Loading...
HomeMy WebLinkAbout2020-10-20 Public HearingNOTICE OF PUBLIC HEARING NOTICE OF PUBLIC HEARING ON PROJECT MANUAL AND ESTIMATED COST FOR THE SLUDGE STORAGE TANK 8801 MASONRY REPAIR PROJECT IN THE CITY FILEDOF IOWA CITY, IOWA TO ALL TAXPAYERS OF THE CITY OF IOWA CITY, OCT 0 12020 IOWA, AND TO OTHER INTERESTED PERSONS: City Clerk Public notice is hereby given that the City Council of the Iowa City, Iowa City of Iowa City, Iowa, will conduct a public hearing on the Project Manual, including the plans, specifications, contract, and estimated cost for the construction of the Sludge Storage Tank 8801 Masonry Repair in said city at 7:00 p.m. on the 2W1 day of October, 2020, said meeting to be held in the Emma J. Harvat Hall in the City Hall, 410 East Washington Street in said city, or if said meeting is cancelled, at the next meeting of the City Council thereafter as posted by the City Clerk. The Project will involve: demolition, repair and replacement of an existing masonry sludge storage tank fagade; concrete patching; removal and replacement of ridged insulation; removal and replacement of aluminum dome cover bearing plates; and removal and replacement of peripheral dome flashing. The project is located at the City of Iowa City Wastewater Treatment Facility, 4366 Napoleon Street SE., Iowa City, Iowa 52240 Said Project Manual and estimated cost are now on file in the office of the City Clerk in the City Hall in Iowa City, Iowa, and may be inspected by any interested persons. Any interested persons may appear at said meeting of the City Council for the purpose of making objections to and comments concerning said Project Manual or the cost of making said improvement. This notice is given by order of the City Council of the City of Iowa City, Iowa and as provided by law. Kellie K. Fruehling, City Clerk STAFF PRESENTATION TO FOLLOW: 1 r I C04;qui h CITY OF lOVVA CITY 410 East Washington Street Iowa City, Iowa S2240-1826 (319) 356-5000 (3I9) 356-5009 FAX www.icgov.org Sludge Storage Tank Masonry Repair Project Wastewater Treatment Facility Ben Clark, PE Senior Engineer Engineering Division Public Works Department CID 340TH ST LOWER WE WASTEWATER TREATMENT FACILITY +r ,1O'''WAY 6 $E 6: IUTh sr 1 K N � � -� r4 C m �gS �Trk y,� C m in z. in sl = xie 4EtRoa� a�E\� F E COURT ST h �{•1 BENTON ST m W _ 1 y m � :.4 , +n W } P 6 W LU , 3 $ O OSAGE ST 5W OSAGE ST SW { �� N n rn p� CID 340TH ST LOWER WE WASTEWATER TREATMENT FACILITY +r ,1O'''WAY 6 $E SLUDGE ' STORAGE TANK 8801 rr r■! 1 %p t4 v --Z" EXISTING SEAM WITH FASTENERS EXISTING DOME SUPPORT FRAMING— EXISTING LOWER DOME SIDE PANEL; SEE NOTE 10 SECURE TO SIDE PANEL WITH STAINLESS STEEL FASTENERS; SEE NOTE 11 NEW DOME ROOF FLASHING; SEE FLASHING SECTION THIS DRAWING VARIES SEE NOTES TOP OF MASONRY TOP OF CONCRETE w � CAVITY WALL FLASHING - 0 q SEALANT w C1 3!4" h WEEP SLOT STAINLESS STEEL DRIP 4" FACE BRICK (MATCH EXISTING) - ADJUSTABLE VENEER ANCHOR PLATES AT 16" ON CENTER (VERTICALLY AND HORIZONTALLY) V RIGID INSULATION; MECHANICALLY FASTEN TO TANK WALL L-L, TYPICAL TOP OF WALL DETAIL �n DOME TENSION BEAM SECURE TOP OF CAVITY WALL FLASHING TO EXISTING CONCRETE TANK WALL WITH FASTENERS AT 16" ON CENTER SECURE CAVITY WALL FLASHING TO EXISTING CONCRETE TANK INNER WALL WITH FASTENERS AT 16" ON CENTER; SET IN BED OF SEALANT EXISTING CONCRETE TANK WALL EXISTING ANCHOR CHANNEL; ABANDON IN PLACE i 9 a ' I a.. e. i a, i i i as i e _ a i � 4 i a < i i b m e i - g . i. i i 8 i a i a i L-L, TYPICAL TOP OF WALL DETAIL �n DOME TENSION BEAM SECURE TOP OF CAVITY WALL FLASHING TO EXISTING CONCRETE TANK WALL WITH FASTENERS AT 16" ON CENTER SECURE CAVITY WALL FLASHING TO EXISTING CONCRETE TANK INNER WALL WITH FASTENERS AT 16" ON CENTER; SET IN BED OF SEALANT EXISTING CONCRETE TANK WALL EXISTING ANCHOR CHANNEL; ABANDON IN PLACE STAFF PRESENTATION CONCLUDED � r rrM as � h CITY OF IOWA CITY 410 East Washington Strect Iowa City, Iowa 52240-1826 (3 19) 356-5000 (3 19) 356-5009 FAX www. icgov. o rg