Loading...
HomeMy WebLinkAbout2018-09-18 Public hearingNOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR IOWA CITY PUBLIC WORKS PHASE 1 IN THE CITY OF IOWA CITY, IOWA TO ALL TAXPAYERS OF THE CITY OF IOWA CITY, IOWA, AND TO OTHER INTERESTED PERSONS: Public notice is hereby given that the City Council of the City of Iowa City, Iowa, will conduct a public hearing on plans, specifications, form on contract, and estimated cost for the construction of the IOWA CITY PUBLIC WORKS PHASE 1 Project in said City at 7:00 p.m. on Tuesday, September 18, 2018, said meeting to be held in the Emma J. Harvat Hall in City Hall in said City, or if said meeting is cancelled, at the next meeting of the City Council thereafter as posted by the City Clerk. Said plans, specifications, form of contract, and the estimated cost are now on file in the office of the city clerk in City Hall in Iowa City, Iowa, and may be inspected by any interested persons. Any interested person may appear at said meeting of the City Council for the purpose of making objections to and comments concerning said plans, specifications, contract or the cost of making said improvement. This notice is given by order of the City - Council of the City of Iowa City, Iowa and as provided by law. KELLIE FRUEHLING, CITY CLERK NPH -1 i1 t I04., MM, �,,. CITY OF IOWA CITY Public Hearing Presentation: 9.18.2018 IOWA CITY PUBLIC WORKS - Master Plan Review Master Plan Site Study I Iowa City 2000'-0" e0m'-0" 0' 4000'-0" IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Master Plan Site Study I Growth 1959-1966 1990- 1969-1975 1980 21 1839-1952: 3542 acres 1959-1966: 6752 acres 1969-1979: 3795 acres 1980-1989: 150 acres 1990-1999: 1515 acres 2000-2014 1113 acres SOU -o• 2400•-0• 1/J1 IOWA CITY PUBLIC WORKS o' 1200'- 0" _, PHASEI NEUMANN MONSON ARCHITECTS Master Plan Site Study I Existing Facilities • LANDFILL ` , �"94 �r _a . f1 rnili 101 �z 8 ea ' F ��1 f e+ A, r r CHH,10 D BIG,TEN GILBERT COURT �6 NAPOLEON 0 600'-0" 6200'-0" OWA CITY PUBLIC WORKS 6' 1600-0• FAIRGROUNDS PHASE NEUMANN MONSON ARCHITECTS Master Plan Site Study I Current Locations - - - - - "-NTELRdSEAVE 1� ♦ 1 u ♦ ♦�z8 LANDFILL ♦♦, 1 BIG TEN BOW -o^ 6200 '6^� 0' 1600'-01• U-191 0 FIRT/POLICE DEPT /4 _ 1 ---/14 COURT RIVERSa 11 1 d 1 / 1 + 1 � FAIRGROUNDS NAPOLEON • EQUIPMENT/REPAIR • LANDFILL • SOLID WASTE STREETS/TRAFFIC • TRANSIT • WATER • FIRE/POLICE OWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS 1 161 Travel Path Miles Time WATER WORKS Landfill to Riverside 5.7 14min Landfill to Napoleon I Fairgrounds to Riverside 1.8 5min Napoleon to Riverside 1.7 5min Fire/police to Big Ten 6.4 12min Gilbert Ct to Napoleon 1.6 5min - - - - - "-NTELRdSEAVE 1� ♦ 1 u ♦ ♦�z8 LANDFILL ♦♦, 1 BIG TEN BOW -o^ 6200 '6^� 0' 1600'-01• U-191 0 FIRT/POLICE DEPT /4 _ 1 ---/14 COURT RIVERSa 11 1 d 1 / 1 + 1 � FAIRGROUNDS NAPOLEON • EQUIPMENT/REPAIR • LANDFILL • SOLID WASTE STREETS/TRAFFIC • TRANSIT • WATER • FIRE/POLICE OWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Master Plan Site Study I Proposed Travel Path Miles Tame'I`*^'iYt {I'tyr1 WgTER WORKS so Landfill to Nappleon 6.$' r' S161.0n!4 i u you 41S^ Y{1' i��li r 'lR*" hr'✓'7 n: w�. iLw{�tl ti Fire/police to Napoleon 2.1 8min t a �`L A ! N i �r, , !til�x�I�t'��,+e' 1 E,' a�' rc ufi dl ,, � t HA , 1 ,a" ��„• �l���P`�l�i`�pt,� ., like y+}91' i uI�N )`tl, 015 Klii Fil�Y� v FN i� x!PY� r }p��'�P�rh, „ �Y” F?t,f;Mraf" ppyryy?eda r.�k` ce .,k �Sfaplp \"1f ✓fir"R t{� jr ri-,a 6t{ 'l j?Mi,` U�jY \ F.'`I �t`U {!$} ,,,, rtrt "Y> `t?{�S�i , I��IN r L. t ¢{jl h{U rj r. Nuay ,T ✓N.ry ra k !�!! hrY { r� ;y1 A( v , ,a' xe { 2✓r^1rt{,r J i i,r > {Rr } NF1 rtl� ,,V l�Y;, a i lh`.jtapv}�: FIRJ/POL1q D A� a s 5uf MELR 3S't kvE M r'rn♦ � 1 iW iftry"* xr r'' st �' HH1 ( r oii psi } 4i r1 � , P+ t ( `1 I � �<riY✓ ry f��'` Pim' ��`` f c u {4 Fp GILBERT COURT LANDFILL X, RIVERSIDE i as wiM/IE 111 dG w.. 6uc •r, r,r.. r �w'�r�r���Q r. w2w, BI TEN P 8 i h'. N OLEON wl T4 600-0' 3200 0" r o' ,eoo'-o FAIRGROUNDS 'F -µ IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS • EQUIPMENT/REPAIR LANDFILL qw'. ri r Lt SOLID WASTE N p ld ��yN STREETS/TRAFFIC a ` ` �'. • TRANSIT lhyrk, a.. saF"• WATER • FIRE/POLICE -µ IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Master Plan Concept I Diagram IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Original Concept Master Planj Phasing Diagram WASH \ RE TOWER �� BAYYARD STORAGE - - • . j EQUIPMENT REPAIR BUB MAI TENANCE yi TRANSIT �f • UTURE\ ✓ _ PARCEL 101]A53013 I BULK �WAIER McCOLLISTER BOULEVARD ' Phase 1 / 2 Phase 3 Phase 4 _; Future PARKING 0 4 - - A - LT MI%BINS o SHOPS I E STORAGE FUTURE DEVELOPMENT 'CLICK 01NASTE _•. :IRE V WASH \ RE TOWER �� BAYYARD STORAGE - - • . j EQUIPMENT REPAIR BUB MAI TENANCE yi TRANSIT �f • UTURE\ ✓ _ PARCEL 101]A53013 I BULK �WAIER McCOLLISTER BOULEVARD ' Phase 1 Phase 2 Phase 3 Phase 4 _; Future IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Original Concept Master Planj Phasing Diagram • w • r\ • ww / STAFF • '• , PARKING • FUTURE DEVELOPMENT MCOOLLISTE2 WUIEVARD L 113 ' Phase 1 Phase 2 Phase 3 _; Phase 4 _; Future IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS IOWA CITY PUBLIC WORKS - Phase 1 Process) Design Team Project Design Team Streets & Traffic, Refuse, Water, Transportation, and Maintenance Departments Neumann Monson Architects MDG IHDR Snyder Associates Genus Raker Rhodes Engineering Modus C -Wise End Users and Administration Architects Maintenance Facility Consultant Civil Engineers Landscape Engineers Structural Engineers Mechanical / Electrical Engineers LEED Consultant IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Project Site Study I Locations After Phase 1 is Complete 11 10-1 WATER WORKS s'> yr r Luiz°B'Irti-�`¢Rrl K� SIS FPY fi a ` a MELR6Rt''AVE s f� 8 r e 8 'BJG TEN W d? E:i9] • EQUIPMENT/REPAIR • LANDFILL • SOLID WASTE • STREETS/TRAFFIC • TRANSIT • WATER FIRE/POLICE Solid Waste Moves to Gilbert Court -e IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS ttF ,7' r ,r wN%� r LK1r � V r r Im LANDFILL a ` a MELR6Rt''AVE s f� 8 r e 8 'BJG TEN W d? E:i9] • EQUIPMENT/REPAIR • LANDFILL • SOLID WASTE • STREETS/TRAFFIC • TRANSIT • WATER FIRE/POLICE Solid Waste Moves to Gilbert Court -e IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Process) Design Input s�z rc IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS c d '.. '.. '.. i a. c y c a � c w 0 Q;it a' �' .N W Z F Y C C O U W C 7O N Q Y d 7 C 3 0 In_ 7 N N'O 7 Y O 00 1 0r o - r m .� m o, Program 0 4) E ° a v Schematic 11 3 w O m y v O W Design/// Q U Y Mobilization Construction + 0 d(12-16 onths) m N m W E m ULd O IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Phase -11 Opinion of Probable Costs $15,000,000 $14,000,000 $13,000,000 $12,000,000 $11,000,000 $10,000,000 $9,000,000 $8,000,000 Schematic Design Design Development Redesign Construction Document ....Estimates Construction Budget Influencers • Labor Shortage • Tariffs • Demand for Construction is Strong • Stronger Inflation Since Master Plan • Providing Major Grading for Future Yard Areas IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Revised Concept Master Plansl Phase 1 Scope Diagram SHE NPpOEEDN. �� f MPo SNE�SE j dr FVAE P OSE S � i �\ ADMIN BUILDINGTO E REMAIN WORK - - - - , SHOW IS FUTURE \i` PHASE i � � •`� i` aJE�\cE0 t t` S�OQSS IC V FUTURE PHASE � i � 1 i UE( t�p`an �. FUTURE � PHASE � til LANDSCAPING ALONG M CCOLLISTER BLVD QUONSET HUTS `! �. REMAIN IN PHASE 1 tt\\ Phase 1- Building Phase 1 - Fence Future Phases IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS FUTURE ' PAVING ' PHASE ' UE( t�p`an �. FUTURE � PHASE � til LANDSCAPING ALONG M CCOLLISTER BLVD QUONSET HUTS `! �. REMAIN IN PHASE 1 tt\\ Phase 1- Building Phase 1 - Fence Future Phases IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Revised Concept Master Plansl Phase 1 Scope Diagra UE( t�p`an LANDSCAPING ALONG M CCOLLISTER BLVD \\ Phase 1- Building Phase 1 - Fence Future Phases IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS / ADM IN BUILDING TO A' REMAIN WORK 0\,NL - \1 SHOW IS FUTURE NppO`EO PHASE �t��N�Q1 A ZOoG, 5 5 �� mv� V ! FUTURE W, I PHASE , Y/ f pC QUONSET HUTS ' REMAIN IN PHASE 1 4 FUTURE bb PAVING PHASE t FUTURE f !� PHASE i UE( t�p`an LANDSCAPING ALONG M CCOLLISTER BLVD \\ Phase 1- Building Phase 1 - Fence Future Phases IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Revised Concept Master Plansl Phasing Diagram SHE NPpDEEDN .. GPSE fJSJpE PPR,J� � i � PpiO A fPGE GE \ SSOS \r'AS i GPSE JEN \ \\ \ AUCTIO FUTURE N VEHICLES Al COVEREDSTORAGE FUEL JSJRE \ � � F ' NCE i D \ \ fJfJ < GATE FUTURE PARKIN \\ 010 LOT FUTURE ' PARKING LOT LANDSCAPING ALONG M CCOLUSTER BLVD Phase 1 Phase 2 Phase 3 Phase 4 Future IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Concept Design) Sustainable Features Site Features • Bike Racks and Bike Storage Containers • Storm Water Quality • Waste Water Sand Oil Separators • Native and Diverse Plantings and Landscape • No Additional Parking — Reuse of existing Lots • Electrical Vehicle Charging Stations • Low Emitting and Car Pool Parking Spaces Building Features Daylight Harvesting • Translucent Walls • Skylights • Light Reflective Materials • Occupancy, Vacancy, and Daylight Harvesting Sensors Envelop and Mechanical Efficiencies and Safety • High Speed Coiling Doors • Roof structure designed for future PV system • Life Cycle Cost Analysis of Building Materials Performed • (HPD) Health Product Declarations and (EPD) Environmental Product Declarations Materials / Social Equity and sourcing • Durable Precast Structure • Destratification Fans • Low Air Return • Energy Recovery Unit • Zoned Comfort Controls • Mechanical Purge/ Fresh Air Water Efficiency • Low Flow Fixtures Fire Pump Test Pits • Water Reclamation at Wash Bays • Fire Pump Test Pits IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Phase -11 Floor Plan l ELECTRICAL I I ENTRANCE STREETS+ TRAFFIC M EZZ. j IT CLOSET SIGN SHOP FORKLIFT ZONE AIR COMP. EQUIPMENT ELEVATOR WATER OPEN TO MEZZ-. BELOW ELECTRICAL MEZZANINE FLOOR PLAN MAIN LEVEL FLOOR PLAN Office / Shared Water Streets / Traffic Parking / Ancillary IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Phase -11 Conceptual Rendering IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS Phase -11 Project Highlights Overall Project Budget: Overall Construction Budget: Overall Square Feet: Anticipate Construction Completion Anticipated LEED Certification Alternate 1 Alternate 2 $12,000,000 $10,900,000 74,250 SF Nov. 2019 Silver $715,000 $270,000 IOWA CITY PUBLIC WORKS PHASE NEUMANN MONSON ARCHITECTS