Loading...
HomeMy WebLinkAbout2020-01-07 Public hearing0110 NOTICE OF PUBLIC HEARING NOTICE OF PUBLIC HEARING ON PROJECT MANUAL FILED AND ESTIMATED COST FOR THE SPRUCE STREET WATER MAIN IMPROVEMENTS PROJECT IN THE CITY DEC ii 2020 OF IOWA CITY, IOWA City Clerk TO ALL TAXPAYERS OF THE CITY OF IOWA CITY, Iowa City, Iowa IOWA, AND TO OTHER INTERESTED PERSONS: Public notice is hereby given that the City Council of the City of Iowa City, Iowa, will conduct a public hearing on the Project Manual, including the plans, specifications, contract, and estimated cost for the construction of the First Avenue Water Main Improvements in said city at 7:00 p.m. on the 7th day of January, 2020, said meeting to be held in the Emma J. Harvat Hall in the City Hall, 410 East Washington Street in said city, or if said meeting is cancelled, at the next meeting of the City Council thereafter as posted by the City Clerk. This project includes approximately 900 feet of 8" PVC water main installed by directional drill method on Spruce Street and associated copper water services, traffic control, and sidewalk and pavement removal and restoration. Said Project Manual and estimated cost are now on file in the office of the City Clerk in the City Hall in Iowa City, Iowa, and may be inspected by any interested persons. Any interested persons may appear at said meeting of the City Council for the purpose of making objections to and comments concerning said Project Manual or the cost of making said improvement. This notice is given by order of the City Council of the City of Iowa City, Iowa and as provided by law. Kellie K. Fruehling, City Clerk STAFF PRESENTATION TO FOLLOW: 1 r I C04;qui h CITY OF lOVVA CITY 410 East Washington Street Iowa City, Iowa S2240-1826 (319) 356-5000 (3I9) 356-5009 FAX www.icgov.org � r CITY OF IOWA CIN UNESCO CITY OF LITERATURE Project Location and Description 1402 1401 1aoz14ozvz 1401 1406 W 1405 2 6 140fi 1406 1409 1410 11 1412 413 414 6 1417 1418 1422 1421 1422 1426 14Z1426 Project Location and Description 1402 1401 1aoz14ozvz 1401 1406 W 1405 2 6 140fi 1406 1409 1410 11 1412 413 414 1416 1417 1418 1422 1421 1422 1426 14Z1426 1430 1429 1430 1434 1433 1414 045 140,9 I E1429 14x0 1436 1433 1434 141P 193] 1940 '�- DEFORESTAVE rY ■ Replace existing 6 -inch cast iron pipe with new 8 -inch PVC pipe along west side of Spruce Street to fix: ■ Existing 1950s and 1960s pipe with history of main breaks ■ Trenchless installation methods will be used to minimize disturbances ■ New water services in the right-of-way ■ New ADA -compliant curb ramps at Highland — Spruce and Deforest — Spruce Intersections. I 1 AEW . CITY OF IOWA CITY UNESCO CITY Of LITERATURE SCHEDULE Schedule and Costs ■ Bid Opening: 3 PM on January 28, 2020 ■ Specified Start Date: March 2, 2020 Substantial Completion: April 30, 2020 ■ Final Completion COSTS ■ About $280,000 May 30, 2020 � r CITY OF IOWA CITY UNESCO CITY OF LITERATURE Project Contacts Watersmith Engineering is the company preparing the Project Manual. Brad Roeth, PE Watersmith Engineering 563-506-2673 brad watersmithengineering. com Joe Welter, PE, PMP City of Iowa City 319-356-5144 joe-welter(a) iowa-city. org SON LEGEND: SON SON SON.] SON SON SON SIGN 7 SON SON9n SON 10 SIGN 11 SON 12 SON 13 SON 16 - LANE CLOSURE DETOUR — — RDUM TRAFFIC CONTROL WAVER MMM GOMSTROCTION ON SPRUCE STREET STAFF PRESENTATION CONCLUDED � r rrM as � h CITY OF IOWA CITY 410 East Washington Strect Iowa City, Iowa 52240-1826 (3 19) 356-5000 (3 19) 356-5009 FAX www. icgov. o rg NOTICE OF PUBLIC HEARING NOTICE OF PUBLIC HEARING ON PROJECT MANUAL AND ESTIMATED COST FOR THE CONSTRUCTION OF THE McCOLLISTER BOULEVARD EXTENSTION PROJECT IN THE CITY OF IOWA CITY, IOWA TO ALL TAXPAYERS OF THE CITY OF IOWA CITY, IOWA, AND TO OTHER INTERESTED PERSONS: Public notice is hereby given that the City Council of the City of Iowa City, Iowa, will conduct a public hearing on Project Manual, including the plans, specifications, contract and estimated cost for the construction of the McCollister Boulevard Extension Project in said city at 7:00 p.m. on the Th day of January, 2020. Said meeting to be held in the Emma J. Harvat Hall in the City Hall, 410 East Washington Street in said city, or if said meeting is cancelled, at the next meeting of the City Council thereafter as posted by the City Clerk. Construction of the McCollister Boulevard extension will begin at its existing intersection at Gilbert Street and continue to the existing roundabout on Sycamore Street. The project includes excavation, 17,500 SY of PCC pavement, 8,300 SY of PCC sidewalk, storm and sanitary sewer, 4,000 LF of 16" water main and appurtenances, fiber and electric conduit and street lights. Traffic Signals will be installed at the Gilbert Street intersection. Said Project Manual and estimated cost are now on file in the office of the City Clerk in the City Hall in Iowa City, Iowa, and may be inspected by any interested persons. Any interested persons may appear at said meeting of the City Council for the purpose of making objections to and comments concerning said Project Manual or the cost of making said improvements. This notice is given by order of the City Council of the City of Iowa City, Iowa and as provided by law. KELLIE K. FRUEHLING, CITY CLERK DEC 18 2020 City Clerk Iowa City, Iowa STAFF PRESENTATION TO FOLLOW: 1 r I C04;qui h CITY OF lOVVA CITY 410 East Washington Street Iowa City, Iowa S2240-1826 (319) 356-5000 (3I9) 356-5009 FAX www.icgov.org � Gor+cvuakn r rsx e' i.s� 10',24 c4sldm Ik P-kkv Egc"e 71 '{' 17 lane LN Fane .�� M, 9 3 SWedRFd Cull AidFI-E ULkOE Praia r��+D.e7 276 1 2' Flhar and Ekctrlc 4ucl Eorm S"drr 6,5"Mnl FlnldhFg Pr4�4B9U IY raoolFlE❑ 3LIEEIJ l4ularklaln rol 9r P.C. Q'7NCRElE PAVEMENT 12' 5uuGRADE PREPAR•g11Gm 2%-. _Tac;=ff2Mz= 9` P.C. C6wCREm PAVEmENi Fm~ 6aoYlary 3~ Fara sho�ltl flrlstiFq Snag Saucr I n �.,ntlral� 1 1- SLWWADE PFjEPARAiICH —1.5% 1' — 10'27 Grade *4,5' FPM4 Trane 0 cle PzrkFV L r Lana Lane *Wngord r. � 934 i•aw'F-E iYw�E ; _Tac;=ff2Mz= 9` P.C. C6wCREm PAVEmENi Fm~ 6aoYlary 3~ Fara sho�ltl flrlstiFq Snag Saucr I n �.,ntlral� 1 1- SLWWADE PFjEPARAiICH —1.5% 1' — 10'27 Grade *4,5' 4 CD PMIRLE FUTURE ROW (TYP)i a JJ Cc -' -t" _ _ • PROPOSED ROW (IYP) — _ '`-rte 10" DIT& � I f�� SNH-2 A.0.FUST MAWbu INSTALL 7-16-7 — — — y FIELD FENCE GATES P RCEO S ARY]ON ASEMENT 4 i - "rospocT Forms } } 4 • PO5SIBLE FUTURE ROW (TYP) i J r f CDNSTRU6T1ON LIMITS '6lSC) —INSTAL SI -182 BARRICADE'. _ 5' -la' gS7CM 5' 017tH • II LP455)3LE FUTURE F;HKIM, �IH5TALL 51- s82ggARRINOE� �N FIELO FENCE GATES _— — — — — — — — — — — — — — — — CONSTRUCTION LIMITS ^•rS: STAFF PRESENTATION CONCLUDED � r rrM as � h CITY OF IOWA CITY 410 East Washington Strect Iowa City, Iowa 52240-1826 (3 19) 356-5000 (3 19) 356-5009 FAX www. icgov. o rg