HomeMy WebLinkAbout2020-12-01 ResolutionItem Number: 6.a.
D ecember 1, 2020
Motion to g ran t an exten sion from December 1 to Decemb er 15 for
su b mission of Iowa City Down town District's F Y 22 Prop osed B u d g et.
AT TAC HM E NT S:
D escription
L etter of request
Item Number: 6.b.
D ecember 1, 2020
Resol u tion accepting the work for th e P olice F ront O ffices Remodel P roject.
Prepared B y:B en Clark, S r. Civil E ngineer
R eviewed B y:J ason Havel, City E ngineer
Ron Knoche, Public Works Director
Geof f F ruin, City Manager
F iscal I mpact:None
R ecommendations:S taff: A pproval
Commission: N/A
Attachments:E ngineer's Report
Resolution
Executive S ummary:
T he Police F ront Of f ices R emodel P roject has been completed by RoCon Construction, L L C , of
I owa C ity, I owa, in substantial accordance with the plans and specif ications prepared by Rohrbach
Associates, P C, of I owa C ity. T he E ngineer’s Report and P erformance and P ayment bond are
on file with the City E ngineer.
P roject Estimated Cost:....................... $65,000.00
P roject Bid R eceived: ......................... $42,646.00
P roject A ctual Cost:............................. $51,704.91
T here were three change orders on the project, which included additional wall patching and door
revision and replacement work.
B ackground / Analysis:
T he P roject consisted of remodeling a portion of the I owa City Police D epartment of f ices which
includes replacement of interior finishes including suspended acoustical ceilings, wall patching,
and paint; replacement of glazing, and doors. E lectrical work included installation of new L E D light
fixtures, revision of existing electrical power circuits, installation of new outlets, and installation of
conduit pathways and junction boxes for communication cable. New air diffusers were also
installed and connected to existing ductwork. Other work perf ormed and coordinated with the
general contractor included replacement of floor f inishes, installation of new f urniture, and
installation of communications cable.
AT TAC HM E NT S:
D escription
Engineer's Report
R esolution
Prepared by: Ben Clark, Senior Engineer, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
Resolution No. 20-264
Resolution accepting the work for the Police Front Offices
Remodel Project
Whereas, the Engineering Division has recommended that the work for construction of the Police
Front Offices Remodel Project as included in a contract between the City of Iowa City and RoCon
Construction, LLC, of Iowa City, Iowa, dated May 281, 2020, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have been
filed in the City Engineer's office; and
Whereas, funds for this project are available in the Police Front Offices Remodel account #Y4443;
and
Whereas, the final contract price is $51,704.91.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 1st day of December , 2020
M
Appr ed by �{ /
Attest: �1.
City Clerk City Attorney's Office — 11/24/2020
It was moved by sergus and seconded by Weiner the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
Item Number: 6.c.
D ecember 1, 2020
Resol u tion accepting the work for th e 2020 Summer Sid ewalk Repair
Proj ect.
Prepared B y:K im Sandberg, Program A ssistant
R eviewed B y:J ason Havel, City E ngineer
Ron Knoche, Public Works Director
Geof f F ruin, City Manager
F iscal I mpact:None
R ecommendations:S taff: A pproval
Commission: N/A
Attachments:E ngineer's Report
Resolution
Executive S ummary:
T he project was let as a Competitive Quotation project and has been completed by Ziegenhorn
C onstruction L L C of Muscatine, I owa, in substantial accordance with the plans and
specifications. T he E ngineer ’s Report and Performance and Payment bonds are on file with the
C ity Engineer as a Competitive Quotation project.
Project E stimated C ost: $ 94,000.00
Project B id Received: $ 93,029.68
Project A ctual C ost: $ 92,625.71
B ackground / Analysis:
T his annual project included the removal and replacement of deficient sidewalk squares as part of
the City’s S idewalk I nspection P rogram.
AT TAC HM E NT S:
D escription
Engineer's Report
R esolution
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
Resolution No. 20-265
Resolution accepting the work for the 2020 Summer Sidewalk
Repair Project
Whereas, the Engineering Division has recommended that the work for construction of the 2020
Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City and
Ziegenhorn Construction LLC of Muscatine, Iowa, dated July 21, 2020, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the City
Engineer's office; and
Whereas, funds for this project are available in account # 22710220; and
Whereas, the final contract price is $92,625.71.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 1st day of December , 2020
M4y6r
Attest:
City Jerk
It was moved by Bergus and seconded by
adopted, and upon roll call there were:
Ayes: Nays:
Ap ed by �{ f
7: "1.
City Attorney's Office —11/24/2020
Weiner the Resolution be
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
(.c,
Item Number: 6.d.
D ecember 1, 2020
Resol u tion accepting the work for th e Traffic Calmin g 2020 P roject.
Prepared B y:J ason R eichart, S r. Civil Engineer
R eviewed B y:J ason Havel, City E ngineer
Ron Knoche, Public Works Director
Geof f F ruin, City Manager
F iscal I mpact:None
R ecommendations:S taff: A pproval
Commission: N/A
Attachments:E ngineer's Report
Resolution
Executive S ummary:
T he project has been completed by L L P elling Company, I nc. of North L iberty, I owa, in
substantial accordance with the plans and specifications. T he Engineer’s Report and
Perf ormance and P ayment bonds are on file with the C ity Engineer.
Project E stimated C ost: $ 109,000.00
Project B id Received: $ 79,114.47
Project A ctual C ost: $ 74,577.55
B ackground / Analysis:
T he Traffic C alming 2020 Project includes the construction of asphalt speed humps on Hickory
Trail, Highland Avenue, K imball R oad, and W illow Street and asphalt speed cushions on
J efferson S treet / G lendale Road.
AT TAC HM E NT S:
D escription
Engineer's Report
R esolution
Prepared by: Jason Reichert. Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5416
Resolution No. 20-266
Resolution accepting the work for the Traffic Calming 2020 Project
Whereas, the Engineering Division has recommended that the work for construction of the Traffic
Calming 2020 Project, as included in a contract between the City of Iowa City and LL Pelling
Company, Inc. of North Liberty, Iowa dated August 20, 2020 be accepted; and
Whereas, the Engineers Report and the performance, payment and maintenance bond have been
filed in the City Engineer's office; and
Whereas, funds for this project are available in the Traffic Calming account # S3816; and
Whereas, the final contract price is $74,577.55.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 1st day of December , 2020
Ma
Attest:
City Jerk
It was moved by Bergus and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
NZ--
City
Attorney's Office — 11/24/2020
Weiner
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
the Resolution be
no
Item Number: 6.e.
D ecember 1, 2020
Resol u tion award ing contract an d au th orizing the Mayor to sign and the City
Cl erk to attest a contract for con stru ction of the S l u d g e S torage Tan k
Mason ry Rep air Proj ect.
Prepared B y:B en Clark, S r. Civil E ngineer
R eviewed B y:J ason Havel, City E ngineer
Ron Knoche, Public Works Director
Geof f F ruin, City Manager
F iscal I mpact:$159,800 available in Wastewater account # 72720122
R ecommendations:S taff: A pproval
Commission: N/A
Attachments:Resolution
Executive S ummary:
T his agenda item awards the construction contract for the S ludge S torage Tank Masonry Repair
Project. Three bids were submitted prior to the November 18, 2020 deadline:
Bidder Name C ity B id
T nT Tuckpointing & B uilding R estoration, L L C S tockton, I owa $159,800.00
Tricon General C onstruction, I nc. Cedar Rapids, I owa $227,000.00
McGill Restoration, I nc. Omaha, Nebraska $233,712.00
T he engineer’s estimate of construction costs was $165,000. S taff recommends awarding the
C ontract for the S ludge Storage Tank Masonry Repair P roject to T nT Tuckpointing & Building
R estoration, L L C of S tockton, I owa.
B ackground / Analysis:
T he sludge storage [belt filter press] f eed tank is a reinforced concrete tank with a masonry facing
and aluminum dome cover that was built during the original south plant construction in 1989. A
section of the masonry f acing recently failed with a section of the bricks falling to the ground. T he
masonry f acing has suffered from moisture issues possible due the way the original dome cover
and flashing system was installed. The project will involve the masonry repairs and dome cover
sealing and flashing systems.
AT TAC HM E NT S:
D escription
R esolution
Prepared by: Ben Clark, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319)356-5436
Resolution No. 20-267
Resolution awarding contract and authorizing the Mayor to sign
and the City Clerk to attest a contract for construction of the
Sludge Storage Tank Masonry Repair Project.
Whereas, TnT Tuckpointing & Building Restoration, LLC, of Stockton, Iowa, has submitted the
lowest responsible bid of $159,800 for construction of the above-named project; and
Whereas, funds for this project are available in Wastewater account # 72720122; and
Whereas, the City Engineer and City Manager are authorized to execute change orders according
to the City's Purchasing Policy as they may become necessary in the construction of the above-
named project.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that:
The contract for the construction of the above-named project is hereby awarded to TnT
Tuckpointing & Building Restoration, LLC, of Stockton, Iowa, subject to the condition that
awardee secure adequate performance and payment bond, insurance certificates, and
contract compliance program statements.
2. The Mayor is hereby authorized to sign and the City Clerk to attest the contract for
construction of the above-named project, subject to the condition that awardee secure
adequate performance and payment bond, insurance certificates, and contract compliance
program statements.
Passed and approved this 1st day of December 2020
.2�
Mayo
Attest : I/
City Clerk
It was moved by Bergus and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
A r ed by /
City Attorney's Office - 11 /24/2020
Weiner
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
the Resolution be
Item Number : 6.f.
D ecember 1, 2020
Resol u tion ap p roving, au thorizin g an d d irectin g th e Mayor to execu te an d
the City Cl erk to attest an Agreemen t by and b etween th e City of Iowa City
and F oth In frastru cture an d E n viron ment, L L C of Ced ar Rapid s, Iowa to
p rovide en g in eering consultant services for the Cou rt S treet Imp rovemen ts
Proj ect.
Prepared B y:E than Yoder, Civil E ngineer
R eviewed B y:J ason Havel, City E ngineer
Ron Knoche, Public Works Director
Geof f F ruin, City Manager
F iscal I mpact:$692,348.00, available in the Court S treet Reconstruction account #S3946
R ecommendations:S taff: A pproval
Commission: N/A
Attachments:Location Map
Resolution
A greement
Executive S ummary:
T his agreement authorizes F oth I nf rastructure and E nvironment L L C to provide preliminary and
final design services, platting for easement/property acquisitions and the preparation of
construction documents f or the Court S treet I mprovements P roject. T his project generally
includes the reconstruction of C ourt S treet between Muscatine Avenue and F irst Avenue. T he
project will also include upgrades to the public utilities (water main, storm sewer and sanitary
sewer) and other associated work.
B ackground / Analysis:
C ourt S treet, between Muscatine Avenue and First Avenue, is a collector street that conveys
approximately 6,000 to 7,000 average annual daily traf f ic (A A D T) between the downtown area and
eastern portions of the City. Given the age, the amount of traffic, and the deteriorating condition of
both the pavement and the public utilities, C ourt Street between Muscatine Avenue to F irst
Avenue is beyond the point of rehabilitation and needs to be reconstructed.
T he C ity issued a Request for Q ualif ications to provide prof essional engineering services for a
number of projects, including the Court S treet I mprovements. F oth I nf rastructure and
Environment, L L C was selected based on qualifications, including project approach, previous
project experience, key personnel, and cost.
AT TAC HM E NT S:
D escription
L ocation Map
R esolution
Agreement
Court St Reconstruction
Court St ReconstructionMuscatine Ave to 1st Ave
Court St
Muscatine Ave 1st AveWashington St
Friendship St
Jefferson St
College St
Prepared by: Ethan Yoder, Civil Engineer, Public Works, 410 E. Washington St., Iowa City, IA 52240; (319) 356-5145
Resolution No. 20-268
Resolution approving, authorizing and directing the Mayor to
execute and the City Clerk to attest an agreement by and between
the City of Iowa City and Foth Infrastructure and Environment,
LLC of Cedar Rapids, Iowa to provide engineering consultant
services for the Court Street Improvements Project
Whereas, the City of Iowa City desires to improve Court Street from Muscatine Avenue to First
Avenue; and
Whereas, this project will include street, sidewalk, storm sewer, water main, and sanitary sewer
improvements; and
Whereas, the City desires the services of a consulting firm to provide preliminary design, final design
and construction engineering for the Court Street Improvements Project; and
Whereas, the City has requested Qualifications from Consultants in July of 2020 for assistance with
public improvements projects; and
Whereas, the City of Iowa City has negotiated an Agreement for said consulting services with Foth
Infrastructure and Environment, LLC, to provide said services; and
Whereas, it is in the public interest to enter into said Consultant Agreement with Foth Infrastructure
and Environment, LLC; and.
Whereas, funds for this project are available in the Court Street Reconstruction account #53946;
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that:
The Consultant's Agreement attached hereto is in the public interest, and is approved as to
form and content.
2. The Mayor and City Clerk are hereby authorized and directed to execute the attached
Consultant's Agreement.
3. The City Manager is authorized to execute amendments to this contract as they may
become necessary.
Pas d and approved this 1st day of December , 2020
" rl,)AA-<�e_ I
e---
M
i
Attest:
City tlerk
A proved
City Attorney's Office
(Sara Greenwood Hektoen — 11/24/2020)
M
Resolution No. 20-268
Page 2
It was moved by Bergus and seconded by Weiner
adopted, and upon roll call there were:
Ayes:
Nays: Absent:
x
Bergus
x
Mims
x
Salih
x
Taylor
x
Teague
x
Thomas
x
Weiner
the Resolution be
Consultant Agreement
This Agreement, made and entered into this 1st day of December , 2020 , by
and between the City of Iowa City, a municipal corporation, hereinafter referred to as the City and
Foth infrastructure and Environment, LLC, of Cedar Rapids, Iowa, hereinafter referred to as the
Consultant.
Whereas, the City desires to obtain the services of a qualified consulting firm to provide preliminary
design, final design, preparation of a project manual for bidding, bidding assistance, and
constructions services for the Court Street Reconstruction Project, and;
WHEREAS, the project consists of the reconstruction of Court Street from Muscatine Avenue to V
Avenue; and
Whereas, the City issued a Request for Qualifications, On --Call Professional Design and
Engineering Services (2020-2022), May f, 2020, to private consulting firms interested in providing
design and engineering services related to public improvement projects in the City of Iowa City,
and;
Whereas, submittals were received from consulting firms and evaluated by a selection committee,
and;
Whereas, Consultant was selected based on qualifications, key personnel, project approach, and
fees and rates, and;
Whereas, founds are available in the Court Street Improvements Project, Account 53946, and,
Now Therefore, it is agreed by and between the paufies hereto that the City does now contract with
the Consultant to provide services as set forth herein.
I. Scope of Services
Consultant agrees to perform the following services for the City, and to do so in a timely and
satisfactory manner.
Services provided under this agreement shall be further described in Attachment 1, attached and
incorporated herein.
iI. Time of Completion
The Consultant shall complete the following phases of the Project in accordance with the schedule
shown.
The schedule of the work to be performed shall conform to the Schedule as set forth in Attachment
2, attached and incorporated therein. Any deviations from the Schedule shall be approved by the
City in writing.
Ill. Compensation for Services
-2 -
In consideration of the services, work, equipment., supplies, or materials provided herein, the City
agrees to pay the Consultant the following NOT -TO -EXCEED FEE (Unit CosttTime Charges),
Including any authorized reimbursable expenses, pursuant to the Schedule of Fees set forth in
Attachment 3, attached and incorporated herein,
Total Not -To -Exceed Fee; $692,348.
IV. General Terms
A. The Consultant shall not commit any of the following employment practices and
agrees to prohibit the following practices in any subcontracts.
1. To discharge or refuse to hire any individual because of their race, color,
religion, sex, national origin, disability, age, marital status, gender identity, or
sexual orientation.
To discriminate against any individual in terms, conditions, or privileges of
employment because of their race, color, religion, sex, national origin,
disability, age, marital status, gender identity, or sexual orientation.
B. Should the City terminate this Agreement, the Consultant shall be paid for all work
and services performed up to the time of termination. However, such sums shall not
be greater than the "not -to -exceed" amount listed in Section III. The City may
terminate this Agreement upon seven (7) calendar days' written notice to the
Consultant.
C. This Agreement shall be binding upon the successors and assigns of the parties
hereto, provided that no assignment shall be without the written consent of all Parties
to said Agreement.
R It is understood and agreed that the retention of the Consultant by the City for the
purpose of the Project shall be as an independent contractor and shall be exclusive,
but the Consultant shall have the right to employ such assistance as may be required
for the performance of the Project.
E, It is agreed by the City that all records and files pertaining to information needed by
the Consultant fdrthe project shall be available by said Ckyupon reasonable request
to the Consultant. The City agrees to furnish all reasonable assistance in the use of
these records and files.
F. It is further agreed that no Party to this Agreement shall perform contrary to any
state, federal, or local law or any of the ordinances of the City of lova City, Iowa.
G. At the request of the City, the Consultant shall attend meetings of the City Council
relative to the work set forth in this Agreement. Any requests made by the City shall
be given with reasonable notice to the Consultant to assure attendance.
H. The Consultant agrees to furnish, upon termination of this Agreement and upon
demand by the City, copies of all basic notes and sketches, charts, computations,
and any other data prepared or obtained by the Consultant pursuant to this
Agreement without cost, and without restdctions or limitation as to the use relative
to specific projects covered under this Agreement. In such event, the Consultant
:shall not be liable for the City's use of such documents on other projects.
WN
The Consultant agrees to furnish all reports, specifications, and drawings with the
seal of a licensed professional as required by Iowa law.
J. The City agrees to tender the Consultant all fees In a timely manner, excepting,
however, that failure of the Consultant to satisfactorily perform in accordance with
this Agreement shall constitute grounds for the City to withhold payment of the
amount sufficient to properly complete the Project in accordance with this
Agreement.
K. Should any section of this Agreement be found invalid, it is agreed that the remaining
portion shall be deemed severable from the invalid portion and continue in full force
and effort.
L., Original contract drawings shall become the property of the City. The Consultant
shall be allowed to keep reproducible copies for the Consultant's own filing use.
M. Fees paid for securing approval of authorities having jurisdiction over the Project will
be paid by the City.
N. Upon signing this Agreement, Consultant acknowledges that Section 362.5 of the
Iowa Code prohibits a City officer or employee from having an interest in a contract
with the City, and certifies that no employee or officer of the City, which includes
members of the City Council and City boards and commissions, has an interest,
either direct or indirect, in this Agreement, that does not fall within the exceptions to
said statutory provision enumerated in Section 362.5.
C. Indemnification
I. To the full extent permitted by law, Consultant agrees to defend, indemnify,
and hold harmless the City against any and all claims, demands, suits, lass,
expenses, including attorney's fees, and for any damages which may be
asserted, claimed or recovered against or from the City by reason of
personal injury, including bodily Injury or death, and property damages,
including Ions of use thereof, caused by Consultant's negligent acts, errors
or omissions in performing the work and/or services provided by Consultant
to the City pursuant to the provisions of this Agreement.
2. Consultant assumes full responsibility for any and all damage or injuries
which may result to any person or property by reason of Consultant's
negligent acts, errors or omissions in connection with the work and/or
services provided by Consultant to the City pursuant to this Agreement, and
agrees to pay the City for a ll damages caused to the City's premises resulting
from the negligent arts, errors or omissions of Consultant.
3, The Consultant's obligation to indemnify the City shall not include the
obligation to indemnify, hold harmless, or defend the City against lability,
claims, damages, losses, or expenses, including attorney fees, to the extent
caused by or resulting from the negligent act, error, or omission of the City.
4. For purposes of this paragraph, the term "Consultant" means and includes
the Consultant, its officers, agents, employees, sub -consultants, and others
for whom Consultant is legally liable, and the term "City" means and includes
-4 -
the City of Iowa City, Iowa its Mayor, City Council members, employees, and
volunteers.
P. Insurance
1. The Consultant agrees at all times material to this Agreement to have and
maintain professional liability insurance covering the Consultant's liability for
the Consultant's negligent acts, errors and omissions in the sum of
$1,000,000 Per Claim, $1,000,000 Annual Aggregate, or a $1,000,000
Combined Single Limit. To the fullest extent permitted by applicable state
law, a Waiver of Subrogation Clause (endorsement) shall be added.
Z Consultant agrees to provide the City a certificate of insurance evidencing
that all coverages, limits and endorsements required herein are maintained
and in full force and effect, and certificates of Insurance shall provide .a
minimum thirty (30) day endeavor to notify, when available by Consultant's
insurer. If the Consultant receives a non -renewal or+ cancellation notice from
an insurance carrier affording coverage required herein, or receives notices
that coverage no longer complies with the insurance; requirements herein,
Consultant agrees to notify the City within five (5) business days with a copy
of the non -renewal or cancellation notice.
Q. Standard of Care
1. The Consultant shall performs services for, and furnish deliverables to, the
City pertaining to the Projekt as set forth in this Agreement. The Consultant
shall possess a degree of learning, care and skill ordinarily :possessed by
reputable professionals, practicing in this ,area under similar circumstances.
The Consultant shall use reasonable diligence and professional judgment in
the exercise of skill and application of learning.
Z Consultant represents that the Services and all its components shall be free
of defects caused by negligence; shall be performed in a manner consistent
with the standard of care of other professional service providers in a similar
Industry and application; shall conform to the requirements of this
Agreement; and shall be sufficient and suitable for the purposes expressed
in this Agreement.
3. All provisions of this Agreement shall be reconciled in accordance with the
generally accepted standards of the Engineering Profession.
4. Consultant's obligations under this Section shall exist without regard to, and
shall not be construed to be waived by, the availability or unavailability of any
insurance, either of City or Consultant.
R. There are no other considerations or monies contingent upon or resulting from the
execution of this Agreement, it is the entire Agreement, and no other monies or
considerations have been solicited.
S. This Agreement shall be interpreted and enforced :in accordance with the laws of the
State of Iowa. Any legal proceeding instituted with respect to this Agreement shall
be brought In a court of competent jurisdiction In Johnson County, Iowa. The parties
hereto hereby submit to personal jurisdiction therein and irrevocably waive any
-5 -
objection as to venue therein, including any argument that such proceeding has
been brought in an inconvenient forum.
For the City For the Consultant
Aaron Muniz
By: By
Title: Mayor Title: SeniorClient Manager
Date: 12/1/2020 Date:
Attest;
11/24/2020
Ap5I by:
4.G-'JI'z—
City
Attorney's Offioe -- 4ek-Ato
Date T-"
Folh infrastructure & Environment, LLC Court Street Reconstruction
Data: November 24, 2020 Preliminary and Final Design
Iowa City, iA
Attachment 'I -Scapa of Services
Preliminary and Final Roadway Design
Court Street Rewnstruction
Iowa City, Iowa
The work to be performed by the Consultant under this agreement shall encompass and include detailed
work, services, materials, equipment and supplies necessary to complete analysis and design for the
project.
The project consists of reconstruction of Court Street from Muscatine Avenue to First Avenue,
approximately 3,700 linear feet. The Consultant will complete preliminary and final roadway and design,
utility upgrades, and prepare bidding documents. This scope of services is based on the following project
information and assumptions:
Project Objectives
• Replace aging street and sidewalk pavement.
• Existing water main, storm sewer and sanitary sewer upgrades.
Project Assumptions
• SUDAS design cxiterila and specifications.
• Urban roadway section with pedestrian facilities. Assess 10 or 11 foot lane widths.
• City will perform right-of-way acquisition services.
• Muscatine Road and 'South 191 Avenue intersections will be fully reconstructed.
o West project limits, reconstruct Court Street up to the west end of radius of the Muscatine
Road Intersection.
o East project limits, reconstruct Court Street up to the east end of radius of the South 1r'
Avenue Intersection.
• Lighting circuitry will be designed by MldAmerican Energy.
+ Joint utility trench for existing overhead utilities will be assessed as part of project.
+ All water main and associated appurtenances will be replaced within project area and up to property
limits.
All storm sewer within the project limits will be replaced. The existing downstream outlet facilities
will be modeled as part of the stoma sewer reconstruction.
All sanitary sewer manholes will be replaced within project area or as directed by City.
• Use www icaov.aro to host project website
• Design to start in November 2020.
• Project construction to begin in 2023.
The Consultant shall consult on a regular basis with the City to clarify and define the City"s requirements
for the Project and review available data. The City agrees to furnish to the Consultant full information with
respect to the City's requirements, Including any special or extraordinary considerations for the Project or
special services needed and also to make available pertinent existing data.
PROJECT MANAGII' MENTIADN INISTRA1TION
Task 1— General Project ilAanagement
The project manager will be responsible for the development and tracking of the project plan for the project
development, This includes existing data collection, task identificaltion, staff scheduling and coordination,
project communications, monthly progress reporting and invoicing and other important elements of the
project. The project duration (design through bidding) is assumed to be twenty-six (26) months from
November 2020 through December 2022.
PROJECT COORDINATION
Task 1- Project Kickoff Meetings
TheConsultant will conduct an internal kick-off event with the project team (Consultant personnel only).
The event will involve the development of a realistic project plan, including a high level master schedule,
resource plan, visual work flow planning boards and a proactive risk identification and mitigation analysis.
Regularly scheduled stand-up meetings, combined with the visual board will be used to update the
Consultant team on the progress of project milestone/deliverables, individual team member task completion
and to facilitate the overall team collaboration. For budget purposes, the project team VAII hold two (2)
internal project development kickoff meetings (a) Preliminary Design and (b) Final Design for
milestoneldeliverable planning.
Task 2 - Design Development Meetings
The Consultant shall schedule, coordinate, and facilitate four (4) meetings with the City to review progress
and discuss specific elements of the project design and receive direction from the City. These meetings will
serve to discuss City review comments and design development. Prepare minutes of meetings and keep
documentation of other communications. For budget purposes, the meetings will be attended by two (2)
staff members of the Consultant.
The following meetings are included with the scope of work-
• Functional Design Phase - One (1) meeting
• Preliminary Design Phase - One (1) meeting
• Pre -Final Design and Check Plan Phase - One (1) meeting
• Final Design Phase - One (1) .meeting
Task 3 - Project Progress Meetings
The Consultant w li maintain communications with the City of lo" City to review progress and discuss
spei�ific elements of the project design and receive direction from the City. The meetings Wil also serve to
establish schedules, develop project goals, establish initial design parameters, promote a dialog between
the various entities, improve the decision-making process and expedite design development. Prepare
minutes of meetings and keep documentation of meeting communications.
The Consultant will schedule the project progress meetings. The meeting will be help virtuallly. For budget
purposes, the Consultant will attend regularly scheduled virtual meetings through the design process that
Will be attended by two (2) or three (3) staff members of the Consultant. Meetings are assumed to be one
(1) hour each, with an estimated occurrence of forty eight (48) progress meetings.
Task 4 - Overhead Electric Relocation Meetings
The Consultant shall schedule and attend relocation specific meetings with MidArnerican Energy to discuss
relocation options (underground and/or overhead). Itis anticipated that there will be two (2) meetings with
representatives of Mid,American Energy. The first will be to advise of the nature and extent of the
improvements, potential conflicts with existing utility systems and relocation considerations, and the second
Wil be to further discuss relocation options including costs.
Task 5- Utility Coordination Meetings
The Consultant will schedule and conduct group meetings with all individual private utilities to address
specific conflicts. All private utility companies located within the project site will be invited. It is anticipated
that there will be three (3) group meetings with representatives of the various utility companies. The first
Will be to advise of the nature and extent of the improvements and any potential conflicts void/ existing utility
systems, and the second/third will be preiiminaryltinal design review and coordination meetings. In addition
to the rgroup meetings„ the Consultant will also conduct individual utility company meetings as necessary
to discuss joint utility trench options, mitigate conflicts and determine design solutions with individual
utilities. For budgeting purposes, an additional four (4) meetings with individual utility companies is
anticipated.
Task +6 - Individual Prop" Owner Meetings
Due to the nature of the project, which includes, but is not limited to, impacts to driveways, retaining walls,
trees, shrubs, and landscaping elements on bath public and private land, it is likely there will be a need to
meet one-on-one with some affected property owners outside of public information meetings. The
Consultant will conduct meetings with individual property owners to address issues of specific ooncern to
adjacent properties. These meetings will be held in koncert with the preliminary design development and
property acquisition phases of the project. an -site meetings, phone, email or a combination of
communication methods will be conducted. This will include specific discussions about access issues,
changes in circulation, potential right-of-way needs and other issues related to specific parcels.
During the scheduled individual property owner meeting times, the Consultant will meet with the affected
property owner to discuss the specifics of the project as it relates to their property, obtain information
regarding any issues the property owner feels is important and get input regarding their expectations about
the project. The information gathered at this time will be used in developing the project documents and
negotiating the required right-of-way, For planning purposes, it is assumed a total of ten (10) meetings with
individual property owners. For reference, it is estimated that sixty eight (68) individual properties may be
impacted by the project.
Task 7 - Public information Meetings
Public Information Meetings (3 meetings): Schedule, advertise and conduct three public information
meetings. These meetings will be held in an open house format, Wth a short presentation on the project
and then time for questions and input. Scope includes two (2) attendees from Consultant for each meeting,
assigning each open house is 1.5 hours in length.
• Meeting ##1 - Preliminaryr Design
• Meeting #2 -- Final DesignlStaging
• Meeting ##3 -- Pre -Construction
The purpose of the meeting 1 will be to provide a brief overview of the improvements to the adjacent
property owners and stakeholders, discuss the plan for improvernents, and gather information on concerns,
specific issues and priorities of the adjacent property Downers and ether affected parties. Meeting 2 will focus
on the presentation of the staging kept and final design elements and provide a general update. Meeting
3 will focus on a general update on schedule and what to expect during construction.
The Consultant will work with the City on reserving of the meeting facility and public notifications.
School Distinct (3 meetings): Consultant will schedule and conduct up to three meetings with the school
district to discuss the project, First meeting will be a general meeting with district officials to discuss project
overview. Second meeting will be hosted at the high school to discuss the final project elements and
construction staging. Third meeting will be hosted at the high school to review the construction start date
and schedule. Scope includes two (2) attendees from Consultant and assumes meeting length of 1.5 hours.
Includes providing all necessary meeting ,materials,
• Meeting ##1 - Project Overview
• Meeting ##2 - Final project elements and construction staging and access
• Meeting ##3 - Schedule and what to expect during construction
Task 8 - indivicdual Color Parcel Exhibits
The Consultant will prepare individual property acquisitions exhibits (8.6 -In by 11 -in) for each parcel which
will consist of aerial imagery and show the roadway design elements, driveway access, site modifications,
existing right-of-way lines, fee title right -c# -way needs and permanent/temporary easement needs, The
exhibits will be labeled with Ivey parcel information and reference individual easement square footage areas.
The exhibits will be used for initial right -orf -way discussions and verification in advance of the preparation
of final acquisition plats.
Task 9 -• Project Newsletters
The Consultant will prepare periodic newsletters for the project, which will be distributed via mail and the
project website to all residents in the project area, City+ High School, local officials, agencies and other
interested parties. The purpose of the newsletters will be to provide a brief overview of the project, including
goals, development steps, schedule and who to contact for additional information. The content of these
newsletters will be reviewed and coordinated with the City. It is anticipated that three (3) newsletters ww►ill be
prepared during the project in conjunction with the Public Information Meetings,
Task 10 - Maintain Project Mailing List
The Consultant will maintain the project mailing list and update it as needed to include all local officials,
agencies and interested parties. The City will provide the initial list of interested parties.
Task 11-- Public Education Tools and Media Kit
The following is a list of visual materials and hands-on tools to leverage as part of the project's public
Involvement plan,
* Public displays (will be developed for Public Information Meetings)
* 3a project rendering of the Court Street corridor.
• Frequently Asked Questions document
* Project website materials and social media plan. The City website will host a dedicated page for
the project. The Consultant will provide materials for posting to the project site and social media to
communicate updates, schedule and improvements.
DESIGN SURVEYS
The Consultant will complete all required surveys for the project, including control surveys, topographic
surveys, utility surveys, property ownership/research, right-of-way surveys and acquisition plat preparation
for permanent fee -tide night -cif -way and temporary construction easements. The Consultant shall also
incorporate field survey date into an electronic base map to be used for the design of the project, indluding
property lines, right-of-way lines and property ownership for parcels located within the project limits.
The Consultant shall perform field and office tasks required to prepare property acquisition plats deemed
necessary to complete the project. Color parcel exhibits and unsigned property acquisition plats will be
submitted for review to the City with the 60% plans. Following City review the Consultant will sign property
acquisition plats after any necessary project updates have been made. The specific supplemental survey
tasks to be performed include the following:
Task 1 — Control Survey
The Consultant will establish horizontal and vertical control for the Project area. Each permanent control
point or benchmark will have horizontal coordinates or elevation, recovery Information and monument
description. Accurate descriptions of the horizontal control points and kranchmarks will be created and
recorded on the plan sheets.
"Cask 2 — Topographic Survey
The Consultant will perform topographic surveys required for the development of the project. Horizontal
and vertical accuracies will be adequate to produce a snap that is compatible with the topographic data for
incorporation into the existing mapping, Consultant Will utilize mobile scanning for purposes of collecting
mainline and side road topographic survey data. The final point cloud will be provided to the City upon
design completion,
Task 3 — Utility Survey
The Consultant will perform utility surveys required for the development of the project. Contact utility owners
of record or the Iowa One Call representative, request that buried utilities be marked in the field and obtain
existing utility map. Establish coordinates .and elevations (if possible) for utilitles that fall within the limits of
the project and are visible or have been marked on the ground "by the utility owner. Show utility name and
describe the utility on the plans.
This task consists of field survey indicating the location of utilities within the existing right-of-way for the
project. The Consultant will field locate utility locations established by others; excavating to expose buried
utilities Is not part of this contract. Utilities to be surveyed, if present, Include but not be limited to phone,
gas, fiber optic, water main, overhead/underground electrical, sanitary sewer and storm sewer (including
power poles, pedestals, valves and manholes). This Includes establishing manhole and Intake elevations
for existing sanitary, storm sewers and roadway culverts.
Task d — Property Ownership and Research
Research City and County records including right -cif -way strip maps, subdivision plats, section corner ties,
and surveys. locate existing boundary comer monuments, and establish property lines, right-of-way Eines,
section lines, and easements. Determine ownership of the properties affected by the project. Prepare a
drawing with property lines, right-of-way lines, section lines and easements within the project area as shown
on the existing plats and other documents of record along with the land corner monuments and boundary
corner monuments located in field. Review property ownership information from public records and add
property owner names to the project mapping for public display and plan preparation purposes.
Task S — Right -of -Way Survey
The Consultant will perfonn right-of-way surveys as required for the development of the project. The right-
of-way surveys Will be in-depth legal surveys for whhich right-of-way and easement exhibits are to be
developed,
This task includes a thorough search of City, County and State records to review all surveys of record
pertaining to the survey corridor, including County Auditor's subdivisions plats, original government
surveys, early surveys made by County Surveyors, all irregular land survey and road establishment records.
Copies of such records are to be included in the project file for future reference.
This task also includes obtaining sufficient field data to locate or establish property lines affected by the
project to enable the preparation of the improvement plans. This includes locating section corners, property
pins, and visible lines of occupation such as fences, field divisions or any other lines, indicating possession.
A diligent effort must be made to receiver existing land corner monuments necessary to describe the right-
of-way along the project corridor.
The task includes incorporation of property lines, right-of-way limes, and ownership of properties affected
by the project into the base mapping for the project. The base mapping will identify the owners and
approximate boundaries of all appropriate parcels within the survey limits.
Task 6 — Project Base Map
incorporate field surveys into an electronic base map to be used for the design of the project. Incorporate
property fines, right-of-way lines, and property ownership for parcels located within the project limits into
the base map. For budgetary purposes, it is assumed that sixty-eight (66) parcels are within the project
limits.
Task 7 — Preparation of Legal Descriptions and Temporary Easement Exhibits
The Consultant will prepare legal descriptions and parcel exhibits for temporary easements to be acquired
for the project. For estimating purposes, the 'following numbers of acquisition plats are assumed for this
agreement.
Permanent (Fre-Title) Right -of -Way Acquisition Plats = 10
Temporary Construction Easement = 68
The following was used to calculate costs per plat included in the agreement and for any additional plats
added at the request of the City. Consultant veil only hili for plats prepared.
Permanent (Fee -Title) Right -of -'Wap Acquisition Plats = $650 per plat
Temporary Construction Easement = $400 per plat
Individual plats and legal descriptions will be prepared for each pard with permanent and temporary
acquisitions. The legal descriptions shall be metes & bounds descriptions for both permanent and
temporary construction acquisitions. The plats and legal descriptions shall comply with requirements of the
Iowa Code and shall be prepared by or under the direct supervision of a duly licensed land surveyor under
the laws of the State of Iowa. The plats shall also be completed in accordance with the City of Iowa City
requirements. For permanent acquisitions, the Consultant will stake the acquisition area at the request of
the City in support of the negotiation process.
Task g — Permanent Monumentation of Right -of -Way
This task consists of monumentation of the right-of-way acquired as part of this project which will be
performed upon completion of construction of the improvements. The monumentation will comply with
requirements of the Iowa Code and will be performed by or under the direct supervision of a duly licensed
land surveyor under the laws of the State of Iowa.
This task also includes resetting existing right-of-way monumentation for those parcels with only a
temporary construction easement,
Task g — Soil Borings, Pavement Cores, and Potholing Locations
The Consultant will survey soil boring/pavement core locations and existing utilities that have been potholed
by others. Potholing activities will be subcontracted by the Consultant,
Task 10 — Public Notice of project
The Consultant will prepare a project notice letter for property owners directly adjacent to the protect. This
letter will provide a brief project description, notification of property surveys, anticipated schedule .and
contact information. The Consultant will distribute the notice letter.
GEOTECHNICAL SERVICES
Task 1— Geotechnical Exploration & Analysis (Terracon)
The Consultant Will retain the services of a sub -contractor to complete geotechnical exploration along the
project corridor. These services wall be in general accordance with the standard specifications for
subsurface investigations and design. This task includes the necessary field and office services to provide
a geotechnical report forthe project. Complete pavement cores and soil borings for pavement design and/or
subsurface treatment design.
• Pavement cares (8) with field data
• Roadway borings (Mainline at 500 -ft intervals alternating EBWB lanes) ^ 8 borings (10' depth)
The purposes of the borings include determination of existing pavement sections, roadway/utility design,
settlement recommendations for now roadway alignment, moisture contents, groundwater levels, and
engineering analysis. The borings will include all City/State required traffic control measures including
coordination, permits and arranging a utility locate through Iowa One Call. The backfilling of the boreholes
Will be performed following the borings and meet City requirements.
This subsurface exploration will Include laboratory testing, engineering analysis, pavement design and a
written report.
The results of the field and laboratory programs will be evaluated by the sub -contractors professional
geotechnical engineer licensed in the State of Iowa. Based on the results of the evaluation, an engineering
report will be prepared and Include the following Information:
• Description of the project.
• Computer generated boring logs with soil stratification based on visual soil classification
• Summarized laboratory data on the boring logs
• Groundwater levels observed during and shortly after completion of grilling
• Boring location diagram
• Subsurface exploration procedures
* Subsurface soil conditions
In addition, geotechnical recommendations for the project will include:
• Earthwork construction
• Expansive sail design considerations, if applicable
• Cut and fill construction
• Excavation and backfill
• Site preparation, including the suitability of the existing tin -site soils for use as structural fill
• Subsurface drainage recommendations
• Subgrade preparation recommendations for grade supported pavements
• Recommendations for Portland Cement Concrete pavement thicknesses
FUNCTIONAL DESIGN (30% PLAN SUBM. I 'TAL)
Complete functional design layout for the improvements. The primary focus will be on development of
roadway geometries, identify existing and futility locations, identify right-of-way needs and develop a general
staging concept to construct the improvements. The work to be performed by the Consultant under the
Functional Design phase shall consist of the following tasks:.
Task I — Develop Design Criteria
The Consultant will develop and submit to the City design criteria to be used in developing the
improvements. Criteria will conform to the City, Iowa DOT, SUfDAS and AASHTC Standards and will be in
English units. The criteria, at a minimum, shall include.
• Functional classification and design type,
• Design speed and regulatory speed.
• Design vehicles for intersection design.
• Widths of parking areas and right-of-way.
Preferred Clear Zone/Acceptable Clear Zone requirements.
• Provisions for pedestrians and/or bicycles.
Street lighting requirements
Utility corridor locations.
Prepare a brief technical memorandum documenting the criteria. The memorandum will be reviewed,
revisers, and approved by the City prior to proceeding with subsequent tasks,
Task 2 — Develop Typical Sections
Develop typical sections for the mainline street improvements. This task includes lane widths, shoulder
width, curb section/type, sidewalk widths, right-of-way widths, pavement types and dear --zones. This task
does not include pavement and subgrade design.
This task afso includes identifying potential storm sewer, water main and other utility locations in the
development of the typical sections. The scope of services for this project does not include design
calculations and capacity analysis for storm sewer or water mains.
Task 3 — Develop Functional Roadway Geometrics
Develop functional geometrics including intersection return radii, sidewalk layout, and driveway locations
for the project. This task also includes preparing turning design vehicle templates at each of the
intersections within the project limits.
Task 4 Develop Horizontal Alignments and Vertical Profiles
Utilizing functional geometrics and design survey, develop horizontal alignments and vertical ;profiles for
the mainline and connecting roadways. The alignments and profiles will be developed used on the
technical memorandum summarizing the design criteria
Task 5 — Functional Drainage Analysis
Inventory existing hydrologic and hydraulic conditions and analyze the impacts the improvements will have
on the area wide drainage patterns. Once the impacts have been quantified, develop storm sewer layout
based on Chapter 2 SUDAS Design Manual. Task hoes not include inverts of profile information.
Task 5 — Sanitary Sewer Technical Memo
The Consultant will collect available data and neaps from City files in order to gain an understanding of the
existing private sanitary sewer system. The sewer malas, previous studies and available: construction plans
provide the basis for an initial understanding of the City's facilities and estimation of theoretical pipe
conveyance capacity, The Consultant's field personnel will also collect any onsite data available,
In addition, discussions with City operations staff can provide Insight Into problem areas and specific field
conditions that may be an indicator of an existing or pending problem situation. This information in
conjunction with other data collection and analysis will be used to jointly develop a sewer system plan with
City staff.
The Consultant will prepare a formal report to summarize the evaluation and recommendations for overall
sanitary sewer Improvements. The report will document the service area evaluation, recommended solution
for future improvements and a high level construction cost for the improvements. The report shall include:
Executive Summary
Purpose and background of study
Scope of study and study area delineation
Service Area Evaluation
Findingstresults of assessments and evaluations
Recommended improvements (projects)
Conceptual diagrams of recommended improvements
Estimated costs of improvements
Appendices containing supporting data and information
Sanitary sewer profiles and pians will not be developed as part of this task. If the City requests detailed
construction plans this work will be added via amendment during the roadway reconstruction design
process.
Task 7 — Water Main and Sanitary Sewer Layout
Develop layout of water main improvements, including services. Water main profile info is not included.
Identify sanitary sewer manhole replacement locations.
Task 8 — Functional Staging Plan Exhibit
Prepare high-level overview of anticipated staging necessary to construct the project. identify the number
of major stages and how traffic, utility service and property access will be maintained during construction,
Document any special consideration that public or private utilities will require during construction. Prepare
memorandum that documents staging constraints, anticipated construction effort and .any special
considerations that will be incorporated into the preliminary and final design. Development of a detailed
traffic control and signage plans are not included in this task.
Task 9 — Functional Plan Preparation
Upon completion of the functional plans, the design plans will be approximately 30 percent complete. The
work to be performed by the Consultant under Functional Design will consist of the following tasks:
Title and Utilky Conflict Sheets A Sheets)
This task consists of assembling the preliminary title and general information sheets. The preliminary title
sheets will include the following: Index of Sheets, Legend, Location Map, Project Number, Design Traffic
data. Includes utility conflict identification tabulations and plan design exhibit sheets,
Functional Typical Dross Sections (S Sheets)
This task consists of assembling the Typical Cross Section to be used for the roadway improvements,
Functional Plan A Profiles (D & E Sheets)
This item consists of the site plan and profile sheets, including the detail information required for plan
approvals, permitting, and construction of the improvements.
Functional Removal Plans (B Sheets)
This Item consists of functional layout of the removal plan for the project.
Functional Crass Sections (W Sheets)
This task consists of the design and drafting associated with the assembly of detailed cross sections (5'
Increments) to illustrate typical conditions, drainage designs, and non -typical Conditions as needed for
guidance during design, review, and quantity estimating purposes.
Task 10 — Budget Review
TheConsultant will prepare a functional opinion of probable construction cost for the project and compare
the cost to the City's current Project budget, The Consultant grill, if necessary, make recommendations
pertaining to modifications in the Project in order to address budgetary concerns. Cost estimates will be
developed as part of the 30% plan submittal and based on representative major project elements and recent
bid information, Detailed quantity takeoffs will not be developed for the functional cost estimate.
Task 11 — Quality Control
Involve ongoing quality control input from the Project Team and the design engineer's senior technical staff
throughout the development of preliminary plans. The design engineer Is responsible for making specific
recommendations and ensuring that critical issues are discussed and resolved prior to submittal of the 30%
plan set.
PRELIMINARY DESIGN (601% PLAN SUBMITTAL)
The Consultant will perform preliminary design services in the preparation of design plans and
specifications depicting the grading, drainage, paving, signing, utility relocation and other features of the
project. Comments received from the Functional Design Phase plains will be implemented in the 'Preliminary
Design Phase plans, The preliminary plisse will include but not be limited to the following tasks:
Task 1— Preliminary water Main and Sanitary Sewer Modification Design
Develop preliminary design modifications for existing water main and sanitary sewer manhole replacements
within the project corridor. Includes water train layout with profiles and sanitary sewer manhole replacement
with existing profiles,
Task 2 — Preliminary Storm Suer Design
Inventory existing hydrologic and hydraulic conditions and analyze the impacts the improvements will have
on the area wide drainage patterns. Once the impacts have been quantified, develop stoma sewer system
layout plan based on Chapter 2 SUDAS Design Manual. Resolve potential conflicts with underground
utilities and other design elements. The existing downstream outlet facilities will also be modeled as part of
the storm sewer design,
Task 3 — Preliminary Traffic Signal Design
Develop permanent preliminary traffic signal designs at the fallowing locations:
a) E Court Street and Muscatine avenue
b) E Court Street and S r'irst Avenue
The preliminary plans will include traffic signal pole layout and major equipment layout. This task also
includes gathering information on the type of equipment to be used for the projec# using available design
standards of the Laity, and the Manual on Uniform Traffic Control Devices (MUTCD),
Task 4 — Utility Research
The Consultant will :meet with the utiiity companies, including City utilities, for information within the project
corridor regarding transmission, distribution and service laterals. This includes information related to
existing facilities and facilities planned for construction during the improvements.
Task 5 — Utility Conflict Identification
The Consultant will identify utility conflicts based: upon the preliminary design layout and develop a
tabulation with plan sheet exhibits for the purpose of working through conflict resolution. This task includes
storm sewer, water main, sanitary sewer and all private utilities including gas, electric and communications.
The Consultant will coordinate the potholing of twenty (20) utility conflicts as part of the project scope of
work. This task will also include the assessment of a joint utility trench for the corridor.
Task B — Construction Staging Pian Development
The Consultant will develop a preliminary traffic control concept to indicate how the project will generally
be constructed and traffic will be maintainedduring construction. The construction staging plan w►tll tale
into consideration all elements of oonstrucbion Including roadway, storm sewer, water man and sanitary
sewer improvements, as well as property access and private utility relocations. The approach to the project
and construction staging will be used on ,using the schedule to have private utility relocations resolved
prior to construction as feasible. With refterntents and acceptance by the City, the concepts developed in
preliminary plans will serve as the basis for preparing the final traffic control plan in final design,
Task 7 — Acquisition Requirements Identification
The Consultant will identify permanent right-of-way and temporary easement needs based on the
preliminary design development. The requirements will take into consideration utilities, coonstruction staging
and access, utility relocations and other critical construction elements. It is anticipated that there will only
be permanent right-of-way acquisitions at the Intersections for sidewalk replacement and temporary
constructioneasement needs.
Task 8 — Preliminary 313 Visualization (Model
Data Collection,, Reality Mesh Data, — Project Corridor
The Consultant will use drone, camera, and video equipment to complete survey -based high quality video
and image gathering along the Court Street between Muscatine Avenue and 16� Avenue. The Consultant
will process the photo andvideo data into a Reality Mash image to be used for 3D modeling. The Consultant
will provide an electronic image mesh to the City,
Rendered images**) Visualization Modeling
The Consultant will create a 3D file using our design files for use in visualization of the Court Street corridor.
This task viii) include adding the following features: pavement markings, roadway signing, underground
utilities, trees, and night poles.
Task 9 — Preliminary Plan Preparation
Upon completion of the preliminary plans, the design plans will be approximately 60 percent complete. The
work to be performed by the Consultant under Preliminary Design will consist of the following tasks:
Title and Utiles Conflict Sheets (A Sheet
This task consists of assembling the preliminary title and general information sheets. The preliminary title
sheets will include the following: Index of Sheets, Legend, Location Map, Project )dumber, Design Traffic
data. Includes utility conflict identification tabulations and plan design exhibit sheets.
Preliminary Typical Cross Sections (B Sheets)
This task consists of assembling the Typical Cross Sections to be used for the improvements as well as a
preliminary determination of the limits that each Typical Section will apply. The Typical Cross Sections will
include but not be limited to typical sections for the grading, drainage and paving Improvements,
Preliminary MainlinelSideroad Plan and Profiles (Q and it Sheets)
This task consists of the development of preliminary plan sheets that will show the existing topography
along with the roadway improvements,, including pedestrian facilities, and access points.
Preliminary Erosion Control (EQ Sheets)
This item consists of preliminary design and layout of erosion control plan sheets required to construct the
proj ec:t.
Preliminary DetourlTemporary Pavement {F Sheets)
This item consists of final design and drafting of the detour and temporary pavement plans.
Preliminary Suryev Refer nce [G Sheets)
This task consists of assembling reference ties to the plan control points and the benchmark data used to
develop the plans and to be preserved throughout construction of the project. This task also includes
preserving any Government Corners that are found in the vicinity of the construction.
Prelirrrinary flight -of W►av (H Sheets)
The preliminary plans will include an ownership reference plan exhibit showing general parcel information.
Preliminary Traffic Control and Staging_(( Sheets)
Develop suitable plan for construction scheduling and staging of the project and for traffic control measures
to be implemented during construction. Staging plan Will include provisions for maintaining access to
adjacent properties during construction. The plan sheets will include construction staging section and plan
exhibits. For estimating purposes, it is assumed that Court Street will maintain a minimum of 1 -lane of traffic
during construction.
Preliminary Geometric, Staking and Jointing(L Sheets)
Develop and refine geometric layouts and provide additional horizontal and vertical surrey information
needed to construct the Intersections.
Preliminary Storm Sewer Plan and Profiles (M Sheets)
Develop preliminary plan and profile sheets for stone sewer layout information.
Preliminary Sanitary Sewer (MSA Sheet
This task consists of the development of preliminary sanitary sewer manhole replacement plan and profile
sheets that will show the existing topography, improvements, existing sewer profile, flow lime and rim
elevations, utility access locations, water main profile, hydrant and valve locations,
Prelimina!y Water Main Design (MWM Sheets)
This task consists of the development of preliminary water main plan and profile sheets that will show the
existing topography,, improvements, and water main profile, hydrant and valve locations.
Preliminary Traffic Signals, Pavement Marking and Traffic Signing Sheets fN Sheets
[develop preliminary traffic signal sheets that includes major equipment layout such as traffic signal poles,
traffic signal cabinet and handholes. This task also consists of design and drafting of the pavement
markings and traffic signing sheets. This task includes development of pavement marking and traffic signing
plans to be placed into service following construction. The traffic signals, traffic control devices, procedures
and layouts will be as per the requirements of the City and Manual on Uniform Traffic Control Devices
(MUTCD).
Preliminary Removal Plans R Sheets)
This item consists of preliminary layout of the project removal plan.
Preliminary Sidewalk Plans (S Sheets)
Develop preliminary curb ramp layout and accessible curia ramp design in accordance with Chapter 12 of
Iowa SUDAS Design Manual. Design ramp geometric configurations alternatives, identify surface
requirement, review general horizontal curb openings, cross slopes, running slope, and identify sidewalk
width and passing space within the corridor,
Prelimina[y cecial Constra.uction Details (U Sheets)
This task consists of preliminary design and drafting associated with special project details such as retaining
wall layouts.
Pr_.._ f 9 ruin@ Cross Sections (es' and X Sheets)
This task consists of the design and drafting associated with the assembly of detailed crass sections (25'
increments) to illustrate typical conditions, drainage designs, and non -typical conditions as needed for
guidance during design, review, and quantity estimating purposes.
Task lit -- Budget Review
The Consultant will prepare a preliminary opinion of probable constructioncost for the project and compare
the cost to the City's current project budget. The Consultant will, if necessary, make recommendations
pertaining to modifications in the project in order to address budgetary concerns. Cost estimates will be
developed as park of the 60% plan submittal and based on representative major project elements and recent
bid information.. Detailed quantity takeoffs will not be developed for the preliminary cost estimate.
Task 11— Quality Control
Involve ongoing quality control input from the project team and the design engineers senior technical staff
throughout the development of preliminary plans. The design engineer is responsible for making specific
recommendations and ensuring that critical issues are discussed and resolved poor to submittal of the 160%
plan set.
Review the preliminary engineering plan set for technical accuracy, as well as for general constructability
and conformance with the project design criteria.
PREwFINAL DESIGN AND CHECK PLANS (90% PLAN UBMiTTAL)
Based upon approved preliminary design, field exams, and public informational meetings, the Consultant
vrill subsequently proceed with final design, contract drawings, specifications and opinion of probable
construction costs for the award of a single Contract for the construction of the improvements,
It is assumed that no geometric revisions to the roadway design will occur after review of the Preliminary
Design (60%) plans is completed and comments incorporated. The work tasks to be performed include the
following:
Task 1 - Incorporate Comments from Preliminary Plan Review
The Consultant will respond to comments resulting from the preliminary plan review. Recommended
modifications will be incorporated into the plan set. The Consultant will revise preliminary construction plans
and .special provisions to Incorporate City comments.
Task 2 -:Final Construetion Plans
The Consultant will provides the City with the following deliverables.
Final Title Sheets (A Sheets
Finalize title shoat. The title sheets will include the following: Index of Sheets, Legend, Location Map,
Project Number and Existing Traffic Data,
Final Typical Sections and Final Details dB Sheets)
This item consists of final design and Grafting of typical cross sections and standard details to be utilized
for the improvements.
Final Quantities and Final Estimate of Miscellaneous Quantities (C Sheets)
This item consists of final bid items to be included in the Project, as well as final quantity tabulations and
the development of the general notes and estimate reference information.
Final MainlinielSideroad Plan and Profiles (D and E Sheetsl
This task consists of the development of final plan sheets that will show the existing topography along with
the roadway improvements, including pedestrian facilities, and access points.
Final Erosion Control Plan (EQ Sheets]
This task consists of the development of erosion control sheets that show a draft pollution prevention plan,
existing topography, location of best management practices and permanent surface restoration types.
Final Detour/Temporary Pavement f F Sheets)
This iters► consists of final design and drafting of the detour and temporary pavement plans,
Reference Ties and Bench Marks (G Sheets)
Finalize the plan control points and the benchmark data used to develop the plans and to be preserved
throughout construction of the project. This task also includes preserving any Government Corners that are
found in the vicinity of the construction and inclusion of horizontal alignment information.
Right-of-W@y Sheets (FM Sheetsji
Finalize Fight -of -Way sheets showing the existing right -cif -way, right -of -away, temporary and permanent
easement information in relation the centedine, control points and property ownership.
Traffic Controt. Staging, Pavement Markings and Traffc Signing (,l Sheets)
This item consists of final design and Grafting of the traffic control, staging and temporary pavement plans.
The traffic control devices, procedures, and layouts will be as per the requirements of the Iowa DOT and
Manual on Uniform Traffic Control Devices {MUTCD).
Fina] Geometric Staking. Jointing. and Edge Profiles iL Sheets)
This item consists of the final design and drafting of jointing details, spot elevations and geometric layouts
for all non -typical pavement areas and intersection improvements,
Final Desian of Storm Drainage Systems (M 5heets3
This item consists of final design and drafting of storm sewers, storm sewer inlets, manholes, open ditches,
culverts and other storm drainage related facilities for the Project.
Final 'Sanitary Sewer (MSA Sheets)
This task consists of the development of final sanitary sewer manhole replacement plan and profile sheets
that will show the existing topography, improvements, existing sewer profile, flow line and rim elevations,
utility access locations, water main profile, hydrant and valve locations.
Final Water Main Design {MWM Sheets1
This task consists of the development of final water main plan and profile sheets that will show the existing
topography, improvements, and water main profile, hydrant and valve locations.
Final Traffic Signals, Pavement Marking and Traffic Signing Sheets (N Sheets)
This task consists of the final design and drafting of permanent traffic signals. included in this task will be
the signal layout dans, wiring diagrams, major equipment, pules, signal heads, quantities, special
provisions, and other elements of the traffic signal installations, as necessary, to accommodate the roadway
design, as well as phasing and timing of traffic signals. This task includes development of pavement
marking and traffic signing plans to be placed into service following construction. The traffic signals,. traffic
control devices, procedures and layouts will lye as per the requirements of the City and Manual on Uniform
Traffic Control Devices (MUTCD).
Final Removal Plans (R Sheets)
This item consists of final layout of the project removal plan.
Accessible Curb Ramp Design (S Sheets]
Develop final curb ramp layout in accordance with Chapter 12 of Iowa SUDAS Design Manual. Finalize
ramp geometric configurations, transitions between sidewalks and driveways, calculate horizontal curb
openings, cross slopes, running slope,. and label sidewalk width ,and passing space within the corridor.
Final Soils Design (T Sheets}
This task consists of final design and drafting of the soils information and earthwork quantities. All soil boring
lags will also be included in theme sheets.
Final Construction Details (U Sheets)
This item consists sof the final design and drafting of the retaining wall layouts and special project details
not covered in other items. Included are such items as special grading details, special storm water
management details not included in the standard drawings. and other required miscellaneous details found
to be required for completion of the project.
Final Design Crass -Sections (W Sheets]
This item consists of the final design and drafting of individual cross sections for the project. Cross sections
will be designed and drawn at 25 -foot maximum intervals, with additional cross -suctions included as
necessary. Cross sections Oil show the existing ground elevations as well as the final project grading.
including fore slope and back slope information, and other pertinent infornmation.
Task 3 - Project Permitting
The Consultant will assist the City in preparing applications for permits from governmental authorities that
have jurisdiction to .approve the design of the projiect and participate in consultations with such authorities,
as necessary. The Consultant will prepare the following documents for the project.
• IDNR Water Supply Section, Construction Permit Application
• IDNR Wastewater Disposal System, Construction Permit Application
• IDNR NPDES Sformwater Discharge Permit
• Notice of Publication
• Pollution Prevention Plan
Any fees for construction permits, licenses or other costs associated with permits and approvals will be the
responsibility of the City. Time Consultant will provide technical criteria, written descriptions and design data
for the City's use in filing the applications for permits. The Consultant will prepare the permit applications
and other documentation.
Task 4 — Special Provisions Development
The Consultant will prepare special provision specifications for the project and submit with 90% Plans,
Task 5.Opinion of Probable Construction Cost
The Consultant will prepare a preliminary Opinion of Probable Construction Cost for the project. An updated
Opinion of Probable Construction Cost will be prepared at the time of completion of the plans and
specifications. The Opinion of Probable Construction Cost is intended for this use of the City in financing
the Project.
Task & - Quality Control
Involve ongoing duality control input from the Project Team and the design engineer's senior technical staff
throughout the development of final plans. Time design engineer is responsible for snaking specific
recommendations and ensuring that critical issues are discussed and resolved prior to submittal of the
check plan set.
FINAL. DESIGN (BID DOCUMENTS)
The Consultant will coordinate and manage the final project development submittals to the City for the
project. The work tasks to be performed or coordinated by the Consultant will include the following
Task 1 - Incorporate city Comments from Pre -Final Plans Submittal
The Consultant will incorporate pre -final plan review comments into the plan set. The Consultant will revise
pre -final construction plans and special provisions to incorporate City comments.
Task 2 - Final Plan Submittal
The Consultant shall submit the final Plans package.
PROJECT BIDDING
The project will be let through the Iowa DOT. The work tasks to be performed or coordinated by the
Consultant will include the following,
Trask 1— Plan Clarification and Addenda
The Consultant will be available to answer questions from contractors prior to the letting and will issue
addenda as appropriate to interpret, clarify or expend the bidding documents.
CONSTRUCTION SERVICES
The City will be responsible for performing construction administration and observation for the prgect.. The
Consultant will be available to attend the pre -construction meeting, perform shop dra+uwing review and be
able to assist with field questions as necessary. For budgetary purposes, it is assumed two (2) members
of the consultant team will attend the pre-oonstruction meeting for the project. It is assumed eight (8) site
visits during construction, attended by one (1) member of the Consultant team.
ADDITIONAL SERVICES:
Additional Services are not included in this Agreement. If authorized under a Supplemental Agreement the
Consultant shall fumish or obtain from others the following services;
• Roadway Lighting Design Services (electrical circuitry design)
* Fiber Interconnection of Traffic Signals
• Traffic Data Collection and Modeling
• Construction Phase Services: Construction Administration, Resident EngineeringlObservation,
Construction Stalking
4-0h Infrastutture & Environmert. LLL
Datf- November 24, 2020
ATTACHMENT 2 - Schedule
Preliminary and Final Roadway Design
Court Street Reconstruction
Iowa City, Iowa
CNA StrI081 Fk(q,0nSlrW'ftr)
Pr&iminafy and Final Design
la" City, IA
Notice to Proceed: December 2020
Project Kick -Off Meeting: December 2020
Field Surveylinvestigations, December 2020
30% Design: January — March 2021
Public Infon-nation Meeting #1: April 2G20
60% Design: March - July 2021
90% Design: July — September 2021
Public Information Meeting #2: September 2021
Right -of -Way Acquisition Process: July 2021 to March 2022
Private Utility Relocation: October 2021 to December 2022
Final Plans (100%): April 2022
Public Information Meeting #3:
Project Letting. December 2022
Construction: 2023-2024
If notice to proceed is given at a later date, Vine of completion shall be extended accordingly.
Attachment 3
FOTH INFRASTRUCTURE AND ENVIRONMENT, L.L,C
STANDARD HOURLY RATE SCHEDULE
Classification
Hourly Rate,
Classification
Hourly (tate
Director
$202,00
Project Scientist 11
$143;00
Projekt Manager IV
$197.00
Projekt Scientist 1
$117.00
Project Manager 111
$188.00
Technology Manager
$164.00
Project Manager II
$178.00
Lead Technician
$14200
Project Manager 1
$169.00
Technician A
$134,00
Lead Project Engineer
5188.00
Technician V
$130.170
Project Engineer IV
$178.00
Technician IV
$119,00
Project Engineer ill
$160.00
Technician III
$108.00
Project Engineer II
$150.00
Technician II
$ 95.00
Project Engineer 1
$142,00
Technician 1
$ 80,00
Staff Engineer IV
$140.00
Construction Manager
$164,00
Staff Engineer 111
$134.00
Land Surveyor IV
$188.00
Staff Engineer If
$125.00
Land Surveyor III
$156.00
Staff Engineer 1
$115.170
Land Surveyor II
$144.00
Planner IV
$188.00
Land Surveyor 1
$132,04
Planner 111
$159.00
Projekt Administrator If
$ 98.00
Planner II
$132..00
Project Administrator 1
$ 78.00
Planner 1
$115.00
Administrative Assistant
$ 60.00
REIMBURSABLE EXPENSES
1. All materials and supplies used in the performance of work on this project will be billed at cost plus 10%.
2. Auto mileage will be reimbursed per the standard mileage reimbursement established by the Internal
Revenue Service. Service vehicle mileage will be reimbursed on the basis of $0.88 per mile,
3. Charges for outside services such as soils and materials testing, fiscal, legal and all other direct
expenses will be invoiced at cost plus 10%,
ADJUSTMENTS TO FEE SCHEDULE
1, Fee schedule effective January 1, 2020. (Rates subject to change annually on January 1.
Item Number: 6.g.
D ecember 1, 2020
Resol u tion ap p roving, au thorizin g an d d irectin g th e Mayor to execu te an d
the City Cl erk to attest an Agreemen t by and b etween th e City of Iowa City
and Snyd er & Associates, In c. to p rovide en g ineerin g con sul tant services for
the Hig h way 6 Trail – F airmead ows Bou l evard to Hein z Road Proj ect.
Prepared B y:J oe Welter, Sr. Civil E ngineer
R eviewed B y:J ason Havel, City E ngineer
Ron Knoche, Public Works Director
Geof f F ruin, City Manager
F iscal I mpact:79,000.00 available in the Hwy 6 Trail – F airmeadows to Heinz P roject,
A ccount Number R 4376
R ecommendations:S taff: A pproval
Commission: N/A
Attachments:Location Map
Resolution
A greement
Executive S ummary:
T his agenda item approves the consultant agreement for the preliminary design, final design,
preparation of plats f or property/easement acquisition, preparation of bidding documents,
permitting, bidding assistance, and construction services f or the multipurpose trail construction as
a part of the Highway 6 – F airmeadows B oulevard to Heinz R oad P roject.
B ackground / Analysis:
T he proposed trail segment has been identif ied as a priority for bicycle and pedestrian
connectivity, is a prioritized in-fill section, and addresses a gap in the City’s side path network due
to the high speeds and volume of vehicular traffic on Highway 6. T he 0.80 miles of ten-foot wide
multi-use trail along Highway 6 from Fairmeadows B oulevard to Heinz Road in I owa City, I owa will
be constructed with a concrete surface, be A mericans with D isabilities Act (A D A) compliant with
curb ramps at its intersections with roadways and f acility entrances, and incorporate signalization
at its intersections with roadways and facility entrances. I ncluded in the project is the installation of
storm sewers, modif ications of the roadside ditches, surface restoration, and other related work.
AT TAC HM E NT S:
D escription
L ocation Map
R esolution
Agreement
6 HEINZ RDLAKESIDE DR
NEVADA AVEMIAMI DRL E H A RV E WESTERN RDUNION RDHOLLYWOOD BLVD
B O R D E A U X INDUSTRIAL PARK RDM A R S E L L I E S ASTER AVECAL IFORNI A AV E
REGAL LNAMBER LNARIZONA AVE
WH ISPERING MEADOW DR WHISPERING PRAIRIE AVELOWER MUSCATINE RD
CHARTRES Highway 6 Trail - Fairmeadows to Heinz
Prepared by: Joe Welter, Public Works, 410 East Washington Street, Iowa City, Iowa 52240; (319) 356-5144
Resolution No. 20-269
Resolution approving, authorizing and directing the Mayor to
execute and the City Clerk to attest an Agreement by and between
the City of Iowa City and Snyder & Associates, Inc. to provide
engineering consultant services for the Highway 6 Trail —
Fairmeadows Boulevard to Heinz Road Project.
Whereas, the proposed trail segment has been identified as a priority for bicycle and pedestrian
connectivity, and;
Whereas, the proposed trail segment is a prioritized in -fill section, and;
Whereas, the proposed trail segment addresses a gap in the City's side path network due to the
high speeds and volume of vehicular traffic on Highway 6, and;
Whereas, the City desires to obtain the services of a qualified consulting firm to provide preliminary
design, final design, preparation of bidding documents, permitting, bidding assistance, and
constructions services for the Highway 6 Trail - Fairmeadows Boulevard to Heinz Road Project,
and;
Whereas, the City issued a Request for Qualifications, On -Call Professional Design and
Engineering Services (2020-2022), May 1, 2020, to private consulting firms interested in providing
design and engineering services related to public improvement projects in the City of Iowa City,
and;
Whereas, submittals were received from consulting firms and evaluated by a selection committee,
and;
Whereas, Consultant was selected based on qualifications, key personnel, project approach, and
fees and rates, and;
Whereas, the City of Iowa City has negotiated a Consultant Agreement for said consulting services
with Snyder & Associates, Inc., to provide said services; and
Whereas, it is in the public interest to enter into said Consultant Agreement with Snyder &
Associates, Inc.; and
Whereas, funds are available in the Hwy 6 Trail - Fairmeadows to Heinz Project, Account Number
R4376,and;
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that:
1. The Consultant Agreement attached hereto is in the public interest, and is approved as to
form and content.
2. The Mayor and City Clerk are hereby authorized and directed to execute the attached
Consultant Agreement.
3. The City Manager is authorized to execute amendments to the Consultant Agreement as
they may become necessary.
Resolution No. zo-269
Page 2
Passed and approved this 1st day of December '2020
Attest:
Ci Clerk
May r
pproved b /
City ttorney's Office
(Sara Greenwood Hektoen —11/24/2020
It was moved by Bergus and seconded by Weiner the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
Consultant Agreement
This Agreement, made and entered into this 1st day of December 2020, by and
between the City of Iowa City, a municipal corporation, hereinafter referred to as the City and
Snyder & Associates, Inc., of Iowa City, Iowa, hereinafter referred to as the Consultant.
Whereas, the City desires to obtain the services of a qualified consulting firm to provide
preliminary design, final design, preparation of bidding documents, permitting, bidding assistance,
and constructions services for the Highway 6 Trail — Fairmeadows Boulevard to Heinz Road
Project, and;
Whereas, the proposed trail segment has been identified as a priority for bicycle and pedestrian
connectivity, and;
Whereas, the proposed trail segment is a prioritized in -fill section, and;
Whereas, the proposed trail segment addresses a gap in the City's side path network due to the
high speeds and volume of vehicular traffic on Highway 6, and;
Whereas, the 0.80 miles of ten -foot wide multiuse trail along Highway 6 from Fairmeadows
Boulevard to Heinz Road in Iowa City, Iowa will be constructed with a concrete surface, be
Americans with Disabilities Act (ADA) compliant with curb ramps at its intersections with
roadways and facility entrances, and incorporate signalization at its intersections with roadways
and facility entrances, and;
Whereas, all services shall be in conformity with the Iowa Department of Transportation
Standards, Design Guides and Specifications; Title 23 U.S. Code of Federal Regulations, Part
625; applicable sections of the U.S. Department of Transportation, Federal Aid Policy Guide
(FAPG); and the design standards of the City. These will serve as a guidance documents for
preparation of plans, specifications, and estimates, and;
Whereas, the City issued a Request for Qualifications, On -Call Professional Design and
Engineering Services (2020-2022), May 1, 2020, to private consulting firms interested in providing
design and engineering services related to public improvement projects in the City of Iowa City,
and;
Whereas, submittals were received from consulting firms and evaluated by a selection committee,
and;
Whereas, Consultant was selected based on qualifications, key personnel, project approach, and
fees and rates, and;
Whereas, the City submitted to the Metropolitan Planning Organization of Johnson County
(MPOJC) an application to receive Federal Transportation alternatives Program (TAP) grant
funding for this Project, and;
Whereas, the MPOJC Urbanized Area Policy Board approved the City's proposal for Federal
Fiscal Year (FFY) 2021 TAP Grant funds in the amount of $438,000, and;
Whereas, funds are available in the Hwy 6 Trail — Fairmeadows to Heinz Project, Account
Number R4376, and;
-2 -
Now Therefore, it is agreed by and between the parties hereto that the City does now contract
with the Consultant to provide services as set forth herein.
Scope of Services
Consultant agrees to perform the following services for the City, and to do so in a timely and
satisfactory manner.
1. Project Administration
1. 1. The Consultant will schedule, coordinate, and conduct a kick-off meeting with City staff
within one week of notice -to -proceed.
1.2. The Consultant will provide overall project management during the duration of this
Agreement. Project management includes coordination with the Project Engineer at
the City, weekly reviews, planning, and adjustment of the scope of work and fees if
needed. The Consultant will check and review project deliverables prior to submission
to the Iowa Department of Transportation (DOT) and City. Monthly status reports and
billing statements will be prepared and submitted to the City's Project Engineer.
1.3. Progress reporting will be provided twice a month.
1.4. The Consultant will monitor and review updates to the Iowa DOT's Instructional
Memorandums (I.M.$), Road Design Manual, Standard Road Plans, Road Design
Details. Updates requiring no additional effort on the part of the Consultant will be
incorporated into the work by the Consultant. If the Consultant is of the opinion
additional effort will be required, the Consultant will so notify the City, in accordance
with Paragraph 8. The Consultant will prepare an amendment for review by the City.
Upon approval by the City, amendments will incorporate additional work and payment
for such work.
1.5. The Consultant will establish review and checking procedures for project deliverables
and designate responsibility for implementation of the review and checking plan.
1.6. The Consultant will assist the City in communicating the design intent to the public.
This assistance will include writing public notices (distributed by the City), one on one
meetings with property owners when necessary and one public meeting.
2. Topographic Survey and Base Mapping
2.1. Preliminary Survey — The Consultant shall perform the preliminary survey for the
project. This survey will include horizontal and vertical control and topographic survey.
Topographic survey will be performed to identify pertinent features within the project
area. Located features may include, but are not limited to, utilities, buildings,
pavement, property pins, storm sewer culverts and intakes, trees, and signs. Side
road and tie-in surveys will be performed where such features intersect the baseline.
Survey shall include hard shots of existing pavements and other visible features.
2.2. The Consultant shall determine the location of existing Right -of -Way (ROW) and
identify property owners adjacent to the project. This task consists of researching
record documents at the City and County, locating existing monumentation along the
corridor. The following lists estimated number of acquisition documents. Provide two
(2) signed copies of each:
2.2.1. Right-of-way (fee title; permanent easement plat; plat signed by a
Professional Licensed Surveyor) — 2
2.2.2. Temporary easement (exhibit, no signature required) — 5
2.3. The Consultant shall provide plats and/or exhibits for each acquisition required. Plats
showing individual right of way acquisitions shall comply with requirement of Iowa
Code Section 354.4.
-3-
2.4. Staking of proposed right of way and/or easements may be provided but are
considered extra work. Utilize Iowa DOT — style symbols when preparing right of way
and property boundary exhibits for use during design and easement acquisitions.
2.5. Computer -Aided Design and Drafting (CADD) Base Mapping — The Consultant shall
prepare a topographic base map within the effective area of the project. It is
anticipated that the design plan scale will vary to accomplish different levels of detail
and will be prepared on 11" x 17" plan sheets.
2.6. All surveying will use the Iowa State Plane South Coordinate System.
2.7. CADD files will be provided in 2018 dwg format files compatible with AutoCAD Civil
3D.
3. Traffic Signal Modifications
3.1. The Consultant will complete pedestrian upgrades to existing traffic signals at the
intersections of Fairmeadows Boulevard, Lakeside Drive, and Heinz Road along
Highway 6 to provide accessible pushbuttons, countdown pedestrian signals, and
Americans with Disabilities Act (ADA) pedestrian ramps per Manual on Uniform Traffic
Control Devices (MUTCD), Iowa DOT, and City Standards.
3.2. The Consultant will prepare an Iowa DOT traffic control device permit application for
signal modifications at these three intersections.
3.3. The City shall provide as -built plans of the existing signal installations.
4. Trail Design and Plans
4.1. Concept Statement — The Consultant shall prepare and submit the Concept Statement
to the Iowa DOT in accordance with the Project Development Guidelines. The City will
aid the Consultant with the development of the document.
4.2. Coordination — The Consultant shall coordinate with the City regarding work potentially
impacting adjacent private properties. The Consultant shall coordinate with local utility
companies and the City to address any utility conflicts as a result of this project.
4.3. Preliminary Design and Plan Preparation — The Consultant shall utilize the base maps
prepared and available information provided by the City to develop preliminary plans.
All plans shall be prepared on 11"x 17" size paper. Trail profiles may be placed on the
same sheet as the corresponding plan view. The preliminary plans shall, at a
minimum, include the following items, if applicable:
4.3.1. Proposed typical cross section(s).
4.3.2. Preliminary plan of trail design.
4.3.3. Preliminary intersection and sidewalk ramp layouts.
4.3.4. Preliminary consideration for stormwater implications.
4.4. Permit Applications — The Consultant shall assist the City in the preparation and
submittal of permit applications for all necessary permits for the project. This includes,
but is not limited to, assessments needed to make sure the project is compliant with
the National Environmental Policy Act (NEPA), which includes verification that the
project is not harmful to the environment in the following areas: noise, air quality,
cultural resources, water quality, wetlands, Floodplain, farmland protection and
hazardous waste sites; Iowa DOT work in right of way; Iowa Department of Natural
Resources (DNR) National Pollutant Discharge Elimination System (NPDES) General
Permit; and City of Iowa City permit requirements. Specific to the NEPA evaluation,
this scope of work anticipates the Iowa DOT will complete a Programmatic Categorical
Exclusion for this site based on the information to be provided in the Concept
Statement; and no further reporting will be required. If the Iowa DOT requires further
reporting (e.g. Phase 1 Environmental Site Assessment, Wetland and Streambank
Delineation, Threatened & Endangered Species Review, Cultural Resources
-4 -
Evaluation, etc.) additional services will be negotiated with the City as detailed in the
Part 8 — Additional Services below.
4.5. Iowa DOT Submission — The Consultant shall submit Preliminary Plans to the Iowa
DOT in accordance with letting procedures. The Consultant will receive comments
from the City and the DOT and incorporate necessary items into the Preliminary Plan
set prior to proceeding to Final Design Plans.
4.6. Check and Final Design and Plan Preparations — The following items shall be
prepared in substantial conformance to the preliminary plans prepared for this project
and shall address the comments of the City and Iowa DOT staff.
4.6.1. Trail Plans and Details — The plans will include proposed improvements,
existing features demolition and/or relocations as needed, pavement base
and surface construction materials, trail profiles, trail cross sections, street
pavement modifications to accommodate the trail and pedestrian crossings,
and details.
4.6.2. Special Provisions — Any special provisions required will be included with the
Iowa DOT submittals.
4.6.3. Erosion Control Plan — The Consultant shall provide a Storm Water Pollution
Prevention Plan in accordance with Iowa NPDES General Permit No. 2. The
Consultant will utilize the Iowa DOT, DNR, and other statewide guidelines in
development of the Storm Water Pollution Prevention Plan. The Consultant
will assist the City in securing the NPDES General Permit for the project.
The Consultant shall prepare all notices, which will be filed and published by
the City.
4.6.4. Iowa DOT Submission — The Consultant shall submit Check Plans and Final
Plans to the Iowa DOT in accordance with letting procedures.
4.6.5. Final Cost Opinion — The Consultant shall prepare a final opinion of probable
construction cost. This will be reviewed against budget considerations to
determine if project adjustments are necessary.
5. Deliverables
5.1. The scope of design services shall be considered to be complete upon completion and
delivery of the following items to the satisfaction of the City:
5.1.1. One set of preliminary plans to the Iowa DOT and the City.
5.1.2. One set of check plans to the Iowa DOT and the City.
5.1.3. Two sets of original final drawings and special provisions, If necessary.
5.1.4. Delivery of final deliverables including the Project Development Certification
(PDC) to the Iowa DOT.
5.1.5. Final Cost Opinion.
5.2. All plan sets shall bell" x 17".
6. Bid Period Assistance
6.1. Soliciting Bids —The bid letting shall be by the Iowa DOT. The Consultant shall assist
the City as required during the bid letting.
6.2. Plan Clarification and Addenda — The Consultant shall assist the City with answering
contractor questions and issuing necessary addenda during the bidding period.
7. Construction Phase Services
7.1. Anticipated construction period services shall include attending construction meetings
and issuing meeting notes, shop drawing review, responding to Requests for
Information (RFIs), issuing Instructions to Contractors (ITCs), preparing punch lists,
-5 -
assisting with closeout and providing as -built record drawings based on contractor
mark-ups.
8. Additional Services
8.1. Work not listed, if required, will be brought to the attention of the City and an additional
fee, if needed, will be provided by the Consultant. The Consultant will prepare an
amendment to this Agreement according to the City's standards and practices. Upon
approval by the Consultant will complete the additional services according to the
schedule agreed upon for the agreed additional fee. Example additional services
include:
8.1.1. Geotechnical Investigation
8.1.2. Additional NEPA Evaluation Services, including:
• Phase 1 Environmental Site Assessment — $3,000
• Threatened and Endangered Species Review— $2,000
• Wetland and Streambank Delineation — $4,000
• Cultural Resources Evaluation — $4,500
8.1.3. Full time construction observation services
8.1.4. Final audit assistance
8.1.5. Structural engineering design associated with the DOT box culvert west of
Lakeside Drive.
II. Time of Completion
The Consultant shall complete the following phases of the Project in accordance with the
schedule shown.
Date of Completion
Task
December 2, 2020
Project Kickoff and Planning
December 11, 2020
Concept Statement to DOT
December 29, 2020
Preliminary Plans to Cit
January 6, 2021
City Preliminary Plans Comments to Consultant
January 12, 2021
Preliminary Plans to DOT
January 22, 2021
Acquisition Plats to City
February 24, 2021
Check Plans to City
March 2, 2021
City Check Plans Comments to Consultant
March 9, 2021
Check Plans to DOT
April 20, 2021
Final Plans and PDC to DOT
April 28, 2021
Final Contract to City
April 30, 2021
City Final Contract Comments to Consultant
May 3, 2021
Final Contract to DOT
May 4, 2021
Set Public Hearing
May 25, 2021
Public Hearing and Accept Project Manual at City Council
Meeting
July 20, 2021
DOT Letting Date
August 10, 2021
Start of Construction
November 12, 2021
Substantial Completion
L-21
III. Compensation for Services
The total hourly, not -to -exceed fee for all services and expenses under this Agreement is $,000.
Compensation shall be based on the rates and fees shown on Attachment A. The associated
task estimates are included below. The individual task fee amounts may be more or less than that
listed but the total fee will not be exceeded except by supplemental agreement.
Milestone / Task Completion
Fee
Task 1 — Project Administration
$5,500
Task 2 — Topographic Survey & Base Mapping
$12,500
Task 3 — Signal Modifications
$9,000
Task 4 & 5 — Trail Design & Deliverables
$42,000
Task 6 — Bid Period Assistance
$2,000
Design Subtotal
$71,000
Task 7 - Construction Phase
$14,000
Total Not -to -Exceed Fee
$85,000
IV. General Terms
A. The Consultant shall not commit any of the following employment practices and
agrees to prohibit the following practices in any subcontracts.
To discharge or refuse to hire any individual because of their race, color,
religion, sex, national origin, disability, age, marital status, gender identity,
or sexual orientation.
To discriminate against any individual in terms, conditions, or privileges of
employment because of their race, color, religion, sex, national origin,
disability, age, marital status, gender identity, or sexual orientation.
B. Should the City terminate this Agreement, the Consultant shall be paid for all work
and services performed up to the time of termination. However, such sums shall
not be greater than the "not -to -exceed" amount listed in Section III. The City may
terminate this Agreement upon seven (7) calendar days' written notice to the
Consultant.
C. This Agreement shall be binding upon the successors and assigns of the parties
hereto, provided that no assignment shall be without the written consent of all
Parties to said Agreement.
D. It is understood and agreed that the retention of the Consultant by the City for the
purpose of the Project shall be as an independent contractor and shall be
exclusive, but the Consultant shall have the right to employ such assistance as
may be required for the performance of the Project.
7-
E. It is agreed by the City that all records and files pertaining to information needed by
the Consultant for the project shall be available by said City upon reasonable
request to the Consultant. The City agrees to furnish all reasonable assistance in
the use of these records and files.
It is further agreed that no Party to this Agreement shall perform contrary to any
state, federal, or local law or any of the ordinances of the City of Iowa City, Iowa.
G. At the request of the City, the Consultant shall attend meetings of the City Council
relative to the work set forth in this Agreement. Any requests made by the City
shall be given with reasonable notice to the Consultant to assure attendance.
H. The Consultant agrees to furnish, upon termination of this Agreement and upon
demand by the City, copies of all basic notes and sketches, charts, computations,
and any other data prepared or obtained by the Consultant pursuant to this
Agreement without cost, and without restrictions or limitation as to the use relative
to specific projects covered under this Agreement. In such event, the Consultant
shall not be liable for the City's use of such documents on other projects.
I. The Consultant agrees to furnish all reports, specifications, and drawings with the
seal of a licensed professional as required by Iowa law.
J. The City agrees to tender the Consultant all fees in a timely manner, excepting,
however, that failure of the Consultant to satisfactorily perform in accordance with
this Agreement shall constitute grounds for the City to withhold payment of the
amount sufficient to property complete the Project in accordance with this
Agreement.
K. Should any section of this Agreement be found invalid, it is agreed that the
remaining portion shall be deemed severable from the invalid portion and continue
in full force and effect.
L. Original contract drawings shall become the property of the City. The Consultant
shall be allowed to keep reproducible copies for the Consultant's own filing use.
M. Fees paid for securing approval of authorities having jurisdiction over the Project
will be paid by the City.
N. Upon signing this Agreement, Consultant acknowledges that Section 362.5 of the
Iowa Code prohibits a City officer or employee from having an interest in a contract
with the City, and certifies that no employee or officer of the City, which includes
members of the City Council and City boards and commissions, has an interest,
either direct or indirect, in this Agreement, that does not fall within the exceptions to
said statutory provision enumerated in Section 362.5.
O. Indemnification
To the full extent permitted by law, Consultant agrees to defend,
indemnify, and hold harmless the City against any and all claims, demands,
suits, loss, expenses, including attorney's fees, and for any damages which
may be asserted, claimed or recovered against or from the City by reason
of personal injury, including bodily injury or death, and property damages,
including loss of use thereof, caused by Consultant's negligent acts, errors
or omissions in performing the work and/or services provided by Consultant
to the City pursuant to the provisions of this Agreement.
2. Consultant assumes full responsibility for any and all damage or injuries
which may result to any person or property by reason of Consultant's
negligent acts, errors or omissions in connection with the work and/or
services provided by Consultant to the City pursuant to this Agreement,
and agrees to pay the City for all damages caused to the City's premises
resulting from the negligent acts, errors or omissions of Consultant.
3. The Consultant's obligation to indemnify the City shall not include the
obligation to indemnify, hold harmless, or defend the City against lability,
claims, damages, losses, or expenses, including attorney fees, to the
extent caused by or resulting from the negligent act, error, or omission of
the City.
4. For purposes of this paragraph, the term "Consultant" means and includes
the Consultant, its officers, agents, employees, sub -consultants, and others
for whom Consultant is legally liable, and the term "City" means and
includes the City of Iowa City, Iowa its Mayor, City Council members,
employees, and volunteers.
P. Insurance
The Consultant agrees at all times material to this Agreement to have and
maintain professional liability insurance covering the Consultant's liability
for the Consultant's negligent acts, errors and omissions in the sum of
$1,000,000 Per Claim, $1,000,000 Annual Aggregate, or a $1,000,000
Combined Single Limit. To the fullest extent permitted by applicable state
law, a Waiver of Subrogation Clause (endorsement) shall be added.
2. Consultant agrees to provide the City a certificate of insurance evidencing
that all coverages, limits and endorsements required herein are maintained
and in full force and effect, and certificates of Insurance shall provide a
minimum thirty (30) day endeavor to notify, when available by Consultant's
insurer. If the Consultant receives a non -renewal or cancellation notice
from an insurance carrier affording coverage required herein, or receives
notice that coverage no longer complies with the insurance requirements
herein, Consultant agrees to notify the City within five (5) business days
with a copy of the non -renewal or cancellation notice.
Q. Standard of Care
The Consultant shall perform services for, and furnish deliverables to, the
City pertaining to the Project as set forth in this Agreement. The
Consultant shall possess a degree of learning, care and skill ordinarily
possessed by reputable professionals, practicing in this area under similar
circumstances. The Consultant shall use reasonable diligence and
professional judgment in the exercise of skill and application of learning.
2. Consultant represents that the Services and all its components shall be
free of defects caused by negligence; shall be performed in a manner
consistent with the standard of care of other professional service providers
in a similar Industry and application; shall conform to the requirements of
i=
this Agreement; and shall be sufficient and suitable for the purposes
expressed in this Agreement.
3. All provisions of this Agreement shall be reconciled in accordance with the
generally accepted standards of the Engineering Profession.
4. Consultant's obligations under this Section shall exist without regard to, and
shall not be construed to be waived by, the availability or unavailability of
any insurance, either of City or Consultant.
R. There are no other considerations or monies contingent upon or resulting from the
execution of this Agreement, it is the entire Agreement, and no other monies or
considerations have been solicited.
S. This Agreement shall be interpreted and enforced in accordance with the laws of
the State of Iowa. Any legal proceeding instituted with respect to this Agreement
shall be brought in a court of competent jurisdiction in Johnson County, Iowa. The
parties hereto hereby submit to personal jurisdiction therein and irrevocably waive
any objection as to venue therein, including any argument that such proceeding
has been brought in an inconvenient forum.
For theC12�--
�_ For the onsultant
By: By: _
TRIS Mayor Rle: Business Unit Leader
Date: 12/1/2020 Date:
Attest:
t=,
City Attorneys Office — 4�— k t +'l {�
/\ / %/U Vei-n /2P.r —)4-
Date
ATTACHMENT A
SNYDER & ASSOCIATES, INC.
2020-21
STANDARD FEE SCHEDULE
Billing Classification/Level Billing Rate
Professional
Engineer, Landscape Architect, Land Surveyor, GIS, Environmental Scientist
Project Manager, Planner, Right -of- WaAgent, Graphic Desi ner
Principal 11
$214.00
/hour
Principal 1
$203.00
/hour
Senior
$182.00
/hour
VIII
$169.00
/hour
VII
$160.00
/hour
VI
$152.00
/hour
V
$142.00
/hour
IV
$132.00
/hour
111
$120.00
/hour
11
$109.00
1 /hour
I I
CADD, Survey, Construction Observation
$96.00
/hour
Lead
$129.00
/hour
Senior
$123.00
/hour
VIII
$115.00
/hour
VII
$106.00
/hour
VI
$95.00
/hour
V
$85.00
/hour
IV
$78.00
/hour
111
$66.00
our
f1
$58.00
/hour
I
Administrative
II
$50.00
$66.00
hour
/hour
I $54.00 /hour
Reimbursables
Milea a current IRS standard rate
Outside Services
As Invoiced
Item Number: 6.h.
D ecember 1, 2020
Resol u tion ap p roving, au thorizin g an d d irectin g th e Mayor to execu te an d
the City Cl erk to attest an Agreemen t by and b etween th e City of Iowa City
and Shive-Hattery, In c., of Iowa City, Iowa, to provid e en g ineerin g an d
architectu ral services for the Mercer P ark Pool Dehu mid ification an d
Tu ckp oin tin g Proj ect.
Prepared B y:B en Clark, S r. Civil E ngineer
R eviewed B y:K umi Morris, Facilities Manager
J uli S eydell J ohnson, P arks and R ecreation Director
J ason Havel, City E ngineer
Ron Knoche, Public Works Director
Geof f F ruin, City Manager
F iscal I mpact:$111,750 available in the Mercer Park Pool Dehumidif ication/Tuckpointing
account #R4369
R ecommendations:S taff: A pproval
Commission: N/A
Attachments:Resolution
Agreement
Executive S ummary:
T his agenda item authorizes an agreement to provide consultant services f or the Mercer P ark
Pool Dehumidif ication and Tuckpointing P roject.
B ackground / Analysis:
T he 2012 City Space Needs S tudy and Master plan, identified the HVA C , mechanical and
electrical systems as deficient, energy inefficient and requiring code updates throughout the
facility. I n 2019 the original boilers were replaced with high ef f icient units and building automation
controls were added to monitor and reduce energy use on the heating load for Mercer Aquatic
C enter and S canlon Gym. I n spring of 2020, the Natatorium HI D (metal halide) lighting fixtures
were replaced with a new L E D lighting system, f rom a lif e cycle cost, a 40% to 50% reduction in
energy savings and reduction in lamp replacement costs.
T he HVA C dehumidification project is the next step to address the infrastructure’s aging HVA C
system and to improve the building’s air quality and to meet the current building code. T he current
code requires more fresh outdoor air supply, even air distribution, dehumidification and proper
exhaust for a healthy environment f or the building and the pool patrons. Another benefit of
meeting the current code, will result in a reduction of use of pool chemicals.
L astly, as a result of the increase in air quality, there will be increased evaporation of pool water, to
of f set any increase of water consumption, a condensate recovery system will be implemented. I t
is estimated that the condensate recovery system, can of fset up to one million gallons of water
annually at Mercer Pool.
T he majority of the HVA C equipment has been operating continuously since 1988 and many
components and system are at the end of their usef ul life. T he original system did not have
dehumidification; from the 2012 f acilities report, this is causing structural issues from the interior
moisture, with rusted lintels and door/window frames and tuckpointing issues in the
masonry. T his project would help resolve the humidity issues in the facility and the related
masonry and lintel repairs.
T his project will allow f or Heating Ventilation and A ir Conditioning (HVA C) and dehumidification
upgrades to the Mercer A quatic C enter and S canlon Gymnasium. T his project will also address
large areas of necessary tuck pointing and masonry repair and repairs on the interior columns
neighboring the natatorium. The work will also address the moisture issues f rom the K alwall
skylight system and rusted lintels around the doors, windows and above the columns in the
courtyard.
AT TAC HM E NT S:
D escription
R esolution
Agreement
Prepared by: Ben Clark, Public Works, 410 E. Washington St., Iowa City, IA 52240; (319) 356-5436
Resolution No. 20-270
Resolution approving, authorizing and directing the Mayor to
execute and the City Clerk to attest an Agreement by and between
the City of Iowa City and Shive-Hattery, Inc., of Iowa City, Iowa,
to provide engineering and architectural services for the Mercer
Park Pool Dehumidification and Tuckpointing Project.
Whereas, the City desires the services of a qualified firm to provide engineering and architectural
services for the Mercer Park Pool Dehumidification and Tuckpointing Project, hereinafter referred
to as the Project; and
Whereas, the Project involves improving the environmental conditions in the Mercer Aquatic Center
natatorium and involves resolving moisture related issues with the lobby skylights and also at
exterior masonry; and
Whereas, the City issued a Request for Qualifications (RFQ) for On -Call Professional and Design
Services for calander years 2020 through 2022; and
Whereas, submittals were received from consulting firms and evaluated by a selection committee;
and
Whereas, Consultant was selected based on qualifications and project specific criteria such as
project approach, regulatory process experience, key personnel, schedule and price; and
Whereas, funds are available in the Mercer Park Pool — Dehumidification/Tuckpointing fund
#R4369.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that:
The Consultant Agreement attached hereto is in the public interest, and is approved as to
form and content.
2. The Mayor and City Clerk are hereby authorized and directed to execute the attached
Consultant Agreement.
3. The City Manager is authorized to execute amendments to the Consultant Agreement as
they may become necessary.
Passed and approved this 1st day of December _'2020
May
pproved by
/
Attest: 5�4� k
CiClerk City Attorney's Office
(Sara Greenwood Hektoen — 11 /25/2020)
Resolution No. 20-270
Page 2
It was moved by Bergus and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
Weiner the Resolution be
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
Consultant Agreement
This Agreement, made and entered into this 1st day of December
2020 , by and between the City of Iowa City, a municipal corporation, hereinafter
referred to as the City and Shive-Hattery, Inc., of Iowa City, Iowa, hereinafter referred to as the
Consultant.
Whereas, the City desires the services of a qualified firm to provide Engineering and Architectural
Services for the Mercer Park Pool Dehumidification and Tuckpointing Project, hereinafter referred
to as the Project; and
Whereas, the Project involves improving the environmental conditions in the Mercer Aquatic
Center natatorium and involves resolving moisture related issues with the lobby skylights and also
at exterior masonry; and
Whereas the City issued a Request for Qualifications (RFQL) for On -Call Professional and Design
Services for calendar years 2020 through 2022; and
Whereas, Submittals were received from consulting firms and evaluated by a selection committee;
and
Whereas, Consultant was selected based on qualifications and project specific criteria such as
project approach, regulatory process experience, key personnel, schedule and price; and
Whereas, funds are available in the Mercer Park Pool — Dehumid ification/Tuckpointing fund
#R4369.
Now Therefore, it is agreed by and between the parties hereto that the City does now contract
with the Consultant to provide services as set forth herein.
I. Project Description
The scope of work consists of two separate and distinct projects at the Mercer Aquatic Center,
as follows:
A. Pool Dehumidification System Project:
1. Provide a new temporary exhaust fan to provide temporary ventilation for
the natatorium, required due the recent failure of the existing air handling
equipment serving that space. This fan will be reused for the new HVAC
system provided under the Pool Dehumidification System project. This
project will be completed first, to replace the failed exhaust system.
2. Remove the existing air handling equipment, main ductwork, and other
related components that serve the natatorium. Install a new
dehumidification unit located on grade just to the west of the natatorium.
Provide related components, including controls, piping, ductwork, and
electrical. Extend ductwork as necessary to improve air distribution in the
south portion of the natatorium. The space above the drop ceiling will
continue to be utilized as a supply air plenum.
3. Under alternate bids, the following shall be provided:
Page 1 of 15
a. Provide exterior duct product in lieu of field applied
weatherproofing.
b. Install a screen wall at the on -grade dehumidification unit.
Replace the air handler that serves spaces along the south edge
of the natatorium, including the hot tub area; base bid leaves the
existing air handler in place.
B. Masonry and Skylight Repairs Project:
1. Implement masonry repairs including removing and replacing sealant
control joints, tuckpointing cracked mortar joints, replacing or repairing
damaged brick, and modifying cavity wall drainage to provide wicking and
venting improvement.
2. Lobby area skylight repairs include replacing gaskets and seals, removing
and re -installing flashings and sealants at skylight perimeter, repairs as
needed to damaged interior finishes, and repairs as needed to flashing of
skylight curbs and adjacent walls.
3. Under a bid alternate, in addition to the above described repairs, the
lobby area skylight panels and any associated damaged framing systems
will be replaced.
II. Scope of Services
Consultant agrees to perform the following services for the City, and to do so in a timely and
satisfactory manner.
A. Basic Services
Attend Project meetings, communicate, provide agenda, record and
distribute meeting minutes to the members of the Project team, and report
progress to the City for the duration of the Project
2. Contact governmental authorities, including other City departments,
required to approve the Construction Documents and entities providing
utility services to the Project. Consultant shall respond to applicable
design requirements imposed by those authorities and entities.
3. Assist the City in connection with the City's responsibility for filing
documents and permits required for the approval of governmental
authorities, including other City departments, having jurisdiction over the
Project.
4. Inform the City of the presence of any suspect hazardous material, such
as, but not limited to, mercury, asbestos and lead. Consultant shall
advise the City on appropriate and/or required testing and mitigation.
B. Preliminary Evaluation
Page 2 of 15
Prepare a preliminary evaluation of the schedule, budget, Project site,
availability and accuracy of record documents, the proposed procurement
and delivery method, and other Project specific information, such as
plans, facility studies and reports, each in terms of the other, to ascertain
the requirements of the Project. Consultant shall notify the City of:
a. Any inconsistencies discovered in the information.
b. Other information or consulting services that may be reasonably
needed for the Project.
2. Present the preliminary evaluation to the City and discuss with the City
alternative approaches to design and construction of the Project.
Consultant shall reach an understanding with the City regarding the
requirements of the Project.
C. Schematic Design Phase
1. Based on the requirements of the Project agreed upon with the City,
Consultant shall prepare and present, for the City's approval, a
preliminary design illustrating the scale and relationship of the Project
components.
2. Based on the City's approval of the preliminary design, Consultant shall
prepare Schematic Design Documents for the City's approval. The
Schematic Design Documents shall consist of drawings and other
documents including a site plan, if appropriate, and preliminary building
plans, sections and elevations; and may include some combination of
study models, perspective sketches, or digital representations.
Preliminary selections of major building systems and construction
materials shall be noted on the drawings or described in writing.
3. Consultant shall consider sustainable design alternatives, such as
material choices and building orientation, together with other
considerations based on program and aesthetics, in developing a design
that is consistent with the City's program, schedule and budget for the
cost of the work.
4. An initiative of the City of Iowa City's strategic plan is to promote energy
and environmental sustainability. The project should include a carbon
emissions reduction effort, with specific options that will allow the facility
and the City to achieve 45% or greater reduction in carbon emissions as
well as a review of choice of systems in terms of life cycle costs. The City
may obtain more advanced sustainable design services as an Additional
Service.
5. Consultant shall consider the value of alternative materials, building
systems and equipment, together with other considerations based on
program and aesthetics, in developing a design for the Project that is
consistent with the City's program, schedule, and budget for the cost of
the work.
6. Submit to the City an estimate of the cost of the work.
Page 3 of 15
Submit the Schematic Design Documents to the City, and request the
City's approval.
D. Design Development Phase
1. Based on the City's approval of the Schematic Design Documents, and
on the City's authorization of any adjustments in the Project requirements
and the budget for the cost of the work, the Consultant shall prepare
Design Development Documents for the City's approval.
2. The Design Development Documents shall illustrate and describe the
development of the approved Schematic Design Documents and shall
consist of drawings and other documents including plans, sections,
elevations, typical construction details, and diagrammatic layouts of
building systems to fix and describe the size and character of the Project
as to civil, architectural, structural, mechanical and electrical systems,
and other appropriate elements.
3. The Design Development Documents shall also include outline
specifications that identify major materials and systems and establish, in
general, their quality levels.
4. Consultant shall update the estimate of the cost of the work. The
estimated cost of work will be the programmed into the project budget as
the Consultant's Estimate, and will be published in the council packet and
released to the public. The Consultant shall advise the owner of any
adjustments prior to starting construction documents.
5. Submit the Design Development Documents to the City, advise the City of
any adjustments to the estimate of the cost of the work, and request the
City's approval.
E. Construction Documents Phase
Based on the City's approval of the Design Development Documents, and
on the City's authorization of any adjustments in the Project requirements
and the budget for the cost of the work, Consultant shall prepare
Construction Documents and fine tune the estimated construction cost for
the City's approval.
2. The Construction Documents shall illustrate and describe the further
development of the approved Design Development Documents and shall
consist of Drawings and Specifications setting forth in detail the quality
levels and performance criteria of materials and systems and other
requirements for the construction of the Work.
3. Consultant shall incorporate the design requirements of governmental
authorities having jurisdiction over the Project into the Construction
Documents.
Bidding and Negotiation Phase
Facilitate the distribution of bidding documents to prospective bidders.
Page 4 of 15
2. Organize and conduct a pre-bid conference; prepare agenda; record and
distribute meeting minutes for prospective bidders.
3. Prepare responses to questions from prospective bidders and provide
clarifications and interpretations of the bidding documents to the
prospective bidders in the form of addenda.
4. If the bidding documents permit substitutions, upon the City's
authorization, Consultant shall consider requests for substitutions and
prepare and distribute addenda identifying approved substitutions to all
prospective bidders.
5. Assist with the opening of the bids, and subsequently documenting and
distributing the bidding results, as directed by the City.
6. Review bids and make a recommendation to award the contract in a
formal document letter.
G. Construction Phase
Organize, create an agenda and conduct a preconstruction conference,
prepare and distribute meeting minutes.
Attend regular progress meetings, prepare and distribute meeting
minutes, an average of one site meeting every other week of construction
for the duration of the project.
3. The Consultant shall visit the site a minimum of every 10 days or at
intervals appropriate to the stage of the Contractor's operations in order
to:
a. Become generally familiar with and to keep the City informed
about the progress and quality of the portion of the Work
completed.
b. Endeavor to guard the City against defects and deficiencies in the
Work.
C. Determine in general if the Work is being performed in a manner
indicating that the Work, when fully completed will be in
accordance with the Contract Documents.
d. Prepare and distribute field notes with photographic
documentation throughout the project.
4. Keep the City reasonably informed about the progress and quality of the
portion of the Work completed, and promptly report to the City:
Known deviations from the Contract Documents.
b. Known deviations form the most recent construction schedule
submitted by the Contractor.
C. Defects and deficiencies observed in the Work.
5. Review and maintain record of Contractor's Shop Drawings, Product Data
and Samples to check for conformity with the Contract Documents.
Page 5 of 15
6. Review and respond to requests for information about the Contract
Documents.
7. Prepare Construction Change Directives and Change Orders for the
City's approval and execution as required.
8. Review Contractor Pay Applications and certify, that to the best of the
Consultant's knowledge, the Contractor is entitled to payment in the
amount certified.
9. Conduct post construction reviews of the work per
architectural/engineering discipline and issue punch list of items to be
completed.
10. Conduct final reviews of the work per architectural/engineering discipline
after the contractor has notified Consultant they have completed the
punch list.
11. Consultant shall review the Operation and Maintenance manuals from the
contractor, and ensure that the documents and warranties are accurate
and complete.
12. Upon completion of construction, Consultant shall issue prepare final
closeout documents and assist in obtaining executed documents to
conclude the work. The close out documents should be an electronic set
of full records including:
a. Approved substitutions
b. Final product submittals.
C. Field note documentation
d. Meeting minutes.
e. Record Drawings.
f. Operation and Maintenance Manuals.
13. When the Project is completed, the Consultant shall prepare and provide
a full set of as -constructed Record Drawings, based on changes to the
Contract Documents and Contractor mark-ups, in electronic format as
follows:
a. One complete set of as -constructed Record Drawings shall be
provided in portable document format (pdf).
b. CAD files shall be in the most recent version of Autodesk
AutoCAD and shall include the following:
C. If the files(s) have been translated from another CAD application it
should be noted as such.
d. Each plan sheet should be complete and ready to print.
Plot Style file shall be included.
Page 6 of 15
If applicable, include all file types used in the plan set; these may
include, but not be limited to, linked attachments such as images,
spreadsheets, and external reference drawings. Do not include
any project data files or other documents not contained within the
plan set. If necessary, include a "Readme" document or any
clarification that may be required.
All drawing files that have externally referenced drawings shall be
inserted or bound into the drawing file.
h. All submittals shall include an explanation of the Consultant's CAD
layer scheme.
i. All drawing files shall have the correct layer scheme in place.
H. Commissioning Services
Construction Document Phase
Develop Cx Plan: Project specific document for mechanical
systems commissioning. These are living documents and will be
updated as the project progresses. The plans shall include the
following:
1) Outline the organizations, schedule, and allocation of
resources, responsibilities, and documentation
requirements of the commissioning process.
2) A listing of the specific equipment or systems to be tested.
3) Functions/sequences to be tested (i.e. calibration,
economizer controls).
4) Conditions that the tests will be performed (i.e. winter or
summer design conditions, minimum OA or economizer
control).
b. Technical Reviews: Independent review of mechanical drawings
and specifications with specific attention given to the
constructability and performance of the mechanical control
sequences.
C. Develop Cx Specifications: Project specific Cx specifications
which will identify the scope of the mechanical systems to be
tested and list key responsibilities of the Cx authority, Contractor,
and Design Team.
2. Construction Phase:
a. Organize and lead the Cx team and schedule and lead all of the
Cx meetings.
b. Submittal Review: Shop Drawings and Product Data related to the
building enclosure and building systems will be reviewed to verify
compliance with the Owner's Requirements and Construction
Documents.
Page 7 of 15
C. Construction Observations: On site visits throughout construction
will be made to observe initial installations and in -progress
installations. Frequency will vary, based on activity on the site. Cx
authority will regularly attend job -site meetings and maintain
communication with Contractor.
d. Installation Checklists: Installation checklist are generated by the
Cx authority for each piece of equipment and are sent to and
completed by the Contractors (mechanical, electrical, controls)
and confirmed to be complete prior to the start of functional
testing.
e. Start-ups: Equipment and system start-ups will be witnessed by
the Cx authority, on an as -needed basis.
f. Testing and Balancing: Testing, adjusting, and balancing work that
has been performed by the Contractor will be monitored/reviewed.
g. Functional Performance Testing: Functional testing shall use a
process of random selection of similar devices (where there are 5
or less of similar devices, all devices will be tested) and if all pass
then this will be considered a successful functional test for those
devices.
Issues Log: A Commissioning and Testing Issues Log will be
maintained to track any issues as well as resolutions throughout
the project.
Cx Report: A close-out report will be provided by Shive-Hattery at
project turnover, summarizing all components and systems that
were commissioned.
Off Season Testing: Systems that cannot be tested during the Cx
phase due to outside conditions (i.e. cooling mode review during
winter) will be tested at a later time when conditions allow.
Services Not Included: The following are additional services are not included in
this proposal but can be added if requested:
1. Predesign Phase: Programming, site evaluation, Project feasibility study,
detailed existing facility evaluation, master planning, site planning,
multiple preliminary designs, life cycle cost analysis.
2. Design Phase: Geotechnical investigation, landscape architecture, interior
design, detailed cost estimating, telecommunications/data, advanced
sustainable design services.
Ill. Time of Completion
The Consultant shall complete the following phases of the Project in accordance with the
schedule shown.
A. Pool Dehumidification System Project:
Preliminary Evaluation...............................................................................October 2020
Page 8 of 15
Schematic Design......................................................................................October 2020
Design Development............................................................................. November 2020
Construction Documents.......................................................................December 2020
Bidding and Negotiation...........................................................................January 2021
Construction Phase.............................................................................September 2021
Commissioning............................................................................................... Concurrent
B. Masonry and Skylight Repairs Project:
Preliminary Evaluation...............................................................................October 2020
SchematicDesign......................................................................................October 2020
Design Development............................................................................. November 2020
Construction Documents.......................................................................December 2020
Bidding and Negotiation...........................................................................January 2021
Construction Phase..........................................................................................June 2021
IV. Compensation for Services
Consultant shall be compensated for performing the Scope of Services on an hourly basis in
accordance with the Standard Hourly Fee Schedule, attached hereto and incorporated herein by
this reference, not to exceed One Hundred Eleven Seven Hundred Fifty Dollars ($11,750) as
outlined below:
A. Pool Dehumidification System Project:
PreliminaryEvaluation...................................................................................................$0
SchematicDesign................................................................................................$10,000
DesignDevelopment...........................................................................................$25,000
ConstructionDocuments.....................................................................................$25,050
Bidding and Negotiation.......................................................................................$1,000
ConstructionPhase..............................................................................................$17,000
Commissioning Construction Document Phase................................................$3,000
Phase..................................................................
Subtotal......................................................................................................
B. Masonry and Skylight Repairs Project:
PreliminaryEvaluation...................................................................................................$0
SchematicDesign.................................................................................................. $4,500
DesignDevelopment.............................................................................................$8,000
Construction Documents.......................................................................................$7,000
Biddingand Negotiation.......................................................................................... $500
ConstructionPhase................................................................................................$6,000
G.i�MMI s9r, nnn
C. Reimbursables
Pool Dehumidification System Project.................................................................. $500
Masonry and Skylight Repairs Project................................................................... $200
Subtotal....................................................................................................................... $700
Total Not -to -Exceed Amount for Services .................................................$111,750
Page 9 of 15
V. General Terms
A The Consultant shall not commit any of the following employment practices and
agrees to prohibit the following practices in any subcontracts.
1. To discharge or refuse to hire any individual because of their race, color,
religion, sex, national origin, disability, age, marital status, gender identity,
or sexual orientation.
2. To discriminate against any individual in terms, conditions, or privileges of
employment because of their race, color, religion, sex, national origin,
disability, age, marital status, gender identity, or sexual orientation.
B Should the City terminate this Agreement, the Consultant shall be paid for all
work and services performed up to the time of termination. However, such sums
shall not be greater than the "not -to -exceed" amount listed in Section III. The
City may terminate this Agreement upon seven (7) calendar days' written notice
to the Consultant.
C This Agreement shall be binding upon the successors and assigns of the parties
hereto, provided that no assignment shall be without the written consent of all
Parties to said Agreement.
D It is understood and agreed that the retention of the Consultant by the City for the
purpose of the Project shall be as an independent contractor and shall be
exclusive, but the Consultant shall have the right to employ such assistance as
may be required for the performance of the Project.
E It is agreed by the City that all records and files pertaining to information needed
by the Consultant for the Project shall be available by said City upon reasonable
request to the Consultant. The City agrees to furnish all reasonable assistance
in the use of these records and files.
F It is further agreed that no Party to this Agreement shall perform contrary to any
state, federal, or local law or any of the ordinances of the City of Iowa City, Iowa.
G At the request of the City, the Consultant shall attend meetings of the City
Council relative to the work set forth in this Agreement. Any requests made by
the City shall be given with reasonable notice to the Consultant to assure
attendance.
H The Consultant agrees to furnish, upon termination of this Agreement and upon
demand by the City, copies of all basic notes and sketches, charts,
computations, and any other data prepared or obtained by the Consultant
pursuant to this Agreement without cost, and without restrictions or limitation as
to the use relative to specific Projects covered under this Agreement. In such
event, the Consultant shall not be liable for the City's use of such documents on
other Projects.
The Consultant agrees to furnish all reports, specifications, and drawings with the
seal of a licensed professional as required by Iowa law.
Page 10 of 15
J The City agrees to tender the Consultant all fees in a timely manner, excepting,
however, that failure of the Consultant to satisfactorily perform in accordance
with this Agreement shall constitute grounds for the City to withhold payment of
the amount sufficient to properly complete the Project in accordance with this
Agreement.
K Should any section of this Agreement be found invalid, it is agreed that the
remaining portion shall be deemed severable from the invalid portion and
continue in full force and effect.
L Original contract drawings shall become the property of the City. The Consultant
shall be allowed to keep reproducible copies for the Consultant's own filing use.
M Fees paid for securing approval of authorities having jurisdiction over the Project
will be paid by the City.
N Upon signing this Agreement, Consultant acknowledges that Section 362.5 of the
Iowa Code prohibits a City officer or employee from having an interest in a
contract with the City, and certifies that no employee or officer of the City, which
includes members of the City Council and City boards and commissions, has an
interest, either direct or indirect, in this Agreement, that does not fall within the
exceptions to said statutory provision enumerated in Section 362.5.
O Indemnification
1. To the full extent permitted by law, Consultant agrees to defend,
indemnify, and hold harmless the City against any and all claims,
demands, suits, loss, expenses, including attorney's fees, and for any
damages which may be asserted, claimed or recovered against or from
the City by reason of personal injury, including bodily injury or death, and
property damages, including loss of use thereof, caused by Consultant's
negligent acts, errors or omissions in performing the work and/or services
provided by Consultant to the City pursuant to the provisions of this
Agreement.
2. Consultant assumes full responsibility for any and all damage or injuries
which may result to any person or property by reason of Consultant's
negligent acts, errors or omissions in connection with the work and/or
services provided by Consultant to the City pursuant to this Agreement,
and agrees to pay the City for all damages caused to the City's premises
resulting from the negligent acts, errors or omissions of Consultant.
3. The Consultant's obligation to indemnify the City shall not include the
obligation to indemnify, hold harmless, or defend the City against lability,
claims, damages, losses, or expenses, including attorney fees, to the
extent caused by or resulting from the negligent act, error, or omission of
the City.
4. For purposes of this paragraph, the term "Consultant" means and
includes the Consultant, its officers, agents, employees, sub -consultants,
and others for whom Consultant is legally liable, and the term "City"
means and includes the City of Iowa City, Iowa its Mayor, City Council
members, employees, and volunteers.
Page 11 of 15
P Insurance
1. The Consultant agrees at all times material to this Agreement to have and
maintain professional liability insurance covering the Consultant's liability
for the Consultant's negligent acts, errors and omissions in the sum of
$1,000,000 Per Claim, $1,000,000 Annual Aggregate, or a $1,000,000
Combined Single Limit. To the fullest extent permitted by applicable state
law, a Waiver of Subrogation Clause (endorsement) shall be added.
2. Consultant agrees to provide the City a certificate of insurance evidencing
that all coverages, limits and endorsements required herein are
maintained and in full force and effect, and certificates of Insurance shall
provide a minimum thirty (30) day endeavor to notify, when available by
Consultant's insurer. If the Consultant receives a non -renewal or
cancellation notice from an insurance carrier affording coverage required
herein, or receives notice that coverage no longer complies with the
insurance requirements herein, Consultant agrees to notify the City within
five (5) business days with a copy of the non -renewal or cancellation
notice.
Q Standard of Care
1. The Consultant shall perform services for, and furnish deliverables to, the
City pertaining to the Project as set forth in this Agreement. The
Consultant shall possess a degree of learning, care and skill ordinarily
possessed by reputable professionals, practicing in this area under
similar circumstances. The Consultant shall use reasonable diligence
and professional judgment in the exercise of skill and application of
learning.
2. Consultant represents that the Services and all its components shall be
free of defects caused by negligence; shall be performed in a manner
consistent with the standard of care of other professional service
providers in a similar Industry and application; shall conform to the
requirements of this Agreement; and shall be sufficient and suitable for
the purposes expressed in this Agreement.
3. All provisions of this Agreement shall be reconciled in accordance with
the generally accepted standards of the Engineering Profession.
4. Consultant's obligations under this Section shall exist without regard to,
and shall not be construed to be waived by, the availability or
unavailability of any insurance, either of City or Consultant.
R There are no other considerations or monies contingent upon or resulting from
the execution of this Agreement, it is the entire Agreement, and no other monies
or considerations have been solicited.
Page 12 of 15
S This Agreement shall be interpreted and enforced in accordance with the laws of
the State of Iowa. Any legal proceeding instituted with respect to this Agreement
shall be brought in a court of competent jurisdiction in Johnson County, Iowa.
The parties hereto hereby submit to personal jurisdiction therein and irrevocably
waive any objection as to venue therein, including any argument that such
proceeding has been brought in an inconvenient forum.
For the City For the Consultant
By. n By:
Title: Mayor Title: Project Manager
Date: 12/1/2020 Date:
Attest:
Page 13 of 15
November 20, 2020
Ap ro by:
CttyAttomey'sOffice—kev_ c ,-
Date
EXHIBIT A
STANDARD HOURLY FEE SCHEDULE
Effective January 1, 2020 to December 31, 2020
PROFESSIONAL
STAFF:
TECHNICAL
STAFF:
$208.00
Grade 1
$ 90.00
One Person with ATV
Grade 1
$ 63.00
Grade 2
$109.00
Grade 2
$ 78.00
$160.00
Grade 3
$122.00
Drone Surveyor (Thermography)
Grade 3
$ 88.00
Grade 4
$136.00
Grade 4
$ 95.00
$175.00
Grade 5
$150.00
Surveyor with Two Scanners
Grade 5
$108.00
Grade 6
$163.00
Grade 6
$122.00
IN-HOUSE SERVICES
Grade 7
$177.00
Mileage- Car/Truck $0.57/ Mile
Grade 7
$137.00
Grade 8
$195.00
$ .30/Sq.
Ft.
Lodging, Meals Cost + 10%
Mylar
Grade 9
$210.00
Airfare Cost + 10%
Photo -gloss
$ .90/Sq.
Ft.
ADMIN STAFF: $ 62.00
SURVEY STAFF:
One Person
$135.00
Two Person
$208.00
One Person with ATV
$161.00
Two Person with ATV
$234.00
Drone Surveyor (Video or Photogrammetry)
$160.00
Drone Surveyor (Thermography)
$320.00
Hydrographic Survey Crew (Two Person)
$274.00
Scanning Surveyor
$175.00
Surveyor with Two Scanners
$250.00
REIMBURSABLE EXPENSES:
TRAVEL 1.
IN-HOUSE SERVICES
Mileage- Car/Truck $0.57/ Mile
Prints/Plots:
Mileage- Survey Trucks $0.67/ Mile
Bond
$ .30/Sq.
Ft.
Lodging, Meals Cost + 10%
Mylar
$ .75/Sq.
Ft.
Airfare Cost + 10%
Photo -gloss
$ .90/Sq.
Ft.
Car Rental Cost + 10%
Color Bond
$ .60/Sq.
Ft.
Foam Core Mounting
$ 13.00
OUTSIDE SERVICES
Aerial Photogrammetry Cost + 10%
Color Prints:
Professional Services Cost + 10%
Letter Size
$ 1.00
Prints/Plots/Photos Cost + 10%
Legal Size
$ 2.00
Deliveries Cost + 10%
Page 14 of 15
EXHIBIT A (CONTINUED)
STANDARD HOURLY FEE SCHEDULE
Effective January 1, 2021 to December 31, 2021
PROFESSIONAL STAFF:
TECHNICAL STAFF:
Grade 1
$ 93.00
Grade 1
$ 65.00
Grade 2
$ 112.00
Grade 2
$ 80.00
Grade 3
$ 126.00
Grade 3
$ 91.00
Grade 4
$ 140.00
Grade 4
$ 98.00
Grade 5
$ 155.00
Grade 5
$ 111.00
Grade 6
$ 168.00
Grade 6
$ 126.00
Grade 7
$ 182.00
Grade 7
$ 141.00
Grade 8
$ 201.00
Mileage- Car/Truck $0.58/ Mile
Grade 9
$ 216.00
Mileage- Survey Trucks $0.68/ Mile
Bond
ADMIN STAFF: $ 64.00
SURVEY STAFF
One Person
$ 139.00
Two Person
$ 214.00
One Person with ATV
$ 166.00
Two Person with ATV
$ 241.00
Drone Surveyor (Video or Photogrammetry)
$ 165.00
Drone Surveyor (Thermography)
$ 330.00
Hydrographic Survey Crew (Two Person)
$ 282.00
Scanning Surveyor
$ 180.00
Surveyor with Two Scanners
$ 258.00
REIMBURSABLE EXPENSES:
TRAVEL
IN-HOUSE SERVICES
Mileage- Car/Truck $0.58/ Mile
Prints/Plots:
Mileage- Survey Trucks $0.68/ Mile
Bond
$ .30/Sq. Ft.
Lodging, Meals Cost + 10%
Mylar
$ .75/Sq. Ft.
Airfare Cost + 10%
Photo -gloss
$ .90/Sq. Ft.
Car Rental Cost + 10%
Color Bond
$ .60/Sq. Ft.
Foam Core Mounting
$ 13.00
OUTSIDE SERVICES
Computer Services Cost + 10%
Color Prints:
Aerial Photogrammetry Cost + 10%
Letter Size
$ 1.00
Professional Services Cost + 10%
Legal Size
$ 2.00
Prints/Plots/Photos Cost + 10%
Deliveries Cost + 10%
Page 15 of 15
Item Number: 6.i.
D ecember 1, 2020
Resol u tion au th orizin g th e p rocu remen t of th e Transp ortation an d Disp osal
of Non -Rad ioactive Ch emical Waste, Disp osal of Comp ressed G as Cylin d ers
and Stabil ization of Poten tially E xp l osive and Reactive Compou n d s.
Prepared B y:J ennif er J ordan, Resource Management S uperintendent
R eviewed B y:Ron Knoche, Public Works Director
Geof f F ruin, City Manager
F iscal I mpact:$175,000 from account #75750122-445310.
R ecommendations:S taff: A pproval
Commission: N/A
Attachments:Resolution
Executive S ummary:
On November 9, 2020, an agreement was established between Tradebe E nvironmental S ervices
L L C and I owa S tate University, the University of Northern I owa, the University of I owa, the I owa
D epartment of Transportation S ervices, the I owa D epartment of A dministrative S ervices, A mes
L aboratory, and the I owa Department of Natural Resources. T he contract allows other local
government agencies to utilize the terms of the contract to purchase goods and services from the
contractor. T he C ity of I owa City R esource Management Division would like to utilize this contract
to procure the Transportation and Disposal of Non-Radioactive Chemical Waste, D isposal of
C ompressed Gas Cylinders and Stabilization of P otentially E xplosive and R eactive C ompounds.
B ackground / Analysis:
T he C ity of I owa C ity Resource Management Division has utilized a cooperative agreement with
Tradebe Environmental S ervices L L C since J anuary 1st, 2015. T he previous contract expired on
J une 30, 2020. T he previous contract was f ulf illed with good results. Using a cooperative
agreement adequately f ulf ills the purchasing requirements as def ined in the C ity of I owa C ity
Purchasing Manual. T hus, the City of I owa C ity Resource Management D ivision would like to
enter into a cooperative agreement with Tradebe E nvironmental S ervices L L C for the
Transportation and Disposal of Non-Radioactive Chemical Waste, Disposal of C ompressed G as
C ylinders and S tabilization of Potentially E xplosive and Reactive C ompounds.
AT TAC HM E NT S:
D escription
R esolution
�1 t
Prepared by Jennifer Jordan, Resource Management Superintendent, 3900 Hebl Avenue SW, Iowa City, IA 52240
(319)887-6160
Resolution No. 20-271
Resolution authorizing the procurement of the Transportation and Disposal
of Non -Radioactive Chemical Waste, Disposal of Compressed Gas
Cylinders and Stabilization of Potentially Explosive and Reactive
Compounds
Whereas, a Cooperative Agreement exists between Tradebe Environmental Services LLC and
Iowa State University, The University of Northern Iowa, The University of Iowa, The Iowa
Department of Transportation Services, The Iowa Department of Administration Services, Ames
Laboratory, and the Iowa Department of Natural Resources for the Transportation and Disposal
of Non -Radioactive Chemical Waste, Disposal of Compressed Gas Cylinders and Stabilization
of Potentially Explosive and Reactive Compounds; and
Whereas, the contract allows other local government agencies to utilize the terms of the contract
to purchase goods and services from the contractor; and
Whereas, The City of Iowa City Resource Management Division would like to utilize this contract
to procure the Transportation and Disposal of Non -Radioactive Chemical Waste, Disposal of
Compressed Gas Cylinders and Stabilization of Potentially Explosive and Reactive Compounds
from Tradebe Environmental Services LLC; and
Whereas, the initial term of this contract will be for three years, with an option to renew for another
three additional one-year terms; and
Whereas, The City's purchasing policy requires City Council to approve purchases for
commodities and services over $150,000; and
Whereas, over the course of this three-year contract the City expects to expend approximately
$175,000 for the Transportation and Disposal of Non -Radioactive Chemical Waste, Disposal of
Compressed Gas Cylinders and Stabilization of Potentially Explosive and Reactive Compounds;
and
Whereas, funds for this purchase are available in The Resource Management Division's operating
budget under 75750122 445310; and
Whereas, approval of this purchase is in the public interest.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that:
1. The proposed procurement as described is approved.
2. The City Manager is authorized to sign the agreement with the vendor and take whatever
steps are necessary to effectuate future purchases including any amendments or renewals of
said agreement.
Passed and approved this 1st day of December _,2020
Resolution No. 20-271
Page 2 �, p
Mayor
App d by
ATTEST:
City Jerk Cit r ey s Office = I /2
It was move by Bergus and seconded by Weiner the Resolution be
adopted, and upon roll call there were:
AYES: NAYS:
ABSENT:
%
Bergus
x
Mims
%
Salih
%
Taylor
%
Teague
x
Thomas
x
Weiner
Item Number: 6.j.
D ecember 1, 2020
Resol u tion au th orizin g th e p rocu remen t for th e removal , d isp osal , and
replacemen t of g ranular activated carbon .
Prepared B y:J onathan Durst A ssistant Water S uperintendent
R eviewed B y:Ron Knoche, Public Works Director
Geof f F ruin, City Manager
F iscal I mpact:T he total project cost is $178,560.00. T his includes disposal of old carbon
and replacement with new custom virgin granular carbon.
R ecommendations:S taff: A pproval
Commission: N/A
Attachments:Resolution
Executive S ummary:
T his resolution will authorize the I owa City Water Division to enter into a contract with Cabot Norit
Americas I nc for the removal, disposal and replacement of granular activated carbon with virgin
granular activated carbon f rom one of f ive constant f low gravity filters located at the C ity of I owa
C ity Water purification f acility.
B ackground / Analysis:
T he City of I owa C ity Water Purification F acility utilizes five constant flow gravity filters to purify
water. T he f ilter media is comprised of three (3) f eet of granular activated carbon (G A C), one foot
of graded support sand and gravel and a plastic under drain system. I n order to keep the f ilters
operating at optimum efficacy the carbon must be removed and replaced. C arbon is removed
and replaced from one of the 5 constant f low gravity f ilters each year.
On O ctober 5, 2020 R equest for P roposal: #21-140, C ustom Virgin or R eactivated/Virgin
g ranular activated carbon was posted to the City of I owa City’s website. Two proposals were
received. A f ter caref ul consideration the evaluation team chose Cabot Norit A mericas I nc. T he
C abot Norit A mericas I nc proposal was deemed to be the most responsive to the City’s needs.
T he C ity of City Water Treatment F acility will expend approximately $89,280 in F Y21 and
$89,280 in F Y22 for a total contract amount of $178,560 with an option to renew for (2) additional
(2) year terms.
AT TAC HM E NT S:
D escription
R esolution
Prepared by: Jonathan Durst, Assistant Water Superintendent, 410 E Washington St, Iowa City, IA 52240 (319) 356-
5076
Resolution No. 20-272
Resolution authorizing the procurement for the removal,
disposal, and replacement of granular activated carbon.
Whereas, a Request for Proposal was put out to solicit proposals from qualified contractor(s) for
the removal, disposal, and replacement of Granular Activated Carbon; and
Whereas, two proposals were received for the removal, disposal, and replacement of the Granular
Activated Carbon; and
Whereas, an evaluation committee composed of City staff members selected Cabot Norit
Americas, Inc.; and
Whereas, the initial term of the City's contract with Cabot Norit, Inc. will be two years, with an
option to renew for two additional two-year terms; and
Whereas, in future renewals, the City expects to spend a similar amount on this purchase; and
Whereas, the purchase price for this project is $89,280 per year for a total of $178,560 for a two-
year contract, which exceeds the City manager's spending authority of $150,000, thus requiring
City Council approval; and
Whereas, funds for this purchase are available in account # 73730120-445230; and
Whereas, approval of this procurement is in the public interest.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that:
1. The proposed procurement as described is approved.
2. Upon the approval of the City Attorney, the City Manager is authorized to take whatever steps
are necessary to effectuate the purchase, and to execute subsequent renewals as are
reasonable and appropriate.
Passed and approved this 1st day of
Attest:4CLIerke—
December
2020
Ma
Ap o d y
City Attorney's Office -11 /25/2020
Resolution No. 20-272
Page 2
It was moved by Bergus and seconded by Weiner
Resolution be adopted, and upon roll call there were:
AYES: NAYS:
ABSENT:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
the
Item Number: 7.a.
D ecember 1, 2020
Resol u tion setting a p u b l ic h earin g on December 15, 2020 on proj ect man u al
and estimate of cost for th e con stru ction of the Id yl l wil d Stormwater Drain ag e
Diversion P roj ect, directing City Cl erk to publish notice of said hearin g , an d
d irectin g th e City Engin eer to p l ace said proj ect man u al on file for p u b l ic
inspection .
Prepared B y:J ason R eichart, S r. Civil Engineer
R eviewed B y:J ason Havel, City E ngineer
Ron Knoche, Public Works Director
Geof f F ruin, City Manager
F iscal I mpact:T he estimated cost for this project is $559,000 and will be f unded by A ccount
#P3976 – I dyllwild D rainage.
R ecommendations:S taff: A pproval
Commission: N/A
Attachments:L ocation Map
Resolution
Executive S ummary:
T his item begins the bidding process f or the I dyllwild Drainage D iversion P roject, which includes
the construction of new storm sewers under F oster R oad and Taft S peedway and a drainage
swale along the west side of No Name R oad to the I owa R iver. T his will allow stormwater f rom
large rain events to bypass the I dyllwild storm sewer and stormwater management system.
T he project will also include a bid alternate for a new pump station f or the I dyllwild S ubdivision.
Coordination with the I dyllwild Condominium Owners Association and the Forest View developers will
occur following the receipt of bids on the project, prior to any recommendations for award of the pump
station alternate.
B ackground / Analysis:
After the completion of the Taft S peedway F lood Mitigation Study in 2012, C ity C ouncil directed
staf f to proceed with a preliminary study for rerouting of f site drainage f rom the northwest corner of
the I dyllwild development. T he study analyzed the I dyllwild watershed (north of F oster Road) and
identif ied deficiencies within the existing stormwater system. F rom the results, two alternatives
were developed at a preliminary level.
T he City entered into a C onsultant Agreement with HR Green, I nc. in 2017, f or the I dyllwild
Stormwater Drainage D iversion Project with authorized HR Green, I nc. to evaluate the results of
the 2016 I dyllwild Drainage Diversion S tudy to determine the best alternative, develop preliminary
pump station design f or the I dyllwild F lood Mitigation S ystem, prepare preliminary and final design
for the desired alternative and provide bidding and construction phase services f or the I dyllwild
D rainage Diversion Project.
I n 2017 I dyllwild completed a grading project to construct a berm around the development. T he
berm was meant to be a foundation for HE S C O barriers and would have protected the area from
river flooding up to 2008 flood levels. However, the berm was not constructed to US A rmy C orp
of Engineering standards and does not address seepage concerns related to large river flood
events. T herefore, the C ity had HR Green complete a seepage analysis and study the effects of
adding HE S C O barriers to the top of the berm. T he results of this analysis showed that the
existing berm would not provide a sound f ooting for HE S C O barriers as originally intended and
recommended addressing the seepage to protect the berm. T hough the diversion nearly
eliminates the need f or a traditional pump station by rerouting larger stormwater f lows around the
I dyllwild development, a smaller pump station could be utilized to address some of the seepage
concerns and provide additional drawdown capabilities for the ponds. A small pump station would
also provide additional protection f rom large local precipitation events f looding F oster Road and
I dyllwild during river f lood events.
C ity staff met with representatives f rom I dyllwild and the proposed development north of F oster
R oad to discuss stormwater concerns related to existing and anticipated post-development
conditions in the area. During these discussions, the C ity committed to completing the design of a
pump station and including it as a bid alternate as part of the diversion project. T his will allow all
parties to evaluate the actual cost to construct the pump station and determine if it should
ultimately be included with the construction of the project. A s part of these discussions, the
F orest View developer (North D ubuque L L C) of f ered to contribute 25% of the project cost for
construction of a pump station. I n addition, representatives from the I dyllwild community stated
they were prepared to contribute up to $100,000 towards the pump station alternate. T he current
estimate for the pump station is $262,000.
P roject Timeline:
S et Public Hearing – D ecember 1, 2020
Hold Public Hearing – D ecember 15, 2020
B id L etting – J anuary 12, 2021
Award Date – F ebruary 2, 2021
Construction S tart – S pring 2021
F inal Completion – F all 2021
T his timeline allows f or additional coordination with I dyllwild and F orest View af ter bids are taken
to discuss a potential funding agreement f or the pump station alternate as discussed above. T he
award of the pump station alternate will be dependent on a funding agreement to use private
contributions to cover a funding shortfall if bids are high.
AT TAC HM E NT S:
D escription
L ocation Map
R esolution
Idyllwild Stormwater Drainage Diversion Project
Project Location
Prepared by: Jason Reichert, Public Worcs, 410 E. Washington St., Iowa City, IA 52240, (319)356-5416
Resolution No. 20-273
Resolution setting a public hearing on December 15, 2020 on
project manual and estimate of cost for the construction of the
Idyllwild Stormwater Drainage Diversion Project, directing City
Clerk to publish notice of said hearing, and directing the City
Engineer to place said project manual on file for public inspection.
Whereas, funds for this project are available in the Idyllwild Drainage account #P3976.
Now, therefore, be it resolved by the Council of the City of Iowa City, Iowa, that:
A public hearing on the project manual and estimate of cost for the construction of the above-
mentioned project is to be held on the 151 day of December 2020, at 7:00 p.m. in the Emma
J. Harvat Hall, City Hall, Iowa City, Iowa, or if said meeting is cancelled, at the next meeting
of the City Council thereafter as posted by the City Clerk.
2. The City Clerk is hereby authorized and directed to publish notice of the public hearing for
the above-named project in a newspaper published at least once weekly and having a
general circulation in the City, not less than four (4) nor more than twenty (20) days before
said hearing.
3. A copy of the project manual and estimate of cost for the construction of the above-named
project is hereby ordered placed on file by the City Engineer in the office of the City Clerk
for public inspection.
Passed and approved this 1st day of December _'2020
T�A� tA-rA.
M
Apprdve6 by /
Attest: { ✓ 4 . J
City Clerk City Attorney's Office - 11/25/2020
It was moved by Bergus and seconded by Weiner the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
Item Number: 10.a.
D ecember 1, 2020
Resol u tion to annex approximatel y 196.17 acres of l an d l ocated west of
Highway 218 an d sou th of Roh ret Road . (AN N20-0001)
AT TAC HM E NT S:
D escription
Staf f R eport with A ttachments
P&Z Minutes
R esolution
STAFF REPORT
To: Planning & Zoning Commission Prepared by: Ray Heitner, Associate Planner
Item: ANN20-0001/REZ20-0002 Date: October 15, 2020
GENERAL INFORMATION:
Applicant: MMS Consultants
1917 S. Gilbert St.
Iowa City, IA 52240
319-351-8282
l.sexton@mmsconsultants.net
Contact Person: Jesse Allen
Allen Homes, Inc.
215 N. Linn St.
Iowa City, IA 52244
319-530-8238
allenhomesinc@gmail.com
Property Owner: Thomas L. Carson and Linda A. Carson Revocable
Living Trust
James T. Carson Revocable Trust
Rebecca Albertson Revocable Trust
Steven M. Carson
Requested Action: Annexation & Rezoning
Purpose: Annexation of 196.17 acres of land currently in
unincorporated Johnson County and rezoning it from
the County Residential (R) and County Urban
Residential (RUA) zone to Interim Development –
Single-Family Residential (ID-RS).
Location: West of Highway 218 and south of Rohret Rd.
Location Map:
Size: 196.17 acres
Existing Land Use and Zoning: Farmland, County Residential (R) and County Urban
2
Residential (RUA)
Surrounding Land Use and Zoning: North: County RR-1 – Neighborhood Public
(Farmland)
South: County R – County Residential (Farmland)
East: RS-8 and RM-12 - Medium Density Single-
Family Residential (Residential) and Low
Density Multi-Family Residential
(Residential)
West: County R – Neighborhood Public (Farmland)
Comprehensive Plan: Iowa City/Johnson County Fringe Area
Agreement
District Plan: Southwest District Plan – Single-Family/Duplex
Residential; Open Space
Neighborhood Open Space District: NA
File Date: July 30, 2020
45 Day Limitation Period: N/A since associated with an annexation
BACKGROUND INFORMATION:
The applicant, MMS Consultants, with the consent of the owners, is requesting annexation and
rezoning of 196.17 acres of property located west of Highway 218 and south of Rohret Road. The
applicant has requested that the property be rezoned from County Residential (R) and County
Urban Residential (RUA) to Interim Development Single -Family (ID-RS) for the entire 196.17
acres.
This area is located adjacent to Iowa City’s current boundary and within Fringe Area C of Johnson
County’s Fringe Area Agreement with Iowa City. The Southwest District Plan shows this area
within the City’s growth area with a future land use of single-family residential and duplex housing
at a density of 2-12 dwelling units per acre. A northern portion of the property (shown below in
Figure 1.0) is shown as having a future land use of open space, surrounding a lake for stormwater
detention.
The City’s 2020-2024 Capital Improvement Plan includes the extension of the Abbey Lane trunk
sewer in its list of funded projects. Per the plan, construction is scheduled for 2023. The extension
of the sewer will allow development to continue west of Highway 218.
In anticipation of this trunk line extension, Planning staff is currently in the process of updating the
Rohret South Subarea portion of the Southwest District Plan, which was adopted in October 2002.
The Rohret South Subarea includes a concept plan (Figure 2) for the area contemplated for
annexation. With the update to the plan underway, the vision for development, including the
general intended land uses, street network, and storm water management system, will likely
change from what is currently shown in the adopted plan. The applicant has been informed of the
potential for change to the existing subarea plan.
3
Figure 1.0 – Subject Property within the Rohret South Subarea Future Land Use Map
4
Figure 2.0 – Rohret South Subarea Concept Plan
As of this writing, the applicant has not conducted a Good Neighbor Meeting.
ANALYSIS:
Annexation: The Comprehensive Plan has established a growth policy to guide decisions
regarding annexations. The annexation policy states that annexations are to occur primarily
through voluntary petitions filed by the property owners. Further, voluntary annexation requests are
to be reviewed under the following three criteria. The Comprehensive Plan states that voluntary
annexation requests should be viewed positively when the following conditions exist.
1. The area under consideration falls within the adopted long-range planning boundary.
A general growth area limit is illustrated in the Comprehensive Plan and on the City’s Zoning Map.
The subject property is located within the City’s long-range growth boundary.
2. Development in the area proposed for annexation will fulfill an identified need without imposing
an undue burden on the City. The Southwest District Plan identifies the subject area as being
appropriate for annexation and development upon provision of sanitary sewer and water services.
The City’s 2020-2024 Capital Improvement Plan identifies the extension of the Abbey Lane trunk
sewer line (Rohret South Sewer) as viable for construction in 2023. The purpose of the trunk
sewer line extension is to accommodate residential development that has been planned in the
Rohret South Subarea of the Southwest District Plan.
5
The Comprehensive Plan encourages growth that is contiguous and connected to existing
neighborhoods to reduce the costs of providing infrastructure and City services. The subject
property is bordered by the city limits on the north and east sides (across from Highway 218).
Therefore, the subject property is contiguous to current development and meets the goal of
contiguous growth.
The proposed annexation will help to accomplish the City’s larger goal of fulfilling the need for
expanded housing options to accommodate the City’s growing population. Because of this need,
staff is recommending that as a condition of the rezoning, the developer satisfy the
Comprehensive Plan’s Annexation Policy requirement, as stated in Resolution 18-211, related to
affordable housing. The policy requires annexation of land for residential use of 10 or more
dwelling units satisfy the City’s goal of creating and maintaining a supply of affordable housing by
providing affordable units equal to 10% of the total units in the annexed area, with an assurance of
long-term affordability.
3. Control of the development is in the City’s best interest. The property is within the City’s
designated Growth Area. It is appropriate that the proposed property be located within the city so
that residents of future development may be served by Fire, Police, water, and sanitary sewer
service. Annexation will allow the City to provide these services and control zoning so that the
subject area remains compatible with the Comprehensive Plan. Furthermore, upon annexation,
the City will be able to guide future development of the area’s road network and subdivision design
to meet the goals of the City’s Comprehensive Plan.
For the reasons stated above, staff finds that the proposed annexation complies with the
annexation policy.
Zoning: The subject property is currently zoned County (R) Residential and County (RUA) Urban
Residential. The County (R) zone allows for single-family residential dwellings to be built in the
subject area, while the County (RUA) zone allows for multi-family residential at a density of up to
four units per acre. The Southwest District Plan currently calls for single-family and duplex
residential throughout the subject area. Because of the subject area’s location in Iowa City’s Fringe
Area within the growth boundary, all development in this area must be constructed to City
standards and it is unlikely that development would occur prior to annexation.
The applicant is requesting rezoning of the subject property to Interim Development Single-Family
(ID-RS) for all 196.17 acres of the property. The purpose of the Interim Development zone is to
provide areas of managed growth in which agricultural and non-urban land uses can continue until
the City is able to provide services to support development. Under this zoning, the only use that is
permitted by right is agriculture. Low density single-family residential development at a density of 1
dwelling unit per 5 acres is also allowed. The applicant is currently exploring options for
subdividing and developing the property. Interim zoning is appropriate for this property since it is
currently not served by City sanitary sewer and water. Additionally, the proposed layout of
development is still undetermined.
Sanitary Sewer and Water: The subject area is currently not serviced by City sanitary and water
utilities. The City currently has extension of the Abbey Lane trunk sewer line to the subject area
within its 5-year Capital Improvement Program. It is unlikely that this area will be serviced by
sanitary sewer, and therefore suitable for urban development, before 2023.
The nearest water main is located north of the subject property, along Rohret Road. The developer
will be required to pay a water main extension fee of $456.75 per acre before public improvements
are constructed.
6
Environmentally Sensitive Areas: The subject property does contain a blue line stream. The
stream will need to be incorporated into future development plans and may trigger a Level I or
Level II Sensitive Areas Review upon subsequent rezoning. The Office of the State
Archaeologist did state that an archaeological surface study should be conducted prior to
ground disturbing activities, as the potential for intact and significant archaeological sites is
moderate. It is expected that this survey will take place closer to subsequent rezoning and
development of the subject area.
Access and Street Design: Since the proposed rezoning is only for Interim Development
Single-Family residential (ID-RS), the applicant does not yet have a design for street access and
interior street connectivity on the subject property. These designs will become available for
analysis upon subsequent rezoning and platting of the property.
It is anticipated that access to the area will come from Rohret Road, north of the subject
property. As the area continues to develop, access to the west and south will need to be
provided. Staff hopes to have more direction on access and street design of the subject area
upon completion of the Rohret South Subarea plan update.
NEXT STEPS:
Pending recommendation of approval of the proposed annexation and rezoning from the Planning
and Zoning Commission, the City Council will hold a public hearing. Before the public hearing,
utility companies and non-consenting parties will be sent the application via certified mail. Pending
approval of the annexation by the City Council, the application for annexation will be sent to the
State Development Board for consideration of approval.
STAFF RECOMMENDATION:
Staff recommends approval of ANN20-0001 and REZ20-0002, a voluntary annexation of
approximately 196.17 acres and a rezoning from County Residential (R) and County Urban
Residential (RUA) to Interim Development – Single-Family Residential (ID-RS) with the following
conditions:
1. The developer satisfies the Comprehensive Plan’s Annexation Policy, as stated in
Resolution 18-211.
ATTACHMENTS:
1. Annexation Exhibit
2. Location Map
3. Zoning Map
4. Applicants Statement
5. Steve Carson Statement
6. Approximate Timeline of Annexation Approval
Approved by: _______________________________________________
Danielle Sitzman, AICP
Department of Neighborhood and Development Services
SW 1\4 - NW 1\4SECTION 20-T79N-R6WSE 1\4 - NE 1\4SECTION 19-T79N-R6WSW 1\4 - NE 1\4SECTION 19-T79N-R6W NE 1\4 - NE 1\4SECTION 19-T79N-R6WNW 1\4 - NE 1\4SECTION 19-T79N-R6WNW 1\4 - NW 1\4SECTION 20-T79N-R6WSE 1\4 - SE 1\4SECTION 18-T79N-R6WSW 1\4 - SE 1\4SECTION 18-T79N-R6WSE 1\4 - NW 1\4SECTION 20-T79N-R6WNE 1\4 - NW 1\4SECTION 20-T79N-R6WANNEXATION PARCEL
(319) 351-8282
LAND PLANNERS
LAND SURVEYORS
CIVIL ENGINEERS
LANDSCAPE ARCHITECTS
IOWA CITY, IOWA 52240
MMS CONSULTANTS, INC.
ENVIRONMENTAL SPECIALISTS
www.mmsconsultants.net
1917 S. GILBERT ST.
JOHNSON COUNTY
IOWA
07-29-2020
RLA 1291
RLW
GDM
7596-107
IOWA CITY
1
ANNEXATION
EXHIBIT
1
1"=200'SE 1\4 - NW 1\4SECTION 19-T79N-R6WNE 1\4 - NW 1\4SECTION 19-T79N-R6WPOINT OF BEGINNING
HI
G
H
W
A
Y
#
2
1
8
/
H
I
G
H
W
A
Y
2
7
HI
G
H
W
A
Y
#
2
1
8
/
H
I
G
H
W
A
Y
2
7
ROHRET ROAD
BRITT'S FIRST ADDITION
LOT 2
LOT 1 KITTY LEE ROADMWD DAVIS ADDITION
O.L. "B"
8
7
6
O.L. "A"
9
10
11
4
5"REVISED" R.H DAVIS SUBDIVISION4
4
4
4
5
6
7
8
9
10
11
8,545,327 SF 196.17 AC
ANNEXATION EXHIBIT
JOHNSON COUNTY, IOWA
A PORTION OF THE NORTHWEST QUARTER OF THE NORTHEAST QUARTER, THE NORTHEAST QUARTER OF THE
NORTHEAST QUARTER, THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER, AND THE SOUTHWEST QUARTER
OF THE NORTHEAST QUARTER OF SECTION 19, AND A PORTION OF THE NORTHWEST QUARTER OF THE NORTHWEST
QUARTER OF SECTION 20, ALL OF TOWNSHIP 79 NORTH, RANGE 6 WEST, OF THE FIFTH PRINCIPAL MERIDIAN
PLAT PREPARED BY:
MMS CONSULTANTS INC.
1917 S. GILBERT STREET
IOWA CITY, IA 52240
OWNERS: APPLICANT'S ATTORNEY:
JAMES T CARSON REVOCABLE TRUST
REBECCA ALBERTSON REVOCABLE TRUST
THOMAS L CARSON & LINDA A CARSON
REVOCABLE LIVING TRUST
STEVEN M. AND MARY BETH CARSON
3207 ROHRET ROAD
IOWA CITY, IA 52246
IOWA DEPARTMENT OF TRANSPORTATION
800 LINCOLN WAY
AMES, IA 50010
ERIK SITTIG
119 WRIGHT STREET
IOWA CITY, IA 52240
APPLICANT:
ALLEN DEVELOPMENT LLC
PO BOX 3474
IOWA CITY, IA 52244
A PORTION OF THE NORTHWEST
QUARTER OF THE NORTHEAST
QUARTER, THE NORTHEAST
QUARTER OF THE NORTHEAST
QUARTER, THE SOUTHEAST
QUARTER OF THE NORTHEAST
QUARTER, AND THE
SOUTHWEST QUARTER OF THE
NORTHEAST QUARTER OF
SECTION 19, AND A PORTION OF
THE NORTHWEST QUARTER OF
THE NORTHWEST QUARTER OF
SECTION 20, ALL OF TOWNSHIP
79 NORTH, RANGE 6 WEST, OF
THE FIFTH PRINCIPAL MERIDIAN
GRAPHIC SCALE IN FEET
0
1"=200'
20 50 100 150 200
LOCATION MAP - NOT TO SCALE
ANNEXATION PARCEL
DESCRIPTION - ANNEXATION PARCEL
A PORTION OF THE NORTHWEST QUARTER OF THE NORTHEAST QUARTER, THE NORTHEAST
QUARTER OF THE NORTHEAST QUARTER, THE SOUTHEAST QUARTER OF THE NORTHEAST
QUARTER, AND THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 19, AND
A PORTION OF THE NORTHWEST QUARTER OF THE NORTHWEST QUARTER OF SECTION 20, ALL
OF TOWNSHIP 79 NORTH, RANGE 6 WEST, OF THE FIFTH PRINCIPAL MERIDIAN, JOHNSON
COUNTY, IOWA, DESCRIBED AS FOLLOWS:
Beginning at the Southeast Corner of the Northeast Quarter of Section 19, Township 79 North, Range 6
West, of the Fifth Principal Meridian, Johnson County, Iowa; Thence S89°18'06"W, along the South Line of
said Northeast Quarter, 2651.04 feet, to the Southwest Corner thereof; Thence N00°00'29"E, along the
West Line of said Northeast Quarter, 2610.20 feet; Thence N44°43'20"E, 46.90 feet, to a Point on the North
Line of said Northeast Quarter; Thence N89°26'11"E, along said North Line, 2617.53 feet, to the Northeast
Corner thereof; Thence N89°44'19"E, along the North Line of the Northwest Quarter of the Northwest
Quarter of Section 20, Township 79 North, Range 6 West, of the Fifth Principal Meridian, 737.85 feet, to its
intersection with the Northeasterly Right-of-Way Line of Highway #218; Thence S48°04'02"E, along said
Northeasterly Right-of-Way Line, 793.23 feet, to its intersection with the East Line of said Northwest Quarter
of the Northwest Quarter; Thence S00°01'48"W, along said East Line, 630.90 feet, to its intersection with the
North Line of Lot 1 of Kitty Lee Subdivision, in accordance with the Plat thereof Recorded in Plat Book 28 at
Page 3 of the Records of the Johnson County Recorder's Office; Thence S87°35'06"W, along said North
Line, 306.03 feet, to the Northwest Corner of said Lot 1; Thence S01°42'33"W, along the West Line of said
Lot 1, a distance of 144.26 feet, to its intersection with the South Line of the Northwest Quarter of the
Northwest Quarter of said Section 20; Thence S89°47'19"W, along said South Line, 1017.56 feet, to the
Southwest Corner thereof, and the Northeast Corner of the Southeast Quarter of the Northeast Quarter of
said Section 19; Thence S00°00'12"E, along the East Line of said Southeast Quarter of the Northeast
Quarter, 1318.50 feet, to the Point of Beginning. Said Annexation Parcel contains 196.17 Acres, and is
subject to easements and restrictions of record.
July 30, 2020
City of Iowa City
Planning and Community Development
Attn: Anne Russett
410 E Washington
Iowa City, IA 52240
RE: Carson Annexation
Dear Anne:
MMS Consultants, on behalf of Allen Development LLC, would like to request an
annexation for the property south of Rohret Road and west of Highway 218, please see attached
Annexation Exhibit for exact location. The property is currently owner by Thomas L Carson &
Linda A Carson Revocable Living Trust, James T Carson Revocable Trust, and Rebecca Albertson
Revocable Trust. Ownership is anticipated to be transferred to Allen Development LLC. The
property is currently within Johnson County and is zoned residential. The applicant is
proposing an annexation into the city limits of Iowa City.
The property is within the growth area of the City of Iowa City, and is in compliance
with the Comprehensive Plan. The applicant is requesting Interim Development zoning due to
infrastructure not being available at this time. As infrastructure becomes available, the
applicant intends to develop the property into new neighborhoods, in compliance with City
planning documents.
The property immediately to the north of the described parcels is within city limits, is
currently zoned RR-1 and is also owned by Thomas L Carson & Linda A Carson Revocable Living
Trust, James T Carson Revocable Trust, and Rebecca Albertson Revocable Trust. This property
is also anticipated to transfer ownership to Allen Development LLC and be developed in
conjunction with the property being requested for annexation. If you have any questions or
comments please feel free to contact myself or John Yapp.
Respectfully submitted,
Jon Marner, Partner
7596-107L1.docx
Targeted Annexation/Rezoning Timeline (timeline subject to change):
• Planning and Zoning Commission Meeting – 10/15/20
• Mailing applications to utilities and non-consenting parties – 11/05/20
• Mailing public hearing notices – 11/05/20
• Setting of Public Hearing by City Council – 11/17/20
• City Council Public Hearing – 12/01/20
• City Development Board Submission – 12/04/20
• City Development Board Meeting – 01/14/21
• Annexation Approval – 02/15/21
MINUTES FINAL
PLANNING AND ZONING COMMISSION
OCTOBER 15, 2020 – 7:00 PM
ELECTRONIC FORMAL MEETING
MEMBERS PRESENT: Susan Craig, Mike Hensch, Phoebe Martin, Mark Nolte, Mark
Signs, Billie Townsend
MEMBERS ABSENT:
STAFF PRESENT: Ray Heitner, Sarah Hektoen, Kirk Lehmann, Anne Russett
OTHERS PRESENT: Luke Newton, Jon Harding, Jon Marner, Chant Eicke, Ryan Wade,
Jeff Clark, William Means
RECOMMENDATIONS TO CITY COUNCIL:
By a vote of 6-0 the Commission set a public hearing for November 5, 2020 on an application to
amend the Downtown and Riverfront Crossings Master Plan, a component of the City’s
Comprehensive Plan, to expand the West Riverfront Subdistrict to include approximately 3.16
acres south of Myrtle Avenue, west of Riverside Drive, north of the Iowa Interstate Railroad, and
east of Olive Street.
By a vote of 6-0 the Commissions recommends approval of REZ20-0001, a proposal to rezone
approximately 3.1 acres of property located at the corner of Camp Cardinal Boulevard and Camp
Cardinal Road, across the street from 80 Gathering Place Lane from Neighborhood Public (P-1)
to Community Commercial with a Planned District Overlay (OPD/CC-2) subject to conditions:
1. Prior to the issuance of building permits, provision of a 15-foot-wide utility easement
along the property’s east side.
2. Prior to the issuance of building permits, payment of $5,000 toward the upgrading of
approximately 25 feet of Camp Cardinal Road that is adjacent to the subject property that
does not meet City standards is made. This amount is based off of Camp Cardinal Road
being a collector street, and the applicant contributing 25% of the cost of the
approximately 25 feet of the road that needs to be improved to the north property line.
By a vote of 6-0 the Commissions recommends approval of VAC20-0001 a vacation of 0.06
acres of Camp Cardinal Road right-of-way north of Camp Cardinal Boulevard and west of
Gathering Place Lane in Iowa City.
Electronic Meeting
(Pursuant to Iowa Code section 21.8)
An electronic meeting was held because a meeting in person is impossible or impractical
due to concerns for the health and safety of Commission members, staff and the public
presented by COVID-19.
By a vote of 4-2 (Martin & Nolte dissenting) the Commissions recommends approval of
ANN20-0001 and REZ20-0002, a voluntary annexation of approximately 196.17 acres
rezoning from County Residential (R) and County Urban Residential (RUA) to Interim
Development – Single-Family Residential (ID-RS) with the following conditions:
1. The developer satisfies the comprehensive plans annexation policy, as stated in
Resolution 18- 211.
By a vote of 6-0 the Commissions recommends approval of VAC20-0002, a vacation of the St.
Mathias Alley right-of-way south of North Dodge Street and east of 1120 North Dodge Street in
Iowa City, Iowa with the amendment to just include the western tip of the alley right-of-way.
By a vote of 5-1 (Townsend dissenting) the Commissions recommends approval of REZ20-0008,
a proposal to rezone approximately 12,000 square feet of land located at 400 North Clinton
Street and 112 East Davenport Street from High-Density Multifamily Residential (RM-44) zone to
Planned High Density Multifamily Residential (PRM zone subject to the following condition:
1. Substantial compliance with the site plan and elevations dated July 1, 2020 if any PRM
bonus provisions or minor adjustments are requested for the property.
By a vote of 6-0 the Commissions recommends approval of REZ20-005, a proposed amendment
to the zoning code to allow minor adjustments in Planned High Density Multifamily Residential
Zones (PRM) for new construction projects which involve preserving a separate historic
structure, as illustrated in attachment one of the staff report.
CASE NOS. ANN20-0001 AND REZ20-0002:
Applicant: MMS Consultants
Location: West of Highway 218 and south of Rohret Rd.
An application submitted for an annexation and rezoning from County Residential (R) and
County Urban Residential (RUA) to Interim Development – Single-Family Residential (ID-RS)
zone for approximately 196.17 acres of land currently in unincorporated Johnson County.
Heitner began the staff report showing an aerial view of the subject property, it is located to the
City's immediate southwest. It is a pretty big piece of land at 196.17 acres. Heitner said the
current zoning is split zone with County Residential and County Urban Residential, which is one
of the more denser County zoning designations. He next showed a map of the growth area and
noted the entire subject property is within City's growth area. Heitner stated the entirety of the
rezoning would be to Interim Development Single Family Residential (ID-RS).
Heitner showed the concept plan from the current Southwest District Plan. The Plan envisions
this area as an array of single-family housing units, some open space and a detention lake
running through the middle of the subject property.
Regarding the annexation, staff looks at the Comprehensive Plan and established growth policy
to guide decisions regarding annexations. The annexation policy states that acquisitions occur
primarily through voluntary petitions filed by property owners and the Comprehensive Plan states
that voluntary annexation requests should be viewed positively when the following conditions
exist. First, the area under consideration falls within the adopted long-range planning boundary.
Heitner reiterated that is clearly the case here as the entirety of the subject property is within the
City’s growth area and annexation of this property is anticipated. Second, development in the
area proposed for annexation will fulfill an identified need without imposing an undue burden on
the City. Heitner did point out that this property is not serviced by sanitary sewer, but the City
does have in its Capital Improvement Plan an allocation to extend sanitary sewer to this area
projected for 2023. Heitner reiterated this annexation and rezoning would be to an interim zone
which is intended as a placeholder until a property can be fully serviced by City services and
development on this property will not take place until that sewer extension is provided.
Additionally, this property is contiguous to City limits to the north and to the east, although
separated by Highway 218, but it is not a leapfrog development being annexed. Third, control of
the development in the area is in the City’s best interest. Staff reviewed this and noted the
annexation will help accomplish the City's larger goal of fulfilling the need of expanding housing
options to accommodate the City's growing population.
Staff is recommending that a condition of the rezoning be the developer satisfy the
Comprehensive Plan’s Annexation Policy requirement, Resolution 18-211, related to affordable
housing, requiring that any development associated with annexation containing 10 or more
dwelling units must have 10% of that development meet affordable housing provisions.
In terms of zoning, Heitner reiterated it is currently in a split zone between County Rural and
Urban Residential. The entirety of this rezoning would be for ID-RS, single family residential and
again the ID-RS zone is to be in place until the City can provide services to support
development.
With respect to water, Heitner explained there are water mains on the north side of the road and
that would probably be the access point for water service to this development. City Engineering
staff has confirmed that facilitation of water service is possible upon subsequent developments,
the developer will be required to pay water main extension fee of $456.75 per acre before public
improvements are constructed. Heitner also noted the property does contain a blue line stream
so there is potential for sensitive areas analysis that would accompany any subsequent
development. Additionally, staff reached out to the Office of the State Archaeologist and that
office recommended that an archaeological surface study be conducted prior to ground
disturbing activities. Staff is not recommending that that study be a condition of this rezoning,
but staff would like to see that study conducted before subsequent development takes place on
this property.
Heitner noted as common with annexations and interim rezones, the applicant does not have a
design for street access or interior street connectivity to the property, those typically become
available on subsequent rezoning and planning of the property.
The role of the Commission is to determine whether the annexation and rezoning satisfies the
following conditions as stated by the Comprehensive Plan’s Annexation Policy that the area
under consideration falls within the adopted Long Range Planning Boundary and development in
the proposed area will fulfill an identified need without imposing an undue burden on the City,
and that control of the development is in the City's best interest.
In terms of next steps, pending approval from this Commission, Council would hold a public
hearing on this annexation and rezoning request. Prior to that public hearing, utility companies
and non-consenting parties will be sent the application by certified mail. Pending approval of
annexation by Council the application will be sent to the State Development Board for approval
as that's a requirement because there are other municipalities within two miles of this annexation
request.
Staff is recommending approval of ANN20-0001 & REZ20-0002, a voluntary annexation of
approximately 196.17 acres rezoning from County Residential (R) and County Urban Residential
(RUA) to Interim Development – Single-Family Residential (ID-RS) with the following conditions:
1. The developer satisfies the comprehensive plans annexation policy, as stated in
Resolution 18- 211.
Hensch asked if there is any reason to believe the State Development Board would have any
objections to this. Heitner is not aware of any, the application fairly straightforward in terms of
being within the growth area and being contiguous to the City.
Hensch noted it is his understanding that that's really the biggest thing they look at with these
annexation applications is whether there's continuity, or whether there's a leapfrog development
being proposed so he suspects that the State Annexation Board will support this. Hensch added
for the benefit of the newer members, an interim development zoning is just a placeholder and
the Commission will see this again when it moves to a permanent rezoning for development.
Heitner confirmed the Commission will review subsequent rezonings that take place in this area
and said he only showed the concept plan that's currently within the Comprehensive Plan and
staff is actually actively involved in doing a revision to that subarea plan for this District Plan so
the sketch outlines a rough concept of streets but it's likely that that will be different as staff
revises the District Plan here.
Hensch also noted as an indicator of the growth going on this area, didn't the Commission a
couple months ago approve a plat for north of Rohret, east of Slothower, for some infill
development for that area. Heitner confirmed that is just north and west of this subject area. He
added there's still a continued demand to develop outward in this area and that is why staff is
working through the process of the revision to the sub area plan to make sure they have those
goals and objectives for this area in place ahead of when most development takes place, and
ahead of development and City service ability in this area. He stated that is something they hope
to accomplish within the next year, the current plan is about 20 years old so it's due for an
update.
Craig noted she was confused when she reviewed this material because of the concept plan
showed a huge body of water, but there's no water there in current pictures. She understands
now that the concept plan showed in the staff report is from the Plan and the developer has no
requirements to doing something that looks like that concept plan, they just have to follow the
other guidelines the City has, and they can come back with a plan that has no water in it.
Russett noted the maps that Heitner shared are the Future Land Use Map and associated
concept for this area that are adopted as part of the Comprehensive Plan in the Southwest
District Plan so any proposals for development out here staff needs to review against those
adopted visions and policies. Staff is currently updating that vision and staff has known that the
sewer extension was going to be coming and knew that this area would be opened up for
development. Since this plan was adopted in 2002 it’s time to revisit it and update it and create a
new vision. They anticipate they will have a new plan adopted and any future rezonings will be
reviewed against the new plan and that is likely to happen before the development because that
isn't going to happen till 2023 when the sewer line is expanded as part of the Capital
Improvement Plan.
Nolte noticed in one of the concept drawings there was a fire station indicated. Heitner
acknowledged that but said that was just conceptualized back in 2002 but that illustration was
shown just as a reference there wouldn’t be any guarantee that there would be a fire station on
this corridor moving forward. Nolte stated that is some of his concern, that road is so heavily
trafficked right now. Watts Development is putting in 600 homes to the west, the Weber School
is already beyond capacity, and Kitty Lee Road is a is a very narrow chip seal road right now so
he doesn’t think it's a good feeder road to this development. He would also like to better
understand the identified need and if this is the type of housing they’re looking for in the future. It
appears to be unwalkable urban sprawl and he thought they were trying to get away from some
of that. The size and scope of this whole development scares him, he does like the
neighborhood commercial for the residents that already live in that area.
Signs asked what is a non-consenting party? Heitner replied that would be anyone opposed to
the application. Russett added they are specifically property owners within the proposed
annexation area. She added for this proposed annexation, there are no non-consenting parties.
Hensch opened the public hearing.
Luke Newton (MMS Consultants) added that the developer is in conversations with the Iowa City
School District to address their needs and concerns.
Hensch noted they don’t have a full concept yet but asked if there would be a water detention
area somewhere. Newton confirmed there would be.
Hensch closed the public hearing.
Hektoen asked for clarification on the annexation policy is with regards to affordable housing.
Heitner clarified that as a condition of the annexation, the developer would be required to abide
by the Comprehensive Plan’s affordable housing policy related to annexation, detailed and
Resolution 18-211 that basically states when new land is brought into the City, affordable
housing is addressed in the process.
Craig moved to recommend approval of ANN20-0001 and REZ20-0002, a voluntary
annexation of approximately 196.17 acres rezoning from County Residential (R) and
County Urban Residential (RUA) to Interim Development – Single-Family Residential (ID-
RS) with the following conditions:
2. The developer satisfies the comprehensive plans annexation policy, as stated in
Resolution 18- 211.
Signs seconded the motion.
Hensch acknowledge this is a little scary as it is a very large annexation, 200 acres almost, and
no concept plan, however he really encourage people to look at this for what it is, interim
development, and they will see this again. Also, staff is working on the Southwest District Plan
so clearly that will change. Hensch wanted to caution everybody to not get too concerned about
a concept plan.
Signs noted also the process of changing the Southwest District Plan is going to involve a lot of
public input and public meetings so the public will be able to weigh in on what they would actually
like to see in this area.
Townsend added she would just hope that the affordable housing pieces in there stay affordable,
not just for 10 years or 20 years.
Heitner agreed there would be plentiful opportunities for public involvement and the Commission
will see the update as well. Signs noted having been through that process with the South District
Plan here a couple years ago, it's extensive. Russett added they are taking a more targeted
approach to this update, it's not an overall update of the entire District Plan, they're really
focusing on this sub area, and this concept is pretty targeted.
Martin noted she is typically not opposed to development, but one of the things that distresses
her a little bit is that they are losing more and more farmland and while one of the things that they
talk about is affordable housing, but there is also so much food insecurity. Granted the farmland
out here is probably corn or soybeans, not something typically people are going to go and eat,
but the point is that in the State of Iowa there is so much amazing land that is not used to its full
potential. She understands this is going to take years and years to develop but wanted to put it
on the record for people to think about the fact that making farmland available to smaller farms,
people that are growing food to actually consume, should be at the forefront of conversation
more so than just taking these this hundreds of acres and paving it over.
Nolte agreed with Martin and is pro-development but stated this just doesn't make sense if they
aspire to affordability and walkability and better transit and all those things, they can't just keep
sprawling out like this. What good is it to have an affordable housing in a place where one must
drive to get anywhere. He is also protective of farmland and realizes people own that land to
develop it but it doesn't seem like the right way to grow the community over time.
Hensch noted it's a voluntary annexation, so that's important to remember. Also if they don't
allow for urban density within the City, then those houses will go somewhere, and then it will end
up with one and five acre lots all throughout the County and actually take more land out of out of
production. He doesn’t know what the CSR (corn suitability rating) on this land is but that's a
pretty important consideration, if it is in the 80s that's prime farmland, but if it's the 20s, 30s or
40s then it's production value is pretty low. He suggested perhaps in the future annexations they
can be given the CSR listed on the properties. He added he is also responsible for local foods
for Johnson County so he is very sensitive to this issue but these farms, like Martin said, are just
corn and soybeans, there's nothing here that's going to be consumed by humans, and certainly
not going to be consumed locally. He noted that is another issue and as a Commission how can
they be proponents of local foods, or foods that humans consume locally, when the problem is
land is so expensive in Johnson County that a farmer who's not growing commodity crops is
likely unable to afford to purchase land to grow on those non commodity crops. Hensch
acknowledged it's very difficult issue and something they probably should take up and have
discussions about.
Martin noted regarding the one and five acre plots and that taking up more land, when she was
sent to New Orleans for a planning and zoning conference a few years back, one of the classes
she took was on sustainability in food productivity, and those little lots can produce an enormous
amount of food. She acknowledged that is a topic for a different time but just want to put that out
there. Hensch agreed but unfortunately, those acres won't be zoned for agriculture or
commercial production, so people wouldn't be able to grow crops for sale on those residential
lots.
A vote was taken and the motion passed 4-2 (Nolte and Martin dissenting).
DEFERRED TO 12/15/20
Prepared by: Ray Heitner, Associate Planner, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5238
(ANN20-0001/REZ20-0002)
RESOLUTION NO.
Resolution to annex approximately 196.17 acres of land located west
of Highway 218 and south of Rohret Road.
Whereas, Thomas L. Carson and Linda A. Carson Revocable Living Trust, James T. Carson
Revocable Trust, Rebecca Albertson Revocable Trust, Steven M. Carson are the owners and legal
titleholders of approximately 196.17 acres located west of Highway 218 and south of Rohret Road;
and
Whereas, Owners have requested annexation of the approximate 196.17 -acre tract into the City
of Iowa City, Iowa; and
Whereas, the aforementioned property is located within the Long -Range Planning Boundary of
the City of Iowa City, and
Whereas, control of the area proposed for annexation is in the City's best interest because it will
allow development in a manner consistent with the Comprehensive Plan; and
Whereas, pursuant to Iowa Code 368.5 and 368.7 (2020), notice of the application for
annexation was sent to the Johnson County Board of Supervisors, Johnson County departments of
Attorney, Auditor, Engineer, Planning and Zoning, each affected public utility, Union and West
Lucas Townships, the Metropolitan Planning Organization of Johnson County, and the East Central
Iowa Council of Governments; and
Whereas, none of these entities have objected to the proposed annexation; and
Whereas, in accordance with the adopted City annexation policy, the owners and developer
have executed a pre -annexation agreement committing to the provision of affordable housing in
accordance with the City's affordable housing policy; and
Whereas, the Planning and Zoning Commission has reviewed the proposed rezoning and has
recommended approval.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that:
1. The following described land should be voluntarily annexed to the City of Iowa City, Iowa:
A PORTION OF THE NORTHWEST QUARTER OF THE NORTHEAST QUARTER, THE
NORTHEAST QUARTER OF THE NORTHEAST QUARTER, THE SOUTHEAST QUARTER OF
THE NORTHEAST QUARTER, AND THE SOUTHWEST QUARTER OF THE NORTHEAST
QUARTER OF SECTION 19, AND A PORTION OF THE NORTHWEST QUARTER OF THE
NORTHWEST QUARTER OF SECTION 20, ALL OF TOWNSHIP 79 NORTH, RANGE 6 WEST,
OF THE FIFTH PRINCIPAL MERIDIAN, JOHNSON COUNTY, IOWA, DESCRIBED AS
FOLLOWS:
Beginning at the Southeast Corner of the Northeast Quarter of Section 19, Township 79 North,
Range 6 West, of the Fifth Principal Meridian, Johnson County, Iowa; Thence S89°18'06"W, along
the South Line of said Northeast Quarter, 2651.04 feet, to the Southwest Corner thereof; Thence
10.E
Resolution No.
Page 2
N00°00'29"E, along the West Line of said Northeast Quarter, 2610.20 feet; Thence N44°43'20"E,
46.90 feet, to a Point on the North Line of said Northeast Quarter; Thence N89026'11"E, along
said North Line, 2617.53 feet, to the Northeast Corner thereof; Thence N89°44'19"E, along the
North Line of the Northwest Quarter of the Northwest Quarter of Section 20, Township 79 North,
Range 6 West, of the Fifth Principal Meridian, 737.85 feet, to its intersection with the Northeasterly
Right -of -Way Line of Highway #218; Thence S48°04'02"E, along said Northeasterly Right -of -Way
Line, 793.23 feet, to its intersection with the East Line of said Northwest Quarter of the Northwest
Quarter; Thence S00°01'48"W, along said East Line, 630.90 feet, to its intersection with the North
Line of Lot 1 of Kitty Lee Subdivision, in accordance with the Plat thereof Recorded in Plat Book
28 at Page 3 of the Records of the Johnson County Recorder's Office; Thence S87°35'06"W,
along said North Line, 306.03 feet, to the Northwest Corner of said Lot 1; Thence S01°42'33"W,
along the West Line of said Lot 1, a distance of 144.26 feet, to its intersection with the South Line
of the Northwest Quarter of the Northwest Quarter of said Section 20; Thence S89°47'19"W, along
said South Line, 1017.56 feet, to the Southwest Corner thereof, and the Northeast Corner of the
Southeast Quarter of the Northeast Quarter of said Section 19; Thence S00°00'12"E, along the
East Line of said Southeast Quarter of the Northeast Quarter, 1318.50 feet, to the Point of
Beginning. Said Annexation Parcel contains 196.17 Acres, and is subject to easements and
restrictions of record.
2. The City Clerk is hereby authorized and directed to certify, file, and record all necessary
documents as required by Iowa law under Section 368.7 at Owners' expense.
3. Further, the City Clerk is hereby authorized and directed to certify and file all necessary
documents for certification of the population of the annexed territory to Johnson County and
the State Treasurer, said population being zero.
Passed and approved this day of , 2020
MAYOR
pproved V
ATTEST: 0�eG N� IL
CITY CLERK City Attorney's Office
(Sara Greenwood Hektoen — 11/24/2020)
1
Prepared by: Ray Heitner, Associate Planner, 410 E. Washington, Iowa City, IA 52240 (319) 356-5238 (REZ20-0002)
Conditional Zoning Agreement
This agreement is made between the City of Iowa City, Iowa, a municipal corporation
(hereinafter "City"); and Thomas L. Carson and Linda A. Carson Revocable Living Trust, James
T. Carson Revocable Trust, Rebecca Albertson Revocable Trust, and Steven M. and Mary Beth
Carson, (hereinafter collectively referred to as "Owner”), and Allen Homes, Inc. (hereinafter
referred to as “Applicant”).
Whereas, Owner is the legal title holder of approximately 196.17 acres of property
located west of Highway 218 and south of Rohret Road; and
Whereas, Applicanthas requested the rezoning of approximately 196.17 acres of land
located west of Highway 218 and south of Rohret Road from County Residential (R) zone and
County Urban Residential (RUA) zone to Interim Development Single-Family Residential (ID-
RS) zone; and
Whereas, the Comprehensive Plan, specifically the Southwest District Plan, indicates
that the subject area is appropriate for residential development; and
Whereas, this rezoning creates public needs to accommodate demand for affordable
housing in Iowa City; and
Whereas, the Planning and Zoning Commission has determined that, with reasonable
conditions regarding satisfaction of these public needs through the provision of affordable
housing, the requested zoning is consistent with the Comprehensive Plan; and
Whereas, Iowa Code §414.5 (2020) provides that the City of Iowa City may impose
reasonable conditions on granting a rezoning request, over and above existing regulations, in
order to satisfy public needs caused by the requested change; and
Whereas, the Owner and Applicant agree to develop this property in accordance with the
terms and conditions of this Conditional Zoning Agreement.
Now, therefore, in consideration of the mutual promises contained herein, the parties agree as
follows:
1. Thomas L. Carson and Linda A. Carson Revocable Living Trust, James T. Carson
Revocable Trust, Rebecca Albertson Revocable Trust, Steven M. and Mary Beth
Carson, are the legal title holders of the property legally described as:
A PORTION OF THE NORTHWEST QUARTER OF THE NORTHEAST QUARTER, THE
NORTHEAST QUARTER OF THE NORTHEAST QUARTER, THE SOUTHEAST QUARTER
OF THE NORTHEAST QUARTER, AND THE SOUTHWEST QUARTER OF THE NORTHEAST
QUARTER OF SECTION 19, AND A PORTION OF THE NORTHWEST QUARTER OF THE
NORTHWEST QUARTER OF SECTION 20, ALL OF TOWNSHIP 79 NORTH, RANGE 6
WEST, OF THE FIFTH PRINCIPAL MERIDIAN, JOHNSON COUNTY, IOWA, DESCRIBED AS
FOLLOWS:
2
Beginning at the Southeast Corner of the Northeast Quarter of Section 19, Township 79 North,
Range 6 West, of the Fifth Principal Meridian, Johnson County, Iowa; Thence S89°18'06"W,
along the South Line of said Northeast Quarter, 2651.04 feet, to the Southwest Corner thereof;
Thence N00°00'29"E, along the West Line of said Northeast Quarter, 2610.20 feet; Thence
N44°43'20"E, 46.90 feet, to a Point on the North Line of said Northeast Quarter; Thence
N89°26'11"E, along said North Line, 2617.53 feet, to the Northeast Corner thereof; Thence
N89°44'19"E, along the North Line of the Northwest Quarter of the Northwest Quarter of Section
20, Township 79 North, Range 6 West, of the Fifth Principal Meridian, 737.85 feet, to its
intersection with the Northeasterly Right-of-Way Line of Highway #218; Thence S48°04'02"E,
along said Northeasterly Right-of-Way Line, 793.23 feet, to its intersection with the East Line of
said Northwest Quarter of the Northwest Quarter; Thence S00°01'48"W, along said East Line,
630.90 feet, to its intersection with the North Line of Lot 1 of Kitty Lee Subdivision, in
accordance with the Plat thereof Recorded in Plat Book 28 at Page 3 of the Records of the
Johnson County Recorder's Office; Thence S87°35'06"W, along said North Line, 306.03 feet, to
the Northwest Corner of said Lot 1; Thence S01°42'33"W, along the West Line of said Lot 1, a
distance of 144.26 feet, to its intersection with the South Line of the Northwest Quarter of the
Northwest Quarter of said Section 20; Thence S89°47'19"W, along said South Line, 1017.56
feet, to the Southwest Corner thereof, and the Northeast Corner of the Southeast Quarter of the
Northeast Quarter of said Section 19; Thence S00°00'12"E, along the East Line of said
Southeast Quarter of the Northeast Quarter, 1318.50 feet, to the Point of Beginning. Said
Annexation Parcel contains 196.17 Acres, and is subject to easements and restrictions of
record.
2. Owner and Applicant acknowledge that the City wishes to ensure conformance to the
principles of the Comprehensive Plan. Further, the parties acknowledge that Iowa Code
§414.5 (2020) provides that the City of Iowa City may impose reasonable conditions on
granting a rezoning request, over and above the existing regulations, in order to satisfy
public needs caused by the requested change.
3. In consideration of the City's rezoning the subject property, Owner and Applicant agree
that development of the subject property will conform to all other requirements of the
Zoning Code, as well as the following conditions:
a. Prior to issuance of a building permit, Owners shall execute an affordable housing
agreement committing to one or more of the following methods to satisfy the
annexation policy:
i. rent or sell 10% of the total units constructed on the above-described real
estate to income-eligible families for a period of 20 years from the date
certificates of occupancy are issued for each such affordable unit, to be
administered in accordance with Iowa City Code of Ordinance 14-2G-8, or a
similar state or federal affordable housing program; or
ii. convey 10% of the total units to the City or an affordable housing provider for
such affordable housing purposes; or
iii. the payment of a fee-in-lieu thereof to the City’s affordable housing fund, in
an amount established by Resolution 18-213, approved on July 17, 2018, or,
if said Resolution has been rescinded at the time Owners apply for a building
permit, as otherwise established by Council resolution.
4. The conditions contained herein are reasonable conditions to impose on the land under
3
Iowa Code §414.5 (2020), and that said conditions satisfy public needs that are caused
by the requested zoning change.
5. This Conditional Zoning Agreement shall be deemed to be a covenant running with the
land and with title to the land, and shall remain in full force and effect as a covenant with
title to the land, unless or until released of record by the City of Iowa City. The parties
further acknowledge that this agreement shall inure to the benefit of and bind all
successors, representatives, and assigns of the parties. In the event the subject property
is transferred, sold, redeveloped, or subdivided, all development will conform with the
terms of this Conditional Zoning Agreement.
6. Nothing in this Conditional Zoning Agreement shall be construed to relieve the Owner
from complying with all other applicable local, state, and federal regulations.
7. This Conditional Zoning Agreement shall be incorporated by reference into the
ordinance rezoning the subject property, and that upon adoption and publication of the
ordinance, this agreement shall be recorded in the Johnson County Recorder's Office at
the Applicant’s expense.
Dated this _____ day of _____________________, 20__.
City of Iowa City Thomas L. Carson and Linda A. Carson
Revocable Living Trust
_________________________________ _________________________________
Bruce Teague, Mayor By:
Attest:
________________________________ James T. Carson Revocable Trust
Kellie Fruehling, City Clerk
Approved by: _________________________________
By:
________________________________
City Attorney’s Office
Rebecca Albertson Revocable Trust
__________________________________
By:
4
Mary Beth Carson
__________________________________
By:
Steven M. Carson
__________________________________
By:
Allen Homes, Inc.
___________________________________
By:
City of Iowa City Acknowledgement:
State of Iowa )
) ss:
Johnson County )
This instrument was acknowledged before me on __________________, 20__ by Bruce Teague
and Kellie Fruehling as Mayor and City Clerk, respectively, of the City of Iowa City.
Notary Public in and for the State of Iowa
(Stamp or Seal)
Title (and Rank)
Thomas L. Carson and Linda A. Carson Revocable Living Trust Acknowledgement:
State of _____
County of __________________
This record was acknowledged before me on_________________, 2020 by
________________________ (Name(s) of individual(s) as ____________________________
(type of authority, such as officer or trustee) of Thomas L. Carson and Linda A. Carson
Revocable Living Trust.
___________________________________
5
Notary Public in and for the State of Iowa
(Stamp or Seal)
Title (and Rank)
My commission expires:_________________
James T. Carson Revocable Trust Acknowledgement:
State of _____
County of __________________
This record was acknowledged before me on_________________, 2020 by
________________________ (Name(s) of individual(s) as ____________________________
(type of authority, such as officer or trustee) of the James T. Carson Revocable Trust.
___________________________________
Notary Public in and for the State of Iowa
(Stamp or Seal)
Title (and Rank)
My commission expires:_________________
Rebecca Albertson Revocable Trust Acknowledgement:
State of _____
County of __________________
This record was acknowledged before me on_________________, 2020 by
________________________ (Name(s) of individual(s) as ____________________________
(type of authority, such as officer or trustee) of the Rebecca Albertson Revocable Trust.
___________________________________
Notary Public in and for the State of Iowa
(Stamp or Seal)
Title (and Rank)
My commission expires:_________________
6
Steven M. and Mary Beth Carson Acknowledgement:
State of _____
County of __________________
This record was acknowledged before me on_________________, 2020 by Steven M. and
Mary Beth Carson.
___________________________________
Notary Public in and for the State of Iowa
(Stamp or Seal)
Title (and Rank)
My commission expires:_________________
Allen Homes, Inc. Acknowledgement:
State of _____
County of __________________
This record was acknowledged before me on_________________, 2020 by
________________________ (Name(s) of individual(s) as ____________________________
(type of authority, such as officer or trustee) of Allen Homes, Inc.
___________________________________
Notary Public in and for the State of Iowa
(Stamp or Seal)
Title (and Rank)
My commission expires:_________________
Item Number: 10.e.
D ecember 1, 2020
Resol u tion to amen d th e Down town an d Riverfron t Crossings Master Plan , a
p art of Iowa City's Compreh ensive Pl an , to in cl u d e p rop erty located n orth of
the Iowa In terstate Railroad, east of O l ive S treet, an d sou th of Myrtl e Aven u e
in the West Riverfront S u b d istrict. (C PA20-0002)
AT TAC HM E NT S:
D escription
Planning & Z oning Commission P acket 11-5-2020
C orrespondence
Planning & Z oning Commission Minutes
R esolution
R esolution A ppendix 1
1
STAFF REPORT
To: Planning and Zoning Commission
Item: CPA20-0002 West Riverside
Prepared by: Kirk Lehmann, Associate Planner
Date: November 5, 2020
GENERAL INFORMATION:
Applicant: Steve Long
K&F Properties, LLC
220 SE 6th Street Suite 200
Des Moines, IA, 50309
319-621-3462
steve@salidapartners.com
Contact Person: Mark Seabold
Shive-Hattery Architecture-Engineering
2839 Northgate Drive
Iowa City, IA 52245
319-325-5350
mseabold@shive-hattery.com
Property Owner(s): K&F Properties, LLC
220 SE 6th Street Suite 200
Des Moines, IA, 50309
Requested Action: To add properties to the West Riverfront Subdistrict
of the Downtown & Riverfront Crossings Master Plan
Purpose: To develop a mixed-use project with housing, retail,
hospitality and neighborhood services
Location: 219, 223, and 245 S. Riverside Court and
119, 201, 203, 205, 207, and 209 Myrtle Avenue
Location Map:
Size: 3.16 acres
2
Existing Land Use and Zoning: Residential; High Density Multi-Family Residential
Zone (RM-44) & Medium Density Single-Family
Residential (RS-8)
Surrounding Land Use and Zoning: North: Institutional (Open Space & Parking),
Institutional Public (P-2)
East: Residential & Commercial; Riverfront
Crossings, West Riverfront (RFC-WR) &
Community Commercial (CC-2)
South: Iowa Interstate Railroad & Residential;
Riverfront Crossings, West Riverfront (RFC-
WR), Riverfront Crossings, Orchard (RFC-
O), & Low Density Single-Family
Residential with Planned Development
Overlay (RS-5 OPD)
West: Residential; Medium Density Single-Family
Residential (RS-8)
Comprehensive Plan: Residential 2-8 Dwelling Units Per Acre, Residential
8-16 Dwelling Units Per Acre, & Mixed Use
District Plan: Southwest District Plan: Single-Family/Duplex
Residential, Medium to High Density Multi-Family, &
Mixed Use
File Date: August 13, 2020
BACKGROUND:
K&F Properties, LLC owns property located at 219, 223, and 245 S. Riverside Court and 119,
201, 203, 205, 207, and 209 Myrtle Ave. The owner is working with Shive-Hattery to prepare
three applications to allow development of a mixed-use project with housing, retail, hospitality,
and neighborhood service uses. This specific application (CPA20-0002) proposes to amend the
Comprehensive Plan by adding the subject properties, approximately 3.16 acres, to the West
Riverfront Subdistrict of the Downtown and Riverfront Crossings Master Plan. Attachment 4
illustrates the proposed changes to the plan.
The subject properties are included in the Southwest District of the Comprehensive Plan, which
indicates the properties are primarily appropriate for Medium to High Density Multi-Family,
specified as 8-16 Dwelling Units Per Acre in the Comprehensive Plan. 209 Myrtle Avenue is
shown as Single-Family/Duplex Residential, specified as 2-8 Dwelling Units Per Acre in the
Comprehensive Plan. The Riverfront Crossings Plan to which the subject properties are being
proposed for inclusion was adopted in 2013.
The other concurrently submitted applications include a zoning map amendment (REZ20-0003),
which would rezone properties the applicant owns from High Density Multi-Family Residential
Zone (RM-44), Community Commercial (CC-2), and Medium Density Single-Family Residential
(RS-8) to Riverfront Crossings-West Riverfront (RFC-WR), and a zoning text amendment
(REZ20-0004), which would amend the West Riverfront subdistrict regulating plan map and
3
increase the maximum bonus height from 5 to 7 stories along the north side of the Iowa
Interstate Railroad. Generally, the Comprehensive Plan Amendment must be approved for
changes to the zoning and regulating plan maps to comply with the Comprehensive Plan.
However, the bonus height zoning text amendment does not require the Comprehensive Plan
amendment to be approved.
The applicant submitted concept plans showing development scenarios for the properties they
own and a statement regarding the proposed amendment (Attachment 3). The concepts
illustrate the potential character of development but are subject to change.
The applicant held an online Good Neighbor Meeting on October 28, 2020. Letters were sent on
October 20 to property owners beyond the minimum required 300-foot distance informing
neighbors about the meeting. An account of the meeting is included in Attachment 5.
ANALYSIS:
The Iowa City Comprehensive Plan serves as a land-use planning guide by illustrating and
describing the location and configuration of appropriate land uses throughout the City, providing
notification to the public regarding intended uses of land; and illustrat ing the long-range growth
area limit for the City. Applicants may request an amendment to the City's Comprehensive Plan
with City Council approval after a recommendation by the Planning and Zoning Commission.
Applicants for a comprehensive plan amendment must provide evidence that the request meets
the approval criteria in Section 14-8D-3D. The comments of the applicant are found in the
attachments. Staff comments on the criteria is as follows.
14-8D-3D Approval Criteria: Applications for a comprehensive plan amendment must
include evidence that the following approval criteria are met:
1. Circumstances have changed and/or additional information or factors have come
to light such that the proposed amendment is in the public interest.
When the Southwest District Plan was adopted in 2002, the land use scenario (Medium
to High Density Multi-Family and Single-Family/Duplex Residential) was a way to create
an appropriate transition from commercial uses along S. Riverside Drive to residential
uses on Olive Street. The adoption of the Downtown and Riverfront Crossings Master
Plan in 2013 was a significant policy evolution by encouraging a more form-based
development approach. The City implemented this change through the adoption of a
form-based code which increased allowable densities while maintaining appropriate
transitions through building height and bulk controls. Subsequently, two multi -family
projects were developed under this code to the south of the subject properties,
Riverview West and the Orchard Lofts. Staff believes the adoption of the master plan,
and its implementation, constitute a change in circumstances for the subject area.
In addition, ownership of the subject parcels has recently changed. K&F assembled the
subject properties, along with those directly east on S. Riverfront Drive, from December
2019 through June 2020. Prior to that point, the subject properties were under four
different owners, with a fifth owning the property along S. Riverside Drive. While some of
this assemblage is currently within the West Riverfront subdistrict of the master plan, the
subject properties are not. This recent unification of ownership presents redevelopment
opportunities that did not previously exist.
4
2. The proposed amendment will be compatible with other policies or provisions of
the comprehensive plan, including any district plans or other amendments thereto.
The Roosevelt Subarea of the Southwest District Plan, which contains the subject
properties, has several goals relevant to the proposed amendment. One of its primary
goals is to provide an opportunity for all types of households to live close to the
University and downtown, including singles, young families, university students and
elderly populations. To this end, the plan encourages stabilizing single-family
neighborhoods and developing high-quality multi-family housing that is compatible with
surrounding neighborhoods. Its recommendations emphasize design standards to
ensure new multi-family development is sensitive to the environment, topography, and
neighborhood. Similarly, the plan encourages the development of attractive, mixed-use
buildings which include commercial uses serving the needs of nearby residents. These
goals reflect broader goals in the comprehensive plan, such as promoting compatible
infill, preventing sprawl, enabling alternatives to commuting by car, providing a diverse
community, and supporting the vitality of downtown.
The City adopted the Downtown and Riverfront Crossings Master Plan to implement
similar policies in the Riverfront Crossings District. Much of the master plan focuses on
encouraging pedestrian-oriented, mixed-use development to enhance the urban fabric.
This is achieved by mixing housing and commercial infill development and activating and
improving streetscapes with pedestrian amenities. In the West Riverfront subdistrict, this
is envisioned as occurring over time as commercial uses west of S. Riverside Drive take
on a more pedestrian-friendly framework or transition to urban apartments and mixed-
use development with buildings at corners and vehicular access behind to create a
pedestrian-oriented street frontage. East of S. Riverside Drive, the master plan
encourages utilizing river views with walkable commercial or niche residential uses,
including townhouses or mid-rise condominium buildings.
While the goals of these two plans generally align, some apparent differences must be
reconciled. The Southwest District Plan notes to avoid concentrations of high-density
multi-family zoning adjacent to low-density single-family zones. It uses its future land use
map to facilitate a transition between higher density uses on S. Riverside Drive and low-
density residential neighborhoods to the west. Alternatively, the master plan encourages
appropriate transitions through its regulating plan incorporated in the Zoning Code (City
Code, Title 14). The West Riverfront subdistrict allows a base height of up to 4 stories
with a 10-foot step back above the third floor on facades facing streets or single-family
residential zones. The maximum height may be increased to five stories where not
abutting a residential zone. While the strategies are different, they achieve the same
ends of appropriately transitioning from lower to higher density uses. The Riverfront
Crossing Form-Based Code also includes enhanced building, frontage, and design
requirements, which further ensures a higher quality of design and supports both plans.
To understand compatibility, the specific context is also relevant. The subject parcels
currently contain 144 dwelling units, primarily in two- to three-story multi-family buildings,
though also in some lower density properties. The Southwest District Plan Future Land
Use Map designations of Single-Family/Duplex Residential, Medium to High Density
Multi-Family, and Mixed Use reflect this situation. Surrounding properties include public
uses to the north, commercial uses to the east, a railroad and high-density multi-family
uses to the south, and some medium-density single-family uses to the west. The subject
parcels are immediately adjacent to areas within the West Riverfront subdistrict and
5
contain similar uses to those in the subdistrict. As such, it makes sense to include the
subject parcels though this was not contemplated in the master plan.
Expanding the West Riverfront subdistrict will increase the allowable density of the subject
properties, but staff believes it maintains compatibility with single-family homes to the west
in this case. Steep slopes create 50 feet of grade change between those homes and the
subject parcels, and West Riverfront parcels abutting a residential zone can only have
buildings up to four stories. As a result, the proposed buildings are expected to have a
three-story exposure to the single-family homes, which is comparable to what would be
allowed in the current zone if the properties were at the same grade. It is also only one
story taller than the existing buildings, maintaining a similar context for homes to the west.
In addition, redevelopment of the site meets other goals in the Southwest District and
Riverfront Crossings plans. First, it allows for a more cohesive development with better
circulation and a high-quality, pedestrian-oriented design. The concept also contains a
mixed of senior and market-rate housing, retail, hospitality and neighborhood services, all
organized around a central, pedestrian-scale plaza. While the concept will increase traffic
to the site, the Traffic Impact Study which was submitted with the application indicates that
all study intersections will operate at acceptable levels of service and th at queuing is not
anticipated to be an issue.
For these reasons, staff finds that the requested Comprehensive Plan amendment to
expand the West Riverfront subdistrict to include the subject properties in the Downtown
and Riverfront Crossings Master Plan is compatible with the surrounding development
and other policies in the Comprehensive Plan. However, implementing this proposed
amendment requires amending the zoning code map and the regulating plan (to be
considered under REZ20-0003 and REZ20-0004 respectively).
STAFF RECOMMENDATION:
Staff recommends approval of CPA20-0002, a proposed amendment to the Comprehensive Plan,
to add approximately 3.16 acres of property to the West Riverfront Subdistrict of the Downtown
and Riverfront Crossings Master Plan located at 219, 223, and 245 S. Riverside Court and 119,
201, 203, 205, 207, and 209 Myrtle Ave.
ATTACHMENTS:
1. Location Map
2. Zoning Map
3. Application Submittal
4. Proposed Changes to the Downtown & Riverfront Crossings Master Plan
5. Good Neighbor Meeting Materials
Approved by: _________________________________________________
Danielle Sitzman, AICP, Development Services Coordinator
Department of Neighborhood and Development Services
SRIVERSIDEDRMYRTLE AVE
S RIVERSIDE CTOLIVE STCPA20-0002West of Riverfront Drive,South of Mrytle Avenue.µ
0 0.025 0.050.0125 Miles Prepared By: Joshua EngelbrechtDate Prepared: August 2020
An application submitted by K & F Properties, LLC to request aComprehensive Plan Amendment to change the land use designationof approximately 3.16 acres of property from High Density Multifamily(RM-44) and Medium Density Single-Family (RS-8) to IowaRiverfront Crossings, West Riverfront (IRC-WR).
S RIVERSIDE DRMYRTLE AVE
S RIVERSIDE CTOLIVE STRFC-O
P2
RFC-WR
RS8
CC2
RM44
RS5
CPA20-0002West of Riverfront Drive,South of Mrytle Avenue.µ
0 0.025 0.050.0125 Miles Prepared By: Joshua EngelbrechtDate Prepared: August 2020
An application submitted by K & F Properties, LLC to request aComprehensive Plan Amendment to change the land use designationof approximately 3.16 acres of property from High Density Multifamily(RM-44) and Medium Density Single-Family (RS-8) to IowaRiverfront Crossings, West Riverfront (IRC-WR).
Project 1191830
CPA20-0001
Applicant’s statement – The proposed amendment will be compatible with other policies or provisions
of the Comprehensive Plan, including any District Plans or other amendments thereto.
Below verbiage included on page 16 of submitted document
“Riverfront West Development requests that Iowa City’s Comprehensive Plan be amended to extend the
Riverfront Crossings District west in the area indicated above from the existing properties in the West
Riverfront Subdistrict along Riverside Drive to the eastern property line of the residential properties
located on Olive Street and 215/213 Myrtle Ave. The existing West Riverfront Subdistrict would be
expanded west as part of this amendment.
This expansion of the West Riverfront Subdistrict would redefine an existing RM-44 zoned area with
existing apartment buildings and two converted/ leased single family residential houses. The properties
to be included in the current RM-44 zoned area are 219, 223, and 245 S. Riverside Court and 119, 201,
203, 205, and 207 Myrtle Ave. This area also includes a single RS8 lot, 209 Myrtle Ave.
Expanding the West Riverfront Subdistrict is appropriate for this site due to the over 50’ of grade change.
Because of this topography, which is atypical of the West Riverfront Subdistrict, the proposed height of
the buildings will present a three-story exposure to the Olive Street residences. This is approximately a
single story more than the existing apartments building
located there now.
This Comprehensive Plan Amendment would allow for a more cohesive development while still being
sensitive to the neighborhood scale to the west.”
Neighboring Property Listing – file attached for property owners within 300 feet of the exterior limits of
the properties involved in this application.
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 1SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA
AUGUST 13, 2020
RIVERFRONT WEST
DEVELOPMENTCOMPREHENSIVE PLAN AMENDMENT &REZONING
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 2SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
EXISTING SITE PHOTOGRAPHY
No existing pedestrian circulation throughout the site. Lack of defined vehicular entrances from Riverside Drive.
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 3SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
EXISTING SITE PHOTOGRAPHY
Outdated buildings lack energy efficiency. Site contributes to heat island effect in this area.
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 4SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
EXISTING SITE PHOTOGRAPHY
Lack of green space/ vegetated area does not relate to surrounding area. Most of site area devoted to parking.
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 5SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
EXISTING SITE PHOTOGRAPHY
Buildings do not relate to each other. Views are to backs of other buildings both within the site and from Olive Street.
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 6SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
EXISTING SITE PHOTOGRAPHY
Buildings do not relate to Myrtle Street. Extreme grade change from Myrtle to existing buildings.
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 7SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
EXISTING SITE PHOTOGRAPHY
Lack of green space/ vegetated area does not relate to surrounding area.
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 8SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
PROPOSED SITE MASSING
PERSPECTIVES
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 9SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
MASSING STUDIES | RIVERSIDE DRIVE LOOKING WEST
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 10SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
MASSING STUDIES | RIVERSIDE DRIVE LOOKING WEST
TEXT AMENDMENT TO WEST RIVERFRONT SUBDISTRICT TO ALLOW HEIGHT BONUS ALLOWANCE TO 7 STORIES MAX FOR PROPERTIES NORTH OF AND ADJOINING IOWA INTERSTATE RAILROAD
CORNER PROPERTY CURRENTLY ZONED WEST RIVERFRONT SUBDISTRICT
FIVE (5) STORIES MAXIMUM FOR PROPERTIES WITHIN THE WEST RIVERFRONT SUBDISTRICT THAT DO NOT HAVE FRONTAGE ALONG THE IOWA RIVER. HOWEVER, BONUS HEIGHT IS NOT ALLOWED ON LOTS THAT ABUT A RESIDENTIAL ZONE.
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 11SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
MASSING STUDIES | CORNER OF RIVERSIDE DRIVE AND MRYTLE AVE LOOKING
SET BACK 10’
SET BACK 10’
TEXT AMENDMENT TO WEST RIVERFRONT SUBDISTRICT TO ALLOW HEIGHT BONUS ALLOWANCE TO 7 STORIES MAX FOR PROPERTIES NORTH OF AND ADJOINING IOWA INTERSTATE RAILROAD
CORNER PROPERTY CURRENTLY ZONED WEST RIVERFRONT SUBDISTRICT
FIVE (5) STORIES MAXIMUM FOR PROPERTIES WITHIN THE WEST RIVERFRONT SUBDISTRICT THAT DO NOT HAVE FRONTAGE ALONG THE IOWA RIVER. HOWEVER, BONUS HEIGHT IS NOT ALLOWED ON LOTS THAT ABUT A RESIDENTIAL ZONE.
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 12SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
MASSING STUDIES | HOTEL ENTRANCE LOOKING NORTH
CORNER PROPERTY CURRENTLY ZONED WEST RIVERFRONT SUBDISTRICT
FIVE (5) STORIES MAXIMUM FOR PROPERTIES WITHIN THE WEST RIVERFRONT SUBDISTRICT THAT DO NOT HAVE FRONTAGE ALONG THE IOWA RIVER. HOWEVER, BONUS HEIGHT IS NOT ALLOWED ON LOTS THAT ABUT A RESIDENTIAL ZONE.
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 13SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
MASSING STUDIES | RETAIL PLAZA LOOKING SOUTH
CORNER PROPERTY CURRENTLY ZONED WEST RIVERFRONT SUBDISTRICT
FIVE (5) STORIES MAXIMUM FOR PROPERTIES WITHIN THE WEST RIVERFRONT SUBDISTRICT THAT DO NOT HAVE FRONTAGE ALONG THE IOWA RIVER. HOWEVER, BONUS HEIGHT IS NOT ALLOWED ON LOTS THAT ABUT A RESIDENTIAL ZONE.
TEXT AMENDMENT TO WEST RIVERFRONT SUBDISTRICT TO ALLOW HEIGHT BONUS ALLOWANCE TO 7 STORIES MAX FOR PROPERTIES NORTH OF AND ADJOINING IOWA INTERSTATE RAILROAD
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 14SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
MASSING STUDIES | RIVERSIDE DRIVE LOOKING NORTH
FUTURE TUNNEL LOCATION
TEXT AMENDMENT TO WEST RIVERFRONT SUBDISTRICT TO ALLOW HEIGHT BONUS ALLOWANCE TO 7 STORIES MAX FOR PROPERTIES NORTH OF AND ADJOINING IOWA INTERSTATE RAILROAD
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 15SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
PROPOSED SUBDISTRICT
WEST RIVERFRONT
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 16SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
Riverfront West Development requests that Iowa City’s Comprehensive Plan be amended to extend the Riverfront Crossings
District west in the area indicated above from the existing properties in the West Riverfront Subdistrict along Riverside Drive
to the eastern property line of the residential properties located on Olive Street and 215/213 Myrtle Ave. The existing West
Riverfront Subdistrict would be expanded west as part of this amendment.
This expansion of the West Riverfront Subdistrict would redefine an existing RM-44 zoned area with existing apartment
buildings and two converted/ leased single family residential houses. The properties to be included in the current RM-44
zoned area are 219, 223, and 245 S. Riverside Court and 119, 201, 203, 205, and 207 Myrtle Ave. This area also includes a
single RS8 lot, 209 Myrtle Ave.
Expanding the West Riverfront Subdistrict is appropriate for this site due to the over 50’ of grade change. Because of this
topography, which is atypical of the West Riverfront Subdistrict, the proposed height of the buildings will present a three-story
exposure to the Olive Street residences. This is approximately a single story more than the existing apartments buildinglocated there now.
This Comprehensive Plan Amendment would allow for a more cohesive development while still being sensitive to the neighborhood scale to the west.
DESCRIPTION OF PROPOSED COMPREHENSIVE PLAN AMENDMENT
PROPOSED COMPREHENSIVE PLAN AMENDMENT & REZONING
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 17SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
EXISTING CONDITIONS | CURRENT ZONING OF PROPERTIES
RIVERFRONT WEST DEVELOPMENT | COMPREHENSIVE PLAN AMENDMENT & REZONING 18SW CORNER OF RIVERSIDE DRIVE AND MYRTLE AVE, IOWA CITY, IA | AUGUST 13, 2020
PROPOSED WEST RIVERFRONT SUBDISTRICT
PROPOSED WEST RIVERFRONT
SUBDISTRICT
CURRENTLY WEST
RIVERFRONT SUBDISTRICT
WEST RIVERFRONT
SUBDISTRICT
WEST RIVERFRONT
SUBDISTRICT
Principal buildings with frontage
on the Iowa River may be eight (8)
stories maximum in height before
application of bonus provisions
Principal buildings with frontage
on the Iowa River may be eight (8)
stories maximum in height before
application of bonus provisions
FIVE (5) STORIES MAXIMUM FOR PROPERTIES WITHIN THE WEST RIVERFRONT SUBDISTRICT THAT DO NOT HAVE FRONTAGE ALONG THE IOWA RIVER. HOWEVER, BONUS HEIGHT IS NOT ALLOWED ON LOTS THAT ABUT A RESIDENTIAL ZONE.
WEST RIVERFRONT
SUBDISTRICT
Principal buildings with frontage
on the Iowa River may be eight (8)
stories maximum in height before
application of bonus provisions
3.16 acres
TEXT AMENDMENT TO WEST RIVERFRONT SUBDISTRICT TO ALLOW HEIGHT BONUS ALLOWANCE TO 7 STORIES MAX FOR PROPERTIES NORTH OF AND ADJOINING IOWA INTERSTATE RAILROAD
downtown & riverfront crossings
january 2013
master plan
ADOPTED
october 2015
july 2016
XXXXX 2020
AMENDED
downtown and riverfront crossings plan2 24
23
2
1
3
4 5
7 8 9
18
19
21
11
12
10
13
22
14 15
16
17
20
1
2
3
4
5
Downtown Infill Development
Burlington Street Pedestrian Enhancements
New Student Housing
Clinton Plaza
Clinton Street Promenade
Ralston Creek Reconstruction
Rock Island Train Depot/Potential Passenger Rail Station
Transit Oriented Development and Station Civic Plaza
Central Crossings Light Rail Stop
Cottage Homes
Artist Courts
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
Park District Mixed-Use Development
River Outlook
Potential Arts Center
Regional Park
Gilbert Street Mixed-Use District
South Gilbert Light Rail Stop
Riverview Townhomes
Riverfront Residential Tower
Riverside Drive Commercial Redevelopment
Riverside Drive Pedestrian Enhancements
Entrance Monuments
Orchard Court Sub-District (July 5, 2016)
Expansion of West Riverfront Subdistrict
RALSTON CREEK
IOWA RIVER
6
11 22
24
23
downtown and riverfront crossings plan4
sub-districts
During the course of the planning process, several prominent
features were discussed on a recurring basis. Due to either their
prominent role in the plan or their relevance and impact on other
elements, these features became to be known as Framework
Elements. Framework Elements consist of Sub-Districts, Primary
Streets and Required Retail Storefronts, Mobility, Green Space,
Public Art, and Student Housing. These Framework Elements will
be discussed in further detail on the following pages.
The Downtown and Riverfront Crossings Master Plan Study Area
is very large in size and contains a number of neighborhoods and
settings, each with their own identity. Instead of combining them
into one homogeneous district, it was determined that it would be
more useful, and appropriate, to break the Study Area into sub-
districts. These sub-districts would be identified based on their
location, primary use, scale, and other identifying features. In all,
eight districts were identified:
›Downtown
›South Downtown
›Central Crossings
›Gilbert
›West Riverfront
›Orchard
›University
›Park
›South Gilbert
Many of these sub-districts existed in a geographic sense, but
were unnamed and given “formal” names as part of the planning
process. Other times, the sub-districts were known by their
formal names, but did not have defined geographic boundaries.
Each sub-district will be described in more detail in the following
chapter.
Johnson County
Sub-District Map for RFC Plan
Right: Sub-District Diagram
West
Riverfront
District
University
District
Park
District
Central
Crossings
District
South
Downtown
District
Downtown
District
Gilbert
District
South
Gilbert
District
Orchard
District
28
5
downtown district
West Riverfront Expansion
Orchard
District(appx. 2)
53
south downtown district
7
West
Riverfront Expansion
Orchard
District
(appx. 2)
59
central crossings district
9
West
Riverfront Expansion
Orchard
District
(appx. 2)
65
gilbert district
11
West Riverfront
Expansion
Orchard
District(appx. 2)
73
west riverfront district
13
West
Riverfront Expansion
Orchard
District
(appx. 2)
79
The West Riverfront District is a high-traffic, auto-oriented corridor
situated on the west side of the Iowa River. South Riverside
Drive bisects the district and connects U.S. Highway 6 with the
University of Iowa campus. It is lined by commercial uses set
back behind surface parking lots. Pedestrians are typically an
afterthought. Unlike the rest of the study area, this district plays by
different rules in terms of achieving an urban, pedestrian friendly
environment.
As redevelopment of the district occurs, new development
should capitalize on the Iowa River and its close proximity to the
campus. In addition, it should take advantage of the access and
visibility provided by Highway 6. It is envisioned that over time,
the commercial development on the west side of South Riverside
Drive will take on a more pedestrian-friendly framework, or it will
transition to urban apartments and mixed-use development. In
the development of gas stations and drive thru businesses, the
building should be anchored at the corner, with vehicular access
and amenities moved to the back to create a pedestrian oriented
street frontage (See Appendix A). Redevelopment on the east side
of the district will take advantage of river views, and will consist
of either pedestrian-friendly commercial uses or niche residential,
including higher end townhouses or mid-rise condo towers.
West Riverfront District Summary
Master Plan Objectives:
›Capitalize on Highway 6 access and visibility
›Improve pedestrian and bicycle circulation
›Capitalize on the Iowa River
›Extend the riverfront trail
›Capture the football crowd
Development Character:
›Temper auto orientation
›Open views and access to river
›Enhance the streetscape and overall aesthetics
Development Program:
›Multiple housing typologies, including condo towers,
apartments and townhouses
›Destination river view restaurants
›Commercial , possible small to midsize box
›Hospitality
downtown and riverfront crossings plan14
west riverfront district
PRENTISS ST.
WRIGHT ST.
LAFAYETTE ST.
BENTON ST.
BENTO
N
ST.
KIRKWOOD AVE.
HIGHWAY 6
ST
U
R
G
I
S
C
O
R
N
E
R
D
R
.SOUTH RIVERSIDE DR.MAIDEN LANEGILBERT ST.I
O
W
A
R
I
V
E
RR A L S T O NORCHARD ST.CREEKDUBUQUE ST.CAPITOL ST.GILBERT ST.80
WR1
WR2
WR3
WR4
WR6
WR5
WR7
WR – 1: Riverfront Enhancements – In order to help encourage
development within the district, a program to enhance the west
bank of the Iowa River should be undertaken. This would include
utilitarian elements, such as stabilizing the riverbank to prevent
further erosion, functional elements, such as extending the
riverfront trail to the north and south, and aesthetic elements,
such as providing additional landscaping. Included in this would
be interpretative stations along the river to provide educational
opportunities relating to the river and its plant and wildlife,
including the many Bald Eagles that frequent this stretch.
WR – 2: Riverside Drive Enhancements – Riverside Drive is very
auto-oriented, with few pedestrian amenities and unappealing
aesthetics. As the district transitions into a more urban setting,
the right-of-way will need to be redesigned in order to provide
enhanced aesthetics and a more walkable environment for
pedestrians.
Enhancements to the pedestrian environment should include the
following:
›Reduce the number of curb cuts along the street
›Provide a wider sidewalk that is set back from the curb a
minimum of six feet and preferably more
›Provide enhanced pedestrian crossings across Riverside Drive
and its cross streets
›Provide a safe pedestrian connection on the west side of
Riverside Drive under the Iowa Interstate Railroad bridge.
Aesthetic enhancements should include the following:
›Gateway signage and landscaping at the intersection of U.S.
Highway 6
›Buried utilities
›Streetscape enhancements, including street trees and other
forms of landscaping
WR – 3: Westside Redevelopment – Located along the west side
of Riverside Drive and north of Benton Street, the car dealership
site provides a large and strategic site for redevelopment. As
shown in the plan, the northwest corner of the intersection is
reserved for an attached green, which would double the amount of
available frontage for neighborhood retail or restaurant uses. This
landscaped green could provide outdoor seating for restaurants
or cafes, and is the “identity” of the site. The remaining buildings
on the site would be pedestrian oriented, with street frontage
and parking in the rear. They are designed to accommodate retail
uses on their first floors, and apartments on the upper floors. This,
as well as the area north of the railroad, could be an appropriate
location for dormitory style housing as discussed earlier. There is
the possibility for a higher room count if housing developed with
a private dorm, provided there is an agreement with the University
to provide car storage offsite.
WR – 4: Riverside Commercial Redevelopment – The commercial
property on the west side of Riverside Drive and south of Benton
Street will take on a more pedestrian friendly format. In order for
this to occur, a slip lane will need to be constructed. This lane will
provide access to the retail uses, as well as “on-street” parking.
In addition, it will be the organizing feature of the site, and help
provide a common “build-to” line for new development to address.
New commercial buildings will be adorned with enhanced facades
and improved landscaping, and overflow parking will be provided
to the rear of the buildings.
WR – 5: Sturgis Corner Redevelopment – The commercial uses on
the Sturgis Corner site were developed in a conventional manner,
with multiple architectural styles, buildings set back behind large
surface parking lots, and limited pedestrian amenities. As this
area begins to redevelop, development guidelines will establish a
new development framework, one that is much more pedestrian
friendly. New commercial buildings will front onto Sturgis
Corner Drive, sidewalks will connect buildings, and parking will
be provided on-street and to the rear of buildings. In addition,
a new building site has been proposed for a new condo tower
overlooking the river and future regional park.
15
WR 3: Westside Redevelopment
WR 4: Riverside Commercial Development
WR 5: Sturgis Corner Redevelopment
81
WR – 6: Riverview – A new neighborhood is designated for
the north side of Benton Street. This neighborhood, which will
overlook the Iowa River and riverfront trail, will contain a new
mid-rise condo tower and townhouses that front onto greens
that provide access and view corridors to the river. All buildings
will be designed with parking on the ground floor in order to
raise habitable space above the floodplain. This design also
allows residents to get a more commanding view of the river. A
restaurant or retail site is located at the intersection of Benton
Street and Riverside Drive. This restaurant would have trail access
and is designed with a large patio with views of the river.
WR – 7: West Riverfront Expansion – The West Riverfront Sub-
District was expanded by a comprehensive plan amendment
(CPA20-0002) on XXXX, XX, 2020. The uses on the site at the time
of expansion were existing single-family and multi-family uses.
The site contains more than 50 feet of grade change, which is
atypical of the subdistrict. Redevelopment of the site will allow
the development of a larger, mixed-use project which may include
housing, retail, hospitality and/or neighborhood services. The new
development would make the site more cohesive and pedestrian-
friendly. However, the development must remain sensitive to the
less dense, single-family homes to the west.
downtown and riverfront crossings plan16
WR 6: Before and After Renderings Showing the New Riverview Neighborhood Development in the West Riverfront District
82
17
PRENTISS ST.
WRIGHT ST.
LAFAYETTE ST.
BENTON ST.
BENTO
N
ST.
KIRKWOOD AVE.
HIGHWAY 6
ST
U
R
G
I
S
C
O
R
N
E
R
D
R
.SOUTH RIVERSIDE DR.MAIDEN LANEGILBERT ST.I
O
W
A
R
I
V
E
RR A L S T O NORCHARD ST.CREEKDUBUQUE ST.CAPITOL ST.GILBERT ST.15
16 17
18
19
20
21
22
23
24
25
26
27
29
28
1 2
3
4
5
6 789
10 11
12
13
14
west riverfront yield analysis
83
downtown and riverfront crossings plan18
WEST RIVERFRONT DISTRICT
Building Building Square Comm.Office Mixed Resid Hotel Misc Suite Residential Hotel Parking Parking
Building ID Type Footprint Stories Footage SF SF SF SF SF SF Units Units Rooms Demand Provided Private Pkg Lot Pkg Gar Notes
WR-1 Commercial 3,900 1 3,900 3,900 - - - - - - - -16 18 -18 -
WR-2 Commercial 5,000 1 5,000 5,000 - - - - - - - -20 26 -26 -
WR-3 Commercial 16,805 1 16,805 16,805 - - - - - - - -67 45 -45 -
WR-4 Commercial 23,365 1 23,365 23,365 - - - - - - - -93 68 -68 -
WR-5 Commercial 10,350 1 10,350 10,350 - - - - - - - -41 42 -42 -
WR-6 Commercial 1,400 1 1,400 1,400 - - - - - - - - 6 5 - 5 -
WR-7 Commercial 1,400 1 1,400 1,400 - - - - - - - - 6 5 - 5 -
WR-8 Commercial 1,400 1 1,400 1,400 - - - - - - - - 6 5 - 5 -
WR-9 Commercial 1,400 1 1,400 1,400 - - - - - - - - 6 5 - 5 -
WR-10 Commercial 4,200 2 8,400 8,400 - - - - - - 3 -38 26 -26 -
WR-11 Mixed Use 2,555 2 5,110 - -2,555 2,555 - - - 2 -12 10 -10 -
WR-12 Mixed Use 11,255 4 45,020 - -11,255 33,765 - - -21 -73 45 -45 -
WR-13 Mixed Use 13,835 4 55,340 - -13,835 41,505 - - -27 -91 56 -56 -
WR-14 Residential 11,640 4 46,560 - - -46,560 - - -32 -48 61 -61 -
WR-15 Residential 11,250 4 45,000 - - -45,000 - - -28 -42 53 -53 -
WR-16 Townhomes 2,885 3 6,675 - - -6,675 - - - 3 - 6 8 6 2 -
WR-17 Townhomes 5,330 3 12,460 - - -12,460 - - - 5 -10 13 10 3 -
WR-18 Townhomes 4,080 3 9,560 - - -9,560 - - - 4 - 8 12 8 4 -
WR-19 Townhomes 6,080 3 14,070 - - -14,070 - - - 6 -12 14 12 2 -
WR-20 Townhomes 6,080 3 14,070 - - -14,070 - - - 6 -12 13 12 1 -
WR-21 Residential 20,315 8 68,875 - - -68,875 - - -40 -63 40 30 10 -parking on ground level
WR-22 Commercial 5,185 1 5,185 5,185 - - - - - - - -21 14 -14 -
WR-23 Mixed Use 10,355 5 45,085 - -3,665 41,420 - - -28 -55 34 17 17 -
WR-24 Commercial 8,835 1 8,835 8,835 - - - - - - - -35 44 -44 -
WR-25 Commercial 7,195 1 7,195 7,195 - - - - - - - -29 36 -36 -
WR-26 Commercial 6,575 1 6,575 6,575 - - - - - - - -26 20 -20 -
WR-27 Commercial 5,000 1 5,000 5,000 - - - - - - - -20 25 -25 -
WR-28 Residential 14,520 7 68,940 - - -68,940 - - -38 -57 57 37 20 -parking on ground level
WR-29 Hotel 13,620 4 54,480 - - - -54,480 - - -108 108 90 -90 -
WEST RIVERFRONT DISTRICT TOTALS 597,455 106,210 0 31,310 405,455 54,480 0 0 243 108 1,026 890 132 758 0
84
university district
19
West
Riverfront Expansion
Orchard
District
(appx. 2)
85
park district
21
West
Riverfront Expansion
Orchard
District
(appx. 2)
91
south gilbert district
downtown and riverfront crossings plan22
West
Riverfront Expansion
Orchard
District
(appx. 2)
96
THOMAS A PAULSEN
1203 SANTA FE DR
IOWA CITY, IA 52246
BENNY LEE STEVENSON
531 OLIVE ST
IOWA CITY, IA 52246
DAVID ALLEN WADKINS
533 OLIVE ST
IOWA CITY, IA 52246
IHAWK INVESTMENTS LLC
1107 RYAN CIR
IOWA CITY, IA 52246
SKYLER A MOSS
527 OLIVE ST
IOWA CITY, IA 52246
ARTHUR T JOHNSON
50 PRAIRIE DR
WALKER, IA 52352
ALFRED R & MARTHA G KLEINMEYER
530 OLIVE ST
IOWA CITY, IA 52246
PRESTIGE PROPERTIES III LLC
329 E COURT ST STE 2B
IOWA CITY, IA 52240
MARTHA KLEINMEYER
530 OLIVE ST
IOWA CITY, IA 52246
RIVER CROSSINGS LLC
2626 NEWPORT RD NE
IOWA CITY, IA 52240
ELISA G WALLICK
534 OLIVE ST
IOWA CITY, IA 52246
TIMOTHY A KLEINMEYER
532 OLIVE ST
IOWA CITY, IA 52246
CHRISTOPHER TRAETOW
475 N MCKENZIE LN
NORTH LIBERTY, IA 52317
KAREN EAKES
702 GIBLIN DR
IOWA CITY, IA 52240
KEYSTONE PROPERTY MANGEMENT
533 SOUTHGATE AVE
IOWA CITY, IA 52240
HOWARD M FIELD
2732 HIDDEN VALLEY TRL NE
SOLON, IA 52333-9551
PETRO-KING INC
606 S RIVERSIDE DR
IOWA CITY, IA 52246-5606
MCWANE DAIRY QUEEN INC
526 S RIVERSIDE DR
IOWA CITY, IA 52246
STATE OF IOWA
4 JESSUP HALL
IOWA CITY, IA 52242
TIMOTHY J & SHEILA M KELLY
1094 BLACK DIAMOND RD
PARNELL, IA 52325
M & W PROPERTIES LLC
916 MAIDEN LN
IOWA CITY, IA 52240
RIVERVIEW WEST LLC
404 E COLLEGE ST #1501
IOWA CITY, IA 52240
L & K PROPERTIES LLC
380 WHITMAN AVE
NORTH LIBERTY, IA 52317
513 RIVERSIDE LLC
13 WOODCREST LN NE
IOWA CITY, IA 52240
FIRST MENNONITE CHURCH OF IC
405 MYRTLE AVE
IOWA CITY, IA 52246
BARKALOW INVESTMENTS INC
PO BOX 1490
IOWA CITY, IA 52244-1490
H SHELTON & ANN M STROMQUIST
316 MYRTLE AVE
IOWA CITY, IA 52246
MAG DEVELOPMENT LLC
PO BOX 5325
CORALVILLE, IA 52241
JAMES M & MARY K KRIER
28042 280TH ST
OLLIE, IA 52576
RIVERFRONT WEST GOOD NEIGHBOR MEETING
October 28, 2020 4:30 pm – 6:00 pm (Zoom)
Attendees
Neighbors: Nick Faselt, Carrie Floss, Mary Knudson, Ann Stomquist, Shel Stromquist, Paula
Swygard, Chris Traetow
Applicant: Mark Seabold (Shive Hattery), Steve Long, Kevin Kain & Adam Carper
(Riverfront West), Maryann Dennis (Riverfront West affordable housing
consultant)
City Staff: Ray Heitner, Kirk Lehman & Marcia Bollinger
Comments & Questions
• What about development on the east side of Riverside Drive, along the Iowa River?
• Are we working with the university?
• When we go before Planning and Zoning will we have a final concept?
• Please explain the comprehensive plan and rezoning process.
• Total number of units proposed?
• Will there be affordable housing replacement?
• Will you meet with us again after rezoning to show us the concept?
• The intersection of Riverside and Benton is so much nicer now and this project
continues that. It’s great. It would add to this area of town.
• Any concerns about the noise from the railroad?
• Updates on the railroad tunnel project?
• Concern about connecting to the neighborhood to the south, if the tunnel is not
constructed.
• Properties that abut the homes on Olive Court is there a buffer, similar to Riverfront
West -Orchard?
• What is the development timeline?
• How much neighborhood commercial space?
Zoom Chat Question
What type of housing is being thought to go here? Hotel?/Senior?/Multi-family?
City Staff Representative Comments
From:Paula Swygard
To:PlanningZoningPublic
Subject:CPA20-0002, REZ20-0003, and REZ20-0004
Date:Monday, November 2, 2020 1:29:12 PM
Attachments:image.png
Members of the Planning and Zoning Commission,
I am writing to ask you to consider the following regarding CPA20-0002 (comp plan),
REZ20-0003 (rezoning), and REZ20-0004 (modification to WRFC for height bonus), for the
properties at 219, 223, and 245 S. Riverside Court and 119, 201, 203, 205, 207, and 209
Myrtle Ave.
The West Riverfront subdistrict of the Riverfront Crossings Master Plan was designed to
allow for infill redevelopment of the commercial properties along Riverside Drive. Among its
major goals were to develop a mixed-use, pedestrian friendly area and to improve the current
streetscape as Riverside Drive transitioned from a strictly commercial area. Orchard Street
was used as the western boundary for the West Riverfront subdistrict south of the railroad
bridge, and properties designated as appropriate for the West Riverfront subdistrict north of
the railroad bridge were limited to the commercial properties as clearly delineated on the
Downtown and Riverfront Crossings Master Plan, p. 80, shaded in blue below.
It is notable that the West Riverfront Crossings subdistrict did not extend across Orchard
Street or into the RM 44 properties west along Myrtle Avenue. The form based code
standards for West Riverfront Crossings do not address the redevelopment of residential
properties whether they be RM 44 or RS8 in the area abutting or adjacent to the West
Riverfront Crossings subdistrict. It targeted the redevelopment of commercial buildings into
mixed use buildings along Riverside Drive.
When redevelopment was sought of the multi-family and residential zoned properties north of
Orchard Street, a new Riverfront Crossings subdistrict, The Orchard District, was developed.
The Orchard District, created after the initial Downtown and Riverfront Crossings Master Plan
was approved, was developed to "provide a transition between higher intensity mixed-use
areas along Riverside Drive and low-scale residential neighborhoods to the west." (Zoning
Code14-2G-3: Subdistrict Standards) It specifies what types of buildings can be built in the
district and has different subdistrict form based guidelines for development. Most notably, it
limits buildings to 3 stories. It has different form based zoning guidelines and restrictions
which are sensitive to RS8 zoning which the West Riverfront Crossings subdistrict does not
have. In particular, it requires more setback between RS8 properties and properties
redeveloped using the form based code for the Orchard District. In addition to guiding what
type of buildings are allowed in the area, it also addresses placement of parking, screening,
lighting, etc. The district was created to allow for a smooth transition between what is allowed
in different zonings (not because of topography).
Citing Orchard Lofts as a circumstance that has changed in the area and therefore a valid
reason to support the comp plan amendment is misleading. Orchard Lofts is in a different
Riverfront Crossings subdistrict, the Orchard District, than the West Riverfront Crossings
subdistrict.
The Riverview West apartment complex, also cited as a circumstance that has changed, is the
kind of infill redevelopment targeted by the West Riverfront Crossings subdistrict master
plan. This residential complex was built on a vacant commercial property, formerly a car
dealership, located within the original West Riverfront Crossings subdistrict boundary in the
master plan. The property never abutted residential properties – Orchard St separates the West
Riverfront Crossings subdistrict from the now Orchard District. It was developed
appropriately according to the West Riverfront Crossings subdistrict guidelines and applicable
form based code. Most notably, it adheres to the four stories laid out in the master plan.
The development standards set forth in the Downtown and Riverfront Crossings Master plan
for the RFC-WR District and the applicable form based code are not designed to abut and
transition to RS8 properties. The form based code for the RFC-WR district does not even
address this, however, the form based code for the Orchard District does.
Faulting the topography seems to be a reason to justify 4 stories abutting the RS8 zone.
Visually, the placement of a 4 story building against the backdrop of the hill may offer a
transition between the two zones. However, overall this will amount to an upzoning and the
proposed apartment building along the west boundary of the property looks expansive. The
RM44 properties could be attractively redeveloped similar in density to the current outdated
buildings rather than through upzoning as would happen by applying RFC-WR. Instead, the
Orchard District zoning and its form based code could be used as a model or extended to this
area. Currently the zoning for the properties is RM44 which allows for three stories. This is
what is allowed in the Orchard District. The form based code for the Orchard District steps
down from development along Riverside Drive and is sensitive to RS8 development. As the
RM44 properties are redeveloped, limiting buildings to 3 stories would maintain better
compatibility between the one story single family homes along Olive Street and these parcels.
Currently, the majority homes along Olive Street actually have no RM44 apartments abutting
them - there is an undeveloped lot and a single family home located within the RM44 zoning
abutting the rear of the majority of the homes. Per staff report 'the proposed buildings are
expected to have a three-story exposure to the single-family homes, which is comparable to
what would be allowed in the current zone if the properties were at the same grade.” So it
follows that if three stories were permitted instead of four, the proposed buildings would then
have a two-story exposure to the single family homes. Regardless, the current apartment
buildings are not close to the Olives St homes but are downhill so that the roofline might
possibly be visible from the RS8 properties, and there is currently no development abutting
them so this would be a huge change for the RS8 properties.
From p. 20 of 44 in the Riverside Development Traffic Impact Study - Preliminary Site Plan -
The plan shows a four story apartment building next to the RS8 properties. It discusses a
Myrtle Avenue semi-truck egress access point. During the Good Neighbor meeting it was
mentioned that the developers are looking at putting a 60’ drive behind the back of the
proposed 4 story apartment building. I’m wondering if the current empty lot will remain
empty behind the RS8 homes or will it be removed to make way for development? At any
rate, this will create a huge change for the rear of the RS8 homes along Olive where they’ve
enjoyed the relative quiet and space between their homes and the one single family
home/downhill 3 story apartments to their rear with the empty lot acting as a buffer. This
proposed drive will light up the night. It will create semi-truck and delivery noises at odd
hours, more car traffic noises due to there being many more apartments than are there
currently, and maintenance noise from garbage and snow removal. It will put a driveway curb
cut for semi- and delivery vehicles on Myrtle St which will create a whole other set of
problems for traffic on a hill on Myrtle, the grade of which may not be appropriate for semis,
delivery, or maintenance vehicles. The roofs of the current 3 story apartments appear to be at a
lower grade than the top of the hill/rear of the RS8 properties. The new apartments would have
the potential to invade that privacy, even if only one story taller, with lights, balconies and
windows facing looking the rear of the RS8 properties where now there is nothing. As you
well know, the actual design of the buildings is not under your control.
Just as was done when the Orchard District was created, a new district can be designed using
the Orchard District as a model or the Orchard District can be applied to redevelop the RM44
properties.
There is also a request to amend the zoning code (REZ20-0004) which would amend the West
Riverfront Crossings subdistrict and would increase the maximum bonus height from five to
seven stories along the north side of the Iowa Interstate Railroad. I still struggle with putting
living space or hotel space alongside the railroad. I can hear the train whistles and grinding of
wheels from my home many blocks away. Anyway, I assume the reasoning is that if 4 story
buildings are permitted in the area currently zoned RM44 which is up on a hill, additional
stories are needed down along Riverside Dr. to create visual continuity. However, if the
Comp Plan allowed for 3 story development on the hill remained similar to the RM44 there
now (i.e. the Orchard District), the additional stories on Riverside Dr. may not necessarily be
needed, and the West Riverfront Crossings subdistrict development standards could remain
unchanged. Perhaps they are also trying to capitalize on “the view” that additional height
would give, but, as a reminder, much of that view could be blocked with any future
development across the street along the east side of Riverside Dr. Seven stories along the west
side of Riverside Drive is not the concept designed by the master plan consultants after much
discussion with residents, approved by the then Planning and Zoning Commission, and
adopted by the City Council. The five story limit was designed to step down from
development on the east side of Riverside Drive.
Every time changes to the core master plan are approved, a precedent is set which is then cited
to steer further and further away from the vision set forth in the Downtown and Riverfront
Crossings Master Plan.
We are in a tremendous period of change. We are still looking at developing more 1st floor
brick and mortar commercial space as we transition to online work/retail. Does the market in
Iowa City still support this? What is the vacancy rate for 1st floor commercial in all the new
mixed-use buildings that have sprung up in the Riverfront Crossings area? In the world of
Amazon, it seems only certain kinds - mostly a repetition - of retail fill some of the emptiness.
Maybe this area of Riverside Drive doesn’t need much 1st floor commercial space. I assume
the retail and neighborhood services that might locate in the proposed development will target
the residents who will occupy the apartments, guests of the proposed hotel, and office workers
should office space be included. Otherwise, Myrtle and Riverside Drive is too far from
campus to be an option for students for food between classes. The restaurants currently along
Riverside Drive and in the Hwy 1 strip mall that attract community visitors are primarily auto-
oriented and don’t rely solely on neighborhood residents to support them. The Miller Orchard
neighborhood consists primarily of mid- and lower income owner occupied housing and
rentals whose occupants are attracted to affordable options and who might have difficulty
supporting upscale hospitality development.
Since the creation of the Southwest District Plan of 2002 (18 years ago), “enabling alternatives
to commuting by car” has been a goal for the area. There’s nothing in this proposal that
transforms the current transportation in the area or that would encourage alternatives to cars
until the tunnel is built by the City through the railroad embankment. While this proposal
creates a nice visual with the potential for revitalizing the area north of the railroad bridge
to Myrtle, it would initially be created as an island with no guarantee of when it will be
connected by a tunnel. Residents of Riverview West/Orchard Lofts and those in the Miller
Orchard neighborhood cannot walk to it without crossing Riverside Drive then re-crossing at
Myrtle. People are just not likely to go to that trouble and will drive if there is some retail or
neighborhood service in the proposed development they want to go to. Although I could walk
the distance, I drove when we wanted pizza from The Wedge. The same will most likely
happen with folks wanting to get to Kum & Go from the Myrtle/Riverside Dr development.
I’ve seen many try to dangerously walk between Riverside Dr. and the embankment. And
without the tunnel, there is no safe way to directly bike there either. Biking on Riverside Drive
would be downright treacherous.
There was a lengthy traffic study done for this project and I didn’t read the details extensively,
but after having lived in the area for so long, my experience is there is already more auto
congestion from Riverview West and Orchard Loft and that this upzoning would bring even
more auto congestion. It appears the best option for traffic will be to exit onto Myrtle for the
best route to get to campus or downtown. Traffic exiting the proposed development using the
Riverside Dr. curb cut will have to turn right/south onto Riverside Drive. If they find it easier
to turn right onto Riverside using the Riverside Dr exit to avoid the stoplight, they will then
either turn left at Benton/Riverside and cross that bridge or creatively cut through Kum & Go
(I see this all the time) dodge traffic to turn left (or right) onto Benton, and then get headed
north or towards downtown at Benton/Riverside. It’s always worth a reminder that the
increase in traffic in the area is not limited to Myrtle/Riverside Drive, Riverside/Burlington or
Benton/Riverside but also includes additional traffic that spills over into the interior cut
through routes in the area, notably Orchard Street, Hudson, and Miller Avenue as people look
for the path of least resistance (fewer stoplights) to/from Hwy 1 (Aldi’s, Walmart). I
appreciate the work of those completing the study, but they are not always aware of the day-
to-day traffic issues faced by those of us who walk and drive in the neighborhood.
From the Staff Report: “The proposed development also contains a mix of senior and market-
rate housing, retail, hospitality and neighborhood service uses, organized around a central,
pedestrian plaza.” Market rate housing will increase rents dramatically compared with rents
charged for current apartments, making them less affordable. The affordable housing
requirement was discussed during the Good Neighbor meeting but it is notable that many
redevelopments opt for fees in lieu of instead of creating affordable units.
While I understand that the City is reluctant to interfere with the question of whether a
developer should or should not invest in the redevelopment of a property, the City is
responsible for guiding the development of the city over the long term. The City is
responsible for allowing overdevelopment of 1st floor commercial leading to vacancies that
adversely affect neighborhoods. It’s responsible for upzoning. It’s responsible for replacing
once affordable housing with housing that is no longer affordable for a lot of
residents, especially close to the core of the city. It’s responsible for adhering to Master Plans
adopted for development.
For many years now, residents of Miller Orchard have looked forward to revitalization of our
area and Riverside Drive. Redevelopment that will be advantageous for both the City and for
the neighborhood are welcome. Overdevelopment that is disconnected, once again limits
affordability close to the center of Iowa City, and infringes on RS8 housing might not be the
answer.
Please dive deeply into the form based subdistrict standards for both the Orchard District
subdistrict and the West Riverfront Crossings subdistrict as you consider CPA20-0002,
REZ20-0003, and REZ20-0004, the significant upzoning of the area approval would bring,
and especially the impact on the RS8 housing to the west.
I know that’s a lot to wade through. Thanks for taking time to read.
Paula Swygard
From:chris kleinmeyer
To:Anne Russett
Subject:Re: Project at Myrtle & Riverside
Date:Thursday, November 5, 2020 9:48:13 AM
Attachments:image005.png
image004.png
image003.png
image002.png
image001.png
Hello Anne
I wanted to let you and the planning and zoning board know the the Kleinmeyer family fully
supports the New Project for the Mtytle & Riverside area.
The family sold a portion of our mothers back lot to let the project proceed forward. We are
all onboard.
The project will be a welcome change to the current buildings, vacant lots and the few older
homes. Having been a life long Olive St neighborhood resident the project will be a benefit
for us all.
Thank you,
Chris Kleinmeyer
501 Melrose Court
Iowa City Iowa 52246
Ckleinmeyer@yahoo.com
319-330-5329
Sent from Yahoo Mail for iPhone
On Thursday, November 5, 2020, 8:28 AM, Anne Russett <Anne-Russett@iowa-city.org> wrote:
Hi, Chris –
I received your message yesterday, but have been unable to get through to you on the
phone. I’ve called several times and am unable to leave a message. Steve Long provided
me with your email address. Please feel free to reach out at the number below. Alternatively
you can email me with questions.
Also, I wanted to let you know that if you have comments on the project, but prefer not to
speak at the Planning and Zoning Commission meeting tonight, you can provide your
comments in writing via email to me and I will pass them along to the Commission. The
meeting starts at 7 PM tonight, so I would need comments by 5 PM today.
Thanks, Anne
WWW.ICGOV.ORG
Anne Russett, AICP
Senior Planner
She/Her/Hers
p: 319-356-5251
410 E Washington St
Iowa City, IA 52240
Disclaimer
The information contained in this communication from the sender is confidential. It is intended
solely for use by the recipient and others authorized to receive it. If you are not the recipient,
you are hereby notified that any disclosure, copying, distribution or taking action in relation of
the contents of this information is strictly prohibited and may be unlawful.
MINUTES PRELIMINARY
PLANNING AND ZONING COMMISSION
NOVEMBER 5 , 2020 – 7:00 PM
ELECTRONIC FORMAL MEETING
MEMBERS PRESENT: Susan Craig, Maggie Elliott, Mike Hensch, Phoebe Martin, Mark
Nolte, Mark Signs, Billie Townsend
MEMBERS ABSENT:
STAFF PRESENT: Ray Heitner, Sara Hektoen, Kirk Lehmann, Anne Russett
OTHERS PRESENT: Mark Seabold, Kevin Kane, Steve Long, Mary Ann Dennis
RECOMMENDATIONS TO CITY COUNCIL:
By a vote of 7-0 the Commission recommends approval of CPA20-0002, a proposed amendment
to the Comprehensive Plan, to add approximately 3.16 acres of property to the West Riverfront
Subdistrict of the Downtown and Riverfront Crossings Master Plan located at 219, 223, and 245
S. Riverside Court and 119, 201, 203, 205, 207, and 209 Myrtle Ave.
By a vote of 7-0 the Commissions recommends approval of REZ20-0003 an application
submitted by K&F Properties, LLC. for a rezoning from Medium Density Single-Family
Residential (RS-8), High Density Multi-Family Residential (RM-44), and Community Commercial
(CC-2) to West Riverfront District (RFC-WR) for approximately 4 acres of land located at 215,
219, 223, and 245 S. Riverside Court; 119, 201, 203, 205, 207, and 209 Myrtle Avenue; 517 and
527 S. Riverside Drive be approved, subject to the following conditions:
1. Prior to issuance of a certificate of occupancy, installation of a 6’ wide sidewalk along the
west side of South Riverside Drive frontage.
2. Provision of a pedestrian linkage between Myrtle Avenue and South Riverside Drive through
the project site, subject to review and approval of the Form-Based Code Committee.
3. In the event that the owner pursues any height bonus for buildings proposed next to the
existing single-family on Olive Street, careful attention must be given to the interface and
transition between the development and the single-family housing to the west. Any such
application shall include mitigating, transitional design elements, including but not limited to
increased separation or increased stepbacks.
4. The subject area shall be limited to one (1) access point onto South Riverside Drive that shall
feature a right-in/right-out design.
5. Dedication of approximately 75 square feet of South Riverside Ct. territory to City right-of-way
when the subject area is replatted.
Electronic Meeting
(Pursuant to Iowa Code section 21.8)
An electronic meeting was held because a meeting in person is impossible or impractical
due to concerns for the health and safety of Commission members, staff and the public
presented by COVID-19.
Planning and Zoning Commission
November 5, 2020
Page 2 of 20
6. Prior to the issuance of building permits, the subject area shall be replatted in a manner that
conforms with the future layout of development.
By a vote of 7-0 the Commission recommends approval of REZ20-0004, a proposed amendment
to the zoning code to expand the Riverfront Crossings, West Riverfront Subdistrict boundaries to
include 219, 223, and 245 S. Riverside Court and 119, 201, 203, 205, 207, and 209 Myrtle
Avenue; and to increase the maximum bonus height from five to seven stories for properties in
the West Riverfront Subdistrict north of and abutting the Iowa Interstate Railroad, as illustrated in
attachment in the staff report.
CALL TO ORDER:
Hensch called the meeting to order at 7:00 PM and welcomed new member Maggie Elliott.
PUBLIC DISCUSSION OF ANY ITEM NOT ON THE AGENDA:
None.
CASE NO. CPA20-0002:
Applicant: K&F Properties, LLC
Location: 219, 223, and 245 S. Riverside Court and 119, 201, 203, 205, 207, and 209 Myrtle
Avenue
A public hearing on an application to amend the Downtown and Riverfront Crossings Master
Plan, a component of the City’s Comprehensive Plan, to expand the West Riverfront Subdistrict
to include approximately 3.16 acres south of Myrtle Avenue, west of Riverside Drive, north of the
Iowa Interstate Railroad, and east of Olive Street.
Lehmann reiterated this is a public hearing to amend the Downtown Riverfront Crossings Master
Plan, which is a sub-component of the City's Comprehensive Plan and incorporate it into the
West Riverfront Subdistrict. Regarding background, K&F Properties owns approximately four
acres south of Myrtle Avenue and west of South Riverside Drive. Lehmann will just begin with a
general background because all three applications on the agenda tonight are tied to the same
project. The 3.16 acres is west of the Downtown in the Riverfront Crossings Masterplan area and
approximately 0.84 acres of that is in the West Riverfront Subdistrict already. Across the four
acres there are three zones, medium density single family residential (RS-8), high density
multifamily residential (RM-44) and community commercial (CC-2). The applicant, K&F
Properties, have submitted three applications to develop a mixed-use project with housing, retail,
hospitality, and neighborhood services uses. The first is CPA20-0002 to expand the West
Riverfront subdistrict and add it into the Downtown Riverfront Crossings Master Plan, it is
followed by REZ20-0003 which is to rezone all four acres to the Riverfront Crossings West
Riverfront zone, and finally REZ20-0004 to modify the text of the zoning code to reflect the
changes caused by the expansion of the West Riverfront Subdistrict in CPA20-0002 and add that
into the regulating plan which is in the zoning code. Additionally they will also look to increase the
maximum height bonus from five to seven stories for properties north of and abutting the railroad
in the West Riverfront zone.
Beginning with the Comprehensive Plan Amendment, Lehmann explained for the rezoning and
Planning and Zoning Commission
November 5, 2020
Page 3 of 20
the regulating plan boundaries to be expanded they have to comply with the Comprehensive
Plan. If it is approved, then they can go ahead with the rezoning and regulating plan map
changes. The bonus height change to the zoning text does not require the approval of the
Comprehensive Plan Amendment but it is part of that third application. Lehmann noted the area
is bounded by Myrle Avenue to the north, South Riverside Drive to the east, the railroad to the
south, and properties on Olive Street to the west. Lehmann showed the zoning map of the area
as well as aerial shots of properties noting there are some multifamily units, some commercial
properties and some lower density properties as well. Lehmann also noted there's some
elevation changes.
Craig asked how many of those trees shown in the pictures are included in this piece of property,
Lehmann replied the first layer of trees would be part of the property.
Continuing, Lehmann said the proposed amendment basically has two parts, to do an update of
the maps of a boundary extension for the West Riverfront Subdistrict and then there's also a text
component that describes the area. The applicant has submitted a proposed concept of mixed-
use and it will be sensitive to the less dense single-family homes to the west. The Commission’s
role tonight is to determine whether the Plan amendment includes evidence of the following
approval criteria are met. The approval criteria are codified in City Code Section 14-8D-3D. The
first is that circumstances have changed and/or additional information or factors that come to
light such that the proposed amendment is in the public interest. The second criteria is that the
proposed amendment will be compatible with other policies or provisions of the Comprehensive
Plan including any district plans or amendments thereto. Lehmann explained first circumstances
have changed in relevant plans and throughout this discussion they’ll refer to the Southwest
District Plan that was adopted in 2002, also the Downtown Riverfront Crossings Master Plan was
adopted in 2013 and that adoption and implementation staff believe constitutes a change,
partially because it reflects a major policy evolution where the City has begun to encourage form-
based regulation rather than the current zoning and in addition, redevelopment to the south, they
mentioned Riverfront West and the Orchard Lofts also constituted change as part of that
implementation of the Plan. Finally, unification of ownership over the multiple parcels that are
part of this project occurred in 2020 and staff believes that that also presents new opportunities,
which constitutes a change of circumstance. Lehmann showed on the maps the area and the
context of changing circumstances with redevelopment of properties in the area.
Signs asked if the City had already previously changed either the Comprehensive Plan or zoning
on the west side of Orchard Street. Lehmann confirmed they had and he will talk in a bit of how
that ties into the policies in the Comprehensive Plan but that is when the Riverfront Crossings
Orchard Subdistrict was created, which is meant to act as a transition point from these lower
density residential uses to the west, over to the higher density uses on South Riverside Drive.
Lehmann stated the second criteria then moving on from constituting just a change of
circumstance is compatibility with policies and provisions of the Comprehensive Plan and any
District Plans and any amendments that have been approved so far. Again, in 2002 the
Southwest District Plan was adopted and is still in effect. He noted the area that is part of the
Roosevelt subarea has some goals in that Plan to include providing a variety of types of housing
to allow different types of households to live near the university and downtown. Some of the
goals are related to stabilizing single-family neighborhoods and developing high-quality multi-
family housing that is compatible with surrounding neighborhoods. Its recommendations
emphasize design standards to ensure new multi-family development is sensitive to the
Planning and Zoning Commission
November 5, 2020
Page 4 of 20
environment, topography, and neighborhood. Additionally, the Comprehensive Plan encourages
the development of attractive, mixed-use buildings which include commercial uses serving the
needs of nearby residents. These goals reflect broader goals in the comprehensive plan, such as
promoting compatible infill, preventing sprawl, enabling alternatives to commuting by car,
providing a diverse community, and supporting the vitality of downtown. Lehmann next discussed
the Downtown Riverfront Crossings Master Plan noting that plan mostly focuses on pedestrian-
oriented, mixed-use infill development to enhance the urban fabric and includes residential
commercial uses, talks a lot about activating and improving streetscapes and adding pedestrian
amenities. In the West Riverfront subdistrict, this is envisioned as occurring over time as
commercial uses west of South Riverside Drive take on a more pedestrian-friendly framework or
transition to urban apartments and mixed- use development with buildings at corners and
vehicular access behind to create a pedestrian-oriented street frontage. East of South Riverside
Drive, the Master Plan encourages utilizing river views with walkable commercial or niche
residential uses, including townhouses or mid-rise condominium buildings. Lehmann stated a lot
of those in the plan are anticipated to be taller east of South Riverside Drive than to the west to
utilize some of those views. Both Plans use different strategies, but they generally are after the
same goal of compatibility, especially between lower density uses, which tend to be the west and
the higher density uses which tend to be along South Riverside Drive and across South
Riverside Drive. For that transition, the Southwest Plan basically uses its Future Land Use map
to create the transition. Lehmann noted the Southwest District Plan does have a provision to
avoid high density multifamily next to low-density single-family housing but again, really what
they're encouraging is high quality design and appropriate transitions between uses and
densities which is discussed in Title 14 of the Zoning Code and is the Form-Based Standards
that affect all the Riverfront Crossings properties. Specifically in the West Riverfront Subdistrict,
there is a four story maximum base height if it's not found on the river, which is increased to five
stories if not abutting residential zones (if they are abutting residential zones there is no increase
in height at all). As they move away residential, they can go up to five stories but that is higher
than the current zoning would allow. The Riverfront Crossings Zone also has provisions for if a
property is visible from a single family residential zone then above the third story, there would
need to be 10 foot stepback that would somewhat reduce how much that building is towering
over adjacent properties. The Riverfront Crossing Form-Based Code also includes enhanced
building, frontage, and design requirements, which further ensures a higher quality of design and
supports both plans.
The proposed extension in this Comprehensive Plan Amendment is also a logical extension of
the West Riverfront Subdistrict as it has similar uses to those in the West Riverfront Subdistrict
and is predominantly two- and three-story multifamily buildings. There is about 144 dwelling units
there currently, and some lower density buildings as well. Surrounding properties include public
uses to the north with The University of Iowa, commercial uses to the east, a railroad and high-
density multi-family uses to the south, and some medium-density single-family uses to the west.
Staff finds that this proposal is compatible with adjacent properties and the Comprehensive Plan.
The West Riverfront Subdistrict as proposed does increase density, but it maintains an
appropriate transition. In addition, at this site there's about 50 feet of grade change from the
single-family zones all the way to South Riverside Drive so with that, if there are four story
buildings, it creates roughly a three story exposure to the single family homes, which would be
the same that would be allowed under the current zone if it was at the same grade.
In addition, redevelopment meets some other goals as well. It allows a mix of uses and a high-
quality pedestrian oriented design, it allows more cohesive development, better circulation, and
Planning and Zoning Commission
November 5, 2020
Page 5 of 20
the traffic impact study that was conducted anticipates no major issues. Lehmann added when
talking about pedestrian orientation, there is a pedestrian tunnel that is planned underneath the
railroad, it was included in the CIP for 2017 but has been delayed a couple years because the
City has been working with the railroad to figure out how to go forward with the project in such a
way that they're comfortable with.
Finally, Lehmann wanted to note that in mix of uses there would potentially be some affordable
housing, market rate housing, retail, hospitality, and neighborhood services.
Lehmann reiterated going over the area in the Comprehensive Plan Amendment area in terms of
height, the area that is currently adjacent to residential zones would be limited to four stories.
The rest, if approved and zoned appropriately, would be potentially eligible for five stories, and
that would require a bonus floor which would be reviewed by staff. Lehmann pointed out to the
northeast it is already zoned RFC West Riverfront and already could be developed at five stories.
He also reiterated the roughly 50 feet of grade change from where the single-family homes are
approximately down to South Riverside Drive.
Staff did receive two pieces of correspondence on this application, one that was for the proposal
and one that was against it. One of the comments was that West Riverfront Subdistrict was
designed to redevelop properties and currently all of the areas that are in the W estern Subdistrict
are zoned commercial, and that's what the redevelopment there was initially intended, whereas,
the Comprehensive Plan Amendment is proposing to add residential. A second piece of the
comment was that redevelopment of the South fold the intent of the plan as amended and
therefore does not constitute a change in this circumstance. Riverview West, they noted
occurred under the initial vision of the plan and didn't need a new district and the Orchard Lofts
created the Orchard Subdistrict so they don't believe that's a comparable comparison to the
current area that's being proposed for addition to the West Riverfront District. They also noted
that the West Riverfront standards in the code are not intended to transition from an RS-8 zone
whereas the Orchard Street Riverfront Crossings District may be a more appropriate transition
and limits height to three stories rather than allowing four and potentially five stories and so they
believe that the focus should be on three stories, which would be currently allowed at the site
rather than the four stories even if there is a grade change there. They also note that because
there is no southward connection currently that it may not promote walkability. Additionally,
because a lot of those multifamily units are currently relatively affordable, that the proposal may
result in the loss of affordable housing. Lehmann noted from the other correspondence, in favor
of the application, is from one of the families who's got at least two of the dwelling units out of the
16 units on Olive Street and they were actually in support of the project and that they sold some
property to allow the project to move forward.
Lehmann reiterated the role of the Commission is to determine if the proposed amendment
should be recommended for approval by City Council, after which Council will make a final
decision following three readings, which will include a public hearing, and this will run
concurrently with the two related applications that will be heard later tonight for map rezoning
and zoning code text amendments.
Staff recommends approval of CPA20-0002, a proposed amendment to the Comprehensive
Plan, to add approximately 3.16 acres of property to the West Riverfront Subdistrict of the
Downtown and Riverfront Crossings Master Plan located at 219, 223, and 245 S. Riverside Court
and 119, 201, 203, 205, 207, and 209 Myrtle Ave.
Planning and Zoning Commission
November 5, 2020
Page 6 of 20
Hensch began by reiterating they are just talking about the Comprehensive Plan right now, in
analyzing whether in their opinion this amendment meets the two approval criteria. He noted it is
pretty easy to get lost in the rezoning piece, but they are just talking about the CPA right now and
if this is approved, they’ll talk about the rezoning next.
Martin noted one of the concerns is this may result in the loss of low-income housing and how is
that so, are those buildings currently supportive of low income housing, because she thought that
was predominantly student housing over there. Lehmann replied his understanding is that
because those are older multifamily properties, the rents that they provide are relatively
affordable but they are not strictly income regulated housing or anything they are just more on
the naturally affordable side of things. He will comment more on this later, but since this will be
in a Riverfront Crossings District it would require that they abide by the affordable housing
requirement, which requires that 10% of units are affordable or f ees paid in lieu of those
affordable units.
Craig noted her concern on the map is how far west it goes. She understands it feels like an area
that's ready for redevelopment, and that is a natural hunk of property to work with but it just felt
like it was going a little bit further west than she was comfortable with. Lehmann showed the
map again and reiterated the Orchard District was again intended as a transition from single
family homes to the west so it's not as far out as it looks when they only look at it in context of the
rest Riverfront Districts.
Lehmann also showed a topographic map of the area to understand elevations between the
Interstate railroad, Myrtle Avenue, and then from South Riverside Drive to the west boundary of
the property.
Hensch opened the public hearing.
Mark Seabold (Shive-Hattery) is here with Steve Long and Kevin Kane, who are with Riverf ront
West, the developer, and then also they have Mary Ann Dennis who is their affordable housing
consultant. Seabold began by acknowledging the Lehmann’s presentation was really well done
and they’ve been working with the City for over a year on this going back and forth and just trying
to make sure that they're addressing all the issues that they've been working through. Seabold
would like to run through his presentation and answer any questions. He began with talking
about the relationship with Olive Street and talked about the upzoning from RM-44, which is the
highest zoning that the City has, and just how this really reflects with the grade change for the
area. He showed some existing images of the site and noted they’ve already dedicated land to
the City to help in both the widening of Riverside Drive as well as pedestrian circulation and
trying to control those vehicular access points. Seabold noted it is really a dangerous stretch of
pedestrian road right there and currently there's not a building that's less than 40 years old there.
It's probably 60 years’ worth of development with opportunistic buildings and then a lot of paving
with no pedestrian circulation, it's all vehicular circulation and parking. He added a lot of that
pavement then just adds to that heat island effect, and this site tends to heat up in the summer
just because of all that additional paving. He noted all the buildings that do face Olive Street are
really the backs of the buildings. Along Myrtle Street for the most part it is just the severely
sloped driveways and again a lack of green space.
Seabold next showed their conceptual designs and as it was indicated in the staff report they’re
Planning and Zoning Commission
November 5, 2020
Page 7 of 20
showing a development scenario with potential character but all is subject to change a little bit at
they certainly still need to work through a lot of tenant relationships, decide how they're going to
subdivide the site and all those things. The concept is just an image of what this Comprehensive
Plan change could mean. He showed the concepts, noting the vehicular access points. On the
corner that's already zoned West Riverfront would be a five-story building that is already allowed.
Then they're looking at a step back seven story building in that area up against the tracks.
Seabold noted they hope to see more pedestrian scale, less access points, lots of sidewalk
dining potential, lots of access from pedestrians along the Riverside Drive portion. There would
also be a walkway with trees. He added there is room there for a six-foot sidewalk and the trees.
He also noted they would stagger the heights of the buildings as they move up the hill with that
grade change and will be providing townhomes, with actual with people living on Myrtle Street
with access points along Myrtle. That will add to the neighborhood, instead of detracting from it
like it does now and the houses will be nestled into the grade change. Doing so really lowers this
entire development on this piece of property as it relates to the to the Olive Street neighborhood.
Seabold showed a view from that interior courtyard including the pedestrian walkway through the
site. They would be providing parking under building except for a few parking spots for those that
just want to run into the commercial businesses quickly.
Nolte asked how much commercial space they are envisioning. Seabold said he believes they
have about 20,000 square feet of commercial space between the two buildings and then they're
looking at the opportunity for commercial offices, it’s really undefined at this point. Once the site
is rezoned then they can actually start hunting for tenants and seeing what the opportunities
there are.
Seabold acknowledged in their concepts they are showing that tunnel under the railroad and
they’ve made provisions for the tunnel by making provisions through the site design to make sure
they're working around that eventual tunnel access. Seabold discussed the grade change again
along Myrle Avenue and how they will accommodate the grade, and believes with their concept
they will be providing a larger buffer than some of the buildings that exist today and then even
that seven story building proposed really doesn't have any kind of an impact of looming up over
the neighborhood on Olive Street due to the grade change.
Kevin Kane (K&F Properties and Riverfront West Development) stated they certainly appreciate
everyone's time tonight and the Commission's consideration of this comp plan amendment
change. He noted they’ve spent more than a year working with City staff and some time before
that trying to acquire the properties. He noted it was quite a feat just to get all 17 parcels bought
and purchased so they could start really thinking about this project. Kane stated they are not
here to make a big change in the community and ask for the world, they’re just trying to make a
development that works and lasts a long, long time and it's more friendly to the pedestrians in the
area, and really copacetic to what they believe this area could be developed into. Their passion
is not high-density type development, they don't focus on student development, that is not what
the site's been purchased for. This is really to be an active senior community, where they can
start to engage seniors with a very active lifestyle and have the amenities on the site to support
that, and others in other neighborhood amenities as well.
Steve Long (K&F Properties and Riverfront West Development) noted he lives a mile from here
just to the north and is heavily invested in Iowa City. As he is getting older, he wanted a place to
live in someday. Senior housing has been a passion for him for many years and to have this
opportunity to create a unique product that he thinks they’ve only found one other place in the
Planning and Zoning Commission
November 5, 2020
Page 8 of 20
United States similar that has a focus on health and wellness and heavy on concierge services
and hospitality, and really turning the area that developed over the past 60 years in kind of a
hodgepodge way into a pedestrian focus, integrated community with access to the hospitals and
to downtown. So he is excited as an longtime Iowa City community member to be a part of this
change and look forward to any suggestions that they have, or any that they hear in the
community as well.
Nolte noted his concern is the amount of commercial space and that it might be difficult to fill. He
wonders what is the ideal amount of commercial that should go in something like this versus
maybe what Code is requiring and is there flexibility. He knows there's been other properties
around where they've done some parking on the first floor so they don't have a lot of vacant
commercial space. Long agreed they have to look at this post COVID as the senior industry has
been rocked, and everyone's had to pivot and recreate senior living with everything from creating
smaller living spaces and living pods so they can isolate, with more elevators, fresh air
exchange, and common areas are decreasing and having more exterior, rooftop patios, and also
services that used to be incorporated into the buildings now are being off site. So therefore, it
may not be traditional retail that in the buildings, it may be health and wellness. Long also added
with the hotel, the other thing that's changed with COVID is hotels are built almost to hospital
standards and there's a lot of flexibility in hotels so that that'll be a lot of flex space. They don’t
have it all figured out yet, but it could be maybe a floor would be a rehab floor and when there's a
football game, it could be switched over if there's not people living there, or patients. So this
project is evolving as COVID evolves. He said they just had a meeting with their potential senior
partner this afternoon and the idea is to have services not in the senior living facility, but to have
them in the adjacent buildings that will be connected together so the amenities would be for the
community and also for the residents.
Mary Ann Dennis (Affordable Housing Consultant) said in the development they plan to have a
mix of owner occupied and rental dwellings that would be affordable and they would certainly
comply with all the Riverfront Crossings inclusionary housing requirements as far as income
levels, and then price points for sales and rents.
Hensch closed the public hearing.
Nolte moved to recommend approval of CPA20-0002, a proposed amendment to the
Comprehensive Plan, to add approximately 3.16 acres of property to the West Riverfront
Subdistrict of the Downtown and Riverfront Crossings Master Plan located at 219, 223,
and 245 S. Riverside Court and 119, 201, 203, 205, 207, and 209 Myrtle Ave.
Martin seconded the motion.
Hensch stated he feels staff laid it out as it pretty clearly meets the approval criteria set forth in
the Iowa City Code and their obligation is to analyze application against that approval criteria and
he agrees it meets that approval criteria.
Signs noted that the elevation section was really helpful and address some of his concerns. He
added because they have already moved the Orchard Street District it doesn't seem like it sticks
out more than what they've already approved.
Craig reiterated her concern about how far west it goes but that is a minor issue, and it does
Planning and Zoning Commission
November 5, 2020
Page 9 of 20
meet the requirements so she is supportive.
Townsend stated that she’s been in those apartments that they're going to be replacing and
those are probably the most dangerous access as far as getting into the driveways and trying to
get back out so she is pleased that they're doing something other than apartments in that area
but is hoping that they are going to keep some affordable housing in those units.
A vote was taken and the motion passed 7-0.
CASE NO. REZ20-0003:
Applicant: K&F Properties, LLC
Location: 215, 219, 223, and 245 S. Riverside Court; 119, 201, 203, 205, 207, and 209 Myrtle
Avenue; 517 and 527 S. Riverside Drive
An application submitted for a rezoning of approximately 4 acres of land from Medium Density
Single-Family Residential (RS-8) zone, High Density Multi-Family Residential (RM-44) zone, and
Community Commercial (CC-2) zone to Riverfront Crossings, West Riverfront (RFC-WR) zone.
Heitner began the staff report noting this is the second prong of three applications on this
development. The first prong was the amendment to the Comprehensive Plan and now is
consideration and review of applying the Riverfront Crossings, West Riverfront zone.
Heitner stated this area includes about four acres and includes businesses there that already
have a CC-2 zoning and were included into the West Riverfront Subdistrict. The current zoning
of the subject property has three different zones, as previously mentioned the Community
Commercial (CC-2) zone, High Density Multifamily Residential (RM-44) and then Medium
Density Single Family Residential (RS-8) for a couple parcels. The proposed zoning again is for
the entire assemblage to be rezone to West Riverfront Crossings. Heitner noted typically what
is envisioned for this zone is commercial and mixed-use developments. The zone has a base
max height of four stories with an additional bonus height up to five stories with the exception of
parcels adjacent to residential zones where the max height is four stories.
In terms of review criteria for rezonings, staff uses two criteria points for rezoning review which
are consistency with Comprehensive Plan and compatibility with the existing neighborhood
character. In terms of consistency with Comprehensive Plan, so the list of Riverfront Districts
lays out a series of objectives and ambitions for development character. Staff believes that the
proposed project would accomplish quite a few of those objectives such as the desire to improve
pedestrian circulation and connectivity in this area. Staff believes that can be accomplished in a
couple ways by having a sidewalk along the west side of South Riverside Drive and also some
internal connectivity for the associated development with this rezoning application. Heitner
pointed out there is a pretty expansive surface parking element to this subject area that doesn't
conform with the goals of the West Riverfront District. The District also strives to generally
enhance streetscape and overall corridor aesthetics with a more form-based building massing.
Heitner noted a couple of interesting goals within this District discuss potential for hospitality and
commercial uses and the applicant has already alluded to the potential for featuring those uses
with their proposal.
Prepared by: Kirk Lehmann, Associate Planner, 410 E. Washington St, Iowa City, IA; 319-356-5230
Resolution No. 20-274
Resolution to amend the Downtown and Riverfront Crossings Master Plan,
a part of Iowa City's Comprehensive Plan, to include property located north
of the Iowa Interstate Railroad, east of Olive Street, and south of Myrtle
Avenue in the West Riverfront Subdistrict (CPA20-0002)
Whereas, the Iowa City Comprehensive Plan serves as a land -use and planning policy
guide by illustrating and describing the location and configuration of appropriate land uses
throughout the City; by providing notification to the public regarding intended uses of land; and by
illustrating the long-range growth area limit for the City; and
Whereas, K&F Properties, LLC, requested that the properties at 219, 223, and 245 S.
Riverside Court and 119, 201, 203, 205, 207, and 209 Myrtle Avenue be added to the West
Riverfront Subdistrict to foster redevelopment consistent with the surrounding redevelopment under
the Downtown and Riverfront Crossings Master Plan; and
Whereas, these properties are currently governed by the Southwest District Plan, which
encourages developing high-quality multi -family housing that is sensitive to the environment,
topography, and neighborhood; and
Whereas, the Downtown and Riverfront Crossings Master Plan has similar goals as the
Southwest District Plan, but more closely focuses on encouraging pedestrian -oriented, mixed-use
development to enhance the urban fabric in accordance with a form -based zoning code and with
careful attention to transitions from lower to higher density uses and enhanced building, frontage,
and design requirements; and
Whereas, the area has experienced extensive redevelopment and the subject parcels were
recently assembled under common ownership which presents redevelopment opportunities that
did not previously exist; and
Whereas, circumstances have changed since the Downtown and Riverfront Crossings
Master Plan was adopted, making it more appropriate to regulate this land in accordance therewith,
rather than the Southwest District Plan;
Whereas, this amendment is in the public interest and compatible with other policies of the
Comprehensive Plan; and
Whereas, the Planning and Zoning Commission reviewed this amendment at its meeting on
November 5, 2020 and determined that circumstances changed to the extent that an amendment
to the comprehensive plan is warranted and the proposed amendment is compatible with other
policies or provisions of the comprehensive plan.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that:
1. The Downtown and Riverfront Crossings Master Plan, a part of the Comprehensive Plan, is
hereby amended to add the properties locally known as 219, 223, and 245 S. Riverside
Court and 119, 201, 203, 205, 207, and 209 Myrtle Avenue to the West Riverfront Subdistrict
of the Downtown and Riverfront Crossings Master Plan, as illustrated and described in
Appendix 1, attached hereto.
2. The Southwest District Plan is no longer applicable to these properties.
io.e,
Resolution No. 20-274
Page 2
Passed and approved this
Attest:
1st day of December ,2020.
N
:
City Attorney's Office
(Sara Greenwood Hektoen -11/24/2020)
Resolution No. 20-274
Page 3
It was moved by trims and seconded by Thomas
Resolution be adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
the
downtown and riverfront crossings plan4
sub-districts
During the course of the planning process, several prominent
features were discussed on a recurring basis. Due to either their
prominent role in the plan or their relevance and impact on other
elements, these features became to be known as Framework
Elements. Framework Elements consist of Sub-Districts, Primary
Streets and Required Retail Storefronts, Mobility, Green Space,
Public Art, and Student Housing. These Framework Elements will
be discussed in further detail on the following pages.
The Downtown and Riverfront Crossings Master Plan Study Area
is very large in size and contains a number of neighborhoods and
settings, each with their own identity. Instead of combining them
into one homogeneous district, it was determined that it would be
more useful, and appropriate, to break the Study Area into sub-
districts. These sub-districts would be identified based on their
location, primary use, scale, and other identifying features. In all,
eight districts were identified:
›Downtown
›South Downtown
›Central Crossings
›Gilbert
›West Riverfront
›Orchard
›University
›Park
›South Gilbert
Many of these sub-districts existed in a geographic sense, but
were unnamed and given “formal” names as part of the planning
process. Other times, the sub-districts were known by their
formal names, but did not have defined geographic boundaries.
Each sub-district will be described in more detail in the following
chapter.
Johnson County
Sub-District Map for RFC Plan
Right: Sub-District Diagram
West
Riverfront
District
University
District
Park
District
Central
Crossings
District
South
Downtown
District
Downtown
District
Gilbert
District
South
Gilbert
District
Orchard
District
28
west riverfront district
13
West
Riverfront Expansion
Orchard
District
(appx. 2)
79
The West Riverfront District is a high-traffic, auto-oriented corridor
situated on the west side of the Iowa River. South Riverside
Drive bisects the district and connects U.S. Highway 6 with the
University of Iowa campus. It is lined by commercial uses set
back behind surface parking lots. Pedestrians are typically an
afterthought. Unlike the rest of the study area, this district plays by
different rules in terms of achieving an urban, pedestrian friendly
environment.
As redevelopment of the district occurs, new development
should capitalize on the Iowa River and its close proximity to the
campus. In addition, it should take advantage of the access and
visibility provided by Highway 6. It is envisioned that over time,
the commercial development on the west side of South Riverside
Drive will take on a more pedestrian-friendly framework, or it will
transition to urban apartments and mixed-use development. In
the development of gas stations and drive thru businesses, the
building should be anchored at the corner, with vehicular access
and amenities moved to the back to create a pedestrian oriented
street frontage (See Appendix A). Redevelopment on the east side
of the district will take advantage of river views, and will consist
of either pedestrian-friendly commercial uses or niche residential,
including higher end townhouses or mid-rise condo towers.
West Riverfront District Summary
Master Plan Objectives:
›Capitalize on Highway 6 access and visibility
›Improve pedestrian and bicycle circulation
›Capitalize on the Iowa River
›Extend the riverfront trail
›Capture the football crowd
Development Character:
›Temper auto orientation
›Open views and access to river
›Enhance the streetscape and overall aesthetics
Development Program:
›Multiple housing typologies, including condo towers,
apartments and townhouses
›Destination river view restaurants
›Commercial , possible small to midsize box
›Hospitality
downtown and riverfront crossings plan14
west riverfront district
PRENTISS ST.
WRIGHT ST.
LAFAYETTE ST.
BENTON ST.
BENTO
N
ST.
KIRKWOOD AVE.
HIGHWAY 6
ST
U
R
G
I
S
C
O
R
N
E
R
D
R
.SOUTH RIVERSIDE DR.MAIDEN LANEGILBERT ST.I
O
W
A
R
I
V
E
RR A L S T O NORCHARD ST.CREEKDUBUQUE ST.CAPITOL ST.GILBERT ST.80
WR1
WR2
WR3
WR4
WR6
WR5
WR7
WR – 1: Riverfront Enhancements – In order to help encourage
development within the district, a program to enhance the west
bank of the Iowa River should be undertaken. This would include
utilitarian elements, such as stabilizing the riverbank to prevent
further erosion, functional elements, such as extending the
riverfront trail to the north and south, and aesthetic elements,
such as providing additional landscaping. Included in this would
be interpretative stations along the river to provide educational
opportunities relating to the river and its plant and wildlife,
including the many Bald Eagles that frequent this stretch.
WR – 2: Riverside Drive Enhancements – Riverside Drive is very
auto-oriented, with few pedestrian amenities and unappealing
aesthetics. As the district transitions into a more urban setting,
the right-of-way will need to be redesigned in order to provide
enhanced aesthetics and a more walkable environment for
pedestrians.
Enhancements to the pedestrian environment should include the
following:
›Reduce the number of curb cuts along the street
›Provide a wider sidewalk that is set back from the curb a
minimum of six feet and preferably more
›Provide enhanced pedestrian crossings across Riverside Drive
and its cross streets
›Provide a safe pedestrian connection on the west side of
Riverside Drive under the Iowa Interstate Railroad bridge.
Aesthetic enhancements should include the following:
›Gateway signage and landscaping at the intersection of U.S.
Highway 6
›Buried utilities
›Streetscape enhancements, including street trees and other
forms of landscaping
WR – 3: Westside Redevelopment – Located along the west side
of Riverside Drive and north of Benton Street, the car dealership
site provides a large and strategic site for redevelopment. As
shown in the plan, the northwest corner of the intersection is
reserved for an attached green, which would double the amount of
available frontage for neighborhood retail or restaurant uses. This
landscaped green could provide outdoor seating for restaurants
or cafes, and is the “identity” of the site. The remaining buildings
on the site would be pedestrian oriented, with street frontage
and parking in the rear. They are designed to accommodate retail
uses on their first floors, and apartments on the upper floors. This,
as well as the area north of the railroad, could be an appropriate
location for dormitory style housing as discussed earlier. There is
the possibility for a higher room count if housing developed with
a private dorm, provided there is an agreement with the University
to provide car storage offsite.
WR – 4: Riverside Commercial Redevelopment – The commercial
property on the west side of Riverside Drive and south of Benton
Street will take on a more pedestrian friendly format. In order for
this to occur, a slip lane will need to be constructed. This lane will
provide access to the retail uses, as well as “on-street” parking.
In addition, it will be the organizing feature of the site, and help
provide a common “build-to” line for new development to address.
New commercial buildings will be adorned with enhanced facades
and improved landscaping, and overflow parking will be provided
to the rear of the buildings.
WR – 5: Sturgis Corner Redevelopment – The commercial uses on
the Sturgis Corner site were developed in a conventional manner,
with multiple architectural styles, buildings set back behind large
surface parking lots, and limited pedestrian amenities. As this
area begins to redevelop, development guidelines will establish a
new development framework, one that is much more pedestrian
friendly. New commercial buildings will front onto Sturgis
Corner Drive, sidewalks will connect buildings, and parking will
be provided on-street and to the rear of buildings. In addition,
a new building site has been proposed for a new condo tower
overlooking the river and future regional park.
15
WR 3: Westside Redevelopment
WR 4: Riverside Commercial Development
WR 5: Sturgis Corner Redevelopment
81
WR – 6: Riverview – A new neighborhood is designated for
the north side of Benton Street. This neighborhood, which will
overlook the Iowa River and riverfront trail, will contain a new
mid-rise condo tower and townhouses that front onto greens
that provide access and view corridors to the river. All buildings
will be designed with parking on the ground floor in order to
raise habitable space above the floodplain. This design also
allows residents to get a more commanding view of the river. A
restaurant or retail site is located at the intersection of Benton
Street and Riverside Drive. This restaurant would have trail access
and is designed with a large patio with views of the river.
WR – 7: West Riverfront Expansion – The West Riverfront Sub-
District was expanded by a comprehensive plan amendment
(CPA20-0002) on XXXX, XX, 2020. The uses on the site at the time
of expansion were existing single-family and multi-family uses.
The site contains more than 50 feet of grade change, which is
atypical of the subdistrict. Redevelopment of the site will allow
the development of a larger, mixed-use project which may include
housing, retail, hospitality and/or neighborhood services. The new
development would make the site more cohesive and pedestrian-
friendly. However, the development must remain sensitive to the
less dense, single-family homes to the west.
downtown and riverfront crossings plan16
WR 6: Before and After Renderings Showing the New Riverview Neighborhood Development in the West Riverfront District
82
17
PRENTISS ST.
WRIGHT ST.
LAFAYETTE ST.
BENTON ST.
BENTO
N
ST.
KIRKWOOD AVE.
HIGHWAY 6
ST
U
R
G
I
S
C
O
R
N
E
R
D
R
.SOUTH RIVERSIDE DR.MAIDEN LANEGILBERT ST.I
O
W
A
R
I
V
E
RR A L S T O NORCHARD ST.CREEKDUBUQUE ST.CAPITOL ST.GILBERT ST.15
16 17
18
19
20
21
22
23
24
25
26
27
29
28
1 2
3
4
5
6 789
10 11
12
13
14
west riverfront yield analysis
83
downtown and riverfront crossings plan18
WEST RIVERFRONT DISTRICT
Building Building Square Comm.Office Mixed Resid Hotel Misc Suite Residential Hotel Parking Parking
Building ID Type Footprint Stories Footage SF SF SF SF SF SF Units Units Rooms Demand Provided Private Pkg Lot Pkg Gar Notes
WR-1 Commercial 3,900 1 3,900 3,900 - - - - - - - -16 18 -18 -
WR-2 Commercial 5,000 1 5,000 5,000 - - - - - - - -20 26 -26 -
WR-3 Commercial 16,805 1 16,805 16,805 - - - - - - - -67 45 -45 -
WR-4 Commercial 23,365 1 23,365 23,365 - - - - - - - -93 68 -68 -
WR-5 Commercial 10,350 1 10,350 10,350 - - - - - - - -41 42 -42 -
WR-6 Commercial 1,400 1 1,400 1,400 - - - - - - - - 6 5 - 5 -
WR-7 Commercial 1,400 1 1,400 1,400 - - - - - - - - 6 5 - 5 -
WR-8 Commercial 1,400 1 1,400 1,400 - - - - - - - - 6 5 - 5 -
WR-9 Commercial 1,400 1 1,400 1,400 - - - - - - - - 6 5 - 5 -
WR-10 Commercial 4,200 2 8,400 8,400 - - - - - - 3 -38 26 -26 -
WR-11 Mixed Use 2,555 2 5,110 - -2,555 2,555 - - - 2 -12 10 -10 -
WR-12 Mixed Use 11,255 4 45,020 - -11,255 33,765 - - -21 -73 45 -45 -
WR-13 Mixed Use 13,835 4 55,340 - -13,835 41,505 - - -27 -91 56 -56 -
WR-14 Residential 11,640 4 46,560 - - -46,560 - - -32 -48 61 -61 -
WR-15 Residential 11,250 4 45,000 - - -45,000 - - -28 -42 53 -53 -
WR-16 Townhomes 2,885 3 6,675 - - -6,675 - - - 3 - 6 8 6 2 -
WR-17 Townhomes 5,330 3 12,460 - - -12,460 - - - 5 -10 13 10 3 -
WR-18 Townhomes 4,080 3 9,560 - - -9,560 - - - 4 - 8 12 8 4 -
WR-19 Townhomes 6,080 3 14,070 - - -14,070 - - - 6 -12 14 12 2 -
WR-20 Townhomes 6,080 3 14,070 - - -14,070 - - - 6 -12 13 12 1 -
WR-21 Residential 20,315 8 68,875 - - -68,875 - - -40 -63 40 30 10 -parking on ground level
WR-22 Commercial 5,185 1 5,185 5,185 - - - - - - - -21 14 -14 -
WR-23 Mixed Use 10,355 5 45,085 - -3,665 41,420 - - -28 -55 34 17 17 -
WR-24 Commercial 8,835 1 8,835 8,835 - - - - - - - -35 44 -44 -
WR-25 Commercial 7,195 1 7,195 7,195 - - - - - - - -29 36 -36 -
WR-26 Commercial 6,575 1 6,575 6,575 - - - - - - - -26 20 -20 -
WR-27 Commercial 5,000 1 5,000 5,000 - - - - - - - -20 25 -25 -
WR-28 Residential 14,520 7 68,940 - - -68,940 - - -38 -57 57 37 20 -parking on ground level
WR-29 Hotel 13,620 4 54,480 - - - -54,480 - - -108 108 90 -90 -
WEST RIVERFRONT DISTRICT TOTALS 597,455 106,210 0 31,310 405,455 54,480 0 0 243 108 1,026 890 132 758 0