Loading...
HomeMy WebLinkAbout10-18-2018 Airport CommissionIOWA CITY AIRPORT COMMISSION MEETING AGENDA - REVISED #2 AIRPORT TERMINAL BUILDING 1801 S. RIVERSIDE DRIVE IOWA CITY, IOWA THURSDAY OCTOBER 18, 2018 - 6:00 P.M. 1. Determine Quorum 2. Approval of Minutes from the following meetings: 5 min" September 26, 2018 3. Public Discussion - Items not on the agenda 5 min 4. Items for Discussion / Action: a. FAA/IDOT Projects: AECOM / David Hughes 30 min i. Obstruction Mitigation ii. North T-Hangar Restroom 1. Consider a resolution accepting project as complete iii. Terminal Apron Rehab iv. FAA Supplemental AIP Program b. FBO / Flight Training Reports 15 min i. Jet Air c. Airport "Operations" 60 min i. Management 1. Airport Viewing Area 2. 2019-2023 Consultant Selection RFQ 3. Consider a resolution setting a public hearing for a ground lease with Westside Automotive LLC. ii. Zoning Code 1. Consider a resolution approving a contract with Short Elliot Hendrickson Inc. iii. Budget 1. FY20 Budget iv. Events d. Commission Members' Reports 2 min e. Staff Report 2 min 5. Set next regular meeting for November 15, 2018 at 6:00 p.m. 6. Adjourn 'The times listed in the agenda are the anticipated duration of that particular agenda item. The actual discussion may take more or less time than anticipated If you will need disability -related accommodations in order to participate in this program/event, please contact Michael Tharp, Airport Operations Specialist, at 319-356-5045 or at michael-tharp(ajowa- city.org. Early requests are strongly encouraged to allow sufficient time to meet your access needs. Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 2 of 42 MINUTES IOWA CITY AIRPORT COMMISSION SEPTEMBER 26, 2018 — 4:00 P.M. AIRPORT TERMINAL BUILDING Members Present: Minnetta Gardinier, Derek LaBrie, Christopher Lawrence Members Absent: Robert Libby Staff Present: Eric Goers, Michael Tharp Others Present: Matt Wolford DRAFT RECOMMENDATIONS TO COUNCIL: (to become effective only after separate Council action): None. DETERMINE QUORUM: The meeting was called to order at 4:45 P.M. APPROVAL OF MINUTES: The minutes from the August 16, 2018, meeting were reviewed first. LaBrie moved to accept the minutes of the August 16, 2018, meeting, as presented. Gardinier seconded the motion. The motion carried 3-0, Libby absent. PUBLIC DISCUSSION: None. ITEMS FOR DISCUSSION/ACTION: a. FAA/IDOT Projects: AECOM / David Hughes i. Obstruction Mitigation — Tharp stated that they just received the project initiation letter from the FAA. There is a conference call scheduled for next week to confirm the projects that will be part of this next phase — the runway 2-5 threshold work, as well as the mitigation work. Wolford asked if they are expecting to do any of this work this year, and Tharp responded by stating that not much actual work will take place this year. The parts in play are the relocation and the marking of the 2-5 threshold, and then some phase of the obstruction mitigation. ii. North T-Hangar Restroom — Tharp stated that the restroom is done and usable now. There were a few punchlist items that the contractor was finishing up. Gardinier stated that the restroom is indeed up and running, although there were no paper towels. She also spoke to the room next to the new restroom, and Tharp stated that it is for utility access basically. Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 3 of 42 The circuit breaker panel is still in there. Gardinier noted that the door to this room was unlocked recently. iii. Terminal Apron Rehab 1. Consider a resolution authorizing Chair to accept an Iowa DOT grant — Tharp stated that the grant offer came through from the DOT. Along with it were a bunch of new forms to be signed and returned, which he noted are in the meeting packet. Goers responded to Member questions regarding this. Lawrence moved to authorize Resolution #A18-07, authorizing the Chair to accept the Iowa DOT grant for the terminal rehab project, LaBrie seconded the motion. The motion carried 3-0, Libby absent. A vote was then taken for an Acting Secretary, due to Libby's absence. Lawrence moved to nominate LaBrie as Acting Secretary. Gardinier seconded the motion. The motion carried 3-0, Libby absent. Gardinier stated that she is still not sure how they got this money, that she thought the Iowa state grant they requested had been denied. Tharp stated that they actually put in for two projects — one to replace the fuel kiosk, and the other for the apron project. b. FBO / Flight Training Reports i. Jet Air — Wolford began with the monthly maintenance reports. He noted that August was basically lots of mowing and they were also able to get some grass seed down. The big purchase for the month was a new chainsaw. He added that the Parks department did come help with the cleanup of the downed trees in front of the Airport. For September, Wolford stated that they had to replace the exit lights as they were not bright enough, according to the Fire Marshall. Tharp also spoke to this, noting some of the locations around the Airport that have already been taken care of. Wolford stated that the Streets department came out and helped with some issues as well. Continuing, Wolford spoke to Jet Air. He stated that they had another successful game day recently, with lots of air traffic. He noted that they have found ways around the wet grounds lately when it comes to parking the airplanes. The charter business is continuing to do well, according to Wolford, as is the shop. C. Airport Operations i. Management 1. Airport Viewing Area — Tharp stated that the issues with the contractor have now been resolved and they should be finishing things up soon. ii. Budget — Tharp stated that one of the things that has come from the cancellation of the Gilbert Street lease is the Airport now has to maintain this property. He noted that with the purchase of a trailer they will be able to tow the zero -turn back and forth. This trailer will run about $2,500, according to Tharp. He added that there is money left over from the furniture replacement that will cover this purchase. Budget season for the City kicks off this week, according to Tharp, which may result in the need for a special meeting of the Commission. Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 4 of 42 iii. Events — Tharp stated that he doesn't have anything scheduled at this time. Wolford then spoke to an October 101h event, from 10:00 A.M. to 1:00 P.M., at the Airport. d. Commission Members' Reports — None. e. Staff Report — Tharp stated that this Friday he may be out of the office late afternoon. Also, towards the end of October, he will be in Chicago again. Consider a motion to go into Executive Session, to discuss strategy with counsel in matters that presently are in litigation, or where litigation is imminent, where its disclosure would be likely to prejudice or disadvantage the position of the governmental body in that litigation — Lawrence moved to enter into Executive Session at 5:06 P.M., seconded by LaBrie. Motion carried 3-0, Libby absent. LaBrie moved to exit the Executive Session at 5:25 P.M., seconded by Gardinier. Motion carried 3-0, Libby absent. SET NEXT REGULAR MEETING FOR: The next regular meeting of the Airport Commission will be held on Thursday, October 18, 2018, at 6:00 P.M. in the Airport Terminal Building. ADJOURN: Lawrence moved to adjourn the meeting at 5:26 P.M. LaBrie seconded the motion. The motion carried 3-0, Libby absent. CHAIRPERSON DATE Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 5 of 42 Airport Commission ATTENDANCE RECORD 2017-2018 TERM 0 0 0 0 0 0 0 0 0 0 0 NAME EXP. m A N N w o m rn rn Minnetta 07/01/19 0 Gardinier X X X X X X /E X X X Robert 07/01/20 O/ O/ Libby O/E X X X E X X X X E Christophe 07/01/21 r Lawrence X X X X X X X X X X Derek 07/01/22 N N N N LaBrie NM M NM NM M M NM M X X X Key: X = Present X/E = Present for Part of Meeting O = Absent O/E = Absent/Excused NM = Not a Member at this time Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 6 of 42 Prepared by: Michael Tharp, Operations Specialist, 1801 S. Riverside Dr, Iowa City IA 52246 319-3505045 Resolution number Resolution accepting the work for the North T-Hangar Restroom Project Whereas, the Commission's consultant for the North T-hangar Restroom Project, AECOM, has reported that the work associated with this project has been completed by Lynch's Plumbing, Inc., and has recommended that we accept the work as complete; and Whereas, the final contract price is $59,690.00, which is established from the original contract cost of $59,690.00. Now, therefore, be it resolved by the Iowa City Airport Commission: 1. Said improvements are hereby accepted by the Iowa City Airport Commission. Passed and approved this day of 12018. Chairperson Attest: Secretary It was moved by and seconded by adopted, and upon roll call there were: Ayes Nays Ap ed by City Attorney's Office Absent the Resolution be Gardinier LaBrie Lawrence Libby Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 7 of 42 FY 2018-2020 Airport Improvement Program Supplemental Appropriation Frequently Asked Questions (FAQs) Updated July 15, 2018 This document is closely related to the Federal Register notice (FRN) published on Monday, July 9, 2018. Stakeholders are strongly advised to refer to the FRN because that is the official governing document. This FAQ document is simply an additional resource, and nothing in this FAQ supersedes either the legislation or the FRN. Interested stakeholders may wish to subscribe to the FAA's Airport Improvement Program (AIP) Supplemental Appropriation webpage where this file is posted, in order to be automatically notified of any updates. 1. Where can I find a copy of the actual legislation that provides the supplemental appropriation and associated requirements? The Consolidated Appropriations Act, 2018 is available online. The specific language that provided the supplemental $1 billion in AIP discretionary funding is on page 1,585 of the PDF version of that legislation. The actual legislative text is also shown below, verbatim, except that it is parsed and bulleted for ease of reference: For an additional amount for "Grants -In -Aid for Airports", to enable the Secretary of Transportation to make grants for projects as authorized by subchapter 1 of chapter 471 and subchapter 1 of chapter 475 of title 49, United States Code, $1,000,000,000, to remain available through September 30, 2020: • Provided, That amounts made available under this heading shall be derived from the general fund, and such funds shall not be subject to apportionment formulas, special apportionment categories, or minimum percentages under chapter 471: • Provided further, That the Secretary shall distribute funds provided under this heading as discretionary grants to airports: • Provided further, That the Secretary shall give priority consideration to projects at o (a) nonprimary airports that are classified as Regional, Local, or Basic airports and are not located within a Metropolitan or Micropolitan Statistical Area as defined by the Office of Management and Budget, or o (b) primary airports that are classified as Small or Nonhub airports: • Provided further, That the Federal share payable of the costs for which a grant is made under this heading to a nonprimary airport shall be 100 percent: • Provided further, That the amount made available under this heading shall not be subject to any limitation on obligations for the Grants -in -Aid for Airports program set forth in any Act: • Provided further, That the Administrator of the Federal Aviation Administration may retain up to 0.5 percent of the funds provided under this heading to fund the award and oversight by the Administrator of grants made under this heading. Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 8 of 42 2. The legislation refers to "projects as authorized by subchapter 1 of chapter 471 and subchapter 1 of chapter 475 of title 49, United States Code." What does that mean? Chapters 471 and 475 establish the eligibility rules, Federal share percentages, and several other key provisions and requirements for Airport Improvement Program (AIP) grants. These statutory provisions have evolved over many years. They are complicated and contain multiple cross-references, including references to other parts of the authorizing statute, as well as to other statutes, regulations, and agencies. Therefore, instead of requiring individual airports to review and analyze the statute itself, the FAA organizes and simplifies the statutory requirements in FAA Order 5100.38D ("Airport Improvement Program Handbook"), which is designed to provide a clearer, easy -to -follow explanation of how the FAA applies the statutory requirements. As noted in the FRN, the FAA administers the AIP in accordance with the Handbook, which explains what types of capital projects may be eligible and justified for AIP funding depending on the airport category, project type, and specific category or categories of AIP funding. The AIP Handbook is available online. The legislation also says that "...such funds shall not be subject to apportionment formulas, special apportionment categories, or minimum percentages under chapter 471." What does that mean? The FAA's authorizing statute establishes rules requiring the FAA to modify apportionments if certain minimum levels of discretionary cannot be met, and to calculate minimum discretionary set -asides. This language in the appropriations legislation simply means that those rules do not apply to the supplemental funding. 4. The legislation also requires the FAA to "...distribute funds provided under this heading as discretionary grants to airports." What does that mean? This provision simply makes it clear that the supplemental funds are discretionary funds, including the associated eligibility rules. 5. What does "Priority Consideration" mean? This provision makes it clear that Congress expects the FAA to direct the majority of the funds for projects at airports meeting the statutory criteria for "Priority Consideration." However, the legislation does not establish hard parameters, minimums, or limits. Moreover, to the extent that the FAA is able to apply these supplemental funds to projects that meet the criteria for "Priority Consideration," it may also provide additional AIP funds for other projects elsewhere. Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 9 of 42 This is a key part of the reason that the FAA established the process outlined in the FRN for airports to notify the FAA of any supplemental funding requests —so that the FAA can consider the full range of available resources for the full range of funding requests. As stated in the FRN, the FAA will consider such requests with due consideration of the FAA's existing responsibility to fully obligate all other available AIP funds by September 30 of each fiscal year, generally for projects previously requested through the Airports Capital Improvement Plan (ACIP) process. 6. What do the terms "Metropolitan or Micropolitan Statistical Area" mean in the legislation, and who defines these areas? The Office of Management and Budget (OMB) issued a Federal Register Notice on June 28, 2010, that updated these terms. In constructing and defining Metropolitan and Micropolitan Statistical Areas (MSAs), the OMB uses Core Based Statistical Areas (CBSAs) that: ...consist of the county or counties or equivalent entities associated with at least one core (urbanized area or urban cluster) of at least 10,000 population, plus adjacent counties having a high degree of social and economic integration with the core as measured through commuting ties with the counties associated with the core. The general concept of a CBSA is that of a core area containing a substantial population nucleus, together with adjacent communities having a high degree of economic and social integration with that core. Metropolitan Statistical Areas are: CBSAs associated with at least one urbanized area that has a population of at least 50,000. The metropolitan statistical area comprises the central county or counties or equivalent entities containing the core, plus adjacent outlying counties having a high degree of social and economic integration with the central county or counties as measured through commuting. Micropolitan Statistical Areas include the same criteria as Metropolitans, except Micropolitans have populations of at least 10,000 but less than 50,000. The OMB MSA definition was applied to Census Bureau data and depicted in individual U.S. state maps available to the public on the Census Bureau's website. Read more about the definitions of Metropolitan and Micropolitan. 7. What does it mean where the legislation says that "...the Federal share payable of the costs for which a grant is made under this heading to a nonprimary airport shall be 100 percent"? This means that grants awarded to nonprimary airports from the supplemental funding will be 100 percent of eligible and allowable costs, with no local match Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 10 of 42 required. For grants at primary airports, the normal Federal share applies based on the airport category and project type. 8. What does it mean where the legislation says that "...the amount made available under this heading shall not be subject to any limitation on obligations for the Grants -in -Aid for Airports program set forth in any Act"? This means that when Congress passes appropriations bills for FY 2019 and FY 2020 (or any other legislation affecting those fiscal years, the obligation limits set in those bills will not affect the continued availability of the supplemental $1 billion that Congress appropriated in FY 2018. 9. How long does the FAA have to spend the supplemental appropriation? The agency has until September 30, 2020, to obligate the supplemental $1 billion. Any portion of this $1 billion not obligated by that date will expire, be returned to the U.S. Treasury, and no longer be available to the FAA (for example, to increase any grant from this funding that may have exceeded original bid amounts). The FAA has until September 30, 2025, to liquidate (pay out) any obligation made under this provision. That is, grant recipients and the FAA need to make all requests for drawdowns to ensure the U.S. Treasury can process all payments by September 30, 2025. After that date, this funding will be unavailable for liquidation of any obligation. Please also see question #23 for discussion of Period of Performance. 10.If a grant can't be awarded before the end of FY 2018, will the FAA be able to continue awarding grants early in FY 2019? As long as the FAA's authorization does not lapse at the end of FY 2018, and as long as other key parts of the FAA have sufficient funding to continue functioning, then the FAA will be able to continue awarding grants from the supplemental appropriation throughout FY 2019 and FY 2020, until the funds are fully obligated. 11. What is the FAA's decision -making process for the supplemental appropriation? The FAA already has a backlog of discretionary funding requests that exceed the amounts available from the normal available AIP funding in any given year, including FY 2018. As a result, the FAA routinely has to work with airports to either break their projects into smaller phases over multiple years, encourage airports to seek other funding sources, or delay the project until funding becomes available. However, in light of the unique statutory requirements associated with the supplemental discretionary funding made available by the Act, the FAA has Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 11 of42 established a supplemental process, which is outlined in the FRN. Once funding requests have been received in accordance with the deadlines set forth in the FRN, the FAA will evaluate the requests based on the stated criteria and with due consideration of the overall funding sources available to address the requests received. 12.In what ways (if any) will the supplemental funding affect the normal AIP discretionary funding process? This supplemental funding does not change any of the rules or policies for the normal AIP funding process. However, as noted above, the additional discretionary funds made available to "Priority Consideration" airports, could free up other types of AIP funds for other airports. See question #5 for further discussion. 13.Are other airports eligible to receive grants under the supplemental appropriation? Any airport included in the National Plan of Integrated Airport Systems (NPIAS) is potentially eligible as long as it meets the legal criteria. Approximately 30 airports listed in the NPIAS, however, are currently ineligible to receive grants due to ownership issues, compliance issues, etc. For any NPIAS airport that has not previously taken an AIP grant, the FAA strongly urges consultation with the appropriate FAA Airports District Office or Regional Office before submitting a funding request. 14. Do all NPIAS airports meet the criteria for "Priority Consideration" criteria? The legislation directs the FAA to give "Priority Consideration" to certain specific categories of airports. See Question #1 for further details. For FY 2018, the FAA has identified the airports that currently meet the criteria for "Priority Consideration." The Priority Consideration list is available online. 15. Will the list of airports meeting the criteria for "Priority Consideration" stay the same through FY 2020? At the beginning of FY 2019 and FY 2020, the FAA will update the list of primary airports that meet the criteria for "Priority Consideration" based on the most current year's classification in accordance with the FAA's authorizing statute. For nonprimary airports, the FAA will update the list based on the updated NPIAS report, which the FAA expects to publish by the end of September 2018 for the timeframe 2019-2023. These updates will likely result in a few changes to the list of airports that meet the criteria for "Priority Consideration." Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 12 of 42 16.Will there be a National Priority Rating (NPR) threshold for projects selected for this supplemental funding? In general, the FAA will focus on high -priority infrastructure projects —typically, but not limited to, those with NPRs above the established fiscal year NPR threshold. High -priority infrastructure projects generally include runways, taxiways, aprons, limited building construction, and other safety critical development. This does not mean that airports cannot request funding for lower -priority projects. The FAA will evaluate and consider all requests submitted in accordance with the stated deadlines and criteria. 17. Will the FAA consider grants for planning, environmental review, or architectural or engineering design? In general, the FAA will focus principally on infrastructure development projects that have already been through the planning, environmental, and design processes. The FAA may consider requests for grants for architectural or engineering design in accordance with the established requirement that there has to be a documented plan to fund construction starting within 2 years. Again, however, the FAA will tend to prioritize actual development. 18. Can airport sponsors carry over entitlements and request a project be funded with only the supplemental funding? As noted in the FRN, an airport sponsor may request supplemental funding even if using entitlements on a lower -priority project. However, the FAA is required to consider that fact as part of the evaluation process. The same is true if the airport sponsor chooses to carry over entitlements. In general, the FAA will continue to apply the existing rule, based on statute, that if an airport uses its entitlements for a lower -priority project or carries over its entitlements, then the FAA would not consider the airport (or would at least consider the airport to be a significantly lower priority than other airports) for a project for discretionary funding. One possible exception might be if a nonprimary airport plans to commit its nonprimary entitlement funds for a revenue -generating facility. Based on the FAA's implementation of the associated statutory provisions, the airport's airside needs must be met first. However, the FAA might still be able to consider the airport for supplemental funding if a compelling case is made. 19. Can the supplemental funding be combined with other types of AIP funding on the same project? Yes, but with one important caveat. The FAA cannot combine the funds in a single grant, and each grant must result in a complete and useable unit of work. Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 13 of 42 Accordingly, this will most typically be accomplished by using the supplemental funding for a discrete phase of a multi -phase project. 20.Can supplemental funds be added to existing AIP grants? No. 21. Can supplemental funds be granted for work that is already underway? 01561 22. What happens if there is an unavoidable cost increase on a grant funded with the supplemental funds? As always, the FAA intends to award grants based on bids, and the FAA expects airport sponsors to manage projects within the available funds. The FAA will not have the latitude to add regular AIP funds to help address any cost increases. If any projects come in under budget, the FAA will recover the unused funds and may reobligate them on other grants, either to amend prior grants made from the supplemental funds (subject to the normal statutory 15 percent limitation), or potentially to award new grants, but only until September 30, 2020. Any funds still unobligated or recovered after that date will have to be returned to the U.S. Treasury. 23. How long does an airport have to draw down funds on a grant from the supplemental funding? Like other AIP grants, grants from the supplemental funds will be subject to the "Period of Performance" requirements set forth in 2 CFR Part 200. This establishes an upper limit of 1,460 days from grant award. Moreover, as noted under question #9, the FAA has only until the end of FY 2025 to liquidate (pay out) any obligations related to this funding. See also question #22 regarding potential amendments. 24. What type of projects are eligible for the supplemental funding? The legislation stipulates that the funds are discretionary and, therefore, the FAA can provide grants only for projects that are eligible for discretionary funding. This varies depending on the classification of the airport. For example, passenger terminal projects are eligible for discretionary funds only at nonhub primary airports with an aggregate limit of $20 million or at reliever or nonprimary Commercial Service airports with an annual limit of $200,000. Conversely, discretionary funds cannot be used for revenue -generating facilities, such as hangars or fuel farms, even at nonprimary airports. See Chapter 3 of the AIP Handbook for further information. Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 14 of 42 Within the bounds of eligible projects, the FAA will consider a broad range of requests, including completion or acceleration of a phased project, projects that might not normally compete well for discretionary funds, and projects for which a nonprimary airport might not normally be able to fund the local share. In all cases, however, the project must be eligible and justified based on current or reasonably forecast aeronautical demand. For example, if an airport is located in an Economically Distressed Area, the FAA may well take that into consideration, but only if there is evidence that the proposed project would fulfill an unmet aeronautical need. 25. Will the FAA consider grants for land acquisition or to purchase either Aircraft Rescue and Firefighting (ARFF) equipment or Snow Removal Equipment (SRE)? The FAA will consider requests for any eligible and justified project. Typically, the acquisition of ARFF is a high priority for regular AIP funding, so it would be unusual for an airport to have unmet needs in this regard, but the FAA will consider such requests. Land acquisition is also a possibility, but only if there is a clear business case for it. Land acquisition would be a higher priority if it is for protection of runway approaches or for specific planned development to address an eligible and justified safety or capacity constraint. 26. Will proposed projects need to be in an airport sponsor's current Capital Improvement Plan (CIP) to be eligible? If not, is preference given to those that are within an existing CIP? The FRN states that "The FAA may award supplemental discretionary funding regardless of whether the airport sponsor previously identified the project through the Airports Capital Improvement Plan (ACIP) process during the preceding year." However, as the FRN also states, for potential grants to be awarded in FY 2018, the FAA will consider grant applications only for projects for which airports have already completed the required planning, airspace reviews, environmental and other permitting requirements, and engineering design. In addition, for FY 2018 the FAA will consider only grant applications for which construction bids will be received in time for the airport sponsor to be legally prepared to accept a grant by September 4, 2018, with construction starting within 6 months thereafter or no later than March 1, 2019. The FAA believes that most projects meeting these criteria will likely be in the airport's existing CIP; however, it is not required. Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 15 of 42 27.Once the FAA receives each set of funding requests, how long will it take the FAA to reach its funding decisions? For any grants to be awarded during the remainder of FY 2018, the FAA will have to make its decisions quickly enough to award the grants between September 1 and September 15. This means that bids have to be in hand, a completed final grant application ready, and all other legal and administrative steps completed by September 4, 2018. For grants to be awarded during FY 2019 and FY 2020, the FAA will work with the individual airports and/or state aeronautical agencies to identify the critical milestones. Please refer to the FRN for information regarding Deadline #2, which is the second and final deadline in connection with the supplemental funding. 28.Aside from providing recommendations to the FAA, what role will block -grant states and/or channeling act states play in administering these funds? As noted in the FRN, "The FAA will consult with state aeronautical agencies, as appropriate, before making decisions regarding requests from nonprimary airports in each state." Beyond that, each state aeronautical agency will fulfill the same roles and responsibilities with respect to the supplemental funding that it does with respect to other Al funds. Airport Commission Agenda & Info Packet MA�m ��f� Imagine it. Meeting Date: October 18, 2018 AECOM Page 16 of 42 --MDelivered. 500 SW 7th Street Des Moines IA, 50309 USA aecom.com October 12, 2018 Mr. Robert Libby Iowa City Airport Commission 1801 S. Riverside Drive Iowa City, IA 52246 SUBJECT: North T-Hangar Restroom Iowa City Municipal Airport Iowa City, Iowa Iowa DOT AIP Project 911701OW300 Contract No. 18501 AECOM ID No. 60525467 Dear Mr. Libby: By this letter, we hereby state: We have made a final review of the project and recommend acceptance- 2- To the best of our knowledge and belief, based on observations of AECOM staff during construction, the contractor, Lynch's Plumbing Inc. has performed the work in accordance with the contract requirements in effect for the above -referenced project. 3. The total cost of the completed work is $ 59,690.00. I hereby certify that this engineering document was prepared by me or ofeS5Icti'•-,,, under my direct personal supervision and that I am a duly licensed ='° 4� ••• 4� "'•, Professional Engineer under the laws of the state of Iowa. :poi DAVIV B. .G'S j• HVGHES v 13037 ^+ _ C4\� �/(—�—��� Oct. 12, 2018 � 4.• ,,. ,' David B. Hughes Date ... w """ License No. 13037 My license renewal date is December 31, 2019. Pages or sheets covered by this seal: P \6V53952610W T HANGAR B RESrR00M\3V0_Communications\31V_Chent\RUD12181trdocx Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 17 of 42 Prepared by: Michael Tharp, Operations Specialist, 1801 S. Riverside Or, Iowa City IA 52246 319-350-5045 Resolution number Resolution authorizing the chairperson to sign a consultant agreement for Airport Zoning Code Update. Whereas, the Iowa City Airport Commission desires to enter into a contract with Short Elliot Hendrickson Inc., to provide for services as they relate to a review and update to the Airport Zoning Code; Now, Therefore, be it resolved by the Iowa City Airport Commission: 1. The Chairperson is hereby authorized to sign a contract for services. Passed and approved this : day of Chairperson Attest: Secretary ` City Attorney's Office It was moved by and seconded by adopted, and upon roll call there were: Ayes Nays Absent 2018. the Resolution be Gardinier LaBrie Lawrence Libby Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 18 of 42 October 10, 2018 Mr. Michael Tharp Airport Operations Specialist City of Iowa City 1801 S. Riverside Drive Iowa City IA 52246 Dear Mr. Tharp: RE: Iowa City Municipal Airport (IOW) Airport Zoning Code Update Thank you for the opportunity to provide aviation planning services to update the existing Airport Zoning Code at the Iowa City Municipal Airport (IOW). The existing Airport Zoning Code will be updated to reflect the protection standards on the FAA approved 2016 Airport Layout Plan (ALP). Scope of Work: SEH will be responsible for the following tasks: • Review existing Airport Zoning Code Title 14 — Chapter 6 of the Iowa City: City Code • Update the language in the Airport Zoning Code to reflect the current protection standards outlined in the approved ALP dated November 7, 2016. • Provide Airport Zoning Maps to document and display the changes and the updated Airport Zoning Code areas. The Airport Zoning Code update will follow the guidelines presented in the Iowa Office of Aviation Airport Land Use Guidebook. Meetings: SEH will participate in up to two (2) Airport Commission meetings to update the Airport Commission on the draft and final versions of the Airport Zoning Code update. SEH will participate in one meeting at the Airport Zoning Commission and one meeting at City Council as needed to assist with presenting the changes to the Airport Zoning Code. Fee and Schedule: The lump sum estimated fee, including expenses, is $4,000. This work will take approximately three to six months to complete. We look forward to working with you on this project. If you have any questions or need additional information, please contact me at munderwood@sehinc.com or 763442-2849. Sincerely, Melissa Underwood, Senior Aviation Planner Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 19 of 42 Request for Qualifications Airport Planning, Architecture/Engineering, Environmental, and Consulting Services Iowa City Municipal Airport RFQ Point of Contact Information: Michael Tharp, C.M. Airport Operations Specialist Iowa City Municipal Airport 1801 S. Riverside Dr Iowa City, IA 52246 michael-tharp(a-)-iowa-city.orq Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 20 of 42 Iowa City Municipal Airport Request for Qualifications Airport Planning, Architecture/Engineering, Environmental and Consulting Services The Iowa City Airport Commission is evaluating the best an ost effective method to provide for the services needed to accomplish their complex five -yea al Aviation Administration -Airport Improvement Plan program for the Iowa City Municipal RFQ Submission Requirements The Iowa City Airport Commission (eking those with expertise in planning, architecture/engineering, environmental onsulting services related to aviation projects. The Iowa City Municipal Airport would like to the prof( sional service f a qualified airport consulting firm to assist the Iowa City Airport issi specific prof ver the next five- (5) years Scope of Services Tasks involved will include, but no be limited to, plannin hitecture, landscaping, airfield civil and electrical engineering, program management, grant pr anagement, surveying and on - call services. r_ This contract subject but not limited to the following fe ovisions: • Title VI of the Civil Rights Act of 1964 • Section 520 of the Airport and Airway Improvement Act of 1982 • DOT Regulation 49 CFR Part 18.36(i) - Access to Records DOT Regulation 49 CFR Part 20 -Lobbying and Influencing Federal Employees DOT Regulation 49 CFR Part 26 -Disadvantage Business Enterprises Participation. • DOT Regulation 49 CFR Part 29 - GMmment-wide Debarment and Suspension DOT Regulation 49 CFR Part 30 - Federal Trade Restriction Clause Current Pla AIP Projects Obstructio ation and Runway Marking/Lighting 12130 & 7/25 Esti Cost of Development: $700,000 Runway Rehab ation Estimated Cost of evelopment: $615,667 Runway Extension — Runway 30 Estimated Cost of Development: $396,000 Runway Extension — Runway 7 Estimated Cost of Development: $1,622,000 General Aviation Apron and Connecting Taxiway Estimated Cost of Development: $1,250,000 Rehabilitate T-hangar Taxilanes Estimated Cost of Development: $532,000 Land/Easement Acquisition Initiation of work may be conditioned upon receipt of federal funds All parties are advised that some of the services may not be required and that the sponsor reserves the right to initiate additional procurement action for any of the services included in the initial procurement. Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 21 of 42 Qualifications The RFQ proposal should include detailed information regarding the consultant's interest and qualifications. To be considered to perform the services requested by this RFQ, a firm or group must submit a proposal demonstrating the following: 1. Current relevant experience with airport improvement projects, planning, design, and engineering of airside and landside aviation facilities. These projects may or may not be funded with FAA-AIP grants 2. A track record in working with governmental agencies on projects of this type. Previous FAA grant experience is a qualifications requirement. Please provide a list of relevant projects, including client contact names, titles, and p4Qne numbers 3. The proposed staffing plan for projects, Resumes of key personnel must also be 4. Relationship between entities if the outside the principal firm. , Agreement Format and Insurance Req� The selected firm or group must be prep contract terms and insurance requirements. Proposed Compensation This request and solicitation is f not be considered in the selecti qualifications. Final compensation on specific project Proposal Su 1. nts comply and job classifications. work performed by someone City of City, Iowa standard Qualifications. Fee information will �submitted with the statement of potiations with the selected firm Proposals: Five (5) ies must be received before 2:00pm December 7, 2018 and should be marked ifr the left upperhand corner Request for Qualifications: Airport Planning, Architecture/Engineering. Environmental and Consulting Services. Proposals should be submitted to: Iowa City Municipal Airport C/O City Clerk, NL 410 E. Washingtol % Iowa City, IA 52240 Nreceiv received fter that time will be returned un-opened. Proposals must be y, not po arked by, the final filing date and time. Telephone, email, facsimile submittals will�not accepted. 2. Proposals shalfinclude the following: a. Cover Letter: One page cover letter which includes the mailing and email addresses and telephone and fax number of the person(s) to be used for contact and who is authorized to represent the firm or group b. Table of Contents: An index of the material included in the proposal c. Statement of Qualifications: A statement of the firm's or group's qualifications covering the items listed in the qualifications subsection above d. Management and Staff: Describe the organizational structure that is proposed to implement the project, including support staff, and any subcontractors. Include resumes of key project personnel, include staff availability and location of office where majority of work will be completed. e. Workload Management: Outlined workload management techniques that will allow ongoing assessments of current workloads. Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 22 of 42 3. Proposals shall be brief and concise, containing no more than thirty-five (35) pages of material (excluding front and back cover, and dividers) Selection Process Proposals received prior to the deadline will be screened and evaluated through the following process: A selection committee consisting of key airport and city officials will screen the proposals to determine whether they are responsive to the RFQ. 2. Selection Criteria contained in FAA Advisory Circular 150/5100-14, as amended, will be considered in the following order of importance: AhL a. Understanding and Recent Experienc imilar projects(s) b. Knowledge of FAA Standards and P c. Interest in solicitation d. References e. Ability to meet schedules a work withiN allocated budget. f. Ability to regularly attend rr commission g. Qualifications of the pro ct manager and consulta signed to project(s) h. Evidence that the consultant has made good efforts in meeting Disadvantaged Business Enterprise (DBE) goals FR 26.53) i. Ability to Furnish Qualified Inspectors for construction insp if applicable j. Current Workload 3. The selection committee ill evaluate all pert information and will establish a list 4. 5. from those firms submit, ubmi statements. Fir ay be contacted for additional information a selection mittee will forwar firms to the Iowa City Airport Commis uct final i iewss Selec ms may sked to submit'�c opy of t ost recent master agreement. Selec ms 7aysked to sub The Iowa City Airport Commission reserves the right to reject any and/or all proposals, and to waive or decline to waive irregularities in any submittal. "1111111W -'ON a T to schedule approval on December 20, 2018. negotiations for specific projects - Id be rri3de in writing to the point of contact no later than November issue no later than November2l. 2018 Selection Schedule Distribution of RequeWl5r Proposals Final Date for Submitting Written Requests for Clarification Last Date for distribution of Addenda Proposals Due Finalist Interviews Commission Approval November 1, 2018 November 16, 2018 November21, 2018 December 7, 2018 December 20, 2018 December 20, 2018 Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 23 of 42 Date: October 12, 2018 To: Airport Commission From: Airport Operations Specialist Re: FY2020 Budget Submittal The budget subcommittee (Chairperson, Secretary, and Airport Operations Specialist) met to discuss the FY2020 budget submittal during the past couple of weeks. Following those discussions, we are presenting our recommendation for the FY2020 budget. The highlights of the budget are: Projected Revenues: $363,000 (rounded) Projected Expenses: $387,000 (rounded) General Levy Support Ask: $124,000 CIP Funding: $100,000 Operations support Funding: $24,000 Special Projects/Funds $8,000 for purchase of a scissor lift. After reviewing rental costs and charges from City Equipment over last 5 years, charges support acquiring piece of equipment for use during maintenance operations $12,000 box blade attachment for tractor. This attachment will make snow plowing more efficient and give the airport a tool to better push first snowfall piles of snow back away from pavements Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 24 of 42 UI N101:49101UAZAVA1101061 The Iowa City Municipal Airport, directed by the Airport Commission, provides a safe, cost- effective general aviation facility. The Airport creates and enriches economic, educational, healthcare, cultural, and recreational opportunities for the greater Iowa City community. The Iowa City Airport Commission is a five member commission of Iowa City residents. The Airport Commission duties are as follows: To exercise all the powers granted to cities and towns under Chapter 330 of the Code of Iowa, except the power to sell said airport. To annually certify the amount of taxes within the limitations of the Statutes of the State of Iowa to be levied for airport purposes. All funds derived from taxation or otherwise for airport purposes shall be under the full and absolute control of the Airport Commission, deposited with the City Treasurer, and disbursed only on the written warrants or order of the Airport Commission. HIGHLIGHTS • The Iowa City Municipal Airport has secured over $11.1 million in state and federal grants since 2010. • The University of Iowa continues to conduct research at their Operator Performance Laboratory at the Airport • The Airport partnered with the Optimist Club to host the annual pancake breakfast • The Airport celebrated it's 100th anniversary in 2018 with a weekend event that saw over 600 people take an airplane ride • The Iowa Department of Transportation estimates that the Airport has an economic impact of over $11 million to the Iowa City area Recent Accomplishments: • Completed the Airport Obstruction Mitigation project Environmental Assessment • Received Grant for Terminal Apron Reconstruction • Hosted 100th Anniversary weekend Staffing: Upcoming Challenges: • FAA/State funding priority changes • Obstruction Mitigation • Increasing Revenue to support operations FY2018 FY2019 FY2020 Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 25 of 42 Total FTE's 1.00 1.00 1.00 Staffing Level Change Summary: There are no staffing level changes in the fiscal year 2020 budget Service Level Change Summary: There are no staffing service level changes in the fiscal year 2020 budget Financial Highlights: Capital outlay includes $20,000 for the purchase of equipment to better allow the airport to carry out maintenance activities Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 26 of 42 Revenues CONTRIB 80ONATONS FYLPLO Airgort Projections TO BE DISCUSSED FYLPLO Full Dead TO BE DISCUSSED FYXH9 Council Railroad Budger Eminde FY2018 RegoNng FY2017Rerenue RegoNng FY2016Rerenue RegoNng FYXH5Rerenue RFRl FYNHal Reenue RegoNng 3fia. nen[Nb&Daretiors $1,]03.03 5.A1aW Trial CONTRIB 80ONATONS S0A0 SOAR, SOAR, SOAR, "Aw SOAR, $1709A00 $28010A10 OTHER MISC REVENUE 36910] France of Expenses $x,140.0] $2,102A1 $1,&p.W $2,30003 36930] Mroelemous OLMr In on. $1.17 $1,705.03 Total OTHER MISC REVENUE SOAR, WARM SOAR, $2,14B.18 $1,800Ap 53,]45AND SOAR, SOAR, INFEREST REVENUFS onTrad Interest on l onessments SC2.L03 SC2m.82 $1,Wf.9] $1A3x.38 ($1r"C"S (Ssn fl3) Trial INTEREST REVENUES WA, KZMAI, WA, stmOm $1,00497 UsU238 (51,98].]9) (55]I.0) RE. 382100 Land Rental Sriac.o3 Sriac.o3 SsERFOR3 SS1S15.84 $15}23.15 $M,691.93 $17,9S.30 SsELLORSO 3822000uddr Poom Rental $271,003.03 $265,910.0] $271,003.03 $265,910.03 $265,x90.33 $255SH.b9 $275,643.86 $250,382.83 Total RENTS 53M,SxMx, SN7,410Ap 532,wm KL7sV924 SN0,413A8 3200,28128 M,682.16 510A91A3 ROYALTIES AND COMMISSIONS 3R4103 Telephone Comm¢sbm 3R420] Vending Machine Commesbn SO. SO. $32.40 Sm.. 3E49W Other Commissions $3650103 531,OxOW $3650103 $31p13.20 $35,230.30 $33,040.10 $27Al2.40 $26969.90 Total ROYALTIES AND COMMI 55pN5 536,500.00 531,020.00 536,Zodw KLMU30 a5,28030 533,041.10 $2I,44411, W049.10 SALE OF ASSETS 392. Sale of Land $xOW3.03 SO. ST. $930643.03 $212S Dan 392303 Sale of Emu pruent Trial SALE OF ASSETS 50.00 50.00 50.00 520,000A, SOAR, S0.00 5930,843AM $212,505AD TRANSFERS 3931. General Levy-OReason. $9,... $13,203A3 521,929W $6RAss.03 $72,342.03 393120 General L- CIVGran[Fundin $1W,0."U.W $10],OJ].0] $10],OJ].0] SSW.00000 Trial TRANSFERS SOAR, 50.00 $100,00A10 $109,61RAND $113,209M $121,929.00 S68,415M M,M2M ToIRAIRfORTOPERATION5 53O,OMA, 5354820.00 5461,500.00 1181,509.04 5461,707]5 1463A2836 $1350,106.17 S610,219]0 Expenses PERSONNEL FYXH9 Eag - TO BE DISCUSSED FYXH9 Eag - TO BE DISCUSSED FYM18 Hall to Actuals Council Adegtetl Bull ESNmale FYM18Budgetur Actuals YTO Eaperdiwra FYMi]BWgetur Actuals YTO Eaperdiwra FYM0613Wgetur Actuals YTO Eaperdiwra FYM15BudRmm ActuAs YTO Eaperdiwra FYM1413Wgetur Actuals YTO Eaperdiwra 411W3 Perm Full Tice xCO.I. xCO.I. WP,5 W $59.505.03 ... 35.94 Sr'sCO.. 2617.x9 41. Perm PartT.- 4C000TnmmrarvEmpMryees $763.03 $763.03 SeCroW S... 5664.s0 $]2].50 $31613 $1,203.53 414100 Overance.ares CADDRO TerrmVacadon Pav 41440] ImAiE Lease 4. Lon - For SsEarcon SsEarcon SsEarcon SsEarcon SsEarcon 3... 3... 3... 421103 Health Insurance $5,671.03 $5,671.03 Ss,394.0] SS,136.x4 SS,ri $4A67.84 SCATr.m SCESIL48 421203 annual Insurance Sxaso. Sxaso. S4ssA3 S... $.o. $335.04 $328.56 $3M84 421303 Ofelnsurance 1420] 1420] 151- $141.20 1ARLS 144.48 $C,,91 42. D-1,01 Insurance $22%m $22%m $263.00 Sss548 $x49.48 $242.72 $... $250.27 421500 aneicpbvmem Compensatbn 422103 FICA $C795.37 $C795.37 703.ss 6x181 9". ... SC.2.Ts SCHI 423103 IPERS $5,931A3 $s.93103 SS664.56 Ss.MS.1H SS,293.. $5,1CA-13 SSA5x.93 S4635.ss 4x4503 Monthly CelluerpP Albwance Trial PERSONNEL S80,690A0 580690A0 S]8,960.11 ST7,081AR S]4,94S1] STL,0130 S]1,37497 S68,450.15 - Al Permnnal numbers canned aver^' All Personnel numbers canned war from FnanceEid orkers4 Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 27 of 42 sEavKa 431a10 4310. 43. 03. 03.. 03. 03. 43. 4330. 43MM 413ass-1. 442030-FV201R 435056 435057 4310. 43.30 43.10 43ww 41.. 436oao 4.10 4.. 43]030 4.1 43]01x 437. 438010 43.30 438050 43ao]o 439090 43.10 41d. 438110 4.1. 433130 43mxa 4.30 4. 441010 442010 440 44.2030 442040 4420EA 442oJ0 443010 443050 4430W n "IBW .B. .,Do. 44503a 445oW a4so]a a4WW a4WW .1. 44s14a 44 1 . 4uu10 .1Wx0 .130 1 .1. 4M150 4M1W 4M150 4462W 446220 .3. Ellin Fee Cuun Carts&services sss.a0 sss as sss.a0 11a.a0 9&.a0 AlO"Services aemral Fees Annual Auad 5B1B. 5B12n. .03 5ldi 5533,0 51,3ti Appralsalservlces 51$90.W Mare rvlces aMr rot-m lees zo Jsa.aa 1Hp.a0 6x6.sa J sa.aa leam,S rpee, [oral vMnese enn Inn olnanmservlm Instain.ana Man Servrces oemeryservrces $ Couriers $x3. 23c. x9 $ta.39 lu to al vubllcerrors s3 ].91 ]9.@] 3].61 Transpation n Penetration too In Miscellaneous Travel Expense Meals Cum Irsurarca .a3 12 V$2ffl.W .a] $1C9.sx $40o.W 37.44 $W.W ] 1.xB $Esi... $349.W .xl $zs.W 190.41 $1x6.. $349.00 n.03 I - --- 3951.11 599.ao lzzae Sss.W 1a 137.a3 $13].]6 $198.W z3z96 $s4.W 3 .10 Cmua Fre&rs $.3.03.a] 67.a3 $1x,]6].a] $1x,61x.a] $1x,ss9.a] $.law a] $171.03] 11,9 $.law.a] $11,627.03 Campfty neuranw rsurarca Waning $163.a3 $163.03 $190.a3 $155.a] $]Bl.a] $151.a] 2ow $llx.a3 Other 6ontlln & otnerlrsurance .a] .a] wel 29.a] Wadq Faellry Bond Loss ReservemIlEnCt �BxnxnS.Bl.a] $18,93.a3 $S,W].a] $S,W].a] $5,150.a3 stoctric, atlC CFa M9,349.0 51934a.a3 192.c. S1,30W $193o2W ]a93261 ]B93261 14xO1.o1 14201.01 13 ]B.o_4 Electric, 519.238 a] $2..w.a3 S1a663.W $1a625.03 $n2..8] $aa$a1.36 $19,235.8.4 $16,466.33 Use 522000 $3,737. sss600 $xss.s4 $ssna9 $73.43 $®3.46 $3s.64 dealing Heflin Full/Gas Gas 379700 3]aJ.ao SZJssoo 3ni z]Ozss z z1.5] 1.sa ss].6x Sewer u(Ilry CFa a 51632a3 $1632a3 Si o59W $1,A3.1x $2A19.41 $xA]s.]3 Water a $xtwa.0o $xtwa.0o 52z33oo $z .ED $1,..92 $1,916.. $;136.]1 lecna Refuse Collection Cho 2391.03 2391.03 23a6W 2..Ed, Mnoun .a] a] Local vnonesry $1A53.a0 $1A53.a0 510 , $1p3a.41 .. ll In onanScruce $a.w $14.47 W.93 5.] $39.72 WEER W-lessvnone servme mootE Plant Teal seCE rvices aneremrxrmcee VeMck ReparrsanMarntenance alter Bi Repairin Malntena 5a5 O0000 S22,527ED S2J.1u.W $22A441 $10$53.55 $12,953.64 $14,xo1.1] $]B,x]x.X HRu once 5 52 So0 o0 5614] 00 51 843 W A2 2]8.4.W 2256.W .W 1 Heflin Epuipmen Repair Equipment Repair Maint $3,223.90 $x,162.s9 $a,2X.]s $9$93.12 0al $21].50 R&MSe& es Heflin F&M $6,0."U.W $6,0."U.W 56D33.W Equipment CoolingEul ebi Reairir Main[ SOW 1.1 45 1 .34 19x.a4 1 5.45 .W Electrical &mumbin Repair &M $5,0."U.W $10,14JW 53 D33.W 929. $9,9x9.3 $1,0.45.30 $5$.w $4,33.eR $373.458 Peet ControlMaintenance $330.W $593.52 $3W.W $233.](I $3]3.45 Ea nce 5ervl Eau Renal r eMalntena Raalo Epui Repai r&Malnten $112.50 $a.W Equipment Rept Telecom Epurpmen[R Repair ntMean RI Mlsc ComipmentbnE a n[Pe Equipment Manuel $4,4CA.W $4,4CA.W $S,W].W $4,363.]0 $4,3]J.32 $4,483.55 $6,] $6,6FA.96 CCither,mle Gble/Elec a&M $33].W w Larne servlre-fawn and vladc 3a .W 3939a.W s ]s.W 3a s1.a3 ](11.4s ]A1.11 WE.W 103s3 WE.30 3a].A Equipment snowaM lic,ire R Remmoval $33.933.00 $31,03TED 24 z4s.W 3o 3](I.M $23,730.19 $21,91 $.CBEREW Ell T-an Tm W servlren z .W 567W 1zW.W ss.W z3a].W 93].W 103a. za CUR CURB, ... $.. Operate rnnerotranivn service: $zA.W $zA.W $z69.W $n3.W $z64.W $z64.W e5ervl25 AdmuOneI anney rneY CFar eback 553Eu.W 56,6a2W $]A3a0 $6,465.W $6$92.W $6,0,43.W $bbx4.s9 li Sery eback 553a.W 553a.W $4J3.30 $155.19 IR-VC eu Feralla orr Charge li K/Penstop Suppo 130."U.W 119JSW 13140.20 12695.](I 930.W .W .W IT.S{omputer Replacementeent Far eb $2,967.21 $x,149.10 $a10.14 ITSSetworaon Development Fee $6/1.W ck ITS Netwar .W ]61.W ]61.W .W ]20.W 541,5 Ct meback SAASCMr eback $2W.W 21lu. $216.W 22ow $2)2W $3.91 Phanwere VFoe CMr eback $16.44 $3.96 $5.10 $a.48 $24.90 Ser, eback Phonem ]CB.32 MoecFar Telecom Move/At/Lin, n CFa eFa Phone Epuipment/Line CFa eFack $1,371W $1,371W $1,3]5.90 $1,350.W $1,212.50 $1,xW.W $1,110.W Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 28 of 42 .i Mall Cna eback $172.e3 $172.e3 589.57 $163.90 $.2..2 $19U.32 $.2.. 2,di Cut, Vehicle 8e lacem em Cnar eb 27.U3 25102.U] 27.U] 111. d, In4'Fo, $17,713.05 ]B l.. 2,di Gq Vehicle Rental Char eback $n7.03 $24859 2,di duelChandiarback $4261.U0 $4261.U0 53}z0.03 $1Azz.38 $z,83991 $3,245A6 $51U1.]6 $Xoh30 2,41 Vehicle Ronald Is Mal menance Cho $24,00tish. $24,00tish. 520adiduld 2z 303.6] Ill 115.82 25]z0.36 26163.3] 19191.01 406390 ANo Boat' local r Cnar eback 4080401,, Sponsoretl Event $ddind 0 409055 Perm un ng Fees .03 .03 51,2.0m .03 .03 z0.03 .03 $1anduound a4906o Dues&Membersnlps $1,3]5.03 $1,3]5.03 51.zss.0] $1,3]5.03 $1,zss.0] $1'..03 $1'..03 449120 EN, em Rental $1,224.03 $1,224.03 529703 $1'... $zm.97 $3,213.27 $150.03 449140 Tools Rental 4492%O Mis, 5 "-Is Charles $..03 249350 hi Lontrave6 Sti 2493W Interest Era- 520,RLou,3 532PI34h. Total SERl 5213mlm 5G2,620Ap $238,835Ap 5105,] A5 UnRi' m WnRi' m $275,959.07 $261,4 1 SUPPLIES 452010 OlV,.Supplies $5]0.03 $5]0.03 $328.03 $557.31 $321.36 $..94 $344.61 $698.13 452030 MlnorO?ceE ul men undu .03 191.43 113.41 250 .03 451010 Reference Materuk & Peaks 45z010Sanitation &lMunrul Supplies $l..36 $0.03 2151011 Reference Materials& Books 451020 5ubscrlpilons $2B2.03 $2B2.03 $251.0] $z]S.w $z49.w $35].95 $24.03 451WO Book, M a res, Uewpapers .1. pull 455120 Mkc Computer xaraxare $138.03 $13].85 $]0.90 $192.82 $201.76 still Plants R Trees 2431010 aver Agnculture Chem orals $392.00 $2..22 $381.42 21.0] $324h. 9]e] 461050 ether All -allure Materials $230.03 $230.03 2dilAbl Other Chem l als&Scroll es 462030 Sanitation & Industrial Supplies 463200 aver Chemicals &Supple 4650z0 Nadi 465030 diesel Fuel 465oW Lubricants 465070 Other Lubricants 465090 Fluids Cases &Curer 466020 camber/xaraware 466030 Paint upplies 466840 Plain Supplies qrRl z0 Ill.0e z01.49 .03 4651 Electrical Supplies $1,1MA& $3,116.31 $817.15 $130.ss $3R1.10 46WW Omer Construction Supplies OHAIO aster Mamterencesu lies $7A.A. $7A.A. $3.0the. ]6s]s1 $1,platual $101.13 spuld Equipment Repair& Maintenances $1,667.03 $M.sO $1,634ha8 $e,237.93 $1,330.02 $512.27 46700 base Equipment Repair Material 4671W Other Verde RpuarlsMalntenan ze3.0] $2.u. $33.01 z0.12 46 020 Concrete 468030 Asphalt 5250.W 55,229,03 $1e3.03 $1,9&].0] $14717 41.. land 1e3.0] W.23 4WMO Tratrc Control Improvement Supp $1,z03.03 $no. $1,395.53 $163.01 $317.03 M91m Minor Equlpmem $20,"iW $1$W.W $1500.03 $6,]R2A& $550.13 584.]9 M9z0] Tools $3inin. $3inin. 250.0] $343.43 z44.89 $rtul..7 210 4f9210 First Avl/Ssfery Supplies 5594.03 $194W .. Fire Ert&Rolls $516.03 $5&3.95 $506. z0 $2,L.L. $313.35 $191.90 469290 Partner, for resale 52.L. .3. MkcelunLous Supplies $357W $35700 $35].40 $9,. $0.03 $335.03 M93W FOM and incoverali $528a0 $1]4.]2 luodi $31.80 TdzI S11PRIE5 $32,4i $11,904.00 $9,514M Qi,`.1698I $9,788.61 Q1,]93A5 $1,91590 Desist.68 IAPITALO VFIAY 472010 Improvement Contracted acmproverove 47MM7MM 50.m s000 50.m $ss9,93zzz 53.490.W Non ContractedImprovements S..2doA0 zO z34. z0 78 5].]3 ]8 n.6s 9]W.W 1zss.0] shi Other Dranea anus, Openrt Equipment shi Citrus,Citrus,FurnFurniture (Greater Than Than $11001 $1BpoB.m msazB aloe w shi mram a xarward,aare Tdhad(JRTAL(All WA) $0.00 $10,00Ap $50,4l udws m $]8,51].45 WOOM $4,715M Airport Commission Agenda & Info Packet Meeting Date: October 18, 2018 Page 29 of 42 Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 12 901R 10/12/2018 15:22 (CITY OF IOWA CITY IP 1 mtharp INVOICE LIST BY GL ACCOUNT apinvgla YEAR/PERIOD: 2019/3 TO 2019/3 ACCOUNT/VENDOR INVOICE PO YEAR/PR TYP S 76850110 Airport Operations WARRANT CHECK DESCRIPTION 7600-70-70-850-850100-850110-000-0000-436030 Transportation 092122 KC PAYMENTS 251801 0 2019 3 INV P 24.00 Pcard ACCOUNT TOTAL 24.00 7600-70-70-850-850100-850110-000-0000-436060 Lodging 092109 ALADDIN HOLIDAY INN 251788 0 2019 3 INV P 399.32 Pcard ACCOUNT TOTAL 399.32 7600-70-70-850-850100-850110-000-0000-437010 Comp Liability Insurance 012284 PETROLEUM MARKETERS UST 2018 0 2019 3 INV P 50.00 092118 ACCOUNT TOTAL 50.00 7600-70-70-850-850100-850110-000-0000-438030 Electricity 010319 MIDAMERICAN ENERGY 20180912115443 0 2019 3 INV P 1,814.76 091418 ACCOUNT TOTAL 1,814.76 7600-70-70-850-850100-850110-000-0000-438070 Heating Fuel/Gas 010319 MIDAMERICAN ENERGY 20180912115443 0 2019 3 INV P 40.35 091418 ACCOUNT TOTAL 40.35 7600-70-70-850-850100-850110-000-0000-438110- Local Phone Service 011937 AUREON COMMUNICATION 0789004025.2018.09 0 2019 3 INV P 85.80 092118 ACCOUNT TOTAL 85.80 7600-70-70-850-850100-850110-000-0000-442010 Other Building R&M Services 010856 JET AIR INC IOW IVI-18-004125 0 2019 3 INV P 600.00 092118 ACCOUNT TOTAL 600.00 7600-70-70-850-850100-850110-000-0000-442030 Heating & Cooling R&M Services 010005 AAA MECHANICAL INC 9955540 0 2019 3 INV P 528.00 100518 ACCOUNT TOTAL 528.00 7600-70-70-850-850100-850110-000-0000-443080 Other Equipment R&M Services 010005 AAA MECHANICAL INC 9955428 0 2019 3 INV P 204.00 100518 ACCOUNT TOTAL 204.00 7600-70-70-850-850100-850110-000-0000-445030 Nursery Srvc-Lawn & Plant Care 010856 JET AIR INC IOW IVI-18-004124 0 2019 3 INV P 5,500.00 092118 ACCOUNT TOTAL 5,500.00 7600-70-70-850-850100-850110-000-0000-449060 Dues & Memberships P-Card invoice for P-Card invoice for 209417 UST Insurance 7852 MidAmBilling 091220 7852 MidAmBilling 091220 209331 Basic Phone Service 209390 Janitorial Services 210074 HVAC Preventive Mai 210073 Boiler/Sump Pump Ch 209390 Groundskeepting/Mai Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 12 901E 10/12/2018 15:22 (CITY OF IOWA CITY IP 2 mtharp INVOICE LIST BY GL ACCOUNT apinvgla YEAR/PERIOD: 2019/3 TO 2019/3 ACCOUNT/VENDOR INVOICE PO YEAR/PR TYP S WARRANT CHECK DESCRIPTION 010232 IOWA CITY CORALVILLE IlIG5871 0 2019 3 INV P 300.00 092118 7932 Annual Dues ACCOUNT TOTAL 300.00 7600-70-70-850-850100-850110-000-0000-452010 Office Supplies 010856 JET AIR INC IOW IVI-18-004126 0 2019 3 INV P 12.99 092118 209390 Maintenance Reimbur ACCOUNT TOTAL 12.99 7600-70-70-850-850100-850110-000-0000-461050- Other Agriculture Materials 010856 JET AIR INC IOW IVI-18-004126 0 2019 3 INV P 49.34 092118 209390 Maintenance Reimbur ACCOUNT TOTAL 49.34 7600-70-70-850-850100-850110-000-0000-466070 Other Maintenance Supplies 011213 GARDINIER, MINNETTA IA99 0 2019 3 INV P 552.71 100518 210113 Reimbursement for s ACCOUNT TOTAL 552.71 7600-70-70-850-850100-850110-000-0000-469200 Tools 010856 JET AIR INC IOW IVI-18-004126 0 2019 3 INV P 408.47 092118 209390 Maintenance Reimbur ACCOUNT TOTAL 408.47 7600-70-70-850-850100-850110-000-0000-469290- Purchases For Resale 015056 LUKON COMPANY 2152 0 2019 3 INV P 1,170.00 092118 209400 Airport T-shirts ACCOUNT TOTAL 1,170.00 ORG 76850110 TOTAL 11,739.74 FUND 7600 Airport TOTAL: 11,739.74 ** END OF REPORT - Generated by Michael Tharp ** Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 18 9018 10/12/2018 15:24 CITY OF IONA CITY P 1 mtharp YEAR-TO-DATE BUDGET REPORT glytdbud FOR 2019 03 ACCOUNTS FOR: 7600 Airport 76850110 Airport Operations JOURNAL DETAIL 2019 3 TO 2019 3 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USED 76850110 381100 Interest on Invest 0 0 0 2019/03/090989 09/30/2018 GEN -187.46 REF SS 2019/03/090989 09/30/2018 GEN -183.79 REF SS 2019/03/090989 09/30/2018 GEN -18.73 REF SS 76850110 382100 Land Rental -50,000 0-50,000 2019/03/090107 09/05/2018 GBM 325.00 REF 2019/03/090872 09/11/2018 CRP -368.75 REF 2118467 US TREAS 2019/03/090943 09/19/2018 CRP -368.75 REF 2120843 US TREAS 76850110 382200 Building/Room Rent 2019/03/090143 09/06/2018 GBI 2019/03/090143 09/06/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI 2019/03/090916 09/28/2018 GBI -275,000 -2,000.00 REF -166.67 REF -144.00 REF -155.00 REF -155.00 REF -155.00 REF -185.00 REF -155.00 REF -155.00 REF -144.00 REF -230.00 REF -185.00 REF -155.00 REF -144.00 REF -358.00 REF -110.00 REF -144.00 REF -225.00 REF -185.00 REF -155.00 REF -332.00 REF -144.00 REF -4,606.00 REF -500.00 REF -144.00 REF -195.00 REF -195.00 REF -650.00 REF -166.67 REF 1,180.29 .00-1,180.29 100.0%* Interest Allocation Entry Interest Allocation Entry Interest Allocation Entry -10,725.28 0-275,000-70,014.84 00-39,274.72 21.5%* GB INVOICES LEASE PAYMENT LEASE PAYMENT 00-204,985.16 25.5%* HANGAR RENTAL HANGAR RENTAL HANGAR #7 HANGAR #16 HANGAR #24 HANGAR #19 HANGAR #47 HANGAR RENT #15 HANGAR #20 HANGAR #10 HANGAR #46 Hangar Rent #41 HANGAR #11 Hangar #2 HANGAR #33 Office Rent (Bldg G) HANGAR #5 HANGAR #57 HANGAR #38 HANGAR #27 HANGAR #56 HANGAR #8 D, E, F, H Hangar M HANGAR #1 HANGAR #59 HANGAR #60 HANGAR #72 AIRPORT RENTAL - HANGAR N Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 12 901E 10/12/2018 15:24 CITY OF IONA CITY P 2 mtharp YEAR-TO-DATE BUDGET REPORT glytdbud FOR 2019 03 ACCOUNTS FOR: 7600 Airport JOURNAL DETAIL 2019 3 TO 2019 3 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USED 09/28/2018 GBI -185.00 REF HANGAR #51 09/28/2018 GBI -155.00 REF HANGAR #13 09/28/2018 GBI -185.00 REF HANGAR #42 09/28/2018 GBI -4,392.00 REF HANGAR #35 09/28/2018 GBI -652.00 REF HANGAR #32 09/28/2018 GBI -144.00 REF HANGAR #9 09/28/2018 GBI -310.00 REF HANGAR #34 09/28/2018 GBI -185.00 REF HANGAR #53 09/28/2018 GBI -155.00 REF HANGAR #18 09/28/2018 GBI -155.00 REF HANGAR #14 09/28/2018 GBI -185.00 REF HANGAR #40 09/28/2018 GBI -225.00 REF HANGAR #58 09/28/2018 GBI -243.00 REF HANGAR #61 09/28/2018 GBI -230.00 REF HANGAR #55 09/28/2018 GBI -650.00 REF HANGAR #71 09/28/2018 GBI -195.00 REF HANGAR #63 09/28/2018 GBI -185.00 REF HANGAR #49 09/28/2018 GBI -185.00 REF HANGAR #36 09/28/2018 GBI -185.00 REF HANGAR #37 09/28/2018 GBI -230.00 REF HANGAR #45 09/28/2018 GBI -155.00 REF HANGAR #25 09/28/2018 GBI -185.00 REF HANGAR #44 09/28/2018 GBI -185.00 REF HANGAR #50 09/28/2018 GBI -155.00 REF HANGAR #28 09/28/2018 GBI -155.00 REF HANGAR #17 09/28/2018 GBI -144.00 REF HANGAR #6 09/28/2018 GBI -155.00 REF HANGAR #30 09/28/2018 GBI -155.00 REF HANGAR #22 09/28/2018 GBI -195.00 REF HANGAR #62 09/28/2018 GBI -185.00 REF HANGAR #43 09/28/2018 GBI -155.00 REF HANGAR #23 09/28/2018 GBI -155.00 REF HARNGAR #21 09/28/2018 GBI -210.00 REF HANGAR #64 09/28/2018 GBI -404.00 REF HANGAR #31 09/28/2018 GBI -92.50 REF HANGAR #48 09/28/2018 GBI -92.50 REF HANGAR #48 09/28/2018 GBI -185.00 REF HANGAR #39 09/28/2018 GBI -155.00 REF HANGAR #12 09/28/2018 GBI -100.00 REF OFFICE SPACE RENT 09/28/2018 GBI -155.00 REF HANGAR #26 09/28/2018 GBI -155.00 REF HANGAR #29 09/28/2018 GBI -185.00 REF HANGAR #54 09/28/2018 GBI -185.00 REF HANGAR #52 Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 12 901E 10/12/2018 15:24 CITY OF IOWA CITY P 3 mtharp YEAR-TO-DATE BUDGET REPORT glytdbud FOR 2019 03 ACCOUNTS FOR: 7600 Airport 76850110 384900 Other Commissions 2019/03/090558 09/19/2018 CRP 76850110 393120 General Levy 2019/03/090088 09/05/2018 GEN 76850110 411000 Perm Full Time 2019/03/090372 09/14/2018 PRJ 2019/03/090918 09/28/2018 PRJ 76850110 413000 Temporary Employee 76850110 414500 Longevity Pay 76850110 421100 Health Insurance 2019/03/090372 09/14/2018 PRJ 2019/03/090918 09/28/2018 PRJ 76850110 421200 Dental Insurance 2019/03/090372 09/14/2018 PRJ 2019/03/090918 09/28/2018 PRJ 76850110 421300 Life Insurance 2019/03/090918 09/28/2018 PRJ 76850110 421400 Disabilitv Insuran 2019/03/090918 09/28/2018 PRJ JOURNAL DETAIL 2019 3 TO 2019 3 ORIGINAL TRANFRS/ REVISED AVAILABLE PCT APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USED -36,500 0-36,500 -11,791.30 .00-24,708.70 32.3%* -3,973.00 REF 2104795 EASTERN AVIATION FUE OTHER -100,000 0 -100,000 -25,000.03 .00 -74,999.97 25.0%* -8,333.33 REF REJE#2 Ptax from Gen Fund 60,965 0 60,965 14,068.80 .00 46,896.20 23.1% 2,344.80 REF 090818 WARRANT-090818 RUN-1 BIWEEKLY 2,344.80 REF 092218 WARRANT-092218 RUN-1 BIWEEKLY 700 0 700 276.00 .00 424.00 39.4% 500 0 500 .00 .00 500.00 .0% 5,394 0 5,394 1,355.94 .00 4,038.06 25.1% 225.99 REF 090818 WARRANT-090818 RUN-1 BIWEEKLY 225.99 REF 092218 WARRANT-092218 RUN-1 BIWEEKLY 415 0 415 96.90 .00 318.10 23.3% 16.15 REF 090818 WARRANT-090818 RUN-1 BIWEEKLY 16.15 REF 092218 WARRANT-092218 RUN-1 BIWEEKLY 151 0 151 34.23 .00 116.77 22.7% 11.41 REF 092218 WARRANT-092218 RUN-1 BIWEEKLY 263 0 263 55.65 .00 207.35 21.2% 18.55 REF 092218 WARRANT-092218 RUN-1 BIWEEKLY Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 12 9n1R 10/12/2018 15:24 CITY OF IOWA CITY P 4 mtharp YEAR-TO-DATE BUDGET REPORT glytdbud FOR 2019 03 ACCOUNTS FOR: 7600 Airport ORIGINAL TRANFRS/ APPROP ADJSTMTS REVISED BUDGET YTD ACTUAL JOURNAL DETAIL ENCUMBRANCES 2019 3 TO AVAILABLE BUDGET 2019 PCT USED 3 76850110 422100 FICA 4,704 0 4,704 1,086.12 .00 3,617.43 23.1% 2019/03/090372 09/14/2018 PRJ 177.08 REF 090818 WARRANT-090818 RUN-1 BIWEEKLY 2019/03/090918 09/28/2018 PRJ 177.16 REF 092218 WARRANT-092218 RUN-1 BIWEEKLY 76850110 423100 IPERS 5,869 0 5,869 1,354.15 .00 4,514.41 23.1% 2019/03/090372 09/14/2018 PRJ 221.35 REF 090818 WARRANT-090818 RUN-1 BIWEEKLY 2019/03/090918 09/28/2018 PRJ 221.35 REF 092218 WARRANT-092218 RUN-1 BIWEEKLY 76850110 432020 Annual Audit 669 0 669 .00 .00 669.00 .0% 76850110 436030 Transportation 1,000 0 1,000 367.35 .00 632.65 36.7% 2019/03/090372 09/14/2018 PRJ 343.35 REF 090818 WARRANT-090818 RUN-1 BIWEEKLY 2019/03/090968 09/21/2018 API 24.00 VND 092122 VCH KC PAYMENTS P-Card invoice for statement c 76850110 436050 Registration 1,000 0 1,000 275.00 .00 725.00 27.5% 76850110 436060 Lodging 500 0 500 399.32 .00 100.68 79.9% 2019/03/090968 09/21/2018 API 399.32 VND 092109 VCH ALADDIN HOLIDAY INN P-Card invoice for statement c 76850110 436080 Meals 200 0 200 25.00 .00 175.00 12.5% 2019/03/090372 09/14/2018 PRJ 25.00 REF 090818 WARRANT-090818 RUN-1 BIWEEKLY 76850110 437010 Comp Liability Ins 4,400 0 4,400 23,006.99 .00 -18,606.99 522.9%* 2019/03/090551 09/18/2018 API 50.00 VND 012284 VCH PETROLEUM MARKETERS UST Insurance 209417 76850110 437020 Fire & Casualty In 12,612 0 12,612 8,862.00 .00 3,750.00 70.3% 2019/03/090971 09/30/2018 GEN 8,862.00 REF SS/MM AW Welt Ambrisco Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 12 901E 10/12/2018 15:24 CITY OF IOWA CITY P 5 mtharp YEAR-TO-DATE BUDGET REPORT glytdbud FOR 2019 03 ACCOUNTS FOR: 7600 Airport ORIGINAL TRANFRS/ REVISED APPROP ADJSTMTS BUDGET 76850110 437030 Worker's Comp Insu 190 0 190 2019/03/090971 09/30/2018 GEN 168.00 REF SS/MM 76850110 437041 Bonding & Other In 870 0 870 76850110 437200 Loss Reserve Pavme 2019/03/090971 09/30/2018 GEN 76850110 438010 Stormwater Utilit 2019/03/090515 09/19/2018 UBB 76850110 438030 Electricity 2019/03/090326 09/12/2018 API 2019/03/090326 09/12/2018 API 2019/03/090326 09/12/2018 API 2019/03/090326 09/12/2018 API 2019/03/090326 09/12/2018 API 76850110 438050 Landfill Use 2019/03/090007 09/04/2018 CRP 76850110 438070 Heating Fuel/Gas 2019/03/090326 09/12/2018 API 2019/03/090326 09/12/2018 API 2019/03/090326 09/12/2018 API 76850110 438080 Sewer Utilitv Char 2019/03/090515 09/19/2018 UBB 5,000 0 5,000 5,000.00 REF SS/MM 19,302 0 19,302 1.577.72 REF 180919 C-180919 4200 18,663 432.89 VND 010319 VCH 28.23 VND 010319 VCH 1,194.71 VND 010319 VCH 147.32 VND 010319 VCH 11.61 VND 010319 VCH 156 .00 REF 2,755 13.45 VND 010319 VCH 13.45 VND 010319 VCH 13.45 VND 010319 VCH JOURNAL DETAIL 2019 3 TO 2019 3 AVAILABLE PCT YTD ACTUAL ENCUMBRANCES BUDGET USED 168.00 .00 22.00 88.4% #6598 AW Welt Ambrisco .00 .00 870.00 .0% 5,000.00 .00 .00 100.0% Loss Reserve Chgbk 4,733.16 .00 14,568.84 24.5% UB AR GEN 0 18,663 3,760.54 .00 14,902.46 20.1% MIDAMERICAN ENERGY MidAmBilling 09122018 7852 MIDAMERICAN ENERGY MidAmBilling 09122018 7852 MIDAMERICAN ENERGY MidAmBilling 09122018 7852 MIDAMERICAN ENERGY MidAmBilling 09122018 7852 MIDAMERICAN ENERGY MidAmBilling 09122018 7852 0 156 36.00 .00 120.00 23.1% GB INVOICE ENTRY 0 2,755 87.57 .00 2,667.43 3.2% MIDAMERICAN ENERGY MidAmBilling 09122018 7852 MIDAMERICAN ENERGY MidAmBilling 09122018 7852 MIDAMERICAN ENERGY MidAmBilling 09122018 7852 2,059 0 2,059 632.02 .00 1,426.98 30.7% 297.95 REF 180919 C-180919 2000 UB AR GEN Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 12 901E 10/12/2018 15:24 CITY OF IOWA CITY P 6 mtharp YEAR-TO-DATE BUDGET REPORT glytdbud FOR 2019 03 ACCOUNTS FOR: 7600 Airport ORIGINAL TRANFRS/ REVISED APPROP ADJSTMTS BUDGET JOURNAL DETAIL 2019 3 TO 2019 3 AVAILABLE PCT YTD ACTUAL ENCUMBRANCES BUDGET USED 76850110 438090 Water Utility Char 2,231 0 2,231 1,145.88 .00 1,085.12 51.4% 2019/03/090515 09/19/2018 UBB 295.78 REF 180919 C-180919 1000 UB AR GEN 2019/03/090515 09/19/2018 UBB 446.00 REF 180919 C-180919 9030 UB AR GEN 76850110 438100 Refuse Collection 2,386 0 2,386 390.00 .00 1,996.00 16.3% 76850110 438110 Local Phone Servic 1,049 0 1,049 257.40 .00 791.60 24.5% 2019/03/090523 09/11/2018 API 85.80 VND 011937 VCH AUREON COMMUNICATION Basic Phone Services 209331 76850110 438120 Long Distance Sery 100 0 100 .00 .00 100.00 .0% 76850110 442010 Other Building R&M 2019/03/090551 09/18/2018 API 76850110 442020 Structure R&M Sery 76850110 442030 Heating & Cooling 2019/03/090861 09/19/2018 API 76850110 442060 Electrical & Plumb 13,000 600.00 VND 010856 VCH 2.843 6,000 528.00 VND 010005 VCH 3,000 76850110 443080 Other Equipment R& 5,000 2019/03/090861 09/19/2018 API 204.00 VND 010005 VCH 76850110 445030 Nursery Srvc-Lawn 45,575 2019/03/090551 09/18/2018 API 5,500.00 VND 010856 VCH 0 13,000 1,830.00 .00 11,170.00 14.1% JET AIR INC IOW Janitorial Services 209390 0 2,843 .00 .00 2,843.00 .0% 0 6,000 528.00 .00 5,472.00 8.8% AAA MECHANICAL INC HVAC Preventive Maintenance an 210074 0 3,000 174.70 .00 2,825.30 5.8% 0 5,000 849.00 .00 4,151.00 17.0% AAA MECHANICAL INC Boiler/Sump Pump Checks 210073 0 45,575 17,050.03 .00 28,524.97 37.4% JET AIR INC IOW Groundskeepting/Maintenance 209390 Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 12 901E 10/12/2018 15:24 CITY OF IONA CITY P 7 mtharp YEAR-TO-DATE BUDGET REPORT glytdbud FOR 2019 03 JOURNAL DETAIL 2019 3 TO 2019 3 ACCOUNTS FOR: ORIGINAL TRANFRS/ REVISED AVAILABLE PCT 7600 Airport APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USED 76850110 445080 Snow and Ice Remov 24,245 0 24,245 .00 76850110 445110 Testing Services 1,200 0 1,200 300.75 76850110 445230 Other Operating Se 269 0 269 273.00 76850110 446100 City Attorney Char 6,682 0 6,682 1,757.53 2019/03/090088 09/05/2018 GEN 585.83 REF REJE#2 76850110 446120 ITS-Server/Storage 538 0 538 121.71 2019/03/090907 09/30/2018 GNI 36.05 REF AO 2019/03/090908 09/30/2018 GNI 3.98 REF AO 76850110 446130 ITS-PC/Peripheral/ 11,975 0 11,975 3,529.80 2019/03/090912 09/30/2018 GNI 1,176.60 REF AO 76850110 446160 ITS-Infrastucture 8,761 0 8,761 .00 76850110 446190 ITS -Software SAAS 216 0 216 55.50 2019/03/090910 09/30/2018 GNI 18.50 REF AO 76850110 446300 Phone Ecruipment/Li 1,371 0 1,371 346.25 2019/03/090911 09/30/2018 GNI 4.05 REF AO 2019/03/090983 09/30/2018 GNI 112.50 REF AO 76850110 446320 Mail Chargeback 172 0 172 4.24 2019/03/090656 09/01/2018 GNI 2.12 REF AO .00 24,245.00 .0% .00 899.25 25.1% .00 -4.00 101.5%* .00 4,924.47 26.3% Airport to Attorney .00 416.29 22.6% Storage of files AIR Storage of Email .00 8,445.20 29.5% SEP ITS Repl Chgbk .00 8,761.00 .0% .00 160.50 25.7% Office software .00 1,024.75 25.3% CH SEP LONG DISTANCE CHARGES CH SEP PHONE ASSET CHARGE .00 167.76 2.5% AUG Mail Charges Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 12 901E 10/12/2018 15:24 CITY OF IOWA CITY P 8 mtharp YEAR-TO-DATE BUDGET REPORT glytdbud FOR 2019 03 ACCOUNTS FOR: 7600 Airport ORIGINAL TRANFRS/ REVISED APPROP ADJSTMTS BUDGET 76850110 446350 City Vehicle Repla 27,000 2019/03/090924 09/30/2018 GNI 2,041.05 REF TLA 76850110 446370 Fuel Chargeback 3,124 2019/03/090924 09/30/2018 GNI 371.63 REF TLA 76850110 446380 Vehicle R&M Charge 20,000 2019/03/090924 09/30/2018 GNI 1,370.66 REF TLA 76850110 449055 Permitting Fees 1,200 76850110 449060 Dues & Memberships 1,225 2019/03/090551 09/18/2018 API 300.00 VND 010232 VCH 76850110 449120 Equipment Rental 297 76850110 452010 Office Supplies 328 2019/03/090551 09/18/2018 API 12.99 VND 010856 VCH 76850110 454020 Subscriptions 254 76850110 461050 Other Agriculture 392 2019/03/090551 09/18/2018 API 49.34 VND 010856 VCH 76850110 466070 Other Maintenance 3,007 2019/03/090861 09/19/2018 API 552.71 VND 011213 VCH JOURNAL DETAIL 2019 3 TO 2019 3 AVAILABLE PCT YTD ACTUAL ENCUMBRANCES BUDGET USED 0 27,000 6,123.15 .00 20,876.85 22.7% SEP REPLACEMENT COST 0 3,124 1,019.55 .00 2,104.45 32.6% SEP DIVISION FUEL 0 20,000 3,330.76 .00 16,669.24 16.7% SEP DIVISION SERVICE 0 1,200 700.00 .00 500.00 58.3% 0 1,225 300.00 .00 925.00 24.5% IOWA CITY CORALVILLE Annual Dues 7932 0 297 309.75 .00 -12.75 104.3%* 0 328 12.99 .00 315.01 4.0% JET AIR INC IOW Maintenance Reimbursement 209390 0 254 .00 .00 254.00 .0% 0 392 108.77 .00 283.23 27.7% JET AIR INC IOW Maintenance Reimbursement 209390 0 3,007 560.46 .00 2,446.54 18.6% GARDINIER, MINNETTA Reimbursement for supplies to 210113 Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 12 901E 10/12/2018 15:24 mtharp FOR 2019 03 ACCOUNTS FOR: 7600 Airport CITY OF IOWA CITY YEAR-TO-DATE BUDGET REPORT ORIGINAL TRANFRS/ APPROP ADJSTMTS REVISED BUDGET YTD ACTUAL JOURNAL DETAIL ENCUMBRANCES 2019 3 TO AVAILABLE BUDGET P 9 glytdbud 2019 3 PCT USED 76850110 467020 Equipment R&M Supp 1,667 0 1,667 56.04 .00 1,610.96 3.4% 76850110 467160 Other Vehicle R&M 200 0 200 .00 .00 200.00 .0% 76850110 468030 Asphalt 100 0 100 .00 .00 100.00 .0% 76850110 468050 Sand 100 0 100 .00 .00 100.00 .0% 76850110 469040 Traffic Cntrl Impr 1,200 0 1,200 .00 .00 1,200.00 .0% 76850110 469190 Minor Ecruinment 1,500 0 1,500 7,154.16 .00 -5,654.16 476.9%* 76850110 469200 Tools 250 0 250 408.47 .00 -158.47 163.4%* 2019/03/090551 09/18/2018 API 408.47 VND 010856 VCH JET AIR INC IOW Maintenance Reimbursement 209390 76850110 469210 First Aid/Safety S 516 0 516 .00 .00 516.00 .0% 76850110 469290 Purchases For Resa 0 0 0 1,170.00 .00 -1,170.00 100.0%* 2019/03/090568 09/18/2018 API 1,170.00 VND 015056 VCH LUKON COMPANY Airport T-shirts 209400 76850110 475010 Furniture & Office 10,000 0 10,000 .00 .00 10,000.00 .0% 652 100 Year Anniversary Celebration 76850110 363910 652 Misc Sale of Me 0 0 0 -415.00 .00 415.00 100.0% Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 18 9018 10/12/2018 15:24 CITY OF IONA CITY P 10 mtharp YEAR-TO-DATE BUDGET REPORT glytdbud FOR 2019 03 JOURNAL DETAIL 2019 3 TO 2019 3 ACCOUNTS FOR: ORIGINAL TRANFRS/ REVISED AVAILABLE PCT 7600 Airport APPROP ADJSTMTS BUDGET YTD ACTUAL ENCUMBRANCES BUDGET USED TOTAL Airport Operations -104,191 0 -104,191 -1,217.53 TOTAL Airport -104,191 0 -104,191 -1,217.53 TOTAL REVENUES-461,500 0 -461,500 -116,766.16 TOTAL EXPENSES 357,309 0 357,309 115,548.63 PRIOR FUND BALANCE 116,769.51 CHANGE IN FUND BALANCE - NET OF REVENUES/EXPENSES 1,217.53 REVISED FUND BALANCE 117,987.04 00-102,973.36 1.2% 00-102,973.36 1.2% 00-344,733.84 00 241,760.48 Airport Commission Agenda & Info Packet KAee}inn rla}erlrtnher 12 901E 10/12/2018 15:24 CITY OF IONA CITY P 11 mtharp YEAR-TO-DATE BUDGET REPORT glytdbud FOR 2019 03 ORIGINAL TRANFRS/ REVISED APPROP ADJSTMTS BUDGET JOURNAL DETAIL 2019 3 TO 2019 3 AVAILABLE PCT YTD ACTUAL ENCUMBRANCES BUDGET USED GRAND TOTAL-104,191 0-104,191-1,217.53 .00-102,973.36 1.2% ** END OF REPORT - Generated by Michael Tharp **