City Council approved the Affordable Housing Action Plan on June 21, 2016 to increase the supply of affordable housing for households under 80% of median income; and WHEREAS, the Affordable Housing Action Plan includes the provision of City funds to support Low Income Housing Tax Credit (LIHTC) projects in Iowa City; and WHEREAS, the City Council budgeted $200,000 in FY2017 and $130,000 in FY2018 for LIHTC projects. Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that The City of Iowa City commits $330,000 to the Del Ray Ridge LP project, a Low Income Housing Tax Credit Project as outlined in Exhibit A. If the Del Rey Limited Partnership project is not awarded FY18 LIHTCs through the Iowa Finance Authority, no funds will be provided. Passed and approved this 3b day of October, 2017. Mayor City Clerk City Attorney's Office Resolution No. 17-318 Page 2 It was moved by Mims and seconded by Botchwav the Resolution be adopted, and upon roll call there were: AYES NAYS: ABSENT: ABSTAIN: Botchway Cole Dickens Mims Taylor Thomas Throgmorton EXHIBIT A Opening the doors 322 E. 2"" St. Iowa City, fA 52240 Office 319-358-9212 Fax 319-358-0053 FROM: Del Rey Limited Partnership REQUEST: $330,000 LIHTC funds for new construction Developer: The Housing Fellowship Maryann Dennis, Executive Director, 319-358-9212 X 5, mdennist@housingfellowshit).com Location: 628 S. Dubuque Street This request is for the Iowa City LIHTC funds in the amount of $330,000 presented here as a 2% loan amortized at thirty years (minimum term of affordability). The parcel is located within the River Front Crossing District. We plan to construct a building having twenty affordable and eight market rate apartments of one and two bedroom dwellings. The building will have an elevator and underground parking. Commercial space is required on the street level; 1,500 — 2,000 square feet. The Housing Fellowship plans to rent the commercial space from the LP for use as offices resulting in on-site property management. Iowa City funds will be used for the affordable residences only. The eight market apartments will not be income targeted. Income targeting for the twenty affordable apartments: 2 at 30% AMI; 5 at 40% AM]; 13 at 60% AMI, The LIHTC application is due to IFA in November and requires extensive planning and cost to submit the application. The IFA Board will approve applications in March 2018 with construction to begin by fall. All units will be leased by December 31, 2019. The total project cost is $5,813,496 and will leverage $4,606,055 in private funds. THF has successfully developed four LIHTC projects. The project neighborhood includes new construction of apartments and commercial establishments. The site is easily accessed to downtown Iowa City and many necessary services and is one block from a bus stop. The site was selected because it is available and there is a willing seller. The Housing Fellowship, as General Partner will manage all aspects of the project. Del Rey Ridge Application Of Funds Nan PdrSq.Ft. Der Ung TOTAL eepmd.We eepreclable Amoniied Evperme 9Credit Acqulsitmn-Lard $ 40.68 $ 31,960 5 8951000 5 - $ 895,000 Acquisition -Building $ _ $ - 5 - Acquldtion-Tand,,Ta. 5 - $ - $ - Acgm9uon. Other $ - 5 - $ AcquW,mn-Sitework $ - $ - 5 Sub1Wl $ 40.68 $ 3],960 $ 895,300 $$ 895,300 S . $ - U.9.0on Coos New 5123P6 $ 9],311 S 2,]15,000 $ 2.725,000 $ 2,725,d10 Cdr9.dmr Criss Rehab S - $ - S - $ - Canstmation Costa Commercial $ 1591 $ 12,500 $ 350,300 $ 350,000 5 Site Work: Off-Snenor o4preciabl¢ 5 5 $ $ Site Work: On -Sim Improvement 35.5 5 - 5 - $ $ Site Workf yR $ $ _ $ - $ - S - 5 Pd. .n. BemeMs27.5 Permet Ind Ptrty.Ace 0ond $ $ - S PersonalProperry-APDIIances etc $ $ _ 5 $ - 5 - 5 Furniture, FuntlMS EgUIOmeM- Omr.0n Areas $ - 5 - 5 - $ $ General Requlseeml $ - S _ _ $ - 5 Convattpr overh $ $ - $ $ $ - 5ead Cantrictor Prey 5 1150 5 9,821 $ - $ 275,000 $ - 275,000 S $ 275,300 Cuu indtlpn Conung.,6.72% S 1013 5 BA36 S 225,000 $ 2Modw 5 225,000 Other CorA Ian $ - $ - $ Sub 7041 $ 16250 $ 12],6)9 $ 3575,000 5 3,575.000 5 $ 3,225,300 5 - $ - nudlil ttOestgn $ 13.00 $ 10.714 $ 300000 $ SWAM 5 300,0027 Architett Sup¢rvlslon $ Environmental Stud, $ 011 5 89 5 2$00 $ ;500 5 2.500 Survey/Engineer 5 091 $ 714 $ 20,000 $ 20AM 5 20,000 Market5wdy 5 OAS 5 321 $ 9,000 S 9,300 S 9,000 APpalal $ 0.20 $ 150 $ 4,300 5 4,300 $ 4,300 A...Vr8/AudVCm,t Cenifintian $ 0.27 5 214 5 6,000 $ 6,30,3 $ 5,000 Real Esdte Attorney 5 0.36 $ 285 5 81000 $ 8,000 S 8,000 Oxet.0m. ManaR¢rnem Fees S 5 _ S S Sub Total $ 15.90 $ 12493 $ 809.800 $ 349,800 $ $ 309.800 $ - $ Bviding Fermits $ _ 5 - 5 - $ CanstruttlOn FonsultaMs 5 _ $ - S S $ 000sttuNon lnsunnm $ 0.91 5 714 $ - 20,000 S - 20,000 5 $ 10400 Bondt/LOCNOt Part of Comtruamn Colnntt 5 - 5 _ 5 _ $ CoeutruNon Period -ran. $ 0.14 5 107 $ 31800 $ 31000 5 $ 3,00C T beard Recording $ 0.68 $ 536 5 15,000 $ 15,000 $ 15,000 Te..MReJotatlon $ _ $ - Saft Cort O,Mingenry $ OtM1er, $ Sub Tgnl $ 3.13 5 1,357 7 38,300 5 38,000 $ 38� $ $ C.rametion W.n Paints/Fees It _ 5 Conrtruaion lean lnspeaions $ Eligible Basis COnmualon roan Legal $ Less Fed Funds/Grants CCa=ff1on Loan Intenag $ 055 Other Conamalon Loan Com $ _ PermalreM laa n p0ims/Fees $ - pam neM loan MISC. Costs $ Qualified Baso Cas Cerufiation $ - PermaoentWon WPI $ - 01MrPennanentWon COas-Title and rebbMin $ - A!,T°tal $ ass $ - Tax CrcdhApPIUMCon FenmPli3,x,Mo $ 0.11 Ta%Reedit MONbdng Fees $ 0.02 ion Fla IFA ReSpNdipn FCpS $ 162 Tax Opinion 8609 Fee $ O16 Sedge Loan Fee. Organlaatlon Coss $ - OtherineliRibleCOots $ - SubTOtal $ L95 $ ]32,887 $ Devela er Fees 10�X $ P� Developer Overheatl $ - ConsuhantFees $ 3A3 Sub Total $ 3058 $ - LeaAngCxpenses/WwkTnng es $ tease -up Re.er ,Fital Capiotl $ Rnameing Hpenati O Raserve $ - OperatingReserve eae Beginning Replacement Reserve $ . Sub Total $ 6.P 5 - $ - TOTALOEVFtOPMENTCOSIS $ 26435 Surpiusor(9hortage) CALOJU01DN OF CREDITS Aeguisataon Eligible Basis S 4,387,80) Less Fed Funds/Grants 5 462 Le..HWorlcC bo 35,6]9 5 Eligible Enb(net) $ 4,387,800 Applicable Fraction 3,568 69S Qualified Baso $ 310691511 Qualified Cf Adjumnent $ 3,966,3P Credit Pe.ntage ANNUALCREDIT 90)!K 3S71 $ ]pJ,000 $ 100,000 $ 300,000 $ $ $ $ $ $ $ $ $ 3,571 $ 100,000 $ 100,000 $ 100000 69 $ 2SCO $ 2500 P $ 462 5 462 1,P4 $ 35,6]9 5 35,679 122 $ 3,568 $ 3,568 21 $ 600 $ 600 6.25000 $ 6751000 1.5m $ 42.809 21829 $ 600,000 $ ROAM S 600000 - $ . $ $ 2,6]9 $ 25500 $ 75500 $ >s 000 24,107 5 MAW 5 6.25000 $ 6751000 4,925 $ 132.887 $ 132,882 $ $ 4,925 $ 132082 $ ]32,887 202,625 $ 5,813,496 $ 4,732,8D0 $ 1,032,9] S 42,809 5 . $ 0.38]-800 TOTALANNUALCRED125 $ 356,293.93 Amountof Credits umed In Analysis $ 356,974 Del Rey Ridge Sources and Uses of Funds Sources Amortisation Stan Date Rate TOTAL %of Tofll Mortgage 30 1/1/2019 5.00% S 1,615,000 27.78% NTFJC 30 1/2/2019 2.00% $ 800,000 13.76% CIN UNTC Funds 30 1/1/2019 2A0% $ 330,000 5.68% General Partner Contribution Low Income %Icor 1/1/2019 $ 100 Sq. Deferred Developer Fee Income Kof Units Monthly Rem Allowance Annual Rent Footage I bedroomA Net 69u4yto Projett W $ 816 $ 816 59 $ $ 77,341 L33% TOTALSOV CFS OF FUNDS 3 $ 525 $ 525 59 $ $ 2993,455 5145% 30% 1 $ 379 S 379 59 $ $ 5,813,496 100.00% Uses of Funds Per Sq.R Per Unit Total 85 S %oFTatal AsyuisidoNOomo $ 40.68 $ 31,964 $ 895,000 IS.40% Building Comtruttlon $ 16250 $ 127,679 $ 3,575,000 61,49% Professional Services $ 1590 S 12,493 $ 349,800 6.02% Kerim Costs $ 1.73 $ 1,357 $ 38,000 0.65% Financing Fees $ 4.55 S 3,571 $ 100,000 2.72% Orb., Son Courts S 195 $ 1,529 $ 42,809 0.74% Development Fee S 30.68 S 24,107 S 675,000 11.61% Reserves $ 6.27 $ 4$25 $ 137,887 237% $ 264.25 $ 207,625 S 5,813,496 100.00% Net Pmjea Equity Projected Date Projected Costs Total Percentage 11/1/2019 $ 2,991,055 $ 2,991,055 100% RENT BREAKDOWN Max Awnsge Low Income %Icor Net Rend Regulated IfOTdy Stabilized Sq. Units Income Kof Units Monthly Rem Allowance Annual Rent Footage I bedroomA 60% W $ 816 $ 816 59 $ 97,920 $ 6% I bad..B 409 3 $ 525 $ 525 59 $ 18.900 $ 650 lbedroomC 30% 1 $ 379 S 379 59 $ 4,548 $ 650 2 bed..A 60% 3 $ 965 S 965 85 S 34,740 $ $00 2 bedrooms 40% 2 $ 615 S 615 85 $ 14,760 $ g00 2 bedroom 30% 1 $ 440 $ 440 85 $ 5,280 $ 800 Maroet units I bedroomA 2 S LD00 $ 24,000 650 2 bed.rnA 6 $ 1,500 $ 108,000 g00 Proforma Spread Sheet Iowa City LIHTC Funds ewes N' Line Description Symbols YR1 YR2 YR3 YR4 Revenues 1 Gross Rental Income - Low Income Units G. Rent $176,3e8 $1]9,6)1. $183,164 $186.930 2 Gross Rental Income -Market Units .o.m<ome s 13aow g34sw $M,333 $Seo cis 3 Other Income e.. late fees R.Conmsbmlon $ z,5o0.00 s 2,550.00 s _ .. 2,01M $ 2653.02 4 Gross Revenues =G, h,eme s 3101648 $ 316,860.96 s 313,198 $ 329,662 5 Vacancy Loss -Vac $ 24,652 $ 25,146 $ 25.649 $ 26,162 n%V%0.@=Gmn4 )(IFRRMMM1 6 Commercial Income 5 30000 s 30,600. s 31.212.00 5 3183824 7 Effective Gross Income 6G $ 315,996 5 32;315 $ 328,761 $ 335,336 Operating Expenses 6 Insurance 5 1y68D 5 13,060 s 13,452 $ 13,856 9 Maintenance& Structural Repairs me WWI of hems l7-10 6heli t5 44F0o 5 45,ne 5 47,104S 48,517 10 Management Fees no less man 52.75omnn $ 16,662 $ 27,162 s 17,6n $ 18,207 11 Misc. Operating Expenses $ 12,$00 5 12,375 $ 13,261 $ 13,659 12 Property Tax $ a,800 $ 24514 5 u,249 $ 26,007 13 Reserves(Operss, ms4rvaro les4 De4s56mwn s 11,200 5 11,536 $ 11,882 5 12,239 14 Total Operating Expenses •O9R. a.. $ 121,242 5 124,679 s 128.626 s 152,480. 15 Net Operating Income =NO] s 194,754 s 197,436 5 200,136 $ 202,852 16 Debt Service First Mortgage s ssgp9s. s 110,095 $ 110,095 5 110,03s 17 Debt Service Subordinate Mortgage(s) .53,308 5 53,508 s .53.303 18 Total Debt Service -o4R 5 163,403 5 163,403 $ 1fi3.403 5 163,403 19 Cash Flow =CF $ 31,351 $ 34,033 s 36,733 s 39,449 19(b) Equity Investment In Project $ -_ _ 3,99JA55 s 2,991,055 $ 2,991,055 $ ;991,055 20 Cash -on- Cash ROI QF 1.0% Sx 1.2% 13% C4,fi FIcv Crv'2]b, EaJNI„wnm-x, 127 Fmbd Eyvhy h.t owcwaupe R4eo(aly vwa. N=44=ne4Ya dun u4 DO 1.19 1.21 1,22 1.24 4MM=GVP44n<=Rulol. En<cunPrNl.sOJ Line YR1 YR2 YR3 YR4 21 Determining Taxes 22 Cash Flaw CF s 31,351 s 30.,033 $ 36,733 $ 39,449 23 Depreciation Expenses -DEPR _ 5 172,284 $ 172,20.4 $ 172,284 $ 172,284 24 Amortization of Fees A ORrz s 4,281 $ 4,281 $ 4,281 $ 4,281 25 Principal Payments .P 5_: n,%$ 5 49,m s 5LD33 s - s1e99 26 27 Reserves Earnings (Loss) Before Taxes +RESERVE$ $ 11,300 5 L1,LI0 s 1L200 s 21= 28 x Tax Rate 35% or 0% =63T. s_ _ I66.6e9) 5 (atnsl 5 V7,599) 5 MM71 29 Tax Incurred(Saved) uAT6 _ a ox ox ox =rAxorfSaMn 1 s $ s s Cash Flow After Tax 30 Cash Flow $ 31,351 $ 30,033 $ 36,]33S 39,049 31 Tax Incurred ax Saved m s 31,351 s 30,033 $ 36,733 $ 39,049 -Tml± $ - s s - 5 32 Cash Flow After Tax =CFATx s 31,351 $ 30,033 $ 36,)33 5 39,009 Line Total Benefit Anal sis 33 Cash Flow After Tax 34 Rehabilitation Tax Credit 6AT. $ _ 3L351 5 _ 30,033 5 36,733 5 39,409 .arc 5 --7 $ 35 Low Income Housing Tax Credit .uarc 'S 36 Net Sale Proceeds 3ss";754' $ 336.794 5 3w.79a $ 356,790 37 Total Benefits After Tax (NCFAT) .Rsv s - s 38 Return on Investment a UAT. s 3W,140 5 390,927 5 393sv 5 396,243 ROI _ 13 13 ox .1 -.. A"Oi(f ry S w �!!gqq Pd g ��.r tlH BSS qq6•.� pN�p'.y.y. @� "- � ,.fir e N N N N N Vn VIS x N N N N N x '.T k cy ;off 1✓ 7u � w 87 VlybF G w � r Y N r Pu' � S'Lil viae' N N N N Nj1%i N N N N N N N jf N N J E G P. w m Its x x N N L;> (fnN x N N x x N N N 5 111200 5 11200 5 1L= $ 113110 $ 11.300 $ 11300 5 11300 5 11200 S (69.1231 $ (63.122) $ (9;053) $ (56,c08) $ (s13n) $ 146.3361 S 140.9&1) 5 (35.612) 5 42,181 5 61,926 $ 47.699 $ 50.462 5 53,349 S 56,045 5 5619$2 $ 61,667 S 4;181 5 44,928 5 47,688 $ W,462 $ 53,349 $ 56,045 $ 58,852 $ 61,663 $ 3m., $ 356,]94 5 356.]94 $ 356,Ai $ 356,)90 5 356,Tl4 $ 6LS81 $ ",we $ 47888 $ SOp62 $ 53,248 $ 56,045 $ 58,852 $ 61,66] 5 x2,161 5 44,918 $ x].688 $ 50,462 S 53,248 $ 56A45 5 58952 $ 6166] $ - $ 5 _ 5 _ $ _ $ _ $ _ $ _ $ 3m., $ 356,]94 5 356.]94 $ 356,Ai $ 356,)90 5 356,Tl4 5 5 5 5 5 5 S 5 $ 399,WS $ 40L]n $ 406.482 $ 40]j56 $ 410.013 $ 413,839 $ 58.&52 $ 61.66] 1334% 13A3% 1352% 13.62% ]3.n% 1380% 4 A x � � � N N N N N n � $ o q n N � N 9Ny $- ^x r x � n � Nl�i Nr y N y �f ��2 4�?l$�� r9i pry S $ npn nmN 8 'J l•S �'.•m8 y 3 n � r'S p���5 I.�4Tj� m '` 1 x N N NNNxNN N N N N N NN M1Y 1 A vi N I, N N NNNNN 1„N NN i« Rin ��x n $- 13 p �::•!!Qq x N N N N '.:py.W N N x�� $x g �q f9 �•• .1 N N N N •N�_gNg N N N�.:N A 5 qNq !Ng@ ryN s M F hl yNy 9RBZ %ZLZ %E9Z WE %rot %SEi %6TZ %9Li KE•49 $ 805'(8 $ L99'8L $ Eig'SL S O6sTL S ESr04 S RE•L9 s a6s'n S $- 5- s- s- $ s - s - 5 - $ - 8EE•08 S SiK'ZB S L 'u $ 628'5( $ 066•iL $ MV04 S 61E'L9 s mvlb own s SOS•W S L99'U S 628'SL S OWU $ ESL•OL S 6LEL9 $ mvn $ " s - 5 - 5 - 5 - $ - s $ - s ME'" S S08'i8 $ L93'BG S 6WU $ 066Zt S ESS'OL S 6LE'(9 $ O6>'o9 $ 8ES'n $ S rs $ G99'BL S 628'54 S OWU 5 ES['Ot S 6LE•G9 $ O60'o9 S %0 %8 9f0 XO five s ms•S s Icotl s (mg) 5 (mTT) 5 16st•ST) s (E05'n) s (U;,M) 5 M016 s mru s mztc 5 wz'cc s a l s mz•Ec s =%T s 8LQ•L2 s CITY OF IOWA CIT 10.03-17 COUNCIL ACTION REPO 10 October 3, 2017 Resolution committing $330,000 in FY2017 and FY2018 General Funds to the Del Ray Ridge LP application for 2018 Low-income Housing Tax Credit funds. Prepared By: Kristopher Ackerson, Community Development Planner Reviewed By: Tracy Hightshoe, Interim Director of NDS Fiscal Impact: $330,000 in FY17 and FY18 local funds set-aside for LIHTC projects Recommendations: Staff: Approval Commission: Housing & Community Development Commission recommended approval by vote of 8-0 to commit $330,000 to Del Ray Ridge LP for 2018 LI HTC proposal Attachments: Del Ray Ridge LP (The Housing Fellowship) Proposal Sand Companies, Inc. Proposal Executive Summary: The Housing and Community Development Commission recommend approval of the attached resolution committing $330,000 in FY17 and FY18 local affordable housing funds to Del Ray Ridge LP (The Housing Fellowship), for their Low Income Housing Tax Credit Application to the Iowa Finance Authority (IFA). Background / Analysis: As part of the adopted Affordable Housing Action Plan (2016), the City budgeted local funds of $200,000 in FY17 and $130,000 in FY18 funds for Low Income Housing Tax Credit (LIHTC) projects. In response to a request for proposals, the City received two submittals that each requested $330,000 for 2018 LIHTC projects. Applications are due in November to the Iowa Finance Authority. At their meeting on September 21, the Housing and Community Development Commission reviewed the proposals by Del Ray Ridge LP (The Housing Fellowship) and Sand Companies, Inc. Both proposals are attached for your reference (Exhibit A). For comparison purposes, the following table provides basic information about each proposal. Sand Project Del Ray Ridge LP Companies, Inc Planning district Downtown North East Units 28 49 1 bedroom units 16 8 2 bedroom units 12 17 3 bedroom units 0 18 4 bedroom units 0 6 Unit income target ► r i -•...�_ 30% median income 40% median income 60% median income Market rate Accessibility Rezoning required Project cost City funds requested Target demographic Sidewalk access Transit route / stop dist. Walking distance to elem. Plavaround access CITY OF IOWA CITY COUNCIL ACTION REPORT 2 5 13 8 10% of units No $5,813,496 $330,000 Low income families Yes East Campus Shuttle 0.1 mi 0.9 miles 0.4 miles 5 8 31 5 10% of units Yes $10,441,216 $330,000 Low income families Yes Eastside Express 0.4 mi 0.9 miles On-site The Commission recommended $330,000 to Del Ray Ridge LP due to its downtown location and proximity to services. The attached resolution commits $330,000 in local funds to Del Ray Ridge LP for their 2018 Low-income Housing Tax Credit application. If the application is unsuccessful, the City will combine FY17-19 funds and issue a request for proposals again next year.