HomeMy WebLinkAbout5.18.21 TTAC Agenda PacketGoal 3 Goal 4 Goal 10 Quality of Life System Preservation Local Commitment 1A 1B 2A 2B 3A 4A 5A 5B 6A 6B 6C 7A 7B 7C 8A 8B 9A 9B 10 1 5th St Reconstruction - 12th Ave to 20th Ave 0.6 mile reconstruction of 5th St between 12th Ave and 20th Ave $3,132,000 Coralville 5 1 0 - 5 5 0 0 3 3 3 7 0 0 0 0 5 0 3 40 2 Taft Ave Reconstruction American Legion Rd to Lower West Branch Rd $12,760,000 Iowa City 5 2 1 - 5 5 0 0 0 3 3 0 0 0 0 0 5 0 9 38 3 Highway 6 & Deer Creek Rd Pavement widening, turn lanes, RRXing improvements, new traffic signals $3,712,000 Coralville 5 2 3 - 0 5 0 7 0 0 0 0 0 7 0 0 5 0 1 35 4 Ranshaw Way Improvements - Phase 6 Full build out from Hawkeye Dr to Forevergreen Rd, including trails and landscaping $11,600,000 North Liberty 5 1 4 1 5 5 0 0 0 3 3 0 0 0 0 0 0 0 7 34 5 Sunset St Pavement Pavement repair and pedestrian improvements $557,960 University Heights 5 1 1 5 5 0 0 3 0 0 0 0 0 0 0 5 3 3 31 6 Melrose Ave Complete Street Improvements Streetscape, stormwater and intersection improvements, utility relocations and construct bike lanes east of Sunset St (0.35 miles)$1,560,000 University Heights 5 1 0 - 5 5 0 0 3 0 3 0 0 0 0 0 0 0 - 22 7 Park Rd (Hwy 6 to Oakdale Blvd)Grade & pave to a four-lane street, install curb, gutter and sidewalks or trails $4,860,000 Tiffin 5 1 2 - 5 5 0 0 0 3 0 0 0 0 0 0 0 0 - 21 8 Melrose Ave Preventative Maintenance Pavement repair within city limits $174,000 University Heights 5 1 0 - 5 5 0 7 3 0 0 0 0 0 0 0 0 0 - 26 9 5th St & 10th Ave Roundabout Reconstruct intersection as a roundabout and reconstruct 10th Ave to Highway 6 $1,450,000 Coralville 5 1 1 - 5 5 0 0 3 0 0 0 0 0 0 0 5 0 - 25 10 Park Rd Reconstruction Reconstruct Park Rd between Riverside Dr and Templin Rd $7,772,000 Iowa City 5 1 0 - 5 5 0 0 3 0 0 0 0 0 0 0 5 0 - 24 11 1st Ave North Phase 1 0.5 mile reconstruction of 1st Ave between southerly E. Grantview Dr and Auburn East Ln from rural to urban cross section $1,537,000 Coralville 5 1 1 - 0 5 0 7 0 3 0 0 0 0 0 0 0 0 - 22 12 12th Ave at I-80 Overpass Reconstruct road approach sections to bridge over I-80, extend shared use path from south end of bridge to 11th St, construct shared use path north of bridge to Ozark Ridge share use path $754,000 Coralville 5 1 0 - 0 5 0 0 3 3 0 0 0 0 0 0 5 0 - 22 13 Benton St Bridge This project is a replacement of the Benton St bridge over Ralston Creek $1,624,000 Iowa City 5 1 0 - 5 5 0 0 0 0 0 0 0 0 0 0 5 0 - 21 14 Hwy 6 (Main St to Park Rd) Grade & pave street, install curb, gutter and sidewalks or trails and install center turn lane $3,190,000 Tiffin 5 2 1 - 5 5 0 0 0 3 0 0 0 0 0 0 0 0 - 21 15 Heartland Dr - Commerce Dr to Jones Blvd 0.42 mile reconstruction of Heartland Dr from Commerce Dr to Jones Blvd $1,740,000 Coralville 5 1 1 - 0 5 0 0 0 3 0 0 0 0 0 0 5 0 - 20 16 Dubuque St Reconstruction - Phase 5 Full reconstruction with curb and gutter from Penn St to Main St $657,720 North Liberty 5 1 1 - 5 5 0 0 0 3 0 0 0 0 0 0 0 0 - 20 17 Forevergreen Rd/Jasper Ave Roundabout Full build out, including trails and landscaping $4,194,560 North Liberty 5 5 1 - 0 5 0 0 0 3 0 0 0 0 0 0 0 0 - 19 18 Commerce Dr - Coral Ridge Ave to Commercial Pk 0.25 mile reconstruction Commerce Dr from Coral Ridge Ave to Commercial Park $1,044,000 Coralville 5 1 0 - 0 5 0 0 3 0 0 0 0 0 0 0 5 0 - 19 19 Sunset St Preventative Maintenance and Crosswalk Improvements Pavement repair between Benton St and Melrose Ave, and Oakcrest Ave crosswalk visibility improvements $174,000 University Heights 5 1 0 - 5 5 0 0 3 0 0 0 0 0 0 0 0 0 - 19 20 Dubuque St Reconstruction - Phase 4 Full reconstruction with curb and gutter from Juniper St to North Liberty Rd $861,880 North Liberty 5 2 1 - 5 5 0 0 0 0 0 0 0 0 0 0 0 0 - 18 21 Dubuque St Reconstruction - Phase 2 Full reconstruction with curb and gutter from Zeller St to Juniper St $2,494,000 North Liberty 5 1 1 - 5 5 0 0 0 0 0 0 0 0 0 0 0 0 - 17 22 Dubuque St Reconstruction - Phase 3 Full reconstruction with curb and gutter from Cherry Street to Zeller Street.$3,087,920 North Liberty 5 1 1 - 5 5 0 0 0 0 0 0 0 0 0 0 0 0 - 17 23 1st Ave - Auburn Hills Dr to Auburn East Ln Roundabout Reconstruction of intersection into a roundabout with pedestrian facilities $1,450,000 Coralville 0 1 1 - 0 5 0 7 0 3 0 0 0 0 0 0 0 0 - 17 24 Hwy 6 (Park Rd to I-380)Grade & pave street, install curb, gutter and sidewalks or trails $1,160,000 Tiffin 0 2 1 - 5 5 0 0 0 3 0 0 0 0 0 0 0 0 - 16 25 Heartland Dr - Commercial Park to Commerce Dr 0.23 mile reconstruction of Heartland Dr from Commercial Park to Commerce Dr $812,000 Coralville 5 1 0 - 0 5 0 0 0 0 0 0 0 0 0 0 5 0 - 16 26 1st Ave & Oakdale Blvd Roundabout Reconstruction of intersection as a roundabout with pedestrian facilities $2,320,000 Coralville 5 1 1 - 0 5 0 0 0 3 0 0 0 0 0 0 0 0 - 15 27 Park Rd (Hwy 6 south to I-80) Phase One Grade & pave street, install curb, gutter and sidewalks or trails $5,800,000 Tiffin 5 1 1 - 0 5 0 0 0 3 0 0 0 0 0 0 0 0 - 15 28 Oakdale Blvd Extension 0.6 mile extension of Oakdale Blvd west of Jones Blvd $2,465,000 Coralville 5 1 1 - 0 0 0 0 0 3 0 0 0 0 0 0 5 0 - 15 29 12th Ave & Oakdale Blvd Intersection Reconstruct intersection as a roundabout $1,160,000 Coralville 5 1 1 - 0 5 0 0 3 0 0 0 0 0 0 0 0 0 - 15 30 Highway 6 & new Heartland Dr Intersection Extension of Heartland Dr to new intersection with Hwy 6. Turn lanes and traffic signal improvements $1,740,000 Coralville 5 2 1 - 0 0 0 0 0 0 0 0 0 0 0 0 5 0 - 13 Total Costs 2022-2030 $85,844,040 Estimated Funding $93,240,028 Remaining $7,395,988 TABLE 1: Fiscally Constrained Road and Bridge Projects 2022-2030 Entity ScoreSafety Goal 7 Health Goal 8 Equity Goal 9 ID $ Cost Estimate at Construction Project Title (Projects in RED have funding programmed in the TIP) Goal 5 Efficiency Choice Goal 6Goal 2 Environment Goal 1 Project Description (include type of project, location, length, etc.) Economic Opportunity 2022-2050 Long Range Transportation Plan - Federally Funded Transportation Infrastructure Needs List Goal 3 Goal 4 Goal 10 Quality of Life System Preservation Local Commitment 1A 1B 2A 2B 3A 4A 5A 5B 6A 6B 6C 7A 7B 7C 8A 8B 9A 9B 10 31 Burlington St Bridge - South This project is a replacement of the Burlington St bridge over the Iowa River that will also increase the number of lanes $36,966,400 Iowa City 5 2 2 - 5 5 0 0 3 3 3 7 7 0 0 0 5 0 - 47 32 Hwy 1/ 6 Intersection Reconstruction Reconstruction of the Hwy 1/ 6/ Riverside Dr intersection $8,360,000 Iowa City 5 2 2 - 0 5 0 0 3 3 3 0 7 0 3 5 5 0 - 43 33 Gilbert St/ US 6 Intersection Left Turn Lanes Reconstruct the intersection to include dual left turn lanes on Gilbert St $7,356,800 Iowa City 5 2 2 - 5 5 0 0 3 3 3 0 7 0 0 0 5 0 - 40 34 South Gilbert St Improvements Reconstruction from Benton St to Stevens Dr. This project does not include improvements to the Gilbert St. US 6 intersection $9,994,790 Iowa City 5 1 1 - 5 5 0 0 3 3 3 7 0 0 0 0 5 0 - 38 35 1st Ave & 1st St Intersection Traffic signals and pedestrian facilities $1,140,000 Coralville 5 2 1 - 5 5 0 0 3 0 3 0 0 0 0 0 5 0 - 29 36 Hwy 6 & relocated 2nd Ave Intersection Traffic signals and pedestrian facilities $1,140,000 Coralville 5 2 1 - 5 5 0 0 3 0 3 0 0 0 0 0 5 0 - 29 37 Sycamore St - East/ West Leg from "L" to South Gilbert St This project will reconstruct Sycamore St to arterial standards using the Complete Streets Policy. This phase will be the east/ west leg of Sycamore St $7,023,616 Iowa City 5 2 1 - 5 5 0 0 0 3 3 0 0 0 0 0 5 0 - 29 38 Hwy 6 & Lucas Ave Intersection Traffic signals, pedestrian facilities extending west on Hwy 6 $760,000 Coralville 5 2 1 - 0 5 0 7 0 0 3 0 0 0 0 0 5 0 - 28 39 Ireland Ave (Village Dr south to Frontage Rd south of I-80) Grade & pave street, install curb, gutter and sidewalks or trails and install center turn lane $4,180,000 Tiffin 5 2 1 - 5 5 0 7 0 3 0 0 0 0 0 0 0 0 - 28 40 1st Ave North Phase 3 0.6 mile reconstruction of 1st Ave between Rustic Ridge Rd and future Forevergreen Rd from a rural to urban cross section $2,128,000 Coralville 5 2 1 - 5 5 0 7 0 3 0 0 0 0 0 0 0 0 - 28 41 1st Ave North Phase 4 0.6 mile reconstruction of 1st Ave between Forevergreen Rd and Dubuque St $2,128,000 Coralville 5 2 1 - 5 5 0 7 0 3 0 0 0 0 0 0 0 0 - 28 42 Forevergreen Rd & Front St Roundabout Reconstruct intersection as a roundabout $1,900,000 Coralville 5 2 1 - 5 5 0 7 3 0 0 0 0 0 0 0 0 0 - 28 43 Forevergreen Rd & Ridgeway Dr Roundabout Reconstruct intersection as a roundabout $1,900,000 Coralville 5 2 1 - 5 5 0 7 0 0 3 0 0 0 0 0 0 0 - 28 44 Melrose Ave Preventative Maintenance Pavement repair within city limits $281,200 University Heights 5 1 0 - 5 5 0 7 3 0 0 0 0 0 0 0 0 0 - 26 45 Linn St Reconstruction - Burlington St to Iowa Ave Part of the Downtown Streetscape Master Plan, this project reconstructs Linn St from Burlington St to Iowa Ave. Project also improves sidewalk pavement, addresses critical update to water main, and replaces and relocates storm sewer between Washington St and Iowa Ave $4,470,624 Iowa City 5 1 1 - 5 5 0 0 0 3 0 0 0 0 0 0 5 0 - 25 46 1st Ave North Phase 2 0.5 mile reconstruction of 1st Ave (and North Liberty Rd) between Auburn East Ln and Rustic Ridge Rd NE $2,014,000 Coralville 5 2 1 - 0 5 0 7 0 3 0 0 0 0 0 0 0 0 - 23 47 1st Ave & Rustic Ridge Rd Roundabout Reconstruction of intersection into a roundabout with pedestrian facilities $1,520,000 Coralville 5 2 1 - 0 5 0 7 0 3 0 0 0 0 0 0 0 0 - 23 48 12th Ave & 10th St Intersection Turn lanes and traffic signals, or roundabout $1,520,000 Coralville 0 1 1 - 5 5 0 0 3 0 3 0 0 0 0 0 5 0 - 23 49 Oakdale Blvd Median and Turn Lane Improvements 0.32 mile of raised medians and turn lane improvement from Crosspark Rd to University Pkwy; creates ped refuge for North Ridge Trail crossing Oakdale Blvd.$760,000 Coralville 5 1 1 - 0 5 0 7 3 0 0 0 0 0 0 0 0 0 - 22 50 Hwy 6 (Roberts Ferry Rd to West City Limits Grade & pave street, install curb, gutter and sidewalks or trails and install center turn lane $5,320,000 Tiffin 5 2 1 - 5 5 0 0 0 3 0 0 0 0 0 0 0 0 - 21 51 Hwy 6/ Westcor Dr/ Kansas Ave Intersection Traffic signals, north leg addition, pedestrian facilities $760,000 Coralville 5 2 1 - 0 5 0 0 0 0 3 0 0 0 0 0 5 0 - 21 52 1st Ave and Russell Slade Blvd Roundabout Reconstruct intersection as a roundabout $2,280,000 Coralville 5 1 1 - 5 5 0 0 3 0 0 0 0 0 0 0 0 0 - 20 53 Heartland Dr & Commerce Dr Intersection Conversion to mini-roundabout, roundabout or traffic signals $912,000 Coralville 5 1 1 - 0 5 0 0 0 0 3 0 0 0 0 0 5 0 - 20 54 Oakdale Blvd & Brown Deer Rd Roundabout Reconstruct intersection as a roundabout $1,900,000 Coralville 5 1 1 - 5 5 0 0 0 0 3 0 0 0 0 0 0 0 - 20 55 10th St Reconstruction #1 0.42 mile reconstruction of 10th St from 12th Ave to 20th Ave $2,280,000 Coralville 0 1 1 - 5 5 0 0 3 0 0 0 0 0 0 0 5 0 - 20 56 10th St Reconstruction #2 0.24 mile reconstruction of 10th St from 20th Ave to 22nd Ave $1,140,000 Coralville 0 1 1 - 5 5 0 0 3 0 0 0 0 0 0 0 5 0 - 20 57 Sunset St Preventative Maintenance Pavement repair between Benton St and Melrose Ave $281,200 University Heights 5 1 0 - 5 5 0 0 3 0 0 0 0 0 0 0 0 0 - 19 58 Oakdale Blvd & Crosspark Rd Roundabout Reconstruct intersection as a roundabout with pedestrian facilities added across Oakdale Blvd $2,280,000 Coralville 5 1 1 - 0 5 0 0 3 0 3 0 0 0 0 0 0 0 - 18 59 Oakdale Blvd & University Pkwy Intersection Roundabout or traffic signal improvements $1,140,000 Coralville 5 1 1 - 0 5 0 0 3 0 3 0 0 0 0 0 0 0 - 18 60 Hwy 6 & Jones Blvd Intersection Pedestrian facilities to connect Jones Blvd shared use path to Clear Creek Trl $608,000 Coralville 5 2 - - 0 0 0 0 0 3 3 0 0 0 0 0 5 0 - 18 61 Roberts Ferry Rd Grade & pave street, install curb, gutter and sidewalks or trails from Ridgeway Dr north to City limits $6,840,000 Tiffin 5 2 1 - 0 5 0 0 0 3 0 0 0 0 0 0 0 0 - 16 62 Forevergreen Rd Extension .52 mile extension of Forevergreen Rd from Naples Ave NE to North Liberty Rd NE $4,560,000 Coralville 5 2 1 - 5 0 0 0 0 3 0 0 0 0 0 0 0 0 - 16 ID $ Cost Estimate at Construction ChoiceEntityProject Description (include type of project, location, length, etc.) Goal 7 EquityHealthProject Title TABLE 2: Fiscally Constrained Road and Bridge Projects 2031-2040 2022-2050 Long Range Transportation Plan - Federally Funded Transportation Infrastructure Needs List SafetyEfficiencyEnvironmentEconomic Opportunity Score Goal 9Goal 8Goal 6Goal 5Goal 1 Goal 2 63 Forevergreen Rd Extension Extension of Forevergreen Rd from 12th Avenue to Naples Ave NE $4,560,000 North Liberty 5 2 1 - 5 0 0 0 0 3 0 0 0 0 0 0 0 0 - 16 63 Iowa Ave Culvert Repair This project will repair a box culvert that carriers Ralston Creek under Iowa Ave $804,019 Iowa City 0 1 0 - 0 5 0 0 0 0 0 0 0 0 0 0 5 0 - 11 64 Deer Creek Rd Bridge over Clear Creek Bridge replacement $1,368,000 Coralville 5 1 0 - 0 5 0 0 0 0 0 0 0 0 0 0 0 0 - 11 65 Park Rd (1-80 to City Limits - includes Kansas Ave) Phase Two Grade & pave street, install curb, gutter and sidewalks or trails $4,560,000 Tiffin 0 2 1 - 0 5 0 0 0 3 0 0 0 0 0 0 0 0 - 11 66 12th Ave and Holiday Rd Roundabout and bridge over CRANDIC Full reconstruction at 12th Ave and Holiday Rd with replacement of bridge over CRANDIC Railroad to provide necessary offset of roundabout east of 12th Ave.$7,600,000 Coralville 0 1 1 - 0 5 0 0 3 0 0 0 0 0 0 0 0 0 - 10 Total Costs 2031-2040 $144,736,650 Estimated Funding $144,933,960 Remaining $197,310 Goal 3 Goal 4 Goal 10 Quality of Life System Preservation Local Commitment 1A 1B 2A 2B 3A 4A 5A 5B 6A 6B 6C 7A 7B 7C 8A 8B 9A 9B 10 67 Melrose Ave West Improvements Streetscape and stormwater improvements, utility relocations and construct bike lanes west of Sunset St (0.2 miles)$2,304,000 University Heights 5 1 1 - 5 5 0 7 3 3 3 0 0 0 0 0 0 0 - 33 68 5th St Reconstruction - 10th Ave to 12th Ave 0.15 mile reconstruction of 5th St from 10th Ave to 12th Ave $768,000 Coralville 5 1 1 - 5 5 0 0 3 3 3 0 0 0 0 0 5 0 - 31 69 Sunset St Improvements Streetscape and stormwater improvements, utility relocations and construct bike lanes south of Melrose Ave (0.35 miles)$1,651,200 University Heights 5 1 1 - 5 5 0 0 3 0 3 0 0 0 0 0 5 0 - 28 70 Melrose Ave Preventative Maintenance Pavement repair within city limits $451,200 University Heights 5 1 0 - 5 5 0 7 3 0 0 0 0 0 0 0 0 0 - 26 71 22nd Ave Reconstruction 0.45 mile reconstruction of 22nd Avenue between Hwy 6 and 10th St $3,840,000 Coralville 5 1 1 - 5 5 0 0 3 0 0 0 0 0 0 0 5 0 - 25 72 10th St Reconstruction #3 0.5 mile reconstruction of 10th St from 22nd Ave to 25th Ave $3,168,000 Coralville 5 1 1 - 5 5 0 0 3 0 0 0 0 0 0 0 5 0 - 25 73 Oakdale Blvd Reconstruction 1 mile reconstruction of Oakdale Blvd from 12th Ave to Crosspark Rd $7,680,000 Coralville 5 1 1 - 0 5 0 7 3 3 0 0 0 0 0 0 0 0 - 25 74 Gilbert St IAIS Underpass This project relocates the sidewalks of the Gilbert St underpass at the IAIS Railroad. The sidewalks are moved further from the street and existing erosion problems are addressed $1,205,453 Iowa City 5 1 0 - 5 5 0 0 3 0 0 0 0 0 0 0 5 0 - 24 75 12th Ave Reconstruction #1 0.5 mile reconstruction of 12th Avenue between 8th Street and I-80 $4,032,000 Coralville 0 1 1 - 5 5 0 0 3 0 3 0 0 0 0 0 5 0 - 23 76 12th Ave Reconstruction #2 0.4 mile reconstruction of 12th Ave between I-80 and Holiday Rd $3,840,000 Coralville 5 1 1 - 5 5 0 0 3 0 3 0 0 0 0 0 0 0 - 23 77 Holiday Rd Reconstruction #1 0.4 mile reconstruction of Holiday Rd between 1st Ave and Brown Deer Rd $3,840,000 Coralville 5 1 1 - 5 5 0 0 3 0 3 0 0 0 0 0 0 0 - 23 78 Holiday Rd Reconstruction #3 0.4 mile reconstruction of Holiday Rd from12th Ave to South Ridge Dr $3,840,000 Coralville 5 1 1 - 5 5 0 0 3 0 3 0 0 0 0 0 0 0 - 23 79 Sunset St Preventative Maintenance Pavement repair between Benton St and Melrose Ave $451,200 University Heights 5 1 0 - 5 5 0 0 3 0 0 0 0 0 0 0 0 0 - 19 80 Rohret Rd - Lake Shore Dr to City Limits This project will reconstruct Rohret Rd to urban standards $6,683,443 Iowa City 5 2 1 - 0 5 0 0 0 3 3 0 0 0 0 0 0 0 - 19 81 Hwy 6 & new 17th Ave Intersection Extension of 17th Ave to Hwy 6 with new turn lanes and traffic signals $1,440,000 Coralville 5 1 1 - 5 0 0 0 0 0 0 0 0 0 0 0 5 0 - 17 82 340th St (Kansas Ave to Ivy Ave)Grade and pave street, install curb, gutter and sidewalks or trails $7,680,000 Tiffin 5 2 1 - 0 5 0 0 0 0 0 0 0 0 0 0 0 0 - 13 83 Half Moon Ave (Hwy 6 north to approximately .5 mile north)Grade and pave street, install curb, gutter and sidewalks or trails $7,680,000 Tiffin 5 2 1 - 0 5 0 0 0 0 0 0 0 0 0 0 0 0 - 13 84 Holiday Rd Reconstruction #2 0.42 mile reconstruction of Holiday Rd between Brown Deer Rd and 12th Ave $4,032,000 Coralville 0 1 1 - 0 5 0 0 3 0 3 0 0 0 0 0 0 0 - 13 85 Rustic Ridge Rd Reconstruction 0.33 mile reconstruction of Rustic Ridge Rd from North Liberty Rd to Dubuque St $2,304,000 Coralville 5 2 1 - 0 5 0 0 0 0 0 0 0 0 0 0 0 0 - 13 86 Camp Cardinal Blvd Reconstruction 0.35 mile reconstruction of Camp Cardinal Blvd from Clear Creek to Hwy 6 $2,880,000 Coralville 5 1 1 - 0 5 0 0 0 0 0 0 0 0 0 0 0 0 - 12 87 Oakdale Blvd - Hwy 1 to Prairie Du Chien Rd This project would construct Oakdale Blvd from Hwy 1, west to Prairie Du Chien Rd $30,375,936 Iowa City 5 2 1 - 0 0 0 0 0 3 0 0 0 0 0 0 0 0 - 11 88 Oakdale Blvd - Hwy 1 to Scott Blvd This project would construct an extension north across I-80 to a new intersection with Iowa Hwy 1 $55,296,000 Iowa City 5 2 1 - 0 0 0 0 0 3 0 0 0 0 0 0 0 0 - 11 89 Village Dr (Ireland Ave to Half Moon Ave) Grade and pave street, install curb, gutter and sidewalks or trails $13,440,000 Tiffin 5 2 1 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -8 90 Traffic Signal Pre-Emption System This project will install a city-wide Geographic Information System (GIS) based traffic signal pre-emption system for emergency vehicles.$4,501,094 Iowa City - - - - -- - - - - - - - - - - - --0 Total Costs 2041-2050 $173,383,526 Estimated Funding $173,459,431 Remaining $75,905 2022-2050 Long Range Transportation Plan - Federally Funded Transportation Infrastructure Needs List ScoreEconomic Opportunity Environment Efficiency Choice Safety Health Equity Goal 1 TABLE 3: Fiscally Constrained Road and Bridge Projects 2041-2050 $ Cost Estimate at Construction Goal 2 Goal 5 Goal 6 Goal 7 Goal 8 Goal 9 EntityProject Description (include type of project, location, length, etc.)Project TitleID Goal 3 Goal 4 Goal 10 Quality of Life System Preservation Local Commitment 1A 1B 2A 2B 3A 4A 5A 5B 6A 6B 6C 7A 7B 7C 8A 8B 9A 9B 10 1 Hwy 6 Trail Construction Construct a 10' trail along Highway 6 between Broadway St and Fairmeadows Blvd $4,524,000 Iowa City 5 2 - - 5 5 0 0 3 3 3 7 0 0 0 5 5 0 9 52 2 North Liberty Rd Trail Improvement Construction of 8' wide trail from along the south side Penn St and south and west side of North Liberty Rd $1,239,840 North Liberty 5 1 - - 5 0 0 7 0 3 3 0 0 0 0 0 0 0 5 29 3 Clear Creek Trail Connection 0.34 mile trail connection on Camp Cardinal Blvd from Highway 6 to the Tom Harkin Trailhead $416,000 Coralville 5 1 - - 0 0 0 0 0 3 3 7 0 0 0 0 5 0 3 27 Total Costs 2022-2030 $6,179,840 Estimated Funding $8,157,692 Remaining $1,977,852 Goal 3 Goal 4 Goal 10 Quality of Life System Preservation Local Commitment 1A 1B 2A 2B 3A 4A 5A 5B 6A 6B 6C 7A 7B 7C 8A 8B 9A 9B 10 4 Iowa River Trail - Benton St to Sturgis Park Extend the Iowa River Trail from Benton Street to Sturgis Park on the west side of the Iowa River $3,981,306 Iowa City 5 1 - - 0 0 0 0 3 3 0 7 7 0 3 0 5 0 -34 5 Iowa River Corridor 'Gateway' Trail Segment Construct a 10' trail between Park Rd (south) to The University of Iowa pedestrian bridge $760,000 Iowa City 5 1 - - 5 0 0 0 3 3 0 7 0 0 0 5 5 0 -34 6 Old Hwy 218 Trail Construct 1.2-mile mile of sidepath on the west side of Old Hwy 218 south of the Mormon Trek Blvd/ McCollister Blvd intersection with an underpass at the intersection of Old Hwy 218 and Oakcrest Hill Rd. $1,824,000 Johnson County 5 2 - - 0 0 0 0 3 3 0 7 0 0 3 0 5 0 -28 7 Old Hwy 218 Trail/ Wide Sidewalk This project will construct an 8' wide sidewalk adjacent to Old Hwy 218 between Sturgis Ferry Park and McCollister Blvd $1,605,120 Iowa City 5 1 - - 0 0 0 0 3 3 0 7 0 0 3 0 5 0 -27 8 Herbert Hoover Hwy Trl Construct 1 mile of sidepath on the south side of Herbert Hoover Hwy/F44 connecting the current sidepath ending on the east side of Thunder Gulch Rd.$1,520,000 Johnson County 5 2 - - 0 0 0 7 0 3 0 0 0 0 3 0 5 0 -25 9 North Ridge Trail Reconstruction Reconstruct 0.25 miles of North Ridge Trail immediately south of Forevergreen Rd $380,000 Coralville 5 1 - - 0 5 0 0 0 3 0 0 0 0 0 5 0 0 -19 10 Morrison Creek Trail Shared use path extension along east side of Morrison Creek from 5th St to 10th St, with pedestrian bridge connection to Applewood Trail north of 8th St $1,026,000 Coralville 5 1 - - 5 0 0 0 0 3 0 0 0 0 0 0 5 0 -19 11 Forevergreen Rd Pedestrian Railroad Crossing Add shared use path crossing of CRANDIC Railroad on south side of Forevergreen Rd $190,000 Coralville 5 1 - - 0 0 0 7 0 3 0 0 0 0 0 0 0 0 -16 12 Trail south on Ireland Ave (Clear Creek Trail to Villages Development) Grade and pave .50 trail extension along Ireland Ave to Villages Development $410,400 Tiffin 5 1 - - 5 0 0 0 0 3 0 0 0 0 0 0 0 0 -14 13 Trail south on Ireland Ave (Railroad to Clear Creek Trail) Grade and pave .25 mile trail extension along Ireland Ave to connect to Clear Creek Trail $380,000 Tiffin 5 1 - - 5 0 0 0 0 3 0 0 0 0 0 0 0 0 -14 14 Trail Reconstruction - Coralville Zone 1 Reconstruction of trails in Zone 1. Zone 1 is located east of 12th Ave and south of I-80. Total length: 1.5 miles $1,368,000 Coralville 1 0 - - 1 5 0 0 3 0 0 0 0 0 0 0 3 0 -13 15 Trailhead at Ireland Grade and pave trailhead $76,000 Tiffin 0 1 - - 0 5 0 0 0 0 0 0 0 0 0 0 0 0 -6 Total Costs 2031-2040 $13,520,826 Estimated Funding $14,011,230 Remaining $490,404 Goal 1 Goal 2 Goal 5 Goal 6 Goal 8 Goal 9 ScoreEconomic Opportunity Environment Efficiency Choice Safety Health Equity Goal 7 ID Project Title Project Description (include type of project, location, length, etc.) $ Cost Estimate at Construction Entity Goal 2 Goal 5 Goal 6 Goal 8 Goal 9 ScoreEconomic Opportunity Environment Efficiency Choice Safety Health Equity Goal 7 Entity Goal 1 ID Project Title (Projects in RED have funding programmed in the TIP) TABLE 1: Fiscally Constrained Bike and Pedestrian Projects 2022-2030 Project Description (include type of project, location, length, etc.) $ Cost Estimate at Construction 2022-2050 Long Range Transportation Plan - Federally Funded Transportation Infrastructure Needs List TABLE 2: Fiscally Constrained Bike and Pedestrian Projects 2031-2040 Date: To: From : Re : Metropolitan Planning Organization of Johnson County May 11 , 2021 Transportation Technical Advisory Committee Emily Bothell~r. Associate Transportation Planner Agenda item #7: Update on Federal Functional Class designations for urbanized area roadways In January the Urbanized Area Policy Board (UAPB) unanimously approved amending the Federal Functional Classification (FFC) system map to include 7 .12 miles of roadways as shown in Table 1 and to forward the request to the Iowa Department of Transportation (DOT) and Federal Highway Administration (FHWA) for final approval. The amendments were approved in April and the attached map depicts the changes . Only 35% of the total road mileage in the Iowa City Urbanized Area can be listed on the FFC system . With the approved amendments, the total road mileage listed on the FFC system in the Iowa City urbanized area equals 167.04 miles or 33%. The FFC updates can be seen on the Iowa Highway Networks at: http://iowadot.maps .arcgis.com/apps/MapSeries/index.html?appid=ee5e09b37329492587f8dd4 dca4f8e75 . I will be available at your May 18th meeting to answer any questions you may have.